    CONSTRUCTION BULLETIN 

    Sample Project of The onth

  • 8/16/2019 Sample Project of the Month 01

    2/46

    About The Publication

    Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f   65 6538 6896 Email: [email protected] Website: www.bciasia.com 

    BCI Asia Construction Bulletin i

    The BCI Asia Construction Bulletin - INDONESIA R071207 is published by:

    BCI Asia Construction Information Pte Ltd371 Beach Road, KeyPoint #02-25, Singapore 199597

    65 6538 6836 f 65 6538 6896 Email  [email protected] Website www.bciasia.com

    Other offices:

    JakartaSurabayaBangkokHanoiHo Chi Minh CityHong KongKuala LumpurManilaSydney 

    6221 5790 2930 6231 8293056844 537 8548

     

    662 651 8600

    848 997 4220 852 2538 0011603 7661 1380632 884 1122612 9432 4100 

    f 6221 5790 2933/34 f   6231 8293057 f 844 537 8549 f   662 651 8606 

    f   848 997 4150 f 852 2875 0511 f 603 7661 1381 f 632 884 1121 f   612 9432 4111 

    E-mail: [email protected]: [email protected]: [email protected]: [email protected]: [email protected]: [email protected]: [email protected]: [email protected]: [email protected]

    THE PUBLICATION 

     BCI Asia Construction Bulletin  reports on building and construction projects in Southeast Asia, Hong Kong, and Macau.Projects are researched locally by highly qualified in-house research staff. Projects are monitored from their inception throughvarious phases of planning, design, tender and contract award through to early construction.

    PROJECT CATEGORIES 

    Projects are classified into 19 categories for easier reference. Categories are defined as follows:

    Car Parks  Major car parks, approximately 50 bays or more.  Community  Child care centres, kindergartens, churches, mosques, temples, funeral parlours and cemeteries, libraries,

    community halls, meeting rooms, fire stations. Education  Universities, colleges, schools, research centres and any buildings that have an educational

    function. Exhibition  Conference centres and exhibition halls. Health  Hospitals, medical centres, surgeries (doctor/dental), pathology centres. Hotel  Hotels, serviced apartments, motels, hostels and other forms of tourist accommodation. Industrial  Factories, plants, workshops, warehouses and any other manufacturing and processing

    facilities. 

    Infrastructure  Roads, bridges, civil works, waterways, marinas, piers pipelines, subdivisions and tunnels.  Landscaping  Significant landscaping component.  Legal  Law courts, police stations and prisons.  Mining  Mines (e.g. coal, gold, tin, copper) excluding oil and gas. Office  Commercial and public offices. Oil and Gas  Oil and gas exploration and production.  Recreation  Sporting stadiums, sporting fields with clubrooms, swimming pools, tennis courts, cinemas,

    theme parks, tourist attractions, clubs, pubs, museums, art galleries and gardens.  Residential  Apartments, townhomes, retirement homes, residential estates and houses. Retail Shopping centres, supermarkets, shops, restaurants and cafes.  Township  Urban development. Transport  Control towers, freight/passenger terminal buildings and bus/rail interchanges. Utilities  Water and sewerage plants, pipelines, telecommunications and power plants. 

    PROJECT STAGES

    Projects are listed in order of their stage of development. Stages are defined as follows:

    Competition  Architectural, interior and other construction-related design competitions Concept  Concept or schematic design is underway Design  Project plans are being drafted for planning approval Documentation  Specification and working drawings are being drafted Tender  Bids are being called for Main Contractor  Post Tender  Tender has closed Construction  Main Contractor has commenced work on site. Main Contract Awarded or Subcontract(s) Tender

    Or Subcontract(s) Awarded 

    Copyright ©  2013 BCI Asia Construction Information Pte Ltd. No part of this publication may be reproduced, stored in a retrievalsystem, or transmitted in any form, or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior

    written permission of the publisher. All rights reserved. Printed in Singapore by BCI Asia Construction Information Pte Ltd. MICA (P) No.045/04/2009. Disclaimer: Every effort is made to ensure that information in this publication is accurate. However, noresponsibility will be taken for any errors which may inadvertently occur. 

  • 8/16/2019 Sample Project of the Month 01

    3/46

    About The Publication

    Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f   65 6538 6896 Email: [email protected] Website: www.bciasia.com 

    BCI Asia Construction Bulletin ii

    HOW TO READ A BCI ASIA CONTRUCTION BULLETIN

    A typical page from BCI Asia Construction Bulletin. Illustrating the features and benefits. The simple concise lay out is easyto read and user friendly.

    THE BCI ASIA QUALITY PROMISE

    Every project presented in BCI Asia Construction Bulletin

      has been research and personally or orally confirmed by a member of the BCI Asia research staff

      features at least one key decision maker with full contact details

      certain jobs or contracts that are yet to be assigned

     No project is included in BCI Asia Construction Bulletin unless it meets these minimum requirements.

    1. The type of project bymajor category, e.g. hostel,industrial , retail, office allowsthe user to identify the projectsmost relevant to him. 2. The stage of the project gives up-to-dateinformation on how far the

     project has advanced.

    6. The constructiontimetable  –  allows the userto stage his sales priorities

    8. The key contacts  –   participants in the decisionmaking process. With thislist of verified names,

    addresses and telephonenumbers, the user can savecountless hours ofsearching and can gostraight to making contactto win new business

    3. The project code- is aunique code for each project

    allowing the user to track the progress of a project, to add

    new information overtime andto assign the project

    to a specific salesrepresentative.

    5. Details of the project- provided in English and

    Indonesian –  containup-to-date and accurate

    information on the

     project –  thoroughlyresearched and updated

    whenever there isa significant changed

    in the deve lopment

    7. The Developer  –  often themost critical decision maker

    when it comes to aconstruction

    contact.

    9. The next tender to beawarded, typically the main

    contractor, who is invited to bid. At the later stage, the

    appointed contractor isannounced as a key contact

    for interested sub-contractors.

    4. The project nameand address  –  allowsquick and reliable

    reference at a glance 

  • 8/16/2019 Sample Project of the Month 01

    4/46

    Sample Project of The Month

    Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f   65 6538 6896 Email: [email protected] Website: www.bciasia.com 

    BCI Asia Construction Bulletin 1

    PROJECT CATEGORY

    Education and Research/ Industrial

    PROJECT STAGE PROJECT CODE

    Competition 144374002

    BALAI PENDIDIKAN DAN PELATIHAN ILMU

    PELAYARAN (BP2IP) SUMATERA BARAT (PHASE 5) Desa Nagari Tapakis, Kecamatan Ulakan, Padang

    Pariaman, West Sumatera 

    ● 2 x 3 storey training centre buildings (approx. 12,000sq m)

    ● 30 classrooms

    ● Workshops● Practical rooms

    Building elements include:● Flooring : ceramic tile● Structural : reinforced concrete● Ceiling : gypsum board● Walling : light brick walls

    ● Roofing : concrete roof tile● Roof truss : steel frame● Aluminium framed doors & windows / solid wood

    doors 

    Estimated cost: Rp50.46 bn (US$3.65 mn). 

    Construction is expected to start in June 2016. Construction isexpected to end in late December 2016.

     Pembangunan 2 gedung balai pelatihan dan pendidikan 3lantai dengan luas bangunan sekitar 12.000 meter persegi.

     Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkanmulai Juni 2016 dan selesai Desember 2016.  

    Government Implementing Agency KementerianPerhubungan - Badan Pengembangan Sumber Daya Manusia(BPSDM) Perhubungan Contact  Mr Wahyu Satrio Utomo, SH, M.Si (Head Officer) 

    62 21 386 5064 f 62 21 384 7480Email: [email protected] Website: www.bpsdm.dephub.go.id  Jalan Medan Merdeka Timur No. 5, Jakarta Pusat, 10110,

    Jakarta, Indonesia

    Contact  Mr Drs Ridwan Setiawan M.Si, M.Mar.E (KepalaPusat Pengembangan Sumber Daya Manusia PerhubunganLaut) 

    62 21 386 5064 f 62 21 384 7480Email: [email protected] Website: www.bpsdm.dephub.go.id 

     Jalan Medan Merdeka Timur No. 5, Jakarta Pusat, 10110,Jakarta, Indonesia

    Interior Designer  To be appointed Remarks: The tenderers are listed in alphabetical order. 

    Bidders include: 

    BALAI PENDIDIKAN DAN PELATIHAN ILMU

    PELAYARAN (BP2IP) SUMATERA BARAT (PHASE 5)

    (continued...)

    Adhika Karsa Pratama PT Contact  Mr Ir. R. Hananto (Director) 

    62 21 314 7774 f 62 21 314 1923Email: [email protected] Website: adhikakarsapratama.co.id 

     Jalan Cimandiri No. 6, Flat 1, Lantai 3, Cikini, JakartaPusat, 10330, Jakarta, Indonesia 

    Asri Desindo Intiwidya PT Contact  Mr Wahyu Kristianto (Director - Project Architect) 

    62 21 765 2061 / 7652064

    f 62 21 765 2065

    Email: [email protected] Website: www.pt-adi.co.id 

     Jalan Ciputat Raya No. 12A, Pondok Pinang, KebayoranLama, Jakarta Selatan, 12310, Jakarta, Indonesia 

    Desigram Reka Matra PT Contact  Mr Hardi (Project Coordinator) 

    62 21 8370 6703 f 62 21 8370 6703Email: [email protected] 

     Gedung Gajah Lantai 3A, Jalan Dr Sahardjo, JakartaSelatan, 12840, Jakarta, Indonesia 

    Mitra Fitrah Alam PT Contact  Mr Muhamamd Djabir Hasan (Director) 

    62 21 8591 7656 f  Not available Rukan Business Park Kirana Cawang Blok 33 Lantai 3,Jalan Mayjen D.I. Panjaitan Kavling 48, Jakarta Timur, 13340,Jakarta, Indonesia 

    Yodya Karya (Persero) PT Contact  Mr Colbert Thomas Pangaribuan (PresidentDirector) 

    62 21 8590 5107 / 8193951

    f 62 21 8591 2134

    Email: [email protected] Website: www.yoka.co.id  

     Gedung STT Sapta Taruna 6th Floor, Jalan D.I. PanjaitanKavling 12, Cawang, Jakarta Timur, 13340, Jakarta, Indonesia

    Construction Manager  To be appointed Remarks: The tenderers are listed in alphabetical order. 

    Bidders include: 

  • 8/16/2019 Sample Project of the Month 01

    5/46

  • 8/16/2019 Sample Project of the Month 01

    6/46

    Sample Project of The Month

    Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f   65 6538 6896 Email: [email protected] Website: www.bciasia.com 

    BCI Asia Construction Bulletin 3

    JATIDIRI SPORTS CENTRE - SEKOLAH KHUSUS

    OLAHRAGA (continued...)

    Architect  To be appointed Remarks: Qualification : Non small scale business.Qualification method : Pre-qualification. The aanwijzing(tender explanation) is scheduled on 28 December 2015. 

    Tender opens on 23 December, 2015 and closes on 29December, 2015.

    Tender Office Dinas Pemuda dan Olahraga Propinsi JawaTengah Contact  Mr Agus Prasutio, SH (Member of Tender

    Committee - Pejabat Pelaksana Teknik Kegiatan (PPTK)) 62 24 841 9956 f 62 24 841 9959

    Website: dinpora.jawatengah.go.id 

     Jalan Ki Mangunsarkoro No.12, Semarang, 50241, CentralJava, Indonesia

    Contractor  To be appointed

    PROJECT CATEGORY

    Education and Research/ Office

    PROJECT STAGE PROJECT CODE

    Competition 145279002

    LABORATORIUM PENGUJIAN PENCEGAHAN DAN

    PEMBERANTASAN PENYAKIT (P2P) Dusun Karanganyar, Desa Wonosari, Kecamatan Tutur,

    Nongkojajar, Kabupaten Pasuruan, East Java 

    ● 3 storey laboratory building (approx. 5,000 sq m)● Equipment storage● Observation room 

    Estimated cost: undisclosed. 

    Construction is expected to start in early May 2016.

    Construction is expected to end in late September 2016.

     Bangunan laboratorium 3 lantai dengan luas bangunan

     sekitar 5.000 meter persegi. Perkiraan biaya: tidakdinyatakan . Konstruksi diharapkan mulai Mei 2016 dan selesai September 2016. 

    Government Implementing Agency Balai Besar TeknikKesehatan Lingkungan dan Pengendalian Penyakit Surabaya  Contact  Mr Zainal Ilyas Nampira, SKM.,M. Kes. (HeadOfficer) 

    62 31 354 0189 / 3540191

    f 62 31 352 8847

    Email: [email protected] Website: www.btklsby.go.id 

     Jalan Sidoluhur No. 12 (Indrapura), Surabaya, 60175, EastJava, Indonesia

    Contact  Mr Wahyu Hari Himawan (Kasubag Bina Program) 62 31 354 0189 / 3540191

    f 62 31 352 8847

    Email: [email protected] Website: www.btklsby.go.id  Jalan Sidoluhur No. 12 (Indrapura), Surabaya, 60175, EastJava, Indonesia

    Supervisory Consultant  To be appointed

    Architect  To be appointed Remarks: Qualification : Small scale business. Qualificationmethod : Pre-qualification. The aanwijzing (tenderexplanation) is scheduled on 29 December 2015. 

    Tender opens on 28 December, 2015 and closes on 04 January,2016.

    Tender Office Balai Besar Teknik Kesehatan Lingkungandan Pengendalian Penyakit Surabaya Contact  Mr Ronny Koesnariyanto, ST, M.Kes. (Head ofTender Comittee) 

    62 31 354 0189 / 354

    0191

    f 62 31 352 8847

    Email: [email protected] Website: www.btklsby.go.id  Jalan Sidoluhur No. 12 (Indrapura), Surabaya, 60175, EastJava, Indonesia

  • 8/16/2019 Sample Project of the Month 01

    7/46

    Sample Project of The Month

    Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f   65 6538 6896 Email: [email protected] Website: www.bciasia.com 

    BCI Asia Construction Bulletin 4

    LABORATORIUM PENGUJIAN PENCEGAHAN DAN

    PEMBERANTASAN PENYAKIT (P2P) (continued...)

    Contractor  To be appointed

    PROJECT CATEGORY

    Residential/ Retail/ Recreation

    PROJECT STAGE PROJECT CODE

    Concept 144893002

    BANDUNG CENTRAL PARK  

    Site yet to be determined, Bandung, West Java 

    ● 2 x 27 storey apartment buildings (approx. 50,000 sqm)

    ● Ground floor retail shops & restaurants● Children playground● Apartment lobby & reception lounge 

    Estimated cost: undisclosed. 

    Construction is expected to start in early June 2017.

    Construction is expected to end in late December 2019.

     Apartemen 27 lantai dengan luas bangunan sekitar 50.000

    meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksidiharapkan mulai Juni 2017 dan selesai Desember 2019.  

    Developer Jabar Bumi Konstruksi PT Contact  Mr Ir Wibowo (Director) 

    62 22 250 1426 f 62 22 250 1426Email: [email protected] Website: jabarbumikonstruksi.co.id 

     Jalan Sidomulya No. 39, Bandung, 40123, West Java,Indonesia

    Contact  Mr Hidayat Karim (Project Manager) 62 22 250 1426 f 62 22 250 1426

    Email: [email protected] Website: jabarbumikonstruksi.co.id  Jalan Sidomulya No. 39, Bandung, 40123, West Java,Indonesia

    Conceptual Designer Jabar Bumi Konstruksi PT Contact  Mr Ir Matheus (Operational Director) 

    62 22 250 1426 f 62 22 250 1426Email: [email protected] Website: jabarbumikonstruksi.co.id 

     Jalan Sidomulya No. 39, Bandung, 40123, West Java,

    Indonesia

    Architect  To be appointed

    Structural Engineer  To be appointed

    Mechanical & Electrical Engineer  To be appointed

    Contractor  To be appointed

  • 8/16/2019 Sample Project of the Month 01

    8/46

    Sample Project of The Month

    Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f   65 6538 6896 Email: [email protected] Website: www.bciasia.com 

    BCI Asia Construction Bulletin 5

    PROJECT CATEGORY

    Residential/ Hotel/ Car Park/ Retail/ Recreation

    PROJECT STAGE PROJECT CODE

    Concept 145339002

    CONDOTEL AT JALAN KOMBES POL M. DURYAT 

    Jalan Kombes Pol M. Duryat, Surabaya, East Java 

    ● 20 storey apartment & hotel building (approx. 18,210sq m)

    ● 6 multi storey car park (approx. 4,200 sq m)● Up to 350 apartment units & hotel rooms● Lobby & reception lounge

    ● Ground floor retail shops & restaurants● Swimming pool

    ● Gymnasium, fitness centre

    Building elements include:● Flooring : ceramic tile / homogeneous tile● Structural : reinforced concrete● Ceiling : gypsum board / acoustical ceiling

    ● Walling : precast concrete panel● Facade : glass wall cladding / decorative cladding● Aluminium framed doors & windows / solid wood

    doors● Roofing : concrete slab roof● Lifts● Duct connected air conditioning / split type air

    conditioning● Fire protection system

    ● Security system● Sanitary ware / plumbing● Building automation system 

    Estimated cost: Rp133.30 bn (US$9.65 mn). 

    Construction is expected to start in early March 2017.Construction is expected to end in early December 2017.

     Kondotel 20 lantai dan 6 lantai gedung parkir dengan totalluas bangunan sekitar 22.410 meter persegi. Perkiraan

    biaya: tidak dinyatakan. Waktu konstruksi belum ditentukan 

    Hotel Operator  To be appointed

    Architect Piter Gan Architect PT - Jakarta Contact  Mr Piter Gan (Director) 

    62 21 765 1781 f 62 21 765 2875Email: [email protected] Website: www.pitergan.com/ 

     Jalan Pangeran Antasari No. 10B, Cipete Selatan, JakartaSelatan, 12150, Jakarta, Indonesia

    Contact  Mr Raymond Wibisono (Architect) 62 21 765 1781 f 62 21 765 2875

    Email: [email protected] Website: www.pitergan.com/  Jalan Pangeran Antasari No. 10B, Cipete Selatan, Jakarta

    Selatan, 12150, Jakarta, Indonesia

    Structural Engineer  To be appointed

    CONDOTEL AT JALAN KOMBES POL M. DURYAT

    (continued...)

    Mechanical & Electrical Engineer  To be appointed

    Quantity Surveyor  To be appointed

    Contractor  To be appointed

  • 8/16/2019 Sample Project of the Month 01

    9/46

  • 8/16/2019 Sample Project of the Month 01

    10/46

    Sample Project of The Month

    Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f   65 6538 6896 Email: [email protected] Website: www.bciasia.com 

    BCI Asia Construction Bulletin 7

    PROJECT CATEGORY

    Hotel/ Retail/ Recreation

    PROJECT STAGE PROJECT CODE

    Concept 145461002

    HARPER HOTEL SOLO (4 STARS) 

    Site yet to be determined, Surakarta, Central Java 

    ● 10 storey hotel building (approx. 6,600 sq m)

    ● up to 150 hotel rooms● Hotel lobby & reception area● Dining & restaurant● Swimming pool

    ● Single basement level car park  

    Estimated cost: undisclosed. 

    Construction is expected to start in late June 2016. Acompletion date is to be determined. 

     Bangunan hotel 10 lantai dan satu level basement, denganluas bangunan sekitar 6.600 meter persegi. Perkiraan biaya:tidak dinyatakan. Konstruksi diharapkan mulai Juni 2016.Waktu penyelesaian belum ditentukan. 

    Hotel Operator Archipelago International (formerly AstonInternational Indonesia) Contact  Ms Nurulita Amalia (Corporate Director ofPurchasing) 

    62 21 831 8800 f 62 21 831 7180Website: www.archipelagointernational.com  Wisma Staco, 3rd Floor Suite 100, Jalan CasablancaKavling 18, Jakarta Selatan, 12870, Jakarta, Indonesia

    Contact  Mr William Cornellius (Head of Project Department- Design Coordinator) 

    62 21 831 8800 f 62 21 831 7180Email: [email protected] Website: www.archipelagointernational.com 

     Wisma Staco, 3rd Floor Suite 100, Jalan CasablancaKavling 18, Jakarta Selatan, 12870, Jakarta, Indonesia

    Architect  To be appointed

    Structural Engineer  To be appointed

    Mechanical & Electrical Engineer  To be appointed

    Contractor  To be appointed

    PROJECT CATEGORY

    Hotel/ Retail/ Recreation/ Car Park

    PROJECT STAGE PROJECT CODE

    Concept 144916002

    HOTEL AT JALAN PEMUDA - SURABAYA 

    Jalan Pemuda No. 17, Surabaya, East Java 

    ● 19 storey hotel (approx 26,500 sq m)

    ● Up to 180 hotel rooms● Hotel lobby & reception lounge● Dining & restaurant● Banquet & function room

    ● Swimming pool● At grade car park

    Building elements include:● Flooring : ceramic tile / homogeneous tile● Structural : reinforced concrete● Ceiling : gypsum board / acoustical ceiling● Walling : light brick walls

    ● Facade : glass wall cladding / aluminium compositecladding

    ● Roofing : concrete slab roof● Aluminium framed doors & windows / fabricated

    wood doors● Piling : bored pile / precast pile / tube pile● Lifts

    ● Duct connected air conditioning● Fire protection system

    ● Security system● Sanitary ware● Building automation system 

    Estimated cost: undisclosed. 

    Construction is expected to start in early September 2016.Construction is expected to end in early September 2017.

     Bangunan hotel 19 lantai dengan luas bangunan sekitar26.500 meter persegi. Perkiraan biaya: tidak dinyatakan.

     Konstruksi diharapkan mulai September 2016 dan selesaiSeptember 2017. 

    Hotel Operator  To be appointed

    Architect Piter Gan Architect PT - Jakarta Contact  Mr Piter Gan (Director) 

    62 21 765 1781 f 62 21 765 2875Email: [email protected] Website: www.pitergan.com/  Jalan Pangeran Antasari No. 10B, Cipete Selatan, JakartaSelatan, 12150, Jakarta, Indonesia

    Contact  Mr Raymond Wibisono (Architect) 62 21 765 1781 f 62 21 765 2875

    Email: [email protected] Website: www.pitergan.com/ 

     Jalan Pangeran Antasari No. 10B, Cipete Selatan, JakartaSelatan, 12150, Jakarta, Indonesia

    Structural Engineer  To be appointed

  • 8/16/2019 Sample Project of the Month 01

    11/46

    Sample Project of The Month

    Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f   65 6538 6896 Email: [email protected] Website: www.bciasia.com 

    BCI Asia Construction Bulletin 8

    HOTEL AT JALAN PEMUDA - SURABAYA (continued...)

    Mechanical & Electrical Engineer  To be appointed

    Quantity Surveyor  To be appointed

    Contractor  To be appointed

    PROJECT CATEGORY

    Education and Research

    PROJECT STAGE PROJECT CODE

    Concept 142564002

    INSTITUT AGAMA ISLAM NEGERI (IAIN)

    TULUNGAGUNG - FAKULTAS SYARIAH DAN ILMU

    HUKUM (FASIH) 

    Jalan Mayor Sujadi Timur No. 46, Tulungagung, East

    Java 

    ● 4 storey campus building (approx 4,500 sq m)● Classrooms

    ● Lecturer rooms● Administration room

    Building elements include:● Flooring : ceramic tile● Structural : reinforced concrete● Ceiling : gypsum board● Walling : light brick walls

    ● Roofing : concrete roof tile● Roof truss : steel frame● Aluminium framed doors & windows / fabricated

    wood doors● Sanitary ware / plumbing 

    Estimated cost: undisclosed. 

    Construction is expected to start in late August 2016.

    Construction is expected to end in late December 2016.

    Gedung kampus 4 lantai terdiri dengan luas bangunan sekitar

    4.500 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Agustus 2016 dan selesai Desember 2016. 

    Developer Institut Agama Islam Negeri Tulungagung Contact  Mr Saifudin Zuhri (Wakil Rektor BidangAdministrasi Umum, Keuangan & Perencanaan) 

    62 355 321 513 f 62 355 321 656Email: [email protected] Website: www.iain-tulungagung.ac.id  Jalan Mayor Sujadi Timur No. 46, Plosokandang,

    Tulungagung, 66221, East Java, Indonesia

    Supervisory Consultant  To be appointed

    Architect Alco Art Studio Consultant PT Contact  Mr Ir. Gunawan ,MT, IAI (Director - PrincipalArchitect) 

    62 31 847 0138 / 8410149

    f 62 31 841 0149

    Email: [email protected]  Jalan Sidosermo PDK VA Kavling 45, Surabaya, 60239,East Java, Indonesia

    Contact  Mr Ir. Mohamad Sjamsul Arifin (Team Leader) 

    62 31 847 0138 / 8414549

    f 62 31 841 4549

    Email: [email protected]  Jalan Sidosermo PDK VA Kavling 45, Surabaya, 60239,East Java, Indonesia

  • 8/16/2019 Sample Project of the Month 01

    12/46

    Sample Project of The Month

    Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f   65 6538 6896 Email: [email protected] Website: www.bciasia.com 

    BCI Asia Construction Bulletin 9

    INSTITUT AGAMA ISLAM NEGERI (IAIN)

    TULUNGAGUNG - FAKULTAS SYARIAH DAN ILMU

    HUKUM (FASIH) (continued...)

    Construction Manager Etika Prana PT Contact  Mr Chasan Hindaroh (Director - Project Coordinator) 

    62 31 594 2677 / 5941598

    f 62 31 594 1598

    Email: [email protected] 

     Jalan Mojoklanggru Wetan IV - A No. 20 - 21, Surabaya,60285, East Java, Indonesia

    Contact  Mr Iqbal Ibnu Rosyid (Team Leader) 62 31 594 2677 / 594

    1598

    f 62 31 594 1598

    Email: [email protected]  Jalan Mojoklanggru Wetan IV - A No. 20 - 21, Surabaya,60285, East Java, Indonesia

    Contractor  To be appointed

    PROJECT CATEGORY

    Utilities/ Infrastructure

    PROJECT STAGE PROJECT CODE

    Concept 121308002

    JAWA 7 COAL POWER PLANT (2 X 1,000 MW) IPP -

    BANTEN Desa Terate, Kecamatan Kramatwatu, Serang, Banten 

    ● Coal fired steam power plant (capacity of 2 x 1,000MW)

    ● Turbine house● Boiler house with steel structure

    ● Chimney● Electrical system

    ● Jetty & trestle●

    Oil tanks● Seal pit● Coal handling system● Cooling water system 

    Estimated cost: undisclosed. 

    Construction is expected to start in early June 2017.Construction is expected to end in early January 2019.

     Pembangkit listrik tenaga uap batubara dengan kapasitas 2 x1.000 megawatt. Perkiraan biaya : tidak dinyatakan. Konstruksi diharapkan mulai Juni 2017 dan selesai Januari2019. 

    Concessionaire Pembangkitan Jawa Bali PT Contact  Mr Mulyo Adji (Development & CommercialDirector) 

    62 31 828 3180 - 8283186

    f 62 31 829 1280

    Email: [email protected] Website: www.ptpjb.com 

     Jalan Ketintang Baru No 11, Surabaya, 60231, East Java,Indonesia

    Regulator Perusahaan Listrik Negara (Persero) PT - UnitInduk Pembangunan VIII Contact  Mr Pudjo Santoso (General Manager) 

    62 31 829 1377f

    62 31 828 8959 / 8291538Email: [email protected] Website: www.pln.co.id/uipkitthermaljb  Jalan Ketintang Baru I No. 1-3, Surabaya, 60231, EastJava, Indonesia

    Perusahaan Listrik Negara (Persero) PT Contact  Mr Iwan Purwana (Head of Strategic ProcurementDivision) 

    62 21 726 1122 / 7261875

    f 62 21 722 7025 / 7227060

    Email: [email protected] Website: www.pln.co.id  

     Jalan Trunojoyo Blok MI / 135, Main Building 15th floor,Kebayoran Baru, Jakarta Selatan, 12110, Jakarta, Indonesia

  • 8/16/2019 Sample Project of the Month 01

    13/46

    Sample Project of The Month

    Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f   65 6538 6896 Email: [email protected] Website: www.bciasia.com 

    BCI Asia Construction Bulletin 10

    JAWA 7 COAL POWER PLANT (2 X 1,000 MW) IPP -

    BANTEN (continued...)

    Contact  Mr Hernadi Buhron (Head of IPP Division) 62 21 726 1122 / 7261875

    f 62 21 722 7025 / 7227060

    Email: [email protected] Website: www.pln.co.id  

     Jalan Trunojoyo Blok MI / 135, Main Building 15th floor,Kebayoran Baru, Jakarta Selatan, 12110, Jakarta, Indonesia

    Loan Agency  To be appointed

    Investor China Shenhua Energy Co.,Ltd Contact  Mr Wang Shumin (Vice President) 

    86 10 5813 1088 f 86 10 5813 1804Email: [email protected] Website: www.csec.com  No.22 Xibinhe Road Andingmen, Dongcheng District,Beijing, China

    Environmental Impact Assessment  To be appointed Remarks: The tenderers are listed in alphabetical order  

    Bidders include: 

    Adi Banuwa PT - Operational Office Contact  Mrs Yuliana Andriani (Director) 

    62 31 841 2536 / 8412543

    f 62 31 841 2517

    Email: [email protected]  Ruko Panji Makmur Blok C No. 11, Jalan Raya PanjangJiwo, Surabaya, 60400, East Java, Indonesia 

    Gelar Buana Semesta PT Contact  Mr Ardi Efendi Saleh (Director) 

     Not available f  Not availableEmail: [email protected]  Jalan Mentor No. 62, Sukaraja, Bandung, 40172, WestJava, Indonesia 

     Nusa Buana Cipta PT 

    Contact  Mr Dwisatya H (Staff of Marketing Division) 62 21 830 3718 f 62 21 830 3718

    Email: [email protected]  Jalan Tebet Utara IB No 3, Tebet, Jakarta Selatan, 12810,Jakarta, Indonesia 

    JAWA 7 COAL POWER PLANT (2 X 1,000 MW) IPP -

    BANTEN (continued...)

    Intimulya Multikencana PT Contact  Mr Ir. H. Suhardi (Direktur Utama) 

    62 22 780 3787 f 62 22 783 4961Email: [email protected] 

     Komplek Ujung Berung Indah Blok 7 No. 7, Bandung,40613, West Java, Indonesia 

    Royal Haskoning DHV Contact  Mr Wybe de Jager (Director) 

    62 21 750 4605 f 62 21 750 4610

    Email: [email protected] Website: www.royalhaskoningdhv.com 

     Ventura Building 2nd floor, Jalan R.A. Kartini No. 26(Outer Ring Road) Cilandak, Jakarta Selatan, 12430, Jakarta,Indonesia 

    Surveyor Indonesia PT Contact  Mr M. Arief Zainuddin (President Director) 

    62 21 526 5526 / 5263333 / 526 51591

    f 62 21 526 5525

    Email: [email protected] Website: www.ptsi.co.id   Graha Surveyor Indonesia, Jalan Jendral Gatot SubrotoKavling 56, Jakarta Selatan, 12950, Jakarta, Indonesia

    Tender Office Perusahaan Listrik Negara (Persero) PT Contact  Mr Kuswara Harjowijaya (Secretary of ProcurementCommittee)  

    62 21 722 7049 f 62 21 722 7025 / 7227060

    Email: [email protected] Website: www.pln.co.id  

     Jalan Trunojoyo Blok MI / 135, Main Building 15th floor,Kebayoran Baru, Jakarta Selatan, 12110, Jakarta, Indonesia

    EPC Contractor  To be appointed

  • 8/16/2019 Sample Project of the Month 01

    14/46

  • 8/16/2019 Sample Project of the Month 01

    15/46

    Sample Project of The Month

    Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f   65 6538 6896 Email: [email protected] Website: www.bciasia.com 

    BCI Asia Construction Bulletin 12

    KOTA BARU PARAHYANGAN (PHASE 2) -

    MARANATHA UNIVERSITY (continued...)

    Yayasan Maranatha Bandung Contact  Mr Beng Sugiharto (Ketua Yayasan) 

    62 22 201 2186 / 2007916

    f 62 22 200 7916

    Email: [email protected] Website: www.maranatha.edu 

     Jalan Prof. drg. Surya Sumantri No. 65, Bandung, 40164,West Java, Indonesia

    Belaputera Intiland PT Contact  Mr Viki Auliya (Architect) 

    62 22 8681 3837 / 6803333 / 680 7888

    f 62 22 680 7555

    Email: [email protected] Website: www.kotabaruparahyangan.com 

     Jalan Panyawangan, Kavling 66B, No. 6, Bumi Indraprasta,Home and Living Centre, Kota Baru Parahyangan, BandungBarat, 40553, West Java, Indonesia

    Yayasan Maranatha Bandung Contact  Ms Cindy (Administrator / General Staff) 

    62 22 201 2186 / 2007916

    f 62 22 200 7916

    Email: [email protected] 

    Website: www.maranatha.edu  Jalan Prof. drg. Surya Sumantri No. 65, Bandung, 40164,West Java, Indonesia

    Master Planner Townland International PT Contact  Mr Johannes Spies (Director) 

    62 21 2941 0621 f 62 21 2941 0622Email: [email protected] Website: www.townland.com  Granadi Building Lantai 7 Tipikal Utara, Jalan Rasuna SaidBlok X - 1, Kavling 8 - 9, Kuningan, Jakarta Selatan, 12950,Jakarta, Indonesia

    Contact  Ms Farida Devi Kurniati (Senior Urban Designer) 

    62 21 2941 0621 f 62 21 2941 0622Email: [email protected] Website: www.townland.com  Granadi Building Lantai 7 Tipikal Utara, Jalan Rasuna SaidBlok X - 1, Kavling 8 - 9, Kuningan, Jakarta Selatan, 12950,Jakarta, Indonesia

    Architect Global Rancang Selaras PT Contact  Mr Adi Utomo Hatmoko (Principal Architect) 

    62 274 880 637 f 62 274 887 778Email: [email protected] Website: www.globalrancangselaras.com  Jalan Apel No. 111, Nglaban, Ngaglik, Sleman, 55281, DIYogyakarta, Indonesia

    KOTA BARU PARAHYANGAN (PHASE 2) -

    MARANATHA UNIVERSITY (continued...)

    Contact  Mr Mario Andreti (Project Architect & ConstructionManager) 

    62 274 880 637 f 62 274 887 778Email: [email protected] Website: www.globalrancangselaras.com  Jalan Apel No. 111, Nglaban, Ngaglik, Sleman, 55281, DIYogyakarta, Indonesia

    Contact  Mrs Dian (Staff Officer) 

    62 274 880 637 f 62 274 887 778Email: [email protected] Website: www.globalrancangselaras.com  Jalan Apel No. 111, Nglaban, Ngaglik, Sleman, 55281, DIYogyakarta, Indonesia

    Structural Engineer  To be appointed

    Mechanical & Electrical Engineer  To be appointed

    Quantity Surveyor  To be appointed

    Piling Contractor  To be appointed

    Contractor  To be appointed

  • 8/16/2019 Sample Project of the Month 01

    16/46

    Sample Project of The Month

    Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f   65 6538 6896 Email: [email protected] Website: www.bciasia.com 

    BCI Asia Construction Bulletin 13

    PROJECT CATEGORY

    Infrastructure

    PROJECT STAGE PROJECT CODE

    Concept 145544002

    PATIHAN MADIUN BRIDGE DEVELOPMENT 

    Desa Patihan, Kecamatan Manguharjo, Madiun, East

    Java 

    ● Bridge construct (35 m length x 10 m width)● Reinforced concrete bridge● Bridge abutment● Girder bridge

    ● Bridge approach slab● Bridge safety barriers 

    Estimated cost: undisclosed. 

    Work is expected to start in early July 2016. Work is expectedto end in late December 2016.

     Pembangunan jembatan struktur beton bertulang dengantotal panjang sekitar 35 meter dan lebar 10 meter. Perkiraanbiaya: tidak dinyatakan. Pekerjaan diharapkan mulai Juli2016 dan selesai Desember 2016. 

    Government Implementing Agency Dinas Pekerjaan UmumKota Madiun Contact  Mr Ir. Danardono (Head Officer) 

    62 351 471 151 f 62 351 496 541Website: www.portal.madiunkota.go.id  Jalan D.I Panjaitan No. 17, Madiun, 63121, East Java,Indonesia

    Contact  Mr Thariq Megah (Kepala Seksi Pemeliharaan Jalandan Jembatan) 

    62 351 471 151 f 62 351 496 541Website: www.portal.madiunkota.go.id 

     Jalan D.I Panjaitan No. 17, Madiun, 63121, East Java,Indonesia

    Supervisory Consultant  To be appointed

    Civil Engineer  To be appointed

    Bridge Contractor  To be appointed

    PROJECT CATEGORY

    Residential/ Health

    PROJECT STAGE PROJECT CODE

    Concept 141195002

    RSUD WATES HOSPITAL - DORMITORY 

    Jalan Tentara Pelajar Km 1 No. 5 Wates, Kulon Progo,

    DI Yogyakarta 

    ● 3 storey dormitory building (approx. 3,000 sq m)● Up to 20 dormitory rooms● Multipurpose room 

    Estimated cost: undisclosed. 

    Construction is expected to start in early September 2016.Construction is expected to end in early December 2016.

     Bangunan asrama 3 lantai, dengan luas bangunan sekitar3.000 meter persegi. Perkiraan biaya: tidak dinyatakan.

     Konstruksi diharapkan mulai September 2016 dan selesai Desember 2016. 

    Developer Rumah Sakit Umum Daerah (RSUD) Wates Contact  Ms Lies Indriyati (Director - Kuasa PenggunaAnggaran) 

    62 274 773 169 f 62 274 773 092Email: [email protected] Website: www.rsud.kulonprogokab.go.id  Jalan Tentara Pelajar Km. 1 No. 5 Wates, Kulonprogo,55611, DI Yogyakarta, Indonesia

    Contact  Mr drg.Agung Sugiarto, M.Kes (Project Coordinator- Kabag administrasi dan Umum) 

    62 274 773 169 f 62 274 773 092Email: [email protected] Website: www.rsud.kulonprogokab.go.id  Jalan Tentara Pelajar Km. 1 No. 5 Wates, Kulonprogo,55611, DI Yogyakarta, Indonesia

    Supervisory Consultant  To be appointed

    Master Planner Pola Data Consultant PT Contact  Mr Nufrizal F Hanafi (Director - Project Manager) 

    62 274 433 3680 / 7478764 / 719 4529

    f 62 274 433 3680

    Email: [email protected]  Jalan Ponpes Sunan Ampel No. 02 Banjeng, Maguwoharjo,Depok, Sleman, 55283, DI Yogyakarta, Indonesia

    Contact  Mr Eko Sulistiatmojo (Architect) 62 274 433 3680 / 7478764 / 719 4529

    f 62 274 433 3680

    Email: [email protected]  Jalan Ponpes Sunan Ampel No. 02 Banjeng, Maguwoharjo,Depok, Sleman, 55283, DI Yogyakarta, Indonesia

    Architect  To be appointed

    Structural Engineer  To be appointed

    Contractor  To be appointed

  • 8/16/2019 Sample Project of the Month 01

    17/46

    Sample Project of The Month

    Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f   65 6538 6896 Email: [email protected] Website: www.bciasia.com 

    BCI Asia Construction Bulletin 14

    PROJECT CATEGORY

    Industrial

    PROJECT STAGE PROJECT CODE

    Concept 144316002

    SAMPOERNA AGRO CPO FACTORY -

    KALIMANTAN BARAT Site yet to be determined, West Kalimantan 

    ● Crude palm oil plant (capacity of 30 tph)● Mechanical work● Conveyor lines● Workshop 

    Estimated cost: undisclosed. 

    Construction timetable is to be determined. 

     Pabrik pengolahan kelapa sawit dengan kapasitas produksi30 ton buah tandan segar per jam. Perkiraan biaya: tidak

    dinyatakan. Waktu konstruksi belum ditentukan. 

    Developer Sampoerna Agro, Tbk PT Contact  Mr Michael Kesuma (Head of Investor Relation) 

    62 21 577 1711 / 5770886

    f 62 21 577 1712 / 5770015

    Website: www.sampoernaagro.com  Sampoerna Strategic Square, North Tower 28 Floor, JalanJendral Sudirman Kavling 45 - 46, Jakarta Selatan, 12930,Jakarta, Indonesia

    Contact  Mr Elman Salim (Project Head of EngineeringDepartment) 

    62 21 577 1711 / 5770886

    f 62 21 577 1712 / 5770015

    Email: [email protected] Website: www.sampoernaagro.com  Sampoerna Strategic Square, North Tower 28 Floor, JalanJendral Sudirman Kavling 45 - 46, Jakarta Selatan, 12930,Jakarta, Indonesia

    Contact  Mr Oke (Staff of Engineering Division) 62 21 577 1711 / 5770886

    f 62 21 577 1712 / 5770015

    Website: www.sampoernaagro.com 

     Sampoerna Strategic Square, North Tower 28 Floor, JalanJendral Sudirman Kavling 45 - 46, Jakarta Selatan, 12930,Jakarta, Indonesia

    EPC Contractor  To be appointed

    PROJECT CATEGORY

    Industrial

    PROJECT STAGE PROJECT CODE

    Concept 144541002

    SIDO MUNCUL FOOD NUTRITION FACTORY -

    SLEMAN Sleman, DI Yogyakarta 

    ● Single storey food nutrition factory (approx 25,000 sqm)

    ● Mechanical work● Production lines

    ● Quality control room 

    Estimated cost: undisclosed. 

    Construction is expected to start in early January 2017.Construction is expected to end in late December 2017.

     Bangunan pabrik nutrisi makanan satu lantai, dengan luasbangunan sekitar 25.000 meter persegi. Perkiraan biaya:tidak dinyatakan. Konstruksi diharapkan mulai Januari 2017dan selesai Desember 2017. 

    Developer Sido Muncul Tbk PT - Semarang Factory Office Contact  Mr Irwan Hidayat (President Director) 

    62 298 523 515 f 62 298 523 509Email: [email protected] Website: www.sidomuncul.com 

     Jalan Soekarno Hatta Km. 28, Kelurahan Klepu,Kecamatan Bergas, Semarang, 50552, Central Java, Indonesia

    Contact  Mr Stefanus Agus Triharyanto (Head of BuildingDivision) 

    62 298 523 515 f 62 298 523 509Email: [email protected] Website: www.sidomuncul.com 

     Jalan Soekarno Hatta Km. 28, Kelurahan Klepu,Kecamatan Bergas, Semarang, 50552, Central Java, Indonesia

    Architect  To be appointed

    Structural Engineer  To be appointed

    Mechanical & Electrical Engineer  To be appointed

    Piling Contractor  To be appointed

    Contractor  To be appointed

  • 8/16/2019 Sample Project of the Month 01

    18/46

    Sample Project of The Month

    Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f   65 6538 6896 Email: [email protected] Website: www.bciasia.com 

    BCI Asia Construction Bulletin 15

    PROJECT CATEGORY

    Hotel/ Recreation/ Retail

    PROJECT STAGE PROJECT CODE

    Concept 103509002

    THE RITZ CARLTON RESORTS AND SPA (5 STARS)

    - TANAH LOT Jalan Tanah Lot, Tabanan, Bali 

    ● 4 storey hotel building (approx 20,000 sq m)● Up to 200 hotel rooms● Hotel lobby & reception area● Dining & restaurant

    ● Swimming pool

    Project deferred indefinitely

    Building elements include:● Flooring : ceramic tile / homogeneous tile● Structural : reinforced concrete● Ceiling : gypsum board

    ● Walling : light brick walls● Roofing : concrete roof tile● Roof truss : lightweight steel● Aluminium framed doors & windows / solid wood

    doors● Lifts● Split type air conditioning / duct connected air

    conditioning● Sanitary ware / plumbing

    ● Fire protection system● Security system● Building automation system 

    Estimated cost: undisclosed. 

    Construction timetable is to be determined. 

     Pembangunan hotel 4 lantai terdiri dari 200 kamar hotel,

    dengan luas bangunan sekitar 20.000 meter persegi. Perkiraan biaya: tidak dinyatakan. Waktu konstruksi belum

    ditentukan. 

    Developer Ciputra Property Tbk PT 

    Contact  Mr Artha Dinata Zakar (Director) 62 21 2988 8898 /5292 0982 / 2988 5858

    f 62 21 2988 8899

    Email: [email protected] Website: www.ciputraproperty.com  Jalan Prof Dr Satrio Kavling 3 - 5, Jakarta Selatan, 12940,Jakarta, Indonesia

    Contact  Mr Antonius Andes (Staff of Project Division) 62 21 2988 8898 /5292 0982 / 2988 5858

    f 62 21 2988 8899

    Email: [email protected] Website: www.ciputraproperty.com  Jalan Prof Dr Satrio Kavling 3 - 5, Jakarta Selatan, 12940,

    Jakarta, Indonesia

    THE RITZ CARLTON RESORTS AND SPA (5 STARS)

    - TANAH LOT (continued...)

    Hotel Operator The Ritz-Carlton Hotel Company L.L.C. Contact  Mrs Ainslie Cheung (Regional Director) 

    852 2192 6207 f 852 2192 6073Email: [email protected] Website: www.ritzcarlton.com  Suite 701, 7/F, 1063 King's Road, Hong Kong, HongKong, Hong Kong SAR

    Architect Ground Kents Architect (GKA) Indonesia PT Contact  Mr Marthin Grounds (Principal) 

    62 361 703 517 / 703518

    f 62 361 703 652

    Email: [email protected] Website: www.gkabali.com  Kawasan Bukit Permai, Mimpi Resort, Jimbaran, Badung,80361, Bali, Indonesia

    Interior Designer Jaya Ibrahim, Jaya & Associates Contact  Mrs Xaviera (Interior Designer) 

    65 6645 3575 f 65 6645 3599Email: [email protected] Website: www.jayainternational.com  115 Amoy Street #02-03, Singapore,Singapore 069935

    Structural Engineer  To be appointed

    Mechanical & Electrical Engineer  To be appointed

    Quantity Surveyor  To be appointed

    Contractor  To be appointed

  • 8/16/2019 Sample Project of the Month 01

    19/46

    Sample Project of The Month

    Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f   65 6538 6896 Email: [email protected] Website: www.bciasia.com 

    BCI Asia Construction Bulletin 16

    PROJECT CATEGORY

    Hotel/ Recreation/ Retail

    PROJECT STAGE PROJECT CODE

    Concept 145484002

    VEGA HOTEL YOGYAKARTA 

    Site yet to be determined, Yogyakarta, DI Yogyakarta 

    ● 4 storey hotel building (approx. 4,000 sq m)

    ● Up to 90 hotel rooms● Restaurant● Lobby & reception lounge● Swimming pool 

    Estimated cost: undisclosed. 

    Construction timetable is to be determined. 

     Hotel 4 lantai dengan luas bangunan sekitar 4.000 meter persegi. Perkiraan biaya: tidak dinyatakan. Waktu konstruksi

    belum ditentukan. 

    Hotel Operator Parador Hotels and Resorts Contact  Mr Ricky Theodores (Chief Operating Officer) 

    62 21 292 15999 / 29171111

    f 62 21 292 16999

    Email: [email protected] Website: www.parador-hotels.com 

     Atria Residences Building, Lobby Level, CBD GadingSerpong Lot #5,Jalan Boulevard Gading Serpong, KabupatenTangerang, 15810, Banten, Indonesia

    Contact  Ms Pramita Sari Setiawan (Corporate MarketingCommunication Manager) 

    62 21 292 15999 / 29171111

    f 62 21 292 16999

    Email: [email protected] Website: www.parador-hotels.com 

     Atria Residences Building, Lobby Level, CBD GadingSerpong Lot #5,Jalan Boulevard Gading Serpong, KabupatenTangerang, 15810, Banten, Indonesia

    Architect  To be appointed

    Structural Engineer  To be appointed

    Mechanical & Electrical Engineer  To be appointed

    Contractor  To be appointed

    PROJECT CATEGORY

    Residential

    PROJECT STAGE PROJECT CODE

    Design 138879002

    CITI ALIT VILLA RESIDENCE - RESIDENTIAL 

    Jalan Raya Goa Gong, Mangupura, Badung, Bali 

    ● 200 x 2 storey residential houses (approx. 120 sq meach)

    ● Units to have 4 bedrooms● Internal road network● Gated entrance

    Building elements include:

    ● Flooring : homogeneous tile●

    Structural : reinforced concrete● Ceiling : gypsum board● Walling : light brick walls● Roofing : concrete roof tile / concrete slab roof● Roof truss : lightweight steel

    ● Timber framed doors & windows / solid wood doors 

    Estimated cost: undisclosed. 

    Construction is expected to start in early March 2017.Construction is expected to end in late March 2018.

     Kawasan perumahan meliputi 200 unit rumah 2 lantai,masing-masing dengan tipe luas bangunan sekitar 120 meter

     persegi. Perkiraan biaya : tidak dinyatakan. Konstruksidiharapkan mulai Maret 2017 dan selesai Maret 2018.  

    Developer Citi Alits Cipta PT Contact  Mr Samuel (Staff of Project Division) 

    62 361 474 3060 / 4743062

    f  Not available

    Email: [email protected] Website: www.citialitswisata.com 

     Jalan Letda Tantular No. 90, Renon, Denpasar, 80226, Bali,Indonesia

    Master Planner Johanes Architects Contact  Mr Dipl. Ing. Johanes A Kurnia (Director) 

    62 21 5890 3517 /9826 5429f

    62 21 5890 3517 / 5872482Email: [email protected] Website: www.johanesarchitects.com  Jalan Rubi Garden I/16 (Permata Mediterania), Pos pengumben, Srengseng, Kembangan, Jakarta Barat, 11630,Jakarta, Indonesia

    Architect Johanes Architects Contact  Mr Dipl. Ing. Johanes A Kurnia (Director) 

    62 21 5890 3517 /9826 5429

    f 62 21 5890 3517 / 5872482

    Email: [email protected] Website: www.johanesarchitects.com 

     Jalan Rubi Garden I/16 (Permata Mediterania), Pos pengumben, Srengseng, Kembangan, Jakarta Barat, 11630,Jakarta, Indonesia

  • 8/16/2019 Sample Project of the Month 01

    20/46

    Sample Project of The Month

    Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f   65 6538 6896 Email: [email protected] Website: www.bciasia.com 

    BCI Asia Construction Bulletin 17

    CITI ALIT VILLA RESIDENCE - RESIDENTIAL

    (continued...)

    Contact  Mr Agung R (Senior Architect) 62 21 5890 3517 /9826 5429

    f 62 21 5890 3517 / 5872482

    Email: [email protected] Website: www.johanesarchitects.com 

     Jalan Rubi Garden I/16 (Permata Mediterania), Pos pengumben, Srengseng, Kembangan, Jakarta Barat, 11630,Jakarta, Indonesia

    Structural Engineer  To be appointed

    Mechanical & Electrical Engineer  To be appointed

    Contractor  To be appointed

    PROJECT CATEGORY

    Residential

    PROJECT STAGE PROJECT CODE

    Design 136313002

    CITRALAND CITY LOSARI MAKASSAR - SUNSET

    COVE CLUSTER  Centre Point of Indonesia, Losari, Makassar, South

    Sulawesi 

    ● 139 x 2 storey residential houses (3 types of houses :120 sq m, 200 sq m & 240 sq m)

    ● Units to have 3 & 4 bedrooms

    ● Internal road network● Gated entrance

    ● Communal garden●

    Perimeter fence walls

    Please find more information atwww.citralandcitymakassar.com

    Building elements include:● Flooring : ceramic tile / homogeneous tile● Structural : reinforced concrete● Ceiling : gypsum board● Walling : light brick walls● Roofing : concrete slab roof / metal sheet roofing● Roof truss : lightweight steel

    ● Aluminium framed doors & windows / fabricatedwood doors

    ● Sanitary ware / plumbing 

    Estimated cost: undisclosed. 

    Construction is expected to start in early June 2016.Construction is expected to end in late December 2017.

     Kawasan perumahan meliputi 139 unit rumah 2 lantai,dengan 3 tipe luas bangunan sekitar 120, 200 dan 240 meter

     persegi. Perkiraan biaya : tidak dinyatakan. Konstruksidiharapkan mulai Juni 2016 dan selesai Desember 2017.  

    Developer Ciputra Fajar Mitra PT (aka Ciputra Group) Contact  Mr Tony Kustono (General Manager - Joint

    Operation Ciputra Fajar Mitra PT - Yasmin Bumi Asri PT) 62 411 822 2288 / 8222299

    f 62 411 822 2299

     Jalan Tun Abdul Razak (Hertasning Baru), Gowa, 90232,South Sulawesi, Indonesia

    Contact  Mr Abdul Hakim (Inhouse Architect - Staf ofPlanning Division) 

    62 411 822 2288 / 8222299

    f 62 411 822 2299

     Jalan Tun Abdul Razak (Hertasning Baru), Gowa, 90232,South Sulawesi, Indonesia

  • 8/16/2019 Sample Project of the Month 01

    21/46

    Sample Project of The Month

    Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f   65 6538 6896 Email: [email protected] Website: www.bciasia.com 

    BCI Asia Construction Bulletin 18

    CITRALAND CITY LOSARI MAKASSAR - SUNSET

    COVE CLUSTER (continued...)

    Yasmin Bumi Asri PT Contact  Mr Adityawarman M Kouwagam (Director) 

     Not available f  Not available Jalan Kakatua II, Makassar, 90133, South Sulawesi,Indonesia ( For enquiry, please contact by Mail.)

    Citraland City Makassar  Contact  Mr Cipta Harun (Manager - Citraland City MakassarProject) 

    62 411 873 625 f 62 411 873 625

    Email: [email protected] Website: www.citralandcitymakassar.com  Jalan Citraland Boulevard No. 6 , Centre Point ofIndonesia, Makassar, 90224, South Sulawesi, Indonesia

    Land Development Consultant Witteveen + Bos ConsultingEngineers Contact  Mr Sawarendro (Master Planner Engineer) 

    62 21 719 1282 f 62 21 719 1283Email: [email protected] Website: www.witteveenbos.com  Park View Plaza 6th Floor JalanTaman Kemang No. 27,Jakarta Selatan, 12730, Jakarta, Indonesia

    Architect DP Architects Pte Ltd Contact  Mr Wu Tzu Chiang (Project Director - PrincipalArchitect) 

    65 6338 3988 f 65 6337 9989Email: [email protected] Website: www.dpa.com.sg  6 Raffles Boulevard #04-100 Marina Square,Singapore 039594

    Quantity Surveyor  To be appointed

    Earthworks Contractor Pembangunan Perumahan (Persero)Tbk PT - Kantor Cabang VIII - Makassar  Contact  Mr Fatchul Birri (Branch Manager) 

    62 411 887 879 / 868701

    f 62 411 868 692

    Email: [email protected] Website: www.pt-pp.com  Jalan Letjen Hertasning Blok II No. 1, Makassar, 90222,South Sulawesi, Indonesia

    Contact  Mr Muliadi (Staff of Procurement Division) 62 411 887 879 / 868701

    f 62 411 868 692

    Email: [email protected] Website: www.pt-pp.com  Jalan Letjen Hertasning Blok II No. 1, Makassar, 90222,

    South Sulawesi, Indonesia

    Contractor  To be appointed

    PROJECT CATEGORY

    Hotel/ Recreation/ Retail

    PROJECT STAGE PROJECT CODE

    Design 135317002

    LOMBOK EPICENTRUM - HOTEL (4 STARS) 

    Jalan Sriwijaya, Mataram, West Nusa Tenggara 

    ● 16 storey hotel (approx 15,000 sq m)

    ● 400 hotel rooms● Hotel lobby & reception lounge● Dining & restaurant● Swimming pool

    Project deferred indefinitely

    Building elements include:● Flooring : homogeneous tile / wood flooring● Structural : reinforced concrete● Ceiling : gypsum board● Walling : light brick walls

    ● Roofing : concrete slab roof● Aluminium framed doors & windows / fabricated

    wood doors● Piling : bored pile / precast pile● Lifts● Duct connected air conditioning● Fire protection system / security system

    ● Sanitary ware / plumbing● Building automation system 

    Estimated cost: undisclosed. 

    Construction timetable is to be determined. 

     Bangunan hotel 16 lantai, dengan luas bangunan sekitar15.000 meter persegi. Perkiraan biaya: tidak dinyatakan.Waktu konstruksi tidak ditentukan. 

    Developer Sriwijaya Propindo Utama PT Contact  Mr Adi Putra (Project Coordinator) 

    62 370 631 777 / 631888

    f 62 370 648 129

    Email: [email protected] 

     Jalan Sriwijaya, Mataram, 83121, West Nusa Tenggara,Indonesia

    Hotel Operator  To be appointed

    Investor Varindo Lombok Inti PT Contact  Mr Gede Agus Surya Primayadi (Managing Director) 

    62 370 635 421 / 626620 / 661 1111

    f 62 370 622 5333

    Email: [email protected]  Jalan Langko No 36A, Mataram, 83114, West NusaTenggara, Indonesia

    Contact  Mrs Fauza (Architect / Technical Manager) 

    62 370 635 421 / 626620 / 661 1111

    f 62 370 622 5333

    Email: [email protected]  Jalan Langko No 36A, Mataram, 83114, West NusaTenggara, Indonesia

  • 8/16/2019 Sample Project of the Month 01

    22/46

    Sample Project of The Month

    Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f   65 6538 6896 Email: [email protected] Website: www.bciasia.com 

    BCI Asia Construction Bulletin 19

    LOMBOK EPICENTRUM - HOTEL (4 STARS)

    (continued...)

    Master Planner ¿¿McKingley Team Architects Contact  Mr Sahlan Mckingley (Director - PrincipalArchitect) 

    612 9299 9779 f 612 9299 9779Email: [email protected] Website: www.mt-architect.com 

     72 Erskine St, Sydney, New South Wales NSW 2000,Australia

    Architect ¿¿McKingley Team Architects Contact  Mr Sahlan Mckingley (Director - Principal

    Architect) 612 9299 9779 f 612 9299 9779

    Email: [email protected] Website: www.mt-architect.com 

     72 Erskine St, Sydney, New South Wales NSW 2000,Australia

    Contact  Mrs Cory Elisabeth (Architect - Project Division) 612 9299 9779 f 612 9299 9779

    Email: [email protected] Website: www.mt-architect.com  72 Erskine St, Sydney, New South Wales NSW 2000,Australia

    Interior Designer  To be appointed

    Mechanical & Electrical Engineer  To be appointed

    Contractor  To be appointed

    PROJECT CATEGORY

    Residential/ Recreation/ Retail/ Car Park

    PROJECT STAGE PROJECT CODE

    Design 129469002

    SENTUL CITY - SENTUL GARDEN APARTMENT

    (TOWER A) Jalan M.H. Thamrin, Komplek Sentul City, Bogor, West

    Java 

    ● 16 storey apartment tower (approx 25,100 sq m)● Up to 448 apartment units● Studio type apartments (approx. 23 sq m), single

     bedroom units (approx. 27 sq m), & 2 bedroom units(approx. 48 sq m)

    ● 2 basement levels car park●

    Apartment lobby & reception area● Ground floor retail shops & restaurants● Swimming pool● Rooftop garden● Gym & fitness centre

    ● Citywalk, café & convenience store

    Building elements include:● Flooring : ceramic tile / homogeneous tile / hardened

    concrete floor● Structural : reinforced concrete● Ceiling : gypsum board

    ● Walling : precast concrete panel / gypsum board● Facade : glass wall cladding / decorative cladding

    ● Aluminium framed doors & windows / fabricateddoors

    ● 5 ifts● Split type air conditioning / duct connected air

    conditioning● Pilling : bored pile

    ● Sanitary ware / plumbing● Fire protection system

    ● Security system● Building automation system 

    Estimated cost: Rp150.60 bn (US$10.90 mn). 

    Construction is expected to start in early August 2016.

    Construction is expected to end in late August 2018.

     Apartemen 16 lantai dan 2 level basement, dengan luas

    bangunan sekitar 25.100 meter persegi. Perkiraan biaya:tidak dinyatakan. Konstruksi diharapkan mulai Agustus 2016dan selesai Agustus 2018. 

    Developer Sentul City Tbk PT Contact  Mr Adi Dharmawan (Project Manager) 

    62 21 8792 6555 f 62 21 8792 6555Email: [email protected] Website: www.sentulcity.co.id  Jalan M H Thamrin Kav.8, Sentul City, Bogor, 16810,West Java, Indonesia

  • 8/16/2019 Sample Project of the Month 01

    23/46

    Sample Project of The Month

    Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f   65 6538 6896 Email: [email protected] Website: www.bciasia.com 

    BCI Asia Construction Bulletin 20

    SENTUL CITY - SENTUL GARDEN APARTMENT

    (TOWER A) (continued...)

    Contact  Mr Petra Firman Pakpahan (Planning Division Staff) 62 21 8792 6555 /8796 1889

    f 62 21 8796 0778 /8796 1777

    Email: [email protected] Website: www.sentulcity.co.id  Gedung Graha Utama, Jalan M.H. Thamrin No. 1 Kavling8, Sentul City, Bogor, 16810, West Java, Indonesia

    Architect Kind Indonesia Architects Contact  Mr Adjie Negara (Principal Architect) 

    62 21 2995 9825 f 62 21 8771 0575

    Email: [email protected] Website: www.kind.id   Citylofts Sudirman Suite 1516, Jalan K.H. Mas Mansyur No. 121, Jakarta Pusat, 10220, Jakarta, Indonesia

    Contact  Ms Siti Aisah Ghani (Team Leader / Architect) 62 21 8771 6431 f 62 21 8771 6431

    Email: [email protected] Website: www.kind.id   Jalan Komjen Polisi M. Yasin, Cimanggis, Depok, 16452,West Java, Indonesia

    Structural Engineer  To be appointed

    Mechanical & Electrical Engineer  To be appointed

    Piling Contractor  To be appointed

    Contractor  To be appointed

    PROJECT CATEGORY

    Community/ Education and Research

    PROJECT STAGE PROJECT CODE

    Design 145235002

    UNIVERSITAS SAMUDRA - AUDITORIUM 

    Gampong Meurandeh, Kecamatan Langsa Lama, Langsa,

    Aceh 

    ● 3 storey auditorium building (approx 9,000 sq m)● Lobby lounge● Auditorium balcony● Equipment room

    Building elements include:

    ● Flooring : ceramic tile / homogeneous tile●

    Structural : reinforced concrete● Ceiling : gypsum board● Walling : light brick walls● Roofing : concrete roof tile● Roof truss : steel frame

    ● Aluminium framed doors & windows / fabricatedwood doors

    ● Sanitary ware / plumbing 

    Estimated cost: undisclosed. 

    Construction is expected to start in early April 2016.Construction is expected to end in late November 2016.

    Gedung auditorium 3 lantai dengan luas bangunan sekitar9.000 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai April 2016 dan selesai

     November 2016. 

    Developer Universitas Samudra Contact  Mr Drs. Bachtiar Akob, M.Pd (Rector) 

    62 641 426 534 f 62 641 426 535Email: [email protected] Website: www.unsam.ac.id  Gampong Meurandeh, Kecamatan Langsa Lama, Langsa,24416, Aceh, Indonesia

    Contact  Mr Tuti Israyani, SP (Kasubbag Perencanaan) 

    62 641 426 534 f 62 641 426 535Email: [email protected] Website: www.unsam.ac.id 

     Gampong Meurandeh, Kecamatan Langsa Lama, Langsa,24416, Aceh, Indonesia

    Supervisory Consultant  To be appointed

    Architect Inochi Konsultan PT Contact  Mr Rickie Andre (Director) 

    62 651 29602 f  Not availableEmail: [email protected]  Jalan Teuku Panglima Nyak Makam No. 5, Gampong KotaBaru, Kecamatan Kuta Alam, Banda Aceh, 23125, Aceh,

    Indonesia

  • 8/16/2019 Sample Project of the Month 01

    24/46

    Sample Project of The Month

    Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f   65 6538 6896 Email: [email protected] Website: www.bciasia.com 

    BCI Asia Construction Bulletin 21

    UNIVERSITAS SAMUDRA - AUDITORIUM (continued...)

    Contact  Ms Cut Sri Sukma (Project Coordinator) 62 651 29602 f  Not available

    Email: [email protected] 

     Jalan Teuku Panglima Nyak Makam No. 5, Gampong KotaBaru, Kecamatan Kuta Alam, Banda Aceh, 23125, Aceh,Indonesia

    Contractor  To be appointed

    PROJECT CATEGORY

    Hotel/ Retail/ Recreation/ Car Park

    PROJECT STAGE PROJECT CODE

    Design 144877002

    YELLO HOTEL (3 STARS) - RUNGKUT SURABAYA 

    Jalan Raya Rungkut, Surabaya, East Java 

    ● 13 storey hotel building (approx 9,000 sq m)

    ● Single basement level car park● Hotel lobby & reception area● Dining & restaurant● Banquet & function hall

    ● Swimming pool

    Building elements include:●

    Flooring : ceramic tile / homogeneous tile● Structural : reinforced concrete● Ceiling : gypsum board / acoustical ceiling● Walling : precast concrete panel / gypsum board / light

     brick walls

    ● Facade : glass wall cladding / decorative cladding● Aluminium framed doors & windows / solid wood

    doors● Lifts● Split type air conditioning / duct connected air

    conditioning● Sanitary ware / plumbing

    ● Fire protection system / security system● Building automation system 

    Estimated cost: undisclosed. 

    Construction is expected to start in early October 2016.Construction is expected to end in late December 2017.

     Pembangunan hotel 13 lantai dan satu level basement,dengan luas bangunan sekitar 9.000 meter persegi. Perkiraanbiaya: tidak dinyatakan. Konstruksi diharapkan mulai

    Oktober 2016 dan selesai Desember 2017. 

    Hotel Operator Tauzia Hotel Management Contact  Mr Armand Steinmeyer (Head of BusinessDevelopment) 

    62 21 526 5223 / 52960490 ext 104

    f 62 21 526 5213

    Email: [email protected] Website: www.tauzia.com   K-link Tower 25th Floor - Suite B, Jalan Jendral GatotSubroto Kavling 59A, Jakarta Selatan, 12950, Jakarta,Indonesia

    Architect Urbane Indonesia PT Contact  Mr Irvan P Darwis (Senior Architect) 

    62 22 253 1004 f 62 22 253 1024Email: [email protected] Website: www.urbane.co.id  Jalan Cigadung Raya Barat No. 5, RT 005 / RW 002,

    Cipaheut Kelurahan Cigadung, Bandung, 40191, West Java,Indonesia

  • 8/16/2019 Sample Project of the Month 01

    25/46

    Sample Project of The Month

    Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f   65 6538 6896 Email: [email protected] Website: www.bciasia.com 

    BCI Asia Construction Bulletin 22

    YELLO HOTEL (3 STARS) - RUNGKUT SURABAYA

    (continued...)

    Contact  Mr Angga Latief (Architect) 62 22 253 1004 f 62 22 253 1024

    Email: [email protected] Website: www.urbane.co.id  Jalan Cigadung Raya Barat No. 5, RT 005 / RW 002,Cipaheut Kelurahan Cigadung, Bandung, 40191, West Java,Indonesia

    Structural Engineer  To be appointed

    Mechanical & Electrical Engineer  To be appointed

    Quantity Surveyor  To be appointed

    Piling Contractor  To be appointed

    Contractor  To be appointed

    PROJECT CATEGORY

    Residential/ Hotel/ Exhibition/ Recreation/ Retail

    PROJECT STAGE PROJECT CODE

    Documentation 116611002

    AMARSVATI RESORT & CONDOTEL (5 STARS) -

    AVANI TOWER  Jalan Raya Malimbu, Lombok Utara, West Nusa

    Tenggara 

    ● 14 storey apartment & hotel building (approx 18,250sq m)

    ● 150 apartment units & hotel rooms

    ●  Studio type units, 1 bedroom units (type of units:approx 45.43 sq m each)

    ● Cafe & restaurant●

    Fitness centre & spa● Banquet & function room● Lobby & reception area● Swimming pool

    Please find more information at www.amarsvati.com

    Building elements include:● Flooring : marble tile / granite flooring / parquet /

    carpet● Structural : reinforced concrete● Ceiling : gypsum board

    ● Walling : light brick walls / precast concrete panel● Roofing : concrete slab roof

    ● Aluminium framed windows / solid wood doors● Piling : bored pile● Lifts● Split type air conditioning / duct connected air

    conditioning● Fire protection system

    ● Security system● Sanitary ware / plumbing

    ● Building automation system 

    Estimated cost: undisclosed. 

    Construction is expected to start in early May 2016.Construction is expected to end in late December 2017.

     Kondotel 14 lantai dengan luas bangunan sekitar 18.250meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi

    diharapkan mulai Mei 2016 dan selesai Desember 2017.  

    Developer  North Pacific Development PT (aka PolluxProperties Indonesia) Contact  Mr Nico Purnomo Po (Chief Executive Officer) 

    62 21 515 1036 f 62 21 515 1037Email: [email protected] Website: www.pollux.co.id  Sudirman Central Business District, Jalan Jendral SudirmanKavling 52-53, Indonesia Stock Exchange Building Tower II#28-01, Jakarta Selatan, 12190, Jakarta, Indonesia

  • 8/16/2019 Sample Project of the Month 01

    26/46

    Sample Project of The Month

    Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f   65 6538 6896 Email: [email protected] Website: www.bciasia.com 

    BCI Asia Construction Bulletin 23

    AMARSVATI RESORT & CONDOTEL (5 STARS) -

    AVANI TOWER (continued...)

    Contact  Ms Andriana Neysa Sutanto (Project Manager /Architect) 

    62 21 515 1036 f 62 21 515 1037Email: [email protected] Website: www.pollux.co.id  Sudirman Central Business District, Jalan Jendral SudirmanKavling 52-53, Indonesia Stock Exchange Building Tower II#28-01, Jakarta Selatan, 12190, Jakarta, Indonesia

    Mega Citra Prima PT Contact  Undisclosed

    62 21 2992 8020 f 62 21 2992 0060Email: [email protected]  Jalan M. H. Thamrin Kavling 20 - 30, The Plaza Indonesia#45 - 1A, Jakarta Pusat, 10350, Jakarta, Indonesia

    ConsultantRemarks: Furniture Consultant & Supplier  

    Mahakarya Warisan Nusantara PT (aka Arbor & Troy) Contact  Mr Kemal (Staff of Project Division) 

    62 21 719 9070 f 62 21 721 0529Website: www.mahakarya-indonesia.com  The Papilion Kemang, Jalan Kemang Raya No. 45 AA,Jakarta Selatan, 12730, Jakarta, Indonesia

    Hotel Operator Ariva Hospitality Contact  Mr Cameron Ong (Director) 

    65 6848 5029 f 65 6848 1083Email: [email protected] Website: www.stayariva.com 

     12 Tannery Road 02 - 05 HB Centre 1, Singapore,Singapore 347722

    Contact  Mr Stanley Ling (Chief Executive Officer) 65 6848 5029 f 65 6848 1083

    Email: [email protected] Website: www.stayariva.com  12 Tannery Road 02 - 05 HB Centre 1, Singapore,Singapore 347722

    Architect Arkonin PT Contact  Mrs Sita Budi Saptawati (Architect) 

    62 21 736 4176 f 62 21 736 3829Email: [email protected] Website: www.arkonin-id.com 

     Gedung Arkonin, Jalan Bintaro Taman Timur, Bintaro JayaSektor I, Jakarta Selatan, 12330, Jakarta, Indonesia

    Contact  Ms Nadya Karina (Architect) 62 21 736 4176 f 62 21 736 3829

    Email: [email protected] 

    Website: www.arkonin-id.com 

     Gedung Arkonin, Jalan Bintaro Taman Timur, Bintaro JayaSektor I, Jakarta Selatan, 12330, Jakarta, Indonesia

    AMARSVATI RESORT & CONDOTEL (5 STARS) -

    AVANI TOWER (continued...)

    Interior Designer Dreammetal Contact  Mr Raymon Cheng (Principal Architect) 

    65 9878 8687 / 97640206

    f  Not available

    Email: [email protected] Website: www.dreammetal.net  4B Boon Tiong Road #07 - 33, Singapore, Singapore165004

    Structural Engineer Rekacipta Kinematika PT 

    Contact  Mr Sugia Mulyana (Project Director) 62 21 8430 6407 f 62 21 8430 6407

    Email: [email protected] Website: www.kinematika.com  Kawasan Niaga Citragrand, Blok R12 No. 3, JalanAlternatif Cibubur - Cileungsi Km. 4, Jatisampurna, Bekasi,17435, West Java, Indonesia

    Contact  Mr Leonardi Kawidjaja (Project Manager) 62 21 8430 6407 f 62 21 8430 6407

    Email: [email protected] Website: www.kinematika.com  Kawasan Niaga Citragrand, Blok R12 No. 3, JalanAlternatif Cibubur - Cileungsi Km. 4, Jatisampurna, Bekasi,

    17435, West Java, Indonesia

    Mechanical & Electrical Engineer Metakom Pranata PT Contact  Mr Agus Joko Triyanto (Project Coordinator) 

    62 21 582 3167 / 5826178

    f 62 21 582 3168

    Email: [email protected] Website: www.metakom-pranata.com  Puri Kencana Blok K7 No. 2 E - F, Kembangan, JakartaBarat, 11610, Jakarta, Indonesia

    Piling Contractor Satria Cipta Astakencana PT Contact  Mr Rudy Setyawan (Director & Project Manager) 

    62 361 463 451 f 62 361 462 773Email: [email protected] 

     Jalan Sekar Jepun No 4 Gatot Subroto Timur, Denpasar,80237, Bali, Indonesia

    Contractor  To be appointed

  • 8/16/2019 Sample Project of the Month 01

    27/46

    Sample Project of The Month

    Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f   65 6538 6896 Email: [email protected] Website: www.bciasia.com 

    BCI Asia Construction Bulletin 24

    PROJECT CATEGORY

    Residential/ Recreation/ Car Park

    PROJECT STAGE PROJECT CODE

    Documentation 131227002

    BANDUNG NASUTION SUPERBLOCK -

    APARTMENT TOWER A Jalan A H. Nasution, Bandung, West Java 

    ● 27 storey apartment tower (approx. 30,000 sq m)● 900 apartment units● Studio type apartments, single bedroom units & 2

     bedroom units

    ● Single basement level car park● Apartment lobby & reception lounge

    ● Ground floor retail shops & restaurants●

    Swimming pool

    Building elements include:● Flooring : ceramic tile / homogeneous tile● Structural : reinforced concrete

    ● Ceiling : gypsum board● Walling : precast concrete panels / light brick wall● Facade : glass wall cladding● Roofing : concrete roof tile / concrete slab roof● Aluminium framed doors & windows / fabricated

    wood doors● Piling : mini pile / bored pile

    ● Lifts● Sanitary ware / plumbing

    ● Fire protection system● Security system● Building automation system 

    Estimated cost: Rp152.00 bn (US$11.26 mn). 

    Construction is expected to start in early December 2016.Construction is expected to end in late December 2018.

     Apartemen 27 lantai dan satu level basement, dengan luasbangunan sekitar 30.000 meter persegi. Perkiraan biaya:

    tidak dinyatakan. Konstruksi diharapkan mulai Desember2016 dan selesai Desember 2018. 

    Developer Robben Graha Mandiri PT Contact  Mr Benny Yoshawirja (Director / ProjectCoordinator) 

    62 22 423 7518 / 4223237

    f 62 22 423 9688

    Email: [email protected]  Pecinan Lama No. 9, Bandung, 40111, West Java,Indonesia

    Environmental Impact Assessment Teisar Cipta Sarana PT(aka Denisa Purnama CV) Contact  Ms Yunita Pusparini (Ririn) (Project Division Staff) 

    62 22 540 5602 / 5433946 / 541 6631

    f 62 22 540 5602

    Email: [email protected]  Jalan Manglid No. 25, Kopo Sayati, Bandung, 40226, WestJava, Indonesia

    BANDUNG NASUTION SUPERBLOCK - APARTMENT

    TOWER A (continued...)

    Contact  Mr Ahmad Dani (Director & Team Leader) 62 22 540 5602 / 5433946 / 541 6631

    f 62 22 540 5602

    Email: [email protected]  Jalan Manglid No. 25, Kopo Sayati, Bandung, 40226, WestJava, Indonesia

    Contact  Mr Radi (Team Leader) 62 22 540 5602 / 543

    3946 / 541 6631

    f 62 22 540 5602

    Email: [email protected]  Jalan Manglid No. 25, Kopo Sayati, Bandung, 40226, WestJava, Indonesia

    Architect Recta Optima PT Contact  Mr Hansen Setiawan (Team Leader / Architect) 

    62 22 727 2052 f 62 22 727 2052Email: [email protected] 

     Jalan Pratista Raya No. 49, Bandung, 40291, West Java,Indonesia

    Contact Mr Rovi (Architect) 62 22 727 2052 f 62 22 727 2052

    Email: [email protected] 

     Jalan Pratista Raya No. 49, Bandung, 40291, West Java,Indonesia

    Structural Engineer Recta Optima PT Contact  Ms Paulina Jacintha (Structural Engineer) 

    62 22 727 2052 f 62 22 727 2052Email: [email protected]  Jalan Pratista Raya No. 49, Bandung, 40291, West Java,Indonesia

    Mechanical & Electrical Engineer  To be appointed

    Piling Contractor  To be appointed

    Contractor  To be appointed

  • 8/16/2019 Sample Project of the Month 01

    28/46

    Sample Project of The Month

    Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f   65 6538 6896 Email: [email protected] Website: www.bciasia.com 

    BCI Asia Construction Bulletin 25

    PROJECT CATEGORY

    Health/ Education and Research/ Car Park

    PROJECT STAGE PROJECT CODE

    Documentation 140714002

    HOSPITAL - JALAN RAYA SOLO - SRAGEN 

    Jalan Raya Solo - Sragen (eks PT Palur Raya), Jaten,

    Karanganyar, Central Java 

    ● 4 storey hospital (approx. 12,000 sq m)● Inpatient care unit● Emergency unit● Polyclinic unit

    ● Surgical unit● Medical laboratory

    ● Medical consulting rooms●

    Patient medical record room● Patient recovery rooms● Obstetrics & gynaecology unit● Registration area & waiting room● Observation room

    ● Pharmacy room●  Neonatal Intensive Care Unit (NICU)● Medical equipment storage room● At grade car park

    Building elements include:● Flooring : ceramic tile / homogeneous tile

    ● Structural : reinforced concrete● Ceiling : gypsum board / acoustical ceiling

    ● Walling : light brick walls● Facade : glass wall cladding / aluminium composite

    cladding● Roofing : concrete slab roof

    ● Aluminium framed doors & windows / fabricatedwood doors

    ● Lifts● Split type air conditioning / duct connected air

    conditioning● Fire protection system● Security system

    ● Sanitary ware

    ● Building automation system 

    Estimated cost: undisclosed. 

    Construction is expected to start in early January 2017. Acompletion date is to be determined. 

     Bangunan rumah sakit 4 lantai dengan luas bangunan sekitar12.000 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Januari 2017. Waktu

     penyelesaian belum ditentukan. 

    HOSPITAL - JALAN RAYA SOLO - SRAGEN

    (continued...)

    Developer Gapura Mas Asri PT Contact  Mr Arya Wiryawan (Project Director) 

    62 271 821 363 / 821800 / 825 888

    f 62 271 821 363 / 825405

    Email: [email protected]  Jalan Raya Palur Km 9,1, Karanganyar, 57771, CentralJava, Indonesia

    Contact  Mr Yudi (Project Manager) 62 271 821 363 / 821

    800 / 825 888

    f 62 271 821 363 / 825

    405Email: [email protected]  Jalan Raya Palur Km 9,1, Karanganyar, 57771, CentralJava, Indonesia

    Architect Megatika International PT - Pos Pengumben Office  Contact  Mr Joe Louis Widodo (Design Director) 

    62 21 5365 1221 f 62 21 5365 0880Email: [email protected] Website: www.megatika.com  Komplek Apartemen Permata Eksekutif, Gedung KantorLantai 3, Jalan Pos Pengumben, Jakarta Barat, 11550, Jakarta,Indonesia

    Contact  Mr Frendy Martin Sudewo (Architect) 62 21 5365 1221 f 62 21 5365 0880

    Email: [email protected] Website: www.megatika.com  Komplek Apartemen Permata Eksekutif, Gedung KantorLantai 3, Jalan Pos Pengumben, Jakarta Barat, 11550, Jakarta,Indonesia

    Structural Engineer Cipta Sukses PT Contact  Mr Anwar Susanto (Director / Project Coordinator) 

    62 21 5596 3655 f 62 21 5595 8211Email: [email protected] 

     Ruko Pelangi Blok H No. 11, Taman Palem Lestari,Cengkareng, Jakarta Barat, 11730, Jakarta, Indonesia

    Mechanical & Electrical Engineer  To be appointed

    Quantity Surveyor  To be appointed

    Contractor  To be appointed

  • 8/16/2019 Sample Project of the Month 01

    29/46

    Sample Project of The Month

    Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f   65 6538 6896 Email: [email protected] Website: www.bciasia.com 

    BCI Asia Construction Bulletin 26

    PROJECT CATEGORY

    Hotel/ Car Park/ Retail

    PROJECT STAGE PROJECT CODE

    Documentation 140180002

    HOTEL - JALAN SUMATERA GRESIK (3 STARS) 

    Jalan Sumatera, Kebomas, Gresik, East Java 

    ● 11 storey hotel building (approx 7,800 sq m)

    ● Up to 140 hotel rooms● Hotel lobby & reception lounge● Dining & restaurant● At grade car park

    Building elements include:

    ● Flooring : ceramic tile / homogeneous tile●

    Structural : reinforced concrete● Ceiling : gypsum board / acoustical ceiling● Walling : light brick walls● Facade : glass wall cladding / aluminium composite

    cladding

    ● Roofing : concrete slab roof● Aluminium framed doors & windows / fabricated

    wood doors● Piling : bored pile / precast pile● Lifts● Split type air conditioning / duct connected air

    conditioning

    ● Fire protection system● Security system

    ● Sanitary ware / plumbing● Building automation system 

    Estimated cost: undisclosed. 

    Construction is expected to start in early December 2016.Construction is expected to end in early November 2017.

     Bangunan hotel 11 lantai dengan luas bangunan sekitar

    7.800 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Desember 2016 dan selesai

     Desember 2017. 

    Developer Bumi Lingga Pertiwi PT 

    Contact  Mr Ir. Rahmat Ridho MBA (Director) 62 31 393 0777 / 34930777

    f 62 31 393 0666

    Email: [email protected] Website: www.blp-property.com  Jalan Jawa No. 99, Gresik Kota Baru, Gresik, 61114, EastJava, Indonesia

    Contact  Mr Yanto (Project Manager) 62 31 393 0777 / 34930777

    f 62 31 393 0666

    Email: [email protected] Website: www.blp-property.com  Jalan Jawa No. 99, Gresik Kota Baru, Gresik, 61114, East

    Java, Indonesia

    Hotel Operator  To be appointed

    HOTEL - JALAN SUMATERA GRESIK (3 STARS)

    (continued...)

    Architect Megatika International PT - Pos Pengumben Office  Contact  Mr Joe Louis Widodo (Design Director) 

    62 21 5365 1221 f 62 21 5365 0880Email: [email protected] Website: www.megatika.com  Komplek Apartemen Permata Eksekutif, Gedung KantorLantai 3, Jalan Pos Pengumben, Jakarta Barat, 11550, Jakarta,Indonesia

    Contact Mr Hadijanto (Architect) 

    62 21 5365 1221 f 62 21 5365 0880Email: [email protected] Website: www.megatika.com  Komplek Apartemen Permata Eksekutif, Gedung KantorLantai 3, Jalan Pos Pengumben, Jakarta Barat, 11550, Jakarta,Indonesia

    Structural Engineer  To be appointed

    Mechanical & Electrical Engineer Tritunggal GlobalMahakarya PT Contact  Mr Indra Pranaka (Project Director) 

    62 21 7888 1457 f 62 21 7888 1457Email: [email protected] 

     Jalan Raya Lenteng Agung No. 26 A, RT 05 / RW 08,Lenteng Agung, Jakarta Selatan, 12610, Jakarta, Indonesia

    Quantity Surveyor  To be appointed

    Contractor  To be appointed

  • 8/16/2019 Sample Project of the Month 01

    30/46

    Sample Project of The Month

    Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f   65 6538 6896 Email: [email protected] Website: www.bciasia.com 

    BCI Asia Construction Bulletin 27

    PROJECT CATEGORY

    Residential/ Infrastructure/ Recreation

    PROJECT STAGE PROJECT CODE

    Documentation 137759002

    PARAMOUNT HILLS MANADO - RESIDENCES 

    Malalayang, Manado, North Sulawesi 

    ● 754 x 2 storey residential houses (4 types of houses :103 sq m, 110 sq m, 161 sq m & 182 sq m)

    ● Units to have 3 & 4 bedrooms● Internal road network● Gated entrance

    ● Communal garden● Perimeter fence walls

    Please find more information at www.paramount-land.com/project/residential/335/paramount-hills-manado/

    Building elements include:● Flooring : ceramic tile / homogeneous tile

    ● Structural : reinforced concrete● Ceiling : gypsum board● Walling : light brick walls● Roofing : concrete roof tile / concrete slab roof● Roof truss : lightweight steel● Aluminium framed doors & windows / fabricated

    wood doors

    ● Sanitary ware / plumbing 

    Estimated cost: undisclosed. 

    Construction is expected to start in early July 2016.Construction is expected to end in early December 2018.

     Kawasan perumahan meliputi 754 unit rumah 2 lantai,dengan 4 tipe luas bangunan sekitar 103, 110, 161 dan 182meter persegi. Perkiraan biaya : tidak dinyatakan. Konstruksidiharapkan mulai Juli 2016 dan selesai Desember 2018.  

    Developer Paramount Enterprise International PT Contact  Mr Aryo Tri Ananto (Technical Director) 

    62 21 5420 0888 /5420 0999

    f 62 21 547 4335

    Website: www.paramount-land.com 

     Paramount Plaza, Jalan Boulevard Raya Gading SerpongKavling 1, Gading Serpong, Kabupaten Tangerang, 15810,Banten, Indonesia

    Contact  Ms Esther Yuanita (Corporate Secretary / CorporateCommunication) 

    62 21 5420 0888 /5420 0999

    f 62 21 547 4335

    Email: [email protected] Website: www.paramount-land.com  Paramount Plaza, Jalan Boulevard Raya Gading SerpongKavling 1, Gading Serpong, Kabupaten Tangerang, 15810,Banten, Indonesia

    PARAMOUNT HILLS MANADO - RESIDENCES

    (continued...)

    Paramount Hills Manado Contact  Mr Nawawi (Associate Director) 

    62 813 1123 0188 f  Not available

     Jalan Wolter Monginsidi, Malalayang, Manado, 95115, North Sulawesi, Indonesia

    Architect Paramount Enterprise International PT Contact  Mr Pramudya Djati Asmoro (Architect) 

    62 21 5420 0888 /

    5420 0999

    f 62 21 547 4335

    Website: www.paramount-land.com 

     Paramount Plaza, Jalan Boulevard Raya Gading SerpongKavling 1, Gading Serpong, Kabupaten Tangerang, 15810,Banten, Indonesia

    Quantity Surveyor Paramount Enterprise International PT Contact  Mr Sutikno (Staff of Purchasing Division) 

    62 21 5420 0888 /5420 0999

    f 62 21 547 4335

    Website: www.paramount-land.com 

     Paramount Plaza, Jalan Boulevard Raya Gading SerpongKavling 1, Gading Serpong, Kabupaten Tangerang, 15810,Banten, Indonesia

    Contractor  To be appointed

  • 8/16/2019 Sample Project of the Month 01

    31/46

    Sample Project of The Month

    Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f   65 6538 6896 Email: [email protected] Website: www.bciasia.com 

    BCI Asia Construction Bulletin 28

    PROJECT CATEGORY

    Education and Research

    PROJECT STAGE PROJECT CODE

    Documentation 135128002

    PELITA HARAPAN SCHOOL 

    Jalan Honggowongso, Surakarta, Central Java 

    ● 5 storey school building (approx 2,300 sq m)

    ● 12 classrooms● Administration office● Library room● Practical room

    ● Teacher rooms

    Building elements include:●

    Flooring : ceramic tile / homogeneous tile● Structural : reinforced concrete● Ceiling : gypsum board● Walling : light brick walls● Facade : glass wall cladding / aluminium composite

    cladding● Roofing : concrete slab roof● Aluminium framed doors & windows / fabricated

    wood doors● Lifts● Split type air conditioning● Fire protection system

    ● Sanitary ware 

    Estimated cost: undisclosed. 

    Construction is expected to start in early December 2016.Construction is expected to end in early July 2017.

    Gedung sekolah 5 lantai terdiri dari 12 kelas dengan luasbangunan sekitar 2.300 meter persegi. Perkiraan biaya: tidakdinyatakan. Konstruksi diharapkan mulai Desember 2016dan selesai Juli 2017. 

    Developer Lippo Karawaci Tbk PT Contact  Mr Eko Wahyudi (Design Manager) 

    62 21 5579 0190 /5577 7808 / 5579 0191

    f 62 21 5579 7109

    Email: [email protected] Website: www.lippokarawaci.co.id  2112 Boulevard Gajah Mada #01- 01, Lippo Cyber Park,Lippo Karawaci Utara, Tangerang, 15811, Banten, Indonesia

    Architect Lippo Karawaci Tbk PT Contact  Mr Eko Wahyudi (Design Manager) 

    62 21 5579 0190 /5577 7808 / 5579 0191

    f 62 21 5579 7109

    Email: [email protected] Website: www.lippokarawaci.co.id  2112 Boulevard Gajah Mada #01- 01, Lippo Cyber Park,Lippo Karawaci Utara, Tangerang, 15811, Banten, Indonesia

    PELITA HARAPAN SCHOOL (continued...)

    Local Architect Prima Detailindo PT (aka Detail StudioEngineering Consultant) Contact  Mr Erwin Cahyadi (Director / Project Coordinator) 

    62 21 5596 3206 f 62 21 5596 3206Email: [email protected] Website: www.primadetailindo.com  Ruko Taman Palem Lestari, Ruko Pelangi Blok J No. 9,Cengkareng Barat, Jakarta Barat, 11730, Jakarta, Indonesia

    Foreign Architect DP Architects Pte Ltd Contact  Mr Wu Tzu Chiang (Project Director - Principal

    Architect) 65 6338 3988 f 65 6337 9989

    Email: [email protected] Website: www.dpa.com.sg  6 Raffles Boulevard #04-100 Marina Square,Singapore 039594

    Structural Engineer Satu Rekayasa Optima PT Contact  Mr Yoas Yuniananta (Team Leader / StructuralEngineer) 

    62 21 2903 4281 f 62 21 2903 4281Email: [email protected]  APL Tower Lantai 18 Suite P3 Central Park, Jakarta Barat,11470, Jakarta, Indonesia

    Contact  Mrs Jennifer Khoo (Civil Engineer) 62 21 2903 4281 f 62 21 2903 4281

    Email: [email protected] 

     APL Tower Lantai 18 Suite P3 Central Park, Jakarta Barat,11470, Jakarta, Indonesia

    Mechanical & Electrical Engineer Meco Systech InternusaPT Contact  Mr Bartholomeus Brajaguna Aritonang (ProjectEngineer) 