FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
TABLE OF CONTENTS
S. No. Description No. of
pages
EPC Main Specification 1 to 22
Annexure-1 Specification for Boiler & Auxiliaries 1 to 20
Annexure-2 Specification for Turbogenerator & Auxiliaries 1 to 22
Annexure-3 Specification for Air Cooled Condenser 1 to 4
Annexure-4 Specification for Fuel Handling System 1 to 10
Annexure-5 Specification for Electrical System 1 to 26
Annexure-6 Specification for Ash Handling System 1 to 4
Annexure-7 Specification for DM Plant, Auxiliary Cooling Tower,
Ventilation and Fire Fighting System
1 to 4
Annexure-8 Specification for Instrumentation & Automation
System
1 to 23
Annexure-9 Scope Matrix 1 to 82
Annexure-10 Questionnaire 1 to 103
Annexure 11 Vendors List 1 to 11
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 2/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
1.0 GENERAL
M/s.Facor Alloys Limited (FAL ) are proposing to install a CPP, a TG set of
rating 45 mw along with a CFBC boiler of capacity 195 TPH with steam
parameters of 110 ata and 545 deg c.
This specification is issued for implementation of the 45 MW CPP and its
auxiliaries through the EPC mode. This specification covers the design,
engineering, manufacture, assembly / re-assembly, tests at manufacturer’s works,
packing, ocean shipment and clearance through Indian Port of entry in case ofimported plant & equipment, inland transportation, in-land delivery to the site,
unloading, storage and in-plant transportation within site, complete civil and
structural design and construction work as required for the plant and facilities
covered by this specification, complete services of erection, testing, successful
commissioning, carrying out PG test, handing over and training of Purchaser’s
personnel, for the power plant complete with all accessories, auxiliaries and
ancillaries as specified hereinafter and elsewhere of this specification and as
required for safe and trouble free operation of the facilities.
The scope shall broadly include the equipment / systems, described in the
subsequent sections of this specification, but shall not be necessarily restricted to
these only. Whatever additional items necessary for safe and efficient operation
of the equipment / systems described elsewhere in this specification, shall also be
included as a part of the total services to be offered by the bidder
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 3/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Cont’d)
132 KV and vice versa. The power plant will have an HTpower distribution system
at 3.3 KV and an LT power system at 415 V.
1.1.2 Water: Source of Raw water for cooling and other uses in the plant will be from
the nearby abandoned rivers bunta and bore wells in the area. The approximate
analysis of the raw water from the 2 sources is given below:
Constituent
in
PPM
Abandoned
Bore
well
Mines Bunta
Total
Hardness
140
380
TDS
200
500
PH 8 8
Phenolphthalein Alkalinity 12 NIL
Methyl
Orange
Alkalinity
120
270
The raw water will have to be suitably treated and supplied as make up to the
auxiliary cooling water system and DM plant of the power plant as well as other
uses such as fire fighting, drinking etc. EPC bidder shall include for a raw water
storage tank of capacity 2000 cum in his scope. All necessary treatment facilities
for raw water shall be included in their scope by the EPC bidder.
1.2 PLANT LAYOUT
1 2 1 The proposed plant general layout of the existing facilities indicating the
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 4/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Cont’d)
information required for bidding, before submitting the Bids. No claim on account
of any ambiguity due to variations/changes in above conditions will be entertained
by purchaser subsequent to finalisation of contract.
Location : Garividi, Vijanagaram Dt, Andhra
Pradesh.
Max. dry bulb temp. : 45oC
Site altitude above MSL : 125 mt
Design dry bulb temp. for
Electrical equipment
: 50oC
Relative humidity for de sign : 80%
Design wet bulb temperature : 28 deg C
Wind Velocity at 10M
elevation
: 8 m/s as per IS 875 (Part 3)-
1987
Susceptibility to earthquake : Zone III as per IS 1893-20
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 5/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Cont’d)
International Electric technical commission (IEC) Publication and also within the
statutory requirements of the Government of India and Government of Orissa as
regards safety, ear thing and other provisions specified therein for installation and
operation of electrical equipment.
1.4.5 The Bidder shall be responsible for obtaining necessary approval and clearance
and making whatever additions / modifications considered necessary by CEIG /
Electricity Company and other Statutory Authorities to bring the installation in
conformity with the above Rules / Regulations at various stages during executionof this contract.
1.4.6 All Environmental / Pollution Control measures and Monitoring devices are to be
incorporated as per the requirement of relevant standards under Environmental &
Safety Act and as per the stipulations of Pollution Control Board of the state in
which plant is located.
1.4.7 Internationally accepted standards which ensure equal or higher performance
than those specified shall also be accepted.
1.5 STANDARDISATION
1.5.1 Contractor shall standardise various types and make of equipment and
accessories in order to reduce diversity, convenience of operation and
maintenance and minimise inventory.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 6/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Cont’d)
1.5.5 Systems shall be designed incorporating the latest technology and maximum
flexibility in operation with sufficient stand-by provision. All system design shall be
subjected to the approval of Purchaser.
1.5.6 Equipment furnished by the Bidder shall be complete in every respect with all
mountings, fittings, fixtures and standard accessories which are normally supplied
even though not specifically detailed in the specification. The Purchaser shall not
be called for any extra payment in respect of such mountings, fittings, fixtures and
accessories which are needed for the safe operation of the equipment as requiredby applicable codes within Indian Territory though they may not have been
included in this contract.
1.5.7 All equipment shall have suitable approach ladder and platform for repair and
maintenance wherever necessary.
1.5.8 The Bidder shall endeavour to utilise and adopt same codes, standards, and
norms keeping in mind the minimum variation & comprehensive standardisation of
the different spare parts for similar / identical basic component / equipment,
machinery and for the plant as a whole.
1.6 DOCUMENTS FORMING PART OF THIS TENDER
1.6.1 The following documents enclosed to this specification shall be considered as a
part of this tender Document:
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 7/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Cont’d)
1.6.2 Bidder shall note that the layout drawings and schematic diagrams furnished with
this specification are for the specific purpose of clarifying purchaser’s
requirements, which are to be considered for preparing the bid. The schematic
diagrams and layout drawings enclosed with this specification are not valid for
interpretation of scope of work during contract execution stage. Successful bidder
shall prepare drawings and schematic diagrams as required for equipment offered
taking also into consideration the technical specification and typical schematic
diagram for manufacturing, supply and erection. Drawings and schemes whichare finally approved by purchaser shall determine the respective scope of supply
& erection and responsibility of supplier.
1.7 COMPLETE SERVICES TILL COMMISSIONING
1.7.1 The scope of service under this specification has been elaborated in above
clauses. It is stressed that all responsibility from design, manufacture to
successful commissioning and performance acceptance test at site rests totally onthe successful Bidder. Purchaser shall not, in any way, be responsible for any
delay in transportation and clearance through Indian Port of entry.
1.7.2 In case bidder offers equipment from foreign sources, it is suggested that bidder
shall employ reputable Indian agents who will furnish necessary helps to ensure
speedy clearance through port, handling and transportation. Bidder / Indian agent
h ld k i it t th it b f b i i f ff i d t th
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 8/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Cont’d)
attended to and the entire trial run repeated for another 15 days. On successful
completion of the trial run and reliability test the boiler will be taken over by the
Purchaser and a Provisional Acceptance Certificate (PAC) issued.
1.8.2 All equipment shall be guaranteed for workmanship and materials, and
satisfactory performance. The guarantee for performance shall cover individual
items and systems including electrics for their ratings/outputs, as required in the
specification. On issue of the PAC as mentioned in para 1.8.1 above supplier shall
conduct the performance guarantee tests within 1 month of issue of PAC toestablish the various parameters guaranteed by him in the contract.
1.8.3 Instruments, gauges and flow meters installed for the normal operation of the
equipment shall be made use of during the acceptance tests as far as practicable.
However, if there is no panel-mounted instrument for measurement, separate
calibrated instruments shall be hooked up for the performance test purpose.
Temporary meters required for PG test shall be arranged by the contractor. ThePerformance test on the unit shall be conducted within one month from the date of
Provisional taking over. Upon successful completion of the Performance tests,
and compliance of all contractual conditions by the contractor such as submission
of all final drawings and documents, as built drawings and operation &
maintenance manuals etc. as well as fulfilment of all other obligations, Purchaser
will issue to contractor a final acceptance certificate.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 9/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Cont’d)
to be mutually agreed upon. A maximum of two chances will be given for repair
and retest to bring the parameters within the guaranteed values and the total time
period for such retests shall be a maximum of 4 months from the date of
commissioning. However, if the performance guarantees are not proved within the
above attempts or time period Liquidity Damages (LD) / price reduction as defined
in following clause will be applied in the case of some of the parameters
1.9 LD CLAUSE / PRICE REDUCTION:
1.9.1 Price reduction for Non performance:
The following LD/price reduction shall be applicable in case of non-achievement of
guarantee parameters as per Para 1.8.4 above:
Nature of
Shortfall
LD/price reduction rate Limit of non acceptability
Maximum
continuous rating
of boiler
0.5% of contract price for
every 1% deficiency or part
thereof.
Deficiency up to 2% will be
accepted with LD. Beyond
2% equipment will have to
be rectified by supplier to
bring it within the
acceptable limit.
Steam pressure
d t t
Not applicable No tolerance is acceptable
th t
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 10/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Cont’d)
efficiency or part thereof. 2 % equipment will have to
be rectified by supplier to
bring it within the
acceptable limit at no extra
cost to Purchaser.
Guaranteed
Auxiliary power
consumption
Rs. 1.5 lakhs for every 1 KW
additional power
consumption over theguaranteed value
Increase in auxiliary power
consumption upto 3% will
be accepted with LD.Beyond 3% equipment will
have to be rectified by
supplier to bring it within
the acceptable limit at no
extra cost to Purchaser.
If the total value of the penalties for shortfall in performance exceed ten percent
(10 %) of Total Contract price, and the supplier has expressed his inability to rectify the
defects & bring the equipment performance to the guaranteed value, then the purchaser
retains the option to reject the equipment, and in case of such option the supplier shall,
jointly and severally, replace the equipment with one, which shall meet the guaranteed
values. The replacement shall be done within a reasonable period mutually agreed and
with no extra cost to the purchaser.
F th it f hi h h tf ll i f i t t bl b d th
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 11/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Cont’d)
1.9.2 Price reduction for Delay in Delivery:
Time is the crux of the project. The supplier shall endeavour to deliver, install &
commission the plant within time period specified in contract. If the supplier fails to
deliver, install & commission any or all the goods within time period, specified in contract
the Purchaser shall, without prejudice to his other remedies, under contract, deduct from
the contract price, as liquidated damages, a sum equivalent to 0.5% of the total contract
price for each week of delay up to maximum 5 % of contract price. Once the maximum is
reached the purchaser may consider termination of the contract.
1.9.3 Total LD / price reduction
The total price reduction on account of both clause 1.15.1 and 1.15.2 above shall
be applicable independently subject to an overall ceiling (considering an aggregate of all
items) of 10% of the total contract price.
1.10 INSPECTION AT WORKS FOR IBR CLEARANCE:
Equipment shall be offered for inspection prior to despatch. The test shall be
conducted as per the procedure laid down by the concerned Indian Boiler Regulations
(IBR) and got cleared by Boiler Inspectorate for pressure parts as per IBR. Third party
inspection by internationally reputed testing agencies like Lloyds inspection, BVQI shall
be arranged by supplier as per requirement of Indian Boiler Inspectorate. All necessary
cost for getting the IBR clearance shall be included by the bidders in their offers.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 12/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Cont’d)
inspection clearance for that stage. Items shall not be despatched without
obtaining inspection clearance.
1.11.3 If any defect / deviation are observed, the same shall be recorded in the report
and corrective measure that will be taken shall be discussed and mutually agreed.
If the correction is not accepted by the testing engineer, the same shall be
referred to the designer / consultant for review and approval. In due course of
inspection, if any additional tests are required to be carried out, the same shall be
done without any additional cost to the purchaser.
1.11.4 Items will be categorised as A, B and C. Major items whose testing is to be
witnessed are categorised as “A” and those items, which are not to be witness
tested, shall be categorised as “B”. All other items like foundation bolts, support
structures and similar items shall be categorised as “C”. Itemised categorisation
will be done at the time of finalisation of order. All routine tests for category A as
per applicable standards will be witnessed by the inspection Engineer. Materialtests certificates and internal inspection test certificates shall be submitted for
category B. Items categorised as category C may be despatched by suppliers
after ensuring the quality themselves.
1.11.5 Even though inspection is conducted, if any defect is found at site, the same shall
be corrected / replaced by supplier without any additional cost to the purchaser.
1 11 6 F ll i d h ll b b i d d b i d f h
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 13/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Cont’d)
/ FHS / AHS test
2Bought outs like boiler feed
pumps etcX, T, W -
3 Control Panels X, T,D -
4 Instruments & control X, T -
5 Motors X, T -
6 MCC X, T, W, D
X –Routine tests to be conducted
T – Type test Certificates to be submitted for review
W – Factory tests will be witnessed by purchaser
D – Dimensional, general arrangement, workmanship, finish checks
The modalities & the QA plan proposed will be discussed & mutually agreed.
1.12 BOILER REGISTRATION
The boiler shall be manufactured as per Indian Boiler Regulations with latest
amendments. One set of relevant documents and certificates signed by the Chief
Inspector of Boilers of concerned state shall be forwarded to the customer. Boiler
registration formalities, IBR approval and approval by other statutory bodies shall be done
by tenderer. However, Purchaser shall pay only the statutory fees to the concerning
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 14/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Cont’d)
1.15 SUPERVISION FOR ERECTION AND COMMISSIONING
Experienced engineers shall be posted at site for erection supervision by the
contractor who shall interact with consultant and client on a day-to-day basis and
reporting shall be on daily basis. For major bought out items like boiler feed pumps etc.
erection & commissioning engineer from OEM shall be made available by contractor.
1.16 TRAINING
All system shall be operated by O&M group of the client from the day of start ofcommissioning under the direct supervision of the commissioning team deployed by
contractor. Commissioning engineers of contractors shall operate for at least 6 months
from the date of reaching 60% of full power operation. During the 6 months O&M team
shall be trained and gain confidence for independent operation.
1.17 SUBLETTING OF CONTRACT
Bought out items shall be procured from approved vendors only. List of suggestedvendors is enclosed as Appendix to this specification. The Contractor shall not without the
consent in writing of the Purchaser/Consultant, which shall not be unreasonably withheld,
assign or sublet his Contract or any substantial part thereof other than for raw materials,
for minor details, or for any part of the works of which the makers are named in the
Contract, provided that any such consent shall not relieve the Contractor from any
obligation, duty or responsibility under the Contract.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 15/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Cont’d)
1.21 DRAWINGS AND DOCUMENTS
1.21.1 Information to be furnished with the tender
Bidders shall submit following drawings along with the bid for review before
finalisation of the tender.
General layout of Boiler and Auxiliaries proposed by the bidder.
Scheme diagrams of Boiler steam system, Feed water system, Auxiliary
system steam, Deaerator etc.,
1.21.2 Drawings to be submitted after award of contract
Bidders shall submit following drawings after award of contract.
a) Approval category
Basic design drawings, general arrangement drawings, P&I diagrams,
procurement data sheets for bought out items, pipe routings, electrical single line
diagrams, electrical relays schedules shall be included in the approval category of
drawings. List of drawings, which will be in approved category, will be finalised at the time
of placement of order.
b) Certified data /Drawings for purchaser’s input
Contractor shall submit following drawings for purchaser’s design inputs.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 16/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Cont’d)
Instructions showing pre-requisites and procedure for erection
Erection drawings for proper erection and assembly of all equipment.
Pre commissioning check list for erection completion which will be signed
as protocol for erection completion
Commissioning procedures
Check list for completion of commissioning as part of protocol for
commissioning
Handing over protocol
e) Inspection and Test reports
Purchaser shall submit all factory test reports and inspection reports, minutes of
meeting during inspection etc. and protocol for erection completion, commissioning
protocol etc. at the end of contract for purchaser and plant records.
f) Operation and maintenance manuals
Contractor shall supply of the following documents & drawings with the delivery of
equipment.
Operation and maintenance manuals.
List of recommended spare parts with specification and supplier reference.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 17/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Cont’d)
All design drawings shall be oriented to match the plant arrangement drawings
and shall have a key plan identifying the plant area to which they apply. All layoutdrawings shall be made with the NORTH arrow pointing to the TOP of the sheet.
1.22 MISCELLANEOUS
1.22.1 Painting
All items of equipment shall be thoroughly cleaned and painted with two coats of
approved primer and two coats of approved alkyd based finish paint as per
standard practise of the equipment supplier. The successful bidder shall furnish
painting procedure for equipment, piping, structural and other items before start of
erection or before fabrication of the items.
1.28.2 Lubrication
All equipment shall have adequate lubrication arrangements for smooth and
efficient operation. Sufficient lubrication points shall be provided wherevernecessary and all such points shall be easily accessible. Grease guns shall be
provided wherever necessary.
1.23 SPARES, TOOLS AND TACKLES & CONSUMABLES
1.23.1 Commissioning Spares
Provision for all spares required for commissioning of the equipment and for its
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 18/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Cont’d)
1.23.5 Consumables, etc.
All consumables for erection, testing and commissioning including first fill of all
items such as oil, grease, etc till handing over of the plant and equipment to purchaser
shall be in the scope of the supplier.
2.0 SCOPE OF THE SPECIFICATION
2.1 The scope of supply of equipment and services covered by this specification are
detailed in various sections of this specification. Any item, though not specificallymentioned but required to make the power plant and auxiliaries complete in all
respects and for its reliable and safe operation and guaranteed performance shall
be included by the tenderer in his offer. Obtaining statutory approvals and
clearances at appropriate stages from various authorities shall also be treated as
though included and the bidder shall include the same, unless otherwise
specifically excluded elsewhere.
2.2 Basic and detailed engineering services including but not limited to the following
for the proposed CPP are covered by this specification:
• Basic engineering for the complete Power Plant covering complete process
design, process calculations, material and heat balance, complete system
design for plant and equipment including utilities, electrics, and
instrumentation and automation systems.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 19/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Cont’d)
2.3 Supply, erection, testing and commissioning of the following equipment, systems
and services for the power plant are included in this specification:
• One (1) Boiler of CFBC design capable of using coal washery rejects,
Indian coal G grade,and Indonesian coal as fuel.However the boiler should
be designed for 100% coal washery rejects. The capacity of the boiler shall
be 195 TPH at required pressure of temperature. The boiler and auxiliaries
shall be as per enclosed specification.
• One (1) Turbo generator set of capacity 45 MW at the designed inlet steam
and temperature. The TG and auxiliaries shall be as per enclosed
specification.
• One (1) Air cooled condenser with air extraction equipment and other
auxiliaries for the turbine and a set of condensate extraction pumps with
drive motors and other accessories. The ACC and auxiliaries shall be as
per enclosed specification.• Complete piping, auxiliary piping, and interconnecting main steam, feed
water, condensate, auxiliary steam etc. complete with hangers, supports,
valves, specialties, etc. for each TG unit
• Raw Water Treatment and auxiliary cooling water system with pumps &
accessories DM plant etc. as per specification enclosed.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 20/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Cont’d)
• Fire detection and protection systems & accessories complete with
detectors, electrics, pumps & associated accessories, pipe work etc andportable C02 extinguishers and sand filled buckets for electrical rooms,
transformer area, control room, cable vaults, etc. as per requirements
• HVAC System & its accessories for turbine building operating and ground
floor, electrical room, battery charger room, control room, office room etc.
including air conditioning & ventilation systems with package and split type
air conditioners, air handling units for washed air supply systems supplyand exhaust fans & associated ducting, piping etc.
• Mono rails with electric hoists for ESP, boiler, pump houses and other
areas as required for maintenance.
• Inspection at Factory, Quality control at manufacturing works, testing of all
the equipment as specified and as per the requirement of Indian Boiler act.
• Commissioning spares as required for all equipment / plant / systems asrecommended by the respective manufacturers for successful
commissioning and operation of the plant till the system is handed over
after successful performance guarantee tests.
• Packing and forwarding, arranging transport inland or sea transportation,
port handling and clearance of imported equipment safe transportation
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 21/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Cont’d)
means shall be provided for lifting and handling of each item of plant and
equipment.
• All statutory permits license from competent authority approvals from Boiler
Inspectorate, Electrical & Factory Inspector, and TAC/ NFPA, labour etc.
as required for the project.
• Carrying out all pre-commissioning and commissioning tests in
consultation with Purchaser’s Engineer at site and commissioning of the
systems.
• Performance Guarantee tests for all the equipment as per mutually agreed
procedure and as per Indian and International Standards.
• Submission of all drawings and documents to Purchaser’s consultants and
obtaining approvals before start of manufacturing or construction.
• Preparation of monthly reports in the agreed formats and attending
monthly review meetings, design coordination meetings etc.
• Arrange permission for Purchaser’s / Purchaser representative’s entry to
different stage and final inspection / testing of equipment at manufacturers
works.
• Receiving and unloading of all equipment, plant and materials at site,
checking with shipment list / consignment note and reporting for missing or
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 22/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Cont’d)
• Carrying out commissioning testing, starting up checks, performance
testing, and handing over of the complete plant / equipment / system / sub-systems.
• Supply of all drawings, data, test certificates, O & M manuals, etc., as
necessary.
• Supply and compilation of different manufacturers operating and instruction
manuals in a comprehensive manner prepared for use by operating and /
or maintenance personnel.
• Submit complete “As-Built” drawings for the plant / system / sub-system /
equipment / material as erected and installed at site incorporating each
change or modifications in the executed works from the approved
construction drawings.
• Project engineering and management and periodic reporting till handing
over the plant.
2.4 The successful bidder shall provide the following manpower at site during
erection, testing and commissioning:
• One experienced Site In charge having at least 15 years of experience in
erection and commissioning of similar projects
• Engineers with experience in similar job as Supervisory staff, inspectors,
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 23/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
EPC Spec (Cont’d)
• Furnace oil/LDO at the inlet of storage tank.
• Raw water supply lines at inlet to raw water storage reservoir.
• Vents to be taken outside building limit wherever necessary with suitable
bird net, rain protecting hood etc., fitted at the outlet with suitable
approaches for servicing & maintenance.
• Drains and blow downs to be taken up to a collection sump through drain
header or drain trench. All above ground drain piping inside the plant shall
also be included by bidder in his scope.
• Electrical 132 KV transmission line for power export at gantry of existing
132 KV bus.
2.7 Following items of work are excluded from the scope of work covered by this
specification:
•
Site levelling, soil investigation etc.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 24/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE-1 – BOILER & AUXILIARIES
1.0 DESIGN BASIS
1.1 BOILER
1. Type Single or bi-drum, vertical, semi-
outdoor, natural circulation
2. Normal Continuous rating
(NCR), Steam pressure and
Temperature at MSSV outlet
195 TPH, 110 ata, 545 +/- 5° C
3. Number One
4. FW inlet temperature 219° C ( min)
5. Steam purity Total Dissolved Solids: 0.1 ppm
(max)
Silica (max): 0.02 ppm
6. Steam system Steam line from CFBC boiler to be
connected to main steam header in
the TG building which has to be
extended as required. Auxiliary
steam header to be provided as
required.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 25/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)
Combination – 3:
Imported coal : 25%
Washery reject : 25 %
Indian Coal ‘G’ : 50 % .
1.2.2 Analysis of Fuels:
Approximate indicative analysis of different fuels is given below:
Ultimate Analysis:
S.No PARTICULARSCoal washery
rejects
Indian coal
G - grade
Indonesian
coal
1 Carbon % 23.0 17.10 59.38
2 Hydrogen % 01.3 0.22 3.15
3 Nitrogen % 00.6 0.10 01.04
4 Sulphur % 01.50 0.57 0.38
5 Moisture % 08.00 06.32 06.00
6 Ash % 60.50 75.48 25.19
7 Oxygen % 05.10 0.20 04.86
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 26/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)
The control of the CPP will be based on a DCS system to be
procured by the purchaser separately. All instruments and controls
provided by the boiler supplier shall be compatible to the DCS and
necessary outputs for feeding the signals to purchasers DCS shall
be provided by the boiler supplier.
1.4 ELECTRICAL SYSTEM
All drive motors up to 200 KW shall be suitable for operation on 415 V, 50
Hz, 3 / 4-wire systems. All the motor shall meet the following conditions. All the AC motors for various auxiliaries should be designed to
operate in humid air with the maximum ambient temperature up to
45 deg. C
All the motors shall be of squirrel cage type
The degree of protection of motors shall be IP 54 & shall confirm to
IS: 325 / IEC – 60034. Motors for outdoor application shall be IP 55 degree of protection
with sheet Steel canopy
The motor winding shall be provided with class F insulation
The motors shall be suitable for + 10 % voltage variation on rated
Voltage and + 5 % frequency variation on 50Hz. Subject to
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 27/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)
Fuel Feeders shall be provided with VFD’s. VFD’s shall be meet the
following requirements:
Rated for 415 V
Suitable for the selected IGBT based variable frequency drive, and
shall match with the drive in respect of over voltage / spike
generated by drives.
Winding shall be VPI treated and two coat enamelled. These motors
shall be sized to operate satisfactorily under the lowest speed
conditions. Operating speed requirement shall be as follows –
Boiler Feed Pump - 30 % to 100 %
Fans - 30 % to 100 %
Fuel Feeder - 10 % to 100 %
Motors of rating above 30 KW shall be provided with thermisters in
the windings and higher capacity motors shall be provided with
RTDs
Motor terminals to be rotatable for 4 X 90 Deg. Higher rating motors
shall be provided with extension terminal box to receive the
aluminium cables. The terminal box shall be capable of
withstanding the maximum system fault current for duration of at
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 28/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)
they will have a minimum clearance of 6.0 metres between bottom
of supporting structures and road crown/ railway track.
All shop headers, except for gravity return fluids, shall be generally
routed along columns in multiple rows at a height 4 to 6 metres
above floor level. The connections to equipment shall be taken
through suitable covered floor trenches for shops at ground floor
and for basements and for elevated operating floors, the equipment
pipe work connections may be taken below the floor level. Allgravity pipes shall also be preferably routed along the same route.
Isolated single pipe connections to equipment may be buried in the
flooring/ equipment foundations. All pipe trenches shall be covered
by chequered plate or by concrete slabs.
The outlet pipes for purging lines and other exhaust pipe work shall
be routed upward along columns / gable ends and / or walls to a
height of 4,000 mm above the roof level.
Platforms, access ladders, hand railing etc shall be provided for
operation and maintenance of valves, instruments and controls. In
case the units and electric drives for the valves are to be located at
a height of more than 1.4 m from the maintenance level, the
platform with stairs shall be envisaged (either stationary or light-
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 29/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)
For condensate (upto 8Kscg & 60 deg. C) velocity shall not exceed
2 m/s
For drain & cooling water (upto 6Kscg & 200 deg. C) velocity shall
not exceed 2 m/s
1.5.3 Valves & Fittings
Valves of DN 100 and above shall be provided with by-pass.
Pipes, fittings and valves shall be supplied with IBR certificates.
Valves shall be provided on pipe work for isolation of pipe sections
and equipment, control of pressure, flow and level of fluids, venting,
draining, pressure relief etc. They shall be suitable for the service
conditions in all respects and located suitably considering ease of
operation and maintenance.
The valves provided shall include but not be limited to the
followings:
On all pipelines both at the sources and consumers.
On all branch pipes from main header to consumers.
Isolating and bypass valves for flow meters, filters, trap assembly
etc.
Check valve on all pipelines requiring unidirectional flow.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 30/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)
Relief & safety valves of adequate capacity shall be provided at
required location for ensuring the safe operation of the system.These shall be of spring-loaded type and shall automatically open
when the pressure and the pipelines, on which they are mounted,
exceed preset values. The valves shall have end connections and
materials specified for throttling valves. Relief/Safety valves for
steam service shall have IBR certification. Relief valves shall have
hand wheel / wrench for adjustment of preset value of relief
pressure.
1.5.4 Expansion and flexibility
Piping stress analysis using suitable software package to comply
with the requirements of ANSI B31.1 power piping code and IBR
All pipe work shall be designed to provide suff icient flexibil ity to
prevent development of undesirable forces or moments at points of
connection to equipment, at anchorages or at guide points due to
thermal expansion.
Flexibility shall be provided by changes of direction or by the use of
bends, loops or offsets. Wherever no self-compensation can be
used to cater for the expansion deformation of the pipelines, special
expansion joints shall be provided. In general, expansion loops
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 31/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)
details might be omitted on the drawings. Supporting shall ensure
freedom for expansion and absence of movement as well as restrictsagging to reasonable limits.
1.5.5 Supports
Pipe supports, anchors, hangers, guides, sway bracings, vibration
dampers etc shall be according to ANSI B 31.1 or equivalent.
Design, material and workmanship for structural steelwork used for
pipe supports shall conform to relevant Indian Standards forStructural Steelwork and Civil Engineering Work.
1.5.6 Welding
The Tenderer shall provide all tools, plant, instruments and
consumable including welding electrodes for carrying out the
welding at site.
The Tenderer shall arrange at his own cost for all tests outlined
below and any other test indicated by the Equipment Manufacturer /
FAL from time to time during the progress of work.
Visual examination.
X-ray and Gamma-ray examination.
Ultrasonic test.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 32/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)
1.5.7 Thermal insulation
Thermal insulation shall be provided for all surfaces substantiallyhotter than ambient conditions. The data regarding ambient
conditions given shall be used for selection of thermal insulation.
The thermal insulation provided shall ensure that the temperature of
outside surface of insulation (Cladding) shall not exceed 60 deg C.
Mineral wool (made from rock, slag & glass) insulation materials
shall be used for hot services. The insulation material shall be oneof the following types.
For pipe work up to DN 350, pipe-sections of light resin-bonded
mineral wool (rock/slag wool) as per IS: 9842 shall be used. In
addition to the compulsory requirements indicated in clauses 4.1 to
4.11 of the IS code, optional requirements laid down in clauses
4.12.1 to 4.12.4 of the IS code shall be fulfilled in all cases.
For pipe sizes above DN 350 and for flat surfaces and equipment,
resin bonded mineral wool (rock wool) mattress as per IS:8183, with
factory stitched G.I. Wire netting on outer surface. In addition to the
compulsory requirements indicated in clauses 4.1 to 4.9 of the IS
code, optional requirements laid down in clauses 4.10.1 to 4.10.7 of
the IS code shall be fulfilled in all cases.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 33/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)
Preparation of detailed GA drawings, Foundation load data
requirements, for main boiler, auxiliaries, piping within the scopeetc.
2.1.2 Manufacture, supply erection & commissioning
Complete manufacture and supply of all the equipment, electrics
and piping covered in the scope including shop testing.
Providing engineering drawings, data, and operation manuals to the
Purchaser. Supply of all equipment, materials, spares and special tools and
tackles, which are required for achieving the specified performance
parameters of the plant. Any special instruments etc. required for
proving the performance of the boilers after the installation at site
shall also be included in the scope.
Testing of the equipment after manufacture at works including
inspection by an approved third party inspection agency as per Para
1.6 above.
Obtaining approval from Indian Boiler Inspectorate for the
equipment supplied, steam and feed water piping and wherever
required by IBR.
Packing forwarding and arranging transportation / shipment from
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 34/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)
Fin welded water wall furnace enclosure with refractory in bed zone.
Down comers and risers.
Drainable super heater assembly with inlet and outlet header.
Spray type inter stage de super heater assembly.
Necessary piping connecting super heaters and de super heater.
Economiser with plain tubes with casings & hoppers.
Multi tubular air pre heater with tubes, tube sheets, casing and
hoppers.
2.2.2 Furnace
Fluidised bed furnace of suitable sizes enclosed by water wall etc.
Firing arrangement
Bed ash drain arrangement
Inspection arrangement
Fuel and air nozzles
2.2.3 Air and Gas ducting
Integral Air and Gas ducting of boiler.
Air headers for primary air and secondary air and suitable
distribution in the furnace
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 35/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)
2.2.8 Boiler Integral Piping
Feed piping from NRV, Feed water control station to feed waterheader.
Feed piping feed water header to economizer.
Feed water piping from economiser outlet to steam drum.
Spray water piping for desuperheater.
Saturated steam line from steam drum to inlet header of primary
super heater.
Steam line from primary super heater outlet to inlet header of
secondary super heater.
Main steam piping from secondary superheater outlet header up to
outlet of main steam stop valve.
Soot blower steam piping as necessary.
HP dosing unit to feed water line.
Boiler blow down up to boiler blow down tank.
Boiler blow down tank (common for continuous and intermittent
blow down and its associated piping)
Drain piping up to common drain header/ nearest trench.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 36/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)
Four no of sample coolers for feed water, saturated steam,
superheated steam and blow down water of boiler.
Flow nozzle, transmitters, Drain valves etc.,
HP dosing system with pumping unit and its drives, supporting,
fittings, valves, agitators etc.,
Feed water control station
Isolation valve at boiler filling line.
Instrument air piping.
Two no. of Safety valve at drum and one no. of safety relief valve at
Main steam header.
Motorised main steam valve and motorised bypass valve
Motorised start up vent valve
2.2.10 Supports and Platforms All steel supporting structure for the boiler over the concrete
platform to be provided.
Minimum & essential operating platforms with approach stairs/
ladders and canopy and side sheeting up to bunker level and side
covering as required to avoid rain beating.
2 2 11 Electrostatic precipitator
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 37/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)
Steel supporting structure for the bunker.
2.2.14 Chemical Dosing System
Skid mounted LP dosing system including pump set (1W + 1S) with
their motors of required capacity.
Skid mounted HP dosing system including pump set (1W + 1S) with
their motors of required capacity.
LP dosing piping including supports upto feed pump suction.
HP dosing piping including supports upto steam drum.
Minimum & essential valves and fittings.
2.2.15 Deaerator and Boiler Feed Pumps
One Deaerator of capacity 220 tons/hour complete with deaerated water
storage tank of capacity 70 cum complete with all necessary accessories,
safety valves, Insulations, supporting structures, foundation bolts, fittings
etc.
Three boiler feed pumps (1W+1S) each of approximate capacity 240
cum/hr and head to suit the pressure requirement of the boilers and the
pressure drop in the pipe work complete with drive motors, recirculation
valves, balancing valves, strainers, isolation valves, check valves,
foundation bolts and accessories etc.,
FACOR ALLOYS LIMITED
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 38/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)
Shut off Head – The shut off head should be at least 1.1 times the
duty point head (at boiler MCR) and should not be more than 1.2times the duty point head (at boiler MCR).
Power Characteristics – The power curve should be of non-
overloading type with the maximum power occurring at or near duty
point or towards maximum run out flow. Deeply formed “S” shaped
power curve should as for as possible be avoided.
NPSHR Characteristics – At rated capacity, margin betweenrequired and available NPSH shall be at least 1.0 M
NPSHR curve should be a continuous rising one in the range of
operation, from the minimum flow in the range to the maximum flow
in the range. A bowl shaped NPSHR curve in the operating range is
unacceptable. Required NPSH values shall not exceed available
values over the entire range from minimum to rated flow.
Efficiency Vs Flow Characteristics – The efficiency curve should be
fairly flat in the range of +(-) 1% of the BEP flow. The duty point of
the equipment should preferably lie in this flat region, but not a flow
higher than the BEP flow.
Pumps operating in parallel shall have equal head rises from
normal capacity to shut off of at least 10 %.
FACOR ALLOYS LIMITED
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 39/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)
2.2.16 Complete feed water pipework between the Deaerator and feed water pumps,
feed water pumps and individual boilers complete with necessary valves, fittingsand accessories.
2.2.17 Complete main steam pipe work from the MSSV of CFBC boiler up to the existing
common steam header in the TG building including extension of the main steam
header, necessary isolation valve at the header and the steam line from the
common stream header up to inlet flange of TG complete with valves, fittings,
supports and accessories.
2.2.18 Complete steam piping from main steam header to PRDSs , to Auxiliary steam
headers, to Deaerator, to Ejector inlet nozzle, to Sealing steam inlet of TG,
Extraction line from TG extraction steam nozzle to Deaerator and other branching
steam pipelines with valves, accessories, fittings etc.,
2.2.19 Basic Field Instruments for the boiler
Thermocouple & RTD (PT100Ω) compatible with DCS for the
following
- Water temperature at the inlet of economiser.
- Water temperature at the outlet of economiser.
- Water temperature at the inlet to primary SH
- Water temperature at the inlet to secondary SH
- Water temperature at the outlet to Primary SH
FACOR ALLOYS LIMITED
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 40/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)
Draught gauges for CFBC boiler with transmitters to measure
- Air box pressure, secondary air pressure
- Furnace pressure
- Flue gas pressure before economiser
- Flue gas pressure before & after multi tubular air heater
- Air pressure before & after multi tubular air heater
- Air pressure at primary air header and secondary air header.
- Compensating cables and impulse piping wherever necessary for the
items, which are under THE CONTRACTOR scope of supply.
- Instrument panel to mount draught gauges supplied by The Contractor.
Boiler Controls:
Following minimum controls are required for the boiler. All field
instruments, switches, level measurements sensors etc shall be provided by the
boiler supplier to enable purchaser’s DCS control system
- Automatic Three element drum level control- Automatic Attemperator control to maintain constant temperature for
60 to 100% flow within +/- 5 Deg C
- Automatic Combustion control for CFBC boiler
- Automatic Furnace draught control for CFBC boiler
- Fuel feeders with variable speed drives
Alarms and annunciation sensors for purchaser’s DCS system
FACOR ALLOYS LIMITED
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 41/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)
Deaerator shell SA 515 Gr.70/SA 516 Gr.70
Deaerator storage tank SA 515 Gr.70/SA 516 Gr.70
Non pressure parts
Steam drum drier / mesh SA 478 Type 304
Air heater corten steel tubes SA 423 Gr.1 ERW
Fuel bunker conical portion AISI 304
Fuel distributor exposed to
radiation
AISI 304
Ducting IS 226 / IS 2062
Bank area baffles AISI 304
Structural steel IS 226 / IS 2062
High tensile steel IS 961
Hand rails IS 1239 – 32 NB Medium
Structural fasteners IS 1363 /1364
Grating BS 4952 Part 1
LP dozing piping SA312 TP 304
FACOR ALLOYS LIMITED
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 42/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)
Piping
Main steam line ASTM A 335 P11/12
Auxiliary steam of low pressure &
low temperature
SA 106 Gr.B
Feed pump SA 106 Gr.B
Spray water piping to
desuperheater
SA 106 Gr.B
Fitting & flanges As per IBR code
Water piping up to NB 150 IS 1239 black medium
Water piping NB 200 & above IS 3589 ERW
Service air piping AISI 304 black medium
Instrument air piping IS 1239 G I
Fittings for Non IBR IS 1239 II /ASTM B16.9
Insulation & refractory
Insulation Bricks IS 2042
FACOR ALLOYS LIMITED
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 43/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-1 Boiler & Auxiliaries (contd.)
Economiser
Stop valve at inlet 1Check valve at inlet 1
Drain valve 1
Vent valve 2
Pressure gauge isolation valve 1
Steam Drum
Spring loaded safety valve 2Isolation valves for level gauges 8
Drain valves for level gauges 2
Air vent valve 1
Isolation valve for pressure gauge 2
Aux. steam stop valve 1
Isolation valve for level transmitter & level switches 4Continuous blow down valve 1
Bypass for CBD 1
Mud Drum & WH Bottom HDRS
Blow down valve 1
Drain Valves 5
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 44/338
FACOR ALLOYS LIMITED
45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.EPC TENDER SPECIFICATION
ANNEXURE-2 – TURBO GENERATOR & AUXILIARIES
1.0 DESIGN BASIS
1.1 THE TURBO GENERATOR AS PER THIS SPECIFICATION SHALL MEET THEFOLLOWING REQUIREMENTS:
NO. DESCRIPTION TURBO-GENERATOR
1. Type Low or High speed, condensing steam with one bleed
for Deaerator and bleed for HP, LP heaters as per
standard design of supplier.
2. Type of
condenser
Air cooled condenser
3. Number One
4. Max. Contin.
Rating
45 MW
5. Press & Temp at
I/L
108 Ksca, 540 deg. C
6
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 45/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)
and uncontrolled bleed for feed water heating in the deaerator. The output capacity of the
turbine will be 45 MW as measured at generator terminals. Turbo generator set shall be
designed for the fluctuations and transients so that the system as a total will sustain
without any adverse effect on the life of the equipment.
1.3 GENERATOR
Generator of voltage rating 11.0KV suitable for 0.8PF, 57 MVA is envisaged.
Generator shall be complete with exciter, brush less excitation system, automatic voltage
control etc. adequately designed for the requirement of generator. Bidders shall furnish a
write up along with the tender indicating the technical consideration for review and to
convince that they will take care of this fluctuating load requirement in their basic design.
1.4 CONDENSING PLANT
Air-cooled condensing system is envisaged for the turbine (TG). However the
condenser with all necessary standard auxiliaries such as condensate storage tanks,
condensate extraction pumps, flash tanks, two-stage steam jet ejectors, start-up ejector,
hot well level control system, bellows etc. is not included in the scope of this specification.
Gland steam system with steam pressure regulators, de-superheater, Gland Vent
Condenser (GVC), all piping and valves and associated instruments shall be provided.
Auxiliary steam for gland sealing will be supplied at 10kg/cm2 and 300 deg C. The leak
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 46/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)
1.7 ELECTRICAL SYSTEM
1.7.1 Generator protection
The generator shall be provided with following minimum protections:
Phase & ground Inverse time O/C relay.
Phase & ground Instantaneous time O/C relay.
Generator stator E/F and Backup earth fault relay.
Differential protection with CTs on phase and neutral sides.
Loss of excitation.
Negative Phase sequence.
Forward power relay for Low Forward trip.
Reverse Power relay for trip with timer.
Over Voltage relay having 2 stages on generator side.
Under voltage relay having 2 stages on generator side.
Low frequency relay having 2 stages on generator side with timer.
Rotor earth fault relay I stage.
Trip circuit supervision.
Lock out relay for hand reset for generator.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 47/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)
1.9 INSTRUMENTATION AND CONTROL
The system envisaged is DCS for the entire CPP having the operator and
Engineering stations in main control room. Auxiliary units like ash handling, fuel handling,
DM Plant will be provided with PC based PLC and the important parameters will be
communicated to DCS for the information of the shift in-charge.
All logics and controls will be provided only in DCS with redundant processors andhot standby units. Minimum controls shall be
Split type hot well level control with re-circulation control valves.
Gland steam pressure control system.
LP heater condensate level control system if opted.
Deaerator pressure control for bleed steam.
1.10 MISCELLANEOUS
1.10.1 Insulation
All exposed portions of the Turbine, auxiliaries and interconnecting piping which
operate at temperature of above 65ºC during normal operation shall be thermally
insulated so that the outer surface temperature of the insulating material before cladding
shall not exceed 65ºC at the ambient temperature of 45ºC at a Wind velocity of 5 m/sec at
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 48/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)
Complete turbine integral piping and other piping including all valves
(isolating, regulating, non-return, hand operated and / or pneumatic,
motorized) actuators, air vents, safety valves, drains, hangers, supports,
anchors and other fittings. Emergency gravity lube oil system with SS
overhead tank, SS piping, SS valves & Instrumentation as per the design
requirement.
Turbine supervisory, protective and governing systems including safetygovernors, load limit device, low vacuum tripping device, thrust bearing
protective device, solenoid trip etc., as specified hereinafter and all
equipment mounted/local instruments, pressure, temperature, level switch,
primary sensing device etc., as required. Governing system shall be
electro hydraulic type.
Oil purifier of suitable capacity.
HP heaters with accessories and auxiliaries.
LP heater with accessories and auxiliaries.
Electrical motor operated or Hydraulic turning gear equipment and
provision for hand barring.
Gland steam sealing system with steam pressure regulators, de-
superheater gland steam condenser all piping and valves and associated
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 49/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)
2.4 ACCESSORIES
Motorized barring gear arrangement with auto engage and auto disengage
facility. In case of turbine trip, the barring gear automatically cuts in when
the rotor speed falls below a preset value and it keeps the rotor rotating at
slow speed to avoid bending of rotor.
QCNRV, FFRV and Isolation valve for all bleed steam lines.
Common base plate for turbine and gearbox
Insulation for Turbine hot parts (lagging & cladding)
Mating flanges for all the equipment connections in the bidders scope of
supply
Base frame, Sole plate for embedment in the concrete, Bottom plate for
foundation bolts.
Set of foundation bolts.
Set of special tools & tackles for maintenance
2.5 AC GENERATOR
AC Generator shall be complete with following:
Four pole, cylindrical rotor type alternator
Brush-less exciter
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 50/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)
2.8 INSTRUMENTATION AND CONTROL
All control gears for turbine and generator whether specifically indicated or
not.
All sensors, field instruments, junction boxes etc for local and remote
monitoring instruments including transmitters, sensing elements,
connecting pipes/tubes and local gauge board.
HP heaters level control valves
LP heater level control valves.
Dial type Pressure gauges as required. List to be furnished with offer.
Temperature gauge as required. List to be furnished
Pressure switches as required. List to be furnished.
Pneumatic and impulse piping with fittings for interconnection within
battery limits.
RTDs (PT 100 type), Thermowells for all the temperature measuring points
for purchaser’s DCS system.
Provision for level transmitters for purchaser’s DCS controls and
instrumentation
2.9 MISCELLANEOUS ITEMS
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 51/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)
Spares, tools and tackles for operation, repair and maintenance for two
years of trouble free operation (Optional) List of items recommended and
their price valid for 6 months shall be submitted.
Insurance Spares like Generator coils etc. as per mutually agreed basis
(Price shall be furnished along with offer).
2.11 SERVICES TO BE RENDERED FOR VARIOUS STAGES OF CONTRACT
2.11.1 Design and Engineering
Complete system design and layout.
Basic design, Preparation of P&I, Schemes, Flow sheets etc.
Preparation of detailed GA drawings, Foundation requirements, details of
auxiliaries etc.
Detailed design of equipment, preparation of drawings for internals,
interfacing details etc.
Preparation of input data for civil and structural design by purchaser.
Sizing of pipe and pipe works preparation of piping layout, routing etc for
interconnection of equipment within the scope of supply as per this
specification.
2 11 2 Manufacturing and supply:
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 52/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)
I & C Engineer for all open loop and closed loop controls to commission
the TG controls along with DCS commissioning group
TG commissioning engineer for checking the completion of erection and
commissioning engineer
Performance test group.
2.11.4 Erection and commissioning:
Receipt and unloading at site of all equipment including pipes, valves,
structural steel materials, etc.
Opening of crates and packing cases, thorough cleaning and checking of
completeness of equipment in relation to Equipment Manufacturer’s
drawings, packing defect. Damages or missing items, if any, shall be
rectified or made good by the successful bidder.
Providing storage and safe custody of the equipment, etc. at site
Supply of erection consumables like weld rods, cleaning agents,
lubricants, grease, and shims, small bolts etc.
Supply of items like pipe, valves, gaskets, bolts, and flanges etc., which
are required during the course of erection at a mutually agreed rate at the
request of purchaser.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 53/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)
Any other work connected with erection and commissioning of the
equipment that is customarily rendered by the successful bidder to
complete the works.
3.0 EQUIPMENT DETAILS
3.1 TURBINE
3.1.1 Casing
The casings shall be designed for hydrostatic test pressure of not less than 50%
in excess of the working pressure. Each turbine casing shall be efficiently drained. The
parts of the turbine, which are expected to be in contact with wet steam in normal
operation or during start-up, shall be provided with a system of inter-stage drainage
whereby extracted water will be prevented from re-entry to the blading and will be
admitted to either a convenient heater extraction branch or the condenser. The casing
drains shall be provided with temperature sensing devices to help ensure proper
evacuation of drains. Bolts, nuts and studs used for the turbine casing flanges and main
turbine valve bonnets etc. shall be with milled threads and of special alloy steel properly
treated. Provision shall be made for electrically heating the bolts to facilitate setting and
loosening. In addition, the supplier shall indicate the design features incorporated to
prevent the seizure of nuts and studs and features, which will facilitate their easy removal
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 54/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)
all load conditions of operation. The peak-to-peak value of vibrations measured on the
bearing housing shall be within 25 microns.
The critical speed/speeds of the combined turbine and generator rotor shall not lie
within a range of + 20% or 40% to 60% of the rated operating speed.
3.1.3 Nozzle & Blading
All nozzles and blading shall be of hard, corrosion and erosion resisting alloy steelsuitable for the specified steam. In the low pressure stages where the moisture
percentage and the blade peripheral speeds are high, additional protection against
erosion by way of hardened surface of blades or strips of erosion and corrosion resistant
material such as stellite, secured to the leading edge, shall be provided.
The method of fixture of the blades to the rotor shall have been satisfactorily
proved by long use of operation. Care shall be taken to ensure that the natural frequency
of the rotor blades is compatible with the rotational frequency of the machine.
3.1.4 Exhausts
The turbine exhaust shall be designed for velocity recovery and shall be suitable
for connecting to the condenser preferably through expansion joints. The unit shall be
provided with turbine exhaust water spray system. The system shall be provided
complete with spray nozzles a controller an automatic spray water control valve and all
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 55/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)
The rotor axial position shall be maintained by a thrust bearing assembly of
adequate capacity. Proper arrangement shall be made to maintain oil pressure under all
load conditions of operation. The design shall incorporate arrangements for monitoring
thrust bearing metal temperatures. Devices shall be provided for annunciation of an
impending failure of the turbine thrust bearing. Additional switches shall be provided for
alarm and trip of the unit in case of a thrust bearing failure.
The metal temperature of all bearing shells shall be monitored by thermocouples,
which extend right into the white metal layer. Provision shall also be made for reading the
oil temperature leaving the bearings. Suitable direct reading type thermometers and
separate switches each with two `High’ signalling contacts for all bearings shall be
provided. Arrangement shall be incorporated in all the bearings for measuring vibrations.
The proposal shall include necessary accessories for remote monitoring of all bearing
metal temperatures, oil temperatures and vibrations.
3.2 TURBINE ACCESSORIES
3.2.1 Coupling
The rotors shall be coupled by means of flanges of aerofoil type of proven make
for ensuring long life. Fitted bolts shall be provided to prevent slippage under abnormal
operating conditions. They shall be such as to facilitate easy alignment during erection.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 56/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)
hydraulic pressure etc. The extraction line valves shall close positively on turbine trip and
at pre-set high heater level. The non-return valves shall be located as close to the turbine
as possible, to reduce entrapped steam.
3.2.4 Governing System
To govern the turbine speed during varying load demand and fluctuating steam
supply conditions, a speed governor of suitable type shall be provided.
Turbine governing system shall be Woodward 505 electronic type. The governing
system shall be an electronic type with an electric signal being transmitted to a hydraulic
actuator for amplification by the turbine throttle valve relay system. Turbine shall operate
as an independent unit, in parallel with other generating sets of known governing
characteristics or in parallel with the main grid supply, in which case inlet pressure control
shall be utilised.
The speed governing system shall limit the over speed of the TG set on loss of full
load so as to avoid tripping by the emergency over speed device. Emergency governor
shall be provided to keep the turbine well below the safety limit and shall come into
operation when the speed sensitive governor fails to operate. The turbine governor shall
also contain electrical and mechanical trips to shutdown the turbine generator during
abnormal conditions, to prevent damage to the unit.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 57/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)
Steam temperature
Metal temperatures
Turning gear status
Seal interference monitoring device, if applicable
Pressure indicator for Curtis stage of the H.P. stage
The above list gives the minimum requirement, any other supervisory instrument
as required by the unit offered shall be included in the scope of supply.
The turbine protection system shall put the turbine out of operation by closing the
turbine emergency stop and control valves as soon as any of the following conditions
occur and admissible limits are exceeded:
Condenser pressure very high
Turbine lube oil pressure very low
Trip oil pressure very low
Control oil pressure very low
Turbine shaft vibrations high
Turbine speed very high
Steam temperature very low
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 58/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)
An oil purification system shall be provided complete with centrifuge, pipe work
etc. to continuously operate as a bypass system handling around 20% per hour of the
total oil in circulation in the oil system. The purifier shall be a separate complete package,
mounted on a skid, complete by itself with drive motor, piping, valves & fittings. Feed to
purifier shall be from the drain end of the reservoir and its operation shall be independent
of the oil system.
3.2.8 HP/LP heaters
HP/ LP heaters shall be provided with inlet steam valves and outlet drain valves
with level controls. Valves are also provided in water lines at both inlet and outlet. All
necessary instrumentation with inter locks are to be provided.
3.2.9 Turbine Gauge Panel
TG Gauge Panel shall house the pressure and temperature gauges for various
operating parameters. Impulse piping with fittings shall be supplied loose for
interconnection between field tap-off points and gauge panel.
3.3 GENERATOR
3.3.1 Stator
Stator body shall be a totally enclosed gas tight, explosion proof fabricated
structure suitably ribbed internally to ensure high rigidity The stator shall be designed to
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 59/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)
Strength test, material analysis and ultrasonic tests shall be performed during the
manufacture of the rotor. The rotor shall be balanced in various planes at different speed
and shall be subjected to over speed test. Individual turns of the rotor coil shall be
insulated against each other.
3.3.3 Fan
The rotor shall have fans mounted on it for the circulation of air inside the
machine. The fixing bolts, pins, nuts, etc. shall be made of non-magnetic material.
3.3.4 Shaft Seals
The shaft seals should be of adequate design to be provided on either side of the
rotor to prevent escape of air from the generator casing along the rotor shaft. The design
should be such that minimum oil should come in contact with the air during the course of
sealing. The shaft seal body on the exciter side shall be suitably insulated from the stator
end shields current.
3.3.5 Bearings
The generator shall be provided with sleeve bearings. The bearings shall be
spherically seated, self-aligning, cylindrical bore type. The liner shall be lined with at least
two-resistance thermometer in each liner for continuous sensing and recording of white
metal temperature The bearing and the oil pipes of the generator on exciter side shall be
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 60/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)
3.3.7 Temperature Measurement
Temperature of various active parts shall be measured. The stator winding
temperature shall be sensed by at least one embedded resistance thermometer for each
coil placed at the bottom of the slots out of which at least six shall be in the end zone.
Temperature of cooling water to the (in case of water cooled machines), air
coolers, hot and cold gas and lubricating oil to the bearings and shaft seals shall also be
sensed by resistance thermometers. The rotor winding temperature shall be measured
by resistance method and shall be continuously recorded. Duplicate sensor shall be
supplied for all the above temperature measurements.
3.3.8 Generator Excitation System
The excitation system shall be brushless type with diodes mounted on the shaft at
location where maintenance access is available without opening the generator cover. The
brushless exciter shall consist of a permanent magnet generator, AC exciter and rotating
rectifier with silicon diodes and indicating fuses. The whole system should be enclosed to
avoid dusty air ingress from outside with adequate cooling arrangement of the closed
circuit air inside.
The excitation system shall be complete with switchgear, control equipment and
automatic voltage regulators It shall be capable for operating the generator at full range
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 61/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)
3.3.10 Surge protection and voltage transformer (SPVT)
A Surge Protection and voltage transformer (SPVT) cubicle for the generator shall
be provided in the turbo generator building at ground floor level. Surge protection shall
comprise lightning arrestors and surge capacitors and shall protect the generator against
high voltage / high frequency surges occurring in the system. The generator neutral shall
be earthed through a resistor to restrict the earth fault current to within limits. An isolator
and a CT shall be provided in the neutral circuit along with a resistor bank, all housed in acubicle. This cubicle shall be located in the turbine hall at the ground floor level close to
the generator.
4.0 ELECTRICAL AND INSTRUMENTATION
4.1 AC MOTORS
All AC motors for driving the various auxiliaries of Turbo generator set shall be
rated for 415V, 3-phase and 50 Hz supply. The motors shall be capable of delivering
rated output at rated power factor with a variation in voltage equal to +10% and a
variation in frequency equal to +5% with any combination of these two variations.
The motors shall meet with the requirements of IS: 325. The stator coils of all
motors shall have class ‘F’ insulation. The temperature of the insulation shall be limited to
class ‘B’ over an ambient temperature of 50 oC
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 62/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)
The instruments, meters and other devices to be provided in the panel
shall include but not be limited to the following:
Spring return to neutral type Raise / Lower control switches for voltage and
speed raise for TG5.
Synchroscope and synchronising lamps
Double voltmeter and frequency meters
Four position synchronising selector switch for breaker selection for
Incomer to Bus, Generator to bus, DG to LT bus and LT bus to incomer
(DG and LT bus not in the scope of this contract. Only synchronising
provision is required).
Synchronising circuit ON/OFF switch.
Synchronising check relay
Voltmeter 0-15KV range with voltmeter selector switch for Bus, Generatorand incomer
Frequency meter 45 to 55Hz for TG, Grid, and DG frequency
measurement. Signal for DG and grid will be provided from the purchaser’s
panel for contractor’s termination at existing panel.
Digital multiple display meter with RS485 Modbus port for export / import
FACOR ALLOYS LIMITED
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 63/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)
4-20 ma DC output signal for Speed, Power. Turbine inlet pressure for
logging in the DCS. These signals shall be made available in the Turbine
panel.
4.4 VIBRATION MONITORING SYSTEM
Vibration monitoring system consisting of X-Y probes, signal conditioning unit,
display unit, junction boxes, interconnecting cables for measurement of bearing
vibrations, shaft vibrations, axial shift position, casing expansion, differential expansion,eccentricity shall be provided. The Vibration monitoring system shall be provided with
isolated 4-20 mA dc output for the above measurements to connect it to customer’s
distributed computer system (DCS)
Temperature detectors (RTD) associated with bearing temperature, motor winding
temperature measurements shall be connected to DCS. The temperature scanner shall
have communication link facility conforming to MODBUS RTU Protocol RS-485 interfaceto provide connectivity to DCS.
4.5 PROTECTION & INTERLOCKING SYSTEMS
The operation of protections shall be accompanied by annunciation, which
will provide definite indication of the primary cause or causes of operation
of the protection. The following basic interlocks and protection
FACOR ALLOYS LIMITED
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 64/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)
• Energisation of generator lockout relay
• Master trip lockout relay energized
• Low lubricating oil pressure for bearings
• Any other protection as envisaged in design
• Generator electrical protection trip
Turbine protection interlock system shall be based on hard-wired logic and
shall be carried out in the Turbine control panel. One set of potential free
contacts shall be provided in the turbine panel for the above faults to wire it
to DCS.
The turbine governing system shall be based on Electro hydraulic type
consisting Woodward electronic unit, E-H converters, Hydraulic unit etc.,
the governing system shall be configured to meet the following operating
requirements./Parallel with the 132 KV Grid and existing DG/Island modewhen both existing TG and grid trip./Along with the Woodward speed
governing system necessary load control module required for the turbine
shall also be supplied so that following functions are done:
• Dead bus closing
• Tie breaker closing
FACOR ALLOYS LIMITED
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 65/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-2 Turbo Generator & Auxiliaries (Contd.)
supplier during detailed engineering and commissioning shall be included
in the scope of work of this tender.
All outdoor electronic instruments shall be provided with IP-65 enclosure.
Pressure gauges shall be provided with snubber for pump discharge
pressure measurements. Bourdon / movement material of all gauges shall
be of SS. Diaphragm of diaphragm sealed pressure gauges in dosing lines
shall be of SS with Teflon lining. Dial sizes of gauges shall be 150 mm.Gauge cocks with drain plugs shall be provided for all gauges. For steam
services, syphons shall be provided.
RTD type temperature elements shall be of Pt-100 three-wire type, duplex
RTDs.All thermocouples shall be provided with compensating cables upto
the field mounted transmitter. SMART type temperature transmitters
having 4-20 mA DC output shall be provided for all thermocouples based
temperature measurements.
Generally instruments tubing, isolation valves etc. shall be of the same
material as specified for main piping/tanks. The specification details for the
instrument cables shall be Inter connecting cables between individual
instruments to junction boxes; Single twisted pair cables having 1.0 sq mm
stranded annealed tinned copper conductor insulated with PVC, inner
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 66/338
EPC TENDER SPECIFICATION
ANNEXURE-3 – AIR COOLED CONDENSER & AUXILIARIES
1.0 DESIGN BASIS
1.1 PROCESS DESCRIPTION
1.1.1 The ACC shall condense the exhaust steam from the turbine, which is at a
pressure of 0.18 ata. The steam is drawn from the turbine to the condenser
through steam ejectors. The outlet temperature of hot well water is estimated as
57deg.C. The ambient dry bulb temperature condition for design shall be
considered as 40deg.C. The hot well water is continuously pumped to deaeratorthrough condensate extraction pumps with control valves. The condenser shall be
provided with exhaust water spray system to operate when exhaust temp exceeds
65 deg. C, rupture disc and necessary instruments to control the system.
1.2 TECHNICAL PARTICULARS OF AIR COOLED CONDENSER SYSTEM
1.2.1 Design of the ACC shall be suitable for the following conditions.
Type of Air CooledCondenser
: Aluminium fin type forced draughtwater to air coolers constructed in
dismountable modules with hot &
cold water headers.
Design ambient temperature
for ACC
: 40 deg. C
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 67/338
Annexure-3 - Air Cooled Condenser & Auxiliaries (Contd.)
1.3.2 Bidder shall provide water cleaning arrangement for the aluminium fins with spray
nozzles having a water jet pressure of at least 3.5 Kg/cm2 which will be provided
from auxiliary cooling water system of the plant.
1.4 CIVIL AND STRUCTURAL
1.4.1 The successful bidder shall supply civil construction drawings for the foundation.
1.4.2 All civil and structural steel work shall be in the scope of the work of this tender.
For design of structure, wind load conditions and Seismic conditions as specified
in this specification shall be considered. While designing the Air Cooled
Condenser structures, either effect of seismic force or wind loads, whichever
produces the worst effect, will be considered along with the usual load conditions.
2.0 SCOPE OF WORK, EQUIPMENT SUPPLY AND SERVICES
2.1 The scope of work of successful Bidder shall include and not be limited to design,
fabrication, manufacture, assembly, testing, packing, Transport, Supply at site,
Erection, start-up, commissioning, and testing for performance.
2.2 Air Cooled condenser unit shall be complete and shall include but not limited to
the following equipment, accessories and services.
2.2.1 Condensing System
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 68/338
Annexure-3 - Air Cooled Condenser & Auxiliaries (Contd.)
2.2.3 Condensate extraction system
Horizontal/ vertical Condensate extraction pumps (CEP) with motors (2 x
100%) along with isolation and recirculation valves and NRVs.
Condensate piping from hot well through CEPs & ejector condensers and
up to inlet of Deaerator.
Split range control valves for Condensate re-circulation along with controls
Pipe supports, strainers, steam traps, drains, vents and isolation Valves as
required.
Drain lines with isolation valves for ejector condenser drains etc.
Dry air/vapour line to ejector with isolation valve.
All high pressure drains lines to flash tank.
2.2.4 Condenser air evacuation system
Steam jet air ejector system complete with:
Twin stage main ejectors (1 working + 1 standby)
Start up ejector (hogging) with silencer
Inter and after condensers individually for each service ejector
2.2.5 Condensing system C&I
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 69/338
Annexure-3 - Air Cooled Condenser & Auxiliaries (Contd.)
Pneumatic and impulse piping with fittings for interconnection within
battery limits.
Instruments cables up to junction boxes for connecting to purchaser’s DCS
system
RTDs, Thermo wells for all the temperature measuring points for
purchaser’s DCS system.
Provision for level transmitters for purchaser’s DCS controls and
instrumentation
Vibration switches for high and Very high for each fan for connecting to
DCS logic.
2.2.6 Electrics:
One (1) lot of drive motors for pumps like CEP, CDP, fans and any
electrical drives Space heaters, its cables up to junction box
Vibration, RTDs etc. as required
2.2.7 Electrical Equipment
One (1) lot of complete interconnecting power and control cables from the
field switches motor heaters to the nearest junction boxes
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 70/338
ANNEXURE – 4 – FUEL HANDLING SYSTEM & AUXILIARIES
1.0 DESIGN BASIS
1.1 MATERIAL TO BE HANDLED
Coal washery rejects, Indian coal and Indonesian coal is proposed to be used as fuel
for the boiler. The characteristics of the material to be handled are given below:
TABLE-1: CHARACTERISTICS OF IMPORTED COAL/ INDIAN COAL
Top size, mm (max) – Indian coal
- Imported coal
- Washery rejects
250 mm
50 mm
50 mm
Average bulk density, kg/ m3 800
The coal will be received and stored in the coal yard of the plant and stacked in
separate heaps / stockpiles.
1.2 SYSTEM CAPACITY
The plant capacity and specification for equipments are given below in Table –2. The
system diagram is shown on drawing No.HIQ-4036-H-01 R0
TABLE – 2: SPECIFICATION OF EQUIPMENTS
Sl.
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
& ( )
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 71/338
Annexure – 4 Fuel handling system & auxiliaries (contd.)
2.3 Hopper size (min.), m 6 m x 4 m with 2 bottom openings
2.4 Grid size, mm Grizzly 200 mm square opening or as required.
2.5 Hopper material RCC
3.0VIBRATING FEEDER
(VF)V F
3.1 Quantity One
3.2 Capacity (each) To be indicated by bidder.
3.3 Type Electromagnetic vibration
3.4 Location Below ground hopper (CLH)
3.5 Material of construction Mild steel
3.6 Vibration frequency 3000 cpm
3.7 Vibration swing 1.6 mm (max)
4.0BELT CONVEYORS
(BC)
BC
– 1
BC –
2BC-3
BC –
4BC-5 BC – 6
BC-7
tripper
4.1 Type 3 roll 30 deg. Trough
4.2 Profile Inclined
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
A 4 F l h dli t & ili i ( td )
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 72/338
Annexure – 4 Fuel handling system & auxiliaries (contd.)
5.3 Location CH 1 & CH 2
5.4 Feed size Less than 250/75 mm
5.5 Product screened size Less than 75/6 mm
5.6 Rated capacity As per the design requirement
5.7 Duty Continuous
6.0 CRUSHER (CR)
6.1 Quantity Two ( primary/Secondary)
6.2 Design Capacity (each) As per the design requirement
6.3 Type Impact type
6.4 Location Crusher House-I & II
6.5 Fuel to be handled Coal washery rejects, Indian coal & Indonesian coal
6.6 Feed size (max.) Primary crusher - < 250 mmSecondary crusher - < 50 mm
6.7 Crushed fuel size (max.)Primary crusher - < 50 mm
Secondary crusher - < 6 mm
6.8Permissible fuel over size
from crusher
Shall be less than 10% of input coal through the
crusher.
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure 4 Fuel handling system & auxiliaries (contd )
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 73/338
Annexure – 4 Fuel handling system & auxiliaries (contd.)
8.7 Weighing accuracy ± 0.5%
9.0 GATE, CHUTE, ETC As required
9.1 Location GH, CHs,THs & Bunker
10.0 DUST EXTRACTION
SYSTEM (DE)
10.1 No. of dust extraction
pointsThree
10.2 Location CH-I, CH-II & BB
10.3Supply to cover
Blowers, bag filters, hoppers, chimney etc to control
dust at all transfer points in various conveyers.
10.4 Max. air / filter bag cloth
ratio1.5 m3 / min / m2
10.5 Filter cloth To be selected considering proximate analysis of coal.
10.6 Dust load in exhaust gas Within 50 mg / Nm3
10.7 Pressure drop across
system125 mm WC (Max)
11.0 DUST SUPPRESSION
SYSTEM (DS)
11 1 N f d t i O
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure 4 Fuel handling system & auxiliaries (contd )
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 74/338
Annexure – 4 Fuel handling system & auxiliaries (contd.)
considering the interconnectivity and interchange ability of equipment such that the
availability of major equipment is ensured at any point of time.
Coal from the coal yard stockpiles will be reclaimed by tractor dozers and fed into
ground hoppers in the Coal Loading House (CLH) where from it will be conveyed through
Belt Conveyer (BC- 1) to the Vibroscreening and crushing plant at Crusher House-I (CH) to
size the coal as per design requirement. Vibratory Feeders (VF) are used below the ground
hopper outlet, which feeds to BC 1. The screened fuel will be crushed in the crusher-I, the
crushed fuel will be taken to BC-1 through Coal Transfer House- 1 (CTH- 1) by Belt
Conveyor (BC- 3) from where it is fed to BC-I by gravity. The accepted coal from vibro
screen is fed to BC-2.The BC-2 belt conveyer feed the coal to the crusher house -2.vibro
screen. The screened fuel will be taken to BC-2 by BC-5 through TH-2.The accepted coal
will be taken to TH-3 by BC-4 then by BC-6 to bunker. BC- 7 through a boiler hopper a tipper
transfers the coal to the each compartment of Boiler Bunker (BB).
On-line magnetic separators are provided at upstream of crushers and boiler bunker
house to prevent damage to the crusher by tramp iron present in the raw coal. Non-ferrousmetals and other objects like stones etc. are detected by metal detectors, provided at
upstream of crushers and boiler bunker house. Belt scales are also provided to measure the
weight of the fuel conveyed by the belts.
Dust Extraction systems (DES) is provided at all transfer points to minimize dust
nuisance. Dust Suppression System (DSS) is provided at coal loading house. For dust
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure – 4 Fuel handling system & auxiliaries (contd )
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 75/338
Annexure 4 Fuel handling system & auxiliaries (contd.)
condition, through ability of the belt and the suitability for supporting the load. The cover
grade and thickness shall be selected to give maximum life of the belting giving due
consideration on the lump size, abrasiveness of the material and the loading cycle. The
permanent splicing of the belt shall be within the scope of work and shall be done by
vulcanising after removing the initial stress.
3.1.3 Belt carriers (idlers)
All belt conveyor idler assemblies shall be suitable for continuous operation under full
load conditions. Idler rollers shall be provided with wear resistant deep groove ball bearings
only. The minimum life of the bearing assembly shall be 40,000 working hours. Idlers shall
be self- lubricated and life sealed. The idler rolls shall be made of ERW pipes of medium
shell thickness. The carrying and return idlers shall confirm to the requirements of IS: 8598
and IS: 11592.
3.1.4 Idler spacing
Maximum spacing of toughing rollers shall be in accordance with the nature of
loading, weight of the materials carried and maximum belt tension. The spacing shall not
exceed 1000mm and shall be such that the centenary sag is within two (2) percent.
3.1.5 Take-up
Take-up shall be sufficient to cope up with a maximum elongation of belt during
operation. Counter weighted vertical gravity take-up shall be used for conveyor length about
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure – 4 Fuel handling system & auxiliaries (contd.)
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 76/338
Annexure 4 Fuel handling system & auxiliaries (contd.)
3.1.8 Belt cleaner / scraper
Suitable cleaning device shall be installed at the discharge end of the conveyor onthe return run of the belt so that the carrying side is properly cleaned before it comes in
contact with the return idlers. The belt cleaners shall be preferably be double bladed type
with spring and /or counter weight arrangement for maintaining constant contact with belt at
adequate pressure.
3.1.9 Deck plate
Mild steel deck plate shall be used between the upper and the lower belt of theconveyor. The decking shall preferably be self-cleaning type.
3.1.10 Conveyor hood
Conveyor hood of 2 mm thick GI sheeting shall be provided for the exposed, Short
Support, portion of the belt conveyor etc.
3.1.11 Stringer, short support, etc
The belt conveyor shall be complete with channel stringer angle or channel, short
support of about 800mm height for support, bracing, suitable head, tail and take-up frame
fabricated from structural steel sections. The supports shall be spaced approximately 3m
apart and shall be designed to withstand fluctuating loads during starting and stopping of
conveyor.
3 2 SHUTTLE CONVEYOR/TRIPPER
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure – 4 Fuel handling system & auxiliaries (contd.)
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 77/338
g y ( )
tensioning screws, dust covers and foundation bolts etc. Bearing used in the screen shall be
vibration duty spherical roller bearing.
3.6 CRUSHERS
The coal crusher (two) receives the coal of sizes less than 250/50 mm and crushes it
to the required size of less than 50/6 mm. It is of impact type and driven by motor.
3.7 BELT SCALE
Belt scale shall be of multi idler–load cell type suitable of indication accurate
conveyor rate flow. The operating accuracy of the belt scale shall be ± 0.5 % on actualconveying rate.
3.8 METAL DETECTOR
Metal detector shall be capable of detecting up to minimum 25 mm aluminium sphere
at a maximum working belt speed. Sensitivity to other materials such as stainless steel and
copper shall be proportional to their electrical characteristics.
3.9 TRAMP IRON SEPARATOR (MAGNETIC SEPARATOR)
The suspended magnet shall be able to pick-up tramp iron from the bottom of the
material being carried by the conveyor over which the equipment is fitted. The equipment
shall be complete in all respects, including electro magnet hanging support necessary
fasteners, electrically operated travelling block. Necessary electrics with AC to DC
conversion system & control necessary sensors for the equipment shall be supplied along
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure – 4 Fuel handling system & auxiliaries (contd.)
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 78/338
3.13 BRAKES
Separate electromagnetic brakes, operated through direct current shall be providedfor each motor driven mechanism. Brakes shall be of approved make and shall be
connected so as to apply automatically when power supply fails or when the stop push
button is pressed or stop command is signalled from PLC. The release of the brake shall be
with adjustable time delay proceeded by electronic command for start of push button is
released. Brakes shall be designed as per IS 3938.
3.14 INSTRUMETNATION AND CONTROL
Complete instrumentation and control for all the equipment provided in this
package shall be covered under the scope of this tender. All field instruments shall be wired
up to the junction box where from the same shall be connected to the PLC as per the
requirement.
3.14.1 Controls
Fuel handling system shall be provided with controls for material flow metering, belt
scale electrical drives, conveyor systems, crusher, dust handling, dust suppression system
and other equipment covered under the scope of this contract.
Field warning sound before starting the conveyors, crusher etc by hooters for one
minute in crusher house, ground hopper, and bunker top shall be provided in every
sequence of operation during start up.
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure – 4 Fuel handling system & auxiliaries (contd.)
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 79/338
operation. Pull chord switches shall be placed at an every interval of 25
metres on both sides of the conveyor.
Belt sway switches at every 10M to 15M distances as required in each side of
the belt. It shall be industrial, heavy duty, housed in a dust and vermin proof
cast iron / cast aluminium box with indirect arrangement for operation.
Zero speed switches / belt slip switches shall be non-contact induction type
with associated electronic unit. Necessary potentiometer for adjustment of
speed setting shall be provided in the electronic unit in each conveyor.
Material flow metering like belt scale shall be of load cell type hermetically
sealed with IP-67 protection class suitable for remote indication of rate of flow
as well as totalised amount material conveyed at any point of time. The
operating accuracy of belt scale shall be + 0.5% on actual conveying rate.
The weighing scale transmitter shall be installed in a safe location.
3.15 SAFETY DEVICES
All equipment shall be complete with approved safety device wherever a potential
hazard to personal exists and with provision for safe access of personnel to and around the
equipment for carrying out operational and maintenance function. The offer shall include the
entire safety item such as coupling guard, conveyor tail pulley guards, gearing and chain
guard, guard deflector, protection and/or shield etc., shall be supplied.
3 16 CIVIL AND STRUCTURAL
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 80/338
ANNEXURE-5 ELECTRICAL EQUIPMENT AND SYSTEMS
1.0 INTRODUCTION
The plant consists of one number Steam Turbine Generator of 45 MW rating, the
generation voltage level 11KV. The plant electrics have been designed for the power
evacuation 11 KV power distribution system and auxiliary power for the boiler, TG, BOP
auxiliary loads. The power evacuation, auxiliary distribution system shall be in 132 KV and
415 V voltage level. For steel plant loads like steel plant, inter connection of existing plant,
connection with generator, input to the auxiliary transformer, power evacuation inter
connection from the generator switch board shall be in 11 KV voltage level.The power distribution for plant electrics is envisaged at 3.3 kV and 415 V level. The
plant outline design is detailed in drawing nos. HIQ-4036-E-01/R-00.
1.1 GENERAL PRINCIPLES OF DESIGN CONCEPT
The design concept of the electrical system as a whole is based on the requirements
for the safe and reliable performance of steam turbine generator sets and the interconnected
electrical system with provision for easy maintenance and overhauling.The design principles and standards delineated herein is generally in compliance
with latest IEC / IS Standards and the Code of Practice already established in the country.
Indian Electricity Rules wherever applicable have also been complied with.
1.1.1 SYSTEM DESCRIPTION
1 Rated Frequency 50 Hz
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 – Electrical System (contd….)
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 81/338
2.10 Control Supply Voltages 110 V AC
110 V DC
3.0 Fault Levels
3.1 132 kV 31.5kA for 1 sec
3.2 11KV 40kA for 3 sec
3.3 3.3 kV 31.5 kA for 1sec
3.4 415 V 50 kA for 1 sec
4 DC System 110 V DC
5 Grounding
5.1 Generator neutral Neutral Grounding Secondary Resistor
5.2 132 kV System Solidly Grounded
5.3 3.3 kV System Medium Resistance Grounded
5.4 415 V System Solidly Grounded
5.6 DC System Ungrounded
6 One minute power frequency
withstand voltage
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 – Electrical System (contd….)
N t
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 82/338
Note:
1. Continuous duty 415V motors will be controlled by contactors.
2. HT motors will be controlled by Vacuum circuit breakers. Coal handling systemmotors (HT) will be controlled by fused vacuum contactors, considering frequent
starting.
1.2 GENERATORS
The generator coupled with steam turbine will have the following salient technical
features.
Type Synchronous generator
Rated capacity
45 MW (56.25 MVA) to suit the Turbine
rating
Rated power factor 0.8 lag
Rated Voltage
Rated terminal voltage 11 kV
Voltage variation ± 10%
Rated Frequency
Rated frequency 50 Hz
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 – Electrical System (contd….)
Q titi d ti f th t t f id d f t ti h ll b
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 83/338
Quantities and ratios of the current transformer provided for protection shall be
decided by the bidder and shall be generally in accordance with standard requirements. The
current transformer ratings shall be such as to provide proper accuracy’s for excitationcontrol, relaying, voltage regulation and metering under all normal and fault conditions.
1.2.2 Rotor
The rotor shall be of cylindrical type, the shaft and body being forged in one piece
from nickel chromium molybdenum vanadium steel. The fully assembled rotor shall be
balanced to a high degree of accuracy and subjected to 20% over speeding for two minutes
as per International Standards to ensure mechanical strength.
The field winding shall consist of coils made up of copper with bonded insulation and
shall be held in position against centrifugal forces in wedges in the slot portion and by high
tensile non-magnetic alloy steel retaining rings in the overhang portion.
Strength test, material analysis and ultrasonic tests shall be performed during the
manufacture of the rotor. The rotor shall be balanced in various planes at different speed
and shall be subjected to over speed test. Individual turns of the rotor coil shall be insulated
against each other.
1.2.3 Fan
The rotor shall have fans mounted on it for the circulation of air inside the machine.
The fixing bolts, pins, nuts, etc. shall be made of non-magnetic material.
1.2.4 Shaft Seals
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 – Electrical System (contd….)
The rotor windings shall be directly cooled by air The stator core shall be cooled by air
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 84/338
The rotor windings shall be directly cooled by air. The stator core shall be cooled by air
flowing through the radial ventilating ducts. The shaft mounted propeller type fans on each
side shall facilitate circulation of air inside the machine. The air inside the generator shall bemaintained clean and dry by continuously circulating the air through a suitable air drier and
filter arrangement. There should be 100% standby arrangement for the same.
1.2.7 Temperature Measurement
Temperature of various active parts shall be measured. The stator winding
temperature shall be sensed by at least one embedded resistance thermometer for each coil
placed at the bottom of the slots out of which at least six shall be in the end zone.
Temperature of cooling water to the (in case of water cooled machines), air coolers,
hot and cold gas and lubricating oil to the bearings and shaft seals shall also be sensed by
resistance thermometers. The rotor winding temperature shall be measured by resistance
method and shall be continuously recorded. Duplicate sensor shall be supplied for all the
above temperature measurements.
1.2.8 Generator Excitation System
The excitation system shall be brushless type. The brushless exciter shall consist of a
permanent magnet generator, AC exciter and rotating rectifier with silicon diodes and
indicating fuses. The whole system should be enclosed to avoid dusty air ingress from
outside with adequate cooling arrangement of the closed circuit air inside.
The excitation system shall be complete with switchgear, control equipment and
a tomatic oltage reg lators It shall be capable for operating the generator at f ll range of
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 – Electrical System (contd….)
Generator will conform to IEC 34 The generator will be capable of withstanding short
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 85/338
Generator will conform to IEC-34. The generator will be capable of withstanding short
circuit level as per IEC. Short circuit ratio will not be less than 0.5. Generator will be suitable
to operate continuously with a negative sequence current of 8% of the rated value, and I2Twill not be less than 8.
The generator withstands capability for 3-phase short circuit at the generator terminals
when operating at rated MVA and p.f. with 5% over voltage will be for a period of not less
than 3 seconds. The generator will be capable of delivering 100 % of the rated output with
one cooler out of service.
Line charging capability (MVAR) of generator will be not be less than 40% rated MVA
at zero p.f. leading.
The generator winding will be star connected and all the six leads of the generator
phase and neutral side will be brought out of the stator frame for connection to busduct. The
neutral of the generator will be earthed through distribution transformer and secondary
resistor to limit the ground fault current to above 10 amps.
Surge diverters and protective capacitors will be provided near STG to protect the
insulation of the generators from the onslaught of surges, both from steepness of wave front
and magnitude of surge level.
The generator will be provided with either brush less excitation system consisting of
exciter with rotating diode assembly along with Permanent Magnet Generator (PMG) or
static excitation achieving high degree of operational reliability and minimum maintenance.
The e citation s stem ill ha e fast response time to meet the s stem req irement
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 – Electrical System (contd….)
Electrical equipment and its systems that will be provided for the proposed Power Plant
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 86/338
Electrical equipment and its systems that will be provided for the proposed Power Plant
(PP) as shown in the SLD No: HIQ-4036-E-01/R-00.
1.3.1 132 KV switchyard bays : The existing switchyard main bus (one bay) shall be extended for
interconnection of proposed 45MW power plant. The synchronization system
to be provided in existing switchyard in both outgoing breaker and alteration
of the existing metering system shall be done in the same the accounting of
both input and output of power. The extended switchyard bay in existing
132KV switchyard shall be connected to the proposed power plant switchyard
through HT cable. The cable length is approximately 600mtrs. Bidders to visit
the existing switchyard in the Ferro alloy plant and satisfy themselves
regarding availability of space and flexibility for existence of the existing
132KV facilities.
Single bus system with suitable post insulators, Bus Potential transformer
with isolators etc.
One section breaker for main bus with CTs on either side
Three sets of Potential transformers one set on each of the sections of main
bus and one on transfer bus.
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 – Electrical System (contd….)
7 Cooling ONAN / ONAF ONAN / ONAF / ONAN / ONAF
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 87/338
7 Cooling ONAN / ONAF ONAN / ONAF /
OFAF
ONAN / ONAF
8 Tap Changer
& Range
OCTC, ± 5 % in
steps of 2.5%
OLTC, ± 10 % in
steps of1.25%
OCTC, ± 5 % in
steps of2.5%
9 Impedance 12.5 % 6.25% 5 % / 6.25 %
10 Basic Insulation level
HT 650kVp 75 kVp 75 kVp
LT 75 kVp 60 kVp 2.5 kVp
11 Sizing Criteria To match the
generator MCR
rating and shall be
design ambient
temperature of 50c
Rated to
meet the unit
HT loads
For supplying the
unit LT loads ans
stations LT loads.
The transformers
are sized on the
basis of 2 x 100%rating.
1.3.3 Generator Electrics:
Generator protections
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 – Electrical System (contd….)
1.3.5 Switchgears
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 88/338
1.3.5 Switchgears
S.
No.
Description 11KV switchgear 3.3 kV Switchgear 415V Switchgear
1 Type Metal clad /metal
enclosed, cubical
type, free floor
standing, dust &
vermin proof, draw
out type
Metal clad /metal
enclosed, cubical
type, free floor
standing, dust &
vermin proof, draw
out type
Metal clad /metal
enclosed, cubical
type, free floor
standing, dust &
vermin proof, draw
out type
2 Constru-
ctionSingle front Single front Single front
3 Design Sectionalized
single bus bar with
tie breakers
Sectionalized
single bus bar with
tie breakers
Sectionalized
single bus bar with
tie breakers
4 IP
protectionIP-42 IP-42 IP-42
5 Fault level 40KA for 3 sec 31.5KA for 1 sec 50KA for 1 sec
6 Incomers VCB breakers VCB breakers ACB breakers
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 – Electrical System (contd….)
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 89/338
13 Max.
Panel
height
from FFL
2400mm 2400mm 2400mm
14 Control
Supply110V DC 110V DC 110V AC
15 Incomer
Cable
Entry
Bottom Bottom Top entry
16 Outgoing
Cable
Entry
Bottom Bottom Bottom
The High Tension and Low Tension switchboards shall generally comprise of
adequately rated circuit breakers for tiebreaker and outgoing circuits. The switch boards
shall be complete with draw-out type circuit – breakers, earthing switches, bus– bars, draw-
out type voltage transformers, CTs, cable connections etc. Earthing trucks of approved
design shall be provided in case inbuilt earth switch is not standard feature in the design.
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 – Electrical System (contd….)
The potential transformers (PTs) shall be mounted on independent draw-out type
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 90/338
p ( ) p yp
carriages in HT board and fixed chassy in LT board in separate panels. In HT board the PT
shall be arranged such that in the draw-out position the PTs together with the protective
HRC fuses shall be disconnected from the high voltage circuit and automatic shutters shall
isolate bus side / line side contacts. The PTs shall be cast resin insulated.
The racking mechanism of the circuit breaker truck shall permit smooth operation
without jerk. It shall be possible to engage and lock the circuit breaker truck in “Service“, i.e.
fully drawn–in and “isolated’ i.e. fully drawn out positions. In the “Test” position, the circuit –
breaker shall be drawn out with low voltage circuit connected to permit testing. All these
positions shall be achieved with the front door closed. Suitable earthing connections
between the circuit breaker truck and the cubicle shall be provided so that the earth
continuity is maintained in ‘ Service ‘ and Test ‘ positions. All necessary connections
between the fixed and the moving portions of the equipment shall be made with positive
pressure contacts without any possibility of loose connections. Flexible jumper connections
with plugs and sockets shall be provided with the equipment so that it will be possible to
operate the breaker for testing when in ‘test’ position. All standard interlocks of switchgears
shall be provided.
Micro switches shall also be provided for the circuit breakers for incorporating
positional interlocks in the control scheme.
Cable box for incoming and outgoing cables shall be suitable for terminating heat
shrinkable type indoor cable terminations. Terminations shall be fully contained within the
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 – Electrical System (contd….)
Strip type space heaters shall be provided in the cable chambers and front breaker
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 91/338
chambers. The space heaters shall be rated for 240V SPN supply and controlled through
thermostat and a switch shall be provided on the front panel on individual cubicles.
1.3.6 Circuit-breakers
Circuit breaker shall be tested and proven design and robust construction. The
minimum rating of the circuit breakers of LBDS shall be 630A for 11KV outgoing and 1200A
for grid & generator breaker. The breaker capacity shall be minimum of 1250A for MCC
feeders and 4000A for Generator, grid and tie breakers. No part of the circuit breaker or any
other part of the equipment carrying the fault current or any supporting structure shall be
unduly strained or damaged when making or breaking the specified fault current. Circuit
breakers should be provided with necessary auxiliary switches for indication, control,
interlocking, protection and other purposes. Four spare sets of auxiliary contacts, two
normally closed and two normally open shall be left free in each unit wired up to the control
cable terminal board. The auxiliary contacts shall be mounted in an accessible position. If
contact multiplication is required, CB normally open (NO) auxiliary contacts shall only be
used along with relays.Each circuit breaker shall have shunt trip device suitable for operation at a voltage of
110V DC and shall be provided with ON and OFF position indicators and operation counter.
Spring charging motor shall be designed to operate at a voltage of 240VAC.
Rated current of all secondary windings of CTs shall be 1A unless otherwise specified.
For differential protection, CTs matching ratio shall be provided. The accuracy limit factor for
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 – Electrical System (contd….)
The cable terminal arrangement for all outgoing circuit-breaker and SFU units shall be
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 92/338
housed in separate cable compartments and shall be suitable for multi-core aluminium
conductor PVC insulated armoured/un-armoured cables of number, types and sizes as
specified. The termination arrangement of multiple cables shall permit easy connection and
disconnection of individual cables without disturbing the other cables. For termination of
cables suitable bus-bar extension of proper size shall be provided.
1.3.7 Circuit-breaker Handling Truck
A suitable universal type truck shall be provided for withdrawing the breakers from the
board. The trucks shall have platforms of adequate mechanical strength for bearing the
weight of the largest circuit-breaker unit and shall be provided with necessary guide rails and
stops. The height of the platform shall be adjustable to suit the levels at which the different
circuit breakers are mounted on the switchboard.
1.3.8 Motor Control Centres:
MCCs will be provided for TG, Water treatment plant, DM Plant, Cooling tower and
pump house, AHS, FHS, Boiler, ESP, capacitor panel with APFC relay, PDB, LDB , etc. The
source of power will be from PCC provided in the LT side of distribution transformer.Feeders shall be selected such that the LT loads above 1KW and below 50KW are
connected to DOL Starter. Above 50KW motor shall be provided with star delta starter. All
valves and conveyors wherever required shall have Reverse DOL starter.
1.3.9 Motors:
All LT motors ill be sq irrel cage ind ction t pe machines and ill operate on 415V 3
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 – Electrical System (contd….)
be provided with space heaters.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 93/338
The speed-torque characteristics of the motors shall be matched with those of the
coupled machines so that smooth acceleration is obtained without over-heating the motorand over-stressing the mechanical parts of the driven equipment. The terminal boxes shall
be of adequate size for terminating the required number and size of PVC insulated,
armoured, aluminum conductor cables after considering the required derating factors. The
motor shall be dynamically balanced to comply with the requirements of IS: 12075 including
the amplitude of vibration specified therein. The motor feet shall be integrally cast with the
stator and shall be of such a design as to prevent breakage or other failures due to vibration
normally encountered in power plants. The motor body shall have two separate earthingterminals. Motors shall be provided with lifting hooks / lugs for frame sizes 100 and above.
1.3.10 Capacitors
Capacitors shall be provided at the load end or in each MCC end which is the source of
the low power factor. However, Capacitors of adequate KVA shall be provided in MCCs to
correct the power factor to 0.9 so that the rating of electrical equipment will be economical
and operation will be optimum. The capacitors shall be equally provided on either side ofeach bus. The power factor correction in bulk loaded MCC (say above 200KVA) shall have
automatic cutting in and cutting out of capacitors and the control requirement shall be
programmed in DCS system.
1.4 CONTROL AND PROTECTION
Central Control Room (CCR) shall have free floor standing vertical panels to provide
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 – Electrical System (contd….)
For protection of equipment against abnormal system conditions, adequate protective
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 94/338
devices will be installed in the respective switchgear and / or relay panels. A group of such
protective devices will be necessary to protect the equipment under different abnormal
conditions arising in the system. In all cases, proper discrimination shall be achieved to
isolate the faulty elements only keeping the healthy part of the system in service.
All protective relay panels will be of free standing, floor mounting, sheet steel
enclosed with a degree of protection of not less than IP 40. The panels will be located in air
conditioned rooms.
All protective relays will be comprehensive numerical type capable of measuring all
electrical parameters like voltage, current, power, power factor, frequency etc. The relays will
be capable of communicating all analogue and digital signals with plant DCS system, as
applicable.
All protective relays will be of draw out type with built in testing facilities. Small auxiliary
relays may be of non-draw-out type and mounted within the cubicle. All relays will have
hand-reset and means for visual indication of their operation.
Fully graded protection system with requisite speed, sensitivity and selectivity will beprovided for the entire power station. Critical equipments / systems will be provided with
duplicate protection.
The unit protection relays will be divided into two independent groups including
separate power supply so that in case of failure of one group, the protection system shall be
still functioning and protection of the unit is guaranteed
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 – Electrical System (contd….)
The protection has two over currents and one earth fault current check elements and
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 95/338
a timer with a continuously adjustable setting of 0.5 sec. This protection shall be provided for
each breaker separately.
1.5.3 Generator Protection
Differential protection - generator winding
Over voltage protection
Stator Earth fault protection
Reverse power protection
Negative phase sequence current protection
Field failure protection
Rotor Earth fault protection
Generator overload protection
Overall differential protection for generator, GT and UAT.
Generator under frequency protection
Local breaker back up protection
Diode failure relay
Backup Impedance Protection
Low forward Power protection
Pole slipping protection
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 – Electrical System (contd….)
1.5.5 LT Service Transformers
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 96/338
Over current protection (IDMTL & instantaneous)
Earth fault Protection LV side Backup Earth fault protection
Buchholz protection
Oil winding temperature protection
1.5.6 HT Auxiliary Transformers
Differential protection
Restricted Earth Fault protection for LV winding
Over current protection on 1IkV side & LV side
Backup Earth fault protection
Bucholtz protection
Oil/winding temperature protection
Pressure Relief valve OLTC surge relay protection.
1.5.7 3.3 kV Motors
Multifunction Numerical motor protection relay having flexibility to
accommodate following protections
I t t t d d fi it ti t t ti
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 – Electrical System (contd….)
1.6.2 Telephone System
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 97/338
The Power plant and housing colony will be provided with microprocessor based
intercom telephone system to facilitate inter-communication for operation/administrative
purposes. This consists of an Electronic Private Automatic Branch Exchange (EPABX) of
suitable capacity. All the instruments for subscribers will also have the provision for hooking
up with P&T lines.
The telephone sets will be installed in various areas of power plant and colony. The
EPABX at Power plant and EPABX at colony will be interconnected.
In hazard areas such as oil storage, wall telephone sets with explosion proof and
corrosion resistant metal cases will be provided.
1.7 ILLUMINATION SYSTEM
The plant lighting system includes the normal AC lighting and emergency Lighting
which contributes together 100% lighting as well as emergency DC lighting in selected areas
of the plant during plant emergency conditions. The emergency AC lighting will provide
about 20% of the total AC lighting.
The plant lighting (illumination level) is varying at different locations of the Plant
depending on the utility and nature of work expected to be carried out at that area.
1.7.1 Normal A.C. Lighting of the Plant
Lighting feeders will be provided with lighting transformers of voltage ratio 1:1 for
reducing fault level. For general illumination, fluorescent fixtures are taken into
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 – Electrical System (contd….)
portable tools and other services. Flush type 5 A and 15 A single phase receptacles shall
l b id d f ffi t l d f l ili
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 98/338
also be provided for office rooms, control rooms and false ceiling areas.
1.7.5 Illumination Levels
Illumination levels proposed at various places are listed below:
Location
Illumination
level (lux)
Control room, control equipment room, testing
laboratories 400
Switchgear rooms, MCC room 200
Turbine hall 200
Air compressor house, pump house, water treatment
plant. 150
Basement floors, boiler house including platforms,
crusher house, 100
Cable galleries, passages, stairs, toilets
Coal conveyors (outdoor), fuel oil delivery header, oil
storage tanks 50
O td T f d & it h d 30 t 50
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 – Electrical System (contd….)
cables will be suitable for unearthed system.
/
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 99/338
LT power cables will be 1100 V grade with stranded aluminium/copper conductor,
XLPE/PVC insulated, extruded PVC inner sheathed, armoured and overall FRLS PVC
sheathed.
Control cables will be multicore 1100 V grade, PVC insulated, PVC inner sheathed
armoured and overall FRLS PVC sheathed with 2.5 mm stranded copper conductors.
Main factors which will be taken into consideration for selection of cable sizes are as
follows:
System short circuit current
Derating factors due to higher ambient temperature and grouping of cables
Continuous current rating.
Voltage drop during starting and continuous operation
Standardization of the cable size to minimize too many sizes of cables.
The cables will conform to the relevant Indian / IEC standards in general with the
following special, FRLS properties for the outer sheath. BOQ of cables shall be submittedwith design basis for approval.
1.9 PLANT DC SYSTEM
The DC power system provides DC power to protection and control requirements and
h i l l d h i d f i l f AC Th DC
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 – Electrical System (contd….)
compensation factors.
B tt ill b f t t l d id ith l t t b l iti l t T (2)
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 100/338
Battery will be of storage type lead acid with plate or tubular positive plates. Two (2)
nos. redundant battery set at Main Power, Plant has been considered. Separate batteries for
switchyard, telephone, fire fighting system and other systems, and remote areas like coal
handling plant to be provided.
1.9.2 Battery Chargers
One (1) No. Battery charger for each battery set (float cum boost) of suitable
capacity will be provided for quick boost and trickle charging.
The battery charger will be of solid-state control rectifier type, completely
automatic and self-regulating.
The float charger will be capable of floating the battery and at the same time
supply the continuous DC load of the unit.
The boost charger will be capable of boost charging the battery a fully
discharged battery to a state of full charge in 12 hours.
1.9.3 BATTERY AND BATTERY CHARGER LOAD DETAILS:
The following minimum requirement loads shall be considered for the battery and
battery charger system design.
415V PCC and MCC panel (trip coil, closing coil, shunt trip coil, protection
relays, indications)
3 3KV & 11KV switchgear (trip coil closing coil shunt trip coil protection
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 – Electrical System (contd….)
The earth mat of the station will be designed such that the total ground impedance
does not exceed 1 0 ohm The plant grounding will utilize GI flat /mild steel rods Equipment
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 101/338
does not exceed 1.0 ohm. The plant grounding will utilize GI flat /mild steel rods. Equipment
grounding conductor will be of galvanized steel flats / GI wire.
Each large structure and building complex will have a ground loop around its
perimeter. The ground loops around each structure will be connected to the ground grid.
The fence within the ground grid will be bonded to the plant ground system. The
power plant ground grid will be tied together with the switchyard ground grid.
The grounding system will be connected to all metallic equipment, electrical as well
as non-electrical (except underground pipelines), located at the plant site. All these will be
connected at two distinct points. This will include all structures, buildings, towers, etc.
The chimney and powerhouse building will be equipped with lightning protection.
Lightning protection conductors located on the top of the structures will be connected to the
ground loop surrounding the structures with down comers as per the provisions contained in
the latest issues of Indian Electricity Rules and IS 2309.
1.11 EMERGENCY POWER SUPPLY SYSTEM
A separate emergency power supply for safe shut down of power plant shall be
provided.
One (1) No. of 625 kVA DG sets will deliver power at 415V, 3 phase, 50 Hz, 4 wire.
The estimated capacity of the set will take care of the following loads:
Barring Gears.
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 – Electrical System (contd….)
Two (2) UPS units (2x100%) will be furnished for the Power Plant sized to feed
essential AC loads like DCS and other C&I equipment The UPS system will be provided
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 102/338
essential AC loads like DCS and other C&I equipment. The UPS system will be provided
with two (2) nos. 100% capacity inverter.
An alternative 110 V A.C. single-phase source through by pass transformer and
stabilizer is provided through a static transfer switch to feed the vital A.C. loads during the
failure of both the inverters.
1.12.1 TECHNICAL DATA SHEET FOR – UPS SYSTEM
SL.NO GENERAL DATA DESCRIPTION
1.Continuous rating : Suitable rating
2.Quantity : Two Sets.
3.Location : Indoor.
4.
Input supply : 110 V +/- 10%
5.Output supply : 110 V +/- 10%
6.Input frequency : 50 +/- 5%
7.Overall efficiency : 80 ~ 85 %
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 – Electrical System (contd….)
18.Transfer time on manual transfer : Synchronous - Break free
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 103/338
19.Charger Type :
FCBC, Constant Voltage with
Charging current Limit.
20.Charger Efficiency : >90%
21.Discharging time : 60 minutes
22.Type of battery : Nickle Cadmium
23.Type of electrolyte in the battery :
Potassium Hydroxide (KOH)
Density: 1.19
24.
Type of Cell container in the
battery : Translucent Polypropylene
25. Permissible overload :
120% for 10 Min. 150 % for 1
Min
26.Degree of protection : IP 42
27.Paint shade : RAL 7035
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 – Electrical System (contd….)
protection shall be provided which will protect the inverter against overloads and short
circuits at the output. The current limit shall be adjustable. Once the overload is removed,
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 104/338
p j ,
the inverter shall automatically resume normal operation.
The inverter output shall have spike / surge suppression filters to protect the loads
By-pass transformer shall be natural air-cooled type suitable for indoor location. Links shall
be provided on 415 V windings to give offload tapings of +/- 2.5% & +/- 5% of normal
voltage.
A manual Bypass switch, make before break type, shall be provided to take the
system out for maintenance without interrupting power to the load. The switch shall be
mounted in the inverter section. The enclosure to be of IP 3X or better The SUPPLIER shallensure that neutral of the all transformers are solidly connected to earth to ensure that the
potential between earth and neutral is zero at all conditions.
1.12.3 PRINCIPLE OF OPERATION:
The uninterrupted power supply system shall be complete with chargers, inverters,
static switches, by pass transformer with Automatic voltage regulator and manual bypass
switch. Normally the system will supply the load in UPS mode. In case of any trouble withone of the Inverter Sections, the load shall be catered by the redundant system if both the
inverters fail, loads shall be transferred to the bypass transformer without any interruption.
A manual by pass switch (make before break) shall be provided to isolate the
inverters and static switches for maintenance. When it becomes necessary to boost charge
the battery (i e when the battery has discharged during mains failure) the charger shall be
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure-5 – Electrical System (contd….)
Switchyard control panel
Transformer control panel
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 105/338
Transformer control panel
SWAS system panel Field instruments
CEMS panel
Annunciator panel
AHS PLC control panel
FHS PLC control panel
DM plant control panel
1.13 CABLE TRAY:
Prefabricated ladder type/ perforated type cable trays shall be used for laying of
cables in cable trenches while routing cables along technological structures etc. Cable trays
shall be galvanized after fabrication.
Ladder type cable trays shall be fabricated by means of 2.5mm thick hot rolled sheet
for longitudinal members and cross members. The cross members shall be placed at an
interval of 250 mm along the length of the rack with 30mm slotted holes for cable clamping
purpose. Width of the rung shall be 50mm and above. Cable tray ends shall be suitable for
connecting the jointing plates. The cable trays shall be of widths 300mm, 450 mm, 600 mm
and 900mm. The ladder type racks shall be used for power and control cables.
FACOR ALLOYS LIMITED
45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.EPC TENDER SPECIFICATION
ANNEXURE -6 ASH HANDLING SYSTEM & AUXILIARIES
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 106/338
1.0 DESIGN BASIS FOR SYSTEM
1.1 BASIC DETAILS OF DRY DENSE PHASE SYSTEM:
Following are the basic details of the proposed ash handling system for CFBC.
Description Details
No of boilers and
capacity
1 Nos of CFBC boiler of capacity 195TPH
Fuel combinations
used in boiler
1. 50% Washery rejects, plus 50% Indian coal
2. 50%Washery rejects, 25% Indian coal, 25%
Indonesian coal
3. 25% Washery rejects 50% Indian coal, 25%
Indonesian coal.
Ash collection points Furnace, Cyclones, Eco/APH and hopper below the
ESP fields.
2.0 THE SCOPE OF SUPPLY FOR THE ASH HANDLING SYSTEM SHALL
INCLUDE BUT NOT BE LIMITED TO THE FOLLOWING:
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure – 6 Ash Handling System & Auxiliaries (Contd.)
For APH / Economiser one ash pipe line from the APH / Economiser
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 107/338
hopper to the respective fly ash silo.
ESP – all lines from the ESP ash hopper to the respective fly ash silo.
Abrasion resistant type Pipe fittings like Lateral, Elbow or Tee as
required changing direction or diameter.
Pneumatic piping interconnecting the compressor, air receiver, receiver
outlet to the required points complete with supports, accessories, various
traps, strainers, etc., as required.
Ash storage silos of RCC construction one no for boiler bottom ash and
one number for fly ash. Capacity of bed ash silo – 150 m3 and Capacity of
fly ash silo – 600 m3.
All ash conveying lines, vent fans, dust collectors aeration blowers and
level indicating instrumentation etc.,
Pocket feeder below the silo to transport ash to dust unloaders.
Dry dust unloaders or pug mill unloaders on the silo at elevated level
above ground to allow access to ash transport vehicles below with water
spray arrangements.
Lubricated screw type air compressors with oil and moisture separators of
required capacity complete with required number of air receivers of
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 108/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Annexure – 6 Ash Handling System & Auxiliaries (Contd.)
incoming air sources. Typically, the filter bags shall be "jet-pulse" cleaned. Silo
t filt b l i h ll b ti
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 109/338
vent filter bag cleaning shall be continuous.
3.10 Pipe line support structure shall be as per the standard.
3.11 Valve access door shall be provided in each chamber for ease of maintenance
and inspection.
3.12 Flapper style gates shall swing completely out of material flow path to minimise
component wear.
3.13 Wear back fittings shall be provided to have plain-end and shall be removable forpipeline inspection.
3.14 Bellows Expansion Joints shall be inserted in long pipe runs and before ash
collection vessels to accommodate thermal expansion.
3.15 Velocity in ash conveying pipelines shall be less than 2 m/sec.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 110/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Anneuxre-7 DM Plant, Auxiliary cooling water system, Ventilation system, Fire fighting system (contd.)
9 Total CO2 NIL
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 111/338
10 Free chlorine NIL
11 Oil NIL
1.4 DEMINERALISING PLANT SHALL CONSIST OF BUT NOT BE LIMITED TOTHE FOLLOWING:
One of raw water tank with accessories.
Two nos. of chlorination dosing system.
Two (1W+1S) nos. of raw water pump with accessories.
One (1) Multi Grade Filter (MGF) with back flush, fast flush recirculation
etc.
One (1) Activated Carbon Filter (ACF) with back flush, fast flush /
recirculation / CIP arrangement, tanks, dosing system etc as required.
One set of RO membrane with back flush, chemical cleaning,
arrangements , high pressure pumps, chemical dosing pump etc.,
Permeate tank and pump with accessories.
One set of conventional DM plant with cation exchanger and anion
exchanger complete with resins and accessories along with degasser
tower with tower packing and necessary accessories
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 112/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
Anneuxre-7 DM Plant, Auxiliary cooling water system, Ventilation system, Fire fighting system (contd.)
Window model split or package air conditioners shall be of standard reputed
make suitable to meet the requirement as per the standard shall be provided.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 113/338
q p p
Integrated air ventilation system for electrical room with AHU adequate fancapacity & suitable ducting shall be recommended. The maximum positive pressure shall
be +5 mmWC.
Ventilation system of having throw fans and exhaust fans for required capacity
shall be considered for TG hall. Required quantity of roof exhausters with required
capacity of air flow shall be selected for TG hall.
Man cooler shall be provide in TG hall in ground floor, 5 mtrs Floor and TG hallto maintain good ventilation with required air changes.
4.0 FIRE FIGHTING SYSTEM
The system covers protection, alarm, and detection fire fighting system required
for various units of the power plant.
Water based fire hydrant system with pipe work, hydrants, hose, and hose reels,
hose cabinet branch pipe coupling hydrant valves and other accessories and auxiliaries.
One AC pump (270 m3/hr), Two (2) jockey pumps each of 10 cum/hr and one diesel
pump of capacity 270 cum/hr shall be provided with valves auto start and stop control to
pump, the water where ever required from the pump house near raw water tank. Hydro
pneumatic tank and compressor shall be provided as required. The water hydrant
system covers complete power plant area.
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE – 8
INSTRUMENTATION & AUTOMATION SYSTEM
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 114/338
1.0 DESIGN BASIS OF DCS
1.1 The following shall be basis for design of the instrumentation and control
systems for the CPP
Steam Generator System (CFBC)
All field Instruments from the different locations will be wired & terminated
up to the local junction box by the boiler supplier. The supplier will furnish the JB
internal wiring details. The junction boxes shall be located at floor wise in the
boiler area depending on the requirement.
From the local junction boxes multi core cable will be laid through the
cable tray to the DCS marshalling cabinet. Scope of laying cable from JB to DCS
including detailing will be under the DCS Supplier scope.
Operating & controlling the system will be from the DCS station located at
CCR. Initial start-up of the system with all protection interlocks/permissive shall be
from the DCS located at CCR.
Steam Turbine Generator (STG)
All field Instruments from the different locations will be wired & terminated
up to the local junction box by the equipment STG supplier The supplier will
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE – 8 INSTRUMENTATION AND AUTOMATION SYSTEM(CONTD.)
Ash Handling System (AHS)
Controlling the System will be from the dedicated redundant PLC located
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 115/338
Controlling the System will be from the dedicated redundant PLC located
in the field control panel. Supply of PLC including cabling from field instruments up
to the PLC shall be in the AHS supplier scope. The control of AHS shall be
selected through Manual or Auto mode switch which will be located in the Local
Control Panel. Brief write-up on entire AHS operational & control sequence shall
be furnished by supplier.
Communication with the DCS for monitoring the sequence & other
parameters will be through the built-in Communication port available in the PLC.The Data Communication to the DCS will be through special Cable (Modbus
Communication Cable).Memory mapping details to be furnished by the PLC
supplier to interface the PLC with DCS. Scope of engineering, detailing & laying
of cable from PLC to the DCS shall be carried out by DCS Supplier.
DM Plant
Controlling the System will be from the dedicated PLC located in the field
control panel. Supply of PLC including cabling from field instruments up to the
PLC shall be in the DM Plant supplier scope. The control of DM Plant shall be
selected in Manual or Auto mode switch which will be located in the local control
panel.
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE – 8 INSTRUMENTATION AND AUTOMATION SYSTEM(CONTD.)
Start-up / Controlling / Sequencing the System will be from the dedicated
micro-processor based controller at the local controller console. The supply of
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 116/338
controller will be under compressor supplier scope.
For monitoring the critical process parameters, communication to the DCS
will be through modbus communication port available in the controller itself. Scope
of supply engineering & laying cable from local controller to the DCS shall be
carried out by DCS Supplier.
Water System
The entire cooling water pump, auxiliary cooling water, CT make up pump
and DM transfer pumps shall be controlled through the DCS from the CCR.
Auto/Manual selection & the corresponding trip Interlock shall be wired in the DCS
panel itself.
For monitoring the process parameters like level, pressure, flow,
temperature, pH, conductivity, pump running status etc shall be hardwired from
the field Instruments to the DCS marshalling panel by the DCS Supplier. Scope ofsupply, engineering & laying cable from local controller to the DCS shall be carried
out by DCS Supplier.
Cooling Tower Monitoring
Control of cooling tower fans shall be from the local control panel in the
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE – 8 INSTRUMENTATION AND AUTOMATION SYSTEM(CONTD.)
Emission Monitoring System
Monitoring the emission of CO SO2 Nox & other important parameters
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 117/338
Monitoring the emission of CO, SO2, Nox, & other important parameters
in the combustion gas & volatile emission will be from the analyzer mounted at
critical location.
The Emission Monitoring System shall be supplied by the boiler supplier.
All critical parameters from these analyzers shall be hardwired to the DCS for
monitoring. In addition to that these analyzers shall also be provided with built-in
modbus communication port.
Scope of supply, engineering & laying cable from MCC/PCC to the DCS
shall be carried out by DCS Supplier. .
SWAS System
Separate analyzing & measurement unit will be mounted in the field for
measuring the parameters like pH, silica, conductivity, dissolved oxygen, in steam
& Feed water.
The SWAS System shall be supplied by the boiler supplier. All the critical
parameters from these analyzers shall be hardwired to the DCS for monitoring. In
addition to that these analyzers shall be provided with built-in modbus
communication port.
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE – 8 INSTRUMENTATION AND AUTOMATION SYSTEM(CONTD.)
DCS analog input module.
Compensating cables shall be
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 118/338
T/C Thermocouple Input AI –T
Compensating cables shall be
provided as part of the field cabling up
to the marshalling cabinet.
RTD – 3 Wire AI – R For Pt-100Ω 3Wire RTD inputs
All the analog outputs shall be of 4-20mA DC capable of driving a load of
700 Ω.
All the digital inputs wired to the DCS from the field limit switches,
proximity switches, process switches and MCC contacts will be potential
free and suitable for 24V DC interrogation voltage.
The digital output transmitted from the DCS to the field solenoid valves
and the MCC shall be through potential free relay contacts. Necessary
interposing relays and contactors shall be provided for all the digital
outputs. Modules with built-in relays are preferred and the specification of
the relay contacts shall meet the duty cycle ratings.
Separate marshalling cabinets along with terminal blocks shall be provided
to terminate cable from the field as well as from MCC. The terminal blocks
shall be arranged as per the field cable schedule, which shall be furnished
during detail engineering
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE – 8 INSTRUMENTATION AND AUTOMATION SYSTEM(CONTD.)
Control/Communication facility to Turbine Governing System, Energy
Meter, OPC Server MIS, SCADA Terminal with RS-485 Link
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 119/338
Controller & IO subsystem capable of performing the following functions
• CLCS
• OLCS (Sequential / Protection & Interlocking)
• Data Acquisition
• SOE with 1 m sec resolution
• Third Party Integration using standard protocol like Modbus Master-
Slave/Modbus RTU or through Ethernet to the Data Highway
The system configuration shall be as per the drawing no. HIQ-4036-I&C-01 titled “System
Configuration Diagram” enclosed to this specification.
This power plant has been unit wise classified in to the following for the purpose of
DCS.
SECTION: CFBC ,STG & BOP
The DCS has been configured in the functional distribution concept having
separate field control sub-system section wise (FCS – 1 ~ 3) for section respectively to
perform the monitoring, closed loop and sequential, protection and interlocking logics as
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE – 8 INSTRUMENTATION AND AUTOMATION SYSTEM(CONTD.)
v) NX- 1 &2 :
High speed, redundant fast Ethernet data
highway network consisting of Ethernet
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 120/338
switches.
The system offered shall be from latest series introduced to the market by the
tenderer in the last 2 years and systems that are old by more than 5 years are not
acceptable even though improvements/up gradations are made to the system.
The system offered shall be from the same nativity of Processor, I/O’s and
Software packages developed exclusively as a total system. Configuration with hybrid
components or software packages is not to be offered.
The Tenderer to configure the system, based on the I/O List. While configuring the
system, the following design aspects are to be considered.
The system components shall be identical as far as possible with high degree of
inter changeability and flexibility.
System with minimum types of modules shall be preferred. The Tenderer should
list out all the types of modules envisaged in the configuration diagram separately in the
offer.
The system offered shall be suitable for upward expandability for future
expansions and additions. This expandability should be ensured with respect to Operator
t ti FCS d l f th ft d l t h dl th i t t Th
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 121/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE – 8 INSTRUMENTATION AND AUTOMATION SYSTEM(CONTD.)
10 % spare slots or 1 slot in each rack whichever is higher is to be
provided as slot spare.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 122/338
The racks shall be exclusive for each unit and mixing of I/O channels in theracks is to be avoided.
3.4 CONTROLLER UNIT
The processor shall be of high speed, 32 Bit, latest state-of-the art technology with
powerful instruction set. The processor shall have advanced features for high speed
processing, power and flexibility to perform application and communication oriented task.
The processor shall be provided with memory of flash RAM type with minimum
capacity of 64 MB. However the memory of the system shall be sized such that the
loading of the memory is only to the tune of 60 to 70% after loading all the programmes.
The system shall have standard features like automatic error detection and
correction, watchdog timers, Status indications, self-diagnostic routines for fault finding
and reporting up to I/O level.
The processor & memory loading on the main controller, I/O cards, and
communication processor shall not exceed 60% under the worst loaded condition &
taking 10% I/O requirement of the future.
The Controller shall be able to operate in manual, auto, cascade mode.
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE – 8 INSTRUMENTATION AND AUTOMATION SYSTEM(CONTD.)
The change over from the primary processor to the secondary processor in
case of failure of the primary processor shall be bump less and balance
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 123/338
less. The failure of the primary processor shall have to be diagnosed andreported in the system.
The redundant data link provided in the processor shall work
independently in redundant configuration and failure of any one link will not
initiate the hot stand by change over process.
The failure of any of the data link connection shall be diagnosed by the
processor and reported to the system.
When the Secondary processor takes over on the failure of the primary
processor, the status of the secondary processor shall automatically
change from secondary to primary without any operator initiation. Once the
failed primary processor gets rectified and replaced, this new processor
will get assigned as secondary processor without disturbing the continuous
functioning of the working processor
The hot stand-by redundancy offered for the field control station shall have
the feature of segmental redundancy concept considering the processors,
communication links, power supplies etc as a redundant pair. With the
segmental redundancy concept failure of any component in a pair will
k th th t t t k f th f il ith t th h
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE – 8 INSTRUMENTATION AND AUTOMATION SYSTEM(CONTD.)
The scan time includes the time for scanning the input, A/D conversion, signal
processing and control and outputting as followed
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 124/338
Protection & Interlock for Digital Signals 250 msec.
Digital Signals 100 msec.
Analog Signal (Std Closed Loops) 100 msec
Analog Signal (Critical Closed Loops) 250 msec
Analog Signal (Open Loops) 500 msec ~ 1 sec
Digital Inputs (SOE) 1msec with time stamping
3.5 Self Diagnosis
The System shall have an extensive set of self diagnostic features such that
any failure detected shall be displayed on the operator screen.
At local level, failure mode in any subsystem shall be monitored by an
individual LED.
Diagnostic software shall have the capability to provide information about the
failed module.
Diagnostics feature to display the sensor condition.
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE – 8 INSTRUMENTATION AND AUTOMATION SYSTEM(CONTD.)
On line replacement of IO modules shall be possible without influencing
other logic function.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 125/338
All modules shall have self diagnostic feature with LED indication
Analog Input modules shall be capable of accepting 4 ~ 20mA DC & shall
provide 24 Vdc power to the field transmitter. However when 4-wire
transmitters are used the modules shall be capable of accepting
4 ~ 20mA DC isolated signal.
RTD modules shall be capable of accepting RTD, Pt-100Ω signal that shall
be individually configured.
Thermo-couple modules shall be compatible for various types of Thermo-
couples like J, K, R, S, T, E, B or N with cold junction compensation.
AO Modules shall have following default option upon failure of the card to
receive fresh output like Hold last value / predefined value from processor
module.
AO Modules shall be capable of driving up to 700Ω total loop resistance at
4 ~ 20mA DC.
DI Modules shall accept the input voltages at 24 Vdc.
DI signal shall be through fused TB with LED indication.
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE – 8 INSTRUMENTATION AND AUTOMATION SYSTEM(CONTD.)
Core 2 Duo Processor or higher family with 32 bit processor having
minimum speed of 3.0 GHz with working memory (RAM) capacity of
min 2 GB
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 126/338
min 2 GB.
High-resolution 22” digital LCD colour monitor (Flat Screen) with minimum
pixel resolution of 1024 x 780.
Bulk memory units (HDD) of not less than 160GB.
One no CD ROM- Drive unit for Operator Station
One no CD Read/Write unit for Engineering Station
Dual ETHERNET 100 MBPS interface modules for connecting the data
highway network and one no ETHERNET interface module for connecting
to the higher-level information network in future.
Console type sheet steel enclosures for mounting the monitors, keyboard,
mouse and the CPU unit of the PC stations.
Engineering and operating workstation console desk shall have furniturearrangements with ergonomic chairs, considering safety and comfort.
The workstations shall be operating using the latest Windows XP platform.
Tenderer shall furnish details of the workstation along with the operating system, in his
offer clearly.
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE – 8 INSTRUMENTATION AND AUTOMATION SYSTEM(CONTD.)
Graphics shall be dynamic & interactive.
3.9 Engineering Station Display
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 127/338
The Engineering Station offered shall provide following functions both on-
line & off-line.
• System Configuration
• Controller Configuration
• Fault diagnostics
• Modification / Addition of Control Loops
• Generation / Modification of Graphics/displays/logs & reports
• Programming of controllers
• Database configuration including configuration of all displays
•
Automatic downloading of the configurations.
• Configuration of various control functions / Alarm settings/Tuning
• Defining the key lock functions
• On-line Compilation of all types of dynamic graphic displays
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 128/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE – 8 INSTRUMENTATION AND AUTOMATION SYSTEM(CONTD.)
After successful commissioning of the system consumables shall be provided for a
minimum of three months operation.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 129/338
3.13 FAST ETHERNET DATA HIGHWAY NETWORK
The PC based workstations and the Field control sub systems (FCS) are networked with
a redundant fault tolerant high-speed control data highway network as shown in the
configuration diagram. The control data highway shall be of high speed Ethernet open
network and systems with proprietary type network are not acceptable. The data highway
network shall have the following main features:
Bus topology of network architecture with high speed Ethernet Backbonethrough redundant fast Ethernet manageable L2 type switches .The
network shall have cross-link independent connections to each node on
the network.
Communication medium shall be of high quality data cable with speed
transmission not less than 100 MBPS.
Communication method shall be of Ethernet conforming to IEEE 802.3
standard
The redundant buses shall concurrently share the traffic load and in case of failure
of one bus, the other shall cater to the full traffic demand. The transfer shall bump less.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 130/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE – 8 INSTRUMENTATION AND AUTOMATION SYSTEM(CONTD.)
shall elaborate in his offer the various performance calculations available
as part of the system with supporting catalogues for the same.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 131/338
3.17 Software at FCS
The Field Control station shall have powerful instructions and function
blocks for complex control loops facilitating effective analog signal processing. The
software shall have the following features:
On-line editing and down loading of the programme.
On –line upload of the programme from the FCS processor for review and
editing.
3.18 SOFTWARE DEVELOPMENT
The Tenderer shall be required to develop job specific application software
modules using the utility packages. This shall include but not limited to the following:
i)
Database generation (for each work
station)
:
As required
ii)
Process graphic mimic displays with
dynamic graphic definitions
:
Approximate 25no’s
Alarm monitoring, trending and :
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE – 8 INSTRUMENTATION AND AUTOMATION SYSTEM(CONTD.)
3.19 Environment Condition
All Control Panel, Operator/Engineering Stations, Printers shall be located in the
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 132/338
Central Control Room with ambient temperature of 23°C ±2°C with 50% relative humidity.However upon failure of air conditioning system the equipment shall be capable of
withstanding 50°C with relative humidity of 95%.
4.0 SYSTEM, I/O AND MARSHALLING CABINETS
4.1 MARSHALLING CABINETS
The system, I/O and marshalling cabinets shall be of free standing, vertical closed
cubicle type with front and rear opening single doors. Separate cabinets shall be provided
for power distribution arrangement. The width, depth and height of the individual cabinets
shall not exceed 800mm (W) x 800mm (D) x 2200mm (H) respectively for the purpose of
easy handling and installation. The make of the cabinet shall be preferably of RITTAL or
HOFFMAN.
The cabinets shall be fabricated out of cold rolled sheet steel (CRCA)
enclosure of thickness 2.5 mm on front & sides and 2mm for Top & Doors
with welded/bolted construction. All welds shall be smooth and all the
corners to be rounded and the weld spatters shall be cleaned.
Mounting angle, flush with bottom shall be provided. All panels shall be
supported on suitably sized vibration rubber pads designed for bolting to
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE – 8 INSTRUMENTATION AND AUTOMATION SYSTEM(CONTD.)
No.of terminations on one side of the DCS IO cabinet shall not
exceed 300.
C bi t l d i ti
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 133/338
Cabinet colour and painting.
All the panels and cabinets shall be pre-treated and powder coated as per
the following colour coding.
i) Exterior : Pebble grey as per shade RAL 7035
ii) Interior : Milky White
4.2 Wiring Termination & Ferruling
a. All incoming and outgoing wires except the thermocouple lead wires shall
be routed through suitable sizes of clip-on type terminal blocks of minimum
size of 2.5mm². Special terminal blocks such as double ducker, fused TB
with LED indication, disconnecting type etc., shall be used wherever
applicable. The preferable make of the terminal block shall be of
WAGO/PHEONIX.
b. Terminal blocks shall be provided for external wiring with proper
identification strips.
c. Terminal blocks shall have laminated plastic engraved tag in white letters
with black back ground fixed on each Terminal Block.
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE – 8 INSTRUMENTATION AND AUTOMATION SYSTEM(CONTD.)
• All Power cables → 2.5 mm²
• All Signal Cables→ 1.0 mm²
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 134/338
• All Alarm Cable → 1.0 mm²
i. All terminal block shall include at least 20 % spare terminals.
Wires shall run in PVC cable trough s inside the panel. All wires shall be
plainly and durably labelled at both ends for easy identification and must
conform to the wiring-labelling scheme shown in the interconnection
drawing. All spare cores shall be terminated with terminal blocks with
proper identity.
j. Separate safety and signal earthing shall be provided in each system
cabinet. The system earth shall be insulated from the body and shall be
connected to a separate earth pit.
4.3 CONTROL DESK
The following cabinets/control desks shall be provided.
i) Power distribution cabinet for DCS : One (1) no.
ii) System cabinets for FCS : As required.
iii) I/O cabinets for the I/O racks : As required
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE – 8 INSTRUMENTATION AND AUTOMATION SYSTEM(CONTD.)
Ferrules shall fit tightly on the wires & shall not fall off when the wire is
disconnected form terminal blocks
Th hil h f + di t f li h ll b f ll d f ll i t l &
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 135/338
The philosophy of cross + direct ferruling shall be followed for all internal &external wiring in the Control Panel, MCC, Junction Boxes etc..
5.3 EARTHING
The Tendered shall include in his scope of supply all necessary items required for
the isolated special earthing arrangement called as system earth exclusively for the DCS.
Details of this arrangement shall be indicated in the offer. However, earthing
arrangement (safety earthing) throughout the plant including earth mat in the control roomshall be provided by the Purchaser. All the panel and the cabinet bodies shall be
connected to this safety earth and the system shall be connected to the system earthing
arrangement.
Exclusive earthing pits (power earth & system earth) for the DCS as per the
requirements of the vendor shall be provided by the purchaser and rest of all the work
related to earthing shall be in the scope of work of the tenderer.
6.0 MANDATORY SPARE REQUIREMENTS
Following Mandatory spares shall be supplied
10 % of the Input / Output connected to each I/O Card shall be supplied as
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARVIDI, ANDHRA PRADESH.
EPC TENDER SPECIFICATION
ANNEXURE – 8 INSTRUMENTATION AND AUTOMATION SYSTEM(CONTD.)
Powering up / loading the system system configuration & carryout internal
loop checks.
8 0 PERFORMANCE GUARANTEE
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 136/338
8.0 PERFORMANCE GUARANTEE
8.1 Demonstration of guarantee & performance test shall be with the
Acceptability as follows.
Redundant System → 100 %
8.2 Performance Guarantee Specification
Percentage loading shall be as follows
CPU loading (maximum) → 60 %
Memory utilisation (maximum) → 60 %
I /O loading ( maximum) → 60 %
Communication processor loading → 60 %
8.3 Call up time
The Call up time for the Type of display shall be 1 ~ 4 seconds for the Overview
,Group Display, Loop Display Dynamic Graphics, Real Time Trend, Historic Trend, Alarm
Summary ,Alarm History & Configuration.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
ANNEXURE – 9 – SCOPE MATRIX
Note: EPC Contr. : Scope of EPC Contractor as per this specification
FAL : Scope of M/s. Facor Alloys Limited or by other agency
A. CFBC BOILER
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 137/338
ENGINEERING
SL.
NODESCRIPTION
BASIC
DESIGN
INCL
P&ID
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
1.
STEAM DRUMFully welded steam drum withinternals, man holes andnecessary nozzle connectionsfor mounting valves, Safety
valves & fittings
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
WATER WALL
Water cooled membrane
enclosure with headers and
necessary connections like
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
2.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NODESCRIPTION
BASIC
DESIGN
INCL
DETAILED AND
CONSTRUCTION
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 138/338
INCLP&ID
ETC.
CONSTRUCTIONDRGS
COMMISSIONING
b. Super heater coilsupports
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
SUPERHEATER LINKS
a. Drum to convection SHinlet header
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
b. Convection SH outletheader to De-SH inlet
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
c. De-SH outlet to radiantSH inlet header
EPCContr.
EPC Contr. EPC Contr. EPC Contr.
d. Radiant SH outlet toMSSV with accessoriessafety valve flow meter
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
5.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NODESCRIPTION
BASIC
DESIGN
INCL
DETAILED AND
CONSTRUCTION
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 139/338
INCLP&ID
ETC.
CONSTRUCTIONDRGS
COMMISSIONING
e. Economiser / evaporator Ash hopper with isolationgate
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
SOOT BLOWERS
a. Retractable sootblower/Rotary sootblowers
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
b. Drive motors EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
c. Local gauge panel /Control panel
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
7.
d. PRV/PRDS EPC
Contr EPC Contr. EPC Contr. EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NODESCRIPTION
BASIC
DESIGN
INCL&
DETAILED AND
CONSTRUCTIONGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 140/338
INCLP&ID
ETC.
CONSTRUCTIONDRGS
COMMISSIONING
10. RISERS EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
INTEGRAL PIPINGWATER PIPING
a. From outlet of deaeratorto Economizer inlet.through HP, LP heatersincluding deliveryheader, with fittings,accessories, motorizedcontrol valves & bypass
valves etc.,
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
b. From economiser outletto steam drum inlet
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
EPC
11.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 141/338
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NODESCRIPTION
BASIC
DESIGN
INCLP&ID
DETAILED AND
CONSTRUCTIONDRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 142/338
INCLP&ID
ETC.
CONSTRUCTIONDRGS
COMMISSIONING
c. Common drain header EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
d. Common drain header toblowdown tank EPCContr.
EPC Contr. EPC Contr. EPC Contr.
e. Piping from blowdowntank outlet to nearesttrench
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
f. Flash steam recovery
piping from continuousblowdown tank todeaerator and exhaust
EPCContr.
EPC Contr. EPC Contr. EPC Contr.
g. Supports for Blowdown,drain & vent piping
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NODESCRIPTION
BASIC
DESIGN
INCLP&ID
DETAILED AND
CONSTRUCTIONDRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 143/338
P&ID
ETC.
DRGS
18. AIR BOX
Air box with air nozzle & fuelnozzle and ash drain pipe
with knife gates
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
AIR DUCTING
a. Air flow measuringdevice as required.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
b. PA fan suction ducting EPCContr.
EPC Contr. EPC Contr. EPC Contr.
c. From PA fan dischargeto air heater /Header/ Airbox.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
19.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NODESCRIPTION
BASIC
DESIGN
INCLP&ID
DETAILED AND
CONSTRUCTIONDRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 144/338
P&ID
ETC.
DRGS
Power operated regulateddelivery damper/ poweroperated damper for suctionduct for SA fan
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
22. Fuel feeding system frombunker to boiler burningchamber including sliding gates,fuel feeders with VFD, dragchain conveyors / screwfeeders, chutes and drivingmotors.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
23. Seal pot blowers/ motors withauxiliaries complete EPCContr.
EPC Contr. EPC Contr. EPC Contr.
24. Ash cooler blowers/ motors withauxiliaries complete
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NODESCRIPTION
BASIC
DESIGN
INCLP&ID
DETAILED AND
CONSTRUCTIONDRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 145/338
P&ID
ETC.
DRGS
c. From ESP outlet tochimney inlet includingthe ID Fan ductingcomplete with necessary
power operateddampers.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
d. Damper & expansion joints in Flue gasducting
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
e. Inlet & outlet expansion
joints of ESP
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
ID Fan & motor with allaccessories/auxiliaries, 2 x 60%capacity with Voith turbohydraulic couplings
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
28.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NODESCRIPTION
BASIC
DESIGN
INCLP&ID
DETAILED AND
CONSTRUCTIONDRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 146/338
P&ID
ETC.
DRGS
d. SS lining of 2mm thkfrom conical portion
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
e. Bed material bunker withsupporting structure fromground level
EPCContr.
EPC Contr. EPC Contr. EPC Contr.
f. Lime stone bunker withsupporting structure fromoperating floor
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
SUPPORTING STRUCTURE
a. Supporting structurefrom ground level
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
b. Operating platform EPC
C t
EPC Contr. EPC Contr. EPC Contr.
30.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NODESCRIPTION
BASIC
DESIGN
INCLP&ID
DETAILED AND
CONSTRUCTIONDRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 147/338
P&ID
ETC.
DRGS
i. Complete steelsupports for ducting
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
j. Refractory supports &
casing
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
k. Hanger rod EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
l. Supporting steelstructures for boiler roof& side cladding
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
m. Approach platform fromboiler to turbine hall
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
n. GI sheets for roof andside cladding for boiler
EPC EPC Contr EPC Contr EPC Contr
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NODESCRIPTION
BASIC
DESIGN
INCL
P&ID
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 148/338
ETC.
b. Hot gas generatorcomplete
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
c. Combustion control andmanagement system asrequired.
EPCContr.
EPC Contr. EPC Contr. EPC Contr.
VALVES & MOUNTINGS
a. Motorised valves whereever required
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
34.
b. Boiler feed watercontrol station.i) 1x100% FCS with
pneumatic control.ii) 1x100% mot. Control
station
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NODESCRIPTION
BASIC
DESIGN
INCL
P&ID
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 149/338
ETC.
c. All isolation, drain & rootvalves
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
MAIN STEAM LINE ( Upto Inletof turbine)
a. Isolation & root valvesfor drain
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
b. Spring loadedmechanical safety valve
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
c. Non return valve EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
d. Silencer on SH safety EPCEPC Contr EPC Contr EPC Contr
38.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NODESCRIPTION
BASIC
DESIGN
INCL
P&ID
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 150/338
ETC.
c. Air box drain valve EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
d. Air box bleed off valve EPCContr. EPC Contr. EPC Contr. EPC Contr.
e. Air & gas line non IBRvalves
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
INSTRUMENTATION & CONTROL
INSTRUMENTATION
LOCAL FIELD INSTRUMENTS / TRANSMITTER
40.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NODESCRIPTION
BASIC
DESIGN
INCL
P&ID
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 151/338
ETC.
Feed water temp-erature beforeeconomiser
Feed water temperature after
economiser
Steam temp. before and afterdesuperheater
Contr.
Pressure gauges to measureSteam pressure at steam drum& superheater outlet
Bed pressure
41.
Feed line pressure before feedcontrol valve
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
Draught gauges to measure42
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NODESCRIPTION
BASIC
DESIGN
INCL
P&ID
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 152/338
ETC.
ID fan inlet EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
PA fan inlet EPC
Contr.
EPC Contr. EPC Contr. EPC Contr.
SA fan inlet EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
44. Power operated open & closetype damper at
PA header
SA header
ID fan outlet
PA fan outlet
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NODESCRIPTION
BASIC
DESIGN
INCL
P&ID
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 153/338
ETC.
45. FIELD INSTRU-MENTSREQUIRED FORCONTROL SYSTEM
Three element drum levelcontrol consists of
Three nos. drum leveltransmitters (1 no. for widerange and 2 nos for Left & Rt.)
Two no. steam flow transmitter.(one for measurement & other
for control)
Two no. feed flowtransmitter(one formeasurement & other forcontrol)
EPCContr.
EPC Contr. EPC Contr. EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NODESCRIPTION
BASIC
DESIGN
INCL
P&ID
ETC
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 154/338
ETC.
47. Auto combustion controlconsists of
Two no. steam pressure
transmitter
One no. air flow transmitter
Any other instrument asrequired for proper & safetycontrol of the system.
EPCContr.
EPC Contr. EPC Contr. EPC Contr.
48. Superheater steam temperature
control consists of
Two no. thermocouple
Two no. temp. transmitterEPC
Contr.EPC Contr. EPC Contr. EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NODESCRIPTION
BASIC
DESIGN
INCL
P&ID
ETC
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 155/338
ETC.
52. Impulse piping, instrumentcables and signal cables fromfield instruments to DCS
Compensating cables upto DCSpanel for all Thermocouple.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
53. SWAS EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
54. Vibration monitoring systems forfans
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
55. Stack monitoring system EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
56 Cables beyond junction boxes EPC
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NODESCRIPTION
BASIC
DESIGN
INCL
P&ID
ETC
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 156/338
ETC.
62. SAMPLE COOLERS
Blowdown / Boiler water /saturated steam / SH steam /
feed water etc
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
ELECTRICALS
a. All motors forID/FD/SA/blowers, feedpump motors and otherrelated motors required.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
b. Motor for HP&LP dosingsystem, Cyclone, Coalfeeders, lime andcyclone screw, Ashhandling system,compressor motors
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
63.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NODESCRIPTION
BASIC
DESIGN
INCL
P&ID
ETC
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 157/338
ETC.
g. Load list with in batterylimits
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
h. VVFDs / Hydrauliccouplings with in batterylimits
EPCContr.
EPC Contr. EPC Contr. EPC Contr.
i. Local push buttonstations for the motorssupplied by EPCCONTR.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
j. Interconnecting LTpower & controlcables including cabletrays from LT MCC todrives supplied by EPCCO
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NODESCRIPTION
BASIC
DESIGN
INCL
P&ID
ETC
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 158/338
ETC.
p. Power control center,transformer, switch gear,starters required for HTmotors
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
64. Dearator of capacity 230tons/hour with storage tank ofcapacity 60 tons complete withall accessories, inter connectingpipes including pegging steamline, level controller, pressurecontroller, safety valve, vent
valve and Emergency drain v/vwith piping & accessoriesterminating at flash tank to storehot DM water for reuse.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
BOILER FEED WATER65.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NODESCRIPTION
BASIC
DESIGN
INCL
P&ID
ETC
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 159/338
ETC.
d. BFP inlet pipingcomplete with valves andaccessories fromDeaerator outlet and all
recirculating lines frompump outlet toDeaerator.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
66. Complete electrostaticprecipitator of suitable size andnumber of fields to ensure adust concentration of less than50mg/Ncum at outlet with allfields in operation and less than75 mg/Ncum with one fielddown.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
CHEMICAL DOSING SYSTEM67.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NODESCRIPTION
BASIC
DESIGN
INCL
P&ID
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 160/338
ETC.
c. Bed ash cooler with allauxiliaries/accessaries
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
69. Ash hopper at the bottom ofradiant chamber, second pass,economiser bottom, ESP etc.forDust collection with valve, with aminimum clearance of 2500mmbetween bottom of the outletflange and ground with isolationgate, expansion bellow andother accessories as required.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
70. BED ASH DISPOSAL SYSTEMbeyond outlet of ash hoppers atvarious locations.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
71 FLY ASH HANDLING SYSEM C
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
B. STEAM TURBO GENERATOR & ITS AUXILIARIES
ENGINEERING
SL.
NO. DESCRIPTION
BASIC
DESIGNINCL
P&ID
DETAILED ANDCONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING ANDCOMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 161/338
P&ID
ETC.
DRGS
1
Steam Turbine complete with
top and bottom casings /
barrel casing, rotor, bearings,hydraulically operated stop and
emergency valve, integral steam
strainer, hydraulically operated
throttle/governing valves, etc
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
2
HP heaters with all auxiliaries &
accessories including thecondensate water line with
necessary control & by pass
valves, drain lines, valves etc.
EPCContr.
EPC Contr. EPC Contr. EPC Contr.
LP h t ith ll ili i &
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NO.DESCRIPTION
BASIC
DESIGN
INCL
P&ID
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 162/338
5
Steam supply lines with
necessary PRDS, valves,
metering instruments, supports
etc for supply of steam from the
boiler main steam header to the
ejectors as well as the gland
sealing system including
preparation of
drawings/documents and
obtaining IBR approval.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
6
Combined lube oil cum
governing oil system complete
with MOP, AOP,EOP etc,
strainers, filters, interconnecting
oil lines with all requiredEPC
Contr EPC Contr. EPC Contr. EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NO.DESCRIPTION
BASIC
DESIGN
INCL
P&ID
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 163/338
11 Turbine governing systemEPC
Contr.EPC Contr. EPC Contr. EPC Contr.
12 Gland sealing system with GVCetc.
EPC
Contr. EPC Contr. EPC Contr. EPC Contr.
13Local gauge panel EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
14
Accessories such as barring
gear, QCNRV, FFRV, isolation
valves etc. in bleed lines.
EPC
Contr. EPC Contr.
EPC Contr.
EPC Contr.
15Common base plate for turbine
and gear box
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NO.DESCRIPTION
BASIC
DESIGN
INCL
P&ID
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 164/338
condensation heater, water
leakage detector, lube oil flow
regulator etc.
21
Generator metering , protectionand control system including
LAPT, MCSP, NGR and inter
connecting cables etc
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
22Motors for TG auxiliaries and
EOP along with starters.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
23
Turbine control and
instrumentation including dial
type pressure and temperature
gauges, pressure switches, level
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NO.DESCRIPTION
BASIC
DESIGN
INCL
P&ID
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 165/338
pipes/tubes etc.
28
Instrument air requirement
2x100 % air compressor with 7
to 8 kg/cm2 (g) dischargepressure will be provided in
load/ unload operation mode.
2nos of air driers and required
nos of air receiver.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
29 a. Ventilation system (A/C)
complete in TG buildingto maintain control room
temperature 22 + 2
degree C.
b. Ventilation fans with
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
C. AIR COOLED CONDENSER & ITS AUXILIARIES
ENGINEERING
SL.
NO.
DESCRIPTIONBASIC
DESIGNINCL
P&ID
DETAILED ANDCONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING ANDCOMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 166/338
P&ID
ETC.
DRGS
1. Turbine exhaust duct from
turbine exhaust flange to ACC
inlet duct with expansionbellow, transition piece etc.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
2. Air cooled Condenser (ACC)
complete with structures
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
3.
ACC fans & Gear boxes with
proper mounting arrangementand vibration sensor & oil level
sensor.
EPC
Contr. EPC Contr. EPC Contr. EPC Contr.
Fan motors with VFD & otherEPC
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NO.DESCRIPTION
BASIC
DESIGN
INCL
P&ID
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 167/338
8. Fan rings EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
9.Rupture disc EPC
Contr. EPC Contr. EPC Contr. EPC Contr.
10.Drain lines for connecting other
drain lines like turbine casing
drains, GVC drains etc
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
11.
11.1
Condenser auxiliaries
Condensate tank with stand
pipe for instruments
EPCContr.
EPC Contr. EPC Contr. EPC Contr.
11 2 Flash pipe for receiving steam EPCEPC Contr EPC Contr EPC Contr
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NO.DESCRIPTION
BASIC
DESIGN
INCL
P&ID
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 168/338
condensers, GVC, LP Heater
and up to inlet of Deaerator.
Contr.
12.3
Split range control valves for
Condensate re-circulation
along with controls
EPCContr. EPC Contr. EPC Contr. EPC Contr.
12.4
Pipe supports, strainers, steam
traps, drains, vents and
isolation Valves as required.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
12.5Drain lines with isolation valves
for ejector condenser drains
etc.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
12 6Dry air/vapour line to ejector EPC
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NO.DESCRIPTION
BASIC
DESIGN
INCL
P&ID
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 169/338
13.4
Inter and after condensers
individually for each service
ejector
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
14.
Fin cleaning system:
Fin cleaning system with water
pumps, motor required pipe
lines or high pressure hoses,
valves, water tank etc.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
15. C&I for ACC comprising but
not limited to:
Split range hot well level control
valves complete with LevelEPC
Contr.EPC Contr. EPC Contr. EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NO.DESCRIPTION
BASIC
DESIGN
INCL
P&IDETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 170/338
15.5Temperature gauge for
condensate outlet, condensate
tank, ejector outlet
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
15.6
Pressure switches for
Condenser pressure high trip &
alarm, CEP & CDP auto start
interlock on very high level and
auto stop on very low level,
alarm for high and low on
exhaust drain and condenser
tank.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
15.7
Level switches for Low level,
Low-Low level, high level,
High high level & CEP auto
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NO.DESCRIPTION
BASIC
DESIGN
INCL
P&IDETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 171/338
15.11Instruments cables up to
junction boxes for connecting to
purchaser’s DCS system
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
15.12RTDs, Thermo wells for all the
temperature measuring points
for purchaser’s DCS system.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
15.13Provision for level transmitters
for DCS controls and
instrumentation
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
15.14Vibration switches for high and
Very high for each fan for
connecting to DCS logic.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
D. FUEL HANDLING SYSTEM (90 TPH min)
ENGINEERING
SL.NO.
DESCRIPTION
BASICDESIGN
INCL
P&IDETC.
DETAILED ANDCONSTRUCTION
DRGS
MANUFACTUREAND SUPPLY
FABRICATIONERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 172/338
1 Electromechanical Vibratingfeeder of required capacity atoutlet of Coal ground hopper.
EPCcontr.
EPC contr. EPC contr. EPC contr.
2 Required motor with gear box,couplings, coupling guards withpush button for BC1.
EPCcontr.
EPC contr. EPC contr. EPC contr.
3
Belt of N/N of required size ofstrength with all drive pulley,end pulleys, snap pulleys, VST
complete, impact rollers,conveyor rollers, skirt rubbersetc.
EPC
contr.
EPC contr. EPC contr. EPC contr.
Magnetic separators, metal
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.NO.
DESCRIPTION
BASICDESIGN
INCLP&IDETC.
DETAILED ANDCONSTRUCTION
DRGS
MANUFACTUREAND SUPPLY
FABRICATIONERECTION,
TESTING ANDCOMMISSIONING
7
Flip flow vibrating screen ofrated capacity to separate250mm coal before primary
EPCcontr
EPC contr. EPC contr. EPC contr.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 173/338
250mm coal before primarycrusher.
contr.
8
Primary crusher – 1 requiredcapacity with drive motor forcrushing coal from 250 mm size
to 75mm size with motorpulleys, belt safety guards etc.
EPC
contr.
EPC contr. EPC contr. EPC contr.
9
Bypass chute for primarycrusher, vibrating screencomplete with duct, pneumatic /rack & pinion gates etc.
EPCcontr.
EPC contr. EPC contr. EPC contr.
10
Belt conveyor (BC-02) of ratedcapacity from primary crusherhouse to secondary crusher,with closed gallery of CGIcladding and roofing,walkways gratings trestle
EPCcontr.
EPC contr. EPC contr. EPC contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.NO.
DESCRIPTION
BASICDESIGN
INCLP&IDETC.
DETAILED ANDCONSTRUCTION
DRGS
MANUFACTUREAND SUPPLY
FABRICATIONERECTION,
TESTING ANDCOMMISSIONING
13
Secondary crushers of ratedcapacity to crush the oversizematerial (75 mm size) to ( ) 10
EPCEPC contr EPC contr EPC contr
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 174/338
13 material (75 mm size) to (-) 10mm with motors, pulleys, beltdrive safety guard etc.
contr. EPC contr. EPC contr. EPC contr.
14
Flip flow type vibrating screens
of rated capacity to separateout (-) 10 mm, complete withsupporting frame, chutes anddust cover before secondarycrusher.
EPCcontr.
EPC contr. EPC contr. EPC contr.
15Required motor with gear box,couplings, coupling guards withpush button for BC1.
EPCcontr.
EPC contr. EPC contr. EPC contr.
16
Belt of N/N of required size ofstrength with all drive pulley,end pulleys, snap pulleys, VSTcomplete, impact rollers,
EPCcontr.
EPC contr. EPC contr. EPC contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.NO.
DESCRIPTION
BASICDESIGN
INCLP&IDETC.
DETAILED ANDCONSTRUCTION
DRGS
MANUFACTUREAND SUPPLY
FABRICATIONERECTION,
TESTING ANDCOMMISSIONING
20
Monorails with hoists at primarycrusher house, secondarycrusher house, screen house EPC
EPC contr EPC contr EPC contr
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 175/338
20and transfer tower. The liftingcapacities to be decided by thebidder.
contr. EPC contr. EPC contr. EPC contr.
21
Belt conveyors (BC-04) of rated
capacity, from secondarycrusher to boiler bunkers, withclosed gallery of CGI claddingand roofing, both sideswalkway, gratings, trestlesupports, etc.
EPCcontr.
EPC contr. EPC contr. EPC contr.
22
Belt conveyor of rated capacity
for feeding crushed material forprimary crusher to BC1 withtransfer tower complete. Itincludes closed gallery of CGIcladding of roofing both sidewalkways, gratings, trestle
EPCcontr.
EPC contr. EPC contr. EPC contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.NO.
DESCRIPTION
BASICDESIGN
INCLP&IDETC.
DETAILED ANDCONSTRUCTION
DRGS
MANUFACTUREAND SUPPLY
FABRICATIONERECTION,
TESTING ANDCOMMISSIONING
27 Compressed air pipingdistribution for coal handlingsystem.
EPCcontr.
EPC contr. EPC contr. EPC contr.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 176/338
y
28
All foundation bolts required forinstallation of all equipment andstructure under CHS vendor’sscope.
EPCcontr.
EPC contr. EPC contr. EPC contr.
29
Dust extraction system (DE-01)with Bag filter, exhaust fan androtary air lock at primarycrusher house.
EPCcontr.
EPC contr. EPC contr. EPC contr.
30
Dust extraction system (DE-02)with Bag filter, exhaust fan androtary air lock at secondarycrusher / screen house.
EPCcontr.
EPC contr. EPC contr. EPC contr.
31
Bag filters (IBF-01 & IBF-02)with Bag filter, exhaust fan androtary air lock at bunkers for
EPCcontr.
EPC contr. EPC contr. EPC contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
E. ASH HANDLING SYSTEM
ENGINEERING
SL.
NO.
DESCRIPTION
BASIC
DESIGN
INCL
P&ID
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 177/338
A. CFBC BOILER FURNACE
1. Bottom ash hopperEPC
Contr.EPC Contr. EPC Contr. EPC Contr.
2. Sliding gate.EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
3. Surge hopperEPC
Contr.EPC Contr. EPC Contr. EPC Contr.
4. Isolation plate valveEPC
Contr.
EPC Contr. EPC Contr. EPC Contr.
5. Level probe and accessoriesEPC
Contr.EPC Contr. EPC Contr. EPC Contr.
6 Expansion jointsEPC
EPC Contr EPC Contr EPC Contr
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NO.
DESCRIPTION
BASIC
DESIGN
INCL
P&ID
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
13Supporting structure for EPC
EPC Contr EPC Contr EPC Contr
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 178/338
13.vessels/ash pipe line Contr.
EPC Contr. EPC Contr. EPC Contr.
CFBC BOILER CYCLONES
14. Bottom ash hopperEPC
Contr. EPC Contr. EPC Contr. EPC Contr.
15. Sliding gate.EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
16. Surge hopperEPC
Contr.EPC Contr. EPC Contr. EPC Contr.
17. Isolation plate valveEPC
Contr.EPC Contr. EPC Contr. EPC Contr.
18. Level probe and accessoriesEPC
ContrEPC Contr. EPC Contr. EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NO.
DESCRIPTION
BASIC
DESIGN
INCL
P&ID
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
25Instrument air/water line up to EPC
EPC Contr EPC Contr EPC Contr
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 179/338
25.terminal point Contr.
EPC Contr. EPC Contr. EPC Contr.
26.Supporting structure for
vessels/ash pipe line
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
CFBC BOILER ECO / APH
27. Bottom ash hopperEPC
Contr.EPC Contr. EPC Contr. EPC Contr.
28. Sliding gateEPC
Contr.EPC Contr. EPC Contr. EPC Contr.
29. Surge hopper EPCContr.
EPC Contr. EPC Contr. EPC Contr.
30. Isolation plate valveEPC
Contr.EPC Contr. EPC Contr. EPC Contr.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 180/338
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NO.
DESCRIPTION
BASIC
DESIGN
INCL
P&ID
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
49. Ash conveying line (pipe,
fl k t )
EPC
C tEPC Contr. EPC Contr. EPC Contr.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 181/338
flanges, gaskets) Contr.
50.Service/ash conveying air line
up to terminal point
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
51.Instrument air/water line up to
terminal point
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
52.Supporting structure for vessels
& pipe line
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
CFBC BOILER – BED ASH STROAGE SILO
53. SiloEPC
Contr.EPC Contr. EPC Contr. EPC Contr.
54.Silo accessories (bag filters, fan
etc)
EPC
ContrEPC Contr. EPC Contr. EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NO.
DESCRIPTION
BASIC
DESIGN
INCL
P&ID
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
61. Rotary feederEPC
C tEPC Contr. EPC Contr. EPC Contr.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 182/338
yContr.
62. Ash conditioner assembly
complete
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
63. Plate valve (ash conveyingvessel)
EPCContr.
EPC Contr. EPC Contr. EPC Contr.
64. Dome valveEPC
Contr.EPC Contr. EPC Contr. EPC Contr.
65. Ash conveying vessel (master
& slave) complete
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
66. Ash conveying line bendsEPC
Contr.EPC Contr. EPC Contr. EPC Contr.
67 Ash conveying line (pipe, EPC
EPC Contr EPC Contr EPC Contr
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NO.
DESCRIPTION
BASIC
DESIGN
INCL
P&ID
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
73. Bottom chuteEPC
ContrEPC Contr. EPC Contr. EPC Contr.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 183/338
Contr.
74. Terminal end box at silo topEPC
Contr.EPC Contr. EPC Contr. EPC Contr.
75. Sliding gate (manual) EPCContr.
EPC Contr. EPC Contr. EPC Contr.
76. Rotary feederEPC
Contr.EPC Contr. EPC Contr. EPC Contr.
77. Ash conditioner assembly
complete
EPC
Contr.
EPC Contr. EPC Contr. EPC Contr.
78. Fluidizing padsEPC
Contr.EPC Contr. EPC Contr. EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NO.
DESCRIPTION
BASIC
DESIGN
INCL
P&ID
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
85
Necessary compressed air
piping instrument and manualEPC
EPC Contr EPC Contr EPC Contr
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 184/338
85. piping, instrument and manual
valves with in battery limit.Contr.
EPC Contr. EPC Contr. EPC Contr.
86.
Service air requirement 2x100
% air compressor with 7 to 8
kg/cm2 (g) discharge pressure
will be provided in load/ unload
operation mode and required
nos of air receiver.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
B. ELECTRICAL
87. Motors of suitable capacityEPC
Contr.EPC Contr. EPC Contr. EPC Contr.
88.EPC Control cable up to
junction box
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
EPC
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NO.
DESCRIPTION
BASIC
DESIGN
INCL
P&ID
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
95. Junction boxesEPC
Contr.EPC Contr. EPC Contr. EPC Contr.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 185/338
Contr.
96. Cables up to junction boxesEPC
Contr.EPC Contr. EPC Contr. EPC Contr.
97. DCS
EPC
Contr. EPC Contr. EPC Contr. EPC Contr.
98. Cables from PLC panel to DCSEPC
Contr.EPC Contr. EPC Contr. EPC Contr.
99.Copper tubing for air line to the
field instruments.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
100.
Cable from local Junction box
to PLC panel.
EPC
Contr. EPC Contr. EPC Contr. EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
F. DM PLANT
ENGINEERING
SL.
NO.DESCRIPTION
BASIC
DESIGN
INCL
P&ID
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTUREAND SUPPLY
FABRICATIONERECTION,
TESTING AND
COMMISSIONING
One No water storage tank of EPC
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 186/338
1One No. water storage tank of
4 hrs holding capacity.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
2
Two Nos. (1W +1S) pump sets
for feeding treated water to
MGF.
EPC
Contr.
EPC Contr. EPC Contr. EPC Contr.
3
Two Nos. (1 x 100%) Vertical
Multi Grade Filters (MGF)
complete with frontal piping,
valves, media and Internals,
instrument etc.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
4
1 X 100% Activated Carbon
Filters (ACF) for removal of
odour, colour, oil and chlorine,
if any.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 187/338
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NO.DESCRIPTION
BASIC
DESIGN
INCL
P&ID
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTUREAND SUPPLY
FABRICATIONERECTION,
TESTING ANDCOMMISSIONING
(MOC: FRP) of capacity 100
m3 each.
Contr.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 188/338
21
Three Nos. (2W+1S) DM water
transfer pumps of capacity 7
m3/hr with a head 90MWC
(min.) for Boiler make up andLP / HP dosing system.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
22
1Nos. boiler initial fill pumps
each of capacity 50 m3/hr with
a head of 90 MWC.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
Balance of Plant (BOP)
Neutralizing pit with 1 nos.
sump pump sets. Bidder shall
connect the necessary
Neutralizing lines from Acid &EPC
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NO.DESCRIPTION
BASIC
DESIGN
INCL
P&ID
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTUREAND SUPPLY
FABRICATIONERECTION,
TESTING ANDCOMMISSIONING
28
1 no. (1W+1S) of caustic
unloading pumps shall beEPC
ContrEPC Contr. EPC Contr. EPC Contr.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 189/338
considered.Contr.
29
1 no. caustic day tanks (MOC
shall be MSRL) for SBA & MB
units.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
30Chlorination system for cooling
tower water shall be provided.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
OTHERS
31
All frontal/interconnecting pipe
work/Valves/Fittings/Resintraps.
EPC
Contr. EPC Contr. EPC Contr. EPC Contr.
32
O/P platforms, ladders, hand
rails and pipe supportingEPC
EPC Contr. EPC Contr. EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NO.DESCRIPTION
BASIC
DESIGN
INCL
P&ID
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTUREAND SUPPLY
FABRICATIONERECTION,
TESTING ANDCOMMISSIONING
control cables with steel
supports.
Contr.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 190/338
39
Inter connecting cables both
power and control, cable glands
and lugs with in the battery
limit.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
40Lightning protection and
earthing work.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
INSTRUMENT
41
All instruments viz. pressure
gauge, flow indicators, flow
transmitters, flow totalizes,
conductivity analyzers, silica
analyzers, indicators,
transmitters, level gauges, pH
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
G. AUXILIARY COOLING TOWER
ENGINEERING
SL.
NODESCRIPTION
BASIC
DESIGNINCL
P&ID
ETC
DETAILED ANDCONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION,
ERECTION,
TESTING ANDCOMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 191/338
ETC.
1
Cooling Tower complete with
Tower fills, fill supports, water
distributors, drift eliminators,fans, gearbox etc.,
EPC
Contr.
EPC Contr. EPC Contr. EPC Contr.
2
Complete hot water piping with
isolation valves and
accessories.
EPC
Contr.
EPC Contr. EPC Contr. EPC Contr.
3Foundation bolts, embedded
parts, inserts pipes etc.
EPC
Contr. EPC Contr. EPC Contr. EPC Contr.
4Pipe work of the cooling tower. EPC
Contr.
EPC Contr. EPC Contr. EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)
H. WATER PUMPS AND PIPINGS
ENGINEERING
SL.
NO
DESCRIPTION
BASIC
DESIGN
INCL
P&ID
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 192/338
1
Auxiliary cooling water system
pump, Raw water pumps,
Deaerator Makeup pumps,
Effluent discharge pumps, DM
plant make up pumps, Drinking
water pump, Boiler blow down
pumps, Reuse water pumps,
Initial filling pump and its motor.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
2
Motor complete, coupling,
coupling guard etc, for all
pumps. (Make ABB, Bharath
Bijlee and Siemns).
EPCContr.
EPC Contr. EPC Contr. EPC Contr.
Combined base frame for pump
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)
I. EOT CRANE
ENGINEERING
SL.
NO.DESCRIPTION BASIC
DESIGNINCL
P&ID
ETC.
DETAILED ANDCONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 193/338
ETC.
1 One No. minimum 60 Tonnes
lifting capacity, Double girder
Electric Overhead TravellingCrane with plain shank hook for
main hoist and one no. auxiliary
hoist (5 Tonnes), complete with
all accessories as detailed in
the crane data sheet and Data
specification sheets, for Steam
Turbine Generator building.
EPC
contr.EPC contr. EPC contr. EPC contr.
2 Maintenance platforms and
access ladders as required,
also monorail facility at the end EPC
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NO.DESCRIPTION BASIC
DESIGN
INCL
P&ID
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7 All hoist and travel motors
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 194/338
7 All hoist and travel motors
including creep motors for
crane as applicable.
EPC
contr.EPC contr. EPC contr. EPC contr.
8 All power and control cabling /
wiring bridge cross conductors,
current collectors etc. as
required for safe and
satisfactory operation of the
crane.
EPC
contr.EPC contr. EPC contr. EPC contr.
9 All safety switches. EPC
contr.EPC contr. EPC contr. EPC contr.
10 All protective, control and
lighting panels push buttonsEPC
EPC contr EPC contr EPC contr
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)
J. FIRE FIGHTING SYSTEM
ENGINEERING
SL.NO DESCRIPTION
BASIC
DESIGN
INCL
LAYOU
T ETC
DETAILED
AND
CONSTRUCTION DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
Fire hydrant system for complete
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 195/338
1
plant with necessary pumps i.e
1W + 1S AC pumps, 1W+1S
Jacking oil pump & 1 no diesel oil
pump with required capacity270m3/hr and hookup to DCS
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
2
Hydrant line from the pump house
to all interior area covering all
buildings and equipments, coal
yard with required valves,
hydrants points, hoses etc.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
3
MVWS system for conveyors and
bunker with all the auxiliaries &
accessories and hookup to DCS
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)
K. VENTILATION & A/C SYSTEM
ENGINEERING
SL.NO. DESCRIPTION
BASIC
DESIGN
INCL
LAYOU
T ETC
DETAILED
AND
CONSTRUCTION DRGS
MANUFACTURE
AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
1Supply air system for electrical EPC
EPC Contr EPC Contr EPC Contr
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 196/338
1rooms Contr.
EPC Contr. EPC Contr. EPC Contr.
2 A/C system from control roomEPC
Contr.EPC Contr. EPC Contr. EPC Contr.
3TG operating floor and TG
building general ventilation
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
4
A/C system local control /
electrical room in FHS, AHS etc
as required.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)
L. ELECTRICAL SYSTEM
ENGINEERING
SL.
NODESCRIPTION BASIC
DESIGN
DETAIL
ED AND
CONST
RUCTIO
N DRGS
MANUFAC
TURE
AND
SUPPLY
FABRICATION
, ERECTION,
TESTING AND
COMMISSIONI
NG
1. Generator and its Auxiliaries:
AC l t i t ti f 45 MW bl f
EPC
Contr
EPC
Contr
EPC Contr. EPC Contr.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 197/338
AC electric generator rating of 45 MW capable of
operating with a power factor of 0.8 lag, generation
voltage 11 KV and frequency 50 Hz shall be
supplied. The generator shall be capable of stableoperation even with a variation in voltage of +/- 5%
and frequency variation of +/- 5%.
Contr. Contr.
2. The excitation system shall be brushless type. The
brushless exciter shall consist of a permanent
magnet generator, AC exciter. Shell and tube heat
exchangers shall be mounted on the machine for
air-cooling.
EPC
Contr.
EPC
Contr.
EPC Contr. EPC Contr.
3. Lightning Arrestor and Surge Protection (LAPT)
cubicle for the Generator.
EPC
Contr.
EPC
Contr
EPC Contr. EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NODESCRIPTION BASIC
DESIGN
DETAIL
ED AND
CONST
RUCTIO
N DRGS
MANUFAC
TURE
AND
SUPPLY
FABRICATION
, ERECTION,
TESTING AND
COMMISSIONI
NG
11. Switchyard:
132/11 KV Switchyard & accessories and
switchyard end connect to existing 132KV bus
EPC
Contr.
EPC
Contr.
EPC Contr. EPC Contr.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 198/338
switchyard end connect to existing 132KV bus
through 132KV HT cables.
12. Single bus system with suitable post insulators,
Bus Potential transformer with isolators, breaker formain bus with CTs on each side, Potential
transformers, Lightning arrestors and feeder
protection on transformers and transmission lines.
EPC
Contr.
EPC
Contr.
EPC Contr. EPC Contr.
13. Generator Transformers:
1 no. of generator transformers of capacity 53
MVA, ONAN/ONAF of voltage rating 11KV / 132
KV, 50HZ suitable for export of power with ON load
tap changer.
EPC
Contr.
EPC
Contr.
EPC Contr. EPC Contr.
14. LT Auxiliary transformers: EPC EPC EPC Contr. EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NODESCRIPTION BASIC
DESIGN
DETAIL
ED AND
CONST
RUCTIO
N DRGS
MANUFAC
TURE
AND
SUPPLY
FABRICATION
, ERECTION,
TESTING AND
COMMISSIONI
NG
breakers, earthing switches, bus bars, draw-out
type voltage transformers, CTs, cable connections
etc. sheet steel having minimum thickness of 2 mm
Contr. Contr.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 199/338
and the construction shall conform to IP 52 degree
of protection for the enclosure. Panel height should
not exceed 2200mm.
20. MCC Panels:
TG MCC, Boiler, ESP, DM plant, ACC, WTS, AHS,
FHS, MPDB, MLDB, Capacitor Panel with APFC,
VFD panel.
EPC
Contr.
EPC
Contr.
EPC Contr. EPC Contr.
21. LT motors will be squirrel cage induction type
machines and will operate on 415V, 3 phase, and
50Hz power supply. Motors of rating 200KW and
below will have rated voltage of 415V and above
200KW shall be rated for 3.3KV voltage.
EPC
Contr.
EPC
Contr.
EPC Contr. EPC Contr.
22. Complete interconnecting power and control cables EPC EPC EPC Contr EPC Contr
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NODESCRIPTION BASIC
DESIGN
DETAIL
ED AND
CONST
RUCTIO
N DRGS
MANUFAC
TURE
AND
SUPPLY
FABRICATION
, ERECTION,
TESTING AND
COMMISSIONI
NG
26. Battery & battery charger:
110V DC suitable capacity of battery will be
provided for catering the power requirement of TG,
EPC
Contr.
EPC
Contr.
EPC Contr. EPC Contr.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 200/338
p g p q
Breaker closing and tripping coils, relays and
protection panels etc. Suitable battery charger with
float/ trickle/ boost charging will be provided.
Suitable DCDB shall be included for control supply
and other DG emergency load.
27. UPS:
2 no’s of Single phase uninterrupted power system
of 110VAC of suitable capacity will be provided for
supplying control power supplies. The source for
this UPS will be from Emergency PCC. Suitable
AC distribution board shall be included in the scope
for control supply.
EPC
Contr.
EPC
Contr.
EPC Contr. EPC Contr.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 201/338
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)
M. CONTROL & INSTRUMENTATION
ENGINEERING
SL.
NODESCRIPTION BASIC
DESIGN
DETAILE
D AND
CONSTR
UCTION
DRGS
MANUFA
CTURE
AND
SUPPLY
FABRICATION
, ERECTION,
TESTING AND
COMMISSIONI
NG
1 Complete design, system detailed engineering,
documentation, manufacture, supply, softwareEPC
Contr
EPC
Contr
EPC
Contr EPC Contr.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 202/338
, , pp y,
development, Installation, Inspection.
Contr. Contr. Contr.
2 All automation Systems and their subsystem
covered in this specification shall be designed,manufactured and tested in compliance with the
latest relevant codes and standards of practices
published by the Bureau of Indian Standards and
Foreign Standards.
EPC
Contr.
EPC
Contr.
EPC
Contr.EPC Contr.
3 DCS shall be inclusive with its subsystems,
associated software & hardware connected with
each other
EPC
Contr.
EPC
Contr.
EPC
Contr.
EPC Contr.
4 Redundancy shall be provided at all levels in DCS.
except the I / O’s modules
EPC
Contr.
EPC
Contr.
EPC
Contr.EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NODESCRIPTION BASIC
DESIGN
DETAILE
D AND
CONSTR
UCTION
DRGS
MANUFA
CTURE
AND
SUPPLY
FABRICATION
, ERECTION,
TESTING AND
COMMISSIONI
NG
capable of driving a load of 700 Ω. Contr. Contr. Contr.
10 Separate marshalling cabinets with terminal blocks
shall be provided at DCS panels to terminate cableEPC
Contr
EPC
Contr
EPC
Contr EPC Contr.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 203/338
shall be provided at DCS panels to terminate cable
from the field as well as from MCC
Contr. Contr. Contr.
11 Scan time includes the time for scanning the input,
A/D conversion, signal processing and control and
outputting shall be 2 to 500ms.
EPC
Contr.
EPC
Contr.
EPC
Contr. EPC Contr.
12 System shall be provided with self diagnostic
features.
EPC
Contr.
EPC
Contr.
EPC
Contr.EPC Contr.
13 Engineering and Operator workstations of the DCS
shall be identical and interchangeable. These shall
be of Business Grade PC units from reputed MNC
Brand and shall be complete with processor,
memory, power supply, bulk memory units, high
resolution colour monitor, key-board, mouse,
EPC
Contr.
EPC
Contr.
EPC
Contr.EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NODESCRIPTION BASIC
DESIGN
DETAILE
D AND
CONSTR
UCTION
DRGS
MANUFA
CTURE
AND
SUPPLY
FABRICATION
, ERECTION,
TESTING AND
COMMISSIONI
NG
shall be pre-treated and powder coated.
18 The supply voltage for all the sub-system and the
workstations of DCS shall be of 110VAC 50Hz
EPC
Contr.
EPC
Contr.
EPC
Contr.EPC Contr.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 204/338
19 Redundant 110 Vac UPS with required VA ratingEPC
Contr.
EPC
Contr.
EPC
Contr.EPC Contr.
20 Special microprocessor based instruments such aselectronic governor, tri-vector meters, precision
meters which shall be provided as part of the
package equipment supply, shall have RS 485
MODBUS serial interface connectivity to the DCS.
EPC
Contr.
EPC
Contr.
EPC
Contr.EPC Contr.
21 Design, supply, procurement & delivery to site of
instrumentation & control cable
EPC
Contr.
EPC
Contr.
EPC
Contr.EPC Contr.
22 Cable laying & Termination from Field instruments
to the DCS along with Testing / checking of all
Control Loops.
EPC
Contr.
EPC
Contr.
EPC
Contr.EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)
ENGINEERING
SL.
NODESCRIPTION BASIC
DESIGN
DETAILE
D AND
CONSTR
UCTION
DRGS
MANUFA
CTURE
AND
SUPPLY
FABRICATION
, ERECTION,
TESTING AND
COMMISSIONI
NG
Testing (FAT),packing, shipment, delivery to the
site,
Contr. Contr. Contr.
29 Supervision of erection, system setup,
i i i f / (SAT) EPC EPC EPC
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 205/338
commissioning, performance/acceptance test (SAT)
training of purchaser persons O & M manuals, &
final handing over of the Plant Automation System
EPC
Contr.
EPC
Contr.
EPC
Contr.EPC Contr.
30 Organizing training programmes at manufacturer’s
works as well as at site during commissioning for
the purchaser’s personnel in operation and
maintenance of DCS.
EPC
Contr.
EPC
Contr.
EPC
Contr.EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)
N. CIVIL AND STRUCTURAL WORKS
ENGINEERINGSL.
NODESCRIPTION BASIC
DESIGN
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTUR
E AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONING
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 206/338
1. CFBC Boiler
1.1
RCC for column supporting
and operating floor slabs.
Staircase wherever required.
EPC
Contr. EPC Contr. EPC Contr. EPC Contr.
1.2Rain gutters and drain piping
for boiler hopper, roof and
side cladding
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
2. Boiler Auxiliaries
2.1. Fans
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)
ENGINEERINGSL.
NODESCRIPTION BASIC
DESIGN
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTUR
E AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONI
NG
2.2. Electro precipitator static
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 207/338
2.2.1Electro static precipitator
column foundation and
staircase column foundation.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
2.3. Chimney (100 mts)
2.3.1
RCC Chimney complete
including foundation, inside
refractory work with lending
wherever required staircases,
hand- railing, aviation lampassembly etc.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
2.4. Blowdown Tank
EPC
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)
ENGINEERINGSL.
NODESCRIPTION BASIC
DESIGN
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTUR
E AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONI
NG
3.2TG Deck foundation. The
deck foundation, deck slabEPC
ContrEPC Contr. EPC Contr. EPC Contr.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 208/338
,
with required cut-outs.
Contr.
3.3 TG auxiliary foundations
a. Oil system
i. Emergency Oil Pump.
ii. Auxiliary Oil Pump.
iii. Jacking Oil Pump
iv. Main oil tank and
pump
Iii. Centrifuge oil purifier
system
iv. Over head oil tank/
over flow oil tank.
Oil l
EPC
Contr.
EPC Contr. EPC Contr. EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)
ENGINEERINGSL.
NODESCRIPTION BASIC
DESIGN
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTUR
E AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONI
NG
3.9 HP/LP dosing system
f d ti
EPC
ContrEPC Contr. EPC Contr. EPC Contr.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 209/338
foundation Contr.
3.10 Staircase and walkwayswherever required
EPCContr.
EPC Contr. EPC Contr.EPC Contr.
3.11
Approach platform between
TG building and air cooled
condenser building &
approach platform TG buildingto boiler.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
EPC
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)
ENGINEERINGSL.
NODESCRIPTION BASIC
DESIGN
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTUR
E AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONI
NG
4.0 Air Cooled Condenser
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 210/338
4.1
Complete air cooled
condenser RCC and structural
works including tie beams, fansupports, fan stacks,
stiffeners, platforms and
corridor etc.,.
EPCContr.
EPC Contr. EPC Contr. EPC Contr.
4.2 Condensate extraction pump
foundation
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
4.3 Condensate drain Boot pump
foundation
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
EPC
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)
ENGINEERINGSL.
NODESCRIPTION BASIC
DESIGN
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTUR
E AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONI
NG
5.0 Balance of Plant
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 211/338
5.1 Fuel Handling System
5.1.1 Ground Hopper in RCC
construction with square
grizzly on top, manual rack
and pinion gate at bottom,
with wear resistant liner on
inclined surfaces.
EPC
Contr.
EPC Contr. EPC Contr. EPC Contr.
5.1.2 Ground hopper, conveyor
structure column foundation,
crusher house, crusher
foundation etc.,
EPC
Contr.
EPC Contr. EPC Contr. EPC Contr.
5 1 3 P i h h i il EPC EPC C t EPC C t EPC C t
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)
ENGINEERINGSL.
NODESCRIPTION BASIC
DESIGN
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTUR
E AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONI
NG
5.1.5 Fuel transfer house and civil
foundation etc.
EPC
Contr.
EPC Contr. EPC Contr. EPC Contr.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 212/338
5.1.6 Steel structure with side
sheeting and staircaseswherever required
EPC
Contr.
EPC Contr. EPC Contr. EPC Contr.
5.1.7 Portable dewatering pumps
RCC Tunnel.
EPC
Contr.
EPC Contr. EPC Contr. EPC Contr.
5.2 Ash Handling System
5.2.1
Ash handling system
foundation, Ash conveying
pipe racks steel structure and
i t
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)
ENGINEERINGSL.
NODESCRIPTION BASIC
DESIGN
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTUR
E AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONI
NG
5.4 Auxiliary Cooling Tower
and Pump
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 213/338
5.4.1 Civil work complete, including
basin of required capacity
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
5.4.2 Auxiliary cooling tower
foundations including basin
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
5.4.3 Auxiliary cooling water pump
foundation
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
5.5 Water system piping and
pumps
5 5 1EPC
EPC Contr EPC Contr EPC Contr
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)
ENGINEERINGSL.
NODESCRIPTION BASIC
DESIGN
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTUR
E AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONI
NG
7.0 General
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 214/338
7.1 Soil investigationEPC
Contr.EPC Contr. EPC Contr. EPC Contr.
7.2 Site levelingEPC
Contr.EPC Contr. EPC Contr. EPC Contr.
7.3 ExcavationEPC
Contr.EPC Contr. EPC Contr. EPC Contr.
7.4 Approach roads to all main
equipments of coal yard.
EPCContr.
EPC Contr. EPC Contr. EPC Contr.
7 5 Weighbridge foundation / EPCEPC C t EPC C t EPC C t
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)
ENGINEERINGSL.
NODESCRIPTION BASIC
DESIGN
ETC.
DETAILED AND
CONSTRUCTION
DRGS
MANUFACTUR
E AND SUPPLY
FABRICATION
ERECTION,
TESTING AND
COMMISSIONI
NG
within the CPP area and
around plant buildings
i l di fl d d i
Contr.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 215/338
including flood water drainage
system.
7.11 All RCC & steel column
structures.
EPC
Contr.EPC Contr. EPC Contr. EPC Contr.
7.12 Grouting for all equipmentsEPC
Contr.
EPC Contr. EPC Contr. EPC Contr.
7.13 Flood water drainage, cabletrench valve pits.
EPC
Contr.
EPC Contr. EPC Contr. EPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-9 Scope Matrix (contd.)
O. COMMON FOR ALL PACKAGES
S.NO DESCRIPTION Scope Remarks
1 Commissioning spares EPC Contr.
2 Set of special tools and tackles for the
all equipments
3 The initial requirement of all
consumables and first fill of materials
such as oil, lubricants etc. required tillEPC Contr.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 216/338
such as oil, lubricants etc. required till
final commissioning
4 Unloading at site EPC Contr.
5 Performance test EPC Contr.
6 Two years O&M spares List of
recommended spares to be furnished
for all equipments.
EPC Contr.
7 PAINTING – Two coats of primer and
Two coats of finish painting of all
equipment, structures, piping, ductingEPC Contr.
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
P. SITE FACILITIES AND SERVICES
S.NO DESCRIPTION Scope Remarks
1 Providing Erection tools, tackles,
hoists, derricks, slings, scaffolding,
rigging tools, welding sets,
instruments, appliances, consumables
required for unloading, transporting,
storing, erection, inspection, testing and
commissioning to accomplish the work.
EPC Contr.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 217/338
2 Unloading at site EPC Contr.
3 Steam blowing Pre-commissioning
check, trial run of equipment calibration
of instrument & control etc.
EPC Contr.
4 Pre-commissioning check, trial run of all
equipment calibration of instrument &
control etc.
EPC Contr
5 Providing instrument for above testing EPC Contr.
6 Performance test at shop and at site EPC Contr
FACOR ALLOYS LIMITED45MW CAPTIVE POWER PLANT, AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-9 Scope Matrix (contd.)
S.NO DESCRIPTION Scope Remarks
cost at one point
13 All IBR approvals / formalities till steam
test and safety valve floating.EPC Contr.
14 Telephone facilities EPC Contr.
15 Emergency / first aid medical facilities
to SUP staff and erection crew posted
at site
EPC Contr.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 218/338
16 Security, Inventory and accounting of
SUP equipment and property till final
take over by FACOR
EPC Contr.
17 Lighting facilities at erection site
EPC Contr.
FACOR will be only responsible for the
overall lighting such as road lighting,
lighting in the erection site etc. in the
plant area. Lighting within EPCCONTR. facilities i.e EPC CONTR.
storage area, office etc will be
responsibility of EPC CONTR.
FACOR ALLOYS LIMITED
45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESHEPC TENDER SPECIFICATION
ANNEXURE – 10
QUESTIONNAIRE
A. BOILER & AUXILIARIES
S.NO DESCRIPTION UNITSTECHNICAL
PARAMETERS
1 Type of Boiler
1.1 Number of boiler No
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 219/338
1.2 Type of circulation
1.3 Type of feeding system
1.4 Type of support
1.5 Design code
1.6 Steam generated, Tons / hr
1.7 Steam purity
1.8 Steam pressure in the steam drum, Kg/cm2
1.9Steam pressure at the main steam
stop valve,kg/cm2
FACOR ALLOYS LIMITED
45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESHEPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTION UNITSTECHNICAL
PARAMETERS
2.4 Ash analysis/qty considered for
design
2.5 Flue gas temperature, deg. C
2.5.1 - At APH outlet deg. C
2.5.2 - At ID fan outlet deg. C
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 220/338
2.6 Turn down ratio boiler
2.7 Superheater steam temp. Controlrange – first stage
% BMCR
2.8Super heater steam temp. Control
range - second stage%
2.9 Combustor outlet temperature
2.10 Cyclone efficiency %
2.11 Primary air qty/ % of total air %
2.12 Secondary air qty/ % of total air %
FACOR ALLOYS LIMITED
45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESHEPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTION UNITSTECHNICAL
PARAMETERS
4.1.5 Outlet secondary superheater deg. C
4.1.6 Inlet primary superheater deg. C
4.1.7 Outlet primary superheater deg. C
4.1.8 Inlet economizer deg. C
4.1.9 Outlet economizer deg. C
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 221/338
g
4.1.10 Inlet air heater deg. C
4.1.11 Outlet air heater deg. C
4.1.12 Inlet of ESP deg. C
4.1.13 Outlet of ESP deg. C
4.1.14 At stack entrance deg. C
4.2 Air
4.2.1 Inlet air preheater deg. C
4.2.2 Outlet air preheater deg. C
FACOR ALLOYS LIMITED
45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESHEPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTION UNITSTECHNICAL
PARAMETERS
final superheater outlet header)
5.2 Water side
5.2.1From feed pump discharge to steam
drum inletKg/cm2
6.0 Velocity
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 222/338
6.1 Gas side
6.1.1 Fluidizing velocity m/s
6.1.2 Super heater zone m/s
6.1.3 Economizer zone m/s
6.1.4 Air heater zone m/s
6.2 Air side
6.2.1 Air heater region m/s
7.0 Ducting
7 1 Cold air m/s
FACOR ALLOYS LIMITED
45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESHEPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTION UNITSTECHNICAL
PARAMETERS
8.5 Thickness mm
8.6 Corrosion allowance mm
8.7 Type of dished end
8.9 Drum internals
9.0 Water fall / furnace
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 223/338
9.1 Type of construction
9.2 Furnace depth m
9.3 Furnace width m
9.4 Furnace volume m3
9.5 Furnace height m
9.6 Tube size (OD) mm
9.7 Tube thickness mm
9.8 Tube material
FACOR ALLOYS LIMITED
45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESHEPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTION UNITSTECHNICAL
PARAMETERS
11.1 Type
11.2 Nos
11.3 Type of construction
11.4 Tube OD mm
11.5 Tube thickness mm
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 224/338
11.6 Tube material
11.7 Fin width mm
11.8 Fin thickness mm
12.0 Super heaters
12.1 Type of flow
12.2 Type of arrangement
12.3 Material
12.4 Tube diameter mm
FACOR ALLOYS LIMITED
45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESHEPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTION UNITSTECHNICAL
PARAMETERS
14.1 Type
14.2 No.
14.3 Fluid inside tubes
14.4 Fluid outside tubes
14.5 Arrangement
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 225/338
14.6 Tube OD mm
14.7 Tube thickness mm
14.8 Tube material
14.9 No of blocks
14.10 Casing material
14.11 Casing thickness mm
14.12 Expansion joint
15.0 Fuel storage system
FACOR ALLOYS LIMITED
45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESHEPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTION UNITSTECHNICAL
PARAMETERS
17.6 Motor rating KW
17.7 Type of control
18.0 Lime stone storage system
18.1 No off bunker
18.2 Type of bunker
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 226/338
18.3 Bunker plate material
18.4 Capacity of bunker m3
18.5 Limestone consumption TPH
18.6 Sulphur capture efficiency %
18.7 Ca: S molar ratio
18.8 Storage time for limestone Hrs
19.0 Limestone feeding system
19.1 Type of feeder
FACOR ALLOYS LIMITED
45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESHEPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTION UNITSTECHNICAL
PARAMETERS
21.5 Motor rating kw
21.6 Type of control
22.0 Start up oil firing system
22.1 Type
22.2 Bunkers/ steam generator nos
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 227/338
22.3 Capacity of each bunker % MCR
22.4 Type of oil pump
22.5 Oil pressure at burner inlet Kg/cm2 (g)
22.6 Atomizing air pressure Kg/cm2 (g)
22.7 Type of oil used for start -up
22.8 GCV of oil considered Kcal / kg
22.9 Turn down ratio
22.10 Igniters type
FACOR ALLOYS LIMITED
45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESHEPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTION UNITSTECHNICAL
PARAMETERS
24.2 Head @ BMCR mmwc
24.3 Speed of the blower rpm
24.4 Type of coupling
25.0 Safety valves
25.1 Location
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 228/338
25.2 Type
25.3 Relieving capacity Kg/hr
25.4 Set pressure Kg/cm2
25.6 Over pressure / blow down pressure
26.0 Feed water pumps
26.1 Type
26.2 No:
26.3Feed water temp. at the inlet of feed
pumpDeg c
FACOR ALLOYS LIMITED
45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESHEPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTION UNITSTECHNICAL
PARAMETERS
27.5 No. of fields
27.6 No . of hoppers
28.0 HP dosing system
28.1 Type of system
28.2 Tank capacity Ltrs
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 229/338
28.3 Tank material
28.4 Chemical dosing system
28.5 Type of stirrer
28.6 Type of pump
28.7 No. of pump
28.8
Piping material from dosing tank to
steam drum
29.0 LP dosing system
29 1 T f t
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTION UNITSTECHNICAL
PARAMETERS
30.1.6 Safety valves set pressure Kg/cm2(g)
30.1.7 Corrosion allowance mm
30.2.0 Intermittent blow down tank
30.2.1 Tank material
30.2.2 Drain
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 230/338
30.2.3 Vent
30.2.4 Corrosion allowance mm
31.0 Insulation
31.1 Type of insulation material
31.2 Density of insulation material Kg/m3
31.3
Type of cladding sheet for main
boiler
31.4Thickness of cladding sheet for
main boiler
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTION UNITSTECHNICAL
PARAMETERS
34.1 Type
34.2 Material
34.3 Thickness of plate mm
35.0 Painting
35.1 No. of primer coats
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 231/338
35.2 Type of primer paint
35.3 No. of final coat
35.4 Type of final paint
36 Feed water system
36.1 Deaerator cum storage tank
36.1.1 Deaerator
36.1.2 Type
36 1 3 Design standard
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTION UNITSTECHNICAL
PARAMETERS
36.3.3 Spray nozzles / trays
36.3.4 Internals
36.3.5Piping between deaerator and boiler
feed pump
37 Chimney
37 1 General
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 232/338
37.1 General
37.2 Quantity
37.3 Mode of operation
37.4 Height m
37.5 Supporting arrangements
37.6 Flue gas temperature at exit Deg c
37.7 Material of construction
37.8 Lightning arrestor
37 9 Aviation lamps
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
B. TURBINE & AUXILIARIES
S.NO DESCRIPTION TECHNICAL PARAMETERS
1.0 TURBINE
1.1 Make
1.2 Type and description
1.3 Inlet steam conditions
1.4 Pressure, Ksca
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 233/338
1.5 Temperature, °C
1.6 Number of Extractions
1.7
Bleed conditions for Deaerator
Flow (TPH),
Pressure (Ksca)
Temperature (°C)
1.8
HP heater steam
-Flow
-Temperature
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTION TECHNICAL PARAMETERS
1.19 Governor
1.20 Make
1.21
Type
1.22 Range of speed control
1.23
Critical speed of rotor
1.24
Type of bearing
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 234/338
1.25 Thrust
1.26 Journal
1.27
Type of bearing lubrication system and
description
1.28
Material specifications for
1.29 Casing
1.30 Rotor
1.31 Shaft
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTION TECHNICAL PARAMETERS
lubricating oil pressure
1.46 Noise level at 1 m, dba
1.47
Details of special measures for noiseattenuation
1.48
Type and details of vibration isolator
1.49 Base plate details
1 49 Overall dimensions of turbine assembly
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 235/338
1.49 Overall dimensions of turbine assembly
1.50
Details of insulation of turbine
1.51 Weight, kg
1.52 Pipe work
1.53
Details of pipe work covering material
specifications, dimensional, fabrication
and testing standards shall be furnished
service wise for different conditions of
temperature and pressure
Schedule for pipes valves fittings and
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTION TECHNICAL PARAMETERS
manufacturing and testing
2.4 Maximum continuous rating, kW
2.5 Maximum continuous rating, kVA
2.6
Rated terminal voltage and permissible
voltage variation
2.7 Rated power factor
2 8 Rated stator current
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 236/338
2.8 Rated stator current
2.9
Rated frequency and permissiblefrequency variation
2.10 Rated speed
2.11 Number of phases
2.12 Phase connection
2.13
Flux density at rated operating point
2.14
Excitation current at rated power output
and rated power factor
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTION TECHNICAL PARAMETERS
2.27
Stator resistance at 75oC, ohms
2.28
Rotor resistance at 75oC, ohms
2.29
Maximum value of sudden short circuitcurrent including DC component
2.30
Sustained three phase short circuit
current (peak/rms values)
2 31Sustained line to line short circuit
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 237/338
2.31
(peak/rms values)
2.32
Permissible momentary over-loads as
percent of full load and duration
2.33
Permissible asynchronous operation time
under loss of excitation
2.34
Permissible operating time under single
phase to ground fault
2.35
Maximum inductive and capacitive output
at the rated voltage and speed at zero PF
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTION TECHNICAL PARAMETERS
2.46
Critical speed, rpm
2.47
Generator housing diameter, mm
2.48
Winding cooling details
2.49 Stator
2.50
Rotor
2.51
Winding insulation details
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 238/338
2.52 Stator
2.53 Rotor
2.54 Moment of inertia of rotor GD2
2.55 Material specification for slip rings
2.56 Grade of brushes for slip rings
2.57 Details of insulation for slip rings
2.58 Number of embedded RTDs and type
2.59 Weight, kg
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTION TECHNICAL PARAMETERS
section out of service
2.73 Excitation System
2.74
AC Exciter
2.75 Make
2.76 Standard followed
2.77 Rated output
2 78 Rated voltage
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 239/338
2.78 Rated voltage
2.79 Rated current
2.80
Exciter ceiling voltage
2.81
Maximum continuous exciter current
2.82 Nominal exciter response ratio
2.83
Rated speed
2.84
Class of insulation
2.85 Rotating Rectifiers
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTION TECHNICAL PARAMETERS
2.98 Gear Box
2.99
Manufacturer
2.100
Type of gear box
2.101 Service
2.102
Gear type
2.103
Teeth
2 104 R t d kW
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 240/338
2.104 Rated, kW
2.105 Input speed, rpm
2.106 Max. Continuous, rpm
2.107 Max. Torque
2.108 Service factor as per AGMA 421
2.109 Gear efficiency, %
3.0 Turbine Oil System
3.1 Lubricating and Control Oil System
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTION TECHNICAL PARAMETERS
3.3.3 Type and description
3.3.4 Number
3.3.5 Capacity, litre/min.
3.3.6 Total differential pressure, kg/sq. cm.
3.3.7 Speed, rpm
3.3.8 Power required at shaft, kW
3 3 9 B i
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 241/338
3.3.9 Bearings
3.3.10 Others (specify)
3.4 Emergency oil pump
3.4.1 Make
3.4.2 Type and description
3.4.3 Number
3.4.4 Capacity, litre/min.
3.4.5 Total differential pressure, kg/sq. cm
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTION TECHNICAL PARAMETERS
3.6.5 Filtration efficiency, % particle size
3.7 Oil tank
3.7.1 Type
3.7.2 Number
3.7.3 Capacity, litre
3.7.4 Material specifications
3 8 Oil vapour removal system
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 242/338
3.8 Oil vapour removal system
3.8.1 Type
3.8.2 Capacity, N cu m / hr.
4.0 Gland Vent Condenser (GVC)
4.1 Make, Type and description
4.2 Number
4.3 Steam condensing rate, tons/hour
4.4 Design code
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTION TECHNICAL PARAMETERS
5.0 Flash Tank
5.1 Make
5.2 Type and description
5.3 Number
5.4 Design Steam flow, tons/hour
6.0 Piping & Utilities
6 1 Pipe work
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 243/338
6.1 Pipe work
6.1.1
Details of pipe work covering material
specifications, dimensional, fabrication
and testing standards shall be furnished
service wise for different conditions of
temperature and pressure
6.1.2
Schedule for pipes, valves, fittings and
supports shall be furnished service wise
for different conditions of temperature and
pressure
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTION TECHNICAL PARAMETERS
7.0 Instrumentation And Control
7.1 Furnish P & ID with list of instruments
8.0 Governing System
8.1 Make
8.2Write-up on governing system with
catalogs and literature
8 3Schematic diagram for governing system
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 244/338
8.3envisaged
8.4 Turbine Supervisory system
8.5Make and model no of the Vibration
monitoring system offered
8.6Make model no of the Temperature
scanner system offered
8.7
Whether list of measurements provided
for TG unit and auxiliary condenser is
included
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTION TECHNICAL PARAMETERS
9.13Maximum temperature of surface where
insulation not provided
9.14Maximum surface temperature of Al
cladding for insulated surfaces
9.15Wind speed considered for design of
insulation Indoor and outdoor
9.16 Al cladding thickness
10 0 Parameters Guaranteed
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 245/338
10.0 Parameters Guaranteed
10.1Turbine steam flow at rated output when
bleed taken for heating steam
10.2
Turbine exhaust pressure with air cooled
condenser and ambient temperature of 45
deg C
10.3 Vibration level in different location of theturbine train.
Total auxiliary power required for
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-10 Questionnaire (contd.)
C. ACC & AUXILIARIES:
S.NO. DESCRIPTION UNITTECHNICAL
PARAMETERS
A. DESIGN DATA
1 Turbine Exhaust Steam flow rate Tons/Hr.
2 Guaranteed Back Pressure Kg/cm2 (A)
3 Steam Enthalpy / Dryness fraction kcal/ kg
4 Temperature at TG Exhaust °C
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 246/338
5 Condensate temperature °C
6 Heat rejected Kcal/hr
7Overall heat transfer coeff ( Bare /
Fin )kcal/hr m2°C
8 MTD °C
9 Design ambient Temperature (dry) °C
10 Outlet temp of air °C
11 Altitude m
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-10 Questionnaire (contd.)
S.NO. DESCRIPTION UNITTECHNICAL
PARAMETERS
5 Plot area without walkways m x m
6 Plot area with walkways m x m
7 Number of bundles per module
8 Air inlet height mts
9 Platform height mts
10 Total height up to top of duct mts
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 247/338
C-2. HEAT TRANSFER SURFACE
1 Finned Area sq.m
2 Bare Tube area sq.m
C-3. POWER CONSUMPTION
1 At fan motor @ Motor shaft (Each) BkW
2 At CEP Motor shaft BkW
3 At Drain Pump Motor shaft BkW
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-10 Questionnaire (contd.)
S.NO. DESCRIPTION UNITTECHNICAL
PARAMETERS
10 Tube pitch mm
11 Tube sheet MOC
12 Tube-to-tube sheet connection
C-6. FANS
1 Make / Model
2 No. of fans Nos
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 248/338
3 Diameter / Speed mm / rpm
4 Air flow Quantity for each fan cum/sec
5 Total air flow quantity (for all fans)kg / hr
6 Bundle face velocity m/sec
7 Static pressure mmWC
8 Fan shaft power FkW
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-10 Questionnaire (contd.)
S.NO. DESCRIPTION UNITTECHNICAL
PARAMETERS
C-9. CONDENSATE PIPING
1 Diameter NB
2 Material of construction
C-10. AIR EVACUATION PIPING
1 Diameter NB
2 Material of construction
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 249/338
C-11. RUPTURE DISC
1 Size/Qty mm/Nos
2 Rupture pressure Kg/cm2(g)
C-12. CONDENSATE TANK
1 Capacity (Total) Cu.m
2 Retention time min
3 Material of construction
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-10 Questionnaire (contd.)
S.NO. DESCRIPTION UNITTECHNICAL
PARAMETERS
3 Capacity / Head Cu.m/hr/MWC
4 Motor rating KW
5 Pump Make
C-15. DRAIN PUMP
1 Type centrifugal
2 Quantity No
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 250/338
y
3 Capacity / Head Cu.m/hr/MWC
4 Motor rating KW
5 Motor Make
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-10 Questionnaire (contd.)
D. FUEL HANDLING SYSTEM
Sl. No DESCRIPTION TECHNICAL PARAMETERS
1.0 Rated Capacity of System, TPH
2.0 No. of Operating hours per day
3.0 Power Consumption for Operating at maximum
rated capacity
4.0 BELT CONVEYORS
4.1 Rated and design capacity, TPH
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 251/338
g y
4.2 Belt width, mm
4.3 Belt speed, mps
4.4 Material of belt
4.5 Toughing angle, degree
4.6 Drive unit - Details
4.7 Gear Box – Details
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-10 Questionnaire (contd.)
Sl. No DESCRIPTION TECHNICAL PARAMETERS
4.10 Brake
4.10.1 Type and quantity
4.10.2 Make and size
4.10.3 Hold back – type and make
4.10.4
Furnish details of pulleys & idlers with shell dia.
& thickness and shaft dia. at bearing and
bearing designation, no. & its quantity
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 252/338
4.10.5 Details of safety switch & spacing
5.0 PRIMARY COAL CRUSHER
5.1 Type
5.2 Make
5.3 Design capacity, TPH
5.4 Feed size, mm
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-10 Questionnaire (contd.)
Sl. No DESCRIPTION TECHNICAL PARAMETERS
7.2 Type
7.3 Material handled
7.4 Design capacity, TPH
7.5 Feed size, mm
7.6 Product size, mm
7.7 Screen size (l x w), mm
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 253/338
7.8 Screen deck opening, mm
7.9 Top deck
7.10 Bottom deck
7.11 Frequency of vibration, cycle/sec
7.12 Declination of Screen, deg
7.13 Type of mounting
7 14 Drive details
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-10 Questionnaire (contd.)
Sl. No DESCRIPTION TECHNICAL PARAMETERS
9.0 METAL DECTOR MD-03
10.0TRAMP IRON SEPARATOR (PERMANENT
MAGNET) / INLINE MAGNETIC SEPARATOR
10.1 Type
10.2 Make
10.3 Location
11.0 BELT SCALE
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 254/338
11.0 BELT SCALE
11.1 Type
11.2 Make
11.3 Location
11.4 Number of load cells per belt scale
12.0 GATES
12.1 Type
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-10 Questionnaire (contd.)
Sl. No DESCRIPTION TECHNICAL PARAMETERS
15.2 Qty
15.3 Make
15.4 Location
15.5 Pump capacity, cu. m /hr
16.0
DUST EXTRACTION SYSTEM –
Give full details/ contents of the system.
Enclose scheme and typical GA drawing of
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 255/338
similar system
17.0
DUST SUPPRESSION SYSTEM –
Give full details/ contents of the system and
quantity. Enclose scheme diagram
18.0 INSTRUMENTATION AND CONTROL
18.1Details of instrumentation and control
system provided
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-10 Questionnaire (contd.)
E. ASH HANDLING SYSTEM:
S.NO DESCRIPTIONTECHNICAL
PARAMETER
1.1Rated capacity of each System
- For CFBC BOILER- fly ash – System-I
- For CFBC BOILER bed ash – System-II
1.2Rated power consumption of Compressor when CFBC
boiler operating at full load.
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 256/338
CAPACITIES/NO ;s
1.3 Bed ash transfer vessel below furnace ash hoppers
1.4 Fly ash Transfer vessel below hoppers of CFBC BOILER
- Cyclone hopper
- Eco./APH hopper
- ESP-1 hopper
- ESP-2 hopper
- ESP-3 hopper
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTIONTECHNICAL
PARAMETER
1.16 Details of ceramic lined pipe work
DENSE PHASE VESSEL
1.17 Type and Make
1.18 Material of construction
1.19 Valve access door arrangement
1.20 Pressure for sealing
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 257/338
1.21 Conveying pressure
1.22 Inlet and outlet nozzle size
ACCESSORIES
1.23 Adopters type and make
1.24 Equaliser valve make and type
1.25 Ash handling valves make and type
1.26 Arrangement for increasing the abrasive resistance
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTIONTECHNICAL
PARAMETER
1.39 Vent blowers capacity and other details
1.40 Capacity and Details of Aeration blowers
1.41 Vacuum pressure and relief door details
FLY ASH STORAGE SILO
1.42 Type and size of bottom opening for unloading
1.43 Vent Filters size and capacity
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 258/338
1.44 Vent blowers capacity and other details
1.45 Capacity and Details of Aeration blowers
1.46 Vacuum pressure and relief door details
DUST UNLOADER FOR BED ASH SILO TRUCK
1.47 Type and Make
1.48 Pocket feeder motor power KW/RPM
1.49 Capacity
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTIONTECHNICAL
PARAMETER
ELECTRICAL DRIVES
1.66 List of drives
1.67 Rating of the motor
1.68 Make of motors
1.69 Operating frequency / Duty cycle
AIR COMPRESSORS
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 259/338
1.70 Type
1.71 Make
1.72 Quantity
1.73 Capacity, Nm3/hr
1.74 Delivery pressure, Kg/cm2
1.75 Material of construction
1.76 Drive motor rating, kw
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-10 Questionnaire (contd.)
F. DM WATER PLANT
S.NO. DESCRIPTION TECHNICAL PARAMETERS
DM Plant capacity
1.0 MGF
1.1 No. of units
1.2 Type
1.3 Flow rate (normal and maximum), cu m / hr
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 260/338
1.4 Design surface flow rate, cum/hr sqm
1.5Total water requirement for back wash & rinse
(cu m), flow rate (cu m/hr), duration (min.).
1.6 Design pressure, kg/sq cm (g)
1.7 Test pressure. Kg/sq. cm (g)
1.8 MOC
2 0 ACTIVATED CARBON FILTER (ACF)
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-10 Questionnaire (contd.)
S.NO. DESCRIPTION TECHNICAL PARAMETERS
4.0 CONSTRUCTION FEATURES
4.1 Material
4.2 Diameter x HOS, mm
4.3 Thickness, mm
4.3.1 - Shell
4.3.2 - top dish
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 261/338
4.3.3 - bottom dish
4.4 Inlet distribution system
4.4.1 - type
4.4.2 - material
4.5 Under bed collector system
4.5.1 - Type
4 5 2 - Material
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-10 Questionnaire (contd.)
S.NO. DESCRIPTION TECHNICAL PARAMETERS
6.4 Design pressure, kg/sq. m (g)
6.5 Test pressure, kg/sq.cm (g)
6.6Total water treated per unit between two
consecutive regenerations, cu m
6.6.1 - Gross, cu m
6.6.2 - Duration of regeneration, min
Total waste water generated per each
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 262/338
6.7 generation (m3)
7.0 RESIN DETAILS
7.1 Name of resin
7.2 Manufacturer
7.3 Resin type
7.4Exchange capacity, kg CaCo3 /cu m of resin
(enclose resin curves)
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-10 Questionnaire (contd.)
S.NO. DESCRIPTION TECHNICAL PARAMETERS
8.7 -Total volume of rinse water, cum
9.0 CONSTRUCTION FEATURES
9.1 -Shell diameter, mm
9.2 -Height of shell, mm
9.3 -Thickness, mm
9.3.1 - Shell
9 3 2 T di h
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 263/338
9.3.2 - Top dish
9.3.3 - Bottom dish
9.3.4 - Lining
9.4 Inlet distribution system
9.4.1 - Type
9.4.2 - Materials
9 5 Under bed collector system
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-10 Questionnaire (contd.)
S.NO. DESCRIPTION TECHNICAL PARAMETERS
10.10 Fill type
10.11 Fill material
10.12 Shell material
10.13 Rubber lining thickness, mm
10.14 Pumps
10.15 Blowers
10 16 T k
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 264/338
10.16 Tank
11.0 PUMPS
11.1 Type of pump
11.2 Capacity in cu m/hr
11.3 Total developed head, in mmWC
11.4 No. of working
11 5 No of standby
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-10 Questionnaire (contd.)
S.NO. DESCRIPTION TECHNICAL PARAMETERS
12.8 Material of construction
12.8.1 - Casing
12.8.2 - Impeller
12.8.3 - Shaft
13.0 REGENERATION SYSTEM
13.1 Preparation / Dilution Tank
13 2 N b f t k
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 265/338
13.2 Number of tanks
13.3 Capacity, cu m
13.4 Dia x Height
13.5 Material of construction
13.6 Agitator type & material
13.7 Agitator kW rating
13 8 Level indicator
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION Annexure-10 Questionnaire (contd.)
S.NO. DESCRIPTION TECHNICAL PARAMETERS
14.9.1 - Number
14.9.2 - Type
14.9.3 - Make
15.0 MIXED BED UNIT
15.1 No. of units
15.2 Design flow, cu m/hr
15 3 Design surface flow rate cum / hr m2
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 266/338
15.3 Design surface flow rate, cum / hr m2
15.4 Design pressure, kg/sq. m (g)
15.5 Test pressure, kg/sq.cm (g)
15.6Total water treated per unit between two
consecutive regenerations, cu m
15.6.1 - Gross, cu m
15.6.2 - Duration of regeneration, min
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER
SPECIFICATION Annexure-10 Questionnaire (contd.)
S.NO. DESCRIPTION TECHNICAL PARAMETERS
17.0 REGENERATION
17.1 -Regenerant used
17.2 -Mode of regeneration, CO/CCR
17.3 -Regeneration level, kg/cu m of resin
17.4 -Regenerant concentration, %
17.5 -Total flow rate, cum/hr
17 6 Quantity of regenerant required (100%) per
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 267/338
17.6 -Quantity of regenerant required (100%) perregeneration per unit, kg
17.7 -Total volume of rinse water, cum
18.0 CONSTRUCTION FEATURES
18.1 -Shell diameter, mm
18.2 -Height of shell, mm
18.3 -Thickness, mm
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC
TENDER
SPECIFICATION Annexure-10 Questionnaire (contd.)
S.NO. DESCRIPTION TECHNICAL PARAMETERS
19.0CHEMICAL DOSING SYSTEM (CDS) FOR PH
CONTROL
19.1 Pump
19.1.1 -Type
19.1.2 -Capacity
19.1.3 -Quantity
19.2 Chemical used for dosing :
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 268/338
19.2.1 -Name of chemical
19.2.2 -Quantity of chemical, liters
19.2.3 -Dosing rate liters /hr
19.3 Chemical solution tank
19.3.1 -Capacity
19.3.2 -Diameter
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
G. AUXILIARY COOLING TOWER PUMPS:
S.NO. DESCRIPTION TECHNICAL
PARAMETERS
1.0. COOLING TOWER
1.1 Type of cooling tower :
1.2 No. of cells :
1.3 Capacity of each cell,m3/hr :
1.4 Total capacity of the cooling tower, m3/hr :
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 269/338
1.5 Cooling range and hot & cold water temperature. :
1.6 Drift loss :
1.7 Wet bulb temperature :
1.8Make up water requirement with a cycle of concentration
of 4.
:
1.9 Design hot water temperature, deg C :
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO. DESCRIPTION TECHNICAL
PARAMETERS
4 Distribution system
4.1 Type :
5 Reduction gear box
5.1 Make and type :
5.2 Service factor at design kW :
5 3 Reduction ratio :
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 270/338
5.3 Reduction ratio :
6 Valves, gate and retaining grate details (indicate quantity against each item)
6.1 Cell inlet water control valve, mm dia :
6.2 Cell isolation valve, mm dia :
6.3 Desludging valve, mm dia :
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO. DESCRIPTION TECHNICAL
PARAMETERS
iii) Pressure rating and Class :
9.0 INSTRUMENTS AND GUAGES
10.0 ELECTRICALS
10.1 Motor
10.1.1 Make :
10 1 2 Type :
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 271/338
10.1.2 Type :
10.1.3 KW rating :
10.1.4 Type of enclosure, IP No. (including terminal box) :
10.1.5 Class of insulation :
10.2 AUXILARY COOLING WATER PUMPS
10.2.1 Make :
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
H. INSTRUMENTATION & AUTOMATION SYSTEM
S.NO. DESCRIPTION
TECHNICAL
PARAMETERS
1.0 GENERAL
1.01 Name and address of the Tenderer
1.02 Place of Manufacturing
1.03 Location of Service Centre
1.04 List of Installation Reference
1.05 No. of Trained Engineers
1 06 S ti f t t f tifi t
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 272/338
1.06 Satisfactory system performance certificate
1.07 MTBF figure of the offered system
1.08 Bar chart for the delivery schedule
1.09 Offered System Name / Series
1.10 Operator Station name & model
1.10 Control Station name & model
1 11 M i O i T i °C
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO. DESCRIPTION
TECHNICAL
PARAMETERS
2.03 Clock Speed
2.04 Word Length
2.05 Main Memory
2.06 RAM provided / expandable
2.07 Cache Memory (MB)
2.08 Flash Memory provided (MB)
2.09 Capacity of Hard disk (GB)
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 273/338
2.10 Capacity & Speed CD – R/W (MB)
2.11 Size / Type of Screen
2.12 Resolution of Screen
2.13 No. Colours supported
2.14 Type of Key Board
2.15 Details of Mouse
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO. DESCRIPTION
TECHNICAL
PARAMETERS
4.06 No. of Tags per trend group
4.07 Is X – Y plotting possible
5.0 HISTORICAL TREND
5.01No. of Graphics pages that can be stored in each
Operator Station
5.02 No. of Tags that can be assigned
5.03 Maximum no. of dynamic points/screen
5 04 Sampling Interval (in sec)
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 274/338
5.04 Sampling Interval (in sec)
5.05 Zooming facility on time & data axis
5.06 No. of Tags per trend group
5.07 Is X – Y plotting possible
6.0 WINDOW FEATURE (multiple Screen)
6.01 Max. no. of dynamic graphics screens (multiple Screen)
6 02 Is Positioning & sizing of displays freely configurable
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO. DESCRIPTION
TECHNICAL
PARAMETERS
9.0 SYSTEM ALARM
9.01 No. of alarms that can be stored in alarm summary
9.02 No. of alarms per page
9.03 Is the audio tone distinct from process alarm
9.04Possibility to store alarms in hard disk beyond the alarm
summary
10.0 COMMUNICATION at Supervisory network
10.01 Communication Standard
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 275/338
10.01 Communication Standard
10.02 Communication protocol
10.03 100 % redundancy provided for communication hardware
10.04 Data Highway
10.05 Highway topology
10.06 Access Method
10 07 Rate of Data Transmission
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO. DESCRIPTION
TECHNICAL
PARAMETERS
11.10Time taken to change over to the standby communication
link bus
12.0 OPEN SYSTEM CONNECTUVITY with LAN/ExpertSystem
12.01 Open system connectivity at what level
12.02 Data Server required
12.03 Data exchange method (DDE / OPC)
12.04 Graphic support availability
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 276/338
12.05 Active “X” support
12.06 Rate of Data Transmission
12.07 Topology
12.08 Media Type
12.09 Length supported
13.0 FIELD CONTROL SYSTEM
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO. DESCRIPTION
TECHNICAL
PARAMETERS
14.02 No. of slots per rack or cluster or file
14.03 Is Power Supply redundant
14.04I/O Rack or Cluster or File communication with CPU true
redundant (module & media)
14.05Wiring done directly on the module TB or on remote
terminal plan
14.06Possibility of on-line replacement of I/O modules &
Communication Processor
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 277/338
14.07Is it necessary to disconnect any cable to replace
I/O modules
14.08Is the system able to detect open/short circuit of sensor
open/short circuit of sensor & output device
14.09 Is bulk Power Supply regulated & redundant
15.0 DIGITAL INPUT MODULE (DI)
15.01 Type (24 V dc)
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO. DESCRIPTION
TECHNICAL
PARAMETERS
16.02 Module model No
16.03 No. of channels per module
16.04Provision of Isolation at Field to Module & Channel to
Channel
16.05 Off to ON delay (in msec)
16.06 On to Off delay (in msec)
16.07 Status LED for all channels
16.08 Current rating(surge/steady state ) per channel in Amps
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 278/338
g( g y )
16.08 Short circuit / overload protection of Outputs
16.09 DO Interface cards required
16.10Provision of changing the output channel to wet or dry
provided
17.0 ANALOG INPUT MODULE (AI)
17.01 Type (4 ~ 20mA)
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO. DESCRIPTION
TECHNICAL
PARAMETERS
18.05 Type of Input Isolation boards with noise filter considered
18.06 Analog Accuracy
18.07 In D/A Conversion no. of D/A Converters offered
18.08 D/A Converter resolution (no. of bits)
18.08 Maximum load resistance in Ω.
18.09 Output Interface-isolation board type
19.0 RTD INPUT MODULE (PT - 100Ω)
19 01 Type (3 wire or 4 wire)
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 279/338
19.01 Type (3 wire or 4 wire)
19.02 Module model No
19.03 No. of channels per module
19.04Provision of galvanic Isolation at Field to Module &
Channel to Channel
19.05 Scan Time per channel
19 06 A/D Converter Accuracy (no of bits)
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO. DESCRIPTION
TECHNICAL
PARAMETERS
20.10 Memory for Real Time Trending (MB)
20.11 Memory for database (MB)
21.0 ENGINEERING PACKAGE
21.01No. of Control Station that can be loaded with HMI/FCS
engineering package
21.02 Is it necessary to HMI edits to all other stations
21.03Possibility to do concurrent engineering of HMI/FCS from
non-resident operator station
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 280/338
21.04 Is engineering package offered separately for OS & FCS
21.05Is it possible to edit one package without closing the other
package
21.06 On-line editing available
21.07 Possibility of editing the FCS engineering package froman active graphic display when the plant is in operation
21 08 I th d t b l b l
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO. DESCRIPTION
TECHNICAL
PARAMETERS
23.0 SYSTEM RESPONSE TIME
23.01Control Processing switch over time to redundant pair of
Controller
23.02 Display call-up time with dynamic data
23.03 Display update time
23.04Elapsed time between the operator command & the
actual change in output value
23.05 Elapsed time between fault occurrence & the time tripwithin one field control system
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 281/338
within one field control system
23.06 Scan time for closed loops
23.07 Scan Time for open loops (Analog & RTD)
23.08 Scan Time for sequence control (DI/DO)
24.0 SPECIAL REQUIREMENTS
24.01 Possibility of Import / Export data to excel spreadsheet
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO. DESCRIPTION
TECHNICAL
PARAMETERS
25.10 No. of spare DI Modules offered
25.11 No. of DI-SOE Modules offered
25.12 No. of spare DI-SOE Modules offered
25.13 No. of DO Modules offered
25.14 No. of spare DO Modules offered
25.16 No. of FCS offered
25.17 No. of Processor Panel offered
25.18 No. of IO cum Marshalling Panel offered
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 282/338
5 8 o o O cu a s a g a e o e ed
25.17 No. of Engineering Station
25.18 No. of Operator Station
25.19 No. of Control Desk
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
I. VENTILATION SYSTEM
S.NO. DESCRIPTION TECHNICAL PARAMETERS
1.0 THROW FLOW FANS
1.1 Make
1.2 Type
1.3 Model and size
1.4 Number of fans.
1.5 Operating fluid
1.6 Specific gravity of fluid considered
1 7 Capacity m3/hr
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 283/338
1.7 Capacity, m3/hr
1.8 Total Differential Head, mmWC at normal flow
1.9
Pressure
Suction
Discharge
1.10 Operating temperature, °C
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO. DESCRIPTION TECHNICAL PARAMETERS
1.25 Accessories as per standard
1.26 Degree of protection as per IS
1.27 Type of cable box
1.28 Weight
1.29
Material Specification
Impeller
Base frame
Air Filter Type
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 284/338
1.30
Type
Internals
Material details
Air Pressure at inlet
Air Pressure at outlet
1.31 Method of Lubrication
1 32 W i ht f F
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO. DESCRIPTION TECHNICAL PARAMETERS
2.13 Efficiency of the Fan
2.14 Fan input KW at rated flow
2.15 Impeller diameter
2.16 Impeller width & Thick
2.17 Impeller mounting
2.18 Casing type
2.19 Casing mounting
2.20 Direction of rotation
2 21 M k d t
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 285/338
2.21 Make and type
2.22 Rated capacity
2.23 Voltage, frequency and variations
2.24 Accessories as per standard2.25 Degree of protection as per IS
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
J. 132KV SWITCHYARD
S.NO DESCRIPTIONTECHNICAL
PARAMETERS
1. Name of manufacturer
2. Standards followed in design, manufacture, testingand erection of 132KV Switch yard & its accessories
with integral instruments
3. SF6 CIRCUIT BREAKER
3.1 Make
3.2 Type
3.3 Rated Voltage
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 286/338
g
3.4 Rated frequency
3.5 Rated current
3.6 Short circuit breaking current
3.7 Making current
3.8 Operating duty
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTIONTECHNICAL
PARAMETERS
3.14 Minimum clearances in air
Between phases
Between live parts and earth
3.15 Type of operating mechanism
Method of tripping
Normal / Emergency
Normal voltage of trip coil
Pick-up range
Power for tripping mechanism
3.16 Method of closing
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 287/338
3.16 g
Normal voltage of closing coils
Power for closing mechanism
3.17 Rated line charging breaking current
3.18 Rated cable charging breaking current.
3.19 Rated (single) capacitor bank breaking current
3 20 Maximum over voltage to earth of the circuit
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTIONTECHNICAL
PARAMETERS
4.5 Frequency
4.6 No. of phases
4.7 Rated conditions current
4.8 Short time current
Rating and duration
4.9 Rated peak short circuit current
4.10 Capacity to interrupt magnetizing current at p f
4.11 Capacity to interrupt line charging current at p f
4 12 D i i t f i l t
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 288/338
4.12 Design requirements for isolator
4.13 Ambient temperature
4.14 Insulation level
4.15 Phase spacing
4.16 Type of break
4 17 Type of mounting
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTIONTECHNICAL
PARAMETERS
5.11 Miscellaneous
5.12 Auxi liary supply
5.13 Interlocks with circuit breakers
5.14 Whether type tests carried out on similar isolators
5.15 Whether all routine / acceptance tests as per latest
standards will be carried out on each isolator
6. 132 KV CURRENT TRANSFORMER
6.1 Type
6 2 Nominal / Highest system voltage
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 289/338
6.2 Nominal / Highest system voltage
6.3 Frequency
6.4 No. of cores
6.5 Rated primary current for each core
6.6 Rated secondary current
6 7 Ratio taps for each core
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTIONTECHNICAL
PARAMETERS
8.7 Class of Insulation
8.8 Maximum temp. rise of winding above ambient of
50°C
8.9 Cantilever strength of CT at the terminal
8.10 1.2 /50 μ sec impulse positive & negative.
8.11 One min. power frequency withstands voltage.
8.12 Creepage distance
8.13 Partial discharge level
9 LIGHTNING ARRESTER
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 290/338
9 LIGHTNING ARRESTER
9.1 Quantity
9.2 Installation
9.3 System Voltage –Nominal / Highest
9.4 Type of earthing
9.5 Type of arrester
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTIONTECHNICAL
PARAMETERS
10.3 Voltage class
10.4 Total Creepage distance
10.5 Cantilever strength
10.6 Withstand voltages
a) 1 min. power frequency – Dry / wet
b) 1 min. Impulse withstand voltage – Dry / wet
10.7 Puncture voltage
11 Disc Insulator
11.1 Voltage class
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 291/338
g
11.2 Type
11.3 Creepage distance
11.4 Electromechanical strength
11.5 Withstand /flashover voltages
a) 1 min. power frequency – Dry / wet
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
K. TRANSFORMERS
SL.
NODESCRIPTION
Power
Transformer
HT aux.
Transformer
Auxiliary
Transformer
1 Name of manufacturer
1.1 Standards followed in design,
manufacture and testing
2 Continuous Rating, KVA
3 Performance guarantee Parameters
3.1 Rating in KV- HV/LV
3.2 Losses in HV / LV
4 Transformer No-load Voltage
5 Transformer Rated current
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 292/338
5 Transformer Rated current
6 Rated frequency
7 Number of phases
8 Vector group reference
9 Impedance voltage between HVand LV at rated current for the
principal tapping
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
SL.
NODESCRIPTION
Power
Transformer
HT aux.
Transformer
Auxiliary
Transformer
18.2 No of coolers per bank
18.3 Logics proposed
18.4 Capacity of each cooler
18.5 Motor rating
19 Type of tap changer
19.1 No. of plus taps
19.2 No. of minus taps
19.3 Voltage per step
19.4 Time for one tap change19.5 On load or off load?
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 293/338
20 Guaranteed loss particulars
20.1 Iron losses in kW at rated voltage
and frequency
20.2 Copper losses in kW at rated full-
load current and frequency at 75’C20.3 Calculation for capitalisation of
losses
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
SL.
NODESCRIPTION
Power
Transformer
HT aux.
Transformer
Auxiliary
Transformer
27 Details of bushings
27.1 Name of manufacturer
27.2 Type
27.3 Dry flash over voltage, kV
27.4 One-minute dry withstand test
voltage, kV
27.5 Rated short-time fault current and
its duration
28 Dimensions
28.1 Overall dimensions of transformer
complete with radiator banks (L x W
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 294/338
complete with radiator banks (L x W
x B) m
28.2 Transportation dimension
28.3 De-tanking height
29 Weights
29.1 Total Weight including oil
29.2 Transportation
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
L. 11KV INDOOR VCB
S.NO DESCRIPTIONTECHNICAL
PARAMETERS
1.0 Name of manufacturer
2.0 Standards followed in design, manufacture and testing
for switch board and the vacuum interrupter
3.0 VACUUM CIRCUIT BREAKER PANEL
3.1 No. Phases
3.2 Continuous current rating of the main busbars
3.3 System Voltage & frequency
3.4 System earthing considered
3 5 Rated current of feeders/ bus bar
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 295/338
3.5 Rated current of feeders/ bus bar
3.6 Rated power frequency withstand voltage
3.7 Rated lighting impulse withstand voltage
3.8 Rated short-circuit breaking current
3.9 Rated short time current withstand
3.10 Rated short circuit making current (peak)
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTIONTECHNICAL
PARAMETERS
3.27 Overall size (L x B x H), mm
3.28 Weight of Panel
3.29Catalogue of switchgear panel enclosed? Yes / no
4.0 CURRENT TRANSFORMER
4.1 Make / Type
4.2 No of core
4.3 Accuracy class / burden
4.4 Outdoor / Indoor?
4.5 Enclosed illustrative catalogue / brochure? Yes / no
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 296/338
5.0 POTENTIAL TRANSFORMER
(BUS PT, TRANSFORMER LINE PT, GENERATOR PT)
5.1 Make / Type
5.2 Ratio
5.3 Accuracy class / burden
5.4 Draw out / non- draw out
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
M. 3.3KV VCB
S.NO DESCRIPTIONTECHNICAL
PARAMETERS
1 Name of manufacturer
2 Standards followed in design, manufacture, testing and
erection of SF6 Circuit breaker & its accessories with
integral instruments
3 Vaccum circuit breaker
4 Make
5 Type
6 Rated Voltage
7 Rated frequency
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 297/338
8 Rated current
9 Short circuit breaking current
10 Making current
11 Operating duty12 Auto Reclosing
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTIONTECHNICAL
PARAMETERS
Pick-up range
Power for tripping mechanism
20 Method of closing
Normal voltage of closing coils
Power for closing mechanism
21 Rated line charging breaking current
22 Rated cable charging breaking current.
23 Overall dimension of complete 3-phase circuit breaker with
structure
24 Weight of complete 3-phase circuit breaker
25 Control panels
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 298/338
25 Control panels
26 Control panel Dimensions ( width x height x depth in mm)
27 Degree of protection of enclosure in terms of IP no.
28 Material and size of earth bus in the panel
29 Control wiring - size and specification
30 Control cable make
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
N. HT CABLES
S.NO DESCRIPTIONTECHNICAL
PARAMETERS
1.0 Name of Manufacturer
2.0 Whether offered cable design is type tested. If yes
enclose the type test certificate.
3.0 Standards followed in design, manufacture and
testing for switch board and the vacuum interrupter
4.0 Type of Cables
7. Voltage rating
8. Current rating Nominal
9. Voltage grade
10 Derating factors to be considered
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 299/338
10. Derating factors to be considered
Laid on ground / air
Temperature correction Ground / air
Thermal resistivity of soil
Grouping factor
Depth of laying
Thermal resistivity
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
O. LT CABLES
S.NO DESCRIPTION
11KV CABLE
TECHNICAL
PARAMETERS
1 Name of Manufacturer
2 Whether offered cable design is type tested. If yes
enclose the type test certificate.
3 Standards followed in design, manufacture and
testing for switch board and the vacuum interrupter
4 Type of Cables
5 Voltage rating
6 Current rating Nominal
7 Voltage grade
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 300/338
7 g g
8 Derating factors to be considered
Laid on ground / air
Temperature correction Ground / air
Thermal resistivity of soil
Grouping factor
Depth of laying
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
P. LT CABLES
S.NO DESCRIPTION LT Control
TECHNICAL
PARAMETERS
1 Name of manufacturer
2 Standards followed in design, manufactureand testing
3 Type of cable (Armoured / un armoured)
4 Voltage Grade
5 Materials of conductor
6 Cross- section of conductor
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 301/338
7 No of cores
8 Overall diameter of cable
9 PVC insulated? Yes / No
10 PVC sheathed? Yes / No
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTION LT Control
TECHNICAL
PARAMETERS
with time duration, for each type and size ofcables, with final temperature not exceeding
200deg.c20 Maximum conductor temperature permissible
a) Continuous operation deg. C
b) During short circuit condition deg. C
c) Short circuit current for one second, deg. C
21 Whether metallic screening armour providedwould carry specified earth fault current. A
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 302/338
y pwith final temperature not exceeding 200deg.c
22 Copies Of All Type Test Certificates, includingthat of earth fault current carrying capacityenclosed? Yes / No
23 Cable Fully Confirm To IS Specification? Yes/ No
24 W i ht t f l t d bl i k
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
Q. CABLE RACK / TRAYS
S.NO DESCRIPTION TECHNICALPARAMETERS
1 Make
2 Material
3 Galvanised or not
4 Thickness of sheet for perforated trays, mm
5 Sizes of trays offered, mm
6Weight per metre of different sizes of ladder and
perforated type trays, kg
7 Enclose illustrative literature/catalogues
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 303/338
7
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
R. LT PANELS
S.NO DESCRIPTION TECHNICALPARAMETERS
1.0 About Company
1.1 Tenderer Name & Address
1.2 Quotation number and date
1.3 Previous experience list of similar job with year of
supply, name of purchaser etc
1.4 Deviation proposed by the bidder
2.0 Documents details
2.1 Drawing no of Single line diagram showing
current rating, CT& PT details
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 304/338
2.2 Technical documents enclosed with bid
2.3 Commercial documents enclosed with bid
2.4 Any certification for factory, design etc.
2.5 List of drawings that will be furnished aftercontract finalisation
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTION TECHNICALPARAMETERS
3.12 -Degree of protection for enclosure
3.13 -Control voltage rating
3.14 -Control voltage supply arrangement
3.15 -Details of incomers
3.16 415V Air break circuit breaker
3.17 Make & Type
3.18 Electrical or manual operation
3.19 Protection device provided –Micro processor /solid state- details of release
3 20 Standards followed
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 305/338
3.20 Standards followed
3.21 Manufacturers type designation
3.22 Dimensions and weight of each complete unit in
kg
3.23 Rated voltage and current
3 24 Maximum voltage in V at which the breaker
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S.NO DESCRIPTION TECHNICALPARAMETERS
3.37 -Make of push buttons & control switches
3.38 -Make of indicating lamps
3.39 -Make of indicating meters
3.40 -Single line diagram enclosed
3.41 -Overall size (Lx B x H), mm
3.42 -Weight of MCC
3.43 -Enclose technical literature/brochure for MCC
enclosed?
4.0 Power & Lighting distribution board (PDB&LDB)
4 1 Make & Type
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 306/338
4.1 Make & Type
4.2 Rated voltage
4.3 Continuous current rating for main Bus bars- A
4.4 Bus bar sizes and materials
4.5 Rating of incomer, A
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S. PCC PANEL
S. NoDESCRIPTION
TECHNICAL
PARAMETERS
1.0 About Company
1.1 Tenderer Name & Address
1.2 Quotation number and date
1.3Previous experience list of similar job with year of
supply, name of purchaser etc
1.4 Deviation proposed by the bidder
2.0 Power control centre (PCC)
2.1 Standards followed
2.2 Rated voltage
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 307/338
2.3 Rated insulation voltage
2.4Continuous current rating of Bus bars specified
ambient temperature while installed in switchboard
2.5 Material of Bus bars / grade used
2.6 Nominal cross section of Bus bars Sq. mm
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S. NoDESCRIPTION
TECHNICAL
PARAMETERS
3.7 Rated voltage and current
3.8 Maximum voltage in V at which the breaker
operator under normal condition
3.9 Maximum voltage in V at which the breaker can
interrupt its rated MVA
3.10 Spring charge motor details and voltage required
3.11 Draw-out/ Non-draw out
3.12 Make type and catalogue no. of HRC fuses
3.13 Make and type of CT
3.14 CT- Ratio, VA, class
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 308/338
3.15 Make/ specification of potential transformer
3.16 Make/ specification of push buttons, switches
3.17 Make / specification of indicating lamps
3.18 Make/ specification of indicating meters
3 19 Make/ specification of energy meters
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
S. NoDESCRIPTION
TECHNICAL
PARAMETERS
4.12 Insulation class
4.13 Rated insulation voltage
4.14 One minute power frequency voltage
4.15 Max. Hot spot temp.raise over ambient temp. Of
50ºC
4.16 Bus enclosure and support structure
4.17 Clearance in air
4.18 Phase to phase
4.19 Phase to earth
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 309/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
T. BATTERY & BATTERY CHARGER
SL.NO DESCRIPTIONBATTERY CUM
CHARGER
1.0 Name of manufacturer
2.0 List of reference for supply of similar panels with
contact addresses
3.0 Standards followed in design, manufacture and
testing for the panel
4.0 Whether offer is as per specification.
5.0 Delivery schedule
5.1 Drawings and document submission
5.2 Despatch of material
6.0 Deviations (Enclose list of deviations)
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 310/338
7.0 PANELS- GENERAL
7.1 Standards followed for panel construction
7.2 Limiting Dimension
7.3 Degree of protection
7 4 System Voltage & frequency
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 311/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
U. UPS
Sl. No DESCRIPTIONTECHNICAL
PARAMETERS
1.0 UPS System details
1.1 Capacity of UPS
1.2 Type
1.3 Parallel Redundant Unit
1.4 Continuous rating
1.5 Location
1.6 Degree of protection
1.7 Tentative dimension
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 312/338
1.7
1.8 Paint shade
1.9 Input supply
1.10 Input frequency
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
Sl. No DESCRIPTIONTECHNICAL
PARAMETERS
3.0 CHARGER ( RECTIFIER )
3.1 Type
3.2 DC Output
3.3 Float Charging Mode
3.4 Boost charging Mode
3.5 Rating
3.6 Efficiency
4.0 BATTERY
4 1 Type
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 313/338
4.1 Type
4.2 Type of electrolyte
4.3 Type of Cell container
4.4 No of cells / battery
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
Sl. No DESCRIPTIONTECHNICAL
PARAMETERS
6.2 Single harmonic
7.0 OVERLOAD CAPABILITY
7.1 125% of full load
7.2 150% of full load
7.3 Power factor range
7.4 Branch fuse clearing capability
8.0 STATIC TRANSFER SWITCHES
8.1 Type
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 314/338
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
V. EPABX SYSTEM
S.NO DESCRIPTION EPABX DETAILS
1 Name of manufacturer
2 Whether offer is as per specification.
3 Delivery schedule
4 Drawings and document submission
5 Despatch of material
6 Deviations ( Enclose list of deviations)
7 System Voltage & frequency
8 System earthing considered
9 Features
C bli i d ifi ti
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 315/338
10 Cabling - size and specification
11 Cable make
12 Whether RS 232/485 ports are connected
for PC connectivity
13 UPS details
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
W. MCB DISTRIBUTION BOARD
Sl.No Description TECHNICALPARAMETERS
I MCB distribution boards/MLDB
1Make of board
2 Standards followed for MCB
3 Rated voltage and frequency
4 Make and type of MCB
5 Rated current A
6 Breaking capacity A
8 Tripping time ms
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 316/338
8 Tripping time ms
9 Sheet steel thickness of the board
10 Degree of protection for enclosure
II 415V TPN isolator in sheet steel enclosure
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
Sl.No Description TECHNICALPARAMETERS
4 Max.size of Aluminium cable that can be
terminated
5 Degree of protection for enclosure
9 Sheet steel thickness, mm
10 Other accessories, if any
IV 240V SPN Switch Socket Outlet
1 Make and Type
2 Rated voltage V, at 50Hz
3 Max.size of Aluminium cable that can be
terminated
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 317/338
terminated
4 Degree of protection for enclosure
5 Sheet steel thickness, mm
V MCB isolating switch
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
X. PLANT LIGHTING
Sl.No DescriptionTECHNICAL
PARAMETERS
1 Voltage
2 Luminaries
3 Make4 Ballast & capacitor used
Floodlight-HPSV -70W
Well glass fitting -70W
Industrial type HPSV -250W
Industrial type HPSV -150W
Out door type Fluorescent lamp-36w
Mirror optic type Fluorescent lamp-
2X36w
Twin tube light with lamp-2x36w
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 318/338
Twin tube light with lamp-2x36w
Single tube light with lamp-36w
Street light fitting-HPSV-150W
5 Nominal power factor
Floodlight-HPSV -70W
Well glass fitting 70W
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
8 Catalogue no
Floodlight-HPSV -70W
Well glass fitting -70W
Industrial type HPSV -250W
Industrial type HPSV -150W
Out door type Fluorescent lamp-36wMirror optic type Fluorescent lamp-
2X36w
Twin tube light with lamp-2x36w
Single tube light with lamp-36w
Street light fitting-HPSV-150W
9 Degree of protection IP
10 Material of construction details
Floodlight-HPSV -70W
Well glass fitting -70W
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 319/338
Well glass fitting 70W
Industrial type HPSV -250W
Industrial type HPSV -150W
Out door type Fluorescent lamp-36w
Mirror optic type Fluorescent lamp-
2X36w
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
Y. BALANCE LIGHTING
Sl.No Description TECHNICAL
PARAMETERS
1 Voltage
2 Luminaries
3 Make
4 Ballast & capacitor used
Floodlight-HPSV -250W
Street light fitting-HPSV-150W
Well glass fitting -70W
Out door type Fluorescent lamp-40W
Twin tube light with lamp-2x40WSingle tube light with lamp-40W
5 Nominal power factor
Fl dli h HPSV 2 0W
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 320/338
Floodlight-HPSV -250W
Street light fitting-HPSV-150W
Well glass fitting -70W
Out door type Fluorescent lamp-40WTwin tube light with lamp-2x40W
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
Annexure-10 Questionnaire (contd.)
Well glass fitting -70W
Out door type Fluorescent lamp-40W
Twin tube light with lamp-2x40W
Single tube light with lamp-40W
11 Colour finish
Floodlight-HPSV -250WStreet light fitting-HPSV-150W
Well glass fitting -70W
Out door type Fluorescent lamp-40W
Twin tube light with lamp-2x40W
Single tube light with lamp-40W
Z. CAPACITOR
S.NO DESCRIPTION DETAILS
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 321/338
1 Make
2 Type
3Capacitor design calculation furnished–
(YES/NO)
FACOR POWER LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
ANNEXURE-11
VENDOR LIST
S.NO DESCRIPTION VENDORS NAME
A MECHANICAL EQUIPMENT
1. TURBINE SIEMENS/APT/HTC/BHEL
2. BOILER THERMAX/CVL/IJT/BHEL
3. AIR COOLED CONDENSER GEA/PAHARPUR
4.
AUXILIARY COOLING TOWER PAHARPUR/PALTECH/SHRIRAM
COTRELL/SOUTHERN COOLING
TOWER
5.DM PLANT THERMAX/ DOSION / TRIVENI / ION
EXCHANGE/
6.FUEL HANDLING SYSTEM BEVCON/ HYQUIP/ TECPRO/ PROMAC/
ELECON / TRF
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 322/338
7. ASH HANDLING SYSTEM BEVCON/ MACAWBEEKAYAR/
MECGALE/ OSM
8.FIRE FIGHTING SYSTEM STERLING WILSON/ NEW FIRECON/
FIRECON/ GPR
9. HVAC BLUESTAR / VOLTAS
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
ANNEXURE – 11 VENDOR LIST (CONTD.)
22. VIBROMETER BENTLE NEVEDA
23. FLUID COUPLINGVOITH/ELECON/FLUIDOMAT/PEMBRIL
(GREAVES)
24. TYPE COUPLING LOVEJOY/FENNER/ ESBI
25. GEAR COUPLING
NAW/FENNER/ELECON/FMG/HI-CLIFF
/LOVEJOY/ WMI CRANES / FLENDER
26. PIN-BUSH COUPLING NAW/FENNER/LOVEJOY/ELECON
27. RESILIENT COUPLING LOVEJOY (BIBBY)/GBM/FENNER
28. DISC BRAKE KATEEL/SVENDBORG
29. THRUSTER BRAKE SVENDBORG/STROM KRAFT/KAKKU
30.BALL BEARING /ROLLER
BEARINGSKF/KOYO/NTN/INA/NBC/FAG/ZKL
31 BELT VULCANIZING UNIT SV DATTER
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 323/338
31. BELT VULCANIZING UNIT SV DATTER
32. RUBBER LINER TEGA/KAVERI/FORECH
33.
SUSPENDED
ELECTROMAGNET
ERIEZ/ELEKTROMAG/POWER BUILD/
ELECTROZAVOD/KAKKU
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
ANNEXURE – 11 VENDOR LIST (CONTD.)
44.GREASE LUBRICATION
SYSTEM
LINCOLN HELIOS INDIA
LTD/DELIMON/AFMC MAIN
45.PNEUMATIC CYLINDERS VELJAN/NUCON/FESTO/SCHRADER
/NORGREN/SMC (JAPAN)/PARKER
46. PNEUMATIC AIR BOOSTER SMC (JAPAN)
47.
PNEUMATIC CONVEYING
SYSTEM
RIECO/MBE/MACAWBER-
BEEKAY/MAHINDRA
ASHTECH/ENERGO/VCC
48.
PRESSURE VESSELS BHARAT HEAVY PLATES &
VESSELS/ISGEC/ASSOCIATED PLATES
& VESSELS/DECTEL/LLOYDS STEEL/L
& T/BOC
49.
AIR COMPRESSOR ATLAS COPCO / IR / ELGI / KIRLOSKER
PNEUMATICS
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 324/338
50. AIR DRYER DELAIR/INDCON/ATLAS COPCO/PACE
51.
DUST SUPPRESSION
SYSTEM(SPRINKLER/DRY-
FOG TYPE)
TPS/F.HARLEY/ KAVERI / PROJECTS &
CONTROL
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
ANNEXURE – 11 VENDOR LIST (CONTD.)
11. PROCESS VALVES
i. IBR AUDCO / BHEL / M&M /KSB / BDK /
FOURESS
ii. NON IBR BDK/ BHEL/ AUDCO /KSB /FISCHER
XOMAX / FOURESS / VALTECH /
BERMACO/ CRESENT /NECO
12. SPRING HANGER SARATHI / MYRICKS
CINSTRUMENTATION &
CONTROLS
1.GOVERNOR WOODWARD505E
2.
TEMPERATURE GAUGES H. GURU / GENERAL INSTRUMENTS
/BELLS / OLYMPUS
3.PRESSURE GAUGES H. GURU / GENERAL INSTRUMENTS
/A.N. INSTRUMENTS /BELLS/ OLYMPUS
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 325/338
4. LEVEL GAUGES LEVCON
5.
PRESSURE TRANSMITTER ROSEMOUNT /YBL /TATA HONEYWELL
/
C.G. HARTMAN & BROWN
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
ANNEXURE – 11 VENDOR LIST (CONTD.)
SYSTEM (DCS) SIEMENS
16.
PLC ROCKWELL AUTOMATION / SIEMENS
/ABB
/SCHNEIDER/ GE-FANUC
17. HMI-PC IBM / HP / DELL
18.
HMI SOFTWARE (3RD PARTY) WONDERWARE (INTOUCH) /
INTELLUTION(FIX) / US DATA
(FACTORY LINK)
19.
CONTROLLER YOKAGAWA/HONEYWELL/SIEMENS/AB
B/EUROTHER M/ INVENSYS(FOXBORO)
20
RECORDER YOKOGAWA/LAXONS(CHINO)/EUROTH
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 326/338
20. ERM/ABB/ HONEYWELL
21.
BARGRAPH & DIGITAL
INDICATOR
MASIBUS/ EUROTHERM/ YOKOGAWA/
HONEYWELL
TOTALISER YOKOGAWA / ABB / MASIBUS/
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
ANNEXURE – 11 VENDOR LIST (CONTD.)
INSTRUMENTATION ENGINEERS /
KROHNE MARSHALL/ INSTRUMENTS /
PLACKA/ ROTA
30.
VORTEX FLOWMETER ENDRESS
HAUSER/YOKOGAWA/KRHONE/
EMERSON/ABB
31.
CONTROL VALVE AND ON-OFF
VALVE
IL/FISHER-XOMOX/SAMSON/ DRESSER
MASONEILAN/ FOURESS/FORBES
MARSHALL(ARCA)/ R.K.CONTROLS /
MIL / ABB (INTROL)
32.
ELECTRIC ACTUATOR AUMA / IL / LIMITORQUE / ROTORK /
ABB
33.
SOLENOID VALVE AVCON/ROTEX/ASCO/VICKERS/SCHRA
DER
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 327/338
33. DER
34. AIR FILTER REGULATOR PLACA/SHAVO NORGREN
35. ENCODER P&F/ROCKWELL/HUBNER
G S S S SO / C /
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
ANNEXURE – 11 VENDOR LIST (CONTD.)
MONITOR FROBESMARSHALL (SHINKAWA)/
SHERMAN
42. POLLUTION CONTROL &
STACK MONITORINR SYSTEM
DRAGER/ HONEYWELL/ ENVIROTECH/
EMERSON/ FROBES MARSHALL/
DURAG/ OPSIS
43. FLAME DETECTOR HONEYWELL/ FIRE-EYE/ FROM
SCHODER/ DURAG
D AUXILIARIES
1. PAINTS BERGER / SHALIMAR / NEROLAC
2. CRANES UNITEK / WMI
3. WEIGHIGHING m/c J&N / IPA / PHILIPS
4. COMPRESSORS ELGI / INGARSOL RAND / KIRLOSKAR /
5CRUSHER TRF OR EQVT. TO BE APPROVED BY
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 328/338
5.CONSULTANT
6.
M.S.TANKS / SS TANKS FABRICATED IN A REPUTED
MANUFACTURING UNIT SUBJECT TO
APPROVAL OF CONSULTANT
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
ANNEXURE – 11 VENDOR LIST (CONTD.)
4. LIGHTNING ARRESTORS ELPRO / AREVA (WSI) / CGL / ABB
5. CTSBHEL / ABB / TELK / CGL / AREVA
(WSI)
6. PTSBHEL / ABB / TELK / CGL / AREVA
(WSI)
7. INSULATORSJAYASHRI INSULATOR / WSI /
MODERN INSULATOR / BHEL
8. HT BUS DUCTC&S/ ECC/ STAR DRIVE/ ENPRO/
GENERAL ENGINEERING
9. VACUUM CONTACTORS AREVA / BHEL / SIEMENS / ABB
10. HRC FUSES AREVA / DP / S&S/ COOPER BUSSMAN
11. NEUTRAL GROUNDING
RESISTOR
NARKHADE / PEFCO / RESITECH /
NATIONAL
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 329/338
12. TRANSFORMERSCGL / AREVA / VOLTAMP / EMCO/ TELK
ABB / SIEMENS
13. METERS AE /IMP/ L&T
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
ANNEXURE – 11 VENDOR LIST (CONTD.)
VENUS CONTROL / PYRAMID
SWITCHGEAR
26. ACB L&T / SIEMENS / ABB / SCHNEIDER /
C&S
27.MCCB L&T / SIEMENS / ABB / SCHNEIDER /
C&S
28.SFU L&T / SIEMENS / ABB / SCHNEIDER /
C&S
29.CONTACTOR L&T / SIEMENS / ABB / SCHNEIDER /
C&S
30. OVER LOAD RELAY L&T / SIEMENS / ABB / SCHNEIDER /C&S
31.VFD L&T / SIEMENS / ABB / SCHNEIDER /
C&S
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 330/338
C&S
32. CT/PT’S KAPPA / VOLTAMP / AE
33. INSTRUMENTS AE / IMP
34 ENERGY METERS / MFM CONSERV / L&T
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
ANNEXURE – 11 VENDOR LIST (CONTD.)
46. AC DRIVES, VVVF DRIVE ABB / SIEMENS /
HITACHI/AREVA/CGL/KEC/BBL
47. MOTOR PROTECTION RELAYSGE POWER / SCHNEIDER / L&T /
SIEMENS / ABB /C&S
48. AUXILIARY RELAYS
AREVA / EASUN / ABB / L&T /
SCHNEIDER / SIEMENS/BCH /
ROCKWELL / GE
49.NUMERICAL PROTECTION
RELAYS (FOR HT SYSTEM) ABB / SIEMENS / AREVA / GE / L&T
50.
NUMERICAL PROTECTION
RELAYS (FOR LT SYSTEM
ABB/ SIEMENS /AREVA /GE
SCHNEIDER / L&T / ASHIDA
51132KV/ 11KV/ 3.3 KV XLPE
RPG / UNIVERSAL / CCI/NICCO /
TORRENT CABLES /
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 331/338
51.CABLE INDUSTRIAL/INCAB / CRYSTAL/
UNIFLEX
1.1 KV PVC/XLPE/HRPVCRPG / UNIVERSAL /CCI/NICCO/TORRENT/INDUSTRIAL/
FACOR ALLOYS LIMITED45 MW CAPTIVE POWER PLANT AT GARIVIDI, ANDHRA PRADESH
EPC TENDER SPECIFICATION
ANNEXURE – 11 VENDOR LIST (CONTD.)
60. UPS
KELTRON / GUJRAT HI-REL / SIEMENS /
EMERSON /GE / DB POWER
CONTROLS
61. CONTROL SWITCHSIEMENS / KAYCEE / AREVA / L&T /
VAISHNO / C&S
62. PUSH BUTTONSIEMENS / BCH / L&T / VAISHNO / C&S /
SCHNEIDER / TECHNIC / KAYCEE
63. LIMIT SWITCH
AG SYSTEMS/JAY
BALAJI/TECHNOCRATS/ ELECTROMAG/
JSI/ TECHNIC (SIEMENS / BCH MAY BE
CONSIDERED ONLY FOR LIGHT DUTY)
64.CHANGE OVER
SWITCH/SELECTOR SWITCH
C&S / STANDARD / HHE /KAYCEE /
SIEMENS/ BCH/L&T/ INDOASIAN
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 332/338
65.DISCREPANCY CONTROL
SWITCH ABB / AG SYSTEMS
66. EPABAX SYSTEM AVAYA / TADIRAN /GTL (NORTEL) /SIEMENS
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 333/338
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 334/338
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 335/338
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 336/338
7/24/2019 Sample power plant specification
http://slidepdf.com/reader/full/sample-power-plant-specification 337/338