DRILLING CONTRACTOR AND GEOLOGY CONSULTANT
PT. MATARAM INTI BUMI NUSANTARA
PT. MATARAM INTI BUMI NUSANTARA
DRILLING CONTRACTOR AND GEOLOGY CONSULTANT
MIB NUSANTARA
Reff : 010-03/TM/MIBN/XI/15 To : PT.XXX Division : Exploration Departement : - PIC : Mr. XX Mrs. YY Attn : Mr. Leris Efronda Email : [email protected] [email protected] Dear Mr. Yanto Thank you for your interest in utilizing PT. Mataram Inti Bumi (MIB) Nusantara, Drilling and Geology Consultancy services. Referring to our discussion, we understand that PT. XXXwishes to develop a Tin concession area at Manggar area, East Belitung Province and seeks a proposal from a reputable and competent mining consultant to complete and independent report of the Tin Resources and Reserve within the area. As we’ve been conducted the exploration activities at this region. We highly recommend to start with the property assessment for the first phase is Geological Mapping and then continue to Drilling Exploration base on Mapping Work result, in order to have better understanding with the potential of prospect area or is’t potential to continue Drilling Work. The objective of the work outlined in this proposal would be focused to identify the most prospect area, verify occurrence and continuity confidence level of measured, indicated and Inferred within area of PT. XXX area. For that reason, we would like to submit a proposal to conduct the related services at the specified area. Please find below the following details about our proposal. Your kind attention and consideration shall be highly appreciated. We look forward to receiving your confirmation and job assignment. Thank you Jakarta, march 26, 2015 Best Regards, Mataram Inti Bumi Nusantara Note : we need site visiting before decide final negotiations.
DRILLING CONTRACTOR AND GEOLOGY CONSULTANT
PT. MATARAM INTI BUMI NUSANTARA
PT. MATARAM INTI BUMI NUSANTARA
DRILLING CONTRACTOR AND GEOLOGY CONSULTANT
MIB NUSANTARA
SUBJECT : Geological Mapping Services for Tin, 100Ha, Horizontal, Manggar, East Belitung
AUTHORIZED BY : PT. XXX I. Scope Of Work
a. Detail geological mapping scale 5000 – 10.000 b. Creating Geological Map c. Creating Topographi Digital Map d. Creating Boundary Area of Interest e. Building database f. Data validation/boreholes review g. Synchronize and reconciliation h. All Mobilization, Accommodations and Meat for Geological Services team will
be prepared by Contractor i. Geological Services team will be full responsible about collecting and recording
geological data progress at field j. All goods & Manpower under insurance protect by contractor
II. Deliverables
a. Report
Will be submitted within 2-3 weeks after the completion of the activities at field
Two hard copy and soft copy reports shall be submitted
b. Certificate of Analysis (selected samples)
Preliminary analysis result will be informed upon the completion of the analysis
Certificate of Analysis will be submitted together with the submission of Final Report
c. Various Map
Tin Ore Distribution Map
Location Map
Traverse Map
Potential Transportation Route Map
Land Utilization Map
Prospect area Map
Etc d. Reporting
Resources Estimation at the Prospect area
DRILLING CONTRACTOR AND GEOLOGY CONSULTANT
PT. MATARAM INTI BUMI NUSANTARA
PT. MATARAM INTI BUMI NUSANTARA
DRILLING CONTRACTOR AND GEOLOGY CONSULTANT
MIB NUSANTARA
III. Timeline & Activity Plan
No. Job Month 1 Month 2
1 2 3 4 1 2 3 4
1 Preparing Desktop Study
2 Field Work
3 Building & Validation database
4 Building and Checking Geological Model
5 Reporting i Remarks : The actual date of activity will be re-confirmed based on the following requirements :
- after the confirmation of this proposal - upon receiving the down payment (refer to the following Payment Terms) - field condition
IV. Price By Project IDR 155.000.000,- (One hundred fifty five thousand IDR)
V. Payment Terms
a. All activity of Geological Mapping Work will be start after 75% of down payment was paid
b. 25 % before submitted the draft report c. All transaction exclude of PPN, but include PPh 23 Bank Account d. Detail Bank Account :
BANK : MANDIRI Acc Name : PT. Mataram Inti Bumi Nusantara Account Number : 137-00-1120941-4 To reduce tax, payment can be discuss latter (with permition both side)
DRILLING CONTRACTOR AND GEOLOGY CONSULTANT
PT. MATARAM INTI BUMI NUSANTARA
PT. MATARAM INTI BUMI NUSANTARA
DRILLING CONTRACTOR AND GEOLOGY CONSULTANT
MIB NUSANTARA
VI. Evaluation And Report a. This report will contains results from due diligence / property assessment of
Field work of PT. XXXconclusion and recommendation for futher activity b. All activities result and recommendation will reported in 1 exclusive report both
soft and hardcopy Final Property Assessment
Samples of Location Observation and Geological Map at Muntok Area, West Bangka
Location Observation Taking Sample Sample Picture Field Observation
DRILLING CONTRACTOR AND GEOLOGY CONSULTANT
PT. MATARAM INTI BUMI NUSANTARA
PT. MATARAM INTI BUMI NUSANTARA
DRILLING CONTRACTOR AND GEOLOGY CONSULTANT
MIB NUSANTARA
SUBJECT : Drilling Exploration Services for Tin, 100Ha, Horizontal, Manggar, East Belitung
AUTHORIZED BY : PT. Tambora Mandiri
I. Drilling Specification : a. Full Coring, NQ size series for normal rock b. Minimum contract should be : 1000 meters c. Distance between drill holes 0-250 meters d. Maximum hole depth 120 meters NQ size (vertical) e. Minimum hole depth 80 meters NQ size (vertical) f. Core recovery minimum 90% for all lithology, CR <90% paid by open hole
(normal conditions) g. Quantity Rig Portable 1 unit type Jacrow 200+ h. Preparing unit 2-3 weeks i. Moving between holes by Client with bulldozer if possible & moving manual
by contractor, more than 100m will be charge IDR. 10,000.00/meters. j. Work day available for 1 shifts (Max 10 Hours/Shift) k. Contractor arranges for Supervisor/Foreman, Driller, Assistant Driller,
Mechanic, Local Labour l. Accommodations (hostel expense and food) by Contractor m. Camp prepared by Contractor n. Transportation 4 WD prepared by Contractor o. Mob & Demo for Unit Rig will be charge to client IDR 20,000,000/Rig p. Hydraulic Oil, Engine Oil, Grace Pipe, Gear Grace responsible by Contractor. q. Fuel responsible by Contractor r. Rod stuck because of Lithology (Rocks Formation), the drill rods will be
charged back to Client with discount 50% of new price (based on approval from client)
s. All goods & Manpower under insurance protect t. Chemical (Polymer, Bentonite) & Casing PVC charge back to Client by daily
drilling report (DDR). u. Core Box(Galvanis) charged back to Client IDR 200,000.00/box(by request) v. Distance between holes to water ≤ 500 meters is free charge, if >500 meters :
IDR 2,500.00/meter (Water Tankwill be provided by Client if needed)
II. Price/Meter : a. Open Hole NQ size (0–120) : IDR 550,000.00/ meter b. Full Coring NQ size (0–120) : IDR 650,000.00/ meter
DRILLING CONTRACTOR AND GEOLOGY CONSULTANT
PT. MATARAM INTI BUMI NUSANTARA
PT. MATARAM INTI BUMI NUSANTARA
DRILLING CONTRACTOR AND GEOLOGY CONSULTANT
MIB NUSANTARA
III. Geological Service Specification: a. Welsite Geologist for every drill rig by request : IDR 500,000 / day b. Senior Geologist for 1 (one) site coordinator : IDR 650,000 / day c. Complete Geological Reporting including : IDR 35,000,000
Resource Calculating by existing data (measure, indicated, inferred)
Tine Ore Prospected
Detail descriptions for all hole
Resource and Ore Modeling Map d. Mobilization, Accommodations and Meat : IDR 20.000.000/project e. Geological Service team will be full responsible about collecting and
recording geological data progress at field a. All goods & Manpower under insurance protect by contractor d. Camp prepared by Contractor if drilling work was going b. Transportation 4 WD prepared by Contractor
IV. Standby Active:IDR 200,000.00/hour(Max 10 hours/Shift)
Folded by : a. Hole Condition (Water loss, Caving, Collapse, etc) b. Reaming c. Casing Installation
V. Standby Passive: IDR 175,000.00/Hour(Max 10 Hours/Shift)
Folded by : a. Prepare Drill pad b. Process Logging (after 2 hour) c. Standby for Logging (after 2 hour) d. Geotechnical measurement if needed e. Waiting access and Land problem. f. Society Problem. g. Etc. caused by Client can be discus latter.
VI. Long Term Standby: IDR 2,000,000.00,-/Day/Rig(started on 2nd day)
VII. Payment Terms
a. All activity of Drilling Exploration Services will be start after:
Down payment, 50% from all transaction was paid
Progress payment, 35% after drilling progress 500m
Progress payment, 15% after drilling progress 750m b. All transaction exclude of PPN, include PPh 23 Bank Account c. Detail Bank Account :
BANK : MANDIRI Acc Name : PT. Mataram Inti Bumi Nusantara Account Number : 137-00-1120941-4 To reduce tax, payment can be discuss latter (with permition both side)
DRILLING CONTRACTOR AND GEOLOGY CONSULTANT
PT. MATARAM INTI BUMI NUSANTARA
PT. MATARAM INTI BUMI NUSANTARA
DRILLING CONTRACTOR AND GEOLOGY CONSULTANT
MIB NUSANTARA
Subsurfece modeling by geological team base on drillingdata, from this data we can get the resource
Drilling Exploration work Coring for valuable data for lab test
Core Bit Inner Cupe Barel PCD bit Core bit
DRILLING CONTRACTOR AND GEOLOGY CONSULTANT
PT. MATARAM INTI BUMI NUSANTARA
PT. MATARAM INTI BUMI NUSANTARA
DRILLING CONTRACTOR AND GEOLOGY CONSULTANT
MIB NUSANTARA