31/07/14

Sample Environment Programme

for the ISIS Neutron Facility

Sample Environment Programme

George Carins, Maarten Verbraeken, Martin Jones, John Irvine

Page 2: Sample Environment Programme for the ISIS Neutron Facility · 2015. 9. 21. · 31/07/14 Sample Environment Programme • Parts procured and manufactured for 2 off assemblies • Trial

Overview

• Sample Environment Development Process

• Example Environment – In Situ Conductivity

• Example Experiment – Alkaline Earth

Hydrides

• Conclusions

31/07/14 Sample Environment Programme

Page 3: Sample Environment Programme for the ISIS Neutron Facility · 2015. 9. 21. · 31/07/14 Sample Environment Programme • Parts procured and manufactured for 2 off assemblies • Trial

Sample Environment Development Process

31/07/14 Sample Environment Programme

1) Beam timeproposal –

viabilitydiscussions and

submission

2) Designconcepts – User

driven

Page 4: Sample Environment Programme for the ISIS Neutron Facility · 2015. 9. 21. · 31/07/14 Sample Environment Programme • Parts procured and manufactured for 2 off assemblies • Trial

31/07/14 Sample Environment Programme

5) Final DesignFreeze –

Engineeringdrawings – ISIS

design team

4) Design review –User, ISIS design,

pressure, electrical,instrument teams

3) Draft Design– ISIS design

team

6) Procurementand

manufacture –ISIS designteam, User

Page 5: Sample Environment Programme for the ISIS Neutron Facility · 2015. 9. 21. · 31/07/14 Sample Environment Programme • Parts procured and manufactured for 2 off assemblies • Trial

31/07/14 Sample Environment Programme

7) Trial Build –Correctivechanges ifrequired

8) Offline Tests– Leak check,

sensors,interfaces, etc.

9) Safety ProofTests –

Pressure,Electrical

10) Commissioning– Temperature,

gases, Backgroundscan IN BEAM.

Corrective changesif required.

Page 6: Sample Environment Programme for the ISIS Neutron Facility · 2015. 9. 21. · 31/07/14 Sample Environment Programme • Parts procured and manufactured for 2 off assemblies • Trial

31/07/14 Sample Environment Programme

11) Experiment

Page 7: Sample Environment Programme for the ISIS Neutron Facility · 2015. 9. 21. · 31/07/14 Sample Environment Programme • Parts procured and manufactured for 2 off assemblies • Trial

Example Environment – In Situ Conductivity

31/07/14 Sample Environment Programme

• A proposal ‘In situ studies of conduction mechanisms and nitrogen

incorporation in alkaline earth deuterides’ awarded beam time

• Required an in situ conductivity environment

• Conceptual designs generated and iterated

Page 8: Sample Environment Programme for the ISIS Neutron Facility · 2015. 9. 21. · 31/07/14 Sample Environment Programme • Parts procured and manufactured for 2 off assemblies • Trial

31/07/14 Sample Environment Programme

• Design review held with input from pressure, electrical and design

teams from ISIS

• Specific consideration given to required standards and interfaces

pO2 sensor

Conductivity contacts

Macor sample holder

Bolt-together assembly

Page 9: Sample Environment Programme for the ISIS Neutron Facility · 2015. 9. 21. · 31/07/14 Sample Environment Programme • Parts procured and manufactured for 2 off assemblies • Trial

31/07/14 Sample Environment Programme

• Detailed design generated by ISIS design team and design frozen

• Engineering drawings generated

Page 10: Sample Environment Programme for the ISIS Neutron Facility · 2015. 9. 21. · 31/07/14 Sample Environment Programme • Parts procured and manufactured for 2 off assemblies • Trial

31/07/14 Sample Environment Programme

• Parts procured and manufactured for 2 off assemblies

• Trial build plus leak test, sensor and interface check carried out

• He mass spec leak check: 2.0x10-9 mbar·l/s

• Pressure proof test of each assembly at 2.5 bara for 30 mins

Page 11: Sample Environment Programme for the ISIS Neutron Facility · 2015. 9. 21. · 31/07/14 Sample Environment Programme • Parts procured and manufactured for 2 off assemblies • Trial

31/07/14 Sample Environment Programme

• Commissioning in POLARIS diffractometer

Stainless steel peaks

Page 12: Sample Environment Programme for the ISIS Neutron Facility · 2015. 9. 21. · 31/07/14 Sample Environment Programme • Parts procured and manufactured for 2 off assemblies • Trial

31/07/14 Sample Environment Programme

With macor holder & screwsHolder removed

Page 13: Sample Environment Programme for the ISIS Neutron Facility · 2015. 9. 21. · 31/07/14 Sample Environment Programme • Parts procured and manufactured for 2 off assemblies • Trial

31/07/14 Sample Environment Programme

With macor holder & screwsModified holder (no screws)

Page 14: Sample Environment Programme for the ISIS Neutron Facility · 2015. 9. 21. · 31/07/14 Sample Environment Programme • Parts procured and manufactured for 2 off assemblies • Trial

Example Experiment

- Alkaline Earth Hydrides

Experimental Aims:

• Synthesise BaD2 and CaD2 dense pellets

• Perform in situ H2/D2 exchange with neutron

diffraction with simultaneous conductivity measurement

– in POLARIS neutron diffractometer

02/06/14 Alkali Earth Metal Hydrides

Page 15: Sample Environment Programme for the ISIS Neutron Facility · 2015. 9. 21. · 31/07/14 Sample Environment Programme • Parts procured and manufactured for 2 off assemblies • Trial

Alkaline Earth Hydride Structures

• BaH2, SrH2 and CaH2 – same orthorhombic structure at RT

• Orthorhombic PbCl2 structure – Pnma space group

• All deuteride analogues – same structure

31/07/14 Sample Environment Programme

• Ionic crystals

• Intrinsic H vacancies• 2.5% - 8%

• Suggests electronic defects

Page 16: Sample Environment Programme for the ISIS Neutron Facility · 2015. 9. 21. · 31/07/14 Sample Environment Programme • Parts procured and manufactured for 2 off assemblies • Trial

Experimental Set Up

• Dense pellets painted with Pd electrodes

• Pellets held in closed end quartz tube

• Au contacts clamped to pellets

• Vials suspended in vacuum furnace

• Furnace mounted in POLARIS diffractometer

02/06/14 Alkali Earth Metal Hydrides

Page 17: Sample Environment Programme for the ISIS Neutron Facility · 2015. 9. 21. · 31/07/14 Sample Environment Programme • Parts procured and manufactured for 2 off assemblies • Trial

• POLARIS - 6 detector banks –

differing resolutions and length scales

• Problems with hydrogen nuclei -

incoherent scattering

BaD2 to BaH2

31/07/14 Sample Environment Programme

Page 18: Sample Environment Programme for the ISIS Neutron Facility · 2015. 9. 21. · 31/07/14 Sample Environment Programme • Parts procured and manufactured for 2 off assemblies • Trial

31/07/14 Sample Environment Programme

Conclusions

• Simple development path for new sample environments

– Very supportive ISIS engineering team

• ISIS/St Andrews collaborated to develop an effective in situ

conductivity/temperature/atmosphere environment

• Money is available for new sample environments

– Contact Martin Jones ([email protected])

Page 19: Sample Environment Programme for the ISIS Neutron Facility · 2015. 9. 21. · 31/07/14 Sample Environment Programme • Parts procured and manufactured for 2 off assemblies • Trial

Any Questions?

Acknowledgements

Ron Smith, Colin Offer, Richard Haynes, Chris Goodway - ISIS

Lewis Downie, Zac Dehaney-Steven, Berceste Beyribey

EPSRC