Salient issues related to the first planning exercise and the production of the draft plan

Embed Size (px)

DESCRIPTION

Regional Information Meeting and Workshop related to the RRC-06 for the administrations of the African countries Dakar, Senegal, 25-29 April 2005. Salient issues related to the first planning exercise and the production of the draft plan. Pham Nhu Hai Radiocommunication Bureau. Outline. - PowerPoint PPT Presentation

Citation preview

  • Regional Information Meeting and Workshop relatedto the RRC-06 for the administrations of the African countriesDakar, Senegal, 25-29 April 2005Salient issues related to the first planning exercise and the production of the draft plan Pham Nhu HaiRadiocommunication Bureau

  • OutlineInput requirementsReference situationPublication of input dataPublication of results of planning exerciseAdministrative declarationsRegulatory issues

  • Input requirements First PXDeadline - 28 February 200584 administrations submitted digital requirements36 administrations did not submit32 in Africa2 in Europe2 in RCC

  • Some statistics (in progress)1212 files63213 notices2842 DS11735 DS220102 DT132612 DT25922 DA1

  • Validation and correctionStill in progressApproximately 30% of the notices require correction

  • Common errorsOrigin of analogue of assignment wrongly referenced or not exists!Geographical coordinatesDuplicate identifiersIncoherent SFN ID

  • Common errors..Non-matching maximum effective heightRadiation pattern not normalisedAllotments notified without allotment areasNo value for frequency block or acceptable channel

  • Common errors..Crossing segments in the definition of sub allotment areasWrong file format!

  • Validation of input requirementsIn progressBR to write to administrations in required30 May 2005 at the latest, requirements validated and correctedPXT to carry out the first planning exercise

  • Reference situationCR/230 of 17 December 2005Broadcasting assignmentsST61 and GE89 assignments unless indicated NOT to be taken into accountRCC listsMIFR by 31 Dec 1989Non- duplicatesindicated NOT to be taken into account

  • Broadcasting reference data120 administrations concernedAll BT excluded : AUT, BEL, D, DNK, EST, F, FIN, G, HNG, HOL, I, LIE, LTU, LVA, NOR, POR, S, SUI HRV (1154 out of 1272)IRL (all UHF and < 100 kW in VHFKEN (BT above 62, 155 out of 417)

  • Other services40 administrations concernedNumber of assignments of Categories I and II: ~8996.Number of assignments of Category III: ~3170.

  • Other services reference data7 administrations excluded their assignments: TUR, POL, DNK, E, MDA, NOR, D.8 administrations submitted R06 notice: BEL, BLR, F, G, RUS, UAE, UKR, UZB.UAE and UZB didnt submit Service type code.

  • Other servicesISR requested the inclusion of their assignments, but not provided R06 notices.KEN (no existing assignments), CME (R06 data for assignments outside the frequency bands).

  • Other services6 administrations having AR 11 notices not yet published in part 2 or 3 of the BR IFIC: BLR (13), F (4), JOR (541), RUS (336), UKR (333), UZB (28). 8 administrations having assignments of category III: ARM (3), BLR (129), IRN (28), ISR (777), JOR (1168), KGZ (13), RUS (1021), UZB (28).

  • Other servicesNo information concerning the Service Type Code in response to BR circular and individual letters was received so far from: 23 administrations (ARM, ARS, BHR, COD, CYP, EGY, ETH, GRC, I, IRN, ISL, JOR, KGZ, KWT, LBY, MOZ, MRC, OMA, POR, QAT, TJK, TZA, USA).

  • Publication of input data - first PX31 May 2005CD-ROM + software to be sent to all administrationsInput data available on ITU website Download softwareView if internet connection available

  • The first planning exercisePXT to carry out planning exercise and other studiesCompatibility analysisSynthesisPreliminary results Submitted to IPG (4-8 July 2005)Published on CD-ROM and ITU website

  • Publication of results first PX15 July 2005CD-ROM + software to be sent to all administrationsInput data available on ITU website Download softwareView if internet connection available

  • Digital requirements coverage!!

  • For one channel!

  • Analogue BC coverage

  • Digital requirements

  • Analysis results

  • Interference analysis

  • Interference from analogue BC

  • Synthesis resultsSearch for requirements that got a channel by specifying selection criteria Identify a requirement that did not get a channel and display surrounding requirements that did get a channel

  • Synthesis resultsIdentify a geographic area or a set of geographic areas and display all requirements that got a channel

  • More featuresLink input and output softwareCompatibility calculations on the run!Display pre-coordination data and administrative declarationsOn-lineExport data to other formats

  • Analysis of results first PXAdministrations have 3.5 months toAnalyse resultsCoordinate with neighbouring administrationsPrepare input requirements for production of the draft plan.Submit administrative declarations

  • Production of the draft Plan31 Oct 05 reference situation date and deadline for submission of input requirements.31 Jan 06 publication of input data13-17 Feb 06 IPG second meeting28 Feb 06 publication of the draft plan2 months administrations to analyse

  • The second session15 May 16 June 2006

    The NEW agreement!!!

  • CoordinationPre-coordination submitted with requirementsAdministrative declarationsTwo requirements from one or two administrations to be compatibleTwo requirements from one or two administrations to be incompatible

  • Admin declarationsAdministrative declarationsA requirement may use a particular channel.A requirement may NOT use a particular channelThe mechanisms should be preferablySimplepracticable

  • Regulatory issuesIssuesTransition periodModification procedureFlexibility to accommodate new technologyForumsRegional groupsSWG1 New AgreementRevise ST61 and GE89RPG December 2005

  • Dont forget regulatory issuesMust participateMust follow the issuesDont wait till second session

  • Conclusions31 October 2005Work with your neighboursVisit www.itu.int regularlyUpdated softwareNews flashesPresentations from previous workshopsFAQContact us if you have any questions!!

  • Thank you for your attention!