SAIMM
Realising the Productivity Potential of Joy Continuous Miners in Underground South African Coal Mines
May 19th 2016
Dean Hoare
Mining Productivity Consultant.
19 May 2016 SAIMM - JoySmart Solutions All information presented is Confidential2
© 2015 Joy Global Inc. All rights reserved
Joy Global: Who We Are
19 May 2016 SAIMM - JoySmart Solutions All information presented is Confidential3
© 2015 Joy Global Inc. All rights reserved
Strategies: Creating Competitive Advantage
Consistent global world-class components, processes, methods,
and metrics throughout the global network with the ability to
rapidly customize locally
Safety ▪ Time ▪ Cost ▪ Quality ▪ Customer Satisfaction
World-Class COE’s
JBS Operational Excellence SMDirect Service
Innovations Creating Growth China and High Growth Markets
LCM ▪ Consumables ▪ JoySmartSM Services Zero Harm ▪ Velocity ▪ Productivity ▪ Quality ▪ References
Lead with Service
$8B Market$2B Market
Hard Rock Mining Systems
19 May 2016 SAIMM - JoySmart Solutions All information presented is Confidential4
© 2015 Joy Global Inc. All rights reserved
Continuous Miner Cutting Cycle Simulations
(In development)
Room and Pillar Development
Continuous Miner Cutting
19 May 2016 SAIMM - JoySmart Solutions All information presented is Confidential6
© 2015 Joy Global Inc. All rights reserved
Continuous Miner Benchmarking performance South Africa
All Joy Continuous Miners are created equal – Yet many CMs under
perform against their design potential (why such variability)?
Joy Smart Solutions enables us to unlock the potential
19 May 2016 SAIMM - JoySmart Solutions All information presented is Confidential7
© 2015 Joy Global Inc. All rights reserved
The Magic Formula
19 May 2016 SAIMM - JoySmart Solutions All information presented is Confidential8
© 2015 Joy Global Inc. All rights reserved
Highest Production
Benchmarking Equipment and Operator
Performance and ‘closing the gaps’
Improving Time Management and Operating
Discipline
Reducing Downtime and Waste – Early Detection
and Improving Operating and Maintenance
Practices
Lowest Operating Costs
Increased Efficiency and LCM
Improving Safety
Key Deliverables from JoySmart Solutions
‘Making each Section Our Reference’
19 May 2016 SAIMM - JoySmart Solutions All information presented is Confidential9
© 2015 Joy Global Inc. All rights reserved
Continuous Miner – ‘Prime Mover and Bottleneck’
Continuous Miner Cutting Cycle – Tune-Up Optimisation
Cutter Amp Feedback Settings Control Sump Speed
Control Shear down rate
Conveyor Amp Feedback Settings Control Shear Down Rate
Variable Frequency Drive
Traction
19 May 2016 SAIMM - JoySmart Solutions All information presented is Confidential11
© 2015 Joy Global Inc. All rights reserved
Continuous Miner Cutting Cycle Profiles – Real Time Simulation Analysis
19 May 2016 SAIMM - JoySmart Solutions All information presented is Confidential12
© 2015 Joy Global Inc. All rights reserved
Example - Section Productivity - Key Performance Indicators
KPI Tracking of Core Mining Processes
-
50
100
150
200
250
-
50
100
150
200
250
300
350
400
450
500
Bas
e L
ine
Mo
nth
1
Mo
nth
2
Mo
nth
3
Mo
nth
4
Mo
nth
5
Mo
nth
6
Mo
nth
7
Mo
nth
8
Mo
nth
9
Mo
nth
10
Mo
nth
11
Mo
nth
12
Pro
du
ctio
n R
ate
To
nn
es/
Ho
ur
Pro
du
ctio
n T
ime
Min
ute
s
Production Time & Production Rate
Production Rate Production Time
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
Ton
ne
s /M
inu
te
Continuous Miner Cutting Rate
Cutting Rate
50
60
70
80
90
100
110
120
Seco
nd
s
Load and Away Time
Load Time Away Time
60%
65%
70%
75%
80%
85%
90%
Fill
Fact
or
%Shuttlecar Fill Factor
Fill Factor
-
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
Do
wn
tim
e H
ou
rs
CM Downtime
Down Time Hours
-
10
20
30
40
50
60
70
Min
ute
s
CM Relocation Time
Per Relocation Time mins
19 May 2016 SAIMM - JoySmart Solutions All information presented is Confidential13
© 2015 Joy Global Inc. All rights reserved
Example – CM Load Time Comparison:
Week 10
Week 31
As visible in the Boxplot comparison it is clear to see the focus with the Operator coaching’s from Mining
Specialist the improvement for all three shift Operators.
• A – Shift sustained the load quantity within 1% with an average load time of 70 seconds
• B – Shift decreased the load quantity by 25 % whilst decreasing load time from 75 to 64 seconds
• C – Shift increased the load quantity with 23% and decreased his average load time from 83 to 69 seconds
19 May 2016 SAIMM - JoySmart Solutions All information presented is Confidential14
© 2015 Joy Global Inc. All rights reserved
So What is in the JoySmart Solutions Tool Box
Visual Aide to repeating ‘Perfect Cutting Cycle’
A Production Timing Indication Light (PTIL) is a system for
continuous miners that will interact, through visual feedback, with
the shuttle car and CM operators.
It gives indications to the operators by using different signs:
When correct sump depth has been reached
When shuttle car should be full
When the next shuttle car should be behind the
miner
Thus creating cutting rhythm and consistent cycle tempo
19 May 2016 SAIMM - JoySmart Solutions All information presented is Confidential16
© 2015 Joy Global Inc. All rights reserved
Production Timing Indication Light (PTIL)
The production timing indication light (PTIL) provides a visual indication to the
operator, with regards to the time it takes to sump and load a shuttle car as well as
the shuttle car away time.
The PTIL will be set according to cutting conditions per section, thus settings will
differ from section to section.
The Production Timing Indication Light indicators are shown as Continuous Miners
and Shuttle Cars.
Smart Mining
On Board Display, improves
cutting cycle accuracy and
process tempo.
19 May 2016 SAIMM - JoySmart Solutions All information presented is Confidential17
© 2015 Joy Global Inc. All rights reserved
In-Section Audits; Productivity Analysis and Coaching
Section Layout and Set-Up
Section Layout/set-up Shuttle Cars Used Anchor Points Changeout Points Distance to Tip
Cable Lengths and
Management
3 In Order In orderLTR 2 Splits in front of
tip, 75m
CM cable not suspended in
LTR from R1 to L2
Cutting Sequence For 8 Road Section Splitting In R2
L4 L3 L2 L1 BR R 1 R 2 R 324 23 21 18 13 12 7 5
9 9
25 20 17 15 11 8 2 3
19 16 14 10 6 4 1
L4 L3 L2 L1 BR R1 R2 R3
F E D C
G A
B
SC 1229
SC1221 SC1222
Long Pillar
Belt
CM Cable SC/BH tram ruote Vent. IN Vent Out Scoop Brattice
Change out point Brattice CM cutting direction Anchor Points
Swit
ge
ѱ
ѱ
ѱ
ѱ
Embedded Mining Experts – Coaching and Best Practice Knowledge Transfer
An extract the
detailed section
evaluation report
Relentless
pursuit of the
BASICS
19 May 2016 SAIMM - JoySmart Solutions All information presented is Confidential18
© 2015 Joy Global Inc. All rights reserved
Joy Connect
All information and data contained on this document is the property of Joy Global and subject to the non disclosure agreements between Sasol Mining and Joy Global and may not be copied , distributed nor shown to any other party in any way, except with the prior written permission of Joy Global
Optimise Complete Value Stream
• Monitor the operating environment
• Additional sensors
• System Modelling and
Simulation
• Monitor operator effectiveness
• Mining sequence and routes
• Future section mapping (Wi-Fi)
• Manage out bye factors
• Bolting constraints
Live Operator
Display
Shuttle Car Load
Count – In field
Trials
Monitoring the full value stream - an integrated approach
19 May 2016 SAIMM - JoySmart Solutions All information presented is Confidential19
© 2015 Joy Global Inc. All rights reserved
Joy Connect : KPIs & Time Management JoySmart Solutions
19 May 2016 SAIMM - JoySmart Solutions All information presented is Confidential20
© 2015 Joy Global Inc. All rights reserved
Real Time Shift Report ‘Smartly Connected’
Real Time Visual Data – Empowering Short Term Decision Makers
..\Documents\Data\JoySmart Solutions\ShiftProgression.ppsx
19 May 2016 SAIMM - JoySmart Solutions All information presented is Confidential21
© 2015 Joy Global Inc. All rights reserved
Cutting Cycle Analysis – Operator Interventions
Mining experts examined cutting cycle and developed method to
break up cutting cycle in order to compare operators/shifts
JoySmart
Re-playing CM Operator Practices – Coaching Tools to Best Practice
Example of a Miner Operator Cutting Profile
19 May 2016 SAIMM - JoySmart Solutions All information presented is Confidential22
© 2015 Joy Global Inc. All rights reserved
Cutting Cycle Analysis
MOVE SUMP SHEAR C/UP
22.25 s 20.12 s 28.18 s 4.55 s
TOTAL SHIFT CUTTING CYCLES:
AVERAGE CUTTING CYCLE TIME:PLUS EXTRA CLEAN UP TIME:
8338INCOMPLETE / NON CUTTING CYCLES:
70.55 s75.10 s
Fair Correlation to Consistent cutting cycle.
Dropping Head to
3.5m Alternate cutting
cycles, sump
19 May 2016 SAIMM - JoySmart Solutions All information presented is Confidential23
© 2015 Joy Global Inc. All rights reserved
AMC - Productivity Improvement Potential
Cutting Height
Cutting Amps
Conveyor Amps
Traction Amps
Cycle Time
Sump Time
Shear Time
Load Time
Trim Time
Cut Tons
Fill Factor
Cutting Rate
84
21
30
48
6
9
75%
6.4 t/min
78
25
30
42
6
10.8
90%
8 .3t/min
Base case Manual Operator Auto Cycle Profile
The Move to Zero Defects
Manual - Auto
Remote Operations – Systems Automation
A perfect cutting cycle; Replicated on command.
19 May 2016 SAIMM - JoySmart Solutions All information presented is Confidential24
© 2015 Joy Global Inc. All rights reserved
In Summary
Current Coal Mining Business Environment -
The Thermal Coal Export Market Commodity Price Cycle
External Cost Pressures, e.g. Power and Labour
Lack of Investment and Capital Constraints
The Productivity
Improvement
lever is potentially
fully within our
internal control.
When pulled it
can help position
us on the right
place on the cost
curve.
Example of Coal Cost Curve
19 May 2016 SAIMM - JoySmart Solutions All information presented is Confidential25
© 2015 Joy Global Inc. All rights reserved
In Summary
19 May 2016 SAIMM - JoySmart Solutions All information presented is Confidential26
© 2015 Joy Global Inc. All rights reserved
Any Questions?