    SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

    Laboratory Testing Inspection SAIC-A-1009 30-Apr-13 CIVIL-PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

    EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

    LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

    SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIMESAUDI ARAMCO USE ONLY

    SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

    SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

    ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE

    A1

    A2

    A3

    A4

    A5

    REFERENCE DOCUMENTS:1- SAES-A-113 -- Geotechnical Engineering Requirements, 11 May 2009

    Contractor / Third-Party Saudi Aramco

    Name, Initials and Date:Work is Complete and Ready for Inspection:

    Name, Initials and Date:T&I Witnessed QC Record Reviewed Work Verified

    QC Inspector PID Representative

    Name, Initials and Date:Performed Inspection Work / Rework May Proceed

    Name, Initials and Date:T&I Witnessed QC Record Reviewed Work Verified

    QC Supervisor Proponent and Others

    Name, Sign and Date: Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified

    ITEM No.

    The Geotechnical Contractor shall utilize Inspection Department's list of Saudi Aramco approved Third Party laboratories with specific approval in geotechnical category, for Laboratory testing.

    SAES-A-113Sec. 5.2.1.2

    Classification testing shall be in accordance with ASTM D2487. Other soil properties shall be determined in accordance with ASTM D1557, D1883, D2166, D2435, D2850, D4253, D4254, and D4318

    SAES-A-113Sec. 6.5.1/6.5.2

    Laboratory CBR tests should use the "three-point" method along with soil density results to estimate the in-situ CBR and the CBR at recommended compaction density

    SAES-A-113Sec. 6.5.2

    Representative chemical analyses of soil and groundwater samples shall be performed in accrdance with SAES-Q-009, AASHTO T290 and T291. Water Soluble and chloride Tests are required where concrete will be in contact with soil.

    SAES-A-113Sec. 6.5.3

    All soil and rock samples shall be retained for a minimum of two months after completion of the geotechnical investigation. Samples must be kept according to ASTM D4220 and D5079.

    SAES-A-113Sec. 5.5

    REMARKS:

    Construction Representative* PMT Representative

    Name, Organization,Initials and Date:

  • Page 2 of 2

    *Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED