    Carry out a safe inspection in accordance with the inspection item. Enter the ,,NA to the column of evaluation. When there is one place also in unmatching, enter the .

    Classify Items Items to inspect Evaluate Comments

    Safety belt use by all persons at high, around opening

    Proper fixing facility such as safety rope, stressing

    Proper strength to use of safety beltInstall the brace & scaffold board to all the frame.Otherwise reinforce the

    frame with the G.I pipes

    Install stair with display

    Notice of usage regulations(responsible person etc.)

    Staircase/Ladder, handrail, skirting, working floor

    Provision of wheel brake

    Prohibition to move it with workers

    Prohibition of stepladder higher than 2m

    Prohibit to use the stepladder that there is no equipment that prevents it

    opens

    Use the safet belt at the work on the most u er ste

    Prohibit the work on the ladder principle

    Provide the stairs to height, depth 1.5 more

    Opening not in use

    Use the material of cover strong enough against the anticipated load.

    Display the opening attention to the coverFixed the cover to the opening

    firml

    Opening in use

    Provided the firm handrail as GI pipe etc.

    Display the opening attention on the cover

    Provided the falling prevention net as occasion demands.Install the horizontal net appropriately without opening or gap promptly .

    (After the steel frame installation )

    Use the sufficient strong net

    Inspection prior to operation, Monthly inspection

    Operation by qualified person

    Preventive measure of hitting, fall-down(Keep off, guide)

    Prevention measure of run away(Key take off, wheel stop)

    Inspection prior to operation,

    Identification of operator, qualification check

    Appointment of signal giving person, arrangement of material handling

    leader

    Invert prevention measure(steel plate laying, ground, outrigger)

    Inspection prior to operation of bundling tool

    Operator aptitude(qualification, education, knowledge)

    Ensurance and maintenance of passenger way

    Vehicle gate identification, inducement, safety facility

    Permission for a fire work such as welding work

    Confirmation of embers after the fire work by Shimizu staff

    Prohibite fire work near farmable material such as uretane form and

    foaming. Indication for no use of fire

    Providing fire extinguisher and control measure for smoking

    Safety Path/SiteKeeping good condition of access way and house keeping

    Bundling

    Protection for the

    3rd party

    Others

    Fire work

    Vehicle&MachineAccidentPr

    evention

    Vehicle type

    construction

    machine,

    Material

    handling,

    Transport

    machine

    Crane, movable

    crane, concrete

    pump truck

    Opening

    installation of

    the steel

    structure

    Rolling tower,

    stepladder

    Lift, movable

    ladderFallAccidentPrevention

    Usage of safety

    belt, Fixing

    facility of safety

    belt

    Scaffolding frame

    roject : Date Inspecter