19
Safer K.P.A. En E E E E Head Office ead Office ead Office ead Office: 601, Weste 601, Weste 601, Weste 601, Weste Road Road Road Road, , , , Adajan Adajan Adajan Adajan, Sur , Sur , Sur , Surat at at at-395 395 395 395 Tele Tele Tele Tele fax: fax: fax: fax: 0261 0261 0261 0261- 2783487 2783487 2783487 2783487 E-mail: mail: mail: mail: mail@kpaenggin mail@kpaenggin mail@kpaenggin mail@kpaenggin r Developments, Faster Projects. ngineering Pvt. L ENGINEERS & CONTRCTORS ENGINEERS & CONTRCTORS ENGINEERS & CONTRCTORS ENGINEERS & CONTRCTORS ern Corridor, Opp. Gujarat Gas Co., ern Corridor, Opp. Gujarat Gas Co., ern Corridor, Opp. Gujarat Gas Co., ern Corridor, Opp. Gujarat Gas Co., Adaj Adaj Adaj Adaj 5009, Gujarat 5009, Gujarat 5009, Gujarat 5009, Gujarat- India India India India. 7, Mob: 099989 62233. 7, Mob: 099989 62233. 7, Mob: 099989 62233. 7, Mob: 099989 62233. ndia.com ndia.com ndia.com ndia.com , , , , Website ebsite ebsite ebsite: www.kpaenggindia www.kpaenggindia www.kpaenggindia www.kpaenggindia Ltd. jan jan jan jan-Hazira Hazira Hazira Hazira a.com a.com a.com a.com

Safer Developments, Faster Projects. K.P.A. Engineering …kpaenggindia.com/wp-content/uploads/2014/03/e-Broch… ·  · 2014-05-0610 WELDING RECTIFIER AND TRANSFORMERS. 11

Embed Size (px)

Citation preview

Page 1: Safer Developments, Faster Projects. K.P.A. Engineering …kpaenggindia.com/wp-content/uploads/2014/03/e-Broch… ·  · 2014-05-0610 WELDING RECTIFIER AND TRANSFORMERS. 11

Safer Developments, Faster Projects.

K.P.A. Engineering Pvt.

ENGINEERS & CONTRCTORSENGINEERS & CONTRCTORSENGINEERS & CONTRCTORSENGINEERS & CONTRCTORS

HHHHead Officeead Officeead Officeead Office:::: 601, Western Corridor, Opp. Gujarat Gas Co., 601, Western Corridor, Opp. Gujarat Gas Co., 601, Western Corridor, Opp. Gujarat Gas Co., 601, Western Corridor, Opp. Gujarat Gas Co.,

RoadRoadRoadRoad, , , , AdajanAdajanAdajanAdajan, Sur, Sur, Sur, Suratatatat----395009, Gujarat395009, Gujarat395009, Gujarat395009, Gujarat

TeleTeleTeleTele fax:fax:fax:fax: 0261026102610261---- 2783487, Mob: 099989 62233.2783487, Mob: 099989 62233.2783487, Mob: 099989 62233.2783487, Mob: 099989 62233.

EEEE----mail:mail:mail:mail: [email protected]@[email protected]@kpaenggindia.com

Safer Developments, Faster Projects.

ngineering Pvt. Ltd.ENGINEERS & CONTRCTORSENGINEERS & CONTRCTORSENGINEERS & CONTRCTORSENGINEERS & CONTRCTORS

601, Western Corridor, Opp. Gujarat Gas Co., 601, Western Corridor, Opp. Gujarat Gas Co., 601, Western Corridor, Opp. Gujarat Gas Co., 601, Western Corridor, Opp. Gujarat Gas Co., AdajanAdajanAdajanAdajan

395009, Gujarat395009, Gujarat395009, Gujarat395009, Gujarat---- IndiaIndiaIndiaIndia....

2783487, Mob: 099989 62233.2783487, Mob: 099989 62233.2783487, Mob: 099989 62233.2783487, Mob: 099989 62233.

[email protected]@[email protected]@kpaenggindia.com , , , , WWWWebsiteebsiteebsiteebsite:::: www.kpaenggindia.comwww.kpaenggindia.comwww.kpaenggindia.comwww.kpaenggindia.com

Ltd.

AdajanAdajanAdajanAdajan----Hazira Hazira Hazira Hazira

www.kpaenggindia.comwww.kpaenggindia.comwww.kpaenggindia.comwww.kpaenggindia.com

Page 2: Safer Developments, Faster Projects. K.P.A. Engineering …kpaenggindia.com/wp-content/uploads/2014/03/e-Broch… ·  · 2014-05-0610 WELDING RECTIFIER AND TRANSFORMERS. 11

K.P.A. Engineering Pvt. Ltd.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

We introduce ourselves as

Engineering Construction

projects for various industries such as

Chemical, Cement, Contin

industry, Paper industry

We also undertake

equipments and piping for the above

K.P.A. Engineering Pvt.

required standards of Quality

K.P.A. Engineering

part of prominent industries in

technological changes in the fast developing scenario

helped us to strengthen our resources further and

support the quality & volume needs of our valuable clients.

In order to carry on relentlessly, with

patronage from our esteemed clients, we hereby introduce with pride

“K.P.A. Engineering Pvt.

fabrication, erection and commissioning

Apart from assuring you our indispensable high quality and reliable

services accompanied with our expertise, we, the

Ltd always look forward to further strengthen our capabilities beyond our

present horizon. This will enable us to serve you better.

We always assure our reliable

Sincerely,

Anil.K.Nair

Managing Director

K.P.A. Engineering Pvt. Ltd.

K.P.A. Engineering Pvt. Ltd.

ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

INTRODUCTION

We introduce ourselves as K.P.A. Engineering Pvt. Ltd.

onstruction Company based in Surat specialized in turnkey

projects for various industries such as Power plants, Petro

ontinuous Polymerization, POY/FDY, Nylon,

industry etc.

We also undertake fabrication, erection & commissioning of

equipments and piping for the above mentioned industries. Since

Pvt. Ltd is doing various projects. We adhere to the

uality & Safety and are always on schedule.

Engineering Pvt. Ltd. has acquired the reputation of being a

part of prominent industries in India and abroad. Adapting

technological changes in the fast developing scenario of recent years has

helped us to strengthen our resources further and has enable

support the quality & volume needs of our valuable clients.

In order to carry on relentlessly, with the best wishes and innocent

patronage from our esteemed clients, we hereby introduce with pride

Pvt. Ltd.” as a complete solution in the field of

fabrication, erection and commissioning including turnkey projects.

uring you our indispensable high quality and reliable

services accompanied with our expertise, we, the K.P.A. Engineering

always look forward to further strengthen our capabilities beyond our

present horizon. This will enable us to serve you better.

our reliable and quality services.

K.P.A. Engineering Pvt. Ltd.

K.P.A. Engineering Pvt. Ltd. an

specialized in turnkey

etro-chemical,

POY/FDY, Nylon, Sugar

fabrication, erection & commissioning of

industries. Since 1992

We adhere to the

and are always on schedule.

acquired the reputation of being a

to exciting

recent years has

enabled us to

the best wishes and innocent

patronage from our esteemed clients, we hereby introduce with pride

a complete solution in the field of

turnkey projects.

uring you our indispensable high quality and reliable

Engineering Pvt.

always look forward to further strengthen our capabilities beyond our

Page 3: Safer Developments, Faster Projects. K.P.A. Engineering …kpaenggindia.com/wp-content/uploads/2014/03/e-Broch… ·  · 2014-05-0610 WELDING RECTIFIER AND TRANSFORMERS. 11

K.P.A. Engineering Pvt. Ltd.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

OUR ACTIVITIES

ASSEMBLING, FABRICATION

01. FABRICATION & ERECTION OF HEAVY STRUCTURALS

02. FABRICATION, ERECTION AND TESTING OF

LINE.

03. FABRICATION & LAYING OF UNDER GROUND PIPING

04. FABRICATION & ERECTION OF

05. FABRICATION & ERECTION OF

06. FABRICATION & ERECTION OF

VESSELS, LIMPET COIL AND JACKETED.

07. ASSEMBLING, ERECTION & COMMISSIONING OF ELECTROST

POWER PLANTS AND CEMENT PLANTS

08. ERECTION & ALIGNMENT OF ROTATRY AND STATIC EQUIPMENTS, HEAT EXCHANG

09. ERECTION & ALIGNMENT OF HEAVY REACTORS LIKE FINISHER AND ESTERIFIERS, SSP

REACTORS, HTM HEATERS, ELECTRIC STEAM GENERATORS & FLASH TANKS

10. ASSEMBLING, ERECTION & COMMISIONING OF COAL HANDLING SYSTEM, ASH HANDLING

SYSTEM

11. ERECTION & COMMISSIONING OF WINDERS & TEXTURISING MACHINES

12. ERECTION & COMMISSIONING OF GAS TURBINES, STEAM TURBINES & WHR BOILERS

13. OIL FIRED BOILER INSTALLATION WITH PRE HEATER AND DUCTING.

K.P.A. Engineering Pvt. Ltd.

ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

OUR ACTIVITIES

FABRICATION, ERECTION AND COMMISSIONING FOR

VARIOUS CLIENTS

FABRICATION & ERECTION OF HEAVY STRUCTURALS (ROLLED AND BUILTUP SECTIONS

AND TESTING OF SS/MS/CS/AS PIPING INCLUDING CORE & JACKET

FABRICATION & LAYING OF UNDER GROUND PIPING

OF SS/MS/CS HEAVY STORAGE TANKS AND BLENDING SILOS.

FABRICATION & ERECTION OF SELF SUPPORTED CHIMNIES

FABRICATION & ERECTION OF REACTORS, COOLING VESSELS AND OTHER PRESSURE

AND JACKETED.

ASSEMBLING, ERECTION & COMMISSIONING OF ELECTROSTATIC PRECIPITORS

AND CEMENT PLANTS.

ERECTION & ALIGNMENT OF ROTATRY AND STATIC EQUIPMENTS, HEAT EXCHANG

ERECTION & ALIGNMENT OF HEAVY REACTORS LIKE FINISHER AND ESTERIFIERS, SSP

REACTORS, HTM HEATERS, ELECTRIC STEAM GENERATORS & FLASH TANKS

ASSEMBLING, ERECTION & COMMISIONING OF COAL HANDLING SYSTEM, ASH HANDLING

COMMISSIONING OF WINDERS & TEXTURISING MACHINES

ERECTION & COMMISSIONING OF GAS TURBINES, STEAM TURBINES & WHR BOILERS

OIL FIRED BOILER INSTALLATION WITH PRE HEATER AND DUCTING.

K.P.A. Engineering Pvt. Ltd.

, ERECTION AND COMMISSIONING FOR

ROLLED AND BUILTUP SECTIONS)

INCLUDING CORE & JACKET

SS/MS/CS HEAVY STORAGE TANKS AND BLENDING SILOS.

OTHER PRESSURE

IC PRECIPITORS (ESP) FOR

ERECTION & ALIGNMENT OF ROTATRY AND STATIC EQUIPMENTS, HEAT EXCHANGERS

ERECTION & ALIGNMENT OF HEAVY REACTORS LIKE FINISHER AND ESTERIFIERS, SSP

REACTORS, HTM HEATERS, ELECTRIC STEAM GENERATORS & FLASH TANKS

ASSEMBLING, ERECTION & COMMISIONING OF COAL HANDLING SYSTEM, ASH HANDLING

ERECTION & COMMISSIONING OF GAS TURBINES, STEAM TURBINES & WHR BOILERS

Page 4: Safer Developments, Faster Projects. K.P.A. Engineering …kpaenggindia.com/wp-content/uploads/2014/03/e-Broch… ·  · 2014-05-0610 WELDING RECTIFIER AND TRANSFORMERS. 11

K.P.A. Engineering Pvt. Ltd.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

14. COMPLETE SPINNING, POY, PFY, FDY AND POLY CONDENSATION PLANTS.

15. COMPLETE NITROGEN PLANT.

16. INSTALLATION OF D.G. SETS &

17. CIVIL STRUCTURAL BUILDINGS

18. INSTALLATION OF COOLING TOWER AND OTHER UTILITY.

19.

ERECTION & ALIGNMENT OF PUMPS AND MOTORS.

20. FABRICATION & ERECTION OF

21. REWINDER AND SPINNING MACHINES.

22.

HOT & COLD INSULATION WORKS FOR HTM, IBR, CHILLED WATER LINES, FLUE GAS DUCTS,

REACTORS, VESSELS, COLUMNS ETC AT POWER PLANTS, CHEMICAL PLANTS &

PETROCHEMICAL PLANTS.

23. INDUSTRIAL PAINTING WORKS FOR STRUCTURALS, STORAGE TANKS,UTILITY PIPINGS,

CHIMNIES ETC.

24. INSTALLATION & COMMISSIONING OF

25. VESSEL CLEANING & CATALYST FILLING JOBS

26. ANNUAL MAINTENANCE JOBS

27. SHUTDOWN JOBS

K.P.A. Engineering Pvt. Ltd.

ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

COMPLETE SPINNING, POY, PFY, FDY AND POLY CONDENSATION PLANTS.

COMPLETE NITROGEN PLANT.

& CHILLER COMPRESSORS.

CIVIL STRUCTURAL BUILDINGS

COOLING TOWER AND OTHER UTILITY.

PUMPS AND MOTORS.

OF CONDENSERS & COAL BUNKER FOR HEATERS.

REWINDER AND SPINNING MACHINES.

HOT & COLD INSULATION WORKS FOR HTM, IBR, CHILLED WATER LINES, FLUE GAS DUCTS,

REACTORS, VESSELS, COLUMNS ETC AT POWER PLANTS, CHEMICAL PLANTS &

INDUSTRIAL PAINTING WORKS FOR STRUCTURALS, STORAGE TANKS,UTILITY PIPINGS,

INSTALLATION & COMMISSIONING OF R.O PLANT, WATER TREATMENT PLANT.

VESSEL CLEANING & CATALYST FILLING JOBS

ANNUAL MAINTENANCE JOBS

K.P.A. Engineering Pvt. Ltd.

COMPLETE SPINNING, POY, PFY, FDY AND POLY CONDENSATION PLANTS.

CONDENSERS & COAL BUNKER FOR HEATERS.

HOT & COLD INSULATION WORKS FOR HTM, IBR, CHILLED WATER LINES, FLUE GAS DUCTS,

REACTORS, VESSELS, COLUMNS ETC AT POWER PLANTS, CHEMICAL PLANTS &

INDUSTRIAL PAINTING WORKS FOR STRUCTURALS, STORAGE TANKS,UTILITY PIPINGS,

R.O PLANT, WATER TREATMENT PLANT.

Page 5: Safer Developments, Faster Projects. K.P.A. Engineering …kpaenggindia.com/wp-content/uploads/2014/03/e-Broch… ·  · 2014-05-0610 WELDING RECTIFIER AND TRANSFORMERS. 11

K.P.A. Engineering Pvt. Ltd.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

MANUFACTURING & FABRICATION

� CHIPS DRYING SYSTEM

� SS/ MS/ CS/AS STORAGE VESSELS

COAL BUNKERS

� STORAGE SILOS FOR

� NITROGEN, AIR RECEIVERS (PRESSURE VESSELS)

� SELF SUPPORTED

HTM AND POWER

� EQUIPMENTS FOR POY & POLY PLANT

� SPIN FINISH SYSTEM

� SPECIAL PURPOSE MACHINER

� FIXTURES FOR DIFFERENT PURPOSES

� BASKET FILTERS AND

� FABRICATION & ERECTION

� HIGH PRESSURE

INCLUDING POLYMER LINES

K.P.A. Engineering Pvt. Ltd.

ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

MANUFACTURING & FABRICATION

CHIPS DRYING SYSTEM

STORAGE VESSELS, PROCESS TANKS &

COAL BUNKERS

SILOS FOR CHIPS & PTA

NITROGEN, AIR RECEIVERS (PRESSURE VESSELS)

SELF SUPPORTED CHIMENIES & FLAIR STACKS

AND POWER PLANTS

EQUIPMENTS FOR POY & POLY PLANT

SPIN FINISH SYSTEM

SPECIAL PURPOSE MACHINERIES

FIXTURES FOR DIFFERENT PURPOSES

BASKET FILTERS AND OTHER TANKS

& ERECTION OF HEAVY STRUCTURALS.

HIGH PRESSURE PIPING (SS/AS/CS/IBR/NONIBR)

POLYMER LINES.

K.P.A. Engineering Pvt. Ltd.

TANKS &

NITROGEN, AIR RECEIVERS (PRESSURE VESSELS)

& FLAIR STACKS FOR

STRUCTURALS.

PIPING (SS/AS/CS/IBR/NONIBR)

Page 6: Safer Developments, Faster Projects. K.P.A. Engineering …kpaenggindia.com/wp-content/uploads/2014/03/e-Broch… ·  · 2014-05-0610 WELDING RECTIFIER AND TRANSFORMERS. 11

K.P.A. Engineering Pvt. Ltd.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

TOOLS AND TACKLES

SR.NO. DESCRIPTION

01. CRANE –16 TON CAP: HYDRAULIC

02. PLATE ROLLING M/C.

(12 THK: X 1850 SPAN, 25 THK: TO 3.0 SPAN)

03. DEISEL GENERATER 30 KVA

04. ELECTRICAL WINCH –5 TO 25TON

05. FORKLIFT 3 MT VOLTAS MAKE CONTAINER APPLICATION

06. E.H.WACHS CUTTING & BEVELLING MACHINE

RANGE 8 “ TO 14 “ UPTO ANY THICKNESS

07. 12 MT HYDRAULIC TANK JACK ALONG WITH ACCESSORIES

08. 10 HP POER PACK ALONG WITH ACCESSORIES

09. PLASMA CUTTING SET

10 WELDING RECTIFIER AND TRANSFORMERS.

11. ARGON SET (AIR/ WATER COOLED)

12. MANUAL WINCH

13. ALL TYPES OF GRINDERS (ANGLE/ FLEXIBLE/SHAFT AND GQ4)

14. DRILLING M/C. - VARIOUS SIZE, MAGNETIC, PORTABLE

15. PUG CUTTING M/C. / ESSAB

16. DERRICK –FOR VARIOUS LEVELS (SELF FABRICATED)

17. ROPE PULLY, ROPES, CHAIN PULLY BLOCK 1 TON TO 25 TON

18. WIRE ROPE SILINGS

19. HYDRAULIC PIPE BENDING M/C. UP TO 50 NB.

20. HYDRAULIC JACK (UP TO 50 TON CAP)

21. OTHER HAND TOOLS / MILL WRIGHT TOOLS

K.P.A. Engineering Pvt. Ltd.

ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

TOOLS AND TACKLES AVAILABILITY FOR MECHANICAL

TON CAP: HYDRAULIC

(12 THK: X 1850 SPAN, 25 THK: TO 3.0 SPAN)

DEISEL GENERATER 30 KVA

TO 25TON

FORKLIFT 3 MT VOLTAS MAKE CONTAINER APPLICATION

E.H.WACHS CUTTING & BEVELLING MACHINE

RANGE 8 “ TO 14 “ UPTO ANY THICKNESS

12 MT HYDRAULIC TANK JACK ALONG WITH ACCESSORIES

10 HP POER PACK ALONG WITH ACCESSORIES

WELDING RECTIFIER AND TRANSFORMERS.-400/600 AMP

ARGON SET (AIR/ WATER COOLED)

ALL TYPES OF GRINDERS (ANGLE/ FLEXIBLE/SHAFT AND GQ4)

SIZE, MAGNETIC, PORTABLE

FOR VARIOUS LEVELS (SELF FABRICATED)

ROPE PULLY, ROPES, CHAIN PULLY BLOCK 1 TON TO 25 TON

BENDING M/C. UP TO 50 NB.

HYDRAULIC JACK (UP TO 50 TON CAP)

OTHER HAND TOOLS / MILL WRIGHT TOOLS

K.P.A. Engineering Pvt. Ltd.

FOR MECHANICAL JOB

QUANTITY

(NOS)

04

06

04

06

02

02

24

2

10

120

SUFFICIENT

08

SUFFICIENT

SUFFICIENT

10

SUFFICIENT

SUFFICIENT

SUFFICIENT

08

SUFFICIENT

SUFFICIENT

Page 7: Safer Developments, Faster Projects. K.P.A. Engineering …kpaenggindia.com/wp-content/uploads/2014/03/e-Broch… ·  · 2014-05-0610 WELDING RECTIFIER AND TRANSFORMERS. 11

K.P.A. Engineering Pvt. Ltd.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

OUR PRESTIGIOUS CLIENTS

01. JBF RAK LLC RASALKHIMA (900 TPD CP PLANT & 600 TPD SSP PLANT)

02. RELIANCE INDUSTRIES LTD (SILVASSA INDUSTRIES PVT.LTD)

(UTILITY PIPING JOBS )

03.

LARSEN AND TOUBRO LTD ( FABRICATION WORK )

04. GARDEN SILK MILLS LTD (600 TPD CP PLANT & POY PLANT)

05.

HINDUSTAN CONSTRUCTION COMPANY LTD ( BRIDGE CONSRUCTION )

06.

VOLTAS LTD ( AC MFG. DIV )

07. WELSPUN SYNTEX LTD ( POY PLANT )

08. MODERN DENIM LTD ( JEANS CLOTH MFG. DIV)

09.

STERLITE INDUSTRIES INDIA LTD

10.

BENGAL SYNTHETIC FIBERS LTD, ( POY PLANT)

11.

VISEN INDUSTRIES LTD ( POLYMER EMULSION PLANT)

K.P.A. Engineering Pvt. Ltd.

ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

OUR PRESTIGIOUS CLIENTS

JBF RAK LLC RASALKHIMA (900 TPD CP PLANT & 600 TPD SSP PLANT) DUBAI

INDUSTRIES LTD (SILVASSA INDUSTRIES PVT.LTD) KHARAPADA

LARSEN AND TOUBRO LTD ( FABRICATION WORK ) POWAI

GARDEN SILK MILLS LTD (600 TPD CP PLANT & POY PLANT) KADODARA

COMPANY LTD ( BRIDGE CONSRUCTION )

BHIVANDI

MUMBAI

WELSPUN SYNTEX LTD ( POY PLANT ) RAKHOLI

MODERN DENIM LTD ( JEANS CLOTH MFG. DIV) MORAYA

E INDUSTRIES INDIA LTD -VEDANTA- (COPPER MFG. DIV.)

CHINCHPADA

SILVASSA

BENGAL SYNTHETIC FIBERS LTD, ( POY PLANT)

CHITTAGONG

BANGLADESH

VISEN INDUSTRIES LTD ( POLYMER EMULSION PLANT)

BEDI BHRAMANA

JAMMU

K.P.A. Engineering Pvt. Ltd.

DUBAI –UAE

KHARAPADA -SILVASSA

POWAI -MUMBAI

KADODARA-SURAT

BHIVANDI- THANE

MUMBAI

RAKHOLI - SILVASSA

MORAYA-AHEMADABAD

CHINCHPADA -

SILVASSA

CHITTAGONG-

BANGLADESH

BEDI BHRAMANA-

JAMMU

Page 8: Safer Developments, Faster Projects. K.P.A. Engineering …kpaenggindia.com/wp-content/uploads/2014/03/e-Broch… ·  · 2014-05-0610 WELDING RECTIFIER AND TRANSFORMERS. 11

K.P.A. Engineering Pvt. Ltd.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

12.

AGRAWAL POLYFIL PVT LTD (POLY PLANT)

13.

JBF INDUSTRIES LTD( POY & FDY ,SSP PLANT & 3 NOS BATCH POLY

PLANTS )

14.

JBF INDUSTRIES LTD ( 600 TPD CP PLANT )

15.

JINDAL POLYESTER LTD (FILM PLANT & 180 TPD CP PLANT )

16. SATHE SYNTHETICS ( DRYER MFG. DIV)

17.

RHYTHM CHEMICALS ( CHEMICAL PLANT)

18.

VEDIK COTTON ( COTTON DIV)

19.

RAJ RAYON LTD,( POY ,FDY PLANTS & 500 TPD CP PROJECT)

20.

SUMEET INDUSTRIES LTD (270 TPD CP PLANT,POY PLANTS & FDY

PLANTS)

21. SUBHALAKSHMI PETRO CHEMICAL (POY PLANT)

22. SUBHALAKSHMI POLYSTERS LTD (CP PLANT)

23. PARAS PETROFILS LTD, (POY PLANT )

24. PARASRAMPURAIA INDUSTRIES LTD (POY PLANT)

25. PAMIS TEX PVT LTD ( POY PLANT)

26. CENTRAL PULP & PAPER MILLS LTD ( PAPER MFG.DIV )

K.P.A. Engineering Pvt. Ltd.

ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

AGRAWAL POLYFIL PVT LTD (POLY PLANT)

BHILAD

JBF INDUSTRIES LTD( POY & FDY ,SSP PLANT & 3 NOS BATCH POLY

ATHOLA

JBF INDUSTRIES LTD ( 600 TPD CP PLANT )

SARIGAM

JINDAL POLYESTER LTD (FILM PLANT & 180 TPD CP PLANT )

NASIK

SATHE SYNTHETICS ( DRYER MFG. DIV) DELHI

RHYTHM CHEMICALS ( CHEMICAL PLANT)

GIDC

ATHOLA

RAJ RAYON LTD,( POY ,FDY PLANTS & 500 TPD CP PROJECT)

SURANGI

(270 TPD CP PLANT,POY PLANTS & FDY

KARANJ

SUBHALAKSHMI PETRO CHEMICAL (POY PLANT) SIILI

SUBHALAKSHMI POLYSTERS LTD (CP PLANT) DAHEJ

PARAS PETROFILS LTD, (POY PLANT ) PALSANA

INDUSTRIES LTD (POY PLANT) DADRA

PAMIS TEX PVT LTD ( POY PLANT) ATHAL

CENTRAL PULP & PAPER MILLS LTD ( PAPER MFG.DIV ) SONGAD

K.P.A. Engineering Pvt. Ltd.

BHILAD- GUJARAT

ATHOLA-SILVASSA

SARIGAM -GUJARAT

NASIK - MAHARASHTRA

DELHI

GIDC-VAPI

ATHOLA -SILVASSA

SURANGI -SILVASSA

KARANJ-SURAT

SIILI -SILVASSA

DAHEJ-BHARUCH

PALSANA- SURAT

DADRA-SILVASSA

ATHAL -SILVASSA

SONGAD-SURAT

Page 9: Safer Developments, Faster Projects. K.P.A. Engineering …kpaenggindia.com/wp-content/uploads/2014/03/e-Broch… ·  · 2014-05-0610 WELDING RECTIFIER AND TRANSFORMERS. 11

K.P.A. Engineering Pvt. Ltd.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

27. SUPERNOVA ENGINEERING LTD ( DG MFG.DIV)

28. RESHAM PETROTECH LTD ( NYLON

29. VISEN INDUSTRIES LTD ( POLYMER EMULSION PLANT)

30. ABAN CONST: LTD (GRP PIPE MFG: DIV)

31. JAY PEE FORGE LTD ( FORGING PLANT)

32. P.S.L. HOLDING LTD ( CROSS COUNTRY PIPE

33. VAKHARIA ALUMINIUM LTD ( ALUMINUM MFG. DIV)

34. I.M.P. POWER LTD ( ELECTRICAL TRANSFORMER MFG. DIV)

35. BASF (INDIA) LTD ( FERTILIZER MFG.DIV)

36.

DAMAN GANGA PROJECT -N.B.C.C

UNDERTAKING- ( A HEAVY BRIDGE CONSTRUCTION PROJECT )

37. GANESH SUGAR MILLS ( SUGAR MILL)

38. GUMPRO DRILLING FLUIDS PVT LTD.

( OFFSHORE DRILLING FLUID MFG.DIV )

39. BHILOSHA INDUSTRIES PVT LTD ( 600 TPD CP PROJECT)

40. DUJODWALA PAPER CHEMICALS LTD. (PAPER PULP MFG.DIV)

41. NAKODA TEXTILE INDUSTRIES LTD ( CP PROJECT &

POY PROJECT)

K.P.A. Engineering Pvt. Ltd.

ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

SUPERNOVA ENGINEERING LTD ( DG MFG.DIV) SAILI

RESHAM PETROTECH LTD ( NYLON PLANT) DOCUMATRY

VISEN INDUSTRIES LTD ( POLYMER EMULSION PLANT) BINANJI

ABAN CONST: LTD (GRP PIPE MFG: DIV) ATHAL

JAY PEE FORGE LTD ( FORGING PLANT) TALOJA

P.S.L. HOLDING LTD ( CROSS COUNTRY PIPE MFG.DIV ) DAMAN & GANDHIDAM

VAKHARIA ALUMINIUM LTD ( ALUMINUM MFG. DIV) MASAD

I.M.P. POWER LTD ( ELECTRICAL TRANSFORMER MFG. DIV) SAILI

BASF (INDIA) LTD ( FERTILIZER MFG.DIV) DADRA

N.B.C.C GOVERNMENT OF INDIA

( A HEAVY BRIDGE CONSTRUCTION PROJECT ) DAMAN

GANESH SUGAR MILLS ( SUGAR MILL) VATTARIYA

ANKLESHWAR

GUMPRO DRILLING FLUIDS PVT LTD.

( OFFSHORE DRILLING FLUID MFG.DIV )

KHOPOLI

MAHARASHTRA

INDUSTRIES PVT LTD ( 600 TPD CP PROJECT) RAKHOLI

DUJODWALA PAPER CHEMICALS LTD. (PAPER PULP MFG.DIV) BEDI BRAMANA

NAKODA TEXTILE INDUSTRIES LTD ( CP PROJECT & KARANJ

K.P.A. Engineering Pvt. Ltd.

SAILI-SILVASSA

DOCUMATRY-SILVASSA

BINANJI-SILVASSA

ATHAL-SILVASSA

TALOJA- NEW MUMABI

DAMAN & GANDHIDAM

MASAD-SILVASSA

SAILI- SILVASSA

DADRA- SILVASSA

DAMAN

VATTARIYA-

ANKLESHWAR

KHOPOLI-

MAHARASHTRA

RAKHOLI-SILVASSA

BEDI BRAMANA-JAMMU

KARANJ-SURAT

Page 10: Safer Developments, Faster Projects. K.P.A. Engineering …kpaenggindia.com/wp-content/uploads/2014/03/e-Broch… ·  · 2014-05-0610 WELDING RECTIFIER AND TRANSFORMERS. 11

K.P.A. Engineering Pvt. Ltd.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

42. RAJASHREE POLYFIL LTD( NYLON TYRE

43. INDORAMA SYTHETIC (I) LTD ( COAL FIRED POWER PLANT PROJECT)

44. EAGLE FIBRES PVT.LTD ( POY PLANT)

45. GOKULANAD PETRO FIBERS ( 450 TPD CP PROJECT & POY PLANT)

46.

BHEL POWER PLANT PROJECT, HAZIRA ( POWER PLANT PROJECT )

47. TERRAM GEO SYNTHETICS ( FIBER CLOTH PLANT)

48. PLATINUM SYNTHETICS LTD (POY PLANT)

49. NIRMAN INDUSTRIES LTD ( FDY PROJECT)

50. SREE DURGA SYNTEX PVT LTD ( 300 & 150 TPD CP PLANT )

51. SARALA POLYSTER LTD.(NYLON PLANT)

K.P.A. Engineering Pvt. Ltd.

ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

RAJASHREE POLYFIL LTD( NYLON TYRE CORD FABRIC PLANT) UMALLA

INDORAMA SYTHETIC (I) LTD ( COAL FIRED POWER PLANT PROJECT) NAGPUR

MAHARASHTRA

EAGLE FIBRES PVT.LTD ( POY PLANT) JOLWA

GOKULANAD PETRO FIBERS ( 450 TPD CP PROJECT & POY PLANT) VANZ

POWER PLANT PROJECT, HAZIRA ( POWER PLANT PROJECT ) HAZIRA

TERRAM GEO SYNTHETICS ( FIBER CLOTH PLANT) MUNDRA

PLATINUM SYNTHETICS LTD (POY PLANT) NANI

NIRMAN INDUSTRIES LTD ( FDY PROJECT) PALSANA

SYNTEX PVT LTD ( 300 & 150 TPD CP PLANT ) JOLWA

SARALA POLYSTER LTD.(NYLON PLANT) AMALI

K.P.A. Engineering Pvt. Ltd.

UMALLA-RAJPIPLLA

NAGPUR-

MAHARASHTRA

JOLWA-SURAT

VANZ- SURAT

HAZIRA-SURAT

MUNDRA-KUTCHCH

NANI-DAMAN

PALSANA-SURAT

JOLWA- SURAT

AMALI-SILVASSA

Page 11: Safer Developments, Faster Projects. K.P.A. Engineering …kpaenggindia.com/wp-content/uploads/2014/03/e-Broch… ·  · 2014-05-0610 WELDING RECTIFIER AND TRANSFORMERS. 11

K.P.A. Engineering Pvt. Ltd.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

OUR MAJOR

01.

SHUBHALAKSHMI POLYSTERS LTD.

Fabrication & erection of process piping,

piping, structure and related mechanical engineering installation work for 600 TPD

continuous poly condensation plant.

Under Inspection & Supervision of CTIEI

02.

SHREE DURGA SYNTEX PVT LTD

Equipments site fabrication and erection, process and utility piping, polymer piping,

jacketed piping, structure and related mechanical engineering installation work for

300 TPD continuous poly condensation plant( 300 TPD = 150 TPD 2 stream).

CP plant all electrical, instrumentation and 66 KV substation installations, testing

and commissioning.

CP ISBL & OSBL Hot and Cold insulation work along with material. Industrial

painting works for structural’s, tanks, chimney etc with material.

Under Inspection & Supervision of Huitong Chemical

03.

RAJ RAYON LTD

Equipments site fabrication and erection, process and utility piping, polymer piping,

jacketed piping, structure and related mechanical engineering installation

400 TPD continuous poly condensation plant.

Under Inspection & supervision of Polytex

04.

GOKULANAND PETROFIBRES

Fabrication & erection of polymer piping and its supports ,structure

& platforms from 450 TPD CP to old POY plant ,dismantling of

Dryers & Extruders, erection & alignment of polymer, pre polymer pumps, polymer

coolers, 3 way & 5 way valves.

05.

M/S. SUMEET INDUSTRIES LTD

Unloading ,shifting, lifting, erection &alignment of spinning beam, melt pumps,

quench chamber, dowthrem boilers, spin finish system, take

piping, polymer transfer piping, supporting and commissioning of 4 line 120 winders

FDY & POY plant at Sumeet Industries Ltd. Under the Inspection of Barmag

Germany.

K.P.A. Engineering Pvt. Ltd.

ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

MAJOR COMPLETED PROJECTS

SHUBHALAKSHMI POLYSTERS LTD.

Fabrication & erection of process piping, utility piping, polymer piping, jacketed

piping, structure and related mechanical engineering installation work for 600 TPD

continuous poly condensation plant.

Under Inspection & Supervision of CTIEI - China

PVT LTD

Equipments site fabrication and erection, process and utility piping, polymer piping,

jacketed piping, structure and related mechanical engineering installation work for

300 TPD continuous poly condensation plant( 300 TPD = 150 TPD 2 stream).

lant all electrical, instrumentation and 66 KV substation installations, testing

CP ISBL & OSBL Hot and Cold insulation work along with material. Industrial

painting works for structural’s, tanks, chimney etc with material.

Inspection & Supervision of Huitong Chemical- China

Equipments site fabrication and erection, process and utility piping, polymer piping,

jacketed piping, structure and related mechanical engineering installation work for

400 TPD continuous poly condensation plant.

Under Inspection & supervision of Polytex – China

GOKULANAND PETROFIBRES

Fabrication & erection of polymer piping and its supports ,structure

latforms from 450 TPD CP to old POY plant ,dismantling of Chips bunkers,

xtruders, erection & alignment of polymer, pre polymer pumps, polymer

M/S. SUMEET INDUSTRIES LTD.

Unloading ,shifting, lifting, erection &alignment of spinning beam, melt pumps,

boilers, spin finish system, take –up, all other related

piping, polymer transfer piping, supporting and commissioning of 4 line 120 winders

POY plant at Sumeet Industries Ltd. Under the Inspection of Barmag

K.P.A. Engineering Pvt. Ltd.

PROJECTS

, jacketed

piping, structure and related mechanical engineering installation work for 600 TPD

Dahej/

Bharuch.

Equipments site fabrication and erection, process and utility piping, polymer piping,

jacketed piping, structure and related mechanical engineering installation work for

lant all electrical, instrumentation and 66 KV substation installations, testing

CP ISBL & OSBL Hot and Cold insulation work along with material. Industrial

Jolwa/Surat

Equipments site fabrication and erection, process and utility piping, polymer piping,

work for

Surangi/

Silvassa

hips bunkers,

xtruders, erection & alignment of polymer, pre polymer pumps, polymer

Vanz- Surat

Unloading ,shifting, lifting, erection &alignment of spinning beam, melt pumps,

up, all other related

piping, polymer transfer piping, supporting and commissioning of 4 line 120 winders

Karanj-Surat

Page 12: Safer Developments, Faster Projects. K.P.A. Engineering …kpaenggindia.com/wp-content/uploads/2014/03/e-Broch… ·  · 2014-05-0610 WELDING RECTIFIER AND TRANSFORMERS. 11

K.P.A. Engineering Pvt. Ltd.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

06.

INDORAMA SYTHETIC (I) LTD

64 MW HTM coal fired power plant project including fabrication

& erection of coal bunkers, HTM storage tank ,ash storage tanks & other utility

Tanks ,HTM piping, IBR piping, utility piping ,heavy structures etc. assembling &

erection of electrostatic preceptors, coal conveying system, ash conveying systems,

slag ash system, erection and commissioning of HTM heater 4 Nos, electric steam

generators & all Hot insulation work (order value :5.18 core)

07.

RAJASHREE POLYFIL ( CENTURY ENKA LTD)

Fabrication, erection and commissioning of 2

including unloading, shifting, erection and alignment of take up, quench, dowthrem,

spin finish system all other related piping and supports. Under the Inspection of

TMT German. Erection & commissioning successfully completed.

08.

M/S. BHILOSA INDUSTRIES PVT

Equipments site fabrication and erection, process and utility piping, polymer piping,

jacketed piping, structure and related mechanical engineering installation work for

600 TPD continuous poly condensation plant.

Under inspection & supervision of CTIEI, CHINA

09.

M/S. GARDEN SILK MILLS LTD.

Equipments / process columns and other high quality equipments site fabrication

and erection, process and utility piping, self supported stack and related mechanical

engineering installation works for 600

Condensation plant. Under inspection of CTIEI

completed.

10.

M/S. JBF INDUSTRIES LTD. (PETRO CHEMICAL PLANT)

600-TPD capacity per day continuous poly condensation plant. Under the Inspection

of CTIEI- CHINA. 1000 tons of different types of structural, near about 1.5 Lakhs

Inch Dia Mtr of quality piping, 500 Tons of storage vessels, Reactor and other

equipments –fabrication and erection, 90 Tons self weight self

and 1200 Tons of imported equipments erection. Erection and commissioning

successfully completed.

K.P.A. Engineering Pvt. Ltd.

ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

INDORAMA SYTHETIC (I) LTD

64 MW HTM coal fired power plant project including fabrication

erection of coal bunkers, HTM storage tank ,ash storage tanks & other utility

,HTM piping, IBR piping, utility piping ,heavy structures etc. assembling &

of electrostatic preceptors, coal conveying system, ash conveying systems,

system, erection and commissioning of HTM heater 4 Nos, electric steam

generators & all Hot insulation work (order value :5.18 core)

RAJASHREE POLYFIL ( CENTURY ENKA LTD)

Fabrication, erection and commissioning of 2 Nos Nylon Tire cord lines 18 position

including unloading, shifting, erection and alignment of take up, quench, dowthrem,

spin finish system all other related piping and supports. Under the Inspection of

TMT German. Erection & commissioning successfully completed.

M/S. BHILOSA INDUSTRIES PVT. LTD.

Equipments site fabrication and erection, process and utility piping, polymer piping,

jacketed piping, structure and related mechanical engineering installation work for

continuous poly condensation plant.

Under inspection & supervision of CTIEI, CHINA – Work successfully Completed

M/S. GARDEN SILK MILLS LTD.

Equipments / process columns and other high quality equipments site fabrication

and erection, process and utility piping, self supported stack and related mechanical

engineering installation works for 600-TPD capacity per day continuous poly

Condensation plant. Under inspection of CTIEI- CHINA – work successfully

M/S. JBF INDUSTRIES LTD. (PETRO CHEMICAL PLANT)

TPD capacity per day continuous poly condensation plant. Under the Inspection

CHINA. 1000 tons of different types of structural, near about 1.5 Lakhs

quality piping, 500 Tons of storage vessels, Reactor and other

fabrication and erection, 90 Tons self weight self -supported Chimney

and 1200 Tons of imported equipments erection. Erection and commissioning

K.P.A. Engineering Pvt. Ltd.

erection of coal bunkers, HTM storage tank ,ash storage tanks & other utility

,HTM piping, IBR piping, utility piping ,heavy structures etc. assembling &

of electrostatic preceptors, coal conveying system, ash conveying systems,

system, erection and commissioning of HTM heater 4 Nos, electric steam

Butibori-

Nagpur

Tire cord lines 18 position

including unloading, shifting, erection and alignment of take up, quench, dowthrem,

spin finish system all other related piping and supports. Under the Inspection of

Umalla-

Rajpiplla

Equipments site fabrication and erection, process and utility piping, polymer piping,

jacketed piping, structure and related mechanical engineering installation work for

Work successfully Completed.

Rakholi-

Silvassa

Equipments / process columns and other high quality equipments site fabrication

and erection, process and utility piping, self supported stack and related mechanical

Kadodara-

Surat

TPD capacity per day continuous poly condensation plant. Under the Inspection

CHINA. 1000 tons of different types of structural, near about 1.5 Lakhs

supported Chimney

Sarigam-

Gujarat

Page 13: Safer Developments, Faster Projects. K.P.A. Engineering …kpaenggindia.com/wp-content/uploads/2014/03/e-Broch… ·  · 2014-05-0610 WELDING RECTIFIER AND TRANSFORMERS. 11

K.P.A. Engineering Pvt. Ltd.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

11.

JINDAL POLY FILMS LTD

Equipments site fabrication and erection, process and utility piping, polymer piping,

jacketed piping, structure and related mechanical engineering installation work for

180-TPD capacity continuous poly condensation plant. Under inspection

& supervision of POLYTEX- CHINA

Film automation plant (BOPP plant) equipment erection, piping and structural work

successfully completed.

12.

M/S. JBF RAK LLC- RASALKHIMA.

900 TPD Poly condensation plant &

equipments – piping & all other mechanical installation and related work

successfully completed

13.

M/S. SUMEET INDUSTRIES LTD

Equipments / process columns and other high quality equipments site fabrication and

erection, process and utility piping, self supported stack and related mechanical

engineering installation works for 270

Under Inspection of HUITONG CHEMICAL, China

14.

NAKODA TEXTILE INDUSTRIES LTD

Site fabrication and erection of heavy storage tanks, silos and other (SS, MS & CS)

equipments in CP (about 500 tons) works

under the inspection of Polytex China & Mottmc Donald.

Spinning FDY units – 02 Nos, 64 positions

Erection and commissioning work successfully completed at Nakoda Textile

industries Ltd, Karanj, Surat.

15.

M/S.GOKULANAD PETROFIBERS

Equipments / process columns and other high quality equipments site fabrication and

erection, process and utility piping, self supported stack and related mechanical

engineering installation works for 300

Work successfully completed.

K.P.A. Engineering Pvt. Ltd.

ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

Equipments site fabrication and erection, process and utility piping, polymer piping,

jacketed piping, structure and related mechanical engineering installation work for

TPD capacity continuous poly condensation plant. Under inspection

CHINA- work successfully completed.

Film automation plant (BOPP plant) equipment erection, piping and structural work

RASALKHIMA.

900 TPD Poly condensation plant & 600 TPD SSP plant, utility –storage tanks / silos

piping & all other mechanical installation and related work

M/S. SUMEET INDUSTRIES LTD.

Equipments / process columns and other high quality equipments site fabrication and

erection, process and utility piping, self supported stack and related mechanical

engineering installation works for 270-TPD continuous Poly Condensation plant.

ection of HUITONG CHEMICAL, China–work successfully completed

NAKODA TEXTILE INDUSTRIES LTD

Site fabrication and erection of heavy storage tanks, silos and other (SS, MS & CS)

equipments in CP (about 500 tons) works successfully completed. Works carried

under the inspection of Polytex China & Mottmc Donald.

os, 64 positions –dismantling and packing from Korea.

Erection and commissioning work successfully completed at Nakoda Textile

M/S.GOKULANAD PETROFIBERS

Equipments / process columns and other high quality equipments site fabrication and

erection, process and utility piping, self supported stack and related mechanical

engineering installation works for 300-TPD Continuous Poly Condensation plant.

K.P.A. Engineering Pvt. Ltd.

Equipments site fabrication and erection, process and utility piping, polymer piping,

jacketed piping, structure and related mechanical engineering installation work for

Film automation plant (BOPP plant) equipment erection, piping and structural work

Nasik-

Maharashtra

storage tanks / silos

U.A.E

Equipments / process columns and other high quality equipments site fabrication and

erection, process and utility piping, self supported stack and related mechanical

TPD continuous Poly Condensation plant.

work successfully completed.

Karanj-Surat

Site fabrication and erection of heavy storage tanks, silos and other (SS, MS & CS)

successfully completed. Works carried out

dismantling and packing from Korea.

Karanj-Surat

Equipments / process columns and other high quality equipments site fabrication and

erection, process and utility piping, self supported stack and related mechanical

TPD Continuous Poly Condensation plant.

Palsana-

Surat

Page 14: Safer Developments, Faster Projects. K.P.A. Engineering …kpaenggindia.com/wp-content/uploads/2014/03/e-Broch… ·  · 2014-05-0610 WELDING RECTIFIER AND TRANSFORMERS. 11

K.P.A. Engineering Pvt. Ltd.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

16.

M/S. SUMEET INDUSTRIES LTD

Spinning FDY units – 05 Nos, 160 positions

Korea, manpower and supervisors supply.

Erection and commissioning at Sumeet industries ltd.

17.

M/S. SUMEET INDUSTRIES LTD

02 lines of 288 end each Barmag-AG Spinning POY machinery erection and

alignment with all related work. Work completed and commissioned. Inspection of

Barmag Germany.

18. M/S. AGRAWAL POLY FIL PVT

Spinning FDY units – 04 Nos line, 64 positions match marking, dismantling &

Packing from Korea. Erection and commissioning at Agrawal Polyfil Pvt

Work successfully completed.

Equipments site fabrication and erection, process and utility piping, polymer piping,

jacketed piping, structure and related mechanical engineering installation work for

125 TON Batch Poly Condensation Plant.

Under inspection & supervision of GR Consultant. Mr.Pai,

successfully completed.

19.

M/S. RAJ RAYON LTD.

Spinning FDY units – 04 Nos FDY lines, 96 positions

& packing from china. Erection and commissioning at Raj rayon ltd, India. Work

successfully completed.

Fabrication, erection and commissioning of 8

unloading, shifting, erection and alignment of take

finish system all other related piping and supports. Dismantling

Taiwan .Erection & commissioning at Raj rayon ltd, India. Work successfully

completed.

K.P.A. Engineering Pvt. Ltd.

ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

M/S. SUMEET INDUSTRIES LTD.

os, 160 positions –dismantling packing and forwarding

manpower and supervisors supply.

at Sumeet industries ltd. Work successfully completed.

M/S. SUMEET INDUSTRIES LTD.

AG Spinning POY machinery erection and

alignment with all related work. Work completed and commissioned. Inspection of

M/S. AGRAWAL POLY FIL PVT. LTD.

os line, 64 positions match marking, dismantling &

from Korea. Erection and commissioning at Agrawal Polyfil Pvt. Ltd, India.

site fabrication and erection, process and utility piping, polymer piping,

jacketed piping, structure and related mechanical engineering installation work for

125 TON Batch Poly Condensation Plant.

Under inspection & supervision of GR Consultant. Mr.Pai, Mumbai. Work

os FDY lines, 96 positions–matches marking, dismantling

& packing from china. Erection and commissioning at Raj rayon ltd, India. Work

Fabrication, erection and commissioning of 8 Nos FDY lines, 128 positions including

unloading, shifting, erection and alignment of take-up, quench, dowthrem, and spin

finish system all other related piping and supports. Dismantling & packing from

Taiwan .Erection & commissioning at Raj rayon ltd, India. Work successfully

K.P.A. Engineering Pvt. Ltd.

warding at

Work successfully completed.

Korea &

Surat

alignment with all related work. Work completed and commissioned. Inspection of

Karanj- Surat

os line, 64 positions match marking, dismantling &

td, India.

site fabrication and erection, process and utility piping, polymer piping,

jacketed piping, structure and related mechanical engineering installation work for

Bhilad –

Gujarat

matches marking, dismantling

& packing from china. Erection and commissioning at Raj rayon ltd, India. Work

os FDY lines, 128 positions including

up, quench, dowthrem, and spin

& packing from

Taiwan .Erection & commissioning at Raj rayon ltd, India. Work successfully

Surangi-

Silvassa

Page 15: Safer Developments, Faster Projects. K.P.A. Engineering …kpaenggindia.com/wp-content/uploads/2014/03/e-Broch… ·  · 2014-05-0610 WELDING RECTIFIER AND TRANSFORMERS. 11

K.P.A. Engineering Pvt. Ltd.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

20.

M/S. JBF INDUSTRIES LTD. (POY DIVISION)

08 line POY and 08 lines FDY each has 96 positions (Shangai Jewels

2nd plant projects had completed successfully.

21.

M/S. SARALA POLYESTER LTD

Mfg: of Nylon 66 yarn structural and dryer erection for nylon 66 plant different

modification godets and spin beam and piping.

22.

EAGLE FIBRES PVT.LTD

Fabrication, erection and commissioning of 4

unloading, shifting, erection and alignment of take

finish system all other related piping and supports. Erection & commissioning

successfully completed.

23.

PLATINUM SYNTHETICS LTD

Fabrication, erection and commissioning of 8

unloading, shifting, erection and alignment of take

system all other related piping and supports. Dismantling & packing from China.

Erection & commissioning successfully completed at Platinum Synthetic Ltd,

Daman.

24.

NIRMAN INDUSTRIES LTD.

All mechanical ,electrical ,instrumentation & insulations fabrication, erection and

commissioning of 4 Nos FDY lines, 120 positions including unloading, shifting,

erection and alignment of take-up, quench, dowthrem, spin finish

other related piping and supports. Dismantling & packing from Taiwan. Erection &

commissioning successfully completed at Nirman Industries Ltd

25.

M/S. VISEN INDUSTRIES LTD.

60000 TPA: Chemical plant, emulsion polymers approx: project cost 150 cores

Under Inspection of Chempro Expertise Pvt.

Ltd – Delhi.

500 Ton structural –350 Ton tank (SS304/SS 316 /CS / MS) One Lakhs Inch

Dia piping and total mechanical erection work is successfully completed

K.P.A. Engineering Pvt. Ltd.

ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

M/S. JBF INDUSTRIES LTD. (POY DIVISION).

08 line POY and 08 lines FDY each has 96 positions (Shangai Jewels –China) .POY

plant projects had completed successfully.

M/S. SARALA POLYESTER LTD.

Mfg: of Nylon 66 yarn structural and dryer erection for nylon 66 plant different

modification godets and spin beam and piping. –project is successfully completed

Fabrication, erection and commissioning of 4 Nos POY lines 48 position including

unloading, shifting, erection and alignment of take-up, quench, dowthrem, spin

finish system all other related piping and supports. Erection & commissioning

PLATINUM SYNTHETICS LTD

Fabrication, erection and commissioning of 8 Nos POY lines 128 position including

erection and alignment of take up, quench, dowthrem, spin finish

system all other related piping and supports. Dismantling & packing from China.

Erection & commissioning successfully completed at Platinum Synthetic Ltd,

All mechanical ,electrical ,instrumentation & insulations fabrication, erection and

os FDY lines, 120 positions including unloading, shifting,

up, quench, dowthrem, spin finish system and all

other related piping and supports. Dismantling & packing from Taiwan. Erection &

commissioning successfully completed at Nirman Industries Ltd- Surat.

M/S. VISEN INDUSTRIES LTD.

60000 TPA: Chemical plant, emulsion polymers approx: project cost 150 cores –

Under Inspection of Chempro Expertise Pvt. Ltd. Mumbai and Chempro Inspection

350 Ton tank (SS304/SS 316 /CS / MS) One Lakhs Inch

and total mechanical erection work is successfully completed.

K.P.A. Engineering Pvt. Ltd.

China) .POY –

Athola-

Silvassa

(D & NH)

Mfg: of Nylon 66 yarn structural and dryer erection for nylon 66 plant different

project is successfully completed.

Amali-

Silvassa

(D & NH)

os POY lines 48 position including

up, quench, dowthrem, spin

finish system all other related piping and supports. Erection & commissioning

Jolwa-

Surat.

os POY lines 128 position including

spin finish

system all other related piping and supports. Dismantling & packing from China.

Nani-Daman

All mechanical ,electrical ,instrumentation & insulations fabrication, erection and

os FDY lines, 120 positions including unloading, shifting,

system and all

other related piping and supports. Dismantling & packing from Taiwan. Erection &

Palsana-

Surat

Mumbai and Chempro Inspection

Badibrahmana

Jammu

Page 16: Safer Developments, Faster Projects. K.P.A. Engineering …kpaenggindia.com/wp-content/uploads/2014/03/e-Broch… ·  · 2014-05-0610 WELDING RECTIFIER AND TRANSFORMERS. 11

K.P.A. Engineering Pvt. Ltd.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

26.

M/S. VISEN INDUSTRIES LTD.

Paint manufacturing unit – approximate project cost 50 cores

Chempro Expertise Pvt. Ltd Mumbai. All mechanical & erection work successfully

completed.

27.

M/S. VISEN INDUSTRIES LTD,

Expansion project with manufacturing of 10 KL

Storage tanks, structural sheds, piping and various

equipments erection of Octadex Plant

28.

TERRAM GEO SYNTHETICS

Erection & alignment of main plant equipments including drying oven, capstan,

winder wrapper, wrapping station, accumulator, edge drummer, weighing belts,

brattice related mechanical piping and structural work successfully completed Under

the Inspection of Sijcon Consultants Pvt.

29.

GUMPRO DRILLING FLUIDS PVT LTD.

Manufacturing and supply of LDO storage tank, Day tank, Cold oil tank, Fumaric

acid tank and Deta tank.

Fabrication & erection of reactors, storage tanks SS 316,304, HTM piping, product

piping (SS 304) utility piping and MS steel structural works successf

Under the Inspection of Clearsep Technologies (I) Pvt.

30.

M/S. VEDIK COTTON

20 TPD cotton filament plant imported from U.S.A

mechanical installation- project completed

31.

DAMAN GANGA PROJECT (N.B.C.C GOVERNMENT OF INDIA

UNDERTAKING)

Heavy structural for river crossing bridge, launching nose fabrication and assembly

at daman- project completed successfully.

32. M/S. DUJODWALA PAPER CHEMICALS LTD.

Resin and paper projects. Under Inspection of Kelker Associates Mumbai. Project cost

45 cores mechanical erection work successfully completed.

K.P.A. Engineering Pvt. Ltd.

ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

M/S. VISEN INDUSTRIES LTD.

approximate project cost 50 cores – Under Inspection of

Ltd Mumbai. All mechanical & erection work successfully

M/S. VISEN INDUSTRIES LTD,

Expansion project with manufacturing of 10 KL –02 Nos, 50 KL –02 Nos Reactors,

Storage tanks, structural sheds, piping and various activities and related

equipments erection of Octadex Plant- work successfully completed.

Erection & alignment of main plant equipments including drying oven, capstan,

station, accumulator, edge drummer, weighing belts,

brattice related mechanical piping and structural work successfully completed Under

the Inspection of Sijcon Consultants Pvt. Ltd-Ahmadabad.

GUMPRO DRILLING FLUIDS PVT LTD.

Manufacturing and supply of LDO storage tank, Day tank, Cold oil tank, Fumaric

Fabrication & erection of reactors, storage tanks SS 316,304, HTM piping, product

piping (SS 304) utility piping and MS steel structural works successfully completed

Under the Inspection of Clearsep Technologies (I) Pvt. Ltd.

20 TPD cotton filament plant imported from U.S.A – Total structural piping and

project completed successfully.

(N.B.C.C GOVERNMENT OF INDIA

Heavy structural for river crossing bridge, launching nose fabrication and assembly

project completed successfully.

M/S. DUJODWALA PAPER CHEMICALS LTD.

Resin and paper projects. Under Inspection of Kelker Associates Mumbai. Project cost

45 cores mechanical erection work successfully completed.

K.P.A. Engineering Pvt. Ltd.

Under Inspection of

Ltd Mumbai. All mechanical & erection work successfully

Samba-

Jammu

os Reactors,

Binanji-

Silvassa

(D & NH)

Erection & alignment of main plant equipments including drying oven, capstan,

station, accumulator, edge drummer, weighing belts,

brattice related mechanical piping and structural work successfully completed Under

Mundra-

Kutchch.

Manufacturing and supply of LDO storage tank, Day tank, Cold oil tank, Fumaric

Fabrication & erection of reactors, storage tanks SS 316,304, HTM piping, product

ully completed

Khopoli-

Maharashtra

Total structural piping and

Athola-

Silvassa

(D & NH)

Heavy structural for river crossing bridge, launching nose fabrication and assembly

Daman

Resin and paper projects. Under Inspection of Kelker Associates Mumbai. Project cost

Jammu

Page 17: Safer Developments, Faster Projects. K.P.A. Engineering …kpaenggindia.com/wp-content/uploads/2014/03/e-Broch… ·  · 2014-05-0610 WELDING RECTIFIER AND TRANSFORMERS. 11

K.P.A. Engineering Pvt. Ltd.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

OUR

1) CEDAR CREEK: FAYETVILLE, NORTH

Supervision, inspection, match

POY plant’s all machineries with other equipment of dryers, boilers, silos, conveyor

trolleys etc for M/s. Raj Rayon

The same plant we have successfully erected and commissioned in

client.

2) M/S. SAN JIE IMPORT & EXPORT TRADING CO.LTD, SHANTOU CITY

CHINA:

Supervision, inspection and match marking for dismantling

each, total 96 winders. All lines with extruder spin beam, quench, spin pack, go

panels, dowthrem boilers, from china for

The same plant we have successfully erected and commissioned in

client.

3) M/S. BENGAL SYNTHETIC FIBERS LTD.CHITTAGONG

We successfully completed their 40

other systems. The required polyester chips drying plant manufactured with our own

design, Installed and successfully commissioned at their plant in

4) M/S. JBF RAK FZ LLC – RASALKHIMA

We supplied 250 peoples incl

and un skilled technicians (fabricators, fitters, welders, argon arc (100% x

riggers, grinder man, helpers, fork lift and crane operators and safety engineers etc…)

We have completed their 900 TPD P

plant our own responsibility with their technical team coordination.

We supplied 50 technicians on permanent basis for

for JBF RAK LLC UAE.

K.P.A. Engineering Pvt. Ltd.

ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

OUR PROJECTS AT ABROAD:

1) CEDAR CREEK: FAYETVILLE, NORTH CAROLINA USA:

match marking, dismantling and loading of 180 TPD capacity

with other equipment of dryers, boilers, silos, conveyor

ayon Industries Ltd, Surangi- Silvassa.

he same plant we have successfully erected and commissioned in India for the same

2) M/S. SAN JIE IMPORT & EXPORT TRADING CO.LTD, SHANTOU CITY

upervision, inspection and match marking for dismantling FDY lines –04 N

ll lines with extruder spin beam, quench, spin pack, go

boilers, from china for Raj Rayon Industries Ltd, Surangi,

same plant we have successfully erected and commissioned in India for the same

) M/S. BENGAL SYNTHETIC FIBERS LTD.CHITTAGONG – BANGLADESH

successfully completed their 40-TPD spinning POY Plant including: utility and all

required polyester chips drying plant manufactured with our own

nstalled and successfully commissioned at their plant in Bangladesh

RASALKHIMA, UAE:

supplied 250 peoples including engineers, supervisors, and store keepers. skilled

and un skilled technicians (fabricators, fitters, welders, argon arc (100% x-

, helpers, fork lift and crane operators and safety engineers etc…)

00 TPD Pet chips continuous poly plant and 600

plant our own responsibility with their technical team coordination.

supplied 50 technicians on permanent basis for maintenance and mechanical work

K.P.A. Engineering Pvt. Ltd.

TPD capacity

with other equipment of dryers, boilers, silos, conveyor

for the same

2) M/S. SAN JIE IMPORT & EXPORT TRADING CO.LTD, SHANTOU CITY –

Nos –24 ends

ll lines with extruder spin beam, quench, spin pack, godet roll,

urangi, Silvassa

for the same

BANGLADESH:

including: utility and all

required polyester chips drying plant manufactured with our own

Bangladesh.

engineers, supervisors, and store keepers. skilled

- ray quality)

, helpers, fork lift and crane operators and safety engineers etc…)

et chips continuous poly plant and 600 TPD SSP

and mechanical work

Page 18: Safer Developments, Faster Projects. K.P.A. Engineering …kpaenggindia.com/wp-content/uploads/2014/03/e-Broch… ·  · 2014-05-0610 WELDING RECTIFIER AND TRANSFORMERS. 11

K.P.A. Engineering Pvt. Ltd.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

5) M/S. VISEN POLYMERS

We have one new opportunity with the above client for their 1, 20,000

capacity of polymer emulsion project at

earliest and fabrication work

6) M/S. CASIA CORP: DAEGU

Supervision, inspection and match marking for dismantling

each – total 160 winders. All lines with extruder spin beam, quench, spin pack, godet

roll, panels, dowthrem boilers, from

The same plant we have successfully erected and commissioned in India for the same

client.

7) M/S. SILVER LINE – GUMI

Supervision, inspection and match marking for dismantling

each, total 64 winders. All lines with extruder spin beam, quench, spin pack, godet roll,

panels, dowthrem boilers, from

The same plant we have successfully erected and commissioned in India for the same

client.

8) M/S.: NIRMAN INDUSTRIES LTD

Supervision, inspection, match marking and dismantling of FDY

each, total 120 winders. All lines with extruder spin beam, quench, spin pack, godet roll,

panels, dowthrem boilers, from

The same plant we have successfully erected and commissioned in India for the same

client.

K.P.A. Engineering Pvt. Ltd.

ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

) M/S. VISEN POLYMERS FZC –SHARJA UAE:

have one new opportunity with the above client for their 1, 20,000 TPA

capacity of polymer emulsion project at U.A.E. Project erection will be started

fabrication work has started at our UAE work shop.

M/S. CASIA CORP: DAEGU -SOUTH KOREA:

upervision, inspection and match marking for dismantling FDY lines –05 N

ll lines with extruder spin beam, quench, spin pack, godet

boilers, from Korea for Sumeet industries Surat.

The same plant we have successfully erected and commissioned in India for the same

GUMI – SOUTH KOREA:

upervision, inspection and match marking for dismantling FDY lines –04 N

ll lines with extruder spin beam, quench, spin pack, godet roll,

boilers, from Korea for Agrawal Poly Fil Pvt. Ltd Bhilad.

The same plant we have successfully erected and commissioned in India for the same

INDUSTRIES LTD- TAIWAN

inspection, match marking and dismantling of FDY lines –04 N

ll lines with extruder spin beam, quench, spin pack, godet roll,

boilers, from Taiwan for Nirman Industries Ltd. Palsana

The same plant we have successfully erected and commissioned in India for the same

K.P.A. Engineering Pvt. Ltd.

TPA production

started at the

Nos –32 ends

ll lines with extruder spin beam, quench, spin pack, godet

The same plant we have successfully erected and commissioned in India for the same

Nos –16 ends

ll lines with extruder spin beam, quench, spin pack, godet roll,

The same plant we have successfully erected and commissioned in India for the same

Nos –30 ends

ll lines with extruder spin beam, quench, spin pack, godet roll,

alsana -Surat.

The same plant we have successfully erected and commissioned in India for the same

Page 19: Safer Developments, Faster Projects. K.P.A. Engineering …kpaenggindia.com/wp-content/uploads/2014/03/e-Broch… ·  · 2014-05-0610 WELDING RECTIFIER AND TRANSFORMERS. 11

K.P.A. Engineering Pvt. Ltd.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

HEAD OFFICE

601-WESTERN CORRIDOR, OPP: GUJARAT GAS CO

ADAJAN HAZIRA ROAD,

ADAJAN, SURAT -395009

GUJARAT, INDIA,

TELEFAX: +91-261-2783487, MOB: +91 99989 62233

EMAIL : [email protected]

Mr. ANIL.K.NAIR (Managing Director)

CELL: +91-98241 43741 & +91

EMAIL: [email protected]

CORPORATE OFFICE

SHOP NO: 1 & 9 A- DEEP COMPLEX

OPP: MICRO TOWER

NAROLI ROAD, SILVASSA,

UT OF DADRA AND NAGAR HAVELI

PHONE NO: +91-260- 2631134

Mr. VISHNU PRASAD.G & Mr. SUJITHKUMAR.S

CELL: +91-76005 08227& 91-85111

Email: [email protected]

K.P.A. Engineering Pvt. Ltd.

ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.ENGINEERS & CONTRCTORS.

Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.Safer Developments, Faster Projects.

Contact Us

WESTERN CORRIDOR, OPP: GUJARAT GAS CO.,

2783487, MOB: +91 99989 62233

[email protected]

Managing Director)

& +91- 96013 77771

[email protected], [email protected]

U.A.E. OFFICE

K.P.A. Engineering L.L.C.

STEEL AND ALUMINUM FABRICATION

NEAR STADIUM – AL – RAMS – RASALKHIMA,

TELEFAX:0097172 662475, 0097172 663242

Mr. V.G.ANILKUMAR

CELL: +97-15075 04815

EMAIL: [email protected], [email protected]

DEEP COMPLEX-A

OF DADRA AND NAGAR HAVELI- 396230, INDIA

Mr. SUJITHKUMAR.S

85111 92771

[email protected] , [email protected].

K.P.A. Engineering Pvt. Ltd.

STEEL AND ALUMINUM FABRICATION

RASALKHIMA, UAE

0097172 662475, 0097172 663242

[email protected]