11
Safeguards Workshop October 30, 2008 Moldova, Chusinau Day 2 – Quiz Mitigation Dmytro Glazkov

Safeguards Workshop October 30, 2008 Moldova, Chusinau Day 2 – Quiz Mitigation Dmytro Glazkov

Embed Size (px)

Citation preview

Page 1: Safeguards Workshop October 30, 2008 Moldova, Chusinau Day 2 – Quiz Mitigation Dmytro Glazkov

Safeguards WorkshopOctober 30, 2008

Moldova, ChusinauDay 2 – Quiz

Mitigation

Dmytro Glazkov

Page 2: Safeguards Workshop October 30, 2008 Moldova, Chusinau Day 2 – Quiz Mitigation Dmytro Glazkov

Case Study Presentation:Environmental Assessment and Environmental Management Plan were developed for Ukraine Power Transmission Project financed by the Bank. EMP included a range of mitigation issues which are devoted to removing or reducing adverse impacts on environment and natural habitats or their functions, keeping such impacts within socially defined limits of acceptable environmental change.Based on local environmental legislation and applicable international standards Ukraine Power Transmission Operator hired Local Institute which developed a comprehensive EIA and EMPYou are a representative of local NGO which received an invitation to Public Consultations planned next week and devoted to review of EA/EMP. You should review publicly available EA/EMP, paying attention to proposed mitigation issues and during Consultations ask questions.

Page 3: Safeguards Workshop October 30, 2008 Moldova, Chusinau Day 2 – Quiz Mitigation Dmytro Glazkov

MITIGATION QUIZWhat is Environmental Mitigation (choose all that apply):1. Avoiding the impact altogether by not taking action. 2. Minimizing impacts by limiting the degree or magnitude of

the action and its implementation. 3. Neglecting minor impacts and paying attention to major

negative ones.4. Softening the impact by repairing, rehabilitating, or restoring

the affected environment. 5. Reducing or eliminating the impact over time by preservation

and maintenance operations during the life of the action. 6. Compensating for the impact by replacing or providing

substitute resources or environments. 7. Compensating people who are negatively affected by impacts8. Demonstrating that negative impacts are outweighed by

positive economic impacts

Page 4: Safeguards Workshop October 30, 2008 Moldova, Chusinau Day 2 – Quiz Mitigation Dmytro Glazkov

MITIGATION QUIZ

Which one is a correct statement?

Does The Bank favors preventive measures over mitigatory or compensatory measures? orThe Bank favors mitigatory or compensatory measures over preventive measures?

Page 5: Safeguards Workshop October 30, 2008 Moldova, Chusinau Day 2 – Quiz Mitigation Dmytro Glazkov

MITIGATION QUIZ

Project's environmental management plan (EMP) consists of? (choose all that apply):

Financial IndicatorsSet of mitigation measuresMonitoring ActionsProject Screening CriteriaProcurement PlanInstitutional MeasuresPublic Disclosure info

Page 6: Safeguards Workshop October 30, 2008 Moldova, Chusinau Day 2 – Quiz Mitigation Dmytro Glazkov

MITIGATION QUIZ Please Match Activity and Impacts to appropriate Mitigation Measure

  Activity / Potential Impact   Mitigation Measure

Potential Impacts during Construction

1 Transportation of Materials to the site / Noise, Emissions, Dust 1Provision of rain/storm water sewage / treatment

2 Substation Rehabilitation / Wastes accumulation 2 Provision of chance find options

3 Vegetation Removal within the right of way 3No blockage for wildlife passage /provision of special passage corridors

4 Visual Aspects for adjacent buildings 4

Traffic Rerouting / Work during Day time / Using Better car fleet with low emissions / Road Watering

Potential Impacts during Operations Stage

5 Surface Water Contamination 5New vegetation planting. Landscaping, protective fencing

6 Blockage of wildlife passage / Species impacts 6Provision of special noise protection screens, usage of low noise/low vibration trains

7 Noise, vibration 7 Proper Wastes collection and disposal

8 Churches, monuments 8Proper sitting of proposed rout, proper public consultations

Page 7: Safeguards Workshop October 30, 2008 Moldova, Chusinau Day 2 – Quiz Mitigation Dmytro Glazkov

MITIGATION QUIZDuring Rehabilitation of High Voltage Power Transformer Consulting Company identified and filed that cooling oil containing PCBs spilled into the ground.What measures should be included in EMP on how to deal with PCBs? (choose all that apply):

1. Call for Public Consultation Process2. Hire qualified company to identify source of contamination and

Removing Sources of Contamination 3. Dispose contaminated land with PCBs at nearby landfill4. Set institutional controls which can prevent intrusion into the

contaminated zone that could lead to increased movement of those PCBs to surface waters

5. Do site sampling of soil and groundwater quality to identify further leaching of PCBs

6. Call to sanitary inspection to clean it up7. Call to sanitary inspection to report on PCB contamination

Page 8: Safeguards Workshop October 30, 2008 Moldova, Chusinau Day 2 – Quiz Mitigation Dmytro Glazkov

MITIGATION QUIZSelect activities performed by Contractors during the construction phase of project (construction of transmission line and 550kV substation) to prevent and mitigate possible negative impacts on the environment and people?

Waste management/handling; Land, soil and water control;Air emission control; Control of energy efficiency measures;Cultural resources/chance find; Traffic rerouting; Natural habitats control; Occupational and health safety of workers;International water ways control;

Page 9: Safeguards Workshop October 30, 2008 Moldova, Chusinau Day 2 – Quiz Mitigation Dmytro Glazkov

MITIGATION QUIZ

What are the institutions responsible during reconstruction of Power Transmission Network for Implementation of Proposed Mitigation Measures?

1. Contractors2. Power Transmission Company (PTC)3. Pest Management Expert4. Laboratory hired for soil sampling 5. Prime minister6. Transport Authority7. Environmental Inspection8. General Population leaving nearby Power Transmission

Line9. Chief Engineer10. Company hired for removal of PCBs

Page 10: Safeguards Workshop October 30, 2008 Moldova, Chusinau Day 2 – Quiz Mitigation Dmytro Glazkov

MITIGATION QUIZPlanned Transmission line passes through ~ 50 years old Forest (select Mitigation Measures which are applicable):

Cut Forest without any compensation;Propose an underground cable instead of power line;Replant Trees into new location as a compensation/mitigation measure;Sacrifice this site and find new site which is equaly important and create a natural biodiversity area;Select a New site and plant new trees (of same sort) as a compensation to old forest plantation;Change pass for Transmission Line;

Page 11: Safeguards Workshop October 30, 2008 Moldova, Chusinau Day 2 – Quiz Mitigation Dmytro Glazkov

MITIGATION QUIZPower Transmission Line also encountered a pile of obsolete pesticides (select Mitigation Measures which might be used):

Transport this pesticides to a site 200 meters away from the planned pass of Transmission Line and dispose their;Send to Incineration Facility;Application of the pesticides to the farms located near the site;Call to the waste management company and get them remove pesticides to the landfill;Collect Pesticides and transport them to the proper storage site (i.e. concrete floor, no leaching, guarded for theft, etc.);