2
Safe and cost-effetive design and operation of floating production systems offshore Brazil July 6th, 2012 Windsor Barra Hotel Rooms Queluz I and II, on first lower level (SS 1) at Avenida Lúcio Costa, 2630 - Barra da Tijuca - Rio de Janeiro Seminar MARINTEK do Brasil has the pleasure to invite you for a seminar addressing important topics to successfully enable the development of oil and gas floating production systems in deep waters offshore Brazil. The seminar will be organized in two parallel sessions: Session 1: Stress and fatigue analysis of flexible risers and umbilicals Session 2: Future paths within deep-water offshore hydrodynamics Highlights for each of the sessions are given below. For a more detailed agenda, see next page. MARINTEK do Brasil is situated at Torre do Rio Sul, Botafogo, Rio de Janeiro Invitation to seminar Session 1 : Stress and fatigue analysis of flexible risers and umbilicals The presentations will include: Selection of environmental loads Global response analysis Local stress analysis Fatigue analysis Requalification Topics for future research Session 2: Future paths within deep-water offshore hydrodynamics The presentations will include : Ocean environment (Deep-water currents; bidirectional waves) VIV Complex hydrodynamics: New code develop- ment Deep-water marine operations Wave impact and green water Please turn the page for Agenda Limited places. Please, confirm your participation to [email protected] Pre-salt fields are located in deep water, in places featuring rugged and irregular sea- bed and exposed to harsher environmental loads, such as steep waves, bi-directional sea states and current profiles changing with depth and time. Under these conditions, precise models and simulation tools are required for safe and cost-effective design and operation of floating production systems www.marintek.com.br

Safe and cost-effetive at Avenida Lúcio Costa, 2630 ... · Torre do Rio Sul, Botafogo, Rio de Janeiro Invitation to seminar Session 1 : Stress and fatigue analysis of flexible risers

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Safe and cost-effetive at Avenida Lúcio Costa, 2630 ... · Torre do Rio Sul, Botafogo, Rio de Janeiro Invitation to seminar Session 1 : Stress and fatigue analysis of flexible risers

Safe and cost-effetive design and operation of floating production systems offshore Brazil

July 6th, 2012Windsor Barra Hotel

Rooms Queluz I and II, on first lower level (SS 1)

at Avenida Lúcio Costa, 2630 - Barra da Tijuca - Rio de Janeiro

SeminarMARINTEK do Brasil has the pleasure to invite you for a seminar addressing important topics to successfully enable the development of oil and gas floating production systems in deep waters offshore Brazil.

The seminar will be organized in two parallel sessions:

Session 1: Stress and fatigue analysis of flexible risers and umbilicalsSession 2: Future paths within deep-water offshore hydrodynamics

Highlights for each of the sessions are given below. For a more detailed agenda, see next page.

MARINTEK do Brasil is situated at Torre do Rio Sul, Botafogo, Rio de Janeiro

Invitation to seminar

Session 1 :

Stress and fatigue analysis of flexible risers and umbilicals

The presentations will include:▪ Selection of environmental loads▪ Global response analysis▪ Local stress analysis▪ Fatigue analysis▪ Requalification▪ Topics for future research

Session 2:

Future paths within deep-water offshore hydrodynamics

The presentations will include :▪ Ocean environment (Deep-water currents;

bidirectional waves)▪ VIV▪ Complex hydrodynamics: New code develop-

ment▪ Deep-water marine operations▪ Wave impact and green water

Please turn the page for Agenda

Limited places. Please, confirm your participation to [email protected]

Pre-salt fields are located in deep water, in places featuring rugged and irregular sea-

bed and exposed to harsher environmental loads, such as steep waves, bi-directional sea states and current profiles changing

with depth and time. Under these conditions, precise models and simulation tools are

required for safe and cost-effective design and operation of floating production systems

www.marintek.com.br

Page 2: Safe and cost-effetive at Avenida Lúcio Costa, 2630 ... · Torre do Rio Sul, Botafogo, Rio de Janeiro Invitation to seminar Session 1 : Stress and fatigue analysis of flexible risers

You are welcome to visit our booth at OMAE

09:00 Welcome .......................................................................... Egil Giertsen, Research Director, MARINTEK

09:10 Selection of environmental loads ................................... Elizabeth Passano, Senior Research Scientist, MARINTEK

09:40 Global response analysis .............................................. Elizabeth Passano, Senior Research Scientist, MARINTEK

10:10 Local stress analysis .............................................. Svein Sævik, Professor, NTNU

10:40 Coffee break

11:00 Fatigue analysis .............................................................. Philippe Mainçon, Senior Research Scientist, MARINTEK

11:45 Requalification ................................................................. Bernt Leira, Professor, NTNU

12:15 Topics for future research ............................................... Philippe Mainçon, Senior Research Scientist, MARINTEK

12:45 LunchAll presentations will be given in English.

Agenda

Safe and cost-effective design and operation of floating production systems offshore Brazil

Session 1: Stress and fatigue analysis of flexible risers and umbilicals

09:00 Welcome ...................................................................... Lilia Nicolli, COO, MARINTEK do Brasil

09:10 Ocean environment (Deep-water currents; Rafael Schiller, Trainee Scientist, bidirectional waves) ......................................................... MARINTEK do Brasil

09:40 VIV Experimental Research on Deepwater Risers Halvor Lie, Research Manager - Risers and and Pipelines ................................................................... Mooring - MARINTEK

10:10 Analysis of Vortex Induced Vibrations ............................. Carl Martin Larsen, Professor, NTNU

10:40 Coffee break

11:00 Complex hydrodynamics: New code development ......... Petter Andreas Berthelsen, Research Scientist, MARINTEK

11:30 Deep-water marine operations ........................................ Halvor Lie, Research Manager - Risers and Mooring, MARINTEK

12:00 Wave impact and green water ...................................... Csaba Pâkozdi, Research Scientist, MARINTEK

12:30 Wrap-up ........................................................................... Lilia Nicolli, COO, MARINTEK do Brasil

12:45 LunchAll presentations will be given in English.

Session 2: Future paths within deep-water offshore hydrodynamics