Experience ∙ Innovation · Results
CALCASIEU PARISH – SABINE RIVER AND BAYOU LACASSINE BASINS
STORMWATER MASTER PLAN
Engineers ∙ Surveyors · Environmental Consultants
Project Objectives
Develop hydrologic and hydraulic models to:
• Understand existing drainage system
• Assess structure capacity
• Recommend drainage improvements
• Develop a maintenance plan
Project Area
Culvert Improvement Analysis
• Examined 45 culvert crossings
• Recommended improving 18 culverts
• Estimated cost: $2,261,000
Culvert Improvements
Drainage Improvement Analysis
• Examined lining 1.8 miles of channel in Vinton
• Not recommended
• Estimated cost: $2,182,000
Drainage Improvement Alternative
Master Plan
Ownership Responsibilities
Best Management
Practices Maintenance Plan Inspection Plan
Public Involvement and Acquiring Funds
Acquiring Funds FEMA Grants
• Hazard Mitigation Grant Program (HMGP)
• Pre-Disaster Mitigation Grant (PDM)
• Flood Mitigation Assistance (FMA)
• Repetitive Flood Claims (RFC)
• Severe Repetitive Loss (SRL)
State and Local Funds
• Statewide Flood Protection Program
• State Capital Outlay
• Roadway Trust Funds
• Drainage Trust Funds