Sabaramati Riverfront Development Project

Embed Size (px)

Citation preview

  • 8/14/2019 Sabaramati Riverfront Development Project.

    1/81

    Sabarmati Riverfront DevelopmentIntegrated Environmental Improvement and Urban

    Revitalization

    Executed By:-Sabarmati River Front Development Corporation Limited& Hasmukh C. Patel (HCP) Design & Project ManagementPvt. Ltd, Ahmedabad. Presented By:

    H. B. Hukare

    1stSem, M Tech, UPLVNIT, Nagpur

    Sub:Urban Design & Conservation

  • 8/14/2019 Sabaramati Riverfront Development Project.

    2/81

    Ahmedabad and the Sabarmati

  • 8/14/2019 Sabaramati Riverfront Development Project.

    3/81

    Ahmedabad was established on Sabarmati in 1411 :

  • 8/14/2019 Sabaramati Riverfront Development Project.

    4/81

    Ahmedabad and Sabarmati in 1672 :

  • 8/14/2019 Sabaramati Riverfront Development Project.

    5/81

    Sabarmati and the Growth of Ahmedabad

  • 8/14/2019 Sabaramati Riverfront Development Project.

    6/81

    Sabarmati has always been importantto Ahmedabad

  • 8/14/2019 Sabaramati Riverfront Development Project.

    7/81

    As a source for drinking water

    As a place for recreation

    Gandhiji built his ashram on thebank of Sabarmati in Ahmedabad

    As a place to gather

  • 8/14/2019 Sabaramati Riverfront Development Project.

    8/81

    As a place for the poor to build their hutments

    As a place for washing and drying clothes

    As a place for holding the traditional Sunday Market

    As a place for farming

  • 8/14/2019 Sabaramati Riverfront Development Project.

    9/81

    And yet, Sabarmati was abused and neglected

    place to dump garbage Stormwater drains spewed untreated

    sewage into the river

    A few nalas brought sewage intothe river

    Sewage from the slums flowed directlyinto the river

  • 8/14/2019 Sabaramati Riverfront Development Project.

    10/81

    Encroachments reduced the riversflood carrying capacity

    The bridges were theonly places from

    which the river couldbe enjoyed

  • 8/14/2019 Sabaramati Riverfront Development Project.

    11/81

    Haphazard and dull development came up along the riverfront

  • 8/14/2019 Sabaramati Riverfront Development Project.

    12/81

    The river became inaccessible to the public

  • 8/14/2019 Sabaramati Riverfront Development Project.

    13/81

    The river became insignificant in the life of the city

  • 8/14/2019 Sabaramati Riverfront Development Project.

    14/81

  • 8/14/2019 Sabaramati Riverfront Development Project.

    15/81

  • 8/14/2019 Sabaramati Riverfront Development Project.

    16/81

  • 8/14/2019 Sabaramati Riverfront Development Project.

    17/81

  • 8/14/2019 Sabaramati Riverfront Development Project.

    18/81

  • 8/14/2019 Sabaramati Riverfront Development Project.

    19/81

  • 8/14/2019 Sabaramati Riverfront Development Project.

    20/81

  • 8/14/2019 Sabaramati Riverfront Development Project.

    21/81

  • 8/14/2019 Sabaramati Riverfront Development Project.

    22/81

  • 8/14/2019 Sabaramati Riverfront Development Project.

    23/81

    AhmedabadMunicipal

    Corporation

    (AMC)

    Sabarmati RiverFront

    DevelopmentCorporation 1997

  • 8/14/2019 Sabaramati Riverfront Development Project.

    24/81

    Ambitions of the Sabarmati Riverfront Development Project

    A Multidimensional Environmental Improvement, SocialUpliftment and Urban Rejuvenation Project

    Make the riverfront accessible to the public Stop the flow of sewage, keep the river clean and pollution-free

    Provide permanent housing for riverbed slum dwellers Reduce risk of erosion and flooding in flood prone neighbourhoods Create riverfront parks, promenades and Ghats to enjoy the water Provide Ahmedabad with new cultural, trade and social amenities Revitalize riverfront neighbourhoods, rejuvenate Ahmedabad

    Generate resources to pay for all of the foregoing Stitch together East and West Ahmedabad Create a memorable identity for Ahmedabad

  • 8/14/2019 Sabaramati Riverfront Development Project.

    25/81

    : Project was initially held for 9 Km length betweenSubhash Road to Wasna Damand later on extended to20 Km between Wasana Dam to Narmada Canal.

    : 10.4 Km stretch is recently released on 15.08.12

    Project Received:: HUDCO National Award 2012for innovative

    infrastructure development.

    : Prime Minister Awardfor excellence in Urban

    planning & Design 1999.: Project Cost- 243.30 Crore,

    Earning through developed land-248.84 Crore

    Revenue generation (Saving)- 215.54 Crore.

  • 8/14/2019 Sabaramati Riverfront Development Project.

    26/81

    Dharoi Dam

    Vasana Barrage

    Fatehwadi

    Canal

    Ahmedabad

    Sabarmati River

    Catchment Areaunder control

    Hatmati DamGuhai Dam

  • 8/14/2019 Sabaramati Riverfront Development Project.

    27/81

  • 8/14/2019 Sabaramati Riverfront Development Project.

    28/81

    Dry River Bed

  • 8/14/2019 Sabaramati Riverfront Development Project.

    29/81

    Make the riverfront accessible tothe public

  • 8/14/2019 Sabaramati Riverfront Development Project.

    30/81

  • 8/14/2019 Sabaramati Riverfront Development Project.

    31/81

  • 8/14/2019 Sabaramati Riverfront Development Project.

    32/81

    River Training and Land Reclamation The Existing Riverbed

  • 8/14/2019 Sabaramati Riverfront Development Project.

    33/81

    River Training and Land Reclamation Defined Waterway 275 m wide Total Reclamation area - 202 Hectares

    Westbank

    Eastbank

    Definedwaterway

    Reclaimed Land

  • 8/14/2019 Sabaramati Riverfront Development Project.

    34/81

    River Training and Land Reclamation The Extent

    679 m

    275 m214m 190 m

    329m

    275m30 m 24 m

  • 8/14/2019 Sabaramati Riverfront Development Project.

    35/81

    The Construction Process Original Condition

  • 8/14/2019 Sabaramati Riverfront Development Project.

    36/81

    SRFD Land PrivaDiaphragm Wall & Anchor Slab (Lower Promenade)

    The Construction Process Diaphragm Wall and Anchor Slab

  • 8/14/2019 Sabaramati Riverfront Development Project.

    37/81

    Diaphragm Wall and Anchor Slab

    Diaphragm Wall and Anchor Slab

  • 8/14/2019 Sabaramati Riverfront Development Project.

    38/81

    Diaphragm Wall and Anchor Slab

    Di h W ll d A h Sl b

  • 8/14/2019 Sabaramati Riverfront Development Project.

    39/81

    Diaphragm Wall and Anchor Slab

  • 8/14/2019 Sabaramati Riverfront Development Project.

    40/81

    The Construction ProcessRetaining Wall and Earth Fill

    h ll d h ll

  • 8/14/2019 Sabaramati Riverfront Development Project.

    41/81

    The Construction ProcessRetaining Wall and Earth Fill

  • 8/14/2019 Sabaramati Riverfront Development Project.

    42/81

    Retaining Wall and General Earth Fill

  • 8/14/2019 Sabaramati Riverfront Development Project.

    43/81

    The entire length of Sabarmati is nowpublic!

    Source 26th February 2011, DNA

  • 8/14/2019 Sabaramati Riverfront Development Project.

    44/81

    Stop the flow of sewage, keep the river clean andpollution-free

  • 8/14/2019 Sabaramati Riverfront Development Project.

    45/81

  • 8/14/2019 Sabaramati Riverfront Development Project.

    46/81

    Eastbank

    East

    bank

    Pumping Station

    Interceptorsewage

    line

    Ensuring Clean Water

    Th C t ti P I t t li

  • 8/14/2019 Sabaramati Riverfront Development Project.

    47/81

    The Construction Process Interceptor sewage lineand Outfalls Extensions

    Interceptor SewerLine SRDF Land private

  • 8/14/2019 Sabaramati Riverfront Development Project.

    48/81

    Interceptor Sewer Line Built Up

    Interceptor Sewer Line Built Up

  • 8/14/2019 Sabaramati Riverfront Development Project.

    49/81

    Interceptor Sewer Line Built Up

  • 8/14/2019 Sabaramati Riverfront Development Project.

    50/81

    Provide permanent housingfor riverbed slum dwellers

    Relocation of Riverbed Slum Dwellers Socio Economic Survey of Riverbed Slu

  • 8/14/2019 Sabaramati Riverfront Development Project.

    51/81

    Relocation of Riverbed Slum Dwellers - Socio Economic Survey of Riverbed Slu

  • 8/14/2019 Sabaramati Riverfront Development Project.

    52/81

    Relocation of Riverbed Slum Dwellers - Housing

    Total number of households within project area : 5723 (as per 2002 survey)Total number of relocated households : 1387 (as of 17th, December 2010)Average number of households relocated daily : 25 - 40

    R l i f Ri b d Sl D ll R l i Si

  • 8/14/2019 Sabaramati Riverfront Development Project.

    53/81

    Relocation of Riverbed Slum Dwellers Relocation Sites

  • 8/14/2019 Sabaramati Riverfront Development Project.

    54/81

    Risk of flooding will significantly reduce in low lyingneighbourhoods!

    Create riverfront parks promenades and Ghats

  • 8/14/2019 Sabaramati Riverfront Development Project.

    55/81

    Create riverfront parks, promenades and Ghatsto enjoy the water

    Park Khanpur

  • 8/14/2019 Sabaramati Riverfront Development Project.

    56/81

    Park Khanpur

    Th H it P k L l D

  • 8/14/2019 Sabaramati Riverfront Development Project.

    57/81

    The Heritage Park Lal Darwaza

    Lower Promenade Ashram Road

  • 8/14/2019 Sabaramati Riverfront Development Project.

    58/81

    Lower Promenade Ashram Road

  • 8/14/2019 Sabaramati Riverfront Development Project.

    59/81

    Lower Promenade - Shahibaug

    Lower Promenade Narayan Ghat

  • 8/14/2019 Sabaramati Riverfront Development Project.

    60/81

    Lower Promenade Narayan Ghat

    Lower Promenade Narayan Ghat

  • 8/14/2019 Sabaramati Riverfront Development Project.

    61/81

    Lower Promenade Narayan Ghat

    Gandhi Ashram

  • 8/14/2019 Sabaramati Riverfront Development Project.

    62/81

    Gandhi Ashram

  • 8/14/2019 Sabaramati Riverfront Development Project.

    63/81

    The Sabarmati Riverfront Project will add almost 10,00,000sq. mts. of parks, promenades and plazas to Ahmedabad!

  • 8/14/2019 Sabaramati Riverfront Development Project.

    64/81

    Lower Promenade - Shahibaug

  • 8/14/2019 Sabaramati Riverfront Development Project.

    65/81

  • 8/14/2019 Sabaramati Riverfront Development Project.

    66/81

  • 8/14/2019 Sabaramati Riverfront Development Project.

    67/81

  • 8/14/2019 Sabaramati Riverfront Development Project.

    68/81

    Cultural, Trade and Social Amenities

    A Mile of Cultural Institutions and Museums

    Hospital Facilities

  • 8/14/2019 Sabaramati Riverfront Development Project.

    69/81

    Open Air Market s

  • 8/14/2019 Sabaramati Riverfront Development Project.

    70/81

    Informal Market at Delight-Junction

    Planning Precincts:

  • 8/14/2019 Sabaramati Riverfront Development Project.

    71/81

    1. Paldi Residential Neighborhood2. Cultural Mile3. Health-care Hub4. B J Park Institutional Precinct5. Ashram road Business District6. Ashram road Mixed Use Precinct7. Gandhi Ashram Heritage Precinct8. Sabarmati Residential Neighborhood9. Sabarmati Redevelopment Precinct

    10. Shahibagh Residential Neighborhood11. Shahibagh Institutional Precinct

    12. Dudeshwar Mixed Use Precinct13. Khanpur Mile14. Lal Darwaza Heritage Precinct15. Fair and Market Precinct16. Calico Redevelopment Precinct17. Pirana Precinct

    18. Lower Promenade

    Planning Precincts:

  • 8/14/2019 Sabaramati Riverfront Development Project.

    72/81

  • 8/14/2019 Sabaramati Riverfront Development Project.

    73/81

  • 8/14/2019 Sabaramati Riverfront Development Project.

    74/81

  • 8/14/2019 Sabaramati Riverfront Development Project.

    75/81

  • 8/14/2019 Sabaramati Riverfront Development Project.

    76/81

    Proposed Land use June 2010

  • 8/14/2019 Sabaramati Riverfront Development Project.

    77/81

    Proposed Land use June 2010Gardens/Promenades/Open Space-53.84%Public Utility Areas-11.08%SRFD Road-19.38%Land for Sale-14.50%Adjoining Residual Area-1.20%

    Proposed Land use June 2010

  • 8/14/2019 Sabaramati Riverfront Development Project.

    78/81

  • 8/14/2019 Sabaramati Riverfront Development Project.

    79/81

    1) Environmental improvement and Urban

    Revitalization.2) Barrel Land used.`3) Landscaping added to natural and physical health.4) Slum improvement sought simultaneously.5) Financial improvement through employment generation.6) Health improvement since environment improvement.7) Revenue Generationthrough land selling and employment.8) Flood Controlthrough proper river channelizing.

    The fallowing aims are sought through implementation ofSRFD Ahmadabad Project:

  • 8/14/2019 Sabaramati Riverfront Development Project.

    80/81

    This city will be known for bringing theSabarmati back to Ahmedabad and for

    bringing Sabarmati back to the Ahmadabad.!

  • 8/14/2019 Sabaramati Riverfront Development Project.

    81/81