9
~EL.+3.50~ STA. CONTROL POINTS E (m) N (m) ELEV.(m) BM-KM6 BM-RID-10-01132 0 2 SCALE METERS 4 6 10 10% Slope to service space +7.5m MSL UP PASAK RIVER EL.+4.00 ROAD BRIDGE TEMPORARY DAM 2 (DOWNSTREAM) see KM-TW-002 TEMPORARY DAM 1 (UPSTREAM) S=1:2.0 EL.+3.50 APPROVED LOCATION REV. DESCRIPTION APPROVED CHECKED APPROVED PRESENT DATE OFFICE OF ENGINEERING DESIGN & ARCHITECTURE IRRIGATION SYSTEM DESIGN GROUP APPROVED DESIGNED CHECKED DRAWN DATE PROPOSED APPROVED VERIFIED ROYAL IRRIGATION DEPARTMENT CHIEF DIRECTOR D.G. ROYAL IRRIGATION DEPARTMENT DATE NO. The Flood Prevention Project of East Side of the Pasak River in Ayutthaya in the Kingdom of Thailand TEMPORARY WORKS OF (TEMPORARY WORKS) KRA MANG FLOODGATE CTI ENGINEERING INTERNATIONAL CO., LTD. Akio SHICHIJUGARI KM-TW-001 Tatsuji ITO T. MISHINA Tatsuji ITO S=1:2.0 ROAD BRIDGE RAILWAY BRIDGE RAILWAY BRIDGE TEMPORARY OFFICE YARD EXISTING ROAD TEMPORARY ACCESS ROAD CONSULTING FIRMS : KRA MANG FLOODGATE STEEL SHEET PILE TYPE-III LAYOUT PLAN Reference Only P. SIRION S. INTARAPRACHA L. KOWATTANA SAND MAT ALONG NATURAL GROUND t=1m SAND MAT ALONG NATURAL GROUND t=1m SAND MAT ALONG NATURAL GROUND t=1m

S=1:2.0 EL.+3.50 EL.+4 - JICA

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: S=1:2.0 EL.+3.50 EL.+4 - JICA

~EL.+3.50~

STA.

CONTROL POINTSE (m)N (m) ELEV.(m)

BM-KM6

BM-RID-10-01132

0 2SCALE

METERS4 6 10

SLO

PE

SLOPE

SLO

PE

SLOPE

SLOPE

SLOPE

10%

Slo

pe to

ser

vice

spa

ce +

7.5m

MSL

UP

PASA

K R

IVER

EL.+4.00

RO

AD

BR

IDG

E

TEMPORARY DAM 2(DOWNSTREAM)

see KM-TW-002

TEMPORARY DAM 1(UPSTREAM)

S=1:2.0

EL.+3.50

APPROVEDLOCATIONREV.

DESCRIPTION APPROVED

CHECKED APPROVED

PRESENTDATEOFFICE OF ENGINEERING DESIGN & ARCHITECTUREIRRIGATION SYSTEM DESIGN GROUP

APPROVED

DESIGNED

CHECKED

DRAWN

DATE

PROPOSED

APPROVED

VERIFIED

ROYAL IRRIGATION DEPARTMENT

CHIEF

DIRECTOR

D.G.

ROYAL IRRIGATION DEPARTMENT

DATE

NO.

The Flood Prevention Project ofEast Side of the Pasak River in Ayutthaya

in the Kingdom of Thailand

TEMPORARY WORKS OF(TEMPORARY WORKS)

KRA MANG FLOODGATE

CTI ENGINEERING INTERNATIONAL CO., LTD.

Akio SHICHIJUGARI

KM-TW-001

Tatsuji ITO

T. MISHINA

Tatsuji ITO

S=1:2.0

RO

AD

BR

IDG

E

RA

ILWA

Y B

RID

GE

RA

ILWA

Y B

RID

GE

TEMPORARYOFFICE YARD

EXISTING ROAD

TEMPORARYACCESS ROAD

CONSULTING FIRMS :

KRA MANGFLOODGATE

STEEL SHEET PILE TYPE-III

LAYOUT PLAN

Reference Only

P. SIRION

S. INTARAPRACHA

L. KOWATTANA

SAND MAT ALONG NATURAL GROUND t=1m

SAND MAT ALONG NATURAL GROUND t=1m

SAND MAT ALONG NATURAL GROUND t=1m

Page 2: S=1:2.0 EL.+3.50 EL.+4 - JICA

PARTS NAME

DESIGN CONDITIONS

WALL LENGTH

SOIL PRESSURE

SURECHAGE

HIGH WATER LEVEL

FILLED MATERIAL

20.000 m

EL.+4.000 m

IMPORTED SAND

0.00 kN/m²

COULOMB'S

DESIGN CONDITIONS PARTS NAME MATERIAL TYPE, DIMENSIONS UNIT Q'ty UNIT WEIGHT MASS REMARKS

DETAIL OF ASSEMBLED PARTS

STEEL SHEET PILE SY 295 TYPE III m 800.00 60.0 kg/m 48.000 t

TIE ROD SS400 (< 40 mm) Ø 50 mm 50.82

CHANNEL SS400 180x75x7x10.5 80.00 21.4 kg/m 1.712 t

m

m

REMARKS :1. ALL DIMENSIONS ARE SHOWN IN MILLIMETERS.

BORING LOG [DH-KM-4]

-2

3.00

CL

DE

PTH

(m)

EN

DE

D D

EP

TH (m

)

SYMBOL

GR

AP

HIC

LO

G

VERY STIFF TO HARDLEAN CLAY, BROWN

DESCRIPTION OF SOIL N-VALUE

PENETRATIONDEPTH,

ft. 0 10 3020 40 50

STANDARDPENETRATION TEST

WA

TER

LE

VE

L

-4

-6

-8

-10

-12

-14

-16

-18

-20

-22

-24

-26

-28

-3030.45

8

8

17

10

17

18

20

22

20

30

27

44

46

37

50/9"

40

36

50/4"

45

50/3"

50/3"

50/5"

50/3"

50/2"

50/1"

SM DENSE TO VERY DENSE SILTYSAND, BROWN

-1.0

MEDIUM FAT CLAY,BROWN

50/8"

50/1"

50/1"

50/9"

50/2"

18.00

*WITH SAND AT SS-4& SS-10

SM VERY DENSE SILTY FINESAND, BROWN

CH

20.00

SM VERY DENSE POORLY GRADEDSAND WITH SILT, BROWN

29.00

+0.72 m MSL

4000

500

10@

1900

= 1

9000

2000

0

500

Ø 50 mm TIE RODS

STEEL SHEET PILE TYPE III

2 x CHANNEL -180x75x7x10.5 mm

A A

1000

1000

1280

4720

3280

8000

Ø 50 mm TIE RODS

2 x CHANNEL -180x75x7x10.5 mm

STEEL SHEET PILE TYPE III

EL.+0.720

EL.+3.000

WL.+0.000

180 180

EL.- 4.000

~IMPORTED SAND~

~IMPORTED SAND~

WL.+2.000

MILLIMETERS

800070006000500040003000200010000SCALE A

SEE DETAIL "2"

SEE DETAIL "1"

STEEL SHEET PILE TYPE III

2 x CHANNEL -180x75x7x10.5 mm

125

400

13 400

STEEL SHEET PILE TYPE III 180

13

2 x CHANNEL - 180x75x7x10.5 mm

BEARING PLATE

ANCHOR NUT

Ø 50 mm TIE RODS

1500

SCALE B

10005000 250

MILLILMETERS

4000

H.W.L.+4.000

LOCATIONREV.NO. APPROVEDLOCATION

REV.DESCRIPTION

CHECKED

PRESENT APPROVED

APPROVEDDATE

OFFICE OF ENGINEERING DESIGN & ARCHITECTUREIRRIGATION SYSTEM DESIGN GROUP

APPROVED

DESIGNED

CHECKED

DRAWN

DATE

PROPOSED

APPROVED

VERIFIED

ROYAL IRRIGATION DEPARTMENT

CHIEF

DIRECTOR

D.G.

ROYAL IRRIGATION DEPARTMENT

DATE

NO.

The Flood Prevention Project ofEast Side of the Pasak River in Ayutthaya

in the Kingdom of Thailand

TEMPORARY WORKS OF(TEMPORARY WORKS)

KRA MANG FLOODGATE

CTI ENGINEERING INTERNATIONAL CO., LTD.

KM-TW-002

Tatsuji ITO

Tatsuji ITO

Akio SHICHIJUGARI

T. MISHINA

CONSULTING FIRMS :

Reference Only

DETAIL OF TEMPORARY DAM 2

PLANSCALE A

CL

CL

CL

CL

SECTION A-ASCALE A

DETAIL "1"SCALE B

DETAIL "2"SCALE B

CL

CL

P. SIRION

S. INTARAPRACHA

L. KOWATTANA

Page 3: S=1:2.0 EL.+3.50 EL.+4 - JICA

A

-1.7m

E

4m

J

18400

28002@

2000

=4000

12400

24400

6800

11600

3@20

00=6

000

8@2000=16000

21200

6000

39200

1360

0

0SCALE

METERS

10

E

F

F

D

D

A

C

C

J34.88

I I

CONTROL POINTSCONTROL POINTSSTA. E (m)N (m) ELEV.(m)STA. E (m)N (m) ELEV.(m)

BM-KM6BM-KM6

20

SLO

PE

SLOPE

SLO

PE

SLOPE

SLOPE

SLOPE

5 30

2000

9@2000=18000

6@2000=12000

1000

LOCATIONREV.NO. APPROVEDLOCATION

REV.DESCRIPTION

CHECKED

PRESENT APPROVED

APPROVEDDATE

OFFICE OF ENGINEERING DESIGN & ARCHITECTUREIRRIGATION SYSTEM DESIGN GROUP

APPROVED

DESIGNED

CHECKED

DRAWN

DATE

PROPOSED

APPROVED

VERIFIED

ROYAL IRRIGATION DEPARTMENT

CHIEF

DIRECTOR

D.G.

ROYAL IRRIGATION DEPARTMENT

DATE

NO.

The Flood Prevention Project ofEast Side of the Pasak River in Ayutthaya

in the Kingdom of Thailand

TEMPORARY WORKS OF(TEMPORARY WORKS)

KRA MANG FLOODGATE

CTI ENGINEERING INTERNATIONAL CO., LTD.

KM-TW-003

Tatsuji ITO

Tatsuji ITO

Akio SHICHIJUGARI

T. MISHINA

CONSULTING FIRMS :

Reference Only

PLAN OF TEMPORARY EXCAVATION WORKS

P. SIRION

S. INTARAPRACHA

L. KOWATTANA

Page 4: S=1:2.0 EL.+3.50 EL.+4 - JICA

-0.7m MSL

+7.5m MSL

GL +3.5m MSL

-2.7m MSL

5050 2700

7750

±0m MSL

+2.8m MSL

-1.7m MSL

5050

7050

STEEL SHEET PILE TYPE-IIIL=8000

TIE ROD Ø50@2000

6500

+3.6m MSL

H-300 x 300 x 10 x 15L=8000 @2000

+2.5m MSL

WALES -150 x 75 x 6.5 x 10

U shaped wallof Floodgate Breast wall of

Floodgate

PC CORRUGATE SHEET PILE SW 500AL=15000

STEEL SHEET PILE TYPE-IIIL=7500

2000

-0.5m MSL

+7.0m MSL

800

1000

200

-1.0m MSL

1500

200

-2

3.00

CH VERY SOFT TO SOFTFAT CLAY, GRAY

0 10 20 30 40 50

-4

-6

-8

-10

-12

-14

-16

-18

-20

BORING LOG [DH-KM-3]

HARD AND FAT LEANCLAY, BROWN

0

0

1

3

1

12

31

34

31

46

57

52

50/9"

50/10"

50/9"

53

37

42

50/2"

50/2"SM

DENSE TO VERY DENSE SILTYSAND, BROWN

-4.0

FILLNORECOVERY

CH,CL

6.00

7.00

18.00

CL STIFF LEAN CLAY, BROWN

DEP

TH (m

)

END

ED D

EPTH

(m)

GR

APH

IC L

OG

DESCRIPTION OF SOILN-VALUE

PENETRATIONDEPTH,

ft.

STANDARDPENETRATION TEST

WA

TER

LEV

ELSYMBOL

±0m MSL

-10.0m MSL

GL +3.2m MSL

-2.2m MSL

4000

Wing wall ofFloodgate

TIE ROD Ø50mm@2000

H-300 x 300 x 10 x 15L=8000 @2000

WALES -250 x 90 x 11 x 14.5

PC CORRUGATE SHEET PILE SW 500AL=15000

+7.5m MSL

+2.8m MSL+2.5m MSL

21.00

SECTION A-A

STEEL SHEET PILE TYPE-IIIL=7500

SECTION B-B SECTION C-C

+2.90m MSL

7.00

CL STIFF TO VERY STIFFLEAN CLAY, GRAY

19.00

20.00

CL HARD LEAN CLAY WITHFINE SAND, BROWN

CL HARD LEAN CLAY,BROWN

SC-SM VERY DENSE SILTY CLAYEYFINE SAND, BROWN

20

19

12

20

16

19

52

34

30

45

40

54

50/11

65

44

56

52

46

50/8"

50/9"

50/9"

48

52

-6.0

24.15

0 10 20 30 40 50

DEP

TH (m

)

END

ED D

EPTH

(m)

GR

APH

IC L

OG

DESCRIPTION OF SOILN-VALUE

PENETRATIONDEPTH,

ft.

STANDARDPENETRATION TEST

WA

TER

LEV

ELSYMBOL

BORING LOG [DH-KM-1]

-2

-4

-6

-8

-10

-12

-14

-16

-18

-20

+2.78m MSL

±0m MSL

-10.0m MSL

+3.6m MSL

-2.7m MSL

2750

-1.0m MSL

1500

200

Breast wall ofFloodgate

-0.7m MSL

+2.8m MSL

5000

7750

STEEL SHEET PILE TYPE-IIIL=8000

TIE ROD Ø50@2000

6500

H-300 x 300 x 10 x 15L=8000 @2000

+2.5m MSL

WALES -150 x 75 x 6.5 x 10

GL +3.5m MSL

-2.2m MSL

6500

Breast wall ofFloodgate

TIE ROD Ø50@2000

H-300 x 300 x 10 x 15L=8000 @2000

WALES -250 x 90 x 11 x 14.5

PC CORRUGATE SHEET PILE SW 500AL=15000

+7.5m MSL

+2.8m MSL+2.5m MSL

-0.7m MSL

3750

-2.7m MSL

-1.0m MSL

5750

9500

1500

1000

STEEL SHEET PILE TYPE IIIL=7500

STEEL SHEET PILE TYPE-IIIL=7500

SECTION D-D SECTION E-E

200

0SCALE

METERS

152 4 6 8 10

LOCATIONREV.NO. APPROVEDLOCATION

REV.DESCRIPTION

CHECKED

PRESENT APPROVED

APPROVEDDATE

OFFICE OF ENGINEERING DESIGN & ARCHITECTUREIRRIGATION SYSTEM DESIGN GROUP

APPROVED

DESIGNED

CHECKED

DRAWN

DATE

PROPOSED

APPROVED

VERIFIED

ROYAL IRRIGATION DEPARTMENT

CHIEF

DIRECTOR

D.G.

ROYAL IRRIGATION DEPARTMENT

DATE

NO.

The Flood Prevention Project ofEast Side of the Pasak River in Ayutthaya

in the Kingdom of Thailand

TEMPORARY WORKS OF(TEMPORARY WORKS)

KRA MANG FLOODGATE

CTI ENGINEERING INTERNATIONAL CO., LTD.

KM-TW-004

Tatsuji ITO

Tatsuji ITO

Akio SHICHIJUGARI

T. MISHINA

CONSULTING FIRMS :

Reference Only DETAIL OF TEMPORARY WORKS (1/2)

P. SIRION

S. INTARAPRACHA

L. KOWATTANA

Page 5: S=1:2.0 EL.+3.50 EL.+4 - JICA

7.00

CL STIFF TO VERY STIFFLEAN CLAY, GRAY

19.00

20.00

CL HARD LEAN CLAY WITHFINE SAND, BROWN

CL HARD LEAN CLAY,BROWN

SC-SM VERY DENSE SILTY CLAYEYFINE SAND, BROWN

20

19

12

20

16

19

52

34

30

45

40

54

50/11

65

44

56

52

46

50/8"

50/9"

50/9"

48

52

-6.0

24.15

0 10 20 30 40 50

DEP

TH (m

)

END

ED D

EPTH

(m)

GR

APH

IC L

OG

DESCRIPTION OF SOILN-VALUE

PENETRATIONDEPTH,

ft.

STANDARDPENETRATION TEST

WA

TER

LEV

ELSYMBOL

BORING LOG [DH-KM-1]

-2

-4

-6

-8

-10

-12

-14

-16

-18

-20

+2.78m MSL

±0m MSL

-10.0m MSL

+2.8m MSL

TIE ROD Ø50@2000

6500

+3.6m MSL

H-300 x 300 x 10 x 15L=8000 @2000

+2.5m MSL

WALES -150 x 75 x 6.5 x 10

STEEL SHEET PILE TYPE-IIIL=8000

Drainage Gate

4.00

CL,CH STIFF TO VERY STIFFLEAN AND FAT CLAY, GRAY

HARD LEAN AND FATCLAY, BROWN

*WITH FINE SAND AT SS-7

SCVERY DENSE CLAYEY FINESAND, BROWN

0

0

0

13

19

33

36

36

42

36

38

62

50/10"

50/4"

45

56

50/9"

50/9"

50/8"

50/9"

+3.0

6.00

VERY SOFT CLAY, GRAYNORECOVERY

CL,CH

17.00

21.00

-0.37m MSL

BORING LOG [DH-KM-2]

0 10 20 30 40 50

DEP

TH (m

)

END

ED D

EPTH

(m)

GR

APH

IC L

OG

DESCRIPTION OF SOILN-VALUE

PENETRATIONDEPTH,

ft.

STANDARDPENETRATION TEST

WA

TER

LEV

ELSYMBOL

±0m MSL

-10.0m MSL

-1.5m MSL

RevetmentFloodgate

STEEL SHEET PILE TYPE-IIIL=7500

±0m MSL

SECTION F-F

SECTION G-G, H-H

CROSS SECTIONOF TEMPORARY ROAD

+0.36m MSL 1:1.01:1.0

4000

GL +3.6m MSL

1:1.0

+7.0m MSL

-1.7m MSL

4150

GL +3.2m MSL

±0m MSL

PC CORRUGATE SHEET PILE SW 500AL=15000

SECTION I-I

SECTION J-J

-1.0m MSL

+1.85m MSL

2650

200

0SCALE

METERS

152 4 6 8 10

LOCATIONREV.NO. APPROVEDLOCATION

REV.DESCRIPTION

CHECKED

PRESENT APPROVED

APPROVEDDATE

OFFICE OF ENGINEERING DESIGN & ARCHITECTUREIRRIGATION SYSTEM DESIGN GROUP

APPROVED

DESIGNED

CHECKED

DRAWN

DATE

PROPOSED

APPROVED

VERIFIED

ROYAL IRRIGATION DEPARTMENT

CHIEF

DIRECTOR

D.G.

ROYAL IRRIGATION DEPARTMENT

DATE

NO.

The Flood Prevention Project ofEast Side of the Pasak River in Ayutthaya

in the Kingdom of Thailand

TEMPORARY WORKS OF(TEMPORARY WORKS)

KRA MANG FLOODGATE

CTI ENGINEERING INTERNATIONAL CO., LTD.

KM-TW-005

Tatsuji ITO

Tatsuji ITO

Akio SHICHIJUGARI

T. MISHINA

CONSULTING FIRMS :

Reference Only DETAIL OF TEMPORARY WORKS (2/2)

P. SIRION

S. INTARAPRACHA

L. KOWATTANA

Page 6: S=1:2.0 EL.+3.50 EL.+4 - JICA

XX

////

////

XX

XX

XX

XX

X

X

XX

X

XX

X

X

XX

XX

XX

X

X

XX

XX

XX

XX

X

XX

X

XX

XX

XX

X

XX

XX

XX

XX

XX

XX

XX

XX

X

XX

XX

XX

XX

XX

XX

XX

X

X X

//

0

0

0

0

0 0

0

0

0.0

0.0

5

Owned by landowner

Owned by landowner

67

66

65

64

63

231

57

58

59

6061

62

228

229

210

261262 263

264

265

266

267

260

259

257258

256

268

1

2

1

56

1819 20

21

23

22

24

25

2627

28

30

29

31

NO

.0 (B

P)

NO

.0+2

0.00

NO

.0+4

0.00

NO

.0+6

0.00

NO

.0+8

0.00

NO

.1+2

0.00

NO.1

+40.

00

NO.1

+60.

00

NO.1

+80.

00

NO.2

NO.2+20

.00NO.2+

40.00

NO.2+60

.00NO.2+

80.00

NO.3

NO.3+20

.00NO.3+

40.00

NO.3+60

.00

NO

.0+5

.29

(BC

)

NO.2+30

.44 (E

C)

NO.2+59.21Drainage Pipe Culvert-LØ600mm

NO.1+59.27Drainage Pipe Culvert-RØ600mm

+3.39m MSL+3.35m MSL

+3.19m MSL

+3.15m MSL

+3.11m MSL

+3.07m MSL

+3.03m MSL

+2.69m MSL

+2.65m MSL+2.65m MSL

+2.65m MSL

+3.09m MSL+2.85m MSL

+2.81m MSL

+2.77m MSL

+2.73m MSL

+2.65m MSL

+2.69m MSL

+2.69m MSL

+2.73m MSL

+2.77m MSL

+2.81m MSL

+2.85m MSL

+2.89m MSL

+2.93m MSL

NO.0+40.00 to NO.1+30.19U-B300xH300

Slope=0.2% L=90.19m

NO.1+59.12 to NO.3+11.84

U-B300xH300

Slope=0.2% PL=152.72m

NO.0+99.92 to NO1+54.63

U-B300xH300

Slope=0.2% L=57.41m

NO.2+59.17 to NO.3+11.84

U-B600xH300

LEVEL L=52.67m

NO.1+54.63 to NO.2+59.17

U-B300xH400

Slope=0.2% L=104.54m

NO.0+60.75Stairs-R1

NO.0+99.93Stairs-R2

NO.1+49.27Stairs-R3

NO.1+81.07Stairs-R4

NO.2+30.59Stairs-R5

NO.2+79.78Stairs-R6

NO.1+1.20Stairs-L1

NO.2+19.64Stairs-L3

NO.2+79.78Stairs-L4

NO

.0+5

0.00

R=3

00m

R=300

m

82@1000=82000

11@1000=11000

10@1000=10000

10@1000=10000

10@1000=10000

11@1000=11000

10@1000=10000

11@1000=11000

10@1000=10000

10@1000=10000

10@1000=10000

11@1000=11000

10@1000=10000

10@1000=10000

11@1000=11000

10@1000=10000

10@1000=10000

11@1000=11000

10@1000=10000

10@1000=10000

20

4000

4000

1700

10290

10300

10300

10300

10300

10300

10300

10300

10300

10300

10300

10300

10300

10300

10300

10300

10300

10300

10300

10300

10300

10300

10300

10300

10300

1030010290

9484

20

9980

20

9980

99804@

500=2000

20

9980

20

9980

20

9980

20

9980

20

998020

9980

20

9980

20

20

9980

20

998020

9980

20

8948

1240

1700

290

1700

290

450

1700

450

1700

4898

9980

20

9980

20

209980

9980

20

2020

998020

998020

9980209980

998

4501700

4@500=2000

1700450

4@500=2000

4@500=2000

4@500=2000

800

600

30040

00

3000

40030

030

0

NO.1+44.92 to NO.1+59.12

U-B300xH300

Slope=0.2% L=14.20m

NO.1+30.19 to NO.1+44.92

U-B300xH700

Slope=0.2% L=14.73m

7980

6000

20 9980

209980

2020

4@500=2000

800

600

30040

00

3000

400

300

300

82@1000=82000

20

10290

10300

10300

10300

10300

10300

10300

10300

10300

10300

10300

10300

10300

10300

10300

10300

10300

10300

10300

2020

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

10@1000=10000

11@1000=11000

10@1000=10000

10@1000=10000

11@1000=11000

10@1000=10000

10@1000=10000

11@1000=11000

10@1000=10000

10@1000=10000

11@1000=11000

9@1000=9000

998

2901700

4188

1700

188

1700

500

290

1700

9980

209980

998020

998020

998020

4@500=2000

4@500=2000

20

20 9980

20

209980

209980

1098020

20

4@500=20008980

20

9980

20

9980

20

7377

1240 50020

11488

209980

9980

20

9980

209980

20

9980

9980

9980

9980

0 10 20 30 40 50METERS

SCALE

27m27m

14m

14m

26.11

m

APPROVEDLOCATIONREV.

DESCRIPTIONCHECKED

PRESENT APPROVED

APPROVEDDATE

OFFICE OF ENGINEERING DESIGN & ARCHITECTUREIRRIGATION SYSTEM DESIGN GROUP

APPROVED

DESIGNED

CHECKED

DRAWN

DATE

PROPOSED

APPROVED

VERIFIED

ROYAL IRRIGATION DEPARTMENT

CHIEF

DIRECTOR

D.G.

ROYAL IRRIGATION DEPARTMENT

CONSULTING FIRMS :

DATE

NO.

The Flood Prevention Project ofEast Side of the Pasak River in Ayutthaya

in the Kingdom of Thailand

HAN TRA FLOODGATE AND CANAL(CIVIL WORKS)

OVERALL LAYOUT

CTI ENGINEERING INTERNATIONAL CO., LTD.

HT-FG&BP-001

Masaki ISHII

Masaki ISHII

Akio SHICHIJUGARI

T. MISHINA

P. SIRION

S. INTARAPRACHA

L. KOWATTANA

Page 7: S=1:2.0 EL.+3.50 EL.+4 - JICA

XX

XX

XX

X

////

////

////

////

////

////

XX

XX

XX

XX

XX

XX

X

X

XX

XX

X

XX

XX

XX

XX

XX

X

XX

XX

XX

XX

XX

XX

XX

X

XX

XX

XX

XX

XX

XX

XX

X

264

2651 2

1

18

19

20

21

23

2224

29

31

NO

.2+2

0.00

NO

.2+4

0.00

NO

.2+6

0.00

NO

.2+8

0.00

NO

.3

NO

.3+2

0.00

NO

.3+4

0.00

NO

.3+6

0.00

NO

.2+3

0.44

(EC

)

+2.65m MSL

+2.65m MSL

+2.65m MSL

+2.77m MSL

+2.85m MSL+2.89m MSL

+2.93m MSL

NO.2+59.17 to NO.3+11.84U-B600xH300LEVEL L=52.67m

NO.1+54.63 to NO.2+59.17Slope=0.2% L=104.54m

Stairs-R5

NO.2+79.78

Stairs-L4

R=3

00m

82@1000=82000

11@1000=11000

10@1000=10000

10@1000=10000

20

10290

10300

10300

10300

10300

10300

10300

10300

10300

10300

948420

998020

9980

9980

4@500=2000209980

20

9980

209980

20

998020

9980

20

9980209980

1700

1700

290

4@500=2000

800

600

300

4000

3000

40030

030

0

800

600

300

4000

3000

400

300

300

82@1000=82000

2010290

10300

10300

10300

10300

10300

10300

10300

10300

10300

20

2020

20

20

20

20

20

20

2020

10@1000=10000

11@1000=11000

1881700

500

2901700

10980

204@500=2000

8980

209980

20

9980

20

7377

1240

50020

11488

209980

9980

20

9980

20 998020

0 10 20 30

METERS

SCALE

27m

27m

14m

14m

26.1

1m

APPROVEDLOCATIONREV.

DESCRIPTIONCHECKED

PRESENT APPROVED

APPROVEDDATE

OFFICE OF ENGINEERING DESIGN & ARCHITECTUREIRRIGATION SYSTEM DESIGN GROUP

APPROVED

DESIGNED

CHECKED

DRAWN

DATE

PROPOSED

APPROVED

VERIFIED

ROYAL IRRIGATION DEPARTMENT

CHIEF

DIRECTOR

D.G.

ROYAL IRRIGATION DEPARTMENT

CONSULTING FIRMS :

DATE

NO.

The Flood Prevention Project ofEast Side of the Pasak River in Ayutthaya

in the Kingdom of Thailand

HAN TRA FLOODGATE AND CANAL(CIVIL WORKS)

LAYOUT (1/3)

CTI ENGINEERING INTERNATIONAL CO., LTD.

HT-FG&BP-002

Masaki ISHII

Masaki ISHII

Akio SHICHIJUGARI

T. MISHINA

P. SIRION

S. INTARAPRACHA

L. KOWATTANA

Page 8: S=1:2.0 EL.+3.50 EL.+4 - JICA

XX

XX

XX

XX

XXXXXXXXXXX

X

XX

XX

XX

XX

XX

XX

X

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

X X X X X X X X X X

XX

XX

XX

XX

00

00

Owned by landowner

63 231

229

210

261

264

265

19

20

21

NO

.1+2

0.00

NO

.1+4

0.00

NO

.1+6

0.00

NO

.1+8

0.00

NO

.2

NO

.2+2

0.00

NO

.2+4

0.00

NO

.2+6

0.00

NO

.2+8

0.00

NO

.2+3

0.44

(EC

)

+3.15m MSL

+3.11m MSL

+3.07m MSL

+2.65m MSL

+2.65m MSL

+2.65m MSL

+2.73m MSL

+2.65m MSL

+2.69m MSL

+2.69m MSL

+2.77m MSL

+2.85m MSL+2.89m MSL

NO.1+59.12 to NO.3+11.84U-B300xH300Slope=0.2% PL=152.72m

NO.0+99.92 to NO1+54.63

U-B300xH300

Slope=0.2% L=57.41m

NO.2+59.17 to NO.3+11.84U-B600xH300LEVEL L=52.67m

NO.1+54.63 to NO.2+59.17U-B300xH400Slope=0.2% L=104.54m

NO.0+99.93

NO.1+49.27

Stairs-R3

NO.1+81.07

Stairs-R4

NO.2+30.59

Stairs-R5

NO.1+1.20

Stairs-L1

NO.2+79.78

Stairs-L4

R=3

00m

82@1000=82000

11@1000=11000

10@1000=10000

10@1000=10000

10@1000=1000011@1000=11000

10@1000=1000011@1000=1100010@1000=1000010@1000=1000010@1000=10000

11@1000=11000

10@1000=10000

10@1000=10000

10300

10300

10300

10300

10300

10300

10300

10300

1030010300

103001030010300103001030010300

1030010300

10300

10300

998020

9980

9980

4@500=200020

9980

20

9980

209980

20

998020

9980

20

9980209980

20

20

9980209980

20

99802089481240

1700

1700

290

450 17004501700

4898

9980

209980

20

2000

4@500=2000

4@500=2000

NO.1+44.92 to NO.1+59.12

U-B300xH300

Slope=0.2% L=14.20m

NO.1+30.19 to NO.1+44.92

U-B300xH700

Slope=0.2% L=14.73m

79806000

20

9980

20

9980 20

20

4@500=2000

82@1000=82000

10290

10300

10300

10300

10300

10300

10300

10300

10300

1030010300

1030010300103001030010300

1030010300

10300

2020

2020 20 20 20 20 20

2020

2020

20

20

20

20

20

20

10@1000=10000

11@1000=11000

10@1000=10000

10@1000=1000011@1000=11000

10@1000=1000010@1000=1000011@1000=1100010@1000=10000

10@1000=10000

11@1000=11000

9@1000=9000

2901700

41881700

1881700

500

2901700

9980 20 99809980

20

9980

20

9980

20

4@500=2000

4@500=2000

20 20

9980

20 20

9980

209980

1098020

204@500=2000

8980

209980

20

9980

20

7377

1240

50020

11488

209980

9980

20

9980

20 9980

9980

9980

9980

14m

0 10 20 30

METERS

SCALE

APPROVEDLOCATIONREV.

DESCRIPTIONCHECKED

PRESENT APPROVED

APPROVEDDATE

OFFICE OF ENGINEERING DESIGN & ARCHITECTUREIRRIGATION SYSTEM DESIGN GROUP

APPROVED

DESIGNED

CHECKED

DRAWN

DATE

PROPOSED

APPROVED

VERIFIED

ROYAL IRRIGATION DEPARTMENT

CHIEF

DIRECTOR

D.G.

ROYAL IRRIGATION DEPARTMENT

CONSULTING FIRMS :

DATE

NO.

The Flood Prevention Project ofEast Side of the Pasak River in Ayutthaya

in the Kingdom of Thailand

HAN TRA FLOODGATE AND CANAL(CIVIL WORKS)

LAYOUT (2/3)

CTI ENGINEERING INTERNATIONAL CO., LTD.

HT-FG&BP-003

Masaki ISHII

Masaki ISHII

Akio SHICHIJUGARI

T. MISHINA

P. SIRION

S. INTARAPRACHA

L. KOWATTANA

Page 9: S=1:2.0 EL.+3.50 EL.+4 - JICA

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

X

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

X

XX

X

0

0

00

0

0

00

Owned by landowner

66

6564

63 231

5758 59

60 61 62228

229

210

NO.0

(BP)

NO.0

+20.

00

NO

.0+4

0.00 N

O.0

+60.

00 NO

.0+8

0.00

NO

.1+2

0.00

NO

.1+4

0.00

NO

.1+6

0.00

NO.0

+5.2

9 (B

C)

+3.15m MSL

+2.85m MSL

+2.73m MSL

+2.65m MSL

+2.69m MSLNO.0+40.00 to NO.1+30.19

U-B300xH300

Slope=0.2% L=90.19m

NO.0+99.92 to NO1+54.63

U-B300xH300

Slope=0.2% L=57.41m

NO.0+99.93

Stairs-R2

NO.1+49.27

Stairs-R3

NO.1+1.20

Stairs-L1

NO.0

+50.

00

R=30

0m

10@1000=1000011@1000=1100010@1000=1000010@1000=1000010@1000=10000

11@1000=11000

10@1000=10000

10@1000=10000

11@1000=11000

10@1000=10000

10@1000=10000

11@1000=11000

10@1000=10000

10@1000=10000

4000

4000

1700

10300103001030010300

1030010300

10300

10300

10300

10300

10300

10300

10290

2089481240

4501700

4898

9980

209980

2020

9980

9980

2020

20998020

9980

209980

20

9980

998

450

1700

4@500=2000 1700450

4@500=2000

NO.1+44.92 to NO.1+59.12

U-B300xH300

Slope=0.2% L=14.20m

NO.1+30.19 to NO.1+44.92

U-B300xH700

Slope=0.2% L=14.73m

79806000

20

9980

20

9980 20

20

4@500=2000

10300103001030010300

1030010300

20

20

20

20

20

2020

2020

20 20 20

10@1000=1000010@1000=1000011@1000=1100010@1000=10000

10@1000=10000

11@1000=11000

9@1000=9000

998

2901700

41881700

9980 20 99809980

20

9980

20

9980

20

4@500=2000

4@500=2000

20 20

9980

9980

9980

0 10 20SCALE

0 10 20 30

METERS

SCALE

APPROVEDLOCATIONREV.

DESCRIPTIONCHECKED

PRESENT APPROVED

APPROVEDDATE

OFFICE OF ENGINEERING DESIGN & ARCHITECTUREIRRIGATION SYSTEM DESIGN GROUP

APPROVED

DESIGNED

CHECKED

DRAWN

DATE

PROPOSED

APPROVED

VERIFIED

ROYAL IRRIGATION DEPARTMENT

CHIEF

DIRECTOR

D.G.

ROYAL IRRIGATION DEPARTMENT

CONSULTING FIRMS :

DATE

NO.

The Flood Prevention Project ofEast Side of the Pasak River in Ayutthaya

in the Kingdom of Thailand

HAN TRA FLOODGATE AND CANAL(CIVIL WORKS)

LAYOUT (3/3)

CTI ENGINEERING INTERNATIONAL CO., LTD.

HT-FG&BP-004

Masaki ISHII

Masaki ISHII

Akio SHICHIJUGARI

T. MISHINA

P. SIRION

S. INTARAPRACHA

L. KOWATTANA