1. PROVIDE ALL MATERIALS AND LABOR NECESSARY FOR A COMPLETE PLUMBING SYSTEM.WARRANTY ALL WORK AND MATERIAL FOR A PERIOD OF AT LEAST ONE YEAR AFTER ACCEPTANCEBY OWNER.
2. DO NOT SCALE DRAWINGS. OBTAIN ROUGH IN DIMENSIONS FROM ARCHITECTURAL DRAWINGSOR FROM MANUFACTURERS PRINTED INSTRUCTIONS AND RECOMMENDATIONS ONLY.CONTRACTOR SHALL COORDINATE EXACT LOCATIONS OF ALL EQUIPMENT, CONNECTIONS ANDLINES WITH THE OWNER PRIOR TO INSTALLATION OF ANY PIPING.
3. COORDINATE PLUMBING SYSTEMS WITH ALL TRADES TO AVOID INTERFERENCE AND CONFLICTSPRIOR TO INSTALLATION OF PIPING, FIXTURES, AND EQUIPMENT.
4. WHENEVER THE WORD "PROVIDE" IS USED, IT SHALL MEAN FURNISH AND INSTALL COMPLETEAND READY FOR USE.
5. UNLESS OTHERWISE SHOWN OR NOTED, ALL PIPING SHALL BE RUN CONCEALED IN WALLS,CHASES AND/OR ABOVE CEILINGS.
6. ALL SUSPENDED PIPING SHALL BE SUPPORTED FROM FLOOR AND/OR ROOF STRUCTURALMEMBERS. IN NO CASE SHALL PIPING BE SUSPENDED FROM FLOOR OR ROOF DECK.
7. WHERE PIPES PENETRATE FIRE RATED ASSEMBLIES, SEAL OPENING AROUND PIPES WITH U.L.LISTED FIRE STOPPING MATERIAL TO MAINTAIN THE FIRE RATING OF THE ASSEMBLY.
8. PROVIDE DRAIN VALVES AT ALL LOW POINTS WHERE POSSIBLE IN HOT & COLD PIPING SYSTEMS.
9. PROVIDE DEEP SEAL TRAPS ON ALL FLOOR DRAINS.
10. PROVIDE ALL VENT PENETRATIONS WHERE INDICATED ON FLOOR PLANS. COLLECT ALL VENTSABOVE CEILING WHERE SHOWN.
11. WALL HYDRANTS SHALL BE MOUNTED 20" ABOVE GRADE, UNO.
12. PROVIDE INSULATION FOR ALL ABOVE CEILING WASTE PIPING COLLECTING CONDENSATE DRAIN.
13. INSTALL ALL SANITARY WASTE AND VENT PIPING IN ACCORDANCE WITH CISPI 301 STANDARD.PROVIDE HANGERS AND SUPPORTS WITHIN 12" OF EACH HORIZONTAL ELBOW.
14. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE IBC INTERNATIONAL PLUMBINGCODE 2009.
15. REFER TO PLUMBING SCHEDULES FOR SUPPLY, WASTE AND VENT LINE SIZES TO EACH FIXTURE.
16. PROVIDE COMPLETE COORDINATION DRAWINGS INDICATING ALL OTHER TRADES IN A SCALE NOLESS THAN 1/4 INCH = 1 FOOT. SEE SPECIFICATIONS FOR FURTHER REQUIREMENTS.
17. THE DRAWINGS SHOW THE GENERAL ARRANGEMENTS AND LOCATION OF EQUIPMENT, PIPINGAND FIXTURES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE PLUMBINGINSTALLATION W/ THE STRUCTURE AND OTHER TRADES AND SHALL PROVIDE ADDITIONAL OFFSETSAND FITTINGS AS REQUIRED.
18. CONTRACTOR SHALL MAKE ALL FINAL CONNECTIONS TO LAB EQUIPMENT AND SECURE THIRDPARTY TESTING AGENCY FOR LABORATORY GAS PIPING.
19. THE CONTRACTOR SHALL LABEL ALL FIXTURES AND DEVICES UTILIZING NON-POTABLE ANDPURIFIED WATER WITH A PERMANENTLY AFFIXED, LEGIBLE LABEL. SIZE AND LOCATION TO BEAPPROVED BY THE OWNER.
20. LABORATORY GASES SHALL BE INSTALLED AND TESTED AS CATEGORY 3 PER NFPA 99.
PLUMBING NOTES:
TYP
U/G
HB
(E)
BFP
B/F
A/C
AFG
FD
VTR
FCO
WCO
BV/BFV
FD
FCO
UNDER GROUND
TYPICAL
HOSE BIBB
ABOVE CEILING
ABOVE FINISH GRADE
BELOW FLOOR
BACKFLOW PREVENTER
EXISTING
ISOLATION AND THROTTLING VALVE
FLOOR DRAIN
VENT THRU ROOF
WALL CLEAN OUT
FLOOR CLEANOUT
PLUMBING SYMBOLSABBREVIATION
PC
PH
V
W
SYMBOL
SOIL AND WASTE PIPING
VENT PIPING
DESCRIPTION
POTABLE COLD WATER PIPING
POTABLE HOT WATER PIPING
TMV THERMOSTATIC MIXING VALVE
SD SD 12" STORM DRAIN
NFWH NON-FREEZE WALL HYDRANT
ST
OF OVERFLOW STORM PIPING
PRIMARY STORM PIPING
AFF ABOVE FINISH FLOOR
WHA WATER HAMMER ARRESTOR
PHR POTABLE HOT WATER RETURN PIPING
PIPE UP
PIPE DN
PIPE REDUCER
PIPE STRAIGHT TEE
PIPE TEE DN
DN DOWN
TP TP TRAP PRIMER
EF EXHAUST FAN
CU CONDENSING UNIT
HD HUB DRAIN
MC MECHANICAL CONTRACTOR
EC ELECTRICAL CONTRACTOR
OFO OVERFLOW OUTLET
GCO GRADE CLEANOUT
NPC
NPH
NON-POTABLE COLD WATER PIPING
NON-POTABLE HOT WATER PIPING
NPHR NON-POTABLE HOT WATER RETURN PIPING
AV
AW ACID WASTE PIPING
ACID VENT PIPING
PWS PURIFIED WATER SUPPLY
PWR PURIFIED WATER RETURN
N NITROGEN GAS
VAC VACUUM
CA COMPRESSED AIR
NG NATURAL GAS
BALANCING VALVE
UNO UNLESS NOTED OTHERWISE
POU POINT-OF-USE
AVTR ACID VENT THRU ROOF
PP POLYPROPYLENE
WC WATER CLOSETLAV LAVATORYUR URINAL
MS MOP SINK
CRS CLEAN ROOM SINK
FS FLOOR SINKPWSB PURIFIED WATER SUPPLY BOX
PRV PRESSURE REDUCING VALVECO CLEANOUT
IMB ICEMAKER BOXDWSB DISHWASHER SUPPLY BOXEWC ELECTRIC WATER COOLER
OF/RD OVERFLOW/ROOF DRAIN
PD PROMENADE DECK DRAIN
SK LAB SINK
CS CUP SINKBRS BREAK SINKUS UTILITY SINK
ESH EMERGENCY SHOWER/EYEWASH
EW DECK-MOUNDED EYEWASH/DRENCH HOSE
UPW ULTRA PURE WATER POLISHING STATION
ANT ACID NEUTRALIZATION TANK
WH WATER HEATER
B BOILER
WDBP WATER DISTRIBUTION BOOSTER PUMP
SOLENOID VALVEs
PLUMBING CODES AND STANDARDS:IPC INTERNATIONAL PLUMBING CODE 2009NFPA 99 2012 EDITIONANSIUNDERWRITERS LABORATORIES (UL)ALL STATE AND LOCAL CODES AND ORDINANCESCOASTAL CAROLINA UNIVERSITY DESIGN GUIDELINES
COMPONENT IMPORTANCE FACTOR (Ip)
COMPONENT IDENTIFICATION SEISMIC RESTRAINT REQUIREMENT NOTES SEISMIC RESTRAINT REQUIREMENT
ROOF MOUNTED RESTRAIN ALL RESTRAIN ALL -
FLOOR MOUNTED RESTRAIN ALL RESTRAIN ALL -
WALL MOUNTED RESTRAIN ALL RESTRAIN ALL -
COMPONENT SUPPORTS RESTRAIN ALL RESTRAIN ALL -
RESTRAIN ALL RESTRAIN ALL -
SUSPENDED DUCTILE PIPING(STEEL, ALUMINUM, COPPER,
ETC.)>3" >1" 3
COMPONENTCERTIFICATION(SEE NOTE 4)
NOT REQUIRED REQUIRED -
1.0 1.5
NOTES
SEISMIC AND WIND REQUIREMENTS FOR PLUMBING SYSTEMSIBC-2009 /ASCE 7-05
SUSPENDED NON DUCTILEPIPING
(CAST IRON, PLASTIC, CERAMIC)
SUSPENDED PIPE ON TRAPEZE
RESTRAIN ALL
RESTRAIN IF ANY PIPEON TRAPEZE > 3"
RESTRAIN IF TOTAL WEIGHT OF PIPESON
TRAPEZE > 10 LBS/FT
RESTRAIN ALL 3
3
RESTRAIN IF ANY PIPEON TRAPEZE > 1"
RESTRAIN IF TOTAL WEIGHT OF PIPESON
TRAPEZE > 10 LBS/FT
SUSPENDED EQUIPMENT
PLUMBING COMPONENT IMPORTANCE FACTOR (Ip) DESIGNATION
Ip = 1.0 Ip = 1.5
NOTES:1. EQUIPMENT 20 LBS. OR LESS IS EXEMPT IF FLEXIBLE CONNECTIONS ARE PROVIDED BETWEEN THE COMPONENT AND ASSOCIATED PIPING AND CONDUIT.
RESTRAINTS ARE NOT REQUIRED IF THE COMPONENT WEIGHS 400 LBS. OR LESS, IS MOUNTED AT 4 FT. OR LESS ABOVE A FLOOR, AND HAS FLEXIBLECONNECTIONS BETWEEN THE COMPONENT AND ASSOCIATED PIPING AND CONDUIT.RESTRAINT IS NOT REQUIRED IF THE PIPING IS SUPPORTED BY HANGERS AND EACH HANGER IN THE PIPING RUN IS 12 IN. OR LESS IN LENGTH FROM THE TOPOF THE PIPE TO THE SUPPORTING STRUCTURE. WHERE PIPES ARE SUPPORTED ON A TRAPEZE, THE TRAPEZE SHALL BE SUPPORTED BY HANGERS HAVING ALENGTH OF 12 IN. OR LESS. WHERE ROD HANGERS ARE USED, THEY SHALL BE EQUIPPED WITH SWIVELS, EYE NUTS OR OTHER DEVICES TO PREVENTBENDING IN THE ROD.COMPONENT CERTIFICATION MUST BE SUPPLIED BY THE EQUIPMENT MANUFACTURER AT TIME OF SUBMITTAL FOR REVIEW BY ENGINEER OF RECORD.
2.
3.
4.
A. EQUIPMENT, APPLIANCES AND SUPPORTS (INCLUDING ROOF CURBS & ROOF RAILS) EXPOSED TO WIND SHALL BE DESIGNED AND INSTALLED TORESIST THE WIND PRESSURES DETERMINED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE. WHERE SEISMIC RESTRAINT ISREQUIRED, THE MORE DEMANDING FORCE OF WIND AND SEISMIC MUST BE USED. SEE SEISMIC INFORMATION CONTAINED IN THE STRUCTURALDRAWINGS FOR SITE SPECIFIC INFORMATION ON SEISMIC DESIGN CATEGORY. SEE EQUIPMENT SCHEDULES AND DETAILS FOR SPECIFICCOMPONENT IMPORTANCE FACTOR DESIGNATIONS.USE APPLICABLE TABLE BELOW TO DETERMINE SEISMIC RESTRAINT REQUIREMENTS FOR EACH MECHANICAL COMPONENT.FOR ALL COMPONENTS REQUIRING SEISMIC RESTRAINT, THE COMPONENT SUPPORTS AND ATTACHMENTS SHALL BE DESIGNED BY A REGISTEREDDESIGN PROFESSIONAL IN THE STATE OF SOUTH CAROLINA.SUBMITTAL MUST INCLUDE STAMPED AND SIGNED DRAWINGS AND CALCULATIONS.WHERE SEISMIC RESTRAINT IS REQUIRED, HOUSEKEEPING PADS NEEDED FOR THE INSTALLATION OF EQUIPMENT UNDER THIS CONTRACT MUST BEDESIGNED BY THE SEISMIC ENGINEER. DO NOT POUR ANY HOUSEKEEPING PADS PRIOR TO THE THE RECEIPT OF THE SEISMIC SUBMITTAL.SEISMIC RESTRAINTS FOR PIPING MUST BE SHOWN ON LAYOUT DRAWINGS SHOWING SPECIFIC RESTRAINT LOCATIONS ALONG WITHACCOMPANYING DETAILS AND CALCULATIONS.
B.C.
D.
E.
· ALL NATURAL GAS APPURTENANCES
1
1, 2
1
1
3
3
3
-
1, 2
· ALL PLUMBING APPURTENANCES, UNO.
CERTI F IC
AT E O F A U THO
RIZAT
ION
SOUTH CAROLINA
CONSULTINGENGINEERS
DWG, INC.
No.C03649
CHECKED BY:
DRAWN BY:
DATE:
PROJECT:
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
1
A
2 3 4 5 6
B
C
D
E
WWW.LS3P.COMTEL. 843.577.4444 FAX 843.722.4789205 1/2 KING ST. CHARLESTON SC 29401
STATE PROJECT NO:H17-9588-FW
REVISIONS:
COPYRIGHT 2014 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.
E
G
No.
L
TU
DS
IC
AH
ISM
RE
TE
K
EG. W
ES
AA
17759
RE
GE
ER
INEN
L
RCAHORP
SEFOLN
S IOINO
LS3P: 1202-122370
MAY 20, 2014
KMM
MGW
PLUMBING NOTES& LEGEND
P000
BID SET
SCIENCE ANNEX IICONSTRUCTION
No. Description Date
111098765432
1
A
B
C
D
F
G
H
X5X3X2
VERT. BIO.104
MSCI ECOLRESEARCH LAB
105
MSCI ECOL LAB106
MSCI ECO RES LAB107
M. TLT.109
JAN.100
OFF-10102H
OFF-11102F
RECEPTION102K
SHARED STOR103
OFF-8 / ADMIN102J
OFF-7 / ADV102I
OFF-6 / ADV102G
OFF-5 / ASST DEAN102E
OFF-4 / DEAN102D
OFF-3 / ADMIN102C
RECEPT102A
OFF-2102B
F. TLT.110
FILE / WORK102
MOLEC & MICROBIO115
LOW SVC ECOLLAB119
DATA111
FRESHWATER101
ELEC.112
ELEV. EQ.116
CHEM WASTE118A
FREEZER114
MECH.M1
BIOHAZARD118B
AQUAR.118C
MUDROOM / DOCK118
NMR118D
ANIMAL120A
ADV WET TEACHLAB127
LOW SVC. TEACHLAB - MSCI
125
MICROSCOPE128
GEO/SED TEACH.LAB124
PREP121
HOUSING120B
WASH120C
ELEVE1
CORRIDORC1-5
CORRIDORC1-7
CORRIDORC1-6
MS
SHOWER108
SH-2LAV-2
FS
WSB
MS
PREP123
STAIR 2-1S1N
STAIR 1-1S1WOUTDOOR
SUPPORTOS
FOYERC1-4
FOYERC1-1
CORRIDORC1-3
LOBBYC1-2
ESH
ESH
ESH
ESH
ESH
ESH
ESH
CS
SK3
SK3
SK3
EWC
SK1
SK1A
2" NPC2" NPH
2" NPC2" NPH
2" N
PC2"
NPH
3/4" NPH3/4" NPC1" NPH
2" NPC2" NPH
2" NPC2" NPH
2" NPC2" NPH
1P301
GEO SEDRESEARCH LAB
126
SK1
SK1
SK1
SK1
SK1
SK1
SK1
3/4" NPHR
MS
SK1
SK1 1
SK1
SK1
SK1A
SK1A
SK1
SK1
SK1A
SK1A
SK1
SK1
SK1CSSK1
MS
MS
SK1
2 1/2" PC
3/4" NPHR
CS CS
CS
SK1
3/4"
NPH
R
FD-3
NFWH
SK1
NFWH
NFWH
SH-1
SH-1
NFWH
NFWH
NFWH
HB
2" PWS
2" PWS
2" PWS
2" PWS
1" NPC1" NPH
3/4" NPC
3/4" NPC
2" P
WS
3/4" NPH3/4" NPC
1" NPH
1" NPC
2" PWS
1" NPC
1" NPC1" NPH
1" NPH
1" NPC
1" NPH1" NPC
3/4" NPH3/4" NPC
1" P
C1"
PH
2" P
WS
2" PWS
1/2"
PH
R
2
P4021
Y1
Y23
CS
SK1
CS CS
2
2
2
2
2
2
2
2
2
CS
2
2
CS
CS
2
22" PWS
3/4" NPC
3/4" NPC3/4" NPH
1/2"
NPC
LS
SK1
4
1" NPC1" NPH
2" PWS
2" PWS2" PWS
3/4" NPC3/4" NPH
1" NPC
1" NPH
1" N
PH1"
NPC
3/4" NPC 3/4" NPH1" NPH 1" NPC
1" NPC
1" NPH
1" NPC1" NPH
1" N
PH1"
NPC
3/4"
NPH
3/4"
NPC
1" NPC
1" N
PC
3/4"
NPH
3/4"
NPC
3/4" NPC3/4" NPH
3/4" NPH 3/4" NPC
3/4"
NPH
3/4"
NPC
SK3
3/4" NPH
8.5
BALANCINGVALVE
2" P
WS
2
2" PWS
2" P
WS
2
2
2
2" PWS
2" P
WS
2" P
WS
2" P
WS
1 1/4" PH1/2" PHR
2" PWS
2
2 2
2" PWS
1" NPH1" NPC
BALANCINGVALVE
4
4
E
3/4" NPC
3/4" NPC
3/4" NPH
1/2"
NPH
3/4" NPC3/4" NPH
3/4" NPC3/4" NPH
3/4"
NPH
3/4"
NPC
3/4" NPH3/4" NPC
3/4" NPH3/4" NPC
2" NPC2" NPH3/4" NPHR
2" PC
3/4" PH
1" NPH1" NPC
3/4" NPH
3/4" NPC
2" P
WS
2" P
WS
BALA
NC
ING
VAL
VE
FIRE PUMPM2
3/4" NPC
3/4" NPC
P4023
2" NPC2" NPH3/4" NPHR
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
CERTI F IC
AT E O F A U THO
RIZAT
ION
SOUTH CAROLINA
CONSULTINGENGINEERS
DWG, INC.
No.C03649
CHECKED BY:
DRAWN BY:
DATE:
PROJECT:
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
1
A
2 3 4 5 6
B
C
D
E
WWW.LS3P.COMTEL. 843.577.4444 FAX 843.722.4789205 1/2 KING ST. CHARLESTON SC 29401
STATE PROJECT NO:H17-9588-FW
REVISIONS:
COPYRIGHT 2014 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.
E
G
No.
L
TU
DS
IC
AH
ISM
RE
TE
K
EG. W
ES
AA
17759
RE
GE
ER
INEN
L
RCAHORP
SEFOLN
S IOINO
5/19
/201
4 2:
48:1
2 PM
C:\U
sers
\km
inog
ue\D
ocum
ents
\120
96_C
CU
Sci
ence
Ann
ex II
Pha
se O
ne_2
013_
kmin
ogue
.rvt
LS3P: 1202-122370
MAY 20, 2014
KMM
MGW
PLUMBING FIRSTFLOOR WATERDISTRIBUTIONPLAN
P101
BID SET
SCIENCE ANNEX IICONSTRUCTION
SCALE: 1/8" = 1'-0"P1011 FIRST FLOOR WATER DISTRIBUTION PLAN
PROVIDE WALL-MOUNTED UPW-1 WATER POLISHER AT THIS LOCATION.
PROVIDE VALVE AT PWS DROP AND MAKE FINAL CONNECTION TO PURIFIED WATEROUTLET. SEE DETAIL.
4" WATER SERVICE SUPPLY. SEE CIVIL FOR CONTINUATION.
PIPING SHALL BE RUN UNDER SLAB.
1
2
GENERAL NOTES:1. ALL LAB FIXTURES AND JANITOR CLOSET MOP SINKS SHALL BE PROVIDED WITHNON-POTABLE WATER.
2. BREAK ROOM SINKS, EWC, RESTROOM/BATHROOM FIXTURES, AND WALLHYDRANTS SHALL BE PROVIDED WITH POTABLE WATER. DO NOT INTERCONNECT NON-POTABLE AND POTABLE DOMESTIC WATER PIPING SYSTEMS UNO.
3. IRRIGATION SYSTEM WATER SUPPLY WILL BE VIA SWAIN SCIENCE BUILDING.
3
4
KEY NOTES:
No. Description Date
UP
11109876543
2
1
A
B
C
D
F
G
H
X5X2
OFF-1241
OFF-13228
OFF-12229
OFF-9232
OFF-7233
OFF-6235
OFF-5236
OFF-4237
OFF-3238
ELEVE2
OFF-8234
OFF-20242
ELEC.240
OFF-10231
OFF-11230
OFF-15227
DATA239
OFF-17224
OFF-14226
OFF-16225
GRAD BULLPEN246
GIS247COMP MODEL
248
COMPUTERSERVER
250
PHYS OCEAN255
OFFICE254
OFFICE253
LOW SVC TEACHLAB252
PREP251
LOW SVC TEACHLAB249
LOW SVC TEACHLAB245
PREP244
LOW SVC TEACHLAB243
ADMIN-1222
OFF-18219
FILE / WORK / BRK217
F. TLT.201
OFF-19218
OFF-1216
OFF-2215
OFF-3214
OFF-5212
OFF-4213
OFF-6211
OFF-7210
OFF-8209
OFF-9208
LECTURECLASSROOM
207
GRAD STD206
LECTURECLASSROOM
205
LECTURECLASSROOM
204
SEMINAR203
M. TLT202
JAN223
STAIR 3S3-2
LG CONF RM220
CORRIDORC2-3
CORRIDORC2-5
STAIR 1-2S2W
STAIR 2-2S2N
CORRIDORC2-4
PLOT256
DWSBIMB
IMB
DWSB
CORRIDORC2-1
CORRIDORC2-2
2" PWS, 2" PWR, 4" PC, 1-1/2"PH, 3/4" PHR, 4" NPC, 2-1/2" NPH,3/4" NPHR, 2" PWS, AND 2" PWRRISERS AND 1-1/2"HVACMAKEUP WATER
ESH ESH
EWC
EWC
ROUTE PIPING FORSINK BELOW FLOOR.COORDINATE STUBUP LOCATION WITHNYCOM.
MS
CS
CS SK1 SK1
SK1SK1
CS
SK1
SK1A SK1A
CS
CS
SK1
SK1
SK1
LSLS
SK1A
SK1
SK1
LS
LSLS
LS
BRS
SK1
SK1A
2" PWS2" PWR
3/4" PC1/2" PH
3/4" NPHR
2" NPC2" NPH
3/4" NPHR1/2" PC1/2" PH
1/2" PHR
1/2" PHR
1" N
PH1"
NPC
1" N
PH1"
NPC
3/4"
NPH 3/
4" N
PC3/
4" N
PH3/
4" N
PC
3/4" NPH3/4" NPC
3/4" NPH3/4" NPC
3/4"
NPH
3/4"
NPC
3/4"
NPH
3/4"
NPC
1" N
PC1"
NPH
3/4"
NPH
3/4"
NPC
3/4" NPH
3/4" NPC
3/4"
NPC
3/4"
NPH
1" N
PC
1" N
PH
1" NPC1" NPH
1" NPC
1" NPH
1
1
11
1
1
1" NPH1" NPC
Y1
Y2
ESH
2 1/2" PC
2" PH
3/4" PHR
3/4" NPHR 2" NPH2" NPC
8.5
2" NPH2" NPC
2" P
WS
2" P
WS
2" PWR
E
P4022
2" P
WR
2" PWS3/
4" N
PC3/
4" N
PH
2" PWS
3/4"
NPH
3/4"
NPC
2" PWS
2" PWS
2" PWS
2" PWS
2" P
WS
2" PWS 2" PWS
2" P
WS
2" P
WS
3/4" NPHR2" NPH2" NPC
2" N
PC
3/4"
NPH
R2"
NPH
EW
EW
PWSB
PWSB
22
2
2
2
2
2
2
2
2
2
3/4" NPC UP
TP
TP
TP
CERTI F IC
AT E O F A U THO
RIZAT
ION
SOUTH CAROLINA
CONSULTINGENGINEERS
DWG, INC.
No.C03649
CHECKED BY:
DRAWN BY:
DATE:
PROJECT:
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
1
A
2 3 4 5 6
B
C
D
E
WWW.LS3P.COMTEL. 843.577.4444 FAX 843.722.4789205 1/2 KING ST. CHARLESTON SC 29401
STATE PROJECT NO:H17-9588-FW
REVISIONS:
COPYRIGHT 2014 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.
E
G
No.
L
TU
DS
IC
AH
ISM
RE
TE
K
EG. W
ES
AA
17759
RE
GE
ER
INEN
L
RCAHORP
SEFOLN
S IOINO
5/19
/201
4 2:
48:3
1 PM
C:\U
sers
\km
inog
ue\D
ocum
ents
\120
96_C
CU
Sci
ence
Ann
ex II
Pha
se O
ne_2
013_
kmin
ogue
.rvt
LS3P: 1202-122370
MAY 20, 2014
KMM
MGW
PLUMBINGSECOND FLOORWATERDISTRIBUTIONPLAN
P102
BID SET
SCIENCE ANNEX IICONSTRUCTION
SCALE: 1/8" = 1'-0"P1021 SECOND FLOOR WATER DISTRIBUTION PLAN
ROUTE PIPING FOR SINK BELOW FLOOR. COORDINATE STUB UP LOCATION WITHNYCOM.
PROVIDE PURIFIED WATER OUTLET WITH VALVE FOR SINK. COORDINATE ROUGH-INLOCATION WITH LAB EQUIPMENT PROVIDER.
1
GENERAL NOTES:1. ALL LAB FIXTURES AND JANITOR CLOSET MOP SINKS SHALL BE PROVIDED WITHNON-POTABLE WATER.
2. BREAK ROOM SINKS, EWC, RESTROOM/BATHROOM FIXTURES, AND WALLHYDRANTS SHALL BE PROVIDED WITH POTABLE WATER. DO NOT INTERCONNECT NON-POTABLE AND POTABLE DOMESTIC WATER PIPING SYSTEMS UNO.
KEY NOTES:
2
No. Description Date
DN
11109
8765432
1A
B
C
D
F
G
H
X5X3X2
ORG CHEM306
A & P TEACHING305
PREP307
ORG CHEM308
PREP304
A&P TEACHING303
M. TLT.310
OFF-19314
OFF-18313
OFF-17312
OFF-16311
F. TLT.302
SECURE FILE301A
OFF-12301B
OFF-11301C
OFF-10301D
OFF-14301Q
DATA316
ELEC317
OFFICE301L
OFF-15301P
CHEM STOR318
OFF-6301H
OFF-5301I
OFF-4301J
OFF-3301K
OFF-2301M
MS M. CHEM.RESEARCH 1
326
MARINE CHEMTEACH LAB
320
MS CHEM INSTR.321
CHEM WET328
PREP329
CHEM. BAL.328B
ADV. CHEM TEACH.330
ROOF TERRACE332
GEN CHEM327
ASTRON. STOR.331
GEN CHEM322
PREP323
MS M CHEMRESEARCH
319A
BALCONY315
OFF-9301E
CORRIDORC3-1
CORRIDORC3-3
CORRIDORC3-2
CORRIDORC3-5
STAIR 2-3S3N
STAIR 1-3S3W
STAIR 3S3-3
ALT TREAD STAIR309
ELEVE3
ROOF ACCESS324
CORRIDORC3-4
CLEAN ROOM319B
OFF-8301F
OFF-7301G
JAN325
MSCI PREP320A
IMB
PWSB
IMB
DWSB
DWSB
PWSB
DW
SB
CS
CS
CRS
PROVIDEUPW-1WATERPOLISHINGSTATION ATEACH LABSINK, THISROOM ONLY.
2" PWS, 2" PWR, 4" PC, 1-1/2"PH, 3/4" PHR, 4"NPC, 2-1/2"NPH, AND 3/4" NPHR RISERSAND 1-1/2" HVAC MAKEUPWATER
SK1
MS
CS SK1
LS
LS
LS
LS
LS
LS
CS CSSK1
SK1
SK1A
SK1
CS
CS
CS CS CS CS
CSCS
CS
CS
CS
2" PWS
2" PWS
2" PWS2" PWS
1" NPH
CSCS
SK1A
SK1
CSCS
CSCS
CSCS
CSCS
SK1
CS
CS
CSCS
CSCS
SK1
SK1
CSCS
CS
CS
CS
CS
CSCS
CSCS
CSCS
CSCS
CSCS
CSCS
SK1
SK1
SK1A
LS SK1A
SK2
CS
SK1A
SK1
SK1A
SK1
2" NPC2" NPH
3/4" NPHR
1" NPC1" NPH
1" NPC1" NPH
2" PWS
1" N
PC
1" N
PH
1" N
PC
1" N
PH1"
NPH
1" N
PC1"
NPC
1" N
PC 1" N
PC
1" N
PH
1" N
PC1"
NPC
1" N
PH
1" N
PC1/
2" N
PH
1" N
PC1"
NPH
1" N
PC1"
NPH
1" N
PC1"
NPH
1" N
PC1"
NPH
1" N
PH1"
NPC
1" N
PH1"
NPC
1" N
PC
1" N
PH
1" N
PH1" N
PC
1" NPC1" NPH
1" N
PC 1" N
PH1"
NPC
1" N
PH1"
NPC
1" N
PC1"
NPH
1" N
PC
1" N
PC
1" NPH1" NPC
1" N
PH1"
NPC
1" N
PH1"
NPC
1" N
PC
1" N
PC1"
NPC
1" NPC1" NPH
1" N
PC1"
NPH1" NPH
1" NPC 1" NPC1" NPH
1" NPH1" NPC
1" NPC1" NPH
1" NPC
1" NPH1" NPC
1" NPH
1" NPC1" NPH
1" N
PH1"
NPC
1" NPH
1" NPC
2" N
PC2"
NPH
3/4"
NPH
R
1" NPH1" NPC
1" NPH
1" NPC
1" NPH
1" NPC
1" NPH
1" NPC
1" NPH 1" NPC
1" N
PC1"
NPH
1" NPC
2" PWS
2" P
WS
2" P
WS
1" NPC 1" NPC 1" NPC1" NPH
1" NPH 1" NPC
1" N
PH
1" N
PC
1" NPC1" NPH
1
1
1
1
1
1
1
1
Y1
Y2
SK1
SK1
CS
CS
SK1
CSSK1SK1
CS
CS
CS
SK1
SK1
3/4" PHR1 1/2" PH2 1/2" PC
2" PWR
2
2" PWS
SK1
SK1
CSCSSK1
CS
SK1
CS
3
3
3
3
3
8.5
E
2" P
WS
2" NPC2" NPH3/4" NPHR
2" PWS
3/4" NPHR2" NPH2" NPC
2" N
PC2"
NPH
2" PWS
1" NPC
1/2" NPH1" NPC
1" NPC
1" NPC
1/2" NPC1/2" NPH
1" N
PC
1" N
PC
1" N
PC
P4024
SK1
SK1
EW
EW
EW
EW
PWSB
PWSB
IMB
DW
SB
2
2
2
2
3
2
3
SK1
3
3
33
3
CS
CS
3 SK1
3
3
3
33
3
3
3
3
3
3
3
22
BALA
NC
ING
VALV
E
BALANCINGVALVE
3/4" NPHR 2" NPH2" NPC
2" NPC2" NPH
3/4" NPHR2" NPH
3/4" NPHR
2" NPC2" NPC2" NPH
3/4" NPHR
2" NPC
3/4" NPHR2" NPH
SK1A
SK2
3
3
3
3
2" PWS
2" PWS
2" PWS
2" PWS
2" PWS
2" P
WS
2" P
WS
2" P
WS
2" P
WS
2" PWS 2" P
WS
2" PWS
2" PWS 2" P
WS
2" PWS2" PWS
2" PWS
2" P
WS
2" PWS2" PWS
2" P
WS
NFWH
NFWH
3/4" NPC DN
TP
TP
TP
TP
TP
TP
TP
TP
TP
SCALE: 1/8" = 1'-0"P1031 THIRD FLOOR WATER DISTRIBUTION PLAN
ROUTE PIPING FOR SINK BELOW FLOOR. COORDINATE STUB UP LOCATION WITH LABCASEWORK PROVIDER AND MAKE FINAL CONNECTIONS.
PROVIDE PURIFIED WATER OUTLET FOR FUME HOOD. COORDINATE ROUGH-INLOCATION WITH LAB EQUIPMENT PROVIDER AND MAKE FINAL CONNECTION.
PROVIDE PURIFIED WATER OUTLET FOR SINK. COORDINATE ROUGH-IN LOCATIONWITH LAB EQUIPMENT PROVIDER AND MAKE FINAL CONNECTION.
1
CERTI F IC
AT E O F A U THO
RIZAT
ION
SOUTH CAROLINA
CONSULTINGENGINEERS
DWG, INC.
No.C03649
CHECKED BY:
DRAWN BY:
DATE:
PROJECT:
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
1
A
2 3 4 5 6
B
C
D
E
WWW.LS3P.COMTEL. 843.577.4444 FAX 843.722.4789205 1/2 KING ST. CHARLESTON SC 29401
STATE PROJECT NO:H17-9588-FW
REVISIONS:
COPYRIGHT 2014 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.
E
G
No.
L
TU
DS
IC
AH
ISM
RE
TE
K
EG. W
ES
AA
17759
RE
GE
ER
INEN
L
RCAHORP
SEFOLN
S IOINO
5/19
/201
4 2:
48:5
6 PM
C:\U
sers
\km
inog
ue\D
ocum
ents
\120
96_C
CU
Sci
ence
Ann
ex II
Pha
se O
ne_2
013_
kmin
ogue
.rvt
LS3P: 1202-122370
MAY 20, 2014
KMM
MGW
PLUMBING THIRDFLOOR WATERDISTRIBUTIONPLAN
P103
BID SET
SCIENCE ANNEX IICONSTRUCTION
GENERAL NOTES:1. ALL LAB FIXTURES AND JANITOR CLOSET MOP SINKS SHALL BE PROVIDED WITH NON-POTABLE WATER.
2. BREAK ROOM SINKS, EWC, RESTROOM/BATHROOM FIXTURES, AND WALL HYDRANTSSHALL BE PROVIDED WITH POTABLE WATER. DO NOT INTERCONNECT NON-POTABLEAND POTABLE DOMESTIC WATER PIPING SYSTEMS UNO.
3. COORDINATE ALL UTILITY REQUIREMENTS WITH LAB EQUIPMENT SUPPLIER.
2
3
KEY NOTES:
No. Description Date
11109
8765432
B
C
D
F
G
H
X5X3X2
MECHANICALSPACE
401FD-2
FD-2
Y1
Y2
3" AV3"AVTR
3"AV DN
3"AVTR
3"AVTR3"AVTR
3"AVTR3"AVTR
8.5
E
3"AVTR
4"VTR
3"AVTR
3"AVTR
3"AVTR
2"VTR
3"AVTR
P4025
TP
TP
TP
TP
TP
2"VTR
2" V4"W DN
3"VTR
4"WDN
2" V
3" V
2"VCONNECTION
CERTI F IC
AT E O F A U THO
RIZAT
ION
SOUTH CAROLINA
CONSULTINGENGINEERS
DWG, INC.
No.C03649
CHECKED BY:
DRAWN BY:
DATE:
PROJECT:
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
1
A
2 3 4 5 6
B
C
D
E
WWW.LS3P.COMTEL. 843.577.4444 FAX 843.722.4789205 1/2 KING ST. CHARLESTON SC 29401
STATE PROJECT NO:H17-9588-FW
REVISIONS:
COPYRIGHT 2014 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.
E
G
No.
L
TU
DS
IC
AH
ISM
RE
TE
K
EG. W
ES
AA
17759
RE
GE
ER
INEN
L
RCAHORP
SEFOLN
S IOINO
5/19
/201
4 2:
49:0
7 PM
C:\U
sers
\km
inog
ue\D
ocum
ents
\120
96_C
CU
Sci
ence
Ann
ex II
Pha
se O
ne_2
013_
kmin
ogue
.rvt
LS3P: 1202-122370
MAY 20, 2014
KMM
MGW
MECHANICALSPACE PLUMBINGPIPING &EQUIPMENT PLAN
P104
BID SET
SCIENCE ANNEX IICONSTRUCTION
SCALE: 1/8" = 1'-0"P1041 MECHANICAL SPACE PLUMBING PIPING & EQUIPMENT PLAN
GENERAL NOTES:1. SLOPE FLOOR TO FLOOR DRAINS. SEE ARCHITECTURAL DOCUMENTS FOR
MORE INFORMATION.2. PROVIDE 1/8" PER FOOT MINIMUM SLOPE FOR ALL VACUUM PIPING.
PROVIDE DRIP LEG WITH REMOVABLE CAP AT ALL LOW POINTS IN PIPING.
No. Description Date
11109
8765432
1
A
B
C
D
F
G
H
X5X3X2
VERT. BIO.104
MSCI ECOLRESEARCH LAB
105
MSCI ECOL LAB106
MSCI ECO RES LAB107
M. TLT.109
JAN.100
OFF-10102H
OFF-11102F
RECEPTION102K
SHARED STOR103
OFF-8 / ADMIN102J
OFF-7 / ADV102I
OFF-6 / ADV102G
OFF-5 / ASST DEAN102E
OFF-4 / DEAN102D
OFF-3 / ADMIN102C
RECEPT102A
OFF-2102B
F. TLT.110
FILE / WORK102
MOLEC & MICROBIO115
LOW SVC ECOLLAB119
DATA111
FRESHWATER101
ELEC.112
ELEV. EQ.116
CHEM WASTE118A
FREEZER114
MECH.M1
BIOHAZARD118B
AQUAR.118C
MUDROOM / DOCK118
NMR118D
ANIMAL120A
ADV WET TEACHLAB127
LOW SVC. TEACHLAB - MSCI
125
CORRIDORC1-6
CORRIDORC1-7
ELEVE1
CORRIDORC1-5
GEO/SED TEACH.LAB124
MICROSCOPE128
PREP121
HOUSING120B
WASH120C
STAIR 1-1S1W
PREP123
SHOWER108
6" AW
ACID WASTE UNDER SLABSANITARY WASTEUNDER SLAB
4" W
TO ACID NEUTRALIZATIONTANK ANT-1. SEE CIVIL FOR
CONTINUATION OF ACIDWASTE PIPING AND
LOCATION OF ANT-1.
SEE CIVIL FORCONTINUATION OFSANITARY WASTE
PIPING.
4" W
4" A
W
4" W
4" W
4" W
STAIR 2-1S1N
OUTDOORSUPPORT
OS
FOYERC1-4
FOYERC1-1
CORRIDORC1-3
LOBBYC1-2
2" W
4" AW UP
4" AWUP
4" AW UP
4" AW UP
4" AW UP
4" WUP
4" W UP
2"W UP
FCO
2"W A/C
FD-3 FD-3 FD-3
FCO
FCO
FCO
FCO
FCO
FCO
FCO
FCO
FCO
FD-1
LAV-1(TYP.)
MS
URUR-A
LAV-1(TYP.)
FD-1
EWC
EWC
4"AW UP
6" ST
FD-1
FD-2
FD-1
FD-1
FD-1
FD-3
FD-1
FD-1
FD-1
FD-3
4" ST
CS
CS CS
SK1
SK1
SK1
SK1
MS SK1
SK1
SK1A
FD-1
WC-A
WC
WC
WC
WC
WC-A
BRS
SK1
CS
SK1
SK1SK1
MS
CSSK1
CS
SK1ASK1
SK1
SK3 CS
SK1
SK1A
SK1
CS
CS
SK1 SK1
SK1A
CS
SK1A
SK1
SK1
SK1
SK1
SK1
SK1
FD-4FD-4
FD-4
FD-4
FD-4
FD-4
FD-4
FD-4
FD-4
SP-1
3"W UP
WCO
LAV-2
SK1
FD-3
OFO
SEE CIVIL FORCONTINUATION.
6" AW6" AW6" AW6" AW6" AW
2" AW
2" AW
4" AW
4" AW
2" A
W
2" AW 3" AW2" AW
1 1/2" AW
2" AW
2" W4" W
4" W
3" AW
3" A
W
3" AW
4" AW
4" AW
3" AW3" AW
3" AW
2" AW
2" AW
2" AW
1 1/2" AW
6" AW6" AW
4"AW UP
FCO
WCO
CO
OFFSET A/C
2" AW
4" AW
WCO WCO
WCO
WCO
WCO
WCO
WCO
WCO
3" AW
3" AW
4" AW4" AW
4" W
3" W
4" AW
4" W
3" W
3" AW
3" AW
4" AW
4" A
W
4" AW
4" AW
2" AW
4"AW UP
2" A
W
4"AW UP
WCO
SEE CIVIL FORCONTINUATION.
3" AW
4" A
W4"
AW
3" AW 4" AW
2" AW
Y1
Y2
3" AW
3" AW
4" ST
4" ST DN
4" OF
FD-4
ESH
ESH
4" A
W
3" AW
3" AW
3" AW
2" AW
3" AWESH
2" AV
3" AW
ESH
ESH
4" AW
2" AW
ESH2" AW
FD-1
FD-4
ESH
2" AW
SD-1
2" W
3" AW
ESH2" AWWCO
ESH2" AW
4"AW DNIN WALL
3" AW
2" AW
3" AW
ESH
3" AW
3" AW
2" AW2" AW
GEO SEDRESEARCH LAB
126
3" AW
3" AW
2" AV
2" A
W
2" AW
2" A
W2"
AW
3" AW
2" AW
3" AW
SK3
SK3
FD-1
CS
8.5
E
FIRE PUMPM2
FD-1AREA RESERVED
FOR FIRE PUMP
SK1MS
US
4" AW
4" W
4" AW
4" AW
4" AW
4" AW
4" AW
4" AW
4" AW
4" W
4" AW
3" AW
3" A
W
FD-3
FD-3
4" AW
2" AW 2" AW
4" ST UP
4" STOFFSET A/C
3" A
W3"
AW
4" AW
2" AW
4" AW
2" A
V2"
AV
1-1/2"W UP3"AW UP
4"AWUP
4"AW UP 4"AW UP
LS
3"AV UP
3" A
V
3"AV UP
3"AVUP
3"AV UP
3"AV UP3"AV UP 3"AV
UP 3"AVUP
3"AVUP
3"AVUP
2"VUP
3"AV UP
3"AVUP
3"AVUP
LOCATION OF pH MONITORINGSTATION FOR ANT-1. SEE
ELECTRICAL SITE PLAN FORMORE INFORMATION.
3" AW
2"V UP2" V
4"W UP
4" W
4" W
4"WUP
4"W UP.WCO ATBASE
4" W
2" AV 2" AV
2" V
2"VUP
4" W
4"W UP
FD-1
2" AV
2" AV
2" AV
FD-3
2" AV
2" AV
4" AW
4" A
W
4" AW
4" A
W
CERTI F IC
AT E O F A U THO
RIZAT
ION
SOUTH CAROLINA
CONSULTINGENGINEERS
DWG, INC.
No.C03649
CHECKED BY:
DRAWN BY:
DATE:
PROJECT:
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
1
A
2 3 4 5 6
B
C
D
E
WWW.LS3P.COMTEL. 843.577.4444 FAX 843.722.4789205 1/2 KING ST. CHARLESTON SC 29401
STATE PROJECT NO:H17-9588-FW
REVISIONS:
COPYRIGHT 2014 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.
E
G
No.
L
TU
DS
IC
AH
ISM
RE
TE
K
EG. W
ES
AA
17759
RE
GE
ER
INEN
L
RCAHORP
SEFOLN
S IOINO
5/19
/201
4 2:
49:4
9 PM
C:\U
sers
\km
inog
ue\D
ocum
ents
\120
96_C
CU
Sci
ence
Ann
ex II
Pha
se O
ne_2
013_
kmin
ogue
.rvt
LS3P: 1202-122370
MAY 20, 2014
KMM
MGW
PLUMBING FIRSTFLOOR WASTE &VENT PLAN
P111
BID SET
SCIENCE ANNEX IICONSTRUCTION
SCALE: 1/8" = 1'-0"P1111 FIRST FLOOR WASTE & VENT PLAN
GENERAL NOTES:1. ALL LAB FIXTURES AND JANITOR CLOSET MOP SINKS SHALL BE PROVIDED WITHACID WASTE/VENT PIPING.
2. BREAK ROOM SINKS, EWC, RESTROOM/BATHROOM FIXTURES SHALL BEPROVIDED WITH SANITARY WASTE/VENT PIPING.
3. DO NOT INTERCONNECT ACID AND SANITARY PIPING SYSTEMS UNO.
No. Description Date
UP
11109
8765432
1A
B
C
D
F
G
H
X5X3X2
OFF-1241
OFF-13228
OFF-12229
OFF-9232
OFF-7233
OFF-6235
OFF-5236
OFF-4237
OFF-3238
ELEVE2
OFF-8234
OFF-20242
ELEC.240
OFF-10231 OFF-11
230
OFF-15227
DATA239
OFF-17224
OFF-14226
OFF-16225
GRAD BULLPEN246
GIS247
COMP MODEL248
COMPUTERSERVER
250
PHYS OCEAN255
OFFICE254
OFFICE253
LOW SVC TEACHLAB252
PREP251
LOW SVC TEACHLAB249
LOW SVC TEACHLAB245
PREP244
LOW SVC TEACHLAB243
ADMIN-1222
OFF-18219
FILE / WORK / BRK217
F. TLT.201
OFF-19218
OFF-1216
OFF-2215
OFF-3214
OFF-5212
OFF-4213
OFF-6211
OFF-7210
OFF-8209
OFF-9208
LECTURECLASSROOM
207
GRAD STD206
LECTURECLASSROOM
205
LECTURECLASSROOM
204
SEMINAR203
M. TLT202
PLOT256
CORRIDORC2-5
LG CONF RM220
CORRIDORC2-4
CORRIDORC2-3
STAIR 2-2S2N
STAIR 1-2S2W
JAN223
4" AWRISER
2" AW DNAND 2" AV
UP
4"AWRISER
4"WRISER
4"WRISER
EWC
CONNECTTO 4"WRISER
2"W DN
EWC
6"ST RISER
WC-A
WC
UR-A
UR
LAV-1(TYP.)
WC-A
WC
WC
WC
FD-1
FD-1
FD-1
3"AW DN
CO
SK1
CS
SK1
SK1
3" AW
FD-4
SK1
SK1A
LS
LS
BRS
LAV-1(TYP.)
SK1A
LS
CS
SK1
LS
SK1ACS
SK1 SK1
SK1
CS
LS
SK1
SK1A
CS
LS
BRS
SK1
SK1
FD-4
FD-1
FD-4
CO
CO
CO
CO
CO
3"W RISER
4"AW UP& DN
4"AW DN,3"AW UP
4"AW DN4"AW DN3"AW UP
4"AW
4" AWRISER
CO
4" AW
4" AW4" AW
3" A
W
1 1/2" AW
1 1/2" AW
2" A
W3"
AW
2" A
W
1 1/
2" A
W
1 1/2" AW
3" AW2" AW
3" AW
1 1/2" AW
4" AW
1 1/2" AW
4" AW
1 1/2" AW
3" AW4" AW
2" AW
2" AW
2" AW
2" AW
2" AV
2" AV3" AW
2" AW 2" AV
2" A
V
1 1/2" AV
1 1/2" AV
2" AV
2" A
W
3" AW4" AW
1 1/2" AV
CO
2" AW
CO
4"AW UP
4"AW DN
4"AW DN
4"AW UP
2" AW
CO
4" AW
Y1
Y2
4" ST DN
4"ST RISER
4"ST RISER
3" AW
3" AW
ESH ESH
2" AW 2" AW
ESHESH
FD-4
2" AW
3" AW3" AW
2" AW
8.5
E
3" AV UP
3"AV UP
2" A
V
3" A
W2"
AW
4" S
T4"
ST
4"ST UPTO PD
4"ST UPTO PD
4"AW
2" A
V2" AV
3"AVDN
3" AV
3"AV DN
3"AVDN
3"AV DN
3"AV DN
3"AV DN
3"AVDN
3"AVDN
3"AVDN
MS
3"AVDN
2"V DN
3"AV DN3"AVDN
3"AVDN
3" AV
2" AV
3"AV UP
2"V UP
4"AWDN
3"AVUP
3"AVUP
3"AV UP
3"AV UP
3"AV UP
3"AVUP
2" V
2"V UP
2"V RISER
4"W UP
4"WDN
4"W UP
4"W UP
4"W DN
2"V STACK
4"W RISER
CERTI F IC
AT E O F A U THO
RIZAT
ION
SOUTH CAROLINA
CONSULTINGENGINEERS
DWG, INC.
No.C03649
CHECKED BY:
DRAWN BY:
DATE:
PROJECT:
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
1
A
2 3 4 5 6
B
C
D
E
WWW.LS3P.COMTEL. 843.577.4444 FAX 843.722.4789205 1/2 KING ST. CHARLESTON SC 29401
STATE PROJECT NO:H17-9588-FW
REVISIONS:
COPYRIGHT 2014 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.
E
G
No.
L
TU
DS
IC
AH
ISM
RE
TE
K
EG. W
ES
AA
17759
RE
GE
ER
INEN
L
RCAHORP
SEFOLN
S IOINO
5/19
/201
4 2:
50:1
1 PM
C:\U
sers
\km
inog
ue\D
ocum
ents
\120
96_C
CU
Sci
ence
Ann
ex II
Pha
se O
ne_2
013_
kmin
ogue
.rvt
LS3P: 1202-122370
MAY 20, 2014
KMM
MGW
PLUMBINGSECOND FLOORWASTE & VENTPLAN
P112
BID SET
SCIENCE ANNEX IICONSTRUCTION
SCALE: 1/8" = 1'-0"P1121 SECOND FLOOR WASTE & VENT PLAN
GENERAL NOTES:1. ALL LAB FIXTURES AND JANITOR CLOSET MOP SINKS SHALL BE PROVIDED WITHACID WASTE/VENT PIPING.
2. BREAK ROOM SINKS, EWC, RESTROOM/BATHROOM FIXTURES SHALL BE PROVIDEDWITH SANITARY WASTE/VENT PIPING. DO NOT INTERCONNECT ACID AND SANITARYPIPING SYSTEMS UNO.
No. Description Date
DN
11109
8765432
1A
B
C
D
F
G
H
X5X3X2
ORG CHEM306
A & P TEACHING305
PREP307
ORG CHEM308
PREP304
A&P TEACHING303
M. TLT.310
OFF-19314
OFF-18313
OFF-17312
OFF-16311
F. TLT.302
SECURE FILE301A
OFF-12301B
OFF-11301C
OFF-10301D
OFF-14301Q
DATA316
ELEC317
OFFICE301L
OFF-15301P
CHEM STOR318
OFF-6301H
OFF-5301I
OFF-4301J
OFF-3301K
OFF-2301M
MS M. CHEM.RESEARCH 1
326
MARINE CHEMTEACH LAB
320
MS CHEM INSTR.321
CHEM WET328
PREP329
CHEM. BAL.328B
ADV. CHEM TEACH.330
ROOF TERRACE332 GEN CHEM
327
ASTRON. STOR.331
GEN CHEM322
PREP323
MS M CHEMRESEARCH
319A
BALCONY315
OFF-9301E
CORRIDORC3-1
CORRIDORC3-3
CORRIDORC3-2
CORRIDORC3-5
STAIR 2-3S3N
STAIR 1-3S3W
STAIR 3S3-3
ALT TREAD STAIR309
ELEVE3
ROOF ACCESS324
CORRIDORC3-4
CLEAN ROOM319B
OFF-8301F
OFF-7301G
JAN325
MSCI PREP320A
4" AW DN
4" AW DN
4" W DN
4"AW DN
4" WDN
2" W DN
EWC
4"AWDN
SK1
SK1
SK1A
SK1
SK1A
SK1 SK1SK1
SK1
SK1
SK1
SK1
SK1SK1A
SK1
SK1
SK1
SK1
SK1
SK1
SK2
SK1A
SK1
SK1A
SK2
SK1A
SK1
SK1
SK1
SK1
SK1A
SK1
3"AW DN
SK1
SK1
ADMIN301
MS
CS
CS
CS
CS
CSCS
CS
CS
CS
CS
CS
BRS
LAV-1
LAV-1
CS
CS
CS
CS
CS
CS
CS CS CS
CSCS
SK1
1
1
CO
UR-A
UR
WCWC-A
WC-A
WC
WC
WC FD-1
FD-1
FD-3
FD-3
FD-1
CS CS
CS CS CS CS
CS
CS
CSCS
CS
CS
CS
CS
CS
CS
CS CS CS CS
CS
CS
CS
CS
CS
CS
CS CS CS CS CS CS CS CS CS
CS
CS
CS
COFD-4
FD-4
FD-4
FD-4
FD-4
FD-4
FD-4
FD-4
FD-4
CO
LS
COCO
CO
CS CS
COCO
LS
CO
CO
LS
COCO
CO
CO CO
CO
LS
CO
CO
CO
LS
CO
(TYP)
(TYP)
CO
3"AW DN 3"AW DN
FD-4
CS
CRS
3"W DN
CO 4" OF
CO
3" A
W
4" AW
3" AW
3" A
W
2" A
W
CO
3" AW
2" AW
2" AW
3" AW
4" AW
2" AW
3" A
W
2" AWESH
2" AW
CO
3" AW
3" AW
CO
CO3" AW
2" AW3" AW 3" AW
2" AW
CO
3" AW
3" AW
1 1/2" AV
3" AW 3" AW
4" AW4" AW 4" AW
4" AW
2" AW 2" AW
4"AW DN
3" AW
3" AW2" AW
3" AW
1 1/2" AV
3" AW
3" A
W
2" AW
2" AW
2" AW1 1/2" AW
2" AW
3"AW DN
4"AW DN
3" AW
3" AW
6" ST UP TO ROOF
6" ST ON2" AW
4"ST DN
4"OF DN
3" AV
2" AW 1 1/2" AW
3" AW
1 1/2" AW
2" AW 2" AW
3" AW3" AW
3" A
W
1 1/2" AW
4" ST
3" AW1 1/2" AW
4" AW
4" AW
3" AW
3" AW
1 1/2" AW
1 1/2" AW
3" AW
1 1/2" AW
4" AW
3" AW
3" A
W
4" AW 4" AW 4" AW
4" A
W
1 1/
2" A
W
4" AW
2" A
W
3" A
W
4" AW
4" AW2" AW
3" AW
4" AW
3" AW
2" AW
3" AW
4"AW DN
3" AV
3" AV
CO
2" AV3" AV3" AV
Y1
Y2
4" AW
3"AVTR
3"AVTR
3"AVTR2"
AV
2" A
V
2" A
V
2" A
V3"AVTR
3" AV
3" A
V
3"AVTR
4" AW
3" AW
3" AV
3"AVTR
3" AW
2" A
V
3" AW3" AW
3" A
W
3" A
V
2" AV2" AV
4" S
T4"
ST
3" VERTICALST DN
PD
PD
PD
PD
ESH
3" AWESH
FD-4
ESH
ESH
ESH
ESH
ESH
FD-4
ESH
ESH
ESH
ESH
3" AW
3" AW
3" AW
2" AW
3" AW
2" AW 3" AW
3" AW
3" AW
3" AW
3" A
W
2" AV
2" AV3" AV
3" A
W3"
AW
3" A
W
3" A
W3"
AW
1 1/2" AV
2" AW
3" A
V
SK1
2" AW
3" AW
3" AW
3" AW
3" AW
SK1
CS
8.5
E
4" A
W
LS
2" AV2" AV
LS
3" AV
2" AV
3" AV
1 1/
2" A
V
2" AV
4" V
2" A
V
2" AV
2" A
V
4" W
3"WRISER
3" V
4" V
4" V
3" A
V
3" AW3" AV3" AV
3"AV DN
2"AV DN
2" A
V
3"AV DN3"AVTR
3"AV
TR
3"AV
TR
4"VTR
3"AVTR
3"AV DN
2" V 2"AV DN
3"AVDN
3"AVTR3"AVDN
3" A
V
3" A
V
1-1/2"V DN
2"VTR
3"AV DN
3" AV
3"AVTR
3"AV DN
3"AVDN
3"AVDN
3" AW
4" AW
2"V DN &UP TO VTR
4"W RISER
2" V
2"V DN
4" V
4"W UP4"W DN
4" W
4"W DN
4" W4"WUP
2" AV
2" A
V
2" A
V
1 1/2" AV
4"W UP
4" W4"WDN
CERTI F IC
AT E O F A U THO
RIZAT
ION
SOUTH CAROLINA
CONSULTINGENGINEERS
DWG, INC.
No.C03649
CHECKED BY:
DRAWN BY:
DATE:
PROJECT:
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
1
A
2 3 4 5 6
B
C
D
E
WWW.LS3P.COMTEL. 843.577.4444 FAX 843.722.4789205 1/2 KING ST. CHARLESTON SC 29401
STATE PROJECT NO:H17-9588-FW
REVISIONS:
COPYRIGHT 2014 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.
E
G
No.
L
TU
DS
IC
AH
ISM
RE
TE
K
EG. W
ES
AA
17759
RE
GE
ER
INEN
L
RCAHORP
SEFOLN
S IOINO
5/19
/201
4 2:
50:4
5 PM
C:\U
sers
\km
inog
ue\D
ocum
ents
\120
96_C
CU
Sci
ence
Ann
ex II
Pha
se O
ne_2
013_
kmin
ogue
.rvt
LS3P: 1202-122370
MAY 20, 2014
KMM
MGW
PLUMBING THIRDFLOOR WASTE &VENT PLAN
P113
BID SET
SCIENCE ANNEX IICONSTRUCTION
SCALE: 1/8" = 1'-0"P1131 THIRD FLOOR WASTE & VENT PLAN
KEY NOTES:PROVIDE ACID DILUTION TANK FOR ACID WASTE HOOD. INSTALL TANK UNDER HOODPROVIDED BY LAB EQUIPMENT SUPPLIER AND MAKE FINAL CONNECTIONS TO WASTEOUTLET. BASIS OF DESIGN: ORION P-8 OR EQUAL.
1
GENERAL NOTES:1. ALL LAB FIXTURES AND JANITOR CLOSET MOP SINKS SHALL BE PROVIDED WITH ACIDWASTE/VENT PIPING.
2. BREAK ROOM SINKS, EWC, RESTROOM/BATHROOM FIXTURES SHALL BE PROVIDEDWITH SANITARY WASTE/VENT PIPING. DO NOT INTERCONNECT ACID AND SANITARYPIPING SYSTEMS UNO.
KEY NOTES:
No. Description Date
11109
8765432
1
A
B
C
D
F
G
H
X5X3X2
1P301
VERT. BIO.104
MSCI ECOLRESEARCH LAB
105
MSCI ECOL LAB106
MSCI ECO RES LAB107
M. TLT.109
JAN.100
OFF-10102H
OFF-11102F
RECEPTION102K
SHARED STOR103
OFF-8 / ADMIN102J
OFF-7 / ADV102I
OFF-6 / ADV102G
OFF-5 / ASST DEAN102E
OFF-4 / DEAN102D
OFF-3 / ADMIN102C
RECEPT102A
OFF-2102B
F. TLT.110
FILE / WORK102
MOLEC & MICROBIO115
LOW SVC ECOLLAB119
DATA111
FRESHWATER101
ELEC.112
ELEV. EQ.116
CHEM WASTE118A
FREEZER114
MECH.M1
BIOHAZARD118B
AQUAR.118C
MUDROOM / DOCK118
NMR118D
ANIMAL120A
ADV WET TEACHLAB127
LOW SVC. TEACHLAB - MSCI
125
MICROSCOPE128
GEO/SED TEACH.LAB124
PREP121
HOUSING120B
WASH120C
ELEVE1
CORRIDORC1-5
CORRIDORC1-7
CORRIDORC1-6
SHOWER108
PREP123
STAIR 2-1S1N
STAIR 1-1S1W
OUTDOORSUPPORT
OS
FOYERC1-4
FOYERC1-1
CORRIDORC1-3
LOBBYC1-2
5" N
G
5" NGRISER
GEO SEDRESEARCH LAB
126
12
3
11
1
1
1
2" NG2" CA
2" N
G
4
2" NG
3/4" NG
1" N
G
1 1/
2" N
G
1 1/2" NG
2" C
A
5
5
1" VAC
2" V
AC
6
Y1
Y2
1
1/2" NG1" VAC
7
7
7
8.5
E
3/4"
VAC
2" N UP
3/4"
NG
3/4"
VAC
2" VAC2" NG
2" VAC 2" VAC
3/4" VAC3/4" NG
5 5
2" V
AC2"
NG
2" N
G2"
VAC
3/4" VAC1" VAC
2" NG2" VAC
2" NG
2" CARISER
NATURAL GAS SERVICEENTRANCE. SEE DETAIL.
COORDINATE EXACT LOCATIONWITH OWNER'S CONTRACTOR.
U/G NATURAL GAS PIPING BY OTHERS.
2"VACRISER
FIRE PUMPM2
TERMINATE VENTING FORUNDERGROUND GAS PIPING
CASING AT EXTERIORLOCATION INDICATED.
COORDINATE LOCATIONWITH HVAC PIPING
8
CERTI F IC
AT E O F A U THO
RIZAT
ION
SOUTH CAROLINA
CONSULTINGENGINEERS
DWG, INC.
No.C03649
CHECKED BY:
DRAWN BY:
DATE:
PROJECT:
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
1
A
2 3 4 5 6
B
C
D
E
WWW.LS3P.COMTEL. 843.577.4444 FAX 843.722.4789205 1/2 KING ST. CHARLESTON SC 29401
STATE PROJECT NO:H17-9588-FW
REVISIONS:
COPYRIGHT 2014 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.
E
G
No.
L
TU
DS
IC
AH
ISM
RE
TE
K
EG. W
ES
AA
17759
RE
GE
ER
INEN
L
RCAHORP
SEFOLN
S IOINO
5/19
/201
4 2:
51:1
1 PM
C:\U
sers
\km
inog
ue\D
ocum
ents
\120
96_C
CU
Sci
ence
Ann
ex II
Pha
se O
ne_2
013_
kmin
ogue
.rvt
LS3P: 1202-122370
MAY 20, 2014
KMM
MGW
PLUMBING FIRSTFLOOR GAS PLAN
P121
BID SET
SCIENCE ANNEX IICONSTRUCTION
SCALE: 1/8" = 1'-0"P1211 FIRST FLOOR GAS PLAN
EMERGENCY SHUTOFF BUTTON SHALL CLOSE GAS SOLENOID VALVE UPONACTIVIATION. COORDINATE WITH SHUNT TRIP REQUIREMENTS AND ELECTRICALDOCUMENTS. INSTALL GAS SOLENOID VALVE AND MANUAL SHUTOFF VALVE ABOVEACCESSIBLE CEILING ON CORRIDOR SIDE OF DOOR.
PROVIDE SHUTOFF VALVE IN ACCESSIBLE LOCATION ABOVE CEILING.
PROVIDE CASING FOR UNDERGROUND GAS PIPING. SEE DETAIL.
COORDINATE CONNECTION TO EQUIPMENT WITH OWNER.
PROVIDE 1" PIPING TO GAS TURRET AT TABLE. SEE ISOMETRIC VIEW FORUNDERGROUND NATURAL GAS PIPING FOR THIS ROOM.
PROVIDE NITROGEN GAS MANIFOLD AND HEADER BAR WITH REGULATOR.BASIS OF DESIGN (OR EQUAL):AMICO M3A-DL-HH-U-NITAMICO M2-HBXS-08L-NIT
3/4" VACUUM PIPING TO PANEL MOUNT OUTLET. THIS CONTRACTOR SHALL MAKEFINAL CONNECTION. COORDINATE EXACT LOCATION WITH LAB EQUIPMENTSUPPLIER.
PROVIDE DRAIN AT BASE OF VACUUM RISER. DRAIN SHALL BE 2" DIAMETER FOR 3'LENGTH BELOW HORIZONTAL CONNECTION TO RISER BEFORE INSTALLATION OFBALL VALVE. PIPING DOWNSTREAM OF BALL VALVE SHALL BE 3/4" DIAMETER. PIPE TONEAREST FLOOR DRAIN.
1
2
3
4
5
6
GENERAL NOTES:1. ALL PIPING SHALL BE CONCEALED ABOVE FIRST FLOOR CEILING, UNO.2. MAKE FINAL CONNECTIONS TO LAB GAS PIPING FROM FUME HOODS ABOVE
CEILING. PIPING CONNECTION SIZE SHALL BE AS FOLLOWS:NATURAL GAS: 1/2"VACUUM: 3/4"COMPRESSED AIR: 1/2"NITROGEN: 1/2"
3. PROVIDE 1/8" PER FOOT MINIMUM SLOPE FOR ALL VACUUM PIPING.PROVIDE DRIP LEG WITH REMOVABLE CAP AT ALL LOW POINTS IN PIPING.
7
KEY NOTES:
8
No. Description Date
UP
11109
8765432
1A
B
C
D
F
G
H
X5X3X2
OFF-1241
OFF-13228
OFF-12229
OFF-9232
OFF-7233
OFF-6235
OFF-5236
OFF-4237
OFF-3238
ELEVE2
OFF-8234
OFF-20242
ELEC.240
OFF-10231
OFF-11230
OFF-15227
DATA239
OFF-17224
OFF-14226
OFF-16225
GRAD BULLPEN246
GIS247COMP MODEL
248
COMPUTERSERVER
250
PHYS OCEAN255
OFFICE254
OFFICE253
LOW SVC TEACHLAB252
PREP251
LOW SVC TEACHLAB249
LOW SVC TEACHLAB245
PREP244
LOW SVC TEACHLAB243
ADMIN-1222 OFF-18
219
FILE / WORK / BRK217
F. TLT.201
OFF-19218
OFF-1216
OFF-2215
OFF-3214
OFF-5212
OFF-4213
OFF-6211
OFF-7210
OFF-8209
OFF-9208
LECTURECLASSROOM
207
GRAD STD206
LECTURECLASSROOM
205
LECTURECLASSROOM
204
SEMINAR203
M. TLT202
JAN223
STAIR 3S3-2
LG CONF RM220
CORRIDORC2-3
CORRIDORC2-5
STAIR 1-2S2W
STAIR 2-2S2N
CORRIDORC2-4
PLOT256
CORRIDORC2-1
CORRIDORC2-2
2" CARISER
1 11 1
1
1
2
2
2
222
3/4" NG
3/4"
NG
3/4" NG2" NG2" NG2" NG2" NG
3/4" VAC1/2" NG
3/4"
VAC
3/4"
NG
3/4"
NG
1/2"
NG
3/4"
VAC
3/4"
VAC
1/2"
NG
2" VAC2" VAC 2" VAC 2" VAC
3/4" VAC
3/4"
VAC
Y1
Y2
1/2" NG3/4" VAC
1/2"
NG
3/4"
VAC
3/4"
VAC
1/2"
NG
8.5
E
2" N FROM 1STFLR TO 3RD FLR
2" VAC2" NG
1" VAC
CONNECT TO2" VAC RISER
CONNECTTO 5" NG
RISER
3/4" VAC
CERTI F IC
AT E O F A U THO
RIZAT
ION
SOUTH CAROLINA
CONSULTINGENGINEERS
DWG, INC.
No.C03649
CHECKED BY:
DRAWN BY:
DATE:
PROJECT:
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
1
A
2 3 4 5 6
B
C
D
E
WWW.LS3P.COMTEL. 843.577.4444 FAX 843.722.4789205 1/2 KING ST. CHARLESTON SC 29401
STATE PROJECT NO:H17-9588-FW
REVISIONS:
COPYRIGHT 2014 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.
E
G
No.
L
TU
DS
IC
AH
ISM
RE
TE
K
EG. W
ES
AA
17759
RE
GE
ER
INEN
L
RCAHORP
SEFOLN
S IOINO
5/19
/201
4 2:
51:2
4 PM
C:\U
sers
\km
inog
ue\D
ocum
ents
\120
96_C
CU
Sci
ence
Ann
ex II
Pha
se O
ne_2
013_
kmin
ogue
.rvt
LS3P: 1202-122370
MAY 20, 2014
KMM
MGW
PLUMBINGSECOND FLOORGAS PLAN
P122
BID SET
SCIENCE ANNEX IICONSTRUCTION
SCALE: 1/8" = 1'-0"P1221 SECOND FLOOR GAS PLAN
EMERGENCY SHUTOFF BUTTON SHALL CLOSE GAS SOLENOID VALVE UPONACTIVIATION. COORDINATE WITH SHUNT TRIP REQUIREMENTS AND ELECTRICALDOCUMENTS. INSTALL GAS SOLENOID VALVE AND MANUAL SHUTOFF VALVE ABOVEACCESSIBLE CEILING ON CORRIDOR SIDE OF DOOR.
ROUTE PIPING FOR GAS OUTLET AT INSTRUCTOR'S TABLE BELOW FLOOR.COORDINATE STUB UP LOCATION WITH LAB EQUIPMENT SUPPLIER. MAKE FINALCONNECTION TO GAS OUTLET.
1
2
GENERAL NOTES:KEY NOTES:1. ALL PIPING SHALL BE CONCEALED ABOVE FIRST FLOOR CEILING, UNO.2. MAKE FINAL CONNECTIONS TO LAB GAS PIPING FROM FUME HOODS
ABOVE CEILING. PIPING CONNECTION SIZE SHALL BE AS FOLLOWS:NATURAL GAS: 1/2"VACUUM: 3/4"COMPRESSED AIR: 1/2"NITROGEN: 1/2"
3. PROVIDE 1/8" PER FOOT MINIMUM SLOPE FOR ALL VACUUM PIPING.PROVIDE DRIP LEG WITH REMOVABLE CAP AT ALL LOW POINTS IN PIPING.
No. Description Date
DN
11109
87654321A
B
C
D
F
G
H
X5X3X2
ORG CHEM306
A & P TEACHING305
PREP307
ORG CHEM308
PREP304
A&P TEACHING303
M. TLT.310
OFF-19314
OFF-18313
OFF-17312
OFF-16311
F. TLT.302
SECURE FILE301A
OFF-12301B
OFF-11301C
OFF-10301D
OFF-14301Q
DATA316
ELEC317
OFFICE301L
OFF-15301P
CHEM STOR318
OFF-6301H
OFF-5301I
OFF-4301J
OFF-3301K
OFF-2301M
MS M. CHEM.RESEARCH 1
326
MARINE CHEMTEACH LAB
320
MS CHEM INSTR.321
CHEM WET328
PREP329
CHEM. BAL.328B
ADV. CHEM TEACH.330
ROOF TERRACE332
GEN CHEM327
ASTRON. STOR.331
GEN CHEM322
PREP323
MS M CHEMRESEARCH
319A
BALCONY315
OFF-9301E
CORRIDORC3-1
CORRIDORC3-3
CORRIDORC3-2
CORRIDORC3-5
STAIR 2-3S3N
STAIR 1-3S3W
STAIR 3S3-3
ALT TREAD STAIR309
ELEVE3
ROOF ACCESS324
CORRIDORC3-4
CLEAN ROOM319B
OFF-8301F
OFF-7301G
JAN325
MSCI PREP320A
CONNECTTO 5" NG
RISER
2
2
2
1/2" NG
1/2" NG
1/2" NG
1
1
1
1
1
1
3/4" NG
3/4" CA
3/4" NG1" VAC3/4" CA
2" VAC 1" NG
1" NG
2" VAC
1" N1" NG
1
3/4" VAC
1" NG
1" NG
1" VAC
1-1/2"CAMANIFOLD
2" CA2" N
2" NG 2" NG2" CA
2" N
2" NG2" CA
2" NG2" CA2" N
2" NG2" CA
2" N
2" NG2" CA
2" N
1/2" NG3/4" VAC
3/4" VAC1/2" NG
3/4" VAC1/2" NG1/2" NG
1" NG
3/4" NG
1" VAC
3/4"
NG
3/4" VAC1/2" NG
1/2"
NG
3/4"
VAC
2" NG
2" N
G2"
CA
2" N
G2"
NG
4
4
2" C
A
4
4
4
41" NG
1" VAC
1" VAC1" NG
2" NG
1/2" NG
3/4" VAC
1" NG1" VAC
P4013
Y1
Y2
3/4" VAC
3/4" VAC
2" NG
3/4"
NG
1" V
AC1/
2" C
A1/
2" N
3
1" VAC1" CA
2" C
A
8.5
1
1
5
1" NG1" N
1" VAC1" CA
3/4" CA3/4" VAC1/2" N1/2" NG
E
1/2" NG1/2" N3/4" VAC1/2" CA
1/2" CA3/4" VAC
1/2" N1/2" NG
1/2" CA3/4" VAC
1/2" NG1/2" N
1/2" NG1/2" N3/4" VAC3/4" CA
1/2" CA3/4" VAC1/2" N1/2" NG
1/2" CA3/4" VAC1/2" N1/2" NG
DN INWALL
2" N
3/4" VAC
P4012
2" N DNIN WALL
1" N
2" CACONNECTTO 2" CARISER
2" VAC
2" VAC
2" V
AC2"
VAC
2" V
AC
2" VAC
2" CA
2" VAC
1" N
G1"
VAC
2" VAC 2" VAC
1" V
AC
1" N
G1"
VAC
CONNECTTO 2" VACRISER
2" VAC
ADMIN301
2" VAC
2" NG
1" VAC
2" VAC
1 1/2" CA
2" N
G
2" N
G
CERTI F IC
AT E O F A U THO
RIZAT
ION
SOUTH CAROLINA
CONSULTINGENGINEERS
DWG, INC.
No.C03649
CHECKED BY:
DRAWN BY:
DATE:
PROJECT:
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
1
A
2 3 4 5 6
B
C
D
E
WWW.LS3P.COMTEL. 843.577.4444 FAX 843.722.4789205 1/2 KING ST. CHARLESTON SC 29401
STATE PROJECT NO:H17-9588-FW
REVISIONS:
COPYRIGHT 2014 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.
E
G
No.
L
TU
DS
IC
AH
ISM
RE
TE
K
EG. W
ES
AA
17759
RE
GE
ER
INEN
L
RCAHORP
SEFOLN
S IOINO
5/19
/201
4 2:
51:4
7 PM
C:\U
sers
\km
inog
ue\D
ocum
ents
\120
96_C
CU
Sci
ence
Ann
ex II
Pha
se O
ne_2
013_
kmin
ogue
.rvt
LS3P: 1202-122370
MAY 20, 2014
KMM
MGW
PLUMBING THIRDFLOOR GAS PLAN
P123
BID SET
SCIENCE ANNEX IICONSTRUCTION
SCALE: 1/8" = 1'-0"P1231 THIRD FLOOR GAS PLAN
EMERGENCY SHUTOFF BUTTON SHALL CLOSE GAS SOLENOID VALVE UPONACTIVATION. COORDINATE WITH SHUNT TRIP REQUIREMENTS AND ELECTRICALDOCUMENTS. INSTALL GAS SOLENOID VALVE AND MANUAL SHUTOFF VALVEABOVE ACCESSIBLE CEILING ON CORRIDOR SIDE OF DOOR.
PROVIDE SHUTOFF VALVE IN READILY ACCESSIBLE LOCATION.
ROUTE PIPING BELOW SLAB. COORDINATE NUMBER AND LOCATION OF GASOUTLETS WITH LAB EQUIPMENT SUPPLIER.
ROUTE PIPING FOR NG AND VAC OUTLETS AT INSTRUCTOR'S TABLE BELOWFLOOR. COORDINATE STUB UP LOCATIONS WITH LAB EQUIPMENT SUPPLIER. MAKEFINAL CONNECTION TO GAS OUTLETS.
MAKE FINAL CONNECTION TO OUTLET PROVIDED BY LAB EQUIPMENT SUPPLIER.
1
2
3
4
GENERAL NOTES:
5
KEY NOTES:1. ALL PIPING SHALL BE CONCEALED ABOVE CEILING, UNO.2. MAKE FINAL CONNECTIONS TO LAB GAS PIPING FROM FUME HOODS ABOVE
CEILING. PIPING CONNECTION SIZE SHALL BE AS FOLLOWS:NATURAL GAS: 1/2"VACUUM: 3/4"COMPRESSED AIR: 1/2"NITROGEN: 1/2"
3. PROVIDE 1/8" PER FOOT MINIMUM SLOPE FOR ALL VACUUM PIPING.PROVIDE DRIP LEG WITH REMOVABLE CAP AT ALL LOW POINTS IN PIPING.
No. Description Date
F
PLUMBING AND MECHANICAL PIPINGSHALL SUPPORTED ON SINGLETRAPEZE HANGER SIZED FOR ALLPIPING IN THIS AREA. LOCATIONSTYPICAL OF ALL CORRIDORS.
STRUCTURAL BEAM AT THIS LOCATION.
SHUTOFF VALVES SHALLBE LOCATED AT ANACCESSIBLE LOCATIONAS LOW AS POSSIBLEABOVE CEILING.
DUCTWORK SHOWNFOR REFERENCE.LOCATIONS TYPICAL OFALL CORRIDORS.
CABLE TRAY SHOWNFOR REFERENCE.LOCATION TYPICALOF ALL CORRIDORS.
CERTI F IC
AT E O F A U THO
RIZAT
ION
SOUTH CAROLINA
CONSULTINGENGINEERS
DWG, INC.
No.C03649
CHECKED BY:
DRAWN BY:
DATE:
PROJECT:
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
1
A
2 3 4 5 6
B
C
D
E
WWW.LS3P.COMTEL. 843.577.4444 FAX 843.722.4789205 1/2 KING ST. CHARLESTON SC 29401
STATE PROJECT NO:H17-9588-FW
REVISIONS:
COPYRIGHT 2014 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.
E
G
No.
L
TU
DS
IC
AH
ISM
RE
TE
K
EG. W
ES
AA
17759
RE
GE
ER
INEN
L
RCAHORP
SEFOLN
S IOINO
5/19
/201
4 2:
52:2
0 PM
C:\U
sers
\km
inog
ue\D
ocum
ents
\120
96_C
CU
Sci
ence
Ann
ex II
Pha
se O
ne_2
013_
kmin
ogue
.rvt
LS3P: 1202-122370
MAY 20, 2014
KMM
MGW
PLUMBINGSECTIONS &ISOMETRICS
P301
BID SET
SCIENCE ANNEX IICONSTRUCTION
SCALE: NOT TO SCALEP3011 PIPING AT CORRIDOR SECTION
SCALE:P3012 ACID WASTE & VENT ISOMETRIC VIEW
SCALE:P3013 SANITARY WASTE & VENT ISO VIEW
NOT TO SCALE
NOT TO SCALE
No. Description Date
98
B
C
D
X2
Y1
1
1
2" NG2" VAC
2" NG2" VAC
2" CA2" NG2" VAC
2" CA2" NG2" VAC
2" CA2" NG2" VAC
2" CA2" NG2" VAC
2" NG2" VAC
1/2" NG
3/4" VAC
2" VAC2" NG2" CA
2" V
AC2"
NG
2" C
A
2" N
G2"
CA
2" V
AC
2" V
AC2"
NG
2" C
A
2" V
AC2"
NG
2" C
A
2" V
AC2"
NG
2" C
A
2" CA
3/4" NG
1" VAC
2" V
AC2"
NG
2" C
A
2" V
AC2"
NG
2" C
A
2" V
AC2"
NG
2" C
A
2" V
AC
2" N
G2"
CA
2" CA
2" NG
2" VAC
2" VAC2" NG2" CA
2" VAC2" NG
2" CA
1" CA
2" V
AC2"
NG
2" C
A
2" C
A
2" N
G2"
VAC
2" C
A2"
NG
2" V
AC
2" C
A2"
NG
2" V
AC
2" C
A2"
NG
2" V
AC
2" CA2" NG
2" C
A 2" N
G
2" V
AC
2" C
A2"
NG
2" V
AC
2" C
A2"
NG
2" V
AC
2" C
A2"
NG
2" V
AC
2" CA2" NG2" VAC
2" CA2" NG
2" VAC
2" NG2" VAC
2" VAC2" NG2" CA 2"
VAC
2" N
G2"
CA
2" VAC
2" NG
2" CA
2" V
AC
2" V
AC
2" V
AC
2" CA
2" V
AC
2" V
AC
2" V
AC
2" NG2" VAC
1/2" CA
1/2" N
2
2
3
3
EXTEND CASING TOEXTERIOR ANDPROVIDE VENT
SEE PLAN FORCONTINUATION
DN IN WALL
SEE PLAN FORCONTINUATION
CONNECT TO GASTURRET PROVIDED BYLAB EQUIPMENTSUPPLIER (TYP.)
SHUTOFF VALVES A/C
4
G
1" VAC3/4" NG3/4" CA3/4" N
3/4" VAC 3/4" VAC
1/2"
NG
1/2"
CA
1/2"
N1/
2" N
1/2"
CA
1/2"
NG
3/4"
VAC
3/4"
VAC
1/2"
NG
1/2"
CA
1/2"
N1/
2" N
1/2"
CA
1/2"
NG
3/4" N3/4" CA3/4" NG1" VAC3/
4" N
3/4"
CA
3/4"
NG
SEE THIRD FLOORGAS PLAN FORCONTINUATION
1" V
AC
2
CERTI F IC
AT E O F A U THO
RIZAT
ION
SOUTH CAROLINA
CONSULTINGENGINEERS
DWG, INC.
No.C03649
CHECKED BY:
DRAWN BY:
DATE:
PROJECT:
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
1
A
2 3 4 5 6
B
C
D
E
WWW.LS3P.COMTEL. 843.577.4444 FAX 843.722.4789205 1/2 KING ST. CHARLESTON SC 29401
STATE PROJECT NO:H17-9588-FW
REVISIONS:
COPYRIGHT 2014 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.
E
G
No.
L
TU
DS
IC
AH
ISM
RE
TE
K
EG. W
ES
AA
17759
RE
GE
ER
INEN
L
RCAHORP
SEFOLN
S IOINO
5/19
/201
4 2:
52:3
3 PM
C:\U
sers
\km
inog
ue\D
ocum
ents
\120
96_C
CU
Sci
ence
Ann
ex II
Pha
se O
ne_2
013_
kmin
ogue
.rvt
LS3P: 1202-122370
MAY 20, 2014
KMM
MGW
PLUMBINGENLARGED PLANS
P401
BID SET
SCIENCE ANNEX IICONSTRUCTION
SCALE: 1/4" = 1'-0"P4013 ORG CHEM 306 & 308 ENLARGED GAS PLAN
ROUTE PIPING FOR NG & VAC OUTLETS AT INSTRUCTOR'S TABLE BELOW FLOOR.COORDINATE STUB UP LOCATIONS WITH LAB EQUIPMENT SUPPLIER. MAKE FINALCONNECTIONS TO GAS OUTLETS.
LAB GAS MANUAL SHUTOFF VALVE A/C IN ACCESSIBLE LOCATION.
EMERGENCY SHUTOFF BUTTON SHALL CLOSE GAS SOLENOID VALVE UPONACTIVATION. COORDINATE WITH SHUNT TRIP REQUIREMENTS AND ELECTRICALDOCUMENTS. INSTALL GAS SOLENOID VALVE AND MANUAL SHUTOFF VALVE ABOVEACCESSIBLE CEILING ON CORRIDOR SIDE OF DOOR.
1
GENERAL NOTES:KEY NOTES:
SCALE:P4011 LOW SVC. TEACH LAB - MSCI 125 NATURAL GAS ISOMETRIC
NOT TO SCALE
SCALE: 1/4" = 1'-0"P4012 PREP 329 ENLARGED GAS PLAN
1. ALL PIPING SHALL BE CONCEALED, UNO.2. MAKE FINAL CONNECTIONS TO LAB GAS PIPING FROM FUME HOODS ABOVE
CEILING. PIPING CONNECTION SIZE SHALL BE AS FOLLOWS:NATURAL GAS: 1/2"VACUUM: 3/4"COMPRESSED AIR: 1/2"NITROGEN: 1/2"
SEE THIRD FLOORGAS PLAN FORCONTINUATION
SEE THIRD FLOORGAS PLAN FORCONTINUATION
SEE THIRD FLOORGAS PLAN FORCONTINUATION
1
2
3
No. Description Date
10
X3 LAV-1(TYP)
WC-AWC UR UR-A
2" PC3/4" PH
2" PC 3/4" PC
2" PC1/2" PH3/4" PC
3/4" PC
BRS
LAV-1(TYP)
2" P
C 3/4"
PH
2 1/2" PC
2 1/2" PC 1" PH
3/4" PH3/4" PH
HB
WC-AWCWCWC
EWC
3/4" PC2 1/2" PC
2 1/2" PC
2" PC 2" PC
2" P
C
F. TLT.110
M. TLT.109
Y1
E
HB
10
9
X3
Y1
E
2" P
C
3/4"
PH
R3/
4" P
H
2" PC
3/4" PH
3/4" PHR
3/4" PC3/4" PH
1 1/
2" P
C
1/2"
PC
2" P
C
3/4" PHR
2" PH
2 1/2" PC
1" P
H
HB
WC-A WC
UR UR-A
LAV-1(TYP.)
M. TLT202
F. TLT.201
3/4" PC
1 1/2" PC
HB
BRS
LAV-1(TYP.)
WC-A
WCWCWC
3/4" PH
3/4"
PC
2" PC
2" PC
2" P
C
10
9
X3
Y1
E2" P
C
2" P
C3/
4" P
H3/
4" P
HR
3/4" PH
2" PC
3/4" PC
2" PC
2 1/2" PC
1 1/2" PH
3/4" PHR 1" PH
2" P
C
2" P
C
2" PC
3/4" PC1/
2" P
C
1/2"
PC
1/2" PH
LAV-1(TYP.)
WC-AWC
URUR-A
2" PC
TP
TP
HB
LAV-1(TYP.)
WC-AWC
WCWC
HB
1 1/2" PC
3/4" PC
8
H
X5 8.5
MECH.M1
FIRE PUMPM2
1/2" PHR
1 1/4" PH
2 1/2" PC
1M: 7,9,11
2" PWS
3/4" NPC
2" PWS
1/2" PC
3/4" NPHR
2" NPH
2" NPC
2
PROVIDE BACKFLOW PREVENTERS FOR1-1/2" HVAC MAKE-UP WATER, 4" NON-POTABLE LAB WATER, AND 4" POTABLEDOMESTIC WATER IN HEADERCONFIGURATION AT THIS LOCATION.SEE DETAIL.
2" PWS, 2" PWR, 4" PC, 1-1/2" PH, 3/4"PHR, 4"NPC, 2-
1/2"NPH, & 3/4"NPHRRISERS AND 1-1/2"HVAC
MAKEUP WATER.
CONNECT TORISER
CONNECTTO RISER
PROVIDE VALVE AT PWS DROP ANDMAKE FINAL CONNECTION TO PURIFIEDWATER OUTLET. SEE DETAIL.
SK1
WDBP-1,2
SEE WATER DISTRIBUTIONBOOSTER PUMP DETAIL
FOR CONTINUATION.
8
F
G
X3
Y2
1 1/2" NPC2" VAC2" CA
5" NG2" PWS3/4" NPC3/4" NPH
2" PWR
WH-3NPWH-2NPWH-1P
FD-1FD-2
FD-2
FD-1
FD-2
FD-2
3"AVTR
CONNECT TO AIRCOMPRESSOR. SEE DETAIL
FOR PIPING CONTINUATION.
1-1/2" NPC FORHVAC, WITHVALVE ANDCAPPED. SEEMECH. FOR MOREINFORMATION.
CONNECT TO VACUUMPUMP. SEE DETAIL FORPIPING CONTINUATION.
SEE PURIFIEDWATER SYSTEMPIPING SCHEMATICFOR CONTINUATION
3"AVTR
TP
RECEIVER TANK FORCOMPRESSED AIR
SYSTEM. SEE DETAIL.
3/4" NPHR
1 1/2" NPC
2 1/2" NPH
3/4" PHR
1 1/2" PC
1 1/2" PH
FD-1
FD-1
5" NG5" NG5" NG 5" NG5" NG
EXPANSION TANK FORNON-POTABLE WATERSYSTEM
EXPANSION TANK FORPOTABLE WATER
SYSTEM
SEE DETAILS FORPIPING CONTINUATION
2"PWS, 2" PWR, 5" NG, 4" PC, 1-1/2" PH, 3/4"PHR, 4"NPC, 2-
1/2"NPH, & 3/4"NPHR RISERS AND1-1/2"HVAC MAKEUP WATER
V-1
AC-1
TP
TP
FD-2
4" W
4" W
4" W
3" V
4"W DN4" W
3"VTR
4" W
4" W
4"W DN
4" W
4" W
3"VCONNECTION
4" VENT AND AIRINTAKE FOR WATERHEATER. TERMINATEWITH CONCENTRICVENT KIT.
3" VAC VENT
3"VAC VENTTHROUGH ROOF
3"V PIPING AT12'-6" AFF MIN.
CERTI F IC
AT E O F A U THO
RIZAT
ION
SOUTH CAROLINA
CONSULTINGENGINEERS
DWG, INC.
No.C03649
CHECKED BY:
DRAWN BY:
DATE:
PROJECT:
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
1
A
2 3 4 5 6
B
C
D
E
WWW.LS3P.COMTEL. 843.577.4444 FAX 843.722.4789205 1/2 KING ST. CHARLESTON SC 29401
STATE PROJECT NO:H17-9588-FW
REVISIONS:
COPYRIGHT 2014 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.
E
G
No.
L
TU
DS
IC
AH
ISM
RE
TE
K
EG. W
ES
AA
17759
RE
GE
ER
INEN
L
RCAHORP
SEFOLN
S IOINO
5/19
/201
4 2:
52:5
5 PM
C:\U
sers
\km
inog
ue\D
ocum
ents
\120
96_C
CU
Sci
ence
Ann
ex II
Pha
se O
ne_2
013_
kmin
ogue
.rvt
LS3P: 1202-122370
MAY 20, 2014
KMM
MGW
PLUMBINGENLARGED PLANS
P402
BID SET
SCIENCE ANNEX IICONSTRUCTION
SCALE: 1/4" = 1'-0"P4021 FIRST FLOOR RESTROOM ENLARGED DOMESTIC WATER PLAN
SCALE: 1/4" = 1'-0"P4022 SECOND FLOOR RESTROOM ENLARGED DOMESTIC WATER PLAN
SCALE: 1/4" = 1'-0"P4024 THIRD FLOOR RESTROOM ENLARGED DOMESTIC WATER PLAN
SCALE: 1/4" = 1'-0"P4023 MECH M1 & FIRE PUMP M2 ENLARGED WATER PIPING PLAN
SCALE: 1/4" = 1'-0"P4025 ENGLARGED MECHANICAL SPACE PIPING & EQUIPMENT PLAN
No. Description Date
3RDFLOOR
2RDFLOOR
1RDFLOOR
CONTROL VALVE
CONTROL VALVE
CONTROL VALVE
POUDROP
POUDROP
POUDROP
FLOWMETER
PWR
RIS
ER
PWS
RIS
ER
1. AT EACH DROP, REDUCE TO 1/2" PP VALVE INCLUDE A1/2" FPT ADAPTER ON OUTLET OF VALVE FOR CONNECTIONTO FAUCET.2. FOR SERVICE OF ONE FLOOR, CLOSE BOTH CONTROLVALVES.
NOTES
PWS
PWS
PWR
PWR
PWS
PWS
PWS
PWR
PWR
PWR
FLOWMETER
FLOWMETER
CONTROL VALVE
CONTROL VALVE
CONTROL VALVE
NOTE: PIPING SHALL BE CONCEALED IN WALL CAVITY.
CEILING
WALL FACE
FRONTVIEW
COUNTER TOP
ORIENT SUCH THAT VALVE ISINSTALLED HORIZONTALLY,EXPOSED IN LOWER CABINET. MAKEFINAL CONNECTION TO FIXTUREREQUIRING PURIFIED WATER.
LEGEND GM
PIPE PRESSURE SWITCHP
LAB
GAS
SU
PPLY
MANIFOLD, MONITORING OFINTERNAL PRESSURETRANSDUCERS AND RESERVETANK SWITCHOVER (TYPICALFOR EACH MANIFOLD)
ISOLATION VALVE (TYPICAL)
1 X 1 GAS MANIFOLD, SEE SCHEDULE FOR GAS TYPEGM
MANIFOLD VENT LINE ROUTED TOROOF, INSTALL PER MANUFACTURER'SRECOMMENDATIONS. TURNED DOWNAND SCREENED
CHECK VALVE (TYPICAL)
GAS STORAGE BOTTLESPROVIDED BY OWNERCONTRACTOR INSTALLED
SECURE CYLINDERS INACCORDANCE WITH NFPA(TYP.)
PROVIDE UNISTRUT SUPPORTSWITH PIPE CLAMPS FORMANIFOLD (TYP.)
TRAPEZE HANGER ASSEMBLYNOTES :
PIPE CLAMP, TYP.
HANGER ROD, TYP.
PIPES
1. TYPICAL MOUNTING DETAIL OF PIPING ON TRAPEZEHANGER.
2. REFER TO THE PLANS FOR NUMBER AND SIZE OF PIPES.
3. PROVIDE DIELECTRIC SHIELDS FOR COPPER PIPINGSUPPORTED IN TRAPEZE.
4 SEE SEISMIC NOTES FOR ADDITIONAL BRACINGREQUIREMENTS.
SUPPLY TO FIXTURE
SUPPLY RISER
TYPE "A" WATER HAMMER ARRESTOR(UNO), WATHER HAMMER ARRESTORSCHEDULE. INSTALL AT EACH FIXTURE,HOSE BIB & WATER HEATER ON HOT ANDCOLD WATER PIPING.
CONCRETE SUPPORT
FLOW
18" SQ.x 6" DEEP CONC.PAD. SLOPE TO GRADE
CAST IRON FERRULEW/COUNTER SUNKBRONZE PLUG.
18" MIN.
1"
FIN. GRADE
EXTENSION LENGTHAS REQ'D
FOR CLEANOUT AT END OFLINE, PLUG WYE AT THIS PONT.
NOTES:
AREAS. SIZE AS REQUIRED.
1. PROVIDE DATA SHEETS FOR CAULKING MATERIALS FOR REVIEW. FAILURE TO COMPLY PRIOR TOINSTALLATION OF ANY CAULKING MATERIALS SHALL REQUIRE THE REMOVAL OF ALL PIPE CAULK MATERIALS.2. UL LISTED FIRESTOP PENETRATION ASSEMBLIES:
MASONRY- STEEL: WJ1000 SERIES- UNINSULATED COPPER: WJ1000 SERIES- FIBERGLASS INSULATED COPPER: WJ5000 SERIES- CLOSED CELL FOAM INSULATED COPPER: WJ5000 SERIES
GYPSUM- STEEL: WL1000 SERIES- UNINSULATED COPPER: WL1000 SERIES- FIBERGLASS INSULATED COPPER: WL5000 SERIES- CLOSED CELL FOAM INSULATED COPPER: WL5000 SERIES
PER U.L. 1479 AND ASTMTHICKNESS AND MATERIAL
FIRE SAFING
E814. (TYPICAL)
PROVIDE CAULKING-
MATERIAL
PIPE
BRASS ESCUTCHEON FOR FINISHEDPROVIDE CHROME PLATED CAST
LOCATIONS)DRGS FOR RATINGS ANDRATED WALL (SEE ARCH
INSULATION (AS APPLICABLE). MAINTAINTHROUGH PENETRATION IF INSULATED
SIZE SLEEVE AS REQUIRED TO MAINTAIN THEU.L. LISTING AND IN ACCORDANCE WITHSEALANT MFR REQT'S
TRAP PRIMER
INSTALLATION NOTE:PROVIDE POSITIVE SLOPE TO TRAP CONNECTION.
3/4" STRAINER
COLD WATER LINE
BALL VALVE
FLOOR DRAIN ORHUB DRAIN, SEE PLAN FORFLOOR HUB DRAINQUANTITY
ROUTE TO TRAP PRIMERCONNECTION ON FLOORDRAINS/SINKS
CHECK VALVE
1. FACE OF PRESSURE GAUGES TO BE TURNED SO AS TO BE ABLE TO BE READ STANDING AT FLOOR LEVEL.2. COORDINATE TIMER SETTINGS WITH ON-SITE MAINTENANCE STAFF.3. SET AQUASTAT CONTROL FOR 20°F DROP IN RETURN LINE.
NOTE:
1/2" SHUT-OFF COCK
PRESSURE GAGE
STRAINER
UNION
UNION
PLAN VIEW
TIMER AND AQUASTAT
MOTOR
CP-1,2
REDUCING TEE
1/4" SHUT-OFF COCK
PRESSURE GAGE
SET TO 3.0 GPM.BALANCING VALVE,FLOW METER ANDMANUAL IN-LINE
BALL VALVE
REDUCING TEE
BALL VALVE
COMP.#1
COMP.#2
COMP.#3
COMP.#4
INLET FILTER(INTERNAL)
AIRCOOLEDAFTER
COOLERAIR
COOLEDAFTER
COOLERAIR
COOLEDAFTER
COOLERAIR
COOLEDAFTER
COOLER
CHECK VALVE(TYP.)
SAFETY VALVE(INTERNAL)
PRESSURETRANSDUCER(INTERNAL)
1"
BALL VALVE(TYP.)
SEPERATOR
FLEX HOSE
DESICCANTDRYER
240GALLON
ASMETANK
1" OUTLET. PROVIDEINCREASER TO 2"
DISTRIBUTION PIPING.
1"
P
PRESSUREGAUGE
1/2" DRAIN
115 VOLT ELECTRICAUTO DRAIN
1/2" DRUM
COMPRESSOR ENCLOSURE
NOTES:1. DETAIL INDICATES EQUIPMENT TO BE PROVIDED BY EQUIPMENT MANUFACTURER.
CONTRACTOR SHALL PIPE ALL DRAINS SHOWN TO NEAREST FLOOR DRAIN.2. SEE ELECTRICAL DRAWINGS FOR ELECTRICAL REQUIREMENTS.
1"
CERTI F IC
AT E O F A U THO
RIZAT
ION
SOUTH CAROLINA
CONSULTINGENGINEERS
DWG, INC.
No.C03649
CHECKED BY:
DRAWN BY:
DATE:
PROJECT:
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
1
A
2 3 4 5 6
B
C
D
E
WWW.LS3P.COMTEL. 843.577.4444 FAX 843.722.4789205 1/2 KING ST. CHARLESTON SC 29401
STATE PROJECT NO:H17-9588-FW
REVISIONS:
COPYRIGHT 2014 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.
E
G
No.
L
TU
DS
IC
AH
ISM
RE
TE
K
EG. W
ES
AA
17759
RE
GE
ER
INEN
L
RCAHORP
SEFOLN
S IOINO
5/20
/201
4 4:
00:4
3 PM
C:\U
sers
\km
inog
ue\D
ocum
ents
\120
96_C
CU
Sci
ence
Ann
ex II
Pha
se O
ne_2
013_
kmin
ogue
.rvt
LS3P: 1202-122370
MAY 20, 2014
KMM
MGW
PLUMBINGDETAILS
P501
BID SET
SCIENCE ANNEX IICONSTRUCTION
SCALE: NOT TO SCALEP5012 PWS & PWR RISER SCHEMATIC DIAGRAM
SCALE: NOT TO SCALEP5011 RO/DI WATER PIPING DROPS DETAIL
SCALE: NOT TO SCALEP5013 LAB GAS MANIFOLD DETAIL
SCALE: NOT TO SCALEP5015 PIPE HANGER DETAIL
SCALE: NOT TO SCALEP5016 WATER HAMMER ARRESTOR INSTALLATION DETAIL
SCALE: NOT TO SCALEP5017 GRADE CLEANOUT DETAIL
SCALE: NOT TO SCALEP5018 PIPE THRU RATED ASSEMBLY
SCALE: NOT TO SCALEP5019 TRAP PRIMER DETAIL
SCALE: NOT TO SCALEP50110 IN-LINE CIRCULATING PUMP
SCALE: NOT TO SCALEP5014 AIR COMPRESSOR PIPING SCHEMATIC No. Description Date
TRAP PRIMERCONNECTION PROVIDEPOSITIVE SLOPE
DEEP SEAL P-TRAP
STRAINER SET FLUSHWITH FLOOR. PROVIDESQUARE TOP FOR TILEFLOORS
SLOPED FLOOR SLAB
GAS SUPPLYINTO BUILDING
FROM CAMPUS UNDERGROUNDDISTRIBUTION SYSTEM AT APPROXIMATELY18 PSI. COORDINATE EXACT LOCATION WITHOWNER'S NG CONTRACTOR.
PLUGGED TEE
GAS COCK (TYP.)
INSULATING UNION
GAS PRESSURE REGULATOR SETAT 2 PSI. COORDINATE SIZE OF
PIPING UPSTREAM OF REGULATORWITH OWNER'S NG CONTRACTOR.
FIN. GRADE
EARTHQUAKE VALVE
PROVIDE DRIP LEG WHEREVERPIPING TURNS UP (TYP)
CAP (TYP.)
MANUAL SHUTOFFVALVE
STRAINER CONTRACTORPORTION
OWNERPORTION
GAS METER PROVIDED ANDINSTALLED BY OWNERSCONTROLS CONTRACTOR.
SP-1
(SQUARE)2'-0"
ELEVATORSHAFT FLOOR
2-1/2" WASTE COPPER DISCHARGE
STRUCTURAL DRAWINGSSUMP GRATE - REFER TO
SUMP PIT - REFER TOARCHITECTURAL FORLOCATION
NON-SLAM BRONZE
BALL VALVE
CHECK VALVE
FLOAT SWITCH
ELEVATOR SHAFT WALL2'
-0"
FINISHED FLOOR FINISHED FLOOR
ELEVATOR SHAFT WALL
ROUTE A/C TO MOP SINKLOCATED IN JANITOR'SCLOSET.
ELECTRICAL JUNCTION BOXRE: ELECTRICAL DRAWINGS
ELECTRICAL POWER CORD
MECHANICAL CONTROLS CONTRACTOR TOWIRE ALARM TO CONTROL PANEL FOR DDCMONITORING. REFER TO ELECTRICAL FORALARM/CONTROL PANEL LOCATION. PANEL TOBE LOCATED WITHIN MUDROOM/DOCK 118.
NOTES:1. INSTALL AND PROVIDE ALL PLUMBING AND ELECTRICAL PERPUMP MANUFACTURER'S REQUIRMENTS,
NOTES:
1. DETAIL APPLIES TO BASIS OF DESIGN THERMOSTATIC MIXING VALVE.SUBMIT MANUFACTURER'S INSTALLATION INSTRUCTIONS AND PIPINGMETHOD TO A/E FOR REVIEW.
2. UNIT PIPING SHALL BE INSTALLED IN ACCORDANCE WITHMANUFACTURER'S INSTALLATION INSTRUCTIONS AND PIPING METHODTO ENSURE PROPER HEAT TRAPPING OCCURS.
3. SEE FLOOR PLANS FOR PIPING DIMENSIONS NOT SHOWN.
CP
TMV-1,2TO WATER HEATER
FROM WATER HEATER
CHECK VALVE(TYP.)
HEAT TRAP
THERMOMETER SET MIXINGVALVE DISCHARGE TO 110°F
BALL VALVE(TYP.)
TEMPERED DOMESTIC HOTWATER TO PLUMBING FIXTURES
DOMESTIC COLDWATER SUPPLY
3/4" BYPASS
3/4" DOMESTIC COLDWATER PIPING
CIRCUIT SETTER
IN-LINE CIRCULATINGPUMP. SEE DETAIL.
EXHAUST
COMBUSTION AIR
ROOF
PER MFRSINSTALLMANUAL
COMBUSTION AIREXHAUST
1. SEE ARCHITECTURAL DOCUMENTS FOR ROOF PENETRATION DETAIL.
NOTE:
FLOOR CLEANOUTSINGLE TWO-WAY CLEANOUTWALL CLEAN OUT
OMIT EXTENSIONAT END OF LINE
CLEAN OUT
FINISHED FLOORFINISHED WALL
ACCESS PLATE
CLEAN OUT
CLEAN OUT
FINISHED FLOOR /FINISHED GRADE
FIN. FLR.
HOSE BIBB
SEISMIC CONCRETE PAD.CONTRACTOR SHALL SUBMITSHOP DRAWINGS TO A/E FOR
REVIEW.
BACKFLOW PREVENTER (TYP.).SEE PLAN FOR LOCATION
WATERSERVICE
1" DRAINVALVE
PRESSURE GAUGE(TYP.)
STRAINER
UNION(TYP.)
4" PCFULL PORT BALL VALVENORMALLY CLOSED.WATTS FBV OR EQUAL(TYP.)
BFPCHECK VALVE
(WDBP) PACKAGED BOOSTER PUMPSEE SCHEDULE
ACCUMULATOR TANK
BFP
BFP
4" NPC
1-1/2" NPCTO HVAC
4" DISCHARGE
4" HEADER
SUBMETER PROVIDED ANDINSTALLED BY OWNERS
CONTROLS CONTRACTOR.
36"CEILING
PIPE SUPPORT
3-1/2"
1" IPS X 21"STAINLESS STEEL
NIPPLE
1" IPS BRASS STAY-OPENBALL VALVE WITH 1" NPT
FEMALE UNIONS ON INLETAND OUTLET (FURNISHED BY LAB
EQUIPMENT PROVIDER,INSTALLED BY CONTRACTOR)
31"
STAINLESS STEELDRAIN PAN
STAINLESS STEELCABINET
90°
PROVIDESTAINLESS STEEL
PIPING EXTENSION ASREQUIRED
STAINLESS STEELESCUTCHEON
STAINLESS STEELSHOWER HEAD
20-1/2" TOFINISH FLOOR
NOTES:
15-1/2"18-1/4"
1. EACH SPRAY HEAD HAS AN INTERNAL FLOW CONTROL AND FILTER TOREMOVE IMPURITIES FROM THE WATER FLOW.
2. PROVIDE IN-LINE STRAINER.
3. FIXTURE IN DASHED LINES IS FURNISHED BY LAB EQUIPMENT SUPPLIERAND INSTALLED BY CONTRACTOR. CONTRACTOR SHALL PROVIDE ALLPIPING, TRIM, AND ANY RELATED APPURTENANCES REQUIRED FOR ACOMPLETE INSTALLATION.
EYEWASH DRAIN
GAS LINE
PROVIDE INSECTSCREEN AT END
OF VENT
18" A.F.G.
3" GAS CASINGINSTALLEDBELOW SLAB
SEAL END OF CASING WATER TIGHTWITH BACKING MATERIAL AND SEALANT
1" GOOSE NECK VENT
3"x 1" REDUCER
CERTI F IC
AT E O F A U THO
RIZAT
ION
SOUTH CAROLINA
CONSULTINGENGINEERS
DWG, INC.
No.C03649
CHECKED BY:
DRAWN BY:
DATE:
PROJECT:
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
1
A
2 3 4 5 6
B
C
D
E
WWW.LS3P.COMTEL. 843.577.4444 FAX 843.722.4789205 1/2 KING ST. CHARLESTON SC 29401
STATE PROJECT NO:H17-9588-FW
REVISIONS:
COPYRIGHT 2014 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.
E
G
No.
L
TU
DS
IC
AH
ISM
RE
TE
K
EG. W
ES
AA
17759
RE
GE
ER
INEN
L
RCAHORP
SEFOLN
S IOINO
5/19
/201
4 2:
53:0
4 PM
C:\U
sers
\km
inog
ue\D
ocum
ents
\120
96_C
CU
Sci
ence
Ann
ex II
Pha
se O
ne_2
013_
kmin
ogue
.rvt
LS3P: 1202-122370
MAY 20, 2014
KMM
MGW
PLUMBINGDETAILS
P502
BID SET
SCIENCE ANNEX IICONSTRUCTION
SCALE: NOT TO SCALEP5023 FLOOR DRAIN (FD)SCALE: NOT TO SCALEP502
1 GAS METER DETAIL
SCALE: NOT TO SCALEP5024 ELEVATOR SUMP PUMP DETAIL
SCALE: NOT TO SCALEP5025 THERMOSTATIC MIXING VALVE DETAIL
SCALE: NOT TO SCALEP5026 WATER HEATER VENTING DETAIL
SCALE: NOT TO SCALEP5027 CLEAN OUT INSTALLATION DETAIL
SCALE: NOT TO SCALEP5028 WATER DISTRIBUTION BOOSTER PUMP DETAIL
SCALE: NOT TO SCALEP5029 EMERGENCY EYEWASH/SHOWER INSTALLATION DETAIL
SCALE: NOT TO SCALEP5022 UNDERGROUND GAS LINE CASING
No. Description Date
3/4" NPC BYCONTRACTOR
1"
T P P
TURBIDITY FILTER WATER SOFTENER
P
1"
CARBON FILTERS
P
1"
P
PRE-FILTER5 MICRON
P
P
1/2"
REVERSE OSMOSIS UNIT
P
2" PWR BYCONTRACTOR
STORAGE TANK500 GALLONS
2"
P
P
2"
DISTRIBUTION PUMP30 GPM @ 75 PSI
DISTRIBUTION PUMP30 GPM @ 70 PSI
P
2"
P
2"
POST FILTER0.2 MICRON
MIXED BED DEIONIZERS3.6 CUBIC FEET EACH
P
2" PWS BYCONTRACTOR
THERMOMETER
MIXING VALVE
SAMPLE PORT (TYP.)PRESSURE GAUGE (TYP.)
FLOWMETER
ISOLATION VALVE (TYP.)SERVICE LIGHT (TYP.)
S
SOLENOIDVALVE (TYP.)
CHECK VALVE (TYP.)
ULTRAVIOLETSTERILIZER
3/4" NPH BYCONTRACTOR
CONTRACTOR SHALL PIPE DRAINTO FLOOR DRAIN (TYP.)
BRINE TANK
NOTES:1. DETAIL INDICATES EQUIPMENT TO BE PROVIDED BY EQUIPMENT MANUFACTURER.
CONTRACTOR SHALL PIPE ALL DRAINS SHOWN TO NEAREST FLOOR DRAIN.2. SEE ELECTRICAL DRAWINGS FOR ELECTRICAL REQUIREMENTS.
D
D D
DRAINGALV SHEET METAL
HEATER. PIPE TO DRAIN.DRAIN PAN BELOW VALVE
BASE MOUNTED OR SUSPENDEDEXPANSION TANK, SEE WATERHEATER SCHEDULE FOR MORE
INFORMATION.
UNION (TYP)
STORED
DIELECTRIC
140°
1-1/2"
FLOW
STORED140°
2-1/2"
ROUTE DRAIN LINETO FLOOR DRAIN
ASME T&P VALVE-SET AT 150PSI. PIPE FULL SIZE TO FLOORDRAIN. (TYPE L COPPER) (TYP)
SEE THERMOSTATICMIXING VALVE DETAIL FORCONTINUATION
SEE THERMOSTATICMIXING VALVE DETAIL FORCONTINUATION
2" x 4"PVC BLOCK
4" PVC AIR INTAKE AND COMBUSTIONAIR THROUGH ROOF. TERMINATE
WITH MANUFACTURER'SCONCENTRIC VENT KIT.
WH-2NP WH-3NP
BASE MOUNTED ORSUSPENDED
FLOW
FLOW
DIELECTRICUNION (TYP)
ASME T&P VALVE-SET AT 150PSI. PIPE FULL SIZE TOHUB DRAIN. (TYPE L COPPER)
3/4"
D
DRAINVALVE
D
STORED140°F
10
10
EXPANSION TANK.
SEE FLOORDRAIN DETAIL
ROUTE DRAIN LINETO FLOOR DRAIN
GALV SHEET METAL
HTR. PIPE TO DRAIN.DRAIN PAN BELOW
2" x 4"PVC BLOCK
SEE THERMOSTATICMIXING VALVE DETAIL FORCONTINUATION.
SEE THERMOSTATICMIXING VALVE DETAIL FORCONTINUATION.
4" PVC AIR INTAKE AND COMBUSTIONAIR THROUGH ROOF. TERMINATE
WITH MANUFACTURER'SCONCENTRIC VENT KIT.
WH-1P
120 GALLONRECEIVER
TANK3"
FLEXJOINT
3"
SOURCE VALVE
SIGHTGAUGE
1/4" DRAINVALVE
3" VAC.PUMP
#1
2"
FLEXJOINT AIR
FILTER
2"
DRIP LEG
1-1/2"
FLEXJOINT
CHECK VALVE (TYP.)2"
VAC.PUMP
#2
TSH2
2"
FLEXJOINT AIR
FILTER
2"
DRIP LEG
1-1/2"
FLEXJOINT
1/4"
VACUUMGAUGE0-30" HG
LEADVACUUMSWITCH
LAGVACUUMSWITCH
LOWVACUUMSWITCH
NOTES:1. DETAIL INDICATES EQUIPMENT TO BE PROVIDED BY EQUIPMENT MANUFACTURER.
CONTRACTOR SHALL PIPE ALL DRAINS SHOWN TO NEAREST FLOOR DRAIN.2. SEE ELECTRICAL DRAWINGS FOR ELECTRICAL REQUIREMENTS.
3" VENT. SEE PLAN FORCONTINUATION.
CERTI F IC
AT E O F A U THO
RIZAT
ION
SOUTH CAROLINA
CONSULTINGENGINEERS
DWG, INC.
No.C03649
CHECKED BY:
DRAWN BY:
DATE:
PROJECT:
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
1
A
2 3 4 5 6
B
C
D
E
WWW.LS3P.COMTEL. 843.577.4444 FAX 843.722.4789205 1/2 KING ST. CHARLESTON SC 29401
STATE PROJECT NO:H17-9588-FW
REVISIONS:
COPYRIGHT 2014 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.
E
G
No.
L
TU
DS
IC
AH
ISM
RE
TE
K
EG. W
ES
AA
17759
RE
GE
ER
INEN
L
RCAHORP
SEFOLN
S IOINO
5/20
/201
4 4:
01:1
2 PM
C:\U
sers
\km
inog
ue\D
ocum
ents
\120
96_C
CU
Sci
ence
Ann
ex II
Pha
se O
ne_2
013_
kmin
ogue
.rvt
LS3P: 1202-122370
MAY 20, 2014
KMM
MGW
PLUMBINGDETAILS
P503
BID SET
SCIENCE ANNEX IICONSTRUCTION
SCALE: NOT TO SCALEP5031 PURIFIED WATER SYSTEM PIPING SCHEMATIC
SCALE: NOT TO SCALEP5033 NON-POTABLE WATER HEATER PIPING SCHEMATIC
SCALE: NOT TO SCALEP5034 POTABLE WATER HEATER PIPING SCHEMATIC
SCALE: NOT TO SCALEP5032 VACUUM PUMP DETAIL
No. Description Date
ITEM
WC-A
LAV-1
MOUNTING HEIGHT / REMARKS
18" SEAT HT. / FLOOR MTD., FLUSH VALVE
PLUMBING FIXTURE SCHEDULE
---
1/2"
HOTWATER
1/2" 1-1/4"
3"
COLDWATER WASTE
1-1/2"
2"
VENT (AFF)1-1/2"WATER CLOSET - HDC'P
LAVATORY
FIXTURE TYPE FIXTURE DESCRIPTION
FLOOR MOUNT, FLOOR OUTLET, VITREOUS CHINA, SIPHON JET FLUSHING ACTIONWITH ELONGATED BOWL, 1-1/2" I.P.S. TOP SPUD INLET (DESIGNED FOR A 1.28 GPMFLUSH CYCLE) FLUSH VALVE. THE WATER CLOSET SHALL BE FITTED WITH OPENFRONT SEAT WITHOUT COVER BY CHURCH. OTHER MANUFACTURERS BENKE ORBEMIS.
FIXTURE: SLOAN MODEL NO. WETS. 2020.1201-1.28 SOLIS. OTHER MANUFACTURERSKOHLER OR AMERICAN STANDARD. WATER CLOSET SHALL BE IN COMPLIANCE TOTHE APPLICABLE SECTIONS OF ASME A112.19.2/CSA B45.1. ADA COMPLIANT OPTIMAPLUS BATTERY POWERED INFRARED SENSOR FOR AUTOMATIC NO HANDSOPERATION. FOUR (4) SIZE AA BATTERIES FACTORY INSTALLED, LOW BATTERYFLASHING LED. 1" I.P.S. SCREWDRIVER BAK-CHEK ANGLE STOP. SPUD COUPLINGAND FLANGE FOR 1-1/2" TOP SPUD.
OVAL DROP-IN LAVATORY
BASIS OF DESIGN SHALL BE BY J.R. SMITH 2000 SERIES.DESCRIPTION: CAST IRON, DRAIN WITH 7" ADJUSTABLE NICKEL BRONZE STRAINERHEAD. PROVIDE COLOR AND ROUND/SQUARE SHAPE TO MATCH FINISHES.COORDINATE FINISHES WITH ARCHITECT. PROVIDE TRAP PRIMER CONNECTIONS.
FLOOR DRAINFD-1 -- 1/2" 4" 2"
SLOAN MODEL NO. SS-3002 OVAL DROP-IN, WHITE VITREOUS CHINA, HANGINGHARDWARE, BACKSPLASH. SINGLE CENTER HOLE PUNCH AND OVERFLOW. OTHERMANUFACTURERS KOHLER OR AMERICAN STANDARD.
FIXTURE: SLOAN OPTIMA SYSTEMS EAF-275-ISM, 0.5 GPM FLOW RATE. OTHERMANUFACTURERS KOHLER OR AMERICAN STANDARD. SENSOR ACTIVATED,ELECTRONIC, CHROME PLATED DIE-CAST METAL, HAND WASHING FAUCET WITH THEFOLLOWING FEATURES:* MODULAR ONE-PIECE CONSTRUCTION WITH ALL CONCEALED COMPONENTS ABOVEDECK* DOUBLE INFRARED SENSORS WITH AUTOMATIC SETUP AND INDICATOR LIGHT* AUTOMATIC SELF-ADAPTING SENSOR TECHNOLOGY* SOLAR POWERED* MAGNETIC SOLENOID VALVE* WATER SUPPLY CONNECTION WITH FLEXIBLE HIGH-PRESSURE HOSE AND STRAINER* 6 VOLT LITHIUM BATTERY BACK-UP POWER SOURCE
GRID DRAIN: EBC OTHER MANUFACTURERS MCGUIRE, DEARBORNP-TRAP: EBC OTHER MANUFACTURERS MCGUIRE, DEARBORNSUPPLIES: EBC OTHER MANUFACTURERS MCGUIRE, BRASS CRAFTTRAP COVERS: TRUEBRO OTHER MANUFACTURERS PROFLO.
FINISH SHALL BE SILVER FOR ALLTOILET ROOMS
WC 16" SEAT HT. / FLOOR MTD., FLUSH VALVE--- 3" 2"1-1/2"WATER CLOSET FLOOR MOUNTED, VITREOUS CHINA, SIPHON JET FLUSHING ACTION WITH ELONGATEDBOWL, 1-1/2" I.P.S. TOP SPUD INLET (DESIGNED FOR A 1.28 GPM FLUSH CYCLE) FLUSHVALVE. THE WATER CLOSET SHALL BE FITTED WITH OPEN FRONT SEAT WITHOUTCOVER.
FIXTURE: SLOAN MODEL NO. WETS. 2000.1201-1.28 SOLIS G2. OTHER MANUFACTURERSAMERICAN STANDARD OR KOHLER. WATER CLOSET SHALL BE IN COMPLIANCE TO THEAPPLICABLE SECTIONS OF ASME A112.19.2/CSA B45.1. ADA COMPLIANT OPTIMA PLUSBATTERY POWERED INFRARED SENSOR FOR AUTOMATIC NO HANDS OPERATION.FOUR (4) SIZE AA BATTERIES FACTORY INSTALLED, LOW BATTERY FLASHING LED. 1"I.P.S. SCREWDRIVER BAK-CHEK ANGLE STOP. SPUD COUPLING AND FLANGE FOR 1-1/2" TOP SPUD. PROVIDE WHITE, PLASTIC OPEN-FRONT EXTRA HEAVY DUTY SEAT BYCHURCH. OTHER MANUFACTURERS BENEKE OR BEMIS.
UR - 3/4" 2" 2"URINAL WALL HUNG ADA (UR-A) 17"AFF RIM HEIGHT
WALL HUNG 24" AFF RIMHEIGHT
WALL HUNG WHITE VITREOUS CHINA, W/ SOLAR-POWERED SENSORACTIVATED FLUSHOMETER.
FIXTURE: SLOAN MODEL NO. WEUS-1000.1201-0.13 SOLIS. OTHERMANUFACTURERS AMERICAN STANDARD OR KOHLER. URINAL SHALL BE INCOMPLIANCE TO THE APPLICABLE SECTION OF ASME 112.19/CSA B45.1. ADACOMPLIANT SOLIS SOLAR-POWERED SENSOR FOR AUTOMATIC NO HANDSOPERATION. COURTESY FLUSH OVERRIDE BUTTON. FOUR (4) SIZE AA BATTERYBACK-UP POWER SOURCE. 3/4" I.P.S. SCREWDRIVER BAK-CHEK ANGLE STOP.FREE SPINNING, VANDAL RESISTANT VACUUM BREAKER FLUSH. SPUDCOUPLING AND FLANGE FOR 3/4" TOP SPUD. 3/4" I.P.S. TOP SPUD INLET. 2" NPTOUTLET FLANGE. INCLUDE ALL MOUNTING HARDWARE. 0.13 GPM WASHDOWNFLUSHING ACTION.
CARRIER: J.R. SMITH OTHER MANUFACTURERS WATTS, ZURN.
MOP SINK SHALL BE FIAT MODEL NO. MSB-2424 WITH 1239BB BUMPERGUARDS, 1453BB STAINLESS STEEL GRID STRAINER. OTHER MANUFACTURERS ACORN ORSWANSTONE.DESCRIPTION: 24"x24" MOLDED STONE MOP BASIN WITH 10" HIGH SIDE AND ANINTEGRAL 3" CHROME PLATED DRAIN WITH A SEAL CONNECTION TO THE WASTEPIPING. MOP BASIN SHALL BE WHITE DRIFT IN COLOR.FAUCET: CHICAGO FAUCET MODEL 897-CP. OTHER MANUFACTURERS TS & BRASSOR ZURN.HOSE AND BRACKET: FIAT 832-AA. OTHER MANUFACTURERS ACORN ORSWANSTONE.PROVIDE BUCKET HOOK, SHUTOFF VALVES FOR CW AND HW AND A CHECK VALVE.
MOP SINKMS 1/2" 1/2" 3" 2" FAUCET SHALL BE MOUNTED 36" AFF
ITEM MOUNTING HEIGHT / REMARKS
PLUMBING FIXTURE SCHEDULE
HOTWATER
COLDWATER WASTE VENT (AFF)FIXTURE TYPE FIXTURE DESCRIPTION
WATER PRESSURE REDUCING VALVES SHALL BE INSTALLED ON THE WATERSERVICE PIPE NEAR ITS ENTRANCE TO THE BUILDING WHERE SUPPLY MAINPRESSURE EXCEEDS 60 PSIG TO REDUCE IT TO 50 PSIG OR LOWER. PROVISIONSHALL BE MADE TO PERMIT THE BYPASS FLOW OF WATER BACK THROUGH THEVALVE INTO THE MAIN WHEN PRESSURES, DUE TO THERMAL EXPANSION ON THEOUTLET SIDE OF THE VALVE, EXCEED THE PRESSURE IN THE MAIN SUPPLY.PRESSURE REDUCING VALVES WITH BUILT-IN BYPASS CHECK VALVES ANDSTRAINER WILL BE ACCEPTABLE. APPROVED VALVES SHALL COMPLY WITH ASSE1003. VALVE SHALL BE A WATTS SERIES 223-S (WITH STRAINER) OTHERMANUFACTURERS APOLLO OR ZURN. BODY MATERIALS SHALL BE BRONZE OR IRON,WITH A REPLACEABLE STAINLESS STEEL SEAT, STAINLESS STEEL STRAINERSCREEN, REINFORCE BUNA-N DIAPHRAGM, AND EPDM VALVE DISC.
PRESSURE REDUCING VALVEPRV SET PRV AT 50 PSIG.
J.R. SMITH 4100 SERIES OTHER MANUFACTURERS JOSAM OR ZURN.DESCRIPTION: CAST IRON BODY WITH ROUND, ADJUSTABLE SCORIATED SECUREDPOLISHED NICKEL BRONZE TOP WITHOUT HUB OUTLET.
FLOOR CLEANOUTFCO-- -- SEE PLANS --
PPP, MODEL P-1 WITH DU-4 DISTRIBUTION UNIT OTHER MANUFACTURERS JOSAM ORZURN.ALL TRAP PRIMERS SHALL HAVE BRAIDED STAINLESS STEEL FLEXIBLE HOSE TOFLOOR DRAINS. SEE PLANS FOR TRAP PRIMER LOCATIONS. SEE DETAIL FOR FURTHERINFORMATION.
TRAP PRIMERTP
-- -- -- --
--
BASIS OF DESIGN: JR SMITH 5618. OTHER MANUFACTURERS JOSAM OR ZURN OREQUIVALENT.DESCRIPTION: ALL BRONZE WITH CHROME PLATED FACE, HOSE CONNECTION ANDINTEGRAL ASSE 1011 VACUUM BREAKER, 360° SWIVEL INLET CONNECTION AND "T"HANDLE KEY.
HOSE BIBB (INTERIOR)HB-- 3/4" -- --
FOR HOSE BIBBS LOCATED IN GANGTOILETS, LOCATE IN AN ACCESSIBLELOCATION SO THAT VANITY PANELWILL NOT NEED TO BE REMOVED.
COORDINATE WITH ARCHITECTURALDOCUMENTS.
-- -- -- --
1/2"
CLEANOUT SHALL BE BY JR SMITH OTHER MANUFACTURERS JOSAM OR ZURN.THREADED PIPE FITTING OR CAST IRON FERRULE WITH GAS TIGHT CLEANOUT PLUG.
CLEANOUTCO -- - SEE PLANS -- --
J.R. SMITH 4100 SERIES OTHER MANUFACTURERS JOSAM OR ZURN.DESCRIPTION: CAST IRON BODY WITH ROUND, ADJUSTABLE SCORIATED SECUREDPOLISHED NICKEL BRONZE TOP WITHOUT HUB OUTLET.
WALL CLEANOUTWCO-- -- SEE PLANS -- --
OATEY MODEL 38811 ICEMAKER BOX COMPLETE WITH VALVE OR EQUIVALENT.OTHER MANUFACTURERS GUY GRAY, HALSEY-TAYLOR.
ICEMAKER BOXIMB -- 1/2" -- -- COORDINATE HEIGHT WITHLAB EQUIPMENT.
NOTES:1. PROVIDE ANGLE STOP VALVES, SUPPLY TUBING, P-TRAPS, ESCUTCHEON PLATES, STRAINERS, ETC., FOR COMPLETE INSTALLATION. BASIS OF DESIGN SHALL BE HEAVY GAUGE, CHROME-PLATED CONSTRUCTION BY EBC ORAPPROVED EQUAL BY MCGUIRE OR DEARBORN.2. PROVIDE CARRIERS FOR COMPLETE INSTALLATION. BASIS OF DESIGN SHALL BE ZURN OR APPROVED EQUAL BY JR SMITH OR JOSAM.2. ALL SUPPLY AND WASTE LINES SHALL BE CONCEALED IN ADJACENT WALL, FLOOR AND CEILING, UNLESS NOTED OTHERWISE.3. SEE DIVISION 22 SPECIFICATION SECTIONS FOR ADDITIONAL INFORMATION.4. MOUNT ALL FIXTURES SO EASILY ACCESSIBLE FOR MAINTENANCE.5. PLUMBING CONTRACTOR SHALL SUBMIT ALL PLUMBING FIXTURE AND COLOR SELECTIONS TO ARCHITECT TO OBTAIN FINAL APPROVAL.6. ACCEPTABLE MANUFACTURERS ARE INDICATED FOR EACH FIXTURE THROUGHOUT THE FIXTURE SCHEDULE. EQUAL PRODUCTS BY OTHER MANUFACTURERS ARE ACCEPTABLE PROVIDING SUBSTITUTIONS ARE SUBMITTED INACCORDANCE WITH REQUIREMENTS LISTED ELSEWHERE IN THE BID DOCUMENTS AND APPROVED BY THE A/E.
PROVIDE, ON EACH ROOF PENETRATION, A FLASHING COUNTER-FLASHING ASSEMBLY.FLASHING SHALL BE 4 LB SEAMLESS LEAD WITH 6" SKIRT AND STEEL REINFORCEDBOOT AND SHALL PERMIT INSTALLATION ON ROOFS WITH UP TO A 20 DEGREE PITCH.COUNTERFLASHING SHALL BE CAST IRON SET SCREW TYPE AND BE ATTACHEDDIRECTLY TO THE ROOF PENETRATION. ALL FLASHING SHALL BE INSTALLED INACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS AND FLASHED INACCORDANCE WITH THE RECOMMENDATIONS OF THE ROOFING MATERIALMANUFACTURER.
BASIS OF DESIGN SHALL BE ELDMOR STONEMAN 1100 SERIES WITH VANDALRESISTANT HOOD.
VENT THRU ROOFVTR-- -- -- -- FLASHING TO BE PROVIDED BY
ROOFING CONTRACTOR. COORDINATEWITH ALL DISCIPLINES.
LAV-2 1/2" 1/2" 1-1/4" 1-1/2"LAVATORY 34" RIM HT. / WALL HUNGSLOAN MODEL NO. SS-3003 WALL HUNG, WHITE VITREOUS CHINA, HANGINGHARDWARE, BACKSPLASH. SINGLE CENTER HOLE PUNCH AND OVERFLOW. OTHERMANUFACTURERS KOHLER OR AMERICAN STANDARD.
FIXTURE: SLOAN OPTIMA SYSTEMS EAF-275-ISM, 0.5 GPM FLOW RATE. OTHERMANUFACTURERS KOHLER OR AMERICAN STANDARD. SENSOR ACTIVATED,ELECTRONIC, CHROME PLATED DIE-CAST METAL, HAND WASHING FAUCET WITH THEFOLLOWING FEATURES:* MODULAR ONE-PIECE CONSTRUCTION WITH ALL CONCEALED COMPONENTS ABOVEDECK* DOUBLE INFRARED SENSORS WITH AUTOMATIC SETUP AND INDICATOR LIGHT* AUTOMATIC SELF-ADAPTING SENSOR TECHNOLOGY* SOLAR POWERED* MAGNETIC SOLENOID VALVE* WATER SUPPLY CONNECTION WITH FLEXIBLE HIGH-PRESSURE HOSE AND STRAINER* 6 VOLT LITHIUM BATTERY BACK-UP POWER SOURCE
GRID DRAIN: EBC OTHER MANUFACTURERS MCGUIRE, DEARBORNP-TRAP: EBC OTHER MANUFACTURERS MCGUIRE, DEARBORNSUPPLIES: EBC OTHER MANUFACTURERS MCGUIRE, BRASS CRAFTCARRIER: J.R. SMITH OTHER MANUFACTURERS WATTS, ZURNTRAP COVERS: TRUEBRO OTHER MANUFACTURERS PROFLO.
BASIS OF DESIGN: J.R. SMITH MODEL NO. 5509 QT. OTHER MANUFACTURERSJOSAM OR ZURN OR EQUIVALENT.DESCRIPTION: BRONZE QUARTER TURN NON-FREEZE AUTOMATIC DRAININGHYDRANT WITH STAINLESS STEEL FACE, HOSE CONNECTION, INTEGRALVACUUM BREAKER AND DUAL CHECK VALVE, "T" HANDLE KEY, WHEEL HANDLEAND STAINLESS STEEL BOX WITH FULL 180° COVER OPENING. PROVIDE WITHPOLISHED BRONZE FINISH.
NON-FREEZE WALL HYDRANTNFWH -- 3/4" -- -- 18" AFG
NOTES:1. PROVIDE ANGLE STOP VALVES, SUPPLY TUBING, P-TRAPS, ESCUTCHEON PLATES, STRAINERS, ETC., FOR COMPLETE INSTALLATION. BASIS OF DESIGN SHALL BE HEAVY GAUGE, CHROME-PLATED CONSTRUCTION BY EBC OR APPROVEDEQUAL BY MCQUIRE OR DEARBORN.2. PROVIDE CARRIERS FOR COMPLETE INSTALLATION. BASIS OF DESIGN SHALL BE ZURN OR APPROVED EQUAL BY JR SMITH OR JOSAM.2. ALL SUPPLY AND WASTE LINES SHALL BE CONCEALED IN ADJACENT WALL, FLOOR AND CEILING, UNLESS NOTED OTHERWISE.3. SEE DIVISION 22 SPECIFICATION SECTIONS FOR ADDITIONAL INFORMATION.4. MOUNT ALL FIXTURES SO EASILY ACCESSIBLE FOR MAINTENANCE.5. PLUMBING CONTRACTOR SHALL SUBMIT ALL PLUMBING FIXTURE AND COLOR SELECTIONS TO ARCHITECT TO OBTAIN FINAL APPROVAL.6. ACCEPTABLE MANUFACTURERS ARE INDICATED FOR EACH FIXTURE THROUGHOUT THE FIXTURE SCHEDULE. EQUAL PRODUCTS BY OTHER MANUFACTURERS ARE ACCEPTABLE PROVIDING SUBSTITUTIONS ARE SUBMITTED INACCORDANCE WITH REQUIREMENTS LISTED ELSEWHERE IN THE BID DOCUMENTS AND APPROVED BY THE A/E.
REDUCED PRESSURE ZONE THE ASSEMBLY SHALL CONSIST OF A PRESSUREDIFFERENTIAL RELIEF VALVE LOCATED IN A ZONE BETWEEN TWO POSITIVE SEATINGCHECK VALVES. THE ASSEMBLY SHALL INCLUDE TWO BALL TYPE SHUTOFF VALVESBEFORE AND AFTER THE ASSEMBLY, TEST COCKS AND A PROTECTIVE STRAINERUPSTREAM OF THE FIRST SHUTOFF VALVE. MATERIALS OF CONSTRUCTION SHALL BEBRONZE OR CAST IRON BODIES, WITH STAINLESS STEEL INTERNALS. THE ASSEMBLYSHALL MEET THE REQUIREMENTS OF ASSE 1013; AWWA STD. C-511-92 AND BE LISTEDIAPMO (UPC) AND SBCCI (STANDARD PLUMBING CODE). PROVIDE WITH AIR GAP FITTING.BASIS OF DESIGN SHALL BE WATTS MODEL LF909QTS, 957OSY.
BACKFLOW PREVENTERBFP-- -- -- -- SEE PLUMBING PLAN FOR LOCATION
AND SIZE
BASIS OF DESIGN SHALL BE BY J.R. SMITH 2000 SERIES WITH FIGURE 3580 FUNNEL.DESCRIPTION: CAST IRON, DRAIN WITH 7" ADJUSTABLE NICKEL BRONZE STRAINERHEAD. PROVIDE COLOR AND ROUND/SQUARE SHAPE TO MATCH FINISHES.COORDINATE FINISHES WITH ARCHITECT. PROVIDE TRAP PRIMER CONNECTIONS.
FLOOR DRAIN WITH FUNNELFD-2 -- 1/2" 4" 2" --
STAINLESS STEEL 12 INCH SQUARE TOP WITH STAINLESS STEEL LOOSE SETHALF GRATE AND SEDIMENT BUCKET. PROVIDE 8" DEEP (MIN.) RECEPTOR BODY,WITH 4" PIPE SIZE OUTLET. PROVIDE TRAP PRIMER CONNECTION, ANDANCHORING/FLASHING FLANGES.BASIS OF DESIGN SHALL BE JR SMITH 3008 PO50. OTHER MANUFACTURERSZURN OR JOSAM.
FLOOR SINKFS1/2" -- 4" 2" --
BASIS OF DESIGN SHALL BE ZURN Z9A-FD2-P.DESCRIPTION: FLAME RETARDANT POLYPROPYLENE BODY WITH 7" ADJUSTABLESTAINLESS STEEL HEAD AND GRATE WITH SEDIMENT BUCKET. PROVIDE TRAP PRIMERCONNECTIONS. PROVIDE ROUND/SQUARE SHAPE TO MATCH FINISHES. COORDINATEFINISHES WITH ARCHITECT.
FLOOR DRAIN WITHSEDIMENT TRAP
FD-3 -- 1/2" 4" 2" --
ELKAY EZH2O DUAL HEIGHT SYSTEM MODEL LZSTL8WSLK. OTHER MANUFACTURERSHAWS OR OASIS. PROVIDE ALL HANGING HARDWARE.
DUAL HEIGHT UNIT SHALL PROVIDE 8 GPH OF 50°F WATER AT 90°F AMBIENT AND 80°FINLET WATER. BOTTLE FILLING UNIT SHALL INCLUDE AN ELECTRONIC SENSOR FORNO-TOUCH ACTIVATION WITH AN AUTOMATIC 30-SECOND SHUT-OFF TIMER. SHALLPROVIDE 1.1-1.5 GPM FLOW RATE WITH LAMINAR FLOW TO MINIMIZE SPLASHING.SHALL INCLUDE ANTIMICROBIAL PROTECTED PLASTIC COMPONENTS TO PREVENTMOLD AND MILDEW. COOLER UNIT SHALL HAVE PUSHBAR ACTIVATION AND WATEREFFICENT BUBBLER. SHALL INCLUDE FILTER, CERTIFIED TO NSF/ANSI 42 AND 53 WITHVISUAL MONITOR TO INDICATE WHEN REPLACEMENT IS NECESSARY. BOTTLE FILLINGUNIT AND COOLER SHALL BE ADA COMPLIANT. UNIT SHALL BE LEAD FREE DESIGNCERTIFIED TO NSF/ANSI 61.
ELECTRIC WATER COOLEREWC -- 1/2" 1 1/4" 1 1/2" WALL MOUNT DUAL HEIGHT 34"AND 26" ORIFICE AFF
CAST IRON BODY WITH FLASHING CLAMP, SUMP RECEIVER, UNDERDECK CLAMPAND METAL DOME. PROVIDE EXTENSION AS REQUIRED FOR ROOF INSULATION.BASIS OF DESIGN SHALL BE JR SMITH 1015 SERIES OTHER MANUFACTURERSJOSAM OR ZURN.
OVERFLOW/ROOF DRAINOF/RD -- -- 4" --DECK-MOUNT
SINK AND FAUCET PROVIDED BY LAB EQUIPMENT SUPPLIER. SUPPLY NON-POTABLE HOT AND COLD WATER AND ACID WASTE AND VENT FOR FIXTURE.PLUMBING CONTRACTOR SHALL MAKE ALL FINAL CONNECTIONS. PROVIDE ANYACCESSORIES NEEDED FOR A COMPLETE INSTALLATION INCLUDING BUT NOTLIMITED TO P-TRAP. COORDINATE WITH LAB EQUIPMENT SUPPLIER.
LAB SINKSK1 1/2" 1/2" 1 1/2" 1 1/2"--
SINK PROVIDED BY LAB EQUIPMENT SUPPLIER AS PART OF FUME HOOD.PROVIDE ACID WASTE AND VENT FOR FIXTURE. PLUMBING CONTRACTORSHALL MAKE ALL FINAL CONNECTIONS. PROVIDE ANY ACCESSORIES NEEDEDFOR A COMPLETE INSTALLATION INCLUDING BUT NOT LIMITED TO P-TRAP.COORDINATE WITH LAB EQUIPMENT SUPPLIER.
CUP SINKCS -- -- -- -- --
SINK: ELKAY LUSTERTONE LRAD1722FAUCET: CHICAGO 895-317E2805-5VPHCP
BREAK SINKBRS 1/2" 1/2" 2" 1-1/2" COUNTERTOP
ADA COMPLIANT RECESSED SAFETY STATION WITH DRAIN PAN & EXPOSEDSHOWER HEAD WITH STAINLESS STEEL COVER, EXPOSED PIPING, ANDESCUTCHEON; BRASS STAY OPEN BALL VALVE; IN-LINE STRAINER. COORDINATECEILING HEIGHTS AND PROVIDE STAINLESS STEEL PIPING EXTENSIONS ASREQUIRED FOR ADA COMPLIANT HEIGHT OF SHOWER HEAD. PROVIDE POINT-OF-USE THERMOSTATIC MIXING VALVE COMPLYING WITH ASSE 1071 OR CSA B125.3LOCATED ABOVE CEILING AT SAFETY STATION TO SUPPLY 75°F TEPID WATER.
SAFETY STATION: BASIS OF DESIGN WATERSAVER SSBF2150. OTHERMANUFACTURERS ACORN, BRADLEY, OR GUARDIAN.EMERGENCY THERMOSTATIC MIXING VALVES: TMV-3 LOCATED ABOVE CEILING.
EMERGENCY SHOWER/EYEWASHESH 3/4" 3/4" 2" 1-1/2" --
12-5/8" SQUARE TOP PROM-DECK DRAIN, DURA-COATED CAST IRON BODY WITHROTATABLE SQUARE PROMENADE FRAME WITH SEEPAGE OPENINGS, FRAMECLAMPS AND DECORATIVE LIGHT DUTY HEEL-PROOF GRATE WITH 3/16" WIDESLOTS AND NICKEL BRONZE VENEER FRAME AND GRATE. PROVIDE EXTENSION ASREQUIRED FOR FINISH.BASIS OF DESIGN SHALL BE ZURN Z154-DT. OTHER MANUFACTURERS JOSAM OR JRSMITH.
PROMENADE DECK DRAINPD -- -- 6" --DECK-MOUNT
SINK AND FAUCET PROVIDED BY LAB EQUIPMENT SUPPLIER. SUPPLY NON-POTABLE HOT AND COLD WATER AND ACID WASTE AND VENT FOR FIXTURE.PLUMBING CONTRACTOR SHALL MAKE ALL FINAL CONNECTIONS. PROVIDE ANYACCESSORIES NEEDED FOR A COMPLETE INSTALLATION INCLUDING BUT NOTLIMITED TO P-TRAP. COORDINATE WITH LAB EQUIPMENT SUPPLIER.
LAB SINKSK1A--
1/2" 1/2" 1 1/2" 1 1/2"
SINK AND FAUCET PROVIDED BY LAB EQUIPMENT SUPPLIER. SUPPLY NON-POTABLE HOT AND COLD WATER AND ACID WASTE AND VENT FOR FIXTURE.PLUMBING CONTRACTOR SHALL MAKE ALL FINAL CONNECTIONS. PROVIDE ANYACCESSORIES NEEDED FOR A COMPLETE INSTALLATION INCLUDING BUT NOTLIMITED TO P-TRAP. COORDINATE WITH LAB EQUIPMENT SUPPLIER.
LAB SINKSK2--
1/2" 1/2" 1 1/2" 1 1/2"
SINK AND FAUCET PROVIDED BY LAB EQUIPMENT SUPPLIER. SUPPLY NON-POTABLE HOT AND COLD WATER AND ACID WASTE AND VENT FOR FIXTURE.PLUMBING CONTRACTOR SHALL MAKE ALL FINAL CONNECTIONS. PROVIDE ANYACCESSORIES NEEDED FOR A COMPLETE INSTALLATION INCLUDING BUT NOTLIMITED TO P-TRAP. COORDINATE WITH LAB EQUIPMENT SUPPLIER.
LAB SINKSK3--
2 X 1/2" 2 X 1/2" 1 1/2" 1 1/2"BASIS OF DESIGN SHALL BE ZURN Z9A-FD2-P.DESCRIPTION: FLAME RETARDANT POLYPROPYLENE BODY WITH 7" ADJUSTABLESTAINLESS STEEL HEAD AND GRATE. PROVIDE TRAP PRIMER CONNECTIONS. PROVIDEROUND/SQUARE SHAPE TO MATCH FINISHES. COORDINATE FINISHES WITH ARCHITECT.
EMERGENCY STATIONFLOOR DRAIN
FD-4 -- 1/2" 3" 2" --
SINK SHALL BE FLORESTONE MODEL FM. OTHER MANUFACTURERS FIAT ORMUSTEE.DESCRIPTION: 23-1/8"x22-3/8" NON-FERROUS UTILITY SINK WITH 35" DEPTH,RESISTANT TO FADING AND ABRASION. COLOR SHALL BE WHITE.FAUCET: CHICAGO FAUCET MODEL 897-CP. OTHER MANUFACTURERS TS & BRASSOR ZURN.
CLEAN ROOM SINKCRS 1/2" 1/2" 1-1/2" 1-1/2" FLOOR-MOUNTED
SERVICE SINK WITH PLAIN BACK AND RIM GUARD, NOMINAL DIMENSIONS 24"X20-1/2"X10-1/2" DEEP. MEETING OR EXCEEDING ASME A112.19.1 FOR CAST IRONPLUMBING FIXTURES. EXPOSED YOKE WALL-MOUNT UTILITY FAUCET WITH VACUUMBREAKER AND STOPS IN SHANK. CAST IRON P-TRAP AND STRAINER.
FIXTURE: AMERICAN STANDARD "AKRON” SERVICE SINK MODEL 7695.000, 8379.026 RIMGUARD.FAUCET: AMERICAN STANDARD 8341.076TRAP: AMERICAN STANDARD 7798.030
OTHER MANUFACTURERS KOHLER, ELJER.
UTILITY SINKUS 1/2" 1/2" 3" 2" FLOOR/WALL MOUNTED
GUY GRAY WHITE POWDER COATED METAL DISH WASHER OUTLET BOXCOMPLETE WITH VALVE OR EQUIVALENT. OTHER MANUFACTURERS OATEY,HALSEY-TAYLOR.
DISHWASHER SUPPLY BOXDWSB 1/2" -- -- -- COORDINATE HEIGHT WITHLAB EQUIPMENT.
EW DECK-MOUNDEDEYEWASH/DRENCH HOSE
FIXTURE PROVIDED BY LAB EQUIPMENT SUPPLIER. SUPPLY NON-POTABLE HOT ANDCOLD WATER. PLUMBING CONTRACTOR SHALL MAKE ALL FINAL CONNECTIONS.PROVIDE TMV-4 LOCATED IN LOWER CABINET SET AT 75°F.
1/2" 1/2" - - DECK MOUNTED.SUPPLY STOPS AT WALL.
PURIFIED WATER SUPPLY BOXPWSB -- -- -- -- COORDINATE HEIGHT WITHLAB EQUIPMENT.
OATEY WHITE POWDER COATED METAL ICE MAKER BOX WITHOUT VALVE, NO. 38687OR EQUIVALENT FOR PURIFIED WATER OUTLET TO DISHWASHER. OTHERMANUFACTURERS OATEY, HALSEY-TAYLOR.
SHOWER HEADAND VALVE
SH-1 1/2" 1/2" -- -- --PRESSURE ACTUATED MIXER WITH STAINLESS STEEL BALANCING PISTON TOEQUALIZE HOT AND COLD SUPPLY PRESSURES. BUILT-IN SHUTOFF FOR SINGLEHANDLE OPERATION. REMOVABLE ONE PIECE UPPER AND LOWER VALVE SEAT,INTERNAL PARTS OF BRONZE AND STAINLESS STEEL, CAST WALL FLANGE ANDLEVER HANDLE, POLISHED CHROME PLATED, MAXIMUM OPERATING PRESSURE: 125PSIG, ADJUSTABLE HIGH TEMPERATURE LIMIT STOP SET FOR 110°F, COLOR CODEDDIAL, OFF THROUGH HOT, WITH DIRECTIONAL INDICATORS, MAXIMUM FLOW 1.5 GPM,ASSE 1016 CERTIFIED, ANGLE CHECKSTOPS, COPPER TUBE CONNECTION, VANDALRESISTANT SCREWS, ARM AND FLANGE.BASIS OF DESIGN SHALL BE LEONARD PAM-II-ST–F VALVE, LEONARD 515P BRASSSHOWER HEAD WITH 1.5 GPM FLOW RATE. OTHER MANUFACTURERS CHICAGOFAUCET AND SYMMONS.
SHOWER DRAINSD-1 -- -- 2" 2" --304 STAINLESS STEEL LINEAR SHOWER DRAIN WITH ADJUSTABLE ANCHORING SUPPORTLEGS, ANTI-PONDING V-SHAPED CHANNEL, ADJUSTABLE SECURED LEVELING FRAMEWITH BUILT-IN TILE EDGE, AND SECURED, LIGHT-DUTY, SLOTTED HEEL-PROOF GRATE.BASIS OF DESIGN: ZURN ZS880-WG. OTHER MANUFACTURERS JOSAM OR JR SMITH.
CERTI F IC
AT E O F A U THO
RIZAT
ION
SOUTH CAROLINA
CONSULTINGENGINEERS
DWG, INC.
No.C03649
CHECKED BY:
DRAWN BY:
DATE:
PROJECT:
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
1
A
2 3 4 5 6
B
C
D
E
WWW.LS3P.COMTEL. 843.577.4444 FAX 843.722.4789205 1/2 KING ST. CHARLESTON SC 29401
STATE PROJECT NO:H17-9588-FW
REVISIONS:
COPYRIGHT 2014 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.
E
G
No.
L
TU
DS
IC
AH
ISM
RE
TE
K
EG. W
ES
AA
17759
RE
GE
ER
INEN
L
RCAHORP
SEFOLN
S IOINO
5/19
/201
4 2:
53:1
1 PM
C:\U
sers
\km
inog
ue\D
ocum
ents
\120
96_C
CU
Sci
ence
Ann
ex II
Pha
se O
ne_2
013_
kmin
ogue
.rvt
LS3P: 1202-122370
MAY 20, 2014
KMM
MGW
PLUMBINGSCHEDULES
P601
BID SET
SCIENCE ANNEX IICONSTRUCTION
No. Description Date
POINT-OF-USE WATER TREATMENTMARK
UPW-1
DESCRIPTION BASIS OF DESIGN
ULTRAPURE WATER POLISHING STATIONWITH ACTIVATED CARBON ABSORBER,PRIMARY AND POLISHING MIXED-BEDDEIONIZERS, PUMPING STATION WITH 185nm UV LIGHT, POSIDYNE MEMBRANEFILTER, AND FAUCET WITH 254 nm UV LIGHTAND RESISTIVITY MONITOR.
EMD MILLIPORE - MILLI Q ADVANTAGE
NOTES:1. WATER SUPPLY SHALL BE RO/DI WATER.2. EQUAL PRODUCTS BY OTHER MANUFACTURERS ARE ACCEPTABLE PROVIDING SUBSTITUTIONS ARE SUBMITTED INACCORDANCE WITH REQUIREMENTS LISTED ELSEWHERE IN BID DOCUMENTS AND APPROVED BY THE A/E.
VACUUM PUMPMARK
V-1
TYPE RATED CFM AT 19.0" Hg ELECTRIC MOTOR DRIVE REC. TANK REMARKS
FACTORY PACKAGED, TANK MOUNTED,DUPLEX OIL-LUBRICATED ROTARY VANEVACUUM PUMP.
41 5 HP EACH10 HP TOTAL
SEE ELECTRICAL DRAWINGS FORMORE INFORMATION
120 GALLONS, VERTICAL BASIS OF DESIGN: POWEREX VVTD0504. 2" OUTLET.
NOTE: EQUAL PRODUCTS BY OTHER MANUFACTURERS ARE ACCEPTABLE PROVIDING SUBSTITUTIONS ARE SUBMITTED IN ACCORDANCE WITH REQUIREMENTS LISTED ELSEWHERE IN BID DOCUMENTS AND APPROVED BY THE A/E.
AIR COMPRESSORMARK
AC-1
TYPE RATED CFMAT 100 PSI
ELECTRICMOTOR DRIVE
REC. TANK REMARKS
FACTORY PACKAGED, SKID MOUNTEDENCLOSED DUPLEX OIL-LESS SCROLLAIR COMPRESSOR SYSTEM. WITH DUALTOWER DESICCANT DRYER.
60.8 20 HPSEE ELECTRICAL FORMORE INFORMATION
240 GALLONS, VERTICAL BASIS OF DESIGN: POWEREX SEQ2007 WITH DESICCANT DRYER OPTION.PROVIDE REGULATOR AT COMPRESSOR OUTLET. COORDINATE AIRPRESSURE REQUIREMENTS WITH OWNER. 1-1/2" OUTLET.
NOTE: EQUAL PRODUCTS BY OTHER MANUFACTURERS ARE ACCEPTABLE PROVIDING SUBSTITUTIONS ARE SUBMITTED IN ACCORDANCE WITH REQUIREMENTS LISTED ELSEWHERE IN BID DOCUMENTS AND APPROVED BY THE A/E.
CONDENSING DOMESTIC WATER HEATER SCHEDULE
WH-1P
THERMALEFF.
BASIS OF DESIGNFUELRECOVERY@ 100 F
CAPACITYITEM
119 GALLON STORAGE 466 GPH NATURALGAS CYCLONE XI BTH 400
NOTES:1. ACCEPTABLE MANUFACTURERS, CONTINGENT UPON COMPLIANCE WITH THE CONTRACT DOCUMENTS, ARE AS FOLLOWS: STATE WATER HEATER, BRADFORD WHITE,
LOCHINVAR AND BOCK. EQUAL PRODUCTS BY OTHER MANUFACTURERS ARE ACCEPTABLE PROVIDING SUBSTITUTIONS ARE SUBMITTED IN ACCORDANCE WITHREQUIREMENTS LISTED ELSEWHERE IN THE BID DOCUMENTS AND APPROVED BY THE A/E.
2. WATER HEATER SHALL INCLUDE AN ASME RATED T&P RELIEF VALVE AND DRAIN VALVE.3. PROVIDE MANUFACTURER'S CONCENTRIC VENT KIT. BASIS OF DESIGN: BTH-400 - 500 VENT KIT. KIT SHALL INCLUDE VENT SUB-ASSEMBLY, TERMINATION ASSEMBLY
AND RAIN CAP ASSEMBLY.4. ALL ADDITIONAL APPURTENANCES INCLUDING PIPE, HANGERS, ADHESIVES ETC. SHALL BE INSTALLED TO PROVIDE A SAFE, SECURE AND OPERATING SYSTEM.5. SEE ELECTRICAL DOCUMENTS FOR VOLTAGE AND AMPERAGE REQUIREMENTS.6. PROVIDE MANUFACTURER'S CONDENSATE NEUTRALIZER KIT.7. PROVIDE EXPANSION TANK FOR DOMESTIC WATER SYSTEM AND NON-POTABLE WATER SYSTEM. SIZE IN ACCORDANCE WITH WATER HEATER MANUFACTURER'S
SIZING GUIDE. BASIS OF DESIGN SHALL BE BELL & GOSSETT PT SERIES. ACCEPTABLE MANUFACTURERS, CONTINGENT UPON COMPLIANCE WITH THE CONTRACTDOCUMENTS, ARE AS FOLLOWS: TACO, AMTROL. EQUAL PRODUCTS BY OTHER MANUFACTURERS ARE ACCEPTABLE PROVIDING SUBSTITUTIONS ARE SUBMITTED INACCORDANCE WITH REQUIREMENTS LISTED ELSEWHERE IN BID DOCUMENTS AND APPROVED BY THE A/E.
8. SUFFIX IN ITEM MARK INDICATES USE FOR POTABLE (P) OR NON-POTABLE (NP) HOT WATER SYSTEM.
INPUTBTUH
399,900 95% A.O. SMITH
MODEL
WH-2NP 119 GALLON STORAGE 576 GPH CYCLONE XI BTH 500499,900 95% A.O. SMITH
WH-3NP 119 GALLON STORAGE 576 GPH CYCLONE XI BTH 500499,900 95% A.O. SMITH
NATURALGAS
NATURALGAS
WATERINLET/
OUTLETSIZE
GASSUPPLY
SIZE
1-1/4"
1-1/4"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
REVERSE-OSMOSIS/DEIONIZED WATER TREATMENT
MARK
PW-1
TYPE DISTRIBUTIONPUMPS STORAGE TANK GENERATION CAPACITY REMARKS
ASTM TYPE 3 HIGH PURITY WATERSYSTEM INCLUDES TURBIDITY FILTER,WATER SOFTENER, CARBON FILTER, 5MICRON PREFILTER, REVERSE OSMOSISUNIT, STORAGE TANK, DUPLEXDISTRIBUTION PUMPS , SIX MIXED BEDDEIONIZERS, 0.2 MICRON POSTFILTER,AND UV STERILIZATION WITH PLCCONTROL PANEL. BETA POLYPROPYLENEINTERCONNECTING PIPING.
DUPLEX PUMPS FORCOMBINED 30 GPMAT 70 PSI.
500 GALLONS 1,000 GALLONS PER DAY. BASIS OF DESIGN: PACKAGE SYSTEM BY HYDRO SERVICE AND SUPPLIESINCLUDING THE FOLLOWING:
TURBIDITY FILTER: ECODYNE INDUSTRIAL M-121A-TCWATER SOFTENER: ECODYNE INDUSTRIAL S-31A-ALT1CARBON FILTER: ECODYNE INDUSTRIAL C-141A-TC-D5 MICRON PREFILTER: ONE 20" LONG X 4-1/2" DIAMETER HIGH CAPACITYFILTERREVERSE OSMOSIS UNIT: HYDRO SERVICE AND SUPPLIESDISTRIBUTION PUMPS: GRUNDFOS CRN LINEMIXED BED DEIONIZERS: HYDRO SERVICE AND SUPPLIES0/2 MICRON POSTFILTER: FIVE 20" LONG BY 2.7" DIAMETERCONTROLLERPLC CONTROL PANEL: ALLEN BRADLEY MICROLOGIX WITH PV600TOUCHSCREEN
SYSTEM SHALL INCLUDE BALL BALVES, SOLENOID VALVES, SAMPLING PORTS,SERVICE LIGHTS, PRESSURE INDICATORS, FLOW METERS, ANALOG INPUTS,TIMERS, PRESSURE SWITCHES, AND ALL ITEMS REQUIRED FOR A COMPLETESYSTEM. PIPING NETWORK SHALL INCLUDE HIGH PURITY WATER RETURNPIPING.
NOTE: EQUAL PRODUCTS BY OTHER MANUFACTURERS ARE ACCEPTABLE PROVIDING SUBSTITUTIONS ARE SUBMITTED IN ACCORDANCE WITH REQUIREMENTS LISTED ELSEWHERE IN BID DOCUMENTS AND APPROVED BY THE A/E.
ACID NEUTRALIZATION TANKMARK
ANT-1
DESCRIPTION BASIS OF DESIGN
BELOW GRADE SEAMLESSPOLYTHYLENE CHEMICAL WASTE TANK,REINFORCED FOR DIRECT BURY. 1,295GALLON LIQUID HOLDING CAPACITY,1,5000 GALLON TOTAL TANK CAPACITY.PROVIDE RISERS TO EXTEND COVERSTO GRADE. PROVIDE pH MONITORINGPACKAGE WITH CENTRAL MONITORINGSTATION.
TANK: SCHIER PRODUCTS NT-1500-BpH MONITORING STATION: SCHIER PRODUCTS COMMANDCENTER
NOTE: EQUAL PRODUCTS BY OTHER MANUFACTURERS ARE ACCEPTABLE PROVIDING SUBSTITUTIONS ARE SUBMITTEDIN ACCORDANCE WITH REQUIREMENTS LISTED ELSEWHERE IN BID DOCUMENTS AND APPROVED BY THE A/E.
NOTES:
1. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.2. ELEVATOR SUMP PUMP WITH OIL SENSING TECHNOLOGY. SEE ELECTRICAL DRAWINGS FOR CONTROLLERLOCATION. PUMP CONTROLLER SHALL BE CAPABLE OF PUMP SHUTDOWN UPON DETECTION OFOIL/HYDRAULIC FLUID.3. SEE ELECTRICAL DRAWINGS FOR VOLTAGE REQUIREMENTS.4. PROVIDE WITH LOCAL AND REMOTE AUDIO AND VISUAL WARNING ALARMS.5. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.6. ACCEPTABLE MANUFACTURERS, CONTINGENT UPON COMPLIANCE WITH THE CONTRACT DOCUMENTS, AREAS FOLLOWS: LIBERTY, BELL & GOSSETT. EQUAL PRODUCTS BY OTHER MANUFACTURERS ARE ACCEPTABLEPROVIDING SUBSTITUTIONS ARE SUBMITTED IN ACCORDANCE WITH REQUIREMENTS LISTED ELSEWHERE INTHE BID DOCUMENTS AND APPROVED BY THE A/E.
SUMP PUMP SCHEDULE
SP-1
ITEM MAXGPM
74 37
HEADFT. W.G.
1/2
MAX.MOTOR
HPBASIS OFDESIGN MODEL
STANCOROIL-MINDER
SE-50
RPM
3600
GAS DEMAND SCHEDULE
ITEM # NAME DEMAND(MBTU)
NUMBER OFFIXTURES
TOTALDEMAND
WH-1 1
BASED ON TOTAL DEVELOPED LENGTH: 150'-0"NATURAL GAS @ 4.8" - 10.5" WCPIPE SIZED PER 2009 IFGC
WATER HEATER 399.9 399.9
TOTAL (MBTU) 17,492.4
WH-2
WH-3
B-1
B-2
WATER HEATER
WATER HEATER
BOILER
BOILER
1
1
1
1
499.9
499.9
499.9
499.9
3,0003,000
3,0003,000
LAB OUTLETS 325325130
GENERATOR 8,2688,2681
WATER DISTRIBUTION BOOSTER PUMPMARK
WDBP
SERVICE GPM(EACH)
HEADFT. W.G.
MOTORHP
MODEL
WATER DISTRIBUTION - POTABLEAND NON-POTABLE
250 69 7.5
NOTES:
RPM
3450
VFD
YES
BASIS OF DESIGN
PACKAGED DUPLEX VARIABLESPEED PUMP BY SYNCROFLO
IRONHEART-A SERIES
55DD07XXX-6H-2A-SWFFF-X-SS
1. REFER TO THE ELECTRICAL DRAWINGS FOR VOLTAGE REQUIREMENTS.2. PROVIDE WITH 130 GALLON ACCUMULATOR TANK.3. PUMP SHALL BE ALL STAINLESS STEEL CONSTRUCTION.4. MOUNT VFDS IN NEMA 1 ENCLOSURE.5. HEADERS SHALL BE 6" STAINLESS STEEL.
NOTES:
1. REFER TO THE ELECTRICAL DRAWINGS FOR VOLTAGE REQUIREMENTS.2. PROVIDE PUMP WITH MANUFACTURER'S TIMERS AND IMMERSION TYPE AQUASTATS.3. ACCEPTABLE MANUFACTURERS, CONTIGENT UPON COMPLIANCE WITH THE CONTRACT DOCUMENTS, ARE AS FOLLOWS: ARMSTRONG, GRUNDFOS.EQUAL PRODUCTS BY OTHER MANUFACTURERS ARE ACCEPTABLE PROVIDING SUBSTITUTIONS ARE SUBMITTED IN ACCORDANCE WITH REQUIREMENTSLISTED ELSEWHERE IN THE BID DOCUMENTS AND APPROVED BY THE A/E.
HOT WATER RECIRCULATING PUMP SCHEDULE
CP-1
ITEM GPM
4 25
HEADFT. W.G.
-
MIN.EFF.
1/2
MAX.MOTOR
HPTYPE BASIS OF
DESIGN
INLINE
VFD
NO TACO
RPM
-2/5
MAX.BHP
CP-2 4 25 -1/2 INLINE NO TACO-2/5
THERMOSTATIC MIXING VALVE SCHEDULE
TMV-1
MANUFACTURERCONNECTEDFIXTURES
SYSTEM USEMARK
POTABLE HOT WATER WH-1P, CP-1 805
NOTES:1. ACCEPTABLE MANUFACTURERS, CONTINGENT UPON COMPLIANCE WITH THE CONTRACT DOCUMENTS, ARE AS FOLLOWS: LAWLER, BRADLEY,
SYMMONS, LEONARD. EQUAL PRODUCTS BY OTHER MANUFACTURERS ARE ACCEPTABLE PROVIDING SUBSTITUTIONS ARE SUBMITTED INACCORDANCE WITH REQUIREMENTS LISTED ELSEWHERE IN THE BID DOCUMENTS AND APPROVED BY THE A/E.
2. INSTALL ABOVE CEILING AT FIXTURE.3. INSTALL IN LOWER CABINET. MAKE FINAL CONNECTIONS TO FIXTURE BY OTHERS.
LAWLER
MODEL
TMV-2 NON-POTABLE HOT WATER WH-2NP, WH-3NP, CP-2 805LAWLER
TMV-4 EMERGENCY EYEWASH EEW S19-2000BRADLEY
TMV-3 EMERGENCY SHOWERSTATION ESH S19-2100BRADLEY
APPLICABLESTANDARDS
ASSE 1070 ORCSA B125.3
ASSE 1071
ASSE 1070 ORCSA B125.3
ASSE 1071
1
NOTES
1
1, 3
1, 2
CERTI F IC
AT E O F A U THO
RIZAT
ION
SOUTH CAROLINA
CONSULTINGENGINEERS
DWG, INC.
No.C03649
CHECKED BY:
DRAWN BY:
DATE:
PROJECT:
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
1
A
2 3 4 5 6
B
C
D
E
WWW.LS3P.COMTEL. 843.577.4444 FAX 843.722.4789205 1/2 KING ST. CHARLESTON SC 29401
STATE PROJECT NO:H17-9588-FW
REVISIONS:
COPYRIGHT 2014 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.
E
G
No.
L
TU
DS
IC
AH
ISM
RE
TE
K
EG. W
ES
AA
17759
RE
GE
ER
INEN
L
RCAHORP
SEFOLN
S IOINO
5/19
/201
4 2:
53:1
5 PM
C:\U
sers
\km
inog
ue\D
ocum
ents
\120
96_C
CU
Sci
ence
Ann
ex II
Pha
se O
ne_2
013_
kmin
ogue
.rvt
LS3P: 1202-122370
MAY 20, 2014
KMM
MGW
PLUMBINGSCHEDULES
P602
BID SET
SCIENCE ANNEX IICONSTRUCTION
No. Description Date