4'-0" MIN, SEE NOTE 1
9'-0
" MIN
, SE
E N
OTE
1
NOTES:
1. MINIMUM DIMENSIONS INDICATED FOR BID PURPOSES,CONTRACTOR TO VERIFY ACTUAL EQUIPMENT DIMENSIONSWITH EQUIPMENT MANUFACTURER AND INCREASE SIZES ASNEEDED.
CONCRETE SLAB ON GRADE-18" THICK W/#4 AT 12" EACH
WAY TOP AND BOTTOM
GENSET PER ELECTRICALDRAWINGS
A
-
TYP
NOTES:
1. INSTALL 12"Ø THREADED ROD, ASTM F593, W/4" MIN EMBED INTO SLABUSING HILTI HIT-RE 500-SD EPOXY ANCHORING SYSTEM, INSTALLANCHOR AT EACH MOUNTING HOLE PROVIDED IN EQUIPMENT.
2. SEE
10" MIN,TYP
6",
TYP
1'-0
", TY
P
2" CLR
3" C
LR,
TYP
UN
O
FINISH GRADE
STANDARD HOOK, TYPICAL
EPOXY DOWEL SEE NOTE 1
STANDBY GENSET WITHSOUND INCLOSURE
SLAB PER PLAN
3
S-502
1'-0"
TYP
718 Third Street Eureka California 95501 USAT 1 707 443 8326 F 1 707 444 8330W www.ghd.com
This Drawing shall not be usedfor Construction unless Signedand Sealed For Construction
CheckDrafting
DateDrawnRevisionNo
Original Size
Title
Project
Client
Check
DesignerDrawn
Scale
Design
Note: * indicates signatures on original issue of drawing or last revision of drawing
Plot Date: Cad File No:31 December 2012 - 3:03 PM N:\US\san francisco\Projects\10344 sf dpw\8410177 sfdpw firestation 6 egu replacement\06-CAD\Sheets\103448410177 S501.dwg
GHD Inc. (Project Director)Approved
Date
JobManager
ProjectDirector
Plotted by: Chris Richards
Contract No.Sht of
Reuse of DocumentsThis document and the ideas and designs incorporatedherein, as an instrument of professional service, is theproperty of GHD Inc. and shall not be reused in whole orin part for any other project without GHD Inc.'s writtenauthorization. © GHD Inc. 2012
-7437A-1
12S-501
SEB CSC
CAR CSC
AS INDICATED5
1
-
GENSET PAD PLANA
-
GENSET PAD SECTION0 2'1'1/2'
1"=1'-0"0 2'1'1/2'
1"=1'-0"
2
3
E
F
A
3
(E) MAIN CIRCUIT BREAKER
(E) SERVICE METER
(E) MAIN PANELBOARD
(N) AUTOMATICTRANSFER SWITCH
(E) EGU CONTROL PANELAND METERING
(E) POWER PANEL
(E) JUNCTIONBOX
(E) METER MAINTO CELL TOWERON ROOF, N.I.C.
(N) WIRE GUTTER
(N) JUNCTION BOX(BELOW (E) MCB) 2
3
5
6
1
16
14
15
16
14
15
15
LB 4
21
J-BOX (BEHINDGUTTER)
6"FROM EDGE
N(ATS)
2
MIN 4" A FF
EDGE OF WALL (APPROX)
REMOVE TILE BEHIND GUTTER AS REQUIREDFOR INSTALLATION. CLEAN, PATCH, ANDPAINT REMAINING EXPOSED SURFACE.
(N) WIRE GUTTER3
LB4
24" A
F F
(E) WALL
HATC
HED
AREA
INDI
CATE
S5'-
0" M
INIM
UM C
LEAR
SPAC
E BE
TWEE
NBU
ILDIN
G AN
D FU
EL TA
NK
4" CURB8'-0"
(E) WINDOW
(E) WALL-MOUNTED LIGHT
(E) DOOR
(N) REMOVABLE BOLLARD(TYP. OF 3)
9 (TYP.)
10(N) EGU
(N) JUNCTION BOX
(N) JUNCTION BOX 12
1312
14
15
16
ROUTE INTERIOR CONDUITALONG ORIGINAL PATH.
7(N) CONCRETEGENERATOR PAD
6"
6"
8GROUND RODTEST WELL
MINIMUM CLEARANCE PERGENERATOR MANUFACTURER
RECOMMENDATIONS
48"48"48"
INSTALL CONDUITBELOW GRADE
6E-501
TURN CONDUIT UP WALL TO +96"AFG APPROX. (ABOVE WINDOW)
17SALVAGED BRICK
718 Third Street Eureka California 95501 USAT 1 707 443 8326 F 1 707 444 8330W www.ghd.com
This Drawing shall not be usedfor Construction unless Signedand Sealed For Construction
CheckDrafting
DateDrawnRevisionNo
Original Size
Title
Project
Client
Check
DesignerDrawn
Scale
Design
Note: * indicates signatures on original issue of drawing or last revision of drawing
Plot Date: Cad File No:31 December 2012 - 3:09 PM N:\US\san francisco\Projects\10344 sf dpw\8410177 sfdpw firestation 6 egu replacement\06-CAD\Sheets\103448410177 E202.dwg
GHD Inc. (Project Director)Approved
Date
JobManager
ProjectDirector
Plotted by: Chris Richards
Contract No.Sht of
Reuse of DocumentsThis document and the ideas and designs incorporatedherein, as an instrument of professional service, is theproperty of GHD Inc. and shall not be reused in whole orin part for any other project without GHD Inc.'s writtenauthorization. © GHD Inc. 2012
-7437A-1
12
SHEET GENERAL NOTES
KEYNOTES
1. PROVIDE (N) AUTOMATIC TRANSFER SWITCH ON WALL AS INDICATED. SEE SINGLE LINEDIAGRAM AND SPECIFICATIONS FOR EQUIPMENT RATINGS. MOUNT BOTTOM OF ATS AT+24" AFF.
2. PROVIDE (N) 6"x6"x6"-DEEP JUNCTION BOX IN WALL BELOW (E) PULLING COMPARTMENT(BELOW (E) MAIN CIRCUIT BREAKER).
3. PROVIDE (N) 6"x6"x48", MIN. 10 GAUGE SHEET METAL WIRE GUTTER ON WALL BELOW (E)METER, (E) MAIN CIRCUIT BREAKER AND (E) MAIN PANELBOARD. ALIGN IN FRONT OF (N)RECESSED JUNCTION BOX.
4. PROVIDE LB AND CONDUIT BETWEEN (N) GUTTER AND (N) ATS. SEE SINGLE LINEDIAGRAM FOR CONDUCTOR AND CONDUIT SIZES. ROUTE CONDUIT/FITTING TIGHT TOWALL.
5. PROVIDE CONDUIT BETWEEN (N) ATS AND (E) MAIN PANELBOARD. SEE SINGLE LINEDIAGRAM FOR CONDUCTOR AND CONDUIT SIZES.
6. PROVIDE (N) SURFACE MOUNT EGU ANNUNCIATOR PANEL ON WALL. MOUNT CENTER OF(N) EGU ANNUNCIATOR PANEL AT +44" AFF.
7. PROVIDE CONCRETE PAD FOR (N) EGU. COORDINATE EXACT DIMENSIONS ANDPENETRATIONS WITH EGU VENDOR. CONCRETE PAD DIMENSIONS SHALL BE 12" WIDERAND LONGER THAN EGU (6" EACH SIDE).
8. PROVIDE GROUND ROD TEST WELL ADJACENT TO CONCRETE PAD. SEE DETAILS SHEETE-501.
9. COORDINATE EXACT LOCATIONS OF CONDUIT STUB-UPS WITH MANUFACTURER SHOPDRAWINGS.
10. PROVIDE (N) EMERGENCY GENERATOR UNIT, SUB BASE TANK, AND MOUNTINGACCESSORIES AND MOUNT ON CONCRETE PAD. SEE SINGLE LINE DIAGRAM ANDSPECIFICATIONS FOR EQUIPMENT RATINGS.
11. PROVIDE GENERATOR FRAME GROUND. SEE DETAIL 1/E501 FOR CONNECTIONBETWEEN EGU FRAME, REBAR AND CU GND ROD.
12. PROVIDE (N) NEMA 3R JUNCTION BOX ABOVE WINDOW. ROUTE CONDUIT AROUNDWINDOW. AVOID CONFLICT WITH (E) WALL-MOUNTED LIGHT.
13. PROVIDE (N) JUNCTION BOX MOUNTED TO CEILING IN OFFICE.
14. PROVIDE 1-1/2" CONDUIT FOR EGU EMERGENCY FEEDER BETWEEN (N) EGU AND (N)ATS. SEE SINGLE LINE DIAGRAM FOR CONDUCTOR SIZES.
15. PROVIDE CONTROL WIRING BETWEEN (N) EGU, (N) EGU ANNUNCIATOR PANEL, AND (N)ATS IN MINIMUM 1-1/4" CONDUIT. COORDINATE WIRE TYPE AND QUANTITY WITH EGUMANUFACTURER.
16. PROVIDE (2) #12 AWG AND #12 GND IN MINIMUM 1" CONDUIT FROM (N) EGU BACK TO (N)CIRCUIT BREAKER IN (E) POWER PANEL FOR (N) EGU BATTERY CHARGER AND JACKETHEATER.
17. REUSE (E) BRICK SALVAGED DURING DEMOLITION TO FILL AREA AROUND GENERATORPAD. FOLLOW EXISTING PATTERN AND RESTORE SURFACE TO ORIGINAL CONDITION.
0 4'2'1'1/2"=1'-0"
3
ENLARGED PLANGENERATOR AREA
2
ENLARGED PLANSERVICE AREA
0 4'2'1'1/2"=1'-0"
1. SEE SHEET E-101 FOR ADDITIONAL INFORMATION ON CONDUIT ROUTING.
2. SEE SHEET E-501 FOR DETAILS.
3. SEE SHEET E-601 FOR SINGLE LINE DIAGRAM.
4. MAINTAIN 5-FOOT MINIMUM CLEAR SPACE BETWEEN GENERATOR FUEL TANK ANDBUILDING IN ACCORDANCE WITH NFPA 30 T22.4.1.1(B).
5. PAINT EXPOSED CONDUIT TO MATCH ADJACENT SURFACES.
6. PATCH UNUSED OPENINGS AND REPAIR DAMAGE PER SPECIFICATIONS.
1 SERVICE AREA ELEVATION
E-202
SMG CAR
BNB BNB
1/4" = 1'-0"10
2
718 Third Street Eureka California 95501 USAT 1 707 443 8326 F 1 707 444 8330W www.ghd.com
This Drawing shall not be usedfor Construction unless Signedand Sealed For Construction
CheckDrafting
DateDrawnRevisionNo
Original Size
Title
Project
Client
Check
DesignerDrawn
Scale
Design
Note: * indicates signatures on original issue of drawing or last revision of drawing
Plot Date: Cad File No:31 December 2012 - 2:53 PM N:\US\San Francisco\Projects\10344 SF DPW\8410177 SFDPW Firestation 6 EGU Replacement\06-CAD\Sheets\103448410177 E701.dwg
GHD Inc. (Project Director)Approved
Date
JobManager
ProjectDirector
Plotted by: Chris Richards
Contract No.Sht of
Reuse of DocumentsThis document and the ideas and designs incorporatedherein, as an instrument of professional service, is theproperty of GHD Inc. and shall not be reused in whole orin part for any other project without GHD Inc.'s writtenauthorization. © GHD Inc. 2012
-7437A-1
12
SHEET GENERAL NOTES
1. CONTRACTOR TO COMPLETE PERMIT APPLICATION CHECKLIST FORDIESEL GENERATORS, DIESEL FIRE PUMPS, AND FUEL TANKS SERVINGGENERATORS AND FIRE PUMPS, LOCATED ON DRAWINGS E-701 ANDE-702. APPLICATION IS PARTIALLY COMPLETED WITH INFORMATIONAVAILABLE DURING DESIGN. CONTRACTOR TO REVIEW, UPDATE, ANDCORRECT AS NECESSARY FOR BUILDING DEPARTMENT.
E-701
SMG CAR
BNB BNB
NO SCALE11
718 Third Street Eureka California 95501 USAT 1 707 443 8326 F 1 707 444 8330W www.ghd.com
This Drawing shall not be usedfor Construction unless Signedand Sealed For Construction
CheckDrafting
DateDrawnRevisionNo
Original Size
Title
Project
Client
Check
DesignerDrawn
Scale
Design
Note: * indicates signatures on original issue of drawing or last revision of drawing
Plot Date: Cad File No:31 December 2012 - 2:51 PM N:\US\San Francisco\Projects\10344 SF DPW\8410177 SFDPW Firestation 6 EGU Replacement\06-CAD\Sheets\103448410177 E702.dwg
GHD Inc. (Project Director)Approved
Date
JobManager
ProjectDirector
Plotted by: Chris Richards
Contract No.Sht of
Reuse of DocumentsThis document and the ideas and designs incorporatedherein, as an instrument of professional service, is theproperty of GHD Inc. and shall not be reused in whole orin part for any other project without GHD Inc.'s writtenauthorization. © GHD Inc. 2012
-7437A-1
12
SHEET GENERAL NOTES
1. CONTRACTOR TO COMPLETE PERMIT APPLICATION CHECKLIST FORDIESEL GENERATORS, DIESEL FIRE PUMPS, AND FUEL TANKS SERVINGGENERATORS AND FIRE PUMPS, LOCATED ON DRAWINGS E-701 ANDE-702. APPLICATION IS PARTIALLY COMPLETED WITH INFORMATIONAVAILABLE DURING DESIGN. CONTRACTOR TO REVIEW, UPDATE, ANDCORRECT AS NECESSARY FOR BUILDING DEPARTMENT.
E-702
SMG CAR
BNB BNB
NO SCALE12