17
Office of the President - Other Executive Offices PHILIPPINE COMIVllSSION ON WOIVIEN 1145 J. P. Laurel Street, San IVliguel, IVlaniia CY 2014 ANNUAL PROCUREMENT PLAN CODE Program / Activity Project End User Mode of Procurement Schedule for each Procurement Activity Source of Funds Estimated Budget Php CODE Program / Activity Project End User Mode of Procurement o u u o CL QJ D. o O CO °- b XJ < o u XJ CQ OJ D. O C ^ 'P ZJ IT) c o ro _3 > UJ 73 CD a O 1 < tj do ro ,E C tin 3 K S -a c >- o <U Q) :^ Q. OJ c Q o u ° & E Source of Funds PS MOGE CO Remarks/ Ativity (Brief Description of Program/Project) A. Supplies ad Materials A.l.a PCW Loyalty Necklace & Pendant (35 years) AFD Shopping 6AA 49,000.00 Loyalty award for employees who rendered 35 years in the service A.l.b PCW Loyalty Bracelet (25 years) AFD Shopping GAA 11,550.00 Loyalty award for employees who rendered 25 years in the service A.l.c PCW Loyalty Ring (20 years) AFD Shopping GAA 2,600.00 Loyalty award for employees who rendered 20 years in the service A.l.d PCW Loyalty Pin (15 & 10 years) AFD Shopping Budget Estimate includes molding fee GAA 15,750.00 Loyalty award for employees who rendered 15 and 10 years in the service A.l.e Common Office Supplies available at the Procurement Service All Agency to Agency To be procured through the PS-DBM GAA 1,526,499.73 Supplies for PCW wide A.l,f Common Office Supplies not available at the Procurement Service All Shopping To be procured on quarterly basis GAA 2,869,865.78 Supplies for PCW wide B. Capital Outlay B.l.a Vault/Safe AFD Shopping To be procured Third Quarter of 2014 GAA 65,000.00 To replace the old and defective units which are already beyond economic repair B.l.b Stainless Water Tank 410 gallons AFD Shopping To be procured Third Quarter of 2014 GAA 25,000.00 The existing small stainless water tank is not sufficient enough to hold water for distribution to the two bidgs. (Annex A and Main Building) B.l.c Aircon window-type and split-type ceiling mounted including installation cost AFD Shopping To be procured Second Quarter of 2014 GAA 261,000.00 To replace the old and defective units which are already beyond economic repair and parts are no longer available B.l.d CCTV camera 6V-MFD 110,1.3 MP AFD Shopping To be procured Third Quarter of 2014 GAA 33,000.00 For security purposes, this units will be placed at the lobby and the Cashier area Page 1 of 17

S O CO ^ 'P CL 1 < 3 QJ XJ Q o IT) CD · Production of Tinig ng Kababaihan Radio Program IRMD Shopping Budget Estimate includes transportation, supplies and communications GAA 73,500.00

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: S O CO ^ 'P CL 1 < 3 QJ XJ Q o IT) CD · Production of Tinig ng Kababaihan Radio Program IRMD Shopping Budget Estimate includes transportation, supplies and communications GAA 73,500.00

Office of the President - Other Executive Offices PHILIPPINE COMIVllSSION ON WOIVIEN 1145 J. P. Laurel Street, San IVliguel, IVlaniia

CY 2014 ANNUAL PROCUREMENT PLAN

CODE Program / Activity Project End User Mode of

Procurement

Schedule for each Procurement Activity

Source of Funds

Estimated Budget Php

CODE Program / Activity Project End User Mode of

Procurement

o u u o

CL QJ D.

o

O CO ° - b

X J <

o u XJ CQ OJ

D .

O C

^ 'P

ZJ IT)

c o ro

_ 3

> UJ 7 3 CD

a O 1 <

t j do

ro ,E C tin 3 K

S - a

c

>- o <U Q)

: ^ Q . OJ c

Q o u

° & E

Source of Funds PS MOGE CO

Remarks/ Ativity (Brief Description of Program/Project)

A. Supplies ad Materials

A . l .a PCW Loyalty Necklace & Pendant

(35 years)

AFD Shopping 6AA 49,000.00 Loyalty award for employees

who rendered 35 years in the

service

A . l .b PCW Loyalty Bracelet (25 years) AFD Shopping GAA 11,550.00 Loyalty award for employees

who rendered 25 years in the

service

A . l . c PCW Loyalty Ring (20 years) AFD Shopping GAA 2,600.00 Loyalty award for employees

who rendered 20 years in the service

A . l .d PCW Loyalty Pin (15 & 10 years) AFD Shopping Budget Estimate includes molding fee GAA 15,750.00 Loyalty award for employees who rendered 15 and 10 years in the service

A . l .e Common Office Supplies available at the Procurement Service

All Agency to Agency

To be procured through the PS-DBM GAA 1,526,499.73 Supplies for PCW wide

A. l , f Common Office Supplies not available at the Procurement Service

All Shopping To be procured on quarterly basis GAA 2,869,865.78 Supplies for PCW wide

B. Capital Outlay

B.l.a Vault/Safe AFD Shopping To be procured Third Quarter of 2014 GAA 65,000.00 To replace the old and defective units which are already beyond economic repair

B.l.b Stainless Water Tank 410 gallons AFD Shopping To be procured Third Quarter of 2014 GAA 25,000.00 The existing small stainless

water tank is not sufficient enough to hold water for distribution to the two bidgs. (Annex A and Main Building)

B.l.c Aircon window-type and split-type ceiling mounted including installation cost

AFD Shopping To be procured Second Quarter of 2014 GAA 261,000.00 To replace the old and defective units which are already beyond economic repair and parts are no longer available

B.l.d CCTV camera 6V-MFD 110,1.3 MP AFD Shopping To be procured Third Quarter of 2014 GAA 33,000.00 For security purposes, this units

will be placed at the lobby and the Cashier area

Page 1 of 17

Page 2: S O CO ^ 'P CL 1 < 3 QJ XJ Q o IT) CD · Production of Tinig ng Kababaihan Radio Program IRMD Shopping Budget Estimate includes transportation, supplies and communications GAA 73,500.00

Office of the President - Other Executive Offices PHILIPPINE COMMISSION ON WOMEN 1145 J. P. Laurel Street, San Miguel, Manila

CY 2014 ANNUAL PROCUREMENT PLAN

CODE Program / Activity Project End User Mode of

Procurement

Schedule for each Procurement Activity

Source of Funds

Estimated Budget Php

CODE Program / Activity Project End User Mode of

Procurement

c s U

o a. tu

Q_

o

p m ^ t= m <

o u -a in i

c QJ tn ^ "° O m

m

c _o CD

§ UJ "O

CQ

§ o a.

° -o

1 <

u aa

8

s -a c

£• •-S t! : i Q . <u c

Q § u

g -

c gi

S- E o => < ^

Source of Funds PS MODE CO

Remarks/ Ativity (Brief Description of Program/Project)

C. Printing Services C l . a Printing and Delivery of RA 9262

Implementing Rules and Regulations (3,000 copies)

IRMD Shopping GAA 81,000.00 For distribution to clients

C l . b Printing and Delivery of RA 9710 Magna Carta of Women Implementing Rules and Regulations (3,000 copies)

IRMD Shopping GAA 84,000.00 For distribution to clients

C.l.c Printing of lEC materials Laws on Women (7192, 7877, 8353/8505, 9208); MC 2011-01; JC 2012-01; BPO Primer, VAW Core Messages, MGEC Policy Documents

IRMD Shopping GAA 335,000.00 For distribution to clients

C l . d Production of GAD Resource Kit IRMD Shopping GAA 68,200.00 For distribution to clients

C.l .e Printing and Delivery of Towards a Gender Fair Media (1,500 copies)

IRMD Shopping GAA 150,000.00 For distribution to clients

D. Utilities

D.l.a

Water Supply AFD Direct

Contracting

Not Applicable: To be procured pursuant to Section 50 (c) of the IRR

of R.A. 9184 Resolution No. 03-2011 dated January 28, 2011.

GAA 600,000.00 PCW wide water supply/

consumption

D.l.b Electric/power supply AFD Direct

Contracting Not Applicable: To be procured pursuant to Section 50 (c) of the IRR of R.A. 9184 Resolution No. 03-2011 dated January 28, 2011.

GAA 2,412,000.00 PCW wide power supply/ consumption

D.l.c Supply and Delivery of Drinking Water

AFD Shopping GAA 48,000.00 PCW wide drinking water

supply

E. Communication E.l.a Deliveries and Courier Services AFD Shopping GAA 120,000.00 Delivery and courier

requirements of the PCW

E.l.b Internet Leased Line All Shopping GAA 450,000,00 To provide communication link services (data, network.

Page 2 of 17

Page 3: S O CO ^ 'P CL 1 < 3 QJ XJ Q o IT) CD · Production of Tinig ng Kababaihan Radio Program IRMD Shopping Budget Estimate includes transportation, supplies and communications GAA 73,500.00

Office of the President - Other Executive Offices PHILIPPINE COMMISSION ON WOMEN 1145 J. P. Laurel Street, San Miguel, Manila

CY 2014 ANNUAL PROCUREMENT PLAN

CODE Program / Activity Project End User Mode of

Procurement

Schedule for each Procurement Activity

Source of Funds

Estimated Budget Php

CODE Program / Activity Project End User Mode of

Procurement

M-C o t_) u o Q-QJ a.

o ca

c o - o CQ Qi Q.

c 1) (/I D. - o

o s

c o

-a CQ

d o CL

o -a OJ ^ •s 5 o <

ro c

1 •& Q on

o -a Qi

(U m

° I

c

01 C s § a. c <u ^

Source of Funds PS MODE CO

Remarks/ Ativity (Brief Description of Program/Project)

internet)

E.l.c Maintenance of the PCW GAD

information systems

IRMD Shopping Budget Estimate includes security software, preventive maintenance and supplies

GAA 400,000.00

E.l.d Supply and Delivery of Watchguard Firebox

IRMD Shopping GAA 78,000.00

E.l.e Renewal of Kaspersky License Subscription

IRMD Shopping GAA 100,000.00

E.l.f Telephone-Mobile All Direct

Contracting IMot Applicable: To be procured pusuant to Section 50 (c) of the IRR of R.A. 9184 Resolution No. 03-2011 dated January 28, 2011.

GAA 513,050.00 Provision of Mobile phones to PCW officials

E.l.g Telephone-Landline All Direct

Contracting Not Applicable: To be procured pusuant to Section 50 (c) of the IRR of R.A. 9184 Resolution No. 03-2011 dated January 28, 2011.

GAA 600,000.00 PCW wide telephone line

F. Rent

F.l.a Photocopying Machine AFD Shopping GAA 300,000.00 Rental of One (1) photocopying

machine for PCW

F.l.b Rental of Storage Space to house

documents

AFD Shopping GAA 105,000.00 One (1) unit of storage room to house documents

G. Professional Services G.l.a MCW Baseline Consultant MED Public Bidding Target Date: May 2014 AECID 717,000.00

G l .b Planning Officer 11 MED Shopping GAA 273,757.00 To provide technical support to the Monitoring and Evaluation Division

G.l .c GAD Plan & Budget Consultants MED Shopping GAA 350,000.00 7 consultants to do review of

2015 GAD Plans and Budget

G. l .d Planning Officer 11 MED Shopping AECID 273,757.00 To provide technical support

to the Monitoring and Evaluation Division

Page 3 of 17

Page 4: S O CO ^ 'P CL 1 < 3 QJ XJ Q o IT) CD · Production of Tinig ng Kababaihan Radio Program IRMD Shopping Budget Estimate includes transportation, supplies and communications GAA 73,500.00

Office of the President - Other Executive Offices PHILIPPINE COMMISSION ON WOMEN 1145 J. P. Laurel Street, San Miguel, Manila

CY 2014 ANNUAL PROCUREMENT PLAN

CODE Program / Activity Project End User Mode of

Procurement

Schedule for each Procurement Activity

Source of Funds

Estimated Budget Php

CODE Program / Activity Project End User Mode of

Procurement

c o <J u o D_ OJ

Q,

O to o m ^ t T3 <

C

5 CQ

Q-

O

c Q. -a o s

C

o m

_3

> LU T3 CQ

o Q-

° P

1 <

2 S

8 "

2 -a QJ

^ -s QJ oJ

1= Q-

" I

t i

P

Source of Funds PS MOOE CO

Remarks/ Ativity {Brief Description of Program/Project)

G.l .e Planning Officer 11 MED Shopping GAA 298,644.00 To provide technical support

to the Monitoring and Evaluation

Division

G.l .f Special Assistant to the Chairperson

BSO Shopping GAA 237,766.32 To provide technical and administrative support to the Chairperson

G.l .g Planning Officer III ESG Shopping GAA 376,212.00 To provide technical support

to the Executive Support Group

G.l.h Planning Officer IV ESG Shopping GAA 546,720.24 To provide technical support to the Executive Support Group

G.l . i Administrative Staff of Deputy Director for Management Services

ESG/

DDMS

Shopping GAA 237,766.32

G.l.j Planning Officer 11 ESG/

DDMS Shopping GAA 319,004.40 To provide technical support

to the Deputy Director for Management Services

G.l.k IT Technical Support Staff IRMD Shopping GAA

AECID 211,200.00 243,600.00

To provide technical support tothelCTU Unit

6.1.1 IT Consultant IRMD Shopping GAA 139,600.00 For the enhancement of the

PCW website

G. l .m KM Coordinator IRMD Shopping GAA 232,057.00

G.l .n KM Consultant IRMD Shopping AECID 200,000.00

G.l .o Assistant Librarian IRMD Shopping AECID 34,510.00 To assist the Librarian in the

Digitization of the PCW Publications

G.l .p Assistant Librarian IRMD Shopping AECID 105,562.80 To assist the Librarian in the

Development of PCW Digital

Page 4 of 17

Page 5: S O CO ^ 'P CL 1 < 3 QJ XJ Q o IT) CD · Production of Tinig ng Kababaihan Radio Program IRMD Shopping Budget Estimate includes transportation, supplies and communications GAA 73,500.00

Office of the President - Other Executive Offices PHILIPPINE COMMISSION ON WOMEN 1145 J. P. Laurel Street, San Miguel, Manila

CY 2014 ANNUAL PROCUREMENT PLAN

CODE Program / Activity Project End User Mode of

Procurement

Schedule for each Procurement Activity

Source of Funds

Estimated Budget Php

CODE Program / Activity Project End User Mode of

Procurement

M-C

<3 u o

D-

a.

o o •o ca Qi a.

o c Q. -a o s SI Ln

c ,o

Z3

g LU "O CQ

§ O

Q.

Qi ^

o <

<_] DO

ra c. "c ^ ° .75

2 -a Qi

S g 1 1

c >- .2 S a! ~ o. OJ p Q o u

?. ° & E U 3

Source of Funds PS MOOE CO

Remarks/ Ativity {Brief Description of Program/Project)

Library

G. l .q IT Support Staff for the GMMS IRMD Shopping AECID 243,600.00 To provide technical support

to the IRMD

G.l .r Report on the status of implementation of the VAW Documentation System in Akian

IRMD Shopping AECID 1,249,005.00 Report on the status of implementation of the VAW Documentation Systems in AkIan

G.l.s Consultant on the Development of the PCW Core Messages

IRMD Shopping AECID 200,000.00 Consultant to guide PCW in its developmentof an organization-wide communications plan with emphasis on institutional branding and major advocacies

G.l.t Development of the PCW Communication Strategy and Plan

IRMD Shopping Budget Estimate includes meals Budget Estimate includes vi/orkshops

AECID AECID

12,500.00 240,500.00

G. l .u Conduct of a levelling off session for PCW staff on the PCW core messages

IRMD Shopping GAA 17,500.00

G.l.v Identification and training of PCW spokeperson/s for media engagements

IRMD Shopping Budget Estimate includes venue, meals and professional fee of Consultant

AECID 156,000.00

G.l.w

Production of Tinig ng Kababaihan Radio Program

IRMD Shopping Budget Estimate includes transportation, supplies and communications GAA 73,500.00

G.l .x Media support to PCW activities IRMD Shopping GAA 183,400.00

G.l.y Learning Session for Media Practitioners IRMD Shopping Target Date: March 2014 GAA 50,190.00

G.1.Z Women's Human Symbol Formation IRMD Shopping Taget Date: March 2014 GAA 354,113.00

G.2.a Womens Consultative Conference on the BPfA + 20

IRMD Public Bidding Target Date: March 2014 GAA 967,765.00

G.2.b MCW App Contest IRMD Shopping Target Date: March 2014 GAA

AECID 120,000.00 178,000.00

Page 5 of 17

Page 6: S O CO ^ 'P CL 1 < 3 QJ XJ Q o IT) CD · Production of Tinig ng Kababaihan Radio Program IRMD Shopping Budget Estimate includes transportation, supplies and communications GAA 73,500.00

Office of the President - Other Executive Offices PHILIPPIIME COMIVllSSION ON WOMEN 1145 J. P. Laurel Street, San Miguel, Manila

CY 2014 ANNUAL PROCUREMENT PLAN

CODE Program / Activity Project End User Mode of

Procurement

Schedule for each Procurement Activity

Source of Funds

Estimated Budget Php

CODE Program / Activity Project End User Mode of

Procurement

c o u o o

C L

OJ Q.

o to o m

° - t

-a <

3 -o CQ C)

»+-O sz OJ yi

^ ~° o s _Q

c o ro >

UJ

•a CQ

§ O

Q.

u

1 <

U CLO

ro c *± 'c c bo

8

3 -o QJ

S g

c >. .2 OJ Q)

— CL

CI §

u

SB § Q- C g ^

Source of Funds PS MOOE CO

Remarks/ Ativity (Brief Description of Program/Project)

G.2.C

Film Making Contest IRMD Shopping Target Date: March 2014 GAA 210,500.00

G.2.d Photo Exhibit IRMD Shopping Target Date: March 2014 GAA 52,000.00

G.2.e Annual observation of the 18-day Campaign to End VAW

IRMD Shopping November-December 2014 GAA 300,000.00

G.2.f Provision of library services IRMD Shopping Budget Estimate includes supplies and subscriptions GAA 36,000.00

G.2.g Consultant for Performance Evaluation Tools (360°)

AFD Shopping GAA 100,000.00

H. Programs/Activities H.l.a Philippines BPfA + 20 review report

prepared and submitted to UNCSW

MED Shopping Target Date: April 2014 Budget Estimate includes meals, venue, supplies and materials

GAA 202,500.00

H.l.b MCW Baseline and 3-year report and GM assessment of NGA's performance including select LGUS prepared and ready for publication

MED Shopping Target Date: October 2014

Budget Estimate includes transportation expenses, meals, venue, airfare, board and lodging, DSA, supplies and materials Budget Estimate includes meals and venue

GAA

AECID

186,100.00

308,500.00

H.l.c Partnership building with PSA to aid in statistical analysis of gender statistics available as input in all reportorial requirements

MED Shopping Target Date; March 2014 and October 2014 Budget estimate includes supplies

GAA 5,000.00 Semi-annual update of gender

statistics

H.l.d Conduct of field monitoring visits per sites (e.g., Yolanda areas, Zamboanga, Bohol)

MED Shopping Target Date: February-November 2014 Budget Estimate includes airfare, transportation expenses, accommodation, DSA

GAA 82,800.00 To monitor reports on the implementation of post disaster/ calamity/conflict areas

H.l.e Conduct of training on data processing/ advanced statistical analysis using Excel program/SPSS

MED Shopping Target Date; May 2014 Budget Estimate includes meals and professional fee of Consultant

AECID 145,000.00

H.l.f Finalization of GADtimpala awardees (Screening by document review, validation

MED Shopping Target Date; March 2014 Budget Estimate includes supplies and materials, meals, transportation

GAA 253,700.00

Page 6 of 17

Page 7: S O CO ^ 'P CL 1 < 3 QJ XJ Q o IT) CD · Production of Tinig ng Kababaihan Radio Program IRMD Shopping Budget Estimate includes transportation, supplies and communications GAA 73,500.00

Office of the President - Other Executive Offices PHILIPPINE COMMISSION ON WOMEN 1145 J. P. Laurel Street, San Miguel, Manila

CY 2014 ANNUAL PROCUREMENT PLAN

CODE Program / Activity Project End User Mode of

Procurement

Schedule for each Procurement Activity

Source of Funds

Estimated Budget Php

CODE Program / Activity Project End User Mode of

Procurement

c o u u o

O-

Q_

o In o cn

^ t in

<

o ~o

CD Q)

c

o s -Q

c .9 ro

5 LU

-o 'cQ

ro d Ul O

Q_

0 - a

1 <

ro c

^ CLO

3

3 -a s g

1 2

QJ OJ ^ Q. Q) C Q §

u

g -

a. c

g s

Source of Funds PS MOOE CO

Remarks/ Ativity (Brief Description of Program/Project)

committee meeting, field validation, and final selection of aw/ardees by PCW

expenses, communication expenses, recognition awards, prize money

H.l.g

Conduct of 1 whole day TCM to discuss gaps and solicit inputs for the operationalization of the M&E Framework

MED Shopping Target Date: July 2014

Budget Estimate includes meals GAA 10,000.00

H.l.h Piloting of M&E guidelines and forms

to select NGAs

MED Shopping Target Date: September 2014 Budget Estimate includes communication expenses

GAA 1,500.00

H.l.i Conduct of PCW PMF Workshop MED Shopping Target Date: October 2014

Budget Estimate includes meals, supplies, accommodation, gasoline and transportation expenses

GAA 41,000.00

H.l.j Conduct of 1 TCM to review PCW PMF MED Shopping Target Date: October 2014

Budget Estimate includes meals GAA 10,000.00

H.l.l< Formulation of a draft resolution and MOU for the establishment of monitoring and referral system on VAWC among member agencies at the national level

MED Shopping Target Date: April 2014 Budget Estimate includes meals

GAA 8,000.00

H.I.I

Pilot testing of the monitoring and

referral system

MED Shopping Target Date: May 2014 Budget Estimate includes supplies and materials, communication expenses, gasoline expenses, meals.

GAA 14,900.00

H.l.m Board Meetings ESG Shopping Target Date: February 2014 and July 2014

Budget Estimate includes supplies and materials, communication expenses, printing, binding and photocopying, DSA and meals

GAA 78,000.00

H.l.n International Commitments Hosting/ Participations/ Reporting (1 UNCSW Conference)

ESG Shopping Target Date: March 2014 GAA 586,792.00 Representations in Regional and International Meetings and Conferences

International Commitments Hosting/ Participations/ Reporting

ESG Shopping Target Date: May 2014 GAA 156,380.00

Page 7 of 17

Page 8: S O CO ^ 'P CL 1 < 3 QJ XJ Q o IT) CD · Production of Tinig ng Kababaihan Radio Program IRMD Shopping Budget Estimate includes transportation, supplies and communications GAA 73,500.00

Office of the President - Other Executive Offices PHILIPPINE COMMISSION ON WOMEN 1145 J. P. Laurel Street, San Miguel, Manila

CODE Program / Activity Project End User

Schedule for each Procurement Activity Estimated Budget Php

CODE Program / Activity Project End User Mode of

Procurement

M-C <s U O CL OJ Q-

'o

p CO

° - t

-o <

C o u -a t o i CL

o s JD

c o

ro > LU -o CQ

ra d o o.

0 -a

1 <

tj too ro c

3 -

2 -a OJ

Q) OJ

I I — Q. a) c ° o

u

Source of Funds PS MOOE CO

Remarks/ Ativity (Brief Description of Program/Project)

H.1.0 (1APEC Ministerial Meetings on

Women)

H.l.p

international Commitments Hosting/ Participations/ Reporting (1 Regional Workshop on Gender Mainstreaming in Labor Policies to Promote Decent Work for All

ESG Shopping Target Date: April 2014 GAA 65,740.00

H.l.q

International Commitments Hosting/ Participations/ Reporting (1 Regional Forum for Policy Discussion and Information Sharing on Social Protection for the Elderly Women in AMS Brunei

ESG Target Date: May 2014 GAA 49,065.00

H.l.r

International Commitments Hosting/ Participations/ Reporting (RP Hosting: Regional Meeting on Social Protection Measures on Micro-Enterprise Development

ESG Shopping Target Date: August 2014 GAA 154,712.00

H.l.s

International Commitments Hosting/ Participations/ Reporting (Inter-ministerial Workshop on Gender Issues in Climate Change and Its Adaptation

ESG Shopping Target Date: October 2014 GAA 300,000.00

H.l.t

International Commitments Hosting/

Participations/ Reporting {13th ACW Back-to-Back with 8th ACWC Meetings

ESG Shopping Target Date: September-October 2014

ACW

ACWC

GAA GAA

235,404.00 725,880.00

H.l.u

RP Hosting: Inter-ministerial Seminar to Share Information and Experiences in Promoting Gender Sensitive Startegies and Services for Female Migrant Workers

ESG Shopping GAA 1,031,440.00

H.l.v

International C International Commitments Hos Participations/ Reporting

|(UNESCAP Bangkok)

ESG Shopping Target Date: August 2014 and November 2014 GAA 143,500.00

Page 8 of 17

Page 9: S O CO ^ 'P CL 1 < 3 QJ XJ Q o IT) CD · Production of Tinig ng Kababaihan Radio Program IRMD Shopping Budget Estimate includes transportation, supplies and communications GAA 73,500.00

Office of the President - Other Executive Offices PHILIPPINE COMMISSION ON WOMEN 1145 J. P. Laurel Street, San Miguel, Manila

CY 2014 ANNUAL PROCUREMENT PLAN

CODE Progrann / Activity Project End User

Schedule for each Procurement Activity

Source of Funds

Estimated Budget Php

CODE Progrann / Activity Project End User Mode of

Procurement

c o u o o

Q-

0 D_

"o 4-' in

p m

^ -

<

o u •a 'cQ

OJ

Q-

c

^ ~° o s SI CO

c o ro

_ 3

ro

•o CQ

ro d

o Q_

1 <

tj CiD

ro c 1 8 -

o -a

s § 1 1

c >. o OJ OJ

— Q-0) c Q o u

4S § E

Source of Funds PS MOOE CO

Remarks/ Ativity (Brief Description of Program/Project)

H.I.VJ

International Commitments Hosting/ Participations/Reporting

(ECOSOC)

ESG Shopping GAA 154,050.00

H.1.X

International Commitments Hosting/

Participations/Reporting

(Vientiane)

ESG Shopping GAA 96,150.00

H.l.y

International Commitments Hosting/ Participations/Reporting

(Jakarta)

ESG Shopping GAA 62,745.00

H.l.z Review and provision of inputs, position papers or policy briefs on bills included in the WPU\ First semester - 5 policy briefs/position papers/inputs to bills Second semester - 5 policy briefs/ position papers/inputs to bills

PDAD Shopping Target Date: First and Second semester of 2014 GAA 473,000.00

H.2.a

Participation in committee hearings/ TWG meetings/other activities in both Houses of Congress

PDAD Shopping Target Date: First Semester GAA 14,400.00

H.2.b

One-on-one lobbying/meetings with legislators and other stakeholders

PDAD Shopping Target Date: January - December 2014 GAA 50,000.00

H.2.C Conduct of legislators' forum and policy advocacy for a with legislators, CSO, stakeholders and other partners on VJLA

PDAD Shopping Target Date: July or August 2014-Women Legislators'Forum May or August 2014-Two policy for a conducted

GAA GAA

100,000.00

150,000.00

H.2.d Participation and attendance to legislative-related meeting/ consultations

PDAD Shopping Target Date: January-December 2014 GAA 6,000.00

H.2.e Development of GAD Policies and Guidelines- Conduct of meetings/ consultations with stakeholders for the development of gender-responsive/ GAD policies

PDAD Shopping Target Date: January-June 2014 GAA 83,000.00

Page 9 of 17

Page 10: S O CO ^ 'P CL 1 < 3 QJ XJ Q o IT) CD · Production of Tinig ng Kababaihan Radio Program IRMD Shopping Budget Estimate includes transportation, supplies and communications GAA 73,500.00

Office of the President - Other Executive Offices PHILIPPINE COMMISSION ON WOMEN 1145 J. P. Laurel Street, San Miguel, Manila

CY 2014 ANNUAL PROCUREMENT PLAN

CODE Progrann / Activity Project End User Mode of

Procurement

Schedule for each Procurement Activity

Source of Funds

Estimated Budget Php

CODE Progrann / Activity Project End User Mode of

Procurement

a o u u O

Q-0)

CL

o

p m ° - t in -o <

c o u •o

CO

CL

o n a> m a. T3 O 5 S2 =3

l/l

c: o to

03 > UJ -a CQ

03 =3

a S

•S -o g 1 1 <

tj QJD CD C

5 -

S -a OJ

OJ QJ

I I

d >. .9 <D QJ

~ CL QJ f:

Q o u

OJ

S g

U =3

Source of Funds PS MOOE CO

Remarks/ Ativity (Brief Description of Program/Project)

H.2.f Participation and attendance to meetings/consultations/workshops/ other related activities other related activities

PDAD Shopping Target Date: January-December 2014 GAA 12,000.00

H.2.g Participation in the Multi-stakeholder Policy Consultation on GAD/ other PCW-AECID-related activities

PDAD Shopping GAA 50,000.00

H.2.h Preparation/ provision of technical inputs to national, regional and international documents

PDAD Shopping Target Date: January-December 2014 GAA 24,000.00

H.2.i Review of national/sectoral plans as to gender responsiveness

PDAD Shopping Target Date: January-December 2014 GAA 15,000.00

H.2.J Participation in meetings and

workshops on national/regional plans

PDAD Shopping Target Date: January-December 2014 GAA 100,000.00

H,2.k Provision of inputs to GAD monitoring reports

PDAD Shopping Target Date: January-December 2014 GAA 12,000.00

H.2.1 Responding to Technical Assistance

requests related to GAD policies

PDAD Shopping Target Date: January-December 2014 GAA 54,000.00

H.2.m Establishment/Strengthening of GAD mechanism-Participation in meetings/ activities of inter-agency mechanisms (e.g. lACVAWC, lACAT, NAC-TWG, NAPWPS, lACRW, etc.)

PDAD Shopping Target Date: January-December 2014 GAA 50,000.00

H.2.n Development of the PCW ISP 2015-2017 IRMD Shopping GAA 68,600.00

H.2.0 Enhancement of the PCW website IRMD Shopping GAA 4,500.00

H.2.P Assessment of the KM Practices of PCW IRMD Shopping Target Date: April 2014 AECID 3,000.00

Page 10 of 17

Page 11: S O CO ^ 'P CL 1 < 3 QJ XJ Q o IT) CD · Production of Tinig ng Kababaihan Radio Program IRMD Shopping Budget Estimate includes transportation, supplies and communications GAA 73,500.00

Office of tfie President - Other Executive Offices PHILIPPINE COIMMISSION ON WOIVIEN 1145 J. P. Laurel Street, San Miguel, Manila

CY 2014 ANNUAL PROCUREMENT PLAN

CODE Progrann / Activity Project End User Mode of

Procurement

Schedule for each Procurement Activity

Source of Funds

Estimated Budget Php

CODE Progrann / Activity Project End User Mode of

Procurement

o o u o a. a) a.

o

p m ^ t

-a <

M-£Z o u - a CD

CJ CL

o c CU to

C L -a

o a =3

p CD =3 n3 >

LLI

n3

§ o

CL

CJ ro

1 <

ro _c

8 "

QJ S g

'° I

c

£- -S OJ S ~ o-03 C ° g

u

QJ

^ 1 S §

g ^ < ^

Source of Funds PS MOOE CO

Remarks/Ativity (Brief Description of Program/Project)

H.2.q Development of the PCW KM Framevi/ork and Action Plan

IRMD Shopping Taget Date: May 2014 Budget Estimate includes lodging, venue, meals and supplies

AECID 213,500.00

H.2.r Conduct of PCW staff orientation on KM, the PCW KM Plan, and the PCW KM Framework

IRMD Shopping Taget Date: June 2014

Budget Estimate includes venue, meals and supplies

GAA 50,000.00

H.2.S Conduct of learning session on KM IRMD Shopping Target Date: June-December 2014

Budget Estimate includes venue, meals and supplies

AECID 25,000.00

H.2.t Assessment of the GMMS pilot testing IRMD Shopping AECID 838,953.00

H.2.U Dissemination of lEC materials: laws on women, MC, Jc, BPO, VAW core messages, GAD resource kit and MGEC policy documents

IRMD Shopping Budget Estimate includes supplies and mailing GAA 124,000.00

H.2.V Training of ICTU staff on Mobile Applications Development

IRMD Shopping AECID 51,500.00 2 staff trained

H.2.W Training of Communication Staff on Video Documentary and Corporate

IRMD Shopping AECID 45,080.00 2 staff trained

H.2.X Continuing education program for Librarians

IRMD Shopping AECID 10,000.00 2 Librarians trained

H.2.y Implementation and operationalization of the National GAD Resource Program (NGRP)

TSD Shopping Target Date: February-May 2014 GAA 138,000.00

H.3.a Development of case materials for each sector

TSD Shopping GAA 90,000.00 3 cases for three selected sectors and learning materials for use in sectoral training packages developed

H.S.b Review and customization of existing modules and tools for standardization

TSD Shopping GAA 264,000.00 2 tools reviewed and enhanced within 2014 (GERL, GMEF)

Page 11 of 17

Page 12: S O CO ^ 'P CL 1 < 3 QJ XJ Q o IT) CD · Production of Tinig ng Kababaihan Radio Program IRMD Shopping Budget Estimate includes transportation, supplies and communications GAA 73,500.00

Office of the President - Other Executive Offices PHILIPPINE COIVlMISSION ON WOMEN 1145 J. P. Laurel Street, San Miguel, Manila

CY 2014 ANNUAL PROCUREMENT PLAN

CODE Progrann / Activity Project End User Mode of

Procurement

Schedule for each Procurement Activity

o o c o o

o D_

CQ

O

-a CQ

IZ CU Q .

O T3

CQ

ra 1

I/) CU UJ i_ " a

< in

sz tlO 5 -

2 -a S g

OJ %

~ a. <u p

o

Source of Funds

Estimated Budget Php

PS MOOE CO Remarks/ Ativity (Brief Description of Program/Project)

H.3.C

Development of Technical Assistance packages/modules per cluster or sectoral issues (use as reference the modules developed under the GWP)

TSD Shopping Target Date: July 2014 GAA 56,000.00 TA packages for 2 sectors

developed

H.3.d

Conduct of validation session on the Technical Assistance packages through NGRP learning session/sector

TSD Shopping Target Date: July 2014 GAA 226,000.00 1 validation cum learning session with GR Pool members

H.3.e

mplementation of TA packages (sector-based PCW course offerings/ training programs/TA packages)

TSD Shopping Target Date: September 2014 GAA 188,000.00 1 sectoral training sessions

H.3.f

Capacity Development and Certification of GR Pool: Pooling of the second and third batches of GR Pool members

TSD Shopping Target Date: February 2014 GAA 302,000.00 20-25 GR pool members each

for batch 2 and 3

H.3.g

Conduct of levelling session and updating capacities of GR Pool members

TSD Shopping Target Date: February and August 2014 GAA 407,500.00 Levelling and learning session for 2nd and 3rd batch ofhte GAD

Resource Pool Capacity development activities/peer learning sessions for GR Pool members

H.3.h

Development of certification tools and accreditation of GR pool members

TSD Shopping Target Date: March 2014 GAA 259,000.00

H.3.i

Preparation and finalization of GR Pool handbook

TSD Shopping Target Date: July 2014 GAA 109,000.00 Pool members certified by March 2014.

GAD Resource Pool handbook finalized by July 2014

H.3.J

Conduct of GAD Focal Point System

Assemblies

TSD Shopping Target Date: August 2014 GAA 298,000.00 1 6FPS Assembly with 30 agencies (at least 60 participants by August 2014

H.3.k

Conduct of annual GAD budget forum (to sustain partnership with COA and explore partnership with other training institutions e.g. PAGDAI, CSI, WAGI Finalization and initial implementation

TSD Shopping Target Date: November 2014

TSD Shopping Target Date: February-March 2014

GAA

GAA

82,000.00

141,000.00

2 GAD Budget For a

Localization program concept

Page 12 of 17

Page 13: S O CO ^ 'P CL 1 < 3 QJ XJ Q o IT) CD · Production of Tinig ng Kababaihan Radio Program IRMD Shopping Budget Estimate includes transportation, supplies and communications GAA 73,500.00

Office of tfie President - Other Executive Offices PHILIPPINE COMIVllSSION ON WOMEN 1145 J. P. Laurel Street, San Miguel, Manila

CY 2014 ANNUAL PROCUREMENT PLAN

CODE Program / Activity Project End User

Schedule for each Procurement Activity Estimated Budget Php

CODE Program / Activity Project End User Mode of

Procurement

c o u u o

a . 0

Q-

p m ^ != CO

- D <

O

u - D CQ

03

Q.

C QJ cn Q . - O

o s _Q =3

to

c o ro

_ 3 ro >

LU "O CQ

ro a tn O

Q .

0 ^

QJ ^ u ro

1 <

ro c ^ tao

5

QJ

S g

e

QJ OJ — Q . QJ p

Qi

S ° CL IZ

g S

Source of Funds PS MOOE CO

Remarks/ Ativity (Brief Description of Program/Project)

H.3.1 of the localization program for select

LGUS and A R M M

note finalized by February 2014

H.B.m

Development of parnership with select

D1L6 regional offices especially on the

provision of TA and monitoring of LGU

efforts on GIVl

TSD Shopping Target Date: May-December 2014 GAA 108,800.00 Partnership with at least 3 DILG regional offices forged by December 2014

H.S.n

Finalization and initial implementation

of the LGU learning hub concept

TSD Shopping Target Date: April and October 2014 GAA 264,000.00 LGU learning hub operational document by April 2014

H.3.0

Conduct of Regional GAD Council Summit to facilitate localization of MCW and sustain convergence at the regional level (from the experience of GWP)

TSD Shopping Target Date: July 2014 GAA 344,500.00 1 RGADC summit conducted

by July 2014

H,3.p

Continue provision of technical assistance to A R M M specifically GFPS members of the ARMM-line agencies, including the Regional Council of Bangsamoro Women and locally created agencies

TSD Shopping Target Date: March 2014 GAA 214,000.00 Second batch of training on GA and GPB for locally created and A R M M line agencies

H.3.q

Training of Trainers for MCW partner

NGAs

PMO Shopping Target Date: August 2014 AECID 162,000.00

H.3.r

Training of trainers for partner LGUs PMO Shopping Target Date: September-November 2014 AECID 194,750.00

H.3.S

Creation of the Philippine Network

for the documentation of VAW Cases

PMO Shopping Target Date: April 2014 AECID 37,000.00

H.3.t

Planning workshop for the harmonization of information systems documenting cases of VAW

PMO Shopping Target Date: May 2014 AECID 249,500.00

H.3.U

Hiring of IT Consultancy for the VAWDocS

Enhancement

PMO Target Date: April-June 2014 AECID 752,255

H.3,v Focus Group Discussions (FGDs)forthe |pMO Shopping Target Date: June-November 2014 AECID 55,700.00

Page 13 of 17

Page 14: S O CO ^ 'P CL 1 < 3 QJ XJ Q o IT) CD · Production of Tinig ng Kababaihan Radio Program IRMD Shopping Budget Estimate includes transportation, supplies and communications GAA 73,500.00

Office of the President - Other Executive Offices PHILIPPIIME COMMISSION ON WOMEN 1145 J. P. Laurel Street, San Miguel, Manila

CY 2014 ANNUAL PROCUREMENT PLAN

CODE Program / Activity Project End User Mode of

Procurement

Schedule for each Procurement Activity

Source of Funds

Estimated Budget Php

CODE Program / Activity Project End User Mode of

Procurement

o u (J o

a_ OJ CL

p m °- t in

8 CQ OJ

Q-

O c QJ to D. XJ

o s rj t/i

c o '•4-' CD

> LU - a CQ

ro 8 tn o

0 -o QJ ^

1 < ro _c

8 - 11

c >. o QJ QJ

~ Q. OJ C Q o u

s g

g- E

< ^

Source of Funds PS MOOE CO

Remarks/ Ativity (Brief Description of Program/Project)

H.3.V Rapid Application Development of the enhanced VAWDocS in AkIan

H.3.W Deployment and Testing of enhanced VAWDocS in AkIan

PMO Shopping Target Date: November 2014 AECID 133,400.00

H.3,x Report Preparation and Presentation (2015 First Meeting of the PNDVC)

PMO Shopping Target Date: January 2015 AECID 11,250.00

H.3.y Presentation of the results of the assessment of the Knowledge Management (KM)

PMO Shopping Target Date: April 2014 AECID 3,000.00

H.3.Z Hiring of Consultant on the Development of the PCW KM Framework and Action Plan

PMO Shopping Target Date: April 2014 AECID 200,000.00

H.4.a Conduct of workshop for the development of the PCW KM Framework Action Plan

PMO Shopping Target Date: May 2014 AECID 213,500.00

H.4.b Meeting/Learning Session on KM PMO Shopping Target Date: June-December 2014 AECID 25,000.00

H.4.C PF and Printing of MCW Exhibit Materials PMO Shopping Target: March 2014 AECID 195,000.00

H.4.d Development of Guide and printing -Development of Guide to Young Women's Leadership

PMO Shopping Target Date: April-June 2014 AECID 190,000.00

H.4.e Development and Production of PCW-AECID Project Report

PMO Shopping Target Date: October-December 2014 AECID 250,000.00

H.4.f Conduct of learning.levelling sessions/ visits of GFPS and GAD Trainers

PMO Target Date: August-December 2014 AECID 900,000.00

H.4.g Training of Luzon SUCs {1st Batch)-Gender Sensitivity Training and Training of Trainers on Gender Analysis Tools and GAD Planning and Budgeting

PMO Target Date: June 2014 AECID 607,250.00

H.4.h Training of VisMIn SUCs (2nd Batch)-Gender Sensitivity Training and Training

PMO Target Date: July 2014 AECID 1,028,750.00

Page 14 of 17

Page 15: S O CO ^ 'P CL 1 < 3 QJ XJ Q o IT) CD · Production of Tinig ng Kababaihan Radio Program IRMD Shopping Budget Estimate includes transportation, supplies and communications GAA 73,500.00

Office of the President - Other Executive Offices PHILIPPINE COMMISSION ON WOMEN 1145 J. P. Laurel Street, San Miguel, Manila

CY 2014 ANNUAL PROCUREMENT PLAN

CODE Program / Activity Project End User Mode of

Procurement

Schedule for each Procurement Activity

01 in P 5

S5 .S QJ

1 2 — Q .

a> c

° 8

Source of Funds

Estimated Budget Php

PS MOOE CO Remarks/ Ativity (Brief Description of Program/Project)

of Trainers on Gender Analysis Tools

and GAD Planning and Budgeting

H.4.i

Two-day Writeshop on Elements/ Components of Gender Responsive Succession Planning Guidelines

PMO Shopping Target Date: May 2014 AECID 424,000.00

H.4.J

Half-day Validation Meeting PMO Shopping Target Date: May 2014 AECID 66,000.00

H.4.k

Approval of the CSC Succession

Planning Guidelines

PMO Shopping Target Date: June 2014 AECID 24,000.00

H.4.h

Half-Day Orientation for Heads of Offices and HR Focal Persons on the Succession Management Program (2 batches)

PMO Shopping Target Date: July 2014 AECID 10,500.00

H.4.i

Writeshop for the Preparation of a

CSC Succession Management Road

Map

PMO Shopping Target Date: July 2014 AECID 227,875.00

H.4.J

Actual Conduct of Meeting/Training-

Meeting with Accountants and

Auditors (18 LGUs + 6 LACS)

PMO Shopping AECID 422,775.00

H.4.k

Preparatory and Actual Consultation

Workshop- Multistakeholder Policy

Consultation on Gad

PMO Shopping Target Date: November 2014 AECID 301,750.00

H.4.1 Conduct of knowledge and product fair with convergence forum

PMO Target Date: December 2014 AECID 600,000.00

H.4.m

Training on Online Writing and Multimedia Production for GFPS and LACS

PMO Shopping Target Date: April-May 2014 AECID 403,500.00

H.4.n

Hiring of consultant to develop research protocol, coach LACs, validate

PMO Shopping Target Date: June-August 2014 AECID 423,800.00

Page 15 of 17

Page 16: S O CO ^ 'P CL 1 < 3 QJ XJ Q o IT) CD · Production of Tinig ng Kababaihan Radio Program IRMD Shopping Budget Estimate includes transportation, supplies and communications GAA 73,500.00

Office of the President - Other Executive Offices

PHILIPPINE COMIVllSSION ON WOMEN

1145 J. P. Laurel Street, San Miguel, Manila

CY 2014 ANNUAL PROCUREMENT PLAN

CODE Program / Activity Project End User Mode of

Procurement

Schedule for each Procurement Activity

Source of

Funds

Estimated Budget Php

CODE Program / Activity Project End User Mode of

Procurement

M -C o u o o

a . 0)

DI

o

p m ^ t

Ln T3 <

O u •a CO

OJ el­

's c OJ (n s- ~° o a

c _o ro =: ro >

LU -o 'm

ro Z3

a in O Q.

CJ ro

1 < C tUD

8 •'^

S - a CU

<U OJ

.9 u

£- -S OJ OJ

~ Q . CU c Q o

(J

^ g

g- E o u < ^

Source of

Funds PS MOOE CO Remarks/ Ativity (Brief Description

of Program/Project)

convergence models, write-up, and

publish

H.4.0

Midyear Assessment with LGUS and

PCW

PMO Shopping Target Date: August 2014 AECID 400,000.00

H.4.P

Exploratory meeting with regional

partners

PMO Shopping Target Date: April-June 2014 AECID 13,800.00

H.4.q Region 6 Partners'Forum cum Training

of Technical Advisers on GAD, GA and

GPB

PMO Shopping Target Date: Aprl-June 2014 AECID 149,370.00

H.4.r Region 6-wide GAD Focal Point System

Assembly for Provincial LGUS and

Regional Line Agencies (6 provinces)

PMO Shopping Target Date: April-June 2014 AECID 145,440.00

H.4.S

Project Steering Committee Meetings PMO Shopping Target Date: March-December 2014 AECID 28,800.00

H.4.t PCWTeambuilding AFD Shopping GAA 382,500.00

H.4.U

Wellness Activities AFD Shopping Target Date: July 2014 GAA 30,000.00

H.4.V. Sporsfest and Family Day AFD Shopping Target Date: September 2014 GAA 194,500.00

H.4.W Mid-year Planning Assessment DDMS Shopping Target Date: July 2014 GAA 41,000.00

H.4.X Year-End Planning and Assessment DDMS Shopping Target Date: December 2014

Budget Estimate includes accommodation, meals, miscellaneous

GAA 256,400.00

1 Subscription

l.l.a Daily Subscription of Newspaper IRMD Shopping Small Value: TO be procured by the Library GAA 30,000.00 For the PCW Library

J. Repair and Maintenance

Page 16 of 17

Page 17: S O CO ^ 'P CL 1 < 3 QJ XJ Q o IT) CD · Production of Tinig ng Kababaihan Radio Program IRMD Shopping Budget Estimate includes transportation, supplies and communications GAA 73,500.00

Office of the President - Other Executive Offices PHILIPPINE COiVllVllSSlON ON WOIVIEN 1145 J. P. Laurel Street, San Miguel, Manila

CY 2014 ANNUAL PROCUREMENT PLAN

CODE Program / Activity Project End User Mode of

Procurement

Schedule for each Procurement Activity

Source of Funds

Estimated Budget Php

CODE Program / Activity Project End User Mode of

Procurement

c o (J

Q. OJ

Q .

o

to

<

o u ~o CQ

CJ

Q_

O c CJ yi Q. -a o s - Q

C

o fU

> UJ T3 CQ

CU

d V, o o_

0 -a QJ O CTJ

1 ̂

u do

C DO ° u5

QJ QJ OJ

I S

c

QJ QJ

— Q , QJ C o o

•i s g S- E o rj

Source of Funds PS MOOE CO

Remarks/ Ativity (Brief Description of Program/Project)

J . l .a Elevator AFD Direct Contracting

Not Applicable: To be procured in accordance to Sec. 50 of the IRR of R.A. 9184

GAA 115,704 Maintenance of one (1) unit elevator at PCW

Compiled by the BAC

Co-ChairpersoH, BAC

EMMELINE L. VERZOSA

Head of Office/Agency

Page 17 of 17