14
91.14M 49.95M 276.21M ( Excluding Nala portion ) ( Nala portion 12.00 M Wide) Area : 93.18 Acs 104.20M 100.40M 67.59M 80.35M 84.49M 135.71M 196.15M 329.57M 152.30M 87.84M 130.24M 269.47M 424.91M 642.59M M/S SAMUHA ENGINEERING INDUSTRIES LTD. PLOT AREA: 103.00 Acres 44.68M EXISTING 45.00 MTS WIDE ROAD EXISTING 36.00 Mts Wide Road 64.06M Non-SEZ Area SEZ Area 90.56M 56.42M 224.71M M/S SAMUHA ENGINEERING INDUSTRIES LTD. PLOT AREA: 40.70 Acres 176.64M PLOT No: 4 AREA: 18.82 Ac PLOT No: 1 PLOT No: 5 PLOT No: 2/1 129.04M PLOT No: 3 160.54M 64.06M PROP.18.00 MTS. WIDE ROAD 64.27M 66.87M 129.04M 7.00M 95.44M 432.48M 42.52M 70.11M 12.00M 85.45M 10.11M 198.01M 143.54M 31.90M 442.40M 424.05M 381.38M PROPOSED 36.00M WIDE ROAD 126.01M 148.98M P 1/A CFC 3 Area:2.03 Ac. CFC 2 Area :2.88 Ac. Adibatla (sy.no:47,48,51,52,53) Area 5.0Acs LP NO:01/SEZ Industries/layout/HMDA/HADA/2012 DT:4.01.2012 LP NO:01/Draft/Industrial layout/hmda/hada/2011 dt07.09.2011 82.14M AREA: 18.72 Ac CFC 1 Existing road 18.00M to 90.70M 47.88M 94.07M 41.90M 29.67M AREA: 7.75 Acs 83.18M 113.29M 105.78M 116.50M 122.52M 123.04M Nadergul( sy.no:519 to 523) S E Z A r e a Nadergul,sy.NO:525 Nadegul,sy.NO:527 Nadegul,sy.NO:398 sy.NO:651 Adibatla,sy.NO:651,657,658 sy.NO:707 sy.NO:708,709 sy.NO:32,33 sy.NO:34 UDL UDL ROADS AREA 15.58ACS OPEN SPACE 16.27 ACS 9.92ACS UTILITY 0.40ACS PLOTTED AREA 98.23ACS NO. OF PLOTS CFC TO ADIBATLA ORR TO HYDERABAD TO NAGARJUNA SAGAR TO N.H. 9 DY.Z .M(E) ZONAL MANAGER SHAMSHABAD ZONE KEY PLAN Scale = 1 : 5000 sez DTA TO NADERGUL sy.no:656,Adibatla Area: 0.74 Ac. 11.10% 11.59% 07.07% 00.28% 69.96% 6 NOS. Proposed Layout For140.40 Acs (133.58 +6.82) Prop Layout For 6.82 Acs Non- SEZ Area Proposed Layout For133.58 Acs SEZ Area LAND USE ANALYSIS T.S.I.I.C LIMITED HYDERABAD LAYOUT PLAN FOR(140.40ACS) AERO SPACE &PRECISSION ENGG SEZ INSURVEY NO.656,OF ADIBATLA(V), IBRAHIMPATNAM-(M) R.R Dist. AREA STATEMENT: NET LAYOUT LAND 140.40 AC. TOTAL LAYOUT AREA: 140.40 AC. LAND TAKEN FROM REV DEPT 337.45 AC. LAND ALLOTTED TO SAMUHA IN SEZ (UDL) (-) 103.00 AC. LAND ALLOTTED TO SAMUHA IN NON-SEZ (UDL (-) 93.18 AC. DEDUCT ROAD IN SEZ EAST SIDE OF SAMUHA (-) 2.33 AC. ADD FOR NALA AREA (+) 1.46 AC. N OPENSPACE PLOT No: 2/2 AREA: 14.25 ACS (EXCLUDING NALA AREA) Utilities 0.40Acs AREA: 13.50Acres 0.18 Acs 201.92M 250.72M 131.95M 197.90M GRAVE YARD 286.41M 134.45M 151.51M 54.94M 40.00M 40.00M 254.16M 227.00M 227.00M 200.00M 123.29M 112.04M 92.38M 260.52M 22.19M 388.89M 125.00M 125.00M 151.53M 133.36M 264.17 M 487.55M 246.41M 329.00M ADIBATLA NALA AREA 1.28 ACS 174.55M AREA: 14.25 ACS (EXCLUDING NALA AREA) OPENSPACE AREA: 14.25 ACS (EXCLUDING NALA AREA) 656 104.37 M 19.57 M 656 656 CHIEF ENGINEER - 1 TSIIC LIMITED,HYDERABAD 57.30 M 108.52M

S E Z A r e a 656 UDL - TSIICtsiic.telangana.gov.in/wp-content/uploads/2018/04/Shamshabad.pdf · udl udl roads area 15.58acs open space 16.27 acs 9.92acs utility 0.40acs plotted area

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: S E Z A r e a 656 UDL - TSIICtsiic.telangana.gov.in/wp-content/uploads/2018/04/Shamshabad.pdf · udl udl roads area 15.58acs open space 16.27 acs 9.92acs utility 0.40acs plotted area

91.14M

49.95M

276.21M

( Excluding Nala portion )

( Nala portion 12.00 M Wide)

Area : 93.18 Acs

104.20M

100.40M

67.5

9M

80.35M84.49M

135.71M 196.15M

329.5

7M

152.30M87.84M 130.24M

269.47M

424.91M

642.

59M

M/S SAMUHA ENGINEERING INDUSTRIES LTD.

PLOT AREA: 103.00 Acres

44.68M

EXISTING 45.00 MTS WIDE ROAD

EXIS

TIN

G 3

6.00

Mts

Wid

e R

oad

64.06M

Non-SEZ AreaSEZ Area

90.56M56.42M

224.

71M

M/S SAMUHA ENGINEERING INDUSTRIES LTD.

PLOT AREA: 40.70 Acres

176.64M

PLOT No: 4 AREA: 18.82 Ac

PLOT No: 1

PLOT No: 5

PLOT No: 2/1

129.04M

PLOT No: 3

160.54M

64.06M

PROP.18.00 MTS. WIDE ROAD

64.27M

66.87M129.04M

7.00M

95.4

4M 432.

48M

42.52M70.11M

12.00M

85.45

M

10.11M

198.01M

143.54M

31.90M

442.40M

424.05M

381.

38M

PROPOSED 36.00M WIDE ROAD

126.01M 148.98M

P 1/A

CFC 3

Area:2.03 Ac.

CFC 2Area :2.88 Ac.

Adib

atla

(sy.no

:47,4

8,51,5

2,53)

Area 5.0Acs

LP NO:01/SEZ Industries/layout/HMDA/HADA/2012 DT:4.01.2012

LP NO:01/Draft/Industrial layout/hmda/hada/2011 dt07.09.2011

82.14M

AREA: 18.72 Ac

CFC 1

Existing road 18.00M to

90.70M

47.88M94.07M

41.90M

29.67M

AREA: 7.75 Acs

83.18M

113.29M

105.78M

116.50M

122.52M

123.04M

Nadergul( sy.no:519 to 523)S E Z A r e a

Nadergul,sy.NO:525

Nadegul,sy.NO:527

Nadegul,sy.NO:398

sy.NO:651

Adibatla,sy.NO:651,657,658

sy.NO:707

sy.NO:708,709

sy.NO:32,33

sy.NO:34

UDL

UDL

ROADS AREA 15.58ACS

OPEN SPACE 16.27 ACS

9.92ACS

UTILITY 0.40ACS

PLOTTED AREA 98.23ACS

NO. OF PLOTS

CFC

TO A

DIB

ATLA ORR

TO H

YD

ERA

BA

D

TO N

AG

AR

JUN

A SA

GA

R

TO N.H. 9

DY.Z .M(E)ZONAL MANAGER

SHAMSHABAD ZONE

KEY PLAN

Scale = 1 : 5000

sezDTA

TO N

AD

ERG

UL

sy.no:656,Adibatla

Area: 0.74 Ac.

11.10%11.59%

07.07%

00.28%

69.96%

6 NOS.

Proposed Layout For140.40 Acs (133.58 +6.82)

Prop Layout For 6.82 Acs Non- SEZ Area

Proposed Layout For133.58 Acs SEZ Area

LAND USE ANALYSIS

T.S.I.I.C LIMITED HYDERABAD LAYOUT PLAN FOR(140.40ACS) AERO

SPACE &PRECISSION ENGG SEZ INSURVEY NO.656,OF ADIBATLA(V),

IBRAHIMPATNAM-(M) R.R Dist.

AREA STATEMENT:

NET LAYOUT LAND 140.40 AC.

TOTAL LAYOUT AREA: 140.40 AC.LAND TAKEN FROM REV DEPT 337.45 AC.

LAND ALLOTTED TO SAMUHA IN SEZ (UDL) (-) 103.00 AC.

LAND ALLOTTED TO SAMUHA IN NON-SEZ (UDL (-) 93.18 AC.

DEDUCT ROAD IN SEZ EAST SIDE OF SAMUHA (-) 2.33 AC.

ADD FOR NALA AREA (+) 1.46 AC.

N

OPENSPACE

PLOT No: 2/2 AREA: 14.25 ACS(EXCLUDING NALA AREA)

Utilities0.40Acs

AREA: 13.50Acres

0.18

Acs

201.92M

250.

72M

131.95M 197.90M

GRAVE YARD

286.

41M

134.45M151.51M

54.94M

40.00M

40.0

0M

254.16M227.00M

227.00M

200.00M

123.

29M

112.04M92.38M

260.52M22.19M

388.

89M

125.

00M

125.

00M

151.

53M

133.

36M

264.17 M

487.55M

246.41M

329.

00M

ADIBATLA

NA

LA A

REA

1.2

8 A

CS

174.55M

AREA: 14.25 ACS(EXCLUDING NALA AREA)

OPENSPACE AREA: 14.25 ACS(EXCLUDING NALA AREA)

656

104.3

7 M

19.57 M

656

656

CHIEF ENGINEER - 1TSIIC LIMITED,HYDERABAD

57.30 M

108.

52M

Page 2: S E Z A r e a 656 UDL - TSIICtsiic.telangana.gov.in/wp-content/uploads/2018/04/Shamshabad.pdf · udl udl roads area 15.58acs open space 16.27 acs 9.92acs utility 0.40acs plotted area

223.56M

EXISTG 18.00 M WIDE ROAD TO BE WIDENED TO 36.00M

36.38

M

PRO

P 12.20M W

IDE R

OA

D C

R2

Plotted Araea 54.31 Acs 55.70 %Roads Area 28. 86 Acs 29.60 %Under Tower Green Belt 01.67 Acs 01.71 %Open Space 09.78 Acs 10.02 %CFC 02.89 Acs 02.97 %

LAND USE ANALYSIS

AREA IN SY.NO:519 70.71AC

TOTAL AREA 97.51 ACS 100.00%AREA IN SY.NO:523 26.80AC

EXISTG 18.00 M WIDE ROAD

TO BE WIDENED TO 36.00M

AREA IN AC % OF AREAINDUSTRIAL PARK

REVISED LAYOUT PLAN OF IP NADERGUL IN SY.NO:519 & 523 OF NADERGUL(V),

SAROORNAGAR(M), R.R.DISTRICT.

T.S.I.I.C LTD. HYD.

6.25ACS

22.50ACS

45.00M M

ASTER PLAN ROAD

18.0M ROAD MR2

PROPSED

1

8.00 M

WID

E

ROAD MR1

2.00 ACS

1.40 ACS

C. F. C 1/2

0.92A

CS

PLOT NO:1/3/A

Area 0

.92Acs

BOUNDARIES T

O BE

SURVEYED &

EXIS

TG

WATERBODY

O S 2

55.31

M

365.00M277.82M

90.41M

119.87M

1.74ACSPLOT NO:3

45.00M M

P ROAD

PRIVATE L

AND SY.N

O:520 &

521

SY.NO:519

SY.N

O:52

4

SY.N

O:53

1

SY.N

O:54

2

SY.NO:544

SY.NO:522

SY.NO:507

SY.NO:509

SY.NO:517

SY.NO:518

SY.N

O:523

SY.NO:656

18.0M ROAD MR2

TO A

DIB

ATLA

ORR

TO H

YD

ERA

BA

D

TO N

AG

AR

JUN

A SA

GA

R

KEY PLAN

TO N

AD

ERG

UL

sy.no:656,Adibatla

ADIBATLA

ORR to NH 9

70.90

M

239.32M

358.12M

123.8

2M

162.3

1M104.34M

61.63M

147.45M

301.1

9M

110.6

8M

72.17

M

145.8

2M

172.8

8M

PRO

P 12.20M W

IDE R

OA

D C

R2

138.95M

1.67AC

S

OPEN SPACE 4

4.20 ACS

65.34M

240.97M

244.04M

PLOT NO: 6

2.70 AC

PLOT NO:5

113.73M

146.88M

83.72M

89.70M

54.12M

161.94M

152.00M

45.02

M25

.72M

83.16

M

175.43M

Prop 12.20 M R

oad CR

3

Prop 12.20 M R

oad CR

4

Plot 8/3

Plot 8/2

Plot 8/1Plot 8/6

Plot 8/5

Plot 8/4

Plot 8/9

Plot 8/8

Plot 8/7Plot 8/10

Plot 8/11

Plot 8/12

Plot 8/13 Plot 8/14

Plot 8/15

Plot 8/16

Plot 7/1

Plot 7/2

Plot 7/3Plot 7/6

Plot 7/5

Plot 7/4Plot 7/7

Plot 7/8Plot 7/9

Plot 7/10

27.44M

34.86M

36.30M

36.30M

27.44M

21.09M

48.53M

23.00M

38.92M

34.00M31.60M

26.03M

33x30.30M

1000 Sqm

1000 Sqm 1000 Sqm

1000 Sqm

1000 Sqm

500 Sqm

Open Space

1478 SqmProp 12.20 M Road MR3

1000 Sqm

738.00 Sqm738.00 Sqm 738.00 Sqm

738.00 Sqm

1000 Sqm 1000 Sqm

1460 Sqm

322 Sqm24.00M

16.23M25.82M

Plot 8/17

39.76M

42.78M

33.00M

30.44M

30.44M

33.00M3

0.44M

33.00M

33.00M

30.44M

Eq

Eq

Eq

Eq

22.40M

22.40M

33.00M

33.00M

33.00M

22.40M

22.40M

33.00M

33.00M

44.80M

44.80M

33.00M

27.00M

8.44M

38.80M

Prposed for Allotted to NOVA

24.83M

148.19M

PROP ROAD 12.20M--CR7

PLOT NO:1/1)

3.00 ACS

PLOT NO:1/2

2.00 ACS

PLOT NO:1/3/A4049.00SQM

C. F. C

1/1

2000

.00SQ

M

26.90

M

26.90

M

150.06 M

150.35 M

150.33 ACS

49.43M

53.80

M

53.80

M

53.90

M

53.90

M

81.10

M

81.10

M

144.29M

62.62

M

80.94

M

Plot 4/1

Plot 4/2

Plot 4/3

Plot 4/4

Plot 4/5

Plot 4/6

Plot 4/7

Plot 4/8

Plot 4/9

Plot 4/10Plot 4/11

Plot 4/12

Plot 4/13

Plot 4/14

Plot 4/16

Plot 4/15

Plot 4/17

Plot 4/18

Plot 4/19

Plot 4/20

Plot 4/22

Plot 4/21

Plot 4/24Plot 4/25

Plot 4/27

Plot 4/26

Plot 4/33

Plot 4/38

Plot 4/35

Plot 4/34

Plot 4/31

Plot 4/37

Plot 4/39

Plot 4/36

Plot 4/40

Plot 4/41

Plot 4/45

Plot 4/46

Plot 4/48

Plot 4/47

Plot 4/49

Plot 4/50

Plot 4/52

Plot 4/29

Plot 4/28

Plot 4/30

PROP 18.00M W

IDE ROAD CR5

18.0M ROAD MR4

27.00 M

30.00 M

40.48 M

36.00 M

55.56 M

2124.60Sqm

1122.85Sqm

1000.00Sqm

36.00M

36.00 M

36.00 M

36.00 M

37.87 M

27.00 M

36.56 M

36.56 M

36.56 M

36.56 M

36.56 M

1363.32Sqm

1392.65 Sqm

1154.80 Sqm

1383.00 Sqm

1111.00 Sqm

1341.00Sqm

1570.00 Sqm

1800.00Sqm

41.60 M

34.07 M

40.43 M

46.80M

1500 Sqm

36.00 M

27.78 M

27.78 M

27.78 M

36.83 M

1000.00Sqm

36.00 M

27.78 M

38.94

M

21.98 M49.76 M

38.31M

26.85M

30.05

M

905.00 Sqm

1223.00 Sqm

30.05

M

1058.00Sqm

1343.00Sqm

1000.00Sqm

1889.00Sqm 38.27 M

43.80 M

30.82 M

27.78 M

27.78 M

36.00 M

36.00 M

58.60 M

10.95

M09.61 M

26.55 M36.78 M

18.00 M

33.55 M

Area1

.0ACS

Plot

No:2/A81

.94MAre

a1.0A

CSPl

otNo:

2/B

Area1

.02ACS

PlotN

o:2/C

81.89

M

49.43M

50.66M

50.18M

17.06

M

64.89

M

PlotNo:2

/DAre

a 1.00

Acs

PlotNo:2

/EAre

a 1.00

Acs

PlotNo:2

/F81

.00M

81.00

M

81.00

M

82.28

M

50.00M

49.43M 50.00M

50.00M

50.00M

50.00M

43.89M

49.00M

72.70

M

36.56M

2000.00Sqm

36.00 M

2000.00Sqm

1500.00Sqm

1500.00Sqm55.56 M

55.56 M

55.56 M

55.56 M

55.56 M

55.56 M

27.00 M

27.00 M

27.00 M

27.00 M

36.00 M55.56 M

55.56 M

36.00 M X 55.56 M

44.96 M

55.74 M

55.56 M

55.56 M

1500.00Sqm

1600.00Sqm 27.42 M

59.59 M

53.16 M

36.00 M

36.00 M

36.00 M

36.00 M

36.00 M

36.00 M

36.00 M

41.66 M

41.66 M

55.56 M

55.56 M

55.56 M

55.56 M

36.00 M

36.00 M

36.00 M

36.00 M

36.00 M

36.00 M

36.56 M

2000.00Sqm

2000.00Sqm

2000.00Sqm

2000.00Sqm

1500.00Sqm

1500.00Sqm

27.00 M

27.00 M

49.05 M

56.40 M

Prop 12.20 M Road CR 6

875.00 Sqm

65.12 M

70.44

M

1500.00Sqm

1250.60Sqm 25.64 M

30.00 M

25.56 M

42.90 M

1500.00Sqm

27.00 M

27.00 M

27.00 M

27.00 M

1500.00Sqm57.94 M

9.14 M

36.00 M

1000.00Sqm

18.00 M

1273.00Sqm

27.83 M

29.39 M

25.00 M

1179.60 Sqm

34.53M

41.66 M

28.87 M

35.24 M

Plot 4/23

Plot 4/32

Plot 4/42

Plot 4/43

Plot 4/44

Plot 4/51

SCALE 1:3000

3.42ACS

141.08M

1.00 ACSC. F. C

63.28M

1.18ACS

OPEN SPACE 12.50acs142.74M

137.18M

72.31

M

11.49

M

PlotNo:2/G

123.21M

75.78

M

33.94

M

205.94M

25.38M

425.14M

AutoCAD SHX Text
TSIIC WALL
AutoCAD SHX Text
TSIIC WALL
AutoCAD SHX Text
N
AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
E
AutoCAD SHX Text
H.T.LINE
AutoCAD SHX Text
H.T.TOWER
AutoCAD SHX Text
H.T.TOWER
AutoCAD SHX Text
WELL
AutoCAD SHX Text
WELL
AutoCAD SHX Text
KUNTA
AutoCAD SHX Text
WIER TOP LEVEL 548.05
Page 3: S E Z A r e a 656 UDL - TSIICtsiic.telangana.gov.in/wp-content/uploads/2018/04/Shamshabad.pdf · udl udl roads area 15.58acs open space 16.27 acs 9.92acs utility 0.40acs plotted area

60' WIDE ROAD NO:22

60' WIDE ROAD NO:24

40' WIDE ROAD

40' WIDE ROAD

40' WIDE ROAD

40' WIDE ROAD

60' WIDE ROAD NO:25

40'

W

IDE

RO

AD

59

510

511

5 6 7 8 12

1 2 3 4 132 9

10

11

6 7 4A 4B

1 2

53

VII B

VII AVI 23 24 25 26 27 28 29 30 31 32 33 34

40' WIDE ROAD

60' WIDE ROAD NO:22

16

15

14

13

12

11

10

9

1

2/B

3

4

5

6

7

8

30 29 28 27 26 25

17 18

19

20

21

22

23 24

40' 0

"

WID

E

R

OA

D

40' WIDE ROAD

60'0" WIDE ROAD NO.20

60'0" WIDE ROAD NO.21

60'0" WIDE ROAD NO.14

11/B

11/A

10/B

10/A

12 13 14 15 16

56789 4 3 21/A

1/B

20A

20B191817

6 7 8 9 10

1 2/A 2 3/B 3/A 4 5

11

11C

11B

11A 11 10 9 8 7 6 5 4 3 2 1

11 10 9 8 7 6 5 4 3 2 1121314151617

1823

22

21

19

20

7

8

9 4 56A

6B

VAUVEC

322A1

11 12

9 10

7 8

5 6

3 4

1 2

1/A 1/B

B 37

1 2

3 4

5 6

7 8

9 10

11 12

1 2

3 4

5 6

7 8

9 10

11 12

1 2

3 4

5 6

7 8

9 10

11 12

1/A

1/B

1/C

2

3 4

60'0" WIDE ROAD NO.26

60'0" WIDE ROAD NO.27

60'

0"

WID

E

R

OA

D

NO

.8

1 2

3 4

5 6

7

9

11

13

15

17

19

21

23

25

8

10

12

14

16

18

20

22

24

26

7 8 1 2 3A 3B 11 12

9 10 4 5 6 1314/B

14/A

1 2 3 6

7

8

910A

10B1112131415

4

5

16

17

18

19

20

21

40' WIDE ROAD NO.1

40' WIDE ROAD NO.2

40' WIDE ROAD NO.3

40' WIDE ROAD NO.10

40' WIDE ROAD

40' WIDE ROAD NO.16

40' WIDE ROAD NO.17

40' WIDE ROAD NO.18

40' WIDE ROAD

60'0" WIDE ROAD NO.14

40' WIDE ROAD

40' WIDE ROAD

SERVICESTATION0.30Ac 0.30Ac

5/5 5/4 5/3

FDCAB E

G

H

I

J2

A

BC4 5/A 6

A 76B

6C

6D5/B

12A

2B

3 4 5

2A3A3C 6

2 3

7

4A

4B

4C

5A

5B

5C

8 9

1 2 3 4 5 6 7 8 9

10 11 12 13 14 15 16 17 18

1 2 3 4 5 6 7 8 9 10 11

12 13 14 15 16A

16B 17

3278

9B

9A

5

6

2A

2B

2D

2C

4A

4C4B

4D

789

5

621

4/A3/A 3/B

3/D 3/C 4C

4B

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

20 21 22 2324 25 26 27 28 29 30 31 32 3334 35 36 37 38

1 2 3 4 5

6 7 8 9 107A

123456789

10 11 12 13 14 15 16 17 18

OHT1234512

36 7 8 9 10

12345

12345

6 7 8 9 10

12345

6 7 8 9 10

12345

9 10

11

12

13

14

15

3B

3A

3E

8

7

6

5B5A4B4A

3A

3D

3C

2A2B2C2D2E

2F2G2H2I2J

1

1 2 3 4 5

910

11

128

7

6

1 2 34A4B4C

4 5 6 7

8

9A9B

1/A

1/B2

3

456

7

8

9/A 9/B

6

7

5432

891011

21 3 4A

4B 5

1B1A2345

678910

1 2 3 4 5

10 9 8 7 6

1

2345

1 2 3 4 5

10 9 8 7 6

1

2345

1

2

3

4

5

6

7

1 2 3 4 5 6

789101112

1234

5

1

2

3

4

5

6

7

8

9

10

11

1214

131517

1518

1 1

4 3

5 6

1 2

3/A

3/B

4/A

4/B

1

2

3

4

4 3 2 1

5

6

7

8 123456

7

89

10111213

14

SER

VIC

EST

AT

ION

5/

2

13A

13B

13E

13C13C

WE

IGH

T B

RIG

EIA IB

XIII

3536

4 5 6 7

56 57

8 9 10111213

141516171819202122

21 3 4 5

678910

60'

-0"

WID

ER

OA

DN

O :

4

80'

-0"

WID

ER

OA

D

TO HYDERABADEXISTING 200'-0" (60.00MTS.) WIDE NATIONAL HIGH WAY NO.9

TO VIJAYAWADA

GOVT.POLY TECHNIC

STORE SHED1.90 ac

100'

0"

WID

E

RO

AD

0.57 ACSAREA ALLOTTED TO M.C

PARKING1.90 AC

OPEN SPACE

OPEN SPACE1.26 ACS

100

'-0"

WID

ER

OA

DN

O:1

100

'-0"

WID

ER

OA

DN

O:1

80'

-0"

WID

ER

OA

DN

O:3REVISED INDUSTRIAL LAYOUT

PERMIT NO:67/MPU/A/99 NO.DT.27.9.2001FINAL LAYOUT IS RELEASED SUBTO THE FOLLOWING CONDITIONS.

THEIS APPROVAL DOES NOT BAR THEAPPLICATIONS OF THR PROVISION OF THEURBAN LAND [CEILING & REGULATION]ACT.1976 TO THE ABOVE LAND.

THIS FINAL LAYOUT APPROVAL DOES NOT CONFEROR FFECT OF OWNER SHIP BOUNDARY IS THE SOLERESPONSIBILITY OF THE APPRLICANT.

THIS FINAL LAYOUT AS RELEASED SUBJECT TO THECONDITION THAT THE XTERNAL DEVELOPMENT OFTHE SATELLITE TOWEN & SHIP OF APIIC LTD BY THEOWENER/PLOT HOLDER AS AND WHEN DEMANDEDBY.HYDERABAD URBAN DEVELOPMENT AUTHORITY.

THE REVISED LAYOUT APPROVAL GRANTED SUPERSEEDSTHE EARLIER LAYOUT PERMISSION GRANTED BY HUDAVIDE PERMT NO.3882/MPU/H/88 DATE:8-7-80 THE APIIC SHOULDSHRICTLY FROM THE ROAD [INCLUDING SIDE DRAINCARRIAGE WAY MEDIAN ETC] WITH B.T SURFACEAS PER STANDARDS & SPECITIONS.

THE OPEN SPACE EARMARKED IN THE LAYOUT SHALL BE DEVELOPED WITH GREENERY AND SHALL NOT BE USED FORANY OTHER PURPOSE THE APIIC SHOULD STRICTLY FOLLOWTHE G.O 4.2.3 AT THE TIME OF ACCORDING BULIDINGPERMISSIONS AS PER RULES IN FORCE THE EXISTING 40'-0" CART TRACT.

LINKIN TO RING ROAD TO AUTO NAGAR AS SHOWN IN THE PLANSHALL BE DEVELOPED BY APIIC AS ON ALTERNATIVE MAINAPPROACH ROAD .WITH BT SURFACE BY FOLLOWOWINGSPECIFICATIONS AND STANDARDS COKNER OF ROADSJUNCTIONS TO BE SPLAYED OR ROUNDED OFF.

N

LAND USE ANALYSIS I N D E X

TO BE APPROVED

SUB-DIVISION & CHANGESFOR INFORMATION

OPEN SPACE/GREEN AREAPARKING SPACE

EXISTING STRUTURESBOUNDARY

TRUE COPY

VICE CHAIRMANHYDERABAD URBAN DEVELOPMENT AUTHORITHY

A.P.I.I.C LIMITED HYDERABAD

REVISED LAYOUT PLAN OFAUTONAGAR HYDERABAD

SCALE :1:2000

OPE

N S

PAC

E

5.00MTB28

B19

B18

B17

B16

B15

B14

B13

B12

B11

5/3

B1

B2

B3

B4

B5

B6

B7

B8

B9

40'

W

IDE

RO

AD

60'

W

IDE

RO

AD

60'

W

IDE

RO

AD

60'

W

IDE

RO

AD

B 29

B 30B 42

B 43

B 10

B 20

B 21

B 22

B 33

B 34B 32

B 23

B24

B25

B26 B27

B35

B36A

B36

B38

B39

B40

B41

80'0" WIDE ROAD NO.19

EXISTING 40'0"

WIDE C

ART

TRACK TO BE W

IDENED TO 80'-0"

TO BE CONNECTED TO INNER RING ROAD

0.80

AC

OPE

N S

PAC

E

80'

-0"

WID

ER

OA

D

60'

0"

WID

E

RO

AD

N

O.7

40'

WID

E

RO

AD

40' WIDE ROAD

40'

WID

E

RO

AD

80'0" WIDE ROAD NO.19

40' WIDE ROAD NO.15

40' WIDE ROAD NO.13

40' WIDE ROAD NO.12

40' WIDE ROAD

40' WIDE ROAD NO.9

40' WIDE ROAD NO.7

40' WIDE ROAD NO.8

40' WIDE ROAD NO.6

40' WIDE ROAD NO.5

40' WIDE ROAD NO.4

R O

A

D

R O A D

60'0" WIDE ROAD NO.14

OPE

N S

PAC

E 0

.20A

CS

TELEPHONEEXCHANGE HOTEL

AREA ALLOTTED TOFILLING STATIONACS.0.67

XIPOSTAL & TELIGRAM

CFC AREA ALLOTTED TO P.H DEPT.FOR 3 MGOBALANCEING RESERVOIR

C.F.C1.20AC

SUMP

C F C

BWCFC

40'

0"

W

IDE

R

OA

D 4

0' 0

"

WID

E

RO

AD

40'

W

IDE

RO

AD

40'

WID

E

RO

AD

TOTAL PLOTTED AREA : ACS.128.55 58.09%

ROADS AREA : ACS. 60.15 27.18%

AREA UNDER COMMONFACILITIES : ACS. 9.92 04.48 %

GREEN AREA & PARKING : ACS. 22.87 10.25 %

TOTAL : ACS. 221.29 /100.00%

VICE CHAIRMANHYDERABAD URBAN DEVELOPMENT AUTHORITY

SD/- 27-9-2001

GENERAL MANAGER/E

""TRUE COPY ""

APIIC L;TD., HYD.

SD/- 27.9.2001

CERTIFIED TRUE COPY OF REVISED LAYOUT APPROVED

VICE CHAIRMAN

HYDERABAD URBAN DEVELOPMENT AUTHORITHY

SD/- 19.12.2001

OPE

N S

PAC

E

AC

S.1.

60

80'

-0"

WID

ER

OA

DN

O:3

100'

Page 4: S E Z A r e a 656 UDL - TSIICtsiic.telangana.gov.in/wp-content/uploads/2018/04/Shamshabad.pdf · udl udl roads area 15.58acs open space 16.27 acs 9.92acs utility 0.40acs plotted area

AREA 11.45 Acs

49.57 M

75.39 M

187.34 M

HT LINE

Plot No:6

Area :50.00 AC

PLOT: 4

PLOT NO: 9 AREA:ACS.21.60

PLOT NO: 9 PartAREA:27.67 AC

AREA 18.66 Acs

Plot-1

Area :2.00 Ac

AC.7.15 Ac

PLOT: 3Area :3.20 Ac

Area :10.00 Ac

PLOT: 5

Plot:11/PArea: 20.00 ac

Area 10.00AC

PLOT N0 21PRO

P 30.00 Mts. W

IDE

RO

AD

EXIS

TIN

G 2

4.00

M W

IDE

RO

AD

C.R

2

EXIS

TIN

G 2

4.00

M W

IDE

RO

AD

C.R

3

EXIS

TIN

G 2

4.00

M

W

IDE

RO

AD

C.R

5

EXIS

TIN

G

30.

00M

W

IDE

R

OA

D C

.R 6

175.30 M

342.52 M

317.

89 M

293.17 M

444.

65 M

426.28 M

104.05 M

373.

18 M

280.42 M

373.

29 M

155.95 M

112.

42 M

81.3

9 M

171.43 M

119.45M

135.

74M

32.56M

67.62M60.32M 31.25M 95.83M

279.

51 M

293.26 M

277.

08 M

116.

49 M

177.41 M

122.

10 M

163.90 M

116.13 M

161.

76 M

120.62 M

204.47 M

49.57 M

208.

68 M

59.04 M 21.63 M93.30 M

290.34 M

72.71 M

131.33 M

35.5

3

302.09 M

647.30 M

69.89

187.30 M 212.81 M 211.02 M 103.20 M 253.70 M

300.

19 M

135.00 M

OUTER RING ROAD

PRO

P 3

0.00

M

WID

E

RO

AD

NPC

R 1

EXSTING 45.00M WIDE APPROACH ROAD EXISTING 45.00M WIDE ROAD M.R 3

Exis

ting

6

4.00

M

ts.

wid

e

Sta

te

Hig

h w

ay

road

TO

SR

I SA

ILA

MT

O H

YD

ER

AB

AD

PRIVATE LAND

PRIVATE LAND

PRIV

ATE LA

ND

(Area :17.33 Ac)

NP-5AC-1.83Ac

155.

65 M

260.00 M

155.

65 M

260.00 M

CFC 31.37 Ac NP-1

AC-3.49 Ac

NP-2AC-3.49 Ac

290.34 M

NP-4AC.1.43 Ac

AC.4.06 Ac

HMDA land10.00 acres

N

Jann

iagud

a roa

d

T.S.I.I.C LTD. HYDERABAD.

AC.25.00 Ac

686.79 M

45.61 M

HUDA LAND

183.89 M

94.01 M

Srinagar(V), TEMPLEAC. 3.50 Ac

Ravi

ryal

(V),

TEM

PLE

Are

a:11

.55

AC

Jann

iagud

a roa

d

OUTER RING

ROAD

Vill

age

Are

a

Sy.No: 18

Sy.No: 18

HT LINE

HT LINE

PROPOSED 36.00 M WIDE APPROACH ROAD AS PER MASTER PLANPR

OP 30.00M

WID

E RO

AD

AS PER

M P

Are

a: 4

.27

ac

1.37Acs

OPEN SPACE 4O

PEN

SPA

CE 3

0.81Acs

0.49

Acs

OPEN SPACE

PRIVATE LANDS

1.72Acs 1.72Acs

3.71Acs

4.37Acs

3.61Acs

6.37 Ac

5.91 AC

4.45Acs

1.235Acs

3.59Acs

CR 4

P R O P O S E D 12.00M W I D E R O A D M.R 7

P R O P O S E D 12.00M W I D E R O A D M.R 6

CR 4

PROP

OSED

24

.00M

WID

E R

OAD

C.R1

GEN

ERAL

PAR

K

Plot-39

EXIS

TIN

G 3

0.00

M W

IDE

RO

AD

C.R

6

OPEN SPACE 2 1.10 Acs

2.46 Acres

238.22M

204.87 M

191.

00 M

TOTAL LAYOUT AREA

Temple Land (Srinagar) (-) 3.50AcsHMDA Land (-)25.00AcsTemple Land (Raviryal) &koneru (-)12.31AcsJennaiguda settlement (-) 4.27AcsApproach road to jennaiguda (-) 4.10AcsORR road area (-)19.77AcsApproach road from srisailam (-)17.71Acs

Deductions :

1152.64 Acs

C F C 1

N P-6

CFC / UTILITIES ZONE

CFC-2

Plot-38

OPEN SPACE 1

Area : 4.45 AC

venkatadas kunta

P R O P O S E D 18.00M W I D E R O A D M.R 9

P R O P O S E D 12.00M W I D E R O A D M.R 8

PROPOSED 18.00M WIDE ROAD NPR 2

1278.57Acs

7.86Acs

Buffer rd 1

Land taken from Rev. Dept.

ELECTRICALSUB-STATION

AC.10.00 Ac

ELECTRICALSUB-STATION

30.0

0 M

H

MD

A G

RID

RO

AD

30.0

0 M

H

MD

A

GR

ID R

OA

D

30.0

0 M

H

MD

A

GR

ID

R

OA

D

30.0

0 M

H

MD

A

GRI

D

RO

AD

EXISTING 24.00M WIDE ROAD M.R 1

N P-9

CFC-1

Area: 0.50 AcsPlot:17

Area: 0.50 AcsPlot:18

Area: 0.50 AcsPlot:19

Area: 0.50 AcsPlot:20

N P-7 N P-8

CFC - 2

CFC - 1

PLOT 7A - 4.00AC

COMMONFACILITIES-5

2.70 AC

HMWSSB7.72 AC

OPEN SPACE-418.23 AC

COMMON AMENITIES-27.13 AC

OS - 64.56 AC

GADDI KUNTA

EXIS

TIN

G 3

0.00

M W

IDE

RO

AD

C.R

2

Plot-42

Plot-41

Plot-40

EXIS

TIN

G 1

8.00

M W

IDE

RO

AD

C.R

4

Plot No:7/1 4.67 acres

Plot No: 22 Plot No: 23

Plot No: 24

Plot No: 26

Plot No: 25

Plot No: 29

Plot No: 27

Plot No: 28

Plot No: 310.88 ACS

Plot No: 32

Plot No: 34

Plot No: 33

PROP. 12.20 M WIDE ROAD M. R 6

Plot No: 35

PROP. 12.20 M WIDE ROAD M.R 5

PROP. 12.20 M WIDE ROAD M. R 7

AREA 1.45 ACS

AREA 0.88 ACS

AREA 1.35 ACS

AREA 0.86 ACS

AREA 0.88 ACS AREA 0.83 ACS

AREA 0.88 ACS AREA 0.78 ACS

AREA 1.06 ACS AREA 0.86 ACS

AREA 1.06 ACS AREA 0.82 ACS

CO

MM

ON

AM

ENIT

IES-

34.

00 A

C

COMMON AMENITIES- 16.70 AC

COMMONFACILITIES-6

-4.36 AC

Plot No:7/24.63 acres

PROPOSED 18 M WIDE ROAD M.R 1

Area: 7.00 acPlot:16

Area: 5.02 acPlot:15

Plot:14(c) AREA 3.00 ACS

Plot:14(A)AREA 5.00 AC

177.41 M

204.34 M

211.33 M

222.54 M

7.81 AcresOPEN SPACE 3

BUFF

ER-3

0

.83

AC

OS

1 -

0.82

AC

OS 2 - 1.21 AC

GREEN BELT- 2.30 AC

BUFFER-5 0.33 AC

3 M WIDE BUFFER-6 0.04 AC

BUFFER-7 0.57 AC

BUFFER-1 0.34 SS

EXISTING 45.00M WIDE ROAD M.R 3

PROPOSED 12.00M WIDE ROAD M.R 4

EXIS

TIN

G

30.

00M

W

IDE

R

OA

D C

.R 6

BUFFER AREA

OPEN SPACE 4 1.30AC

CFC-12.57 ACS

Plot No:7/32.30 ACS

Plot No:7/42.18 ACS

PERIPHERAL ROAD

PERIPHERAL ROAD PERI

PHER

AL R

OAD

PERI

PHER

AL

ROA

D

PER

IPH

ERA

L R

OA

D

PERI

PHER

AL

ROA

D

PERIPHERAL ROAD

PERI

PHER

AL R

OAD

- 2 (s

ez)

PLOT 1 - 0.91AC

PLOT 2 - 0.87AC

PLOT 3 - 0.82AC

PLOT 4 -3.53AC

PLOT 5 - 1.82AC

PLOT 6 - 2.04AC

PLOT 7 - 4.20AC

PLOT 8 -1.93AC

PLOT 9 - 1.93AC

PLOT 10 - 3.92AC

PLOT 11 - 2.00AC PLOT 12 - 2.00AC

PLOT 13 -3.92AC

PLOT 14 - 2.00AC

PLOT 15 - 2.00AC

PLOT 16 - 2.26AC PLOT 17 - 2.00

ACPLOT 18 - 2.00

ACPLOT 19 - 2.00

AC

PLOT 20 - 1.00AC

PLOT 21 - 1.00AC

PLOT 24 -1.96AC

PLOT 25 - 2.00AC

PLOT 26 - 2.00AC

PLOT 22 - 1.00AC

PLOT 23 - 1.00AC

PLOT 27 -4.50AC

PLOT 38 - 4.5AC

PLOT 28-3.00AC

PLOT 39 - 3.0AC

PLOT 29 - 3.0AC

PLOT 40 - 3.0AC

PLOT 30 -3.00AC

PLOT 41 - 3.0AC

PLOT 31-3.00AC

PLOT 42 - 3.0AC

PLOT 43-2.70AC

PLOT 33-2.70AC

PLOT 44 -2.70AC

PLOT 34 - 2.70AC

PLOT 45 - 2.70AC

PLOT 52 - 2.00AC

PLOT 54 -1.90AC

PLOT 56 - 3.28 AC PLOT 55 - 3.53 AC

PLOT 57 - 3.28 AC PLOT 58 - 2.95 AC

PLOT 59 - 1.50AC

PLOT 64 - 1.50AC

PLOT 65 -3.77 AC

PLOT 60 - 2.00AC

PLOT 61 - 2.00AC

PLOT 62 - 2.00AC

PLOT 63 - 2.00AC

PLOT 66 - 2.00AC

PLOT 67- 2.00AC

PLOT 68 - 2.00AC

PLOT 69 - 2.00AC

PLOT 70 - 2.92AC

PLOT 71 -2.02AC PLOT 72 - 2.00AC PLOT 73 -

1.40ACPLOT 74 -

2.00 ACPLOT 75 -

2.44AC

PLOT 76 - 2.27AC

PLOT 77 -3.58AC

PLOT 78 -2.40AC

PLOT 79 -1.50AC

PLOT 35 - 3.42AC

PLOT 36 -3.42AC

PLOT 37 -3.42AC

PLOT 513.20 AC

PLOT 50 3.4AC

PLOT 494.37 AC

PLOT 463.20AC

PLOT 47 3.4AC

PLOT 484.48 AC

PLOT 1 - 1.72AC

PLOT 2 -1.63AC

PLOT 3 - 1.80AC

PLOT 4 - 2.44AC

PLOT 5 -3.32AC

PLOT 6 - 4.6AC

PLOT 7 - 2.38AC

PLOT 8 - 3.37AC

PLOT 9 - 2.73AC

PLOT 10 -3.15 AC

PLOT 11-3.06AC

PLOT 12-3.18 AC

PLOT 13-3.32 AC

PLOT 14-3.73AC PLOT 15- 2.90

AC

PLOT 16- 1.82AC

PLOT 17-3.07AC

PLOT 18- 3.24 AC

PLOT 19-2.50AC

PLOT 20- 2.73AC

PLOT 21- 2.95AC

PLOT 22- 3.30AC

PLOT 23- 3.25AC

PLOT 24- 1.55 AC

PLOT 25- 2.89AC

PLOT 26- 2.89AC

PLOT 27- 2.89AC

PLOT 28- 1.50AC

PLOT 29 3.00AC

PLOT 30- 2.82AC

PLOT 31- 2.82AC

PLOT 32- 2.82AC

PLOT 33- 2.75AC

PLOT 34-5.00AC

PLOT 35- 4.93AC

PLOT 36- 3.72AC PLOT 37- 2.42

AC

COMPOUND WALL

COMPOUND WALL

COMPOUND WALL

COMPOUND WALL

COMPOUND WALL

COMPOUND WALLCOMPOUND WALL

COMPOUND WALL

REVISED COMPREHENSIVE LAYOUT OF ( FAB CITY) SEZ , ELECTRONICS MANUFACTURING CLUSTER & GENERAL INDUSTRIAL PARK IN RAVIRYAL & SRINAGAR (V), MAHESHWARAM (M), R.R, DIST,

0.88 ACS

PROPOSED 12 M WIDE ROAD MR -2

PROPOSED 12 M WIDE ROAD MR -3

PRO

POSE

D

30

.00

M

WID

E

R

OA

D C

R -

4

24.98 WATER BODIESINCLUDING BUFFER

WATER BODIES6.07 ACS INCLUDINGBUFFER AREA

BUFFER

WATER BODY 09.74 ACSINCLUDING BUFFER AREA

PROPOSED 18 M WIDE ROAD M.R 5A

venkatadas kunta (-)24.98AcsGaddi Kunta (-)06.07AcsWATER BODY at east side (-)09.74Acs

SCALE 1:5000

SEZ AREA

Processing Area (Exclusing tank) 267.52 Acs

Non processing area 44.15 Acs

NON SEZ AREA

EMC Area (Excluding Tanks) 595.71 AcsGeneral IP 243.74 Acs

Total layout area 1151.12 Acs

AREA STATEMENT

::::::::::

:

::

:

PLOT NO 36 - 50 AC

SECTOR WISE AREA

:

18

111

112

113

114/1

114/2

88

2524

23

2221

31

30

29

59

6061

62

26

28

27

58

6564

63

67

66

5756

55

54

53

52

44

4542

4036 33

35

34

3841

46

47

49

50

69

70

68

86

87

85

84

71

72

73

74

75

80

81

82

83

7879

7776

51

39

48

43

37

18

114/1

32

KEY PLAN

FAB CITY

OUTER RING ROAD

SRIS

AIL

AM

HIG

HW

AY

NAGARJUNA

SAGAR HIGH WAY

LANDUSE ANALYSIS OF FAB CITY AREA IN AC PERCENTAGE OF AREA

Total Area 1151.12 100.00 %

Plotted Area 762.58 66.25%

Roads Area 178.39 15.50%

Open Space 122.41 10.63%

Common Facilities 87.75 7.62%

Number Of Plots No 171

NOT TO SCALE

PROPOSED 45M WIDE MASTERPLAN ROAD

Plot:14(B)AREA 2.46 AC

88.61 M

182.

66 M

89.3

7 M

PLOT 32 - 2.70AC

95.97 M

81.6

8 M

104.11 M

PLOT 53 -5.40AC

BUFFER

OS-31.77ACS

OPEN SPACE -5 Area:4.80 Ac

Plot:13AREA 2.72 AC

PLOT NO:10AREA:7.76AC

PLOT:850.00 ACS

135.

47 M

Plot No: 300.75 ACS

Plot-40/A

OS

7- 1

.45

AC

OS 4

OS-50.21ACS

1.30 ACSOS 6

192.

09 M

30 M W

IDE ROAD

30 M WIDE ROAD

30 M WIDE ROAD

30 M WIDE ROAD

AREA 9.83AcsPRO

POSE

D 2

4.00

M W

IDE

RO

AD

C.R

1

24.00M WIDE ROAD

PLOT NO:S2/1

PLOT NO:S2/2AREA:6.94Acs

181.22 M

181.22 M

138.

57 M

183.65 M

171.

32 M

249.

70 M

18M W

IDE

RO

AD

18M W

IDE

RO

AD

OPEN SPACE1.40acs

AREA 4.44 Acs

AREA 4.33 Acs

96.75 M

AREA 2.00 AcsAREA 0.41 Acs

PLOT NO:S2/15

45.6

2M

AREA 0.82 Acs AREA 0.82 Acs

AREA0.50 Acs AREA 0.52Acs

AREA 0.41 Acs AREA 0.50 Acs

Plot-1(P)/A

Plot-1(P)/B

Plot-1(P)/C

Plot-1(P)/D

PLOT NO:S2/5 PLOT NO:S2/6

PLOT NO:S2/7 PLOT NO:S2/8

PLOT NO:S2/10PLOT NO:S2/9

PLOT NO:S2/11PLOT NO:S2/12

204.67 M89.77 M

178.87 M

128.23 M

63.64 M114.14 M

46.47 M45.16 M

AREA 0.41 Acs

PLOT NO:S2/16

AREA 0.43 Acs

PLOT NO:S2/14

AREA 0.44 Acs

PLOT NO:S2/13

53.78 M

AREA 0.73 Acs AREA 0.73Acs

PLOT NO:S2/3PLOT NO:S2/4

AREA 0.63 AcsAREA 0.70Acs

55.13 M 55.21 M

59.69 M59.87 M

57.7

8 M

57.9

8 M

64.23 M31.85 M

52.6

8 M

52.8

8 M

44.70 M 44.66 M

44.81 M30.15 M

44.7

7 M

57.9

8 M

53.61 M

OPEN SPACE 3.50ACS

OPEN SPACE 1.32ACS

30 M W

IDE ROAD

30 M WIDE ROAD 30 M WIDE ROAD 30 M WIDE ROAD

24.00M WIDE ROAD

PROCESSING AREA IN SEZ OF FAB CITY

NON PROCESSING AREA IN SEZ OFFAB CITY

GENERAL PARK

EMC e CITY - 603.52 Acres

EXIS

TIN

G 2

4.00

M W

IDE

RO

AD

C.R

1

Plot:11/P2Area: 15.97 ac

Plot:11/P3Area: 11.63 ac

Plot:11/P4Area: 13.71Ac

Area: 9.43 acManufacturing Support Facilities

Plot:11/P1

Plot:13 P1AREA 5.78 AC

Plot:13 P2AREA 6.82 AC

PLOT 6 A-1.44 AC

LEGEND

BUFFER AREABUFFER AREA

BUFFER AREA

BUFFER AREA

BUFFERBUFFER

BUFFERBUFFER

BUFFER

koneru0.76 Ac

53.05 M

58.3

7 M

58.3

4 M

52.41 M

PLOT 24/A- 0.77 AC

PROPOSED 30.00 Mts. WIDE ROAD - NPR 1

TSIIC LAND Area :2.09Ac

33.3

5M

24.9

0M

74.0

5 M

74.7

9 M

78.61 M

78.8

0 M

185.05 M

183.68 M 111.92 M

119.00 M

64.1

5 M

64.29 M

185.57 M

3.31Acs

P R

O P

O S

E D

2

4.00

M

W I

E E

R

O A

D

C.R

2 G

ENER

AL

PARK

4.67Acs

5.41Acs

3.99 Acs

4.65 Acs

CFC-3

CFC-4

CFC-5

CFC-6

P R O P O S E D 18.00M WIDE ROAD P R O P O S E D 18.00M WIDE ROAD

Sy.No: 18

HT LINEO S - 3

COMMON AMENITIES-42.22 AC

Page 5: S E Z A r e a 656 UDL - TSIICtsiic.telangana.gov.in/wp-content/uploads/2018/04/Shamshabad.pdf · udl udl roads area 15.58acs open space 16.27 acs 9.92acs utility 0.40acs plotted area

WOMEN ENTREPRENEURS

INDUSTRY ZONE

U

N

I

V

E

R

S

I

T

Y

Z

O

N

E

GENERAL ENGINEERING ZONE-V

MICRO SMALL AND MEDIUM ENTERPRISES ZONE

COMMERCIAL

ZONE

GENERAL ENGINEERING ZONE-II

E

X

I

S

T

I

N

G

1

5

.

3

0

M

W

I

D

E

R

O

A

D

P

A

R

K

E

X

I

S

T

I

N

G

1

0

M

W

I

D

E

R

O

A

D

E

X

I

S

T

.

1

0

M

W

I

D

E

R

O

A

D

E

X

I

S

T

.

1

5

.

3

0

M

W

I

D

E

R

O

A

D

E

X

I

S

T

.

1

5

.

3

0

M

R

O

A

D

R

1

R

2

R

3

R

4

M

R.N

O.1

a

A

c

.

0

.

2

2

A

c

.

0

.

0

7

A

c

.0

.3

1

E

X

I

S

T

.

2

4

.

0

0

M

W

I

D

E

R

O

A

D

E

X

I

S

T

.

2

4

.

0

0

M

W

I

D

E

R

O

A

D

M

R

.

N

O

.

2

M

R

.

N

O

.

3

E

X

I

S

T

.

2

0

.

0

0

M

W

I

D

E

R

O

A

D

E

X

I

S

T

I

N

G

1

5

.

3

0

M

S

E

R

V

I

C

E

R

O

A

D

M

R

.

N

O

.

6

M

R

.

N

O

.

5

R

O

AD

M

R

.

N

O

.

6

0

.

4

0

A

c

s

2

1

6

.

6

6

M

2

4

4

.

9

9

M

2

4

1

.

3

9

M

294.9

8 M

352.3

3 M

3

6

5

.

6

4

M

4

4

1

.

4

6

M

108.8

5 M

MR.NO.9a

125.8

1M

1

1

6

.9

6

M

1

2

9

.

7

6

M

70.62M

224.67M

159.62M

1

2

6

.

3

3

M

1

5

4

.

1

6

M

1

0

1

.

4

5

M

4

4

.

2

1

M

3

9

3

.

0

4

M

1

5

0

.

2

5

M

1

3

0

.

3

4

M

1

5

4

.

2

4

M

3

2

3

.

2

2

M

236.9

1M

119.2

0M

1

3

8

.

2

0

M

1

4

9

.

9

4

M

1

0

6

.

7

5

M

8

6

.

4

1

M

1

1

8

.

0

1

M

1

3

2

.

0

2

M

2

1

1

.

9

8

M

259.6

1M

1

4

0

.1

3

M

6

2

.

4

1

M

1

7

2

.

5

6

M

1

0

3

.

7

4

M

5

7

.6

5

M

5

5

.9

8

M

4

2

.

3

8

M

156.89M

1

0

7

.

4

1

M

64.23M

T

A

N

D

A

A

c

.

9

.

0

3

M

R

.

N

O

.

1

1

P

R

O

P

1

5

.

3

0

M

S

E

R

V

I

C

E

R

O

A

D

M

R

.

N

O

.

1

4

P

R

O

P

. 1

5

.3

0

M

W

I

D

E

R

O

A

D

P

R

O

P

. 1

5

.3

0

M

W

I

D

E

R

O

A

D

P

R

O

P

1

5

.3

0

M

S

E

R

V

IC

E

R

O

A

D

M

R

.

N

O

.

1

0

P

R

O

P

1

5

.

3

0

M

S

E

R

V

I

C

E

R

O

A

D

4

4

1

.

4

6

M

6

5

7

.

9

6

M

6

0

.

9

5

M

179.50M

62.09M

M

R

.

N

O

.

1

2

M

R

.

N

O

.

1

2

(REHABILITATION for)

HOUSING (5.09Acs)

(MUDIREDDYPALLY)

GRAVE YARD FOR

MUDIREDDYPALLY

1.00Acres

1

.

0

0

A

c

s

G

r

a

v

e

y

a

r

d

-

1

6

5

.

6

7

m

1

2

3

.

5

5

m

139.92m

O

P

E

N

&

C

O

M

M

U

N

I

T

Y

C

O

M

M

U

N

IT

Y

H

A

L

L

P

U

R

P

O

S

E

S

S

C

H

O

O

L

&

3

1

7

.1

3

M

1

4

1

.0

7

M

7

0

.

8

8

M

2

0

6

.

0

9

M

6

0

.

6

2

M

5

.

7

2

A

c

.

A

c

. 0

.9

9

3

4

9

.

7

0

M

1

3

0

.

4

3

M

O

P

E

N

S

P

A

C

E

A

C

2

.

9

3

GREEN INDUSTRY ZONE-III

E

X

I

S

T

I

N

G

3

6

.

0

0

M

W

I

D

E

R

O

A

D

E

X

I

S

T

I

N

G

3

6

.

0

0

M

W

I

D

E

R

O

A

D

E

X

I

S

T

I

N

G

2

4

.

0

0

M

W

I

D

E

R

O

A

D

E

X

I S

T

I N

G

3

6

.0

0

M

W

I D

E

R

O

A

D

E

X

I

S

T

I

N

G

4

5

.

0

0

M

W

I

D

E

R

O

A

D

E

X

I

S

T

.

2

4

.

0

0

M

W

I

D

E

R

O

A

D

5

.7

2

A

C

S

P

R

O

P

1

5

.

3

0

M

S

E

R

V

I

C

E

R

O

A

D

B

-

2

1

B

-

1

5

B

-

1

4

B

-

1

0

B

-

9

B

-

1

6

B

-

8

B

-

1

9

6

5

7

.

9

6

M

68.49M

160.68M

6

9

.

3

1

M

101.5

4M

1

2

6

.

3

3

M

1

5

4

.

1

6

M

C

R

N

O

.

2

E

X

I

S

T

I

N

G

3

6

.

0

0

M

W

I

D

E

R

O

A

D

C

R

N

O

.

3

E

X

I

S

T

I

N

G

2

4

.

0

0

M

W

I

D

E

R

O

A

D

C

R

N

O

.

4

E

X

I

S

T

I

N

G

3

6

.

0

0

M

W

I

D

E

R

O

A

D

C

R

N

O

.

5

M

R

.

N

O

.

1

2

P

R

O

P

.

1

5

.

3

0

M

W

I

D

E

M

R

.

N

O

.

6

1

4

3

.9

5

M

1

6

0

.8

1

M

1

3

3

.2

1

m

86.8

9m

7

5

.

1

5

M

1

1

8

.

0

1

M

1

3

2

.

0

2

M

0

.

2

9

A

c

s

M

R

.

N

O

.

1

09

1

.

1

6

m

1

2

6

.

4

7

m

1

1

2

.

3

7

M

GENERAL ENGINEERING ZONE-III

G

E

N

E

R

A

L

E

N

G

I

N

E

E

R

I

N

G

Z

O

N

E

-

I

V

G

E

N

E

R

A

L

E

N

G

I

N

E

E

R

I

N

G

Z

O

N

E

-

I

GENERAL ENGINEERING ZONE-VI

GENERAL ENGINEERING ZONE-VIII

GENERAL ENGINEERING ZONE-IX

2

1

3

.

7

6

M

2

4

2

.

3

0

M

90.3

4 M

1

2

6

.

0

0

M

172.8

5 M

1

0

1

.

0

6

M

E

X

I

S

T

I

N

G

4

5

.

0

0

M

W

I

D

E

R

O

A

D

8

9

.

4

5

A

C

S

M

A

N

D

A

L

'

S

U

N

I

V

E

R

S

I

T

Y

B

-

8

S

H

I

E

V

I

L

E

P

A

R

L

E

K

E

L

A

V

A

N

I

E

X

I

S

T

I

N

G

3

6

.

0

0

M

W

I

D

E

R

O

A

D

C

R

N

O

.

5

E

X

I

S

T

.

2

4

.

0

0

M

W

I

D

E

R

O

A

D

G

2

1

,

G

2

2

&

G

2

3

G

2

4

L

&

T

L

i

m

i

t

e

d

P

lu

s

V

e

n

tila

tio

n

G

2

5

/A

&

G

2

6

G

2

5

/

B

M

R

.

N

O

.

2

O

P

E

N

S

P

A

C

E

A

C

1

1

.

3

2

15

3

6

3

.

5

9

M

3

3

0

.

6

1

M

8

4

.

9

4

M

G

1

1

&

1

2

/

A

G

1

3

/

B

G

1

4

G

1

5

G

1

6

G

1

7

G

1

8

G

1

9

G

2

0

K

e

n

e

t

i

c

G

e

n

c

o

G

-

1

2

/

B

&

G

1

3

/

A

S

h

a

r

p

I

n

t

e

r

n

a

t

i

o

n

a

l

E

X

I

S

T

I

N

G

4

5

.

0

0

M

W

I

D

E

R

O

A

D

P

R

O

P

1

5

.

3

0

M

S

E

R

V

I

C

E

R

O

A

D

G

3

G

4

G

6

G

7

G

9

/

C

G

9

/

A

G

1

0

T

h

e

r

m

o

C

a

b

l

e

s

B

-

1

8

G

1

T

h

e

r

m

o

C

a

b

l

e

s

G

2

/

B

E

X

I

S

T

I

N

G

3

6

.

0

0

M

W

I

D

E

R

O

A

D

C

R

N

O

.

2

M

R

.

N

O

.

1

2

G

E

N

E

R

A

L

E

N

G

I

N

E

E

R

I

N

G

Z

O

N

E

-

V

I

I

1

0

0

.

0

0

M

1

6

7

.

5

0

M

9

3

.

4

5

M

60.27 M

21.41 M

1

0

0

.

0

0

M

8

0

.

0

0

M

E

X

I

S

T

I

N

G

3

6

.

0

0

M

W

I

D

E

R

O

A

D

E

X

I

S

T

I

N

G

3

6

.

0

0

M

W

I

D

E

R

O

A

D

E

X

I

S

T

I

N

G

4

5

.

0

0

M

W

I

D

E

R

O

A

D

E

X

I

S

T

.

3

6

.

0

0

M

W

I

D

E

R

O

A

D

L

1

9

L

2

0

L

2

1

L

2

2

L

2

8

L

2

7

L

2

6

L

2

5

L

2

4

B

R

G

E

n

e

g

r

y

L

2

3

M

R

.

N

O

.

1

E

X

I

S

T

I

N

G

3

6

.

0

0

M

W

I

D

E

R

O

A

D

E

X

I

S

T

.

3

6

.

0

0

M

W

I

D

E

R

O

A

D

E

X

I

S

T

.

2

0

.

0

0

M

W

I

D

E

R

O

A

D

J

a

i

s

u

n

g

c

o

n

t

r

o

l

s

A

d

i

D

i

a

g

L

2

9

/

B

L

3

0

L

3

1

L

3

2

L

3

3

L

3

4

L

3

5

(

B

1

)

L

4

1

&

L

4

2

L

4

0

L

3

6

(

B

)

L

3

5

(

A

)

L

3

6

(

A

)

B

a

l

a

j

i

P

e

t

S

V

R

E

le

c

tric

a

ls

L

3

5

-

B

2

E

X

I

S

T

.

3

6

.

0

0

M

W

I

D

E

R

O

A

D

L

2

9

/B

V

is

io

n

T

e

c

h

V

J

A

P

S

L

3

5

-

B

3

L

3

9

1

2

1

.

1

6

M

1

3

0

.

3

4

M

1

5

4

.

2

4

M

3

2

3

.

2

2

M

1

.

0

0

A

c

s

1

.

0

0

A

c

s

1

.

0

0

A

c

s

1

.

0

0

A

c

s

0

.

4

8

A

c

s

1

.

0

0

A

c

s

1

.

0

0

A

c

s

0

.

4

0

A

c

s

M

R

.

N

O

.

1

M

R

.

N

O

.

5

L

3

7

&

L

3

8

O

M

S

H

E

E

L

T

S

C

P

D

C

L

4

0

4

6

8

.

4

0

S

q

m

o

r

1

0

.

0

0

A

c

s

236.9

1M

119.2

0M

1

0

6

.

4

7

M

2

8

0

.

0

0

m

1

4

4

.

5

3

M

136.4

1 M

1

1

3

.

7

9

M

1

0

9

.

6

6

M

88.9

5 M

91.0

7 M

7

.

6

1

A

c

.

O

P

E

N

S

P

A

C

E

10

MSME

Block-1

MSME

Block-2

MSME

Block-3

MSME

Block-4

M

S

M

E

B

l

o

c

k

-

5

MSME

Block-6

M

S

M

E

B

l

o

c

k

-

7

M

S

M

E

B

l

o

c

k

-

8

M

S

M

E

B

l

o

c

k

-

9

M

S

M

E

B

l

o

c

k

-

1

0

M

S

M

E

B

l

o

c

k

-

1

1

M

S

M

E

B

l

o

c

k

-

1

2

M

S

M

E

B

l

o

c

k

-

1

5

M

S

M

E

B

l

o

c

k

-

1

4

M

S

M

E

B

l

o

c

k

-

1

3

6

.

0

0

M

4

0

.

0

0

M

4

0

.

5

8

M

E

X

I S

T

I N

G

3

6

.0

0

M

W

I D

E

R

O

A

D

C

R

-

1

L

1

/

A

A

u

t

o

m

o

t

i

v

i

e

s

D

a

r

s

h

a

n

L

o

g

i

s

t

i

c

s

E

X

I

S

T

.

1

5

.

0

0

M

W

I

D

E

R

O

A

D

2

5

M

X

4

0

M

2

5

M

X

4

0

M

P

R

O

P

1

5

.

0

0

M

W

I

D

E

R

O

A

D

P

R

O

P

1

5

.

0

0

M

W

I

D

E

R

O

A

D

P

R

O

P

1

5

.

0

0

M

W

I

D

E

R

O

A

D

P

R

O

P

1

5

.

0

0

M

W

I

D

E

R

O

A

D

P

R

O

P

1

5

.

0

0

M

W

I

D

E

R

O

A

D

2

5

M

X

4

0

M

2

5

M

X

4

0

M

L

1

/

B

&

L

2

/

A

1

6

0

0

0

.

0

0

S

q

m

o

r

3

.

9

5

A

c

s

C

R

N

o

.

1

4

C

R

N

o

.

1

3

C

R

N

o

.

1

2

C

R

N

o

.

1

1

C

R

N

o

.

1

0

C

R

N

o

.

9

E

X

I

S

T

.

1

5

.

0

0

M

W

I

D

E

R

O

A

D

M

R

.

N

O

.

7

M

R

.

N

O

.

6

2

5

M

X

4

0

M

3

6

.

5

0

M

X

2

7

.

5

0

M

3

6

.

5

0

M

X

2

7

.

5

0

M

3

6

.

5

0

M

X

2

7

.

5

0

M

4

0

.

0

0

M

2

5

.

0

0

M

2

5

.

0

0

M

2

3

.

5

4

M

2

5

.

0

0

M

2

5

.

0

0

M

2

3

.

5

4

M

2

3

.

5

4

M

2

5

.

0

0

M

2

5

.

0

0

M

2

5

.

0

0

M

4

4

.

1

5

M

6

6

.

1

5

M

2

5

.

0

0

M

2

5

.

0

0

M

2

4

.

2

5

M

1

1

5

.

8

3

M

2

5

.

0

0

M

2

5

.

0

0

M

2

5

.

0

0

M

2

5

M

X

4

0

M

P

r

o

p

.

1

5

.

0

0

M

W

I

D

E

R

O

A

D

(

M

R

1

7

)

CZONE-2

C-ZONE-1

S

-

B

l

o

c

k

-

1

S

-

B

l

o

c

k

-

2

S

-

B

l

o

c

k

-

3

S

-

B

l

o

c

k

-

4

E

X

I

S

T

I

N

G

3

6

.

0

0

M

W

I

D

E

R

O

A

D

E

X

I

S

T

I

N

G

4

5

.

0

0

M

W

I

D

E

R

O

A

D

M

/

s

.

A

U

R

A

B

I

N

D

O

P

H

A

R

M

A

M

/

s

.

A

.

P

.

L

.

H

E

A

L

T

H

C

A

R

E

5

7

0

M

X

3

1

9

.

5

0

M

=

4

5

.

0

0

A

c

s

5

7

0

M

X

2

1

3

M

3

0

.

0

0

A

c

s

E

X

I

S

T

.

2

4

.

0

0

M

W

I

D

E

R

O

A

D

E

X

I

S

T

I

N

G

2

4

.

0

0

M

W

I

D

E

R

O

A

D

O

P

E

N

S

P

A

C

E

P

R

O

P

1

5

.3

0

M

S

E

R

V

IC

E

R

O

A

D

S

1

(

A

)

S

1

(

B

)

S

3

S

4

S

8

S

9

S

1

4

/

B

S

2

6

S

1

6

S

1

7

S

1

8

S

2

0

S

2

1

S

2

2

S

2

3

S

2

4

/

A

S

2

5

P

H

A

R

M

A

F

O

R

M

U

L

A

T

I

O

N

S

S

E

Z

E

p

s

i

l

o

n

P

h

a

r

m

a

c

e

u

t

O

p

t

i

m

u

s

R

a

i

c

h

e

m

P

h

a

r

m

a

M

/

s

.

H

E

T

E

R

O

D

R

U

G

S

6

6

.

0

0

A

c

.

M

/

s

.

H

E

T

E

R

O

L

A

B

1

2

6

M

x

2

9

0

M

=

9

.

0

0

A

c

s

2

0

4

.

1

4

M

224.67M

159.62M

6

.

7

7

A

c

.

R

a

i

c

h

e

m

P

h

a

r

m

a

S

2

4

/

B

S

5

/

A

1

7

2

.

5

6

M

1

0

3

.

7

4

M

5

7

.6

5

M

5

5

.9

8

M

4

2

.

3

8

M

156.89M

1

0

7

.

4

1

M

64.23M

2

.

0

6

A

c

.

T

A

N

D

A

3

O

P

E

N

S

P

A

C

E

1

1

.

2

1

A

c

.

4

C

R

N

O

.

6

E

X

I

S

T

I

N

G

2

4

.

0

0

M

W

I

D

E

R

O

A

D

C

R

N

O

.

7

C

R

N

O

.

6

M

R

.

N

O

.

4

M

R

.

N

O

.

4

MR.NO.13

P

R

O

P

. 1

5

.3

0

M

W

I

D

E

R

O

A

D

S

2

A

1

t

o

A

1

1

S

2

/

B

PROP. 15.30M ROAD

1

8

.

4

4

M

89.32M

3

1

3

.

3

7

M

2

9

4

.

4

9

M

2

4

.

5

0

M

S

1

4

/

A

S

5

/

B

S

6

S

7

S

-

B

l

o

c

k

-

6

S

-

B

l

o

c

k

-

5

5

7

0

.

0

0

M

5

7

0

.

0

0

M

1

9

3

.

0

8

M

5

7

0

.

0

0

M

O

P

E

N

S

P

A

C

E

4

.

8

7

A

c

.

13

2

4

8

.

9

0

m

1

0

0

.

0

0

M

1

0

0

.

0

0

M

259.6

1M

1

4

0

.1

3

M

M

R

.N

O

.10

3

6

.8

1

m

1

1

6

.

5

3

M

9

2

.

0

4

M

245.20 M

1

4

0

.1

3

M

6

2

.

4

1

M

0

.

4

2

A

c

.

5

M

R

.

N

O

.

1

3

8

0

.

0

0

M

2

3

4

.1

2

M

1

8

0

.

0

0

M

7

2

.6

7

M

5

9

.2

4

M

5

8

.5

3

M

4

4

.3

4

M

147.1

6 M

10.90 M

1

5

.

1

6

M

1

3

8

.

5

4

M

9

9

.

2

3

M

4

3

.

1

2

M

2

7

6

.

7

7

M

4

5

.

3

9

M

7

8

.

0

8

M

1

4

0

6

.

0

0

M

2

7

6

.

9

8

M

G

R

E

E

N

B

E

L

T

E

X

I

S

T

I

N

G

1

0

.

0

0

M

W

I

D

E

R

O

A

D

E

X

I

S

T

.

2

4

M

W

I

D

E

R

O

A

D

3

1

7

.1

3

M

1

4

1

.0

7

M

7

0

.

8

8

M

2

0

6

.

0

9

M

R

E

H

A

B

I

L

I

T

A

T

I

O

N

H

O

U

S

I

N

G

C

O

L

O

N

Y

A

c

.

2

0

.

0

6

C

R

N

O

.

8

R

1

0

R

9

R

8

R

7

R

6

R

5

MR

.NO

.14

E

X

I

X

T

I

N

G

4

5

.

0

0

M

W

I

D

E

R

O

A

D

1

0

4

.

4

5

M

1

0

1

.

2

0

M

9

4

.

3

0

M

9

4

.

3

0

M

G

R

A

V

E

Y

A

R

D

-

2

5

.

0

0

A

c

.

E

X

I

S

T

I

N

G

1

0

.

0

0

M

W

I

D

E

R

O

A

D

E

X

I

S

T

I

N

G

1

0

.

0

0

M

W

I

D

E

R

O

A

D

E

X

I

S

T

I

N

G

1

0

.

0

0

M

W

I

D

E

R

O

A

D

E

X

I

S

T

I

N

G

1

0

.

0

0

M

W

I

D

E

R

O

A

D

E

X

I

S

T

I

N

G

1

0

.

0

0

M

W

I

D

E

R

O

A

D

B

o

r

e

w

e

l

l

1

3

.

3

6

M

8

.

0

M

A

C

1

.

2

6

2

O

P

E

N

S

P

A

C

E

E

X

I

S

T

I

N

G

1

0

.

0

0

M

W

I

D

E

R

O

A

D

1

0

M

t

R

O

A

D

R

1

2

R

1

1

3

9

.

9

5

M

1

0

7

.

6

9

M

2

2

.

5

3

M

1

0

0

.

6

3

M

7

3

.

8

3

M

6

0

.

4

8

M

93.3

3 M

5

2

.5

0

M

2

6

0

.

0

0

M

P

R

O

P

2

4

M

W

I

D

E

R

O

A

D

C

R

N

O

.

7

3

5

1

.

9

4

M

2

7

8

.2

5

M

1

4

7

.

1

0

M

9

7

.

3

1

M

7

9

.2

4

M

1

1

.

1

2

A

c

.

9

0

.

0

0

M

1

9

3

.

0

8

M

1

7

5

.

6

2

M

1

7

5

.

6

2

M

WEI ZONE-3

22.21 Ac.

WEI ZONE-1

14.83 Ac.

7

1

.

4

5

M

GREEN INDUSTRY

ZONE-I

5.36 Ac.

GREEN INDUSTRY ZONE-II

14.50 Ac.

M

R

.

N

O

.

9

P

A

R

K

P

A

R

K

P

A

R

K

N

PROPOSED

GREEN PARK

N

LOCATION PLANK

a

r

t

h

i

k

e

y

a

P

-

3

P

-

4

P

-

6

P

-

1

/

B

L

e

e

s

a

M

G

R

M

A

M

R

O

N

C

O

P

-

5

E

L

L

E

N

B

A

R

R

I

E

P

-

9

/

B

P

-

1

/

A

P

-

2

E

X

I

S

T

I

N

G

3

6

.

0

0

M

W

I

D

E

R

O

A

D

C

R

N

O

.

5

P

-

1

/

A

1

1

2

0

M

X

1

7

2

M

5

8

.

0

1

M

2

3

.

7

2

M

2

5

.

0

0

M

2

5

.

0

0

M

2

5

.

0

0

M

2

1

.

8

8

M

6

6

.

6

2

M

6

6

.

6

0

M

6

1

.

7

4

M

2

5

.

0

0

M

2

5

.

0

0

M

2

5

M

X

4

0

M

P

R

O

P

1

5

.

0

0

M

W

I

D

E

R

O

A

D

C

R

N

o

.

1

7

2

5

.

0

0

M

2

5

.

7

5

M

1

7

8

7

1

.

4

5

M

5

4

.

5

0

M

4

5

.

0

0

M

4

5

.

0

0

M

5

4

.

5

0

M

9

1

0

1

1

1

2

5

0

.

0

0

7

1

.

4

5

M

7

1

.

4

5

M

5

0

.

0

0

5

0

.

0

0

5

0

.

0

0

1

2

0

.

3

5

M

1

2

0

.

3

5

M

5

6

.

2

1

M

6

9

.

6

1

M

1

3

1

4

4

9

.

5

0

M

5

0

.

6

8

M

5

3

.

7

1

M

7

4

.1

8

M

P

R

O

P

.

2

4

.

0

0

M

W

I

D

E

R

O

A

D

(

M

R

8

)

7

5

M

X

1

1

0

M

1

5

1

9

2

1

2

3

2

2

2

4

3

5

16.03 Ac.

9

0

.

0

0

M

WEI ZONE-2

13.54 Ac.

2

9

3

0

7

5

M

X

1

1

0

M

7

5

M

X

1

1

0

M

3

6

4

0

P

R

O

P

.

2

4

M

W

I

D

E

R

O

A

D

(

C

R

-

1

5

)

4

2

3

8

3

9

M

R

.

N

O

.

8

4

3

4

8

4

6

6

0

M

X

1

0

7

M

4

7

4

9

6

6

.

0

0

M

6

0

.

0

0

M

6

0

.

0

0

M

6

0

M

X

1

0

7

M

9

0

.

0

0

M

9

4

.

3

0

M

1

0

0

.

0

0

M

6

0

.

0

0

M

6

0

.

0

0

M

6

0

.

0

0

M

8

0

.

0

0

M

G

2

7

G

2

8

G

2

9

G

3

0

1

4

5

.

3

5

m

5

0

.

0

0

m

O

P

E

N

S

P

A

C

E

3

.

8

4

A

c

.

14

5

0

.

0

0

m

4

4

.

5

1

M

2

5

1

1

0

.

0

0

1

1

0

.

0

0

M

M

R

.

N

O

.

1

7

5

.

0

0

M

7

5

.

0

0

M

7

5

.

0

0

M

7

5

.

0

0

M

7

5

.

0

0

M

1

2

0

.

0

0

M

7

5

.

0

0

M

7

5

.

0

0

M

7

5

.

0

0

M

7

5

.

0

0

M

7

5

.

0

0

M

7

5

.

0

0

M

1

1

0

.

0

0

M

1

1

0

.

0

0

M

7

5

.

0

0

M

7

5

.

0

0

M

7

5

.

0

0

M

7

5

.

0

0

M

6

0

.

0

0

2

6

2

7

2

8

3

1

3

2

3

3

3

4

1

6

1

7

1

8

6

0

M

X

1

1

0

M

2

0

6

0

.

0

0

6

0

.

0

0

1

1

0

.

0

0

1

1

0

.

0

0

1

1

0

.

0

0

1

1

0

.

0

0

1

1

0

.

0

0

6

0

.

0

0

6

0

.

0

0

6

0

.

0

0

2.33 Ac.

3

7

4

1

4

4

4

5

4

8

.

2

3

M

4

8

.

2

3

M

4

8

.

2

3

M

2

5

.

0

0

M

2

5

.

0

0

M

2

5

.

0

0

M

2

5

.

0

0

M

2

5

.

0

0

M

2

5

.

0

0

M

2

5

.

0

0

M

1

5

2

7

s

q

m

1

4

3

1

s

q

m

1

3

3

4

s

q

m

1

2

3

8

s

q

m

1

1

6

5

s

q

m

1

1

6

2

s

q

m

1

1

6

8

s

q

m

1

1

7

1

s

q

m

1

1

7

4

s

q

m

1

1

7

7

s

q

m

1

1

8

1

s

q

m

1

1

8

4

s

q

m

1

1

1

8

s

q

m

4

5

.

0

0

M

4

5

.

0

0

M

4

5

.

0

0

M

4

5

.

0

0

M

4

5

.

0

0

M

4

5

.

0

0

M

4

5

.

0

0

M

4

5

.

0

0

M

7

1

.

4

5

M

7

1

.

4

5

M

7

1

.

4

5

M

7

1

.

4

5

M

7

1

.

4

5

M

7

1

.

4

5

M

1

2

0

.

3

5

M

1

2

0

.

3

5

M

1

2

0

.

3

5

M

TELANGANA STATE INDUSTRIALINFRASTRUCTURE CORPORATIONLIMITED,HYDERABAD

P

R

O

P

1

5

.

0

0

M

R

O

A

D

7

8

.

0

8

M

7

8

.

0

8

M

7

8

.

0

8

M

7

8

.

0

8

M

7

8

.

0

8

M

7

8

.

0

8

M

7

8

.

0

8

M

5

0

5

7

S

1

0

S

1

1

S

1

2

12

T

h

e

r

m

o

C

a

b

l

e

s

G

2

/

A

G

2

/

C

1

.

0

0

A

c

s

0

.

9

8

A

c

s

1

.

0

0

A

c

s

2

.

9

9

A

c

s

5

.

2

9

A

c

s

1

.

0

0

A

c

s

1

.

5

0

A

c

s

2

.

6

6

A

c

s

3

.

1

3

A

c

s

2

.

7

7

A

c

s

5

0

.

1

1

M

5

1

.

0

9

M

5

2

.

0

8

M

5

3

.

0

7

M

5

4

.

0

5

M

5

3

.

5

3

M

5

2

.

2

0

M

2

5

.

0

0

M

2

5

.

0

0

M

2

5

.

0

0

M

2

5

.

0

2

M

2

5

.

0

2

M

2

5

.

0

4

M

2

5

.

0

4

M

0

8

.

8

6

M

1

6

.

1

8

M

3

.

0

0

A

c

s

3

.

0

0

A

c

s

3

.

2

6

A

c

s

G

5

G

8

G

9

/

B

G

1

2

/

A

G

1

3

/

C

Page 6: S E Z A r e a 656 UDL - TSIICtsiic.telangana.gov.in/wp-content/uploads/2018/04/Shamshabad.pdf · udl udl roads area 15.58acs open space 16.27 acs 9.92acs utility 0.40acs plotted area

R O A D

MAM

IDIP

ALLY

VILLAGE LANDS

E X I

S T

I N G

60M

(100

') W

I D E

R

O A

D

W I D E R O A D

ROAD

LAI

D

B

Y

A

PIIC

E X I S T I N G 60M (100')

E X

I S

T I N

G

60

'

W

I D

E

R

O A

D

M/S

INDU T

ECHZO

NE P

VT.LT

D

(S

EZ A

REA)

TEM

PLE

AREA

POLICESTATION

P.S Q

RSAC.3.

36

APIIC LAND

MAMIDIPALLI (V) LANDS

E X I S T I N G 150'0" W I D E R O A D

W I D E R O A D

E X I S T I N G 150'0"

E X I S T I N G

TO HYDERABAD

APIIC LAND

AC.27.90

APIIC LAND

AC.35.00/10GTS/25.00

SQ.YADS

PROP. 30.00M

WID

E ROAD

E X

I S

T I N

G

TO IN

TERN

ATIO

NAL

60.0

0M(2

00')

WID

ERO

ADTO

STATE/HIGHWAY

AIR

PO

RT

M/S

VEMTECHNOLOGIE

S

A

C.6.98

M/S

VID

IOCON

A

C.13.00

K.I (V) SY.NO.-1/11

M.P.(V)SY.NO. 39/12

M.P.(V)SY.NO.99/1

2

K.V.(V)SY.NO. 1/1

65.00 MTS

PLOT AREAAC.70.00

M/S.JT HOLDINGS

TANK

AC.2.0

AP SEB-SUB-STATION

400/220 KU S.S.

A.P. HOUSING BOARD LAND

AGHA KHAN FOUNDATION AC.100.00

M/S ANANTH

TECHNOLOGIES

AC.25.00

M/S GEM PARK

AC.170.51

PHASE-I

AC.50.00

M/SCATALYTIC

SOFTWARE

LTD.

R.S.F.D

M/S STARGAZE PROPERTIES (P)LTD

AC.234.45

SITE A : AC.234.45

SITE B : AC.15.55

TOTAL : AC.250.00

689.

27m

216.04m

1126.80m

1176.40m

590.30m

250.0m

401.01m

377.41m

260.0m

316.09m

90.03m

349.29m

70.90m116.89m

76.72m

21.43

m

29.63m

439.22

m

219.08m

AC.15.55

C.F.C

OPEN

SPACE

566.40m

PLOTS

193.1

9m

PVT.LANDP L O T S

80X100m

P L O T S

80X144m

P L O T SP L

O

T

SAPSEB

SUB-STN200m

150m

200m

150m

P L O T S

P L O T S

R & B

E X

I S T

I N G

24

.50m

W I

D E

R O A

D

E X I S T I N G

W I D E

R & B

R O A D

A.P.H.BOARD AC.100.00

E X I S T I N G R O A D

E X I S T I N G R O A D TO R A V I R A L A (V)

E X

I

S

T I

N

G

R

O

A

D

S A

R D

A R

N A

G A

RT

O

A

E X I S

T I N G

30.00

m

W

I D E

R O A

D

EXTG. 30.00m WIDE ROAD

EXTG. 24.5m WIDE ROAD

EXISTING . 24.5m WIDE ROAD

EXISIT

ING

30.00

m W

IDE

ROAD

23/A

24/C

24/B

24/A

24/E

24/D

EXTG. 12.00M ROAD

30m

37.2

208+50.9m

22.4

m

98m 58m110

84m 37.25

84m

87.25

88.6

85.6

83.6

8.6

4839

33.70

100

77.8

77.8

114

78.3

23.3

245.1

7m

291.76m

396.58m

414.37m

K.I(V) SY.NO 1/1

379

67.92

33.96

175.89m

255.30m

18.17m

38.83

15.8717

0.91m

79.93

m

118.5

8

321.25m

54.33

74.66

23.58

38.62

36.85 71.40

47.23

AC.1.36

38.09

90.48

62.69

57.36

49.67

9.59

AC:2.09

A P I

I C

L A

N D

S

37.87

76.35

103.1

4

359.4

0m

171.14

220.19

184.48

102.37

230.47

122.6

3

168.7238.3

185.52

183.2

6m

38.48

208.1

6

74.3

164.29

329.53m

63.10 71.15

195.881

271.14

115.62

TO S

RIS

ALI

AM

HIG

HW

AY

TO M

P (V

)

N

HT LINE

PERTOL PUMP

ADVISOR - II

REVISED COMPREHENSIVE LAYOUT PLAN OF HARDWARE PARK IN SURVEY NO:1

1 OF KANCHA IMARATH (V) AND SURVEY NO:99/1 OF MAMIDIPALLY (V) SAROORNAGAR MANDAL,AND MAHESHWARAM MADAL, RANGAREDDY DIST T.S.

T. S. I. I. C. LTD. HYDERABADASST. MANAGER / T

DY.GENERAL MANAGER/E

GENERAL MANAGER/AMEXISITING ROAD :

LAND USE ANALYSIS FOR APPROVED LAYOUT FROM DTCP (LP NO: 86/2002 )

LAY OUT AREA :

LAYOUT BOUNDARY :

AC. 168.27PROPOSED ROAD :

% OF OPEN AREA : (10.00)

% OF ROADS AREA : (14.00) AC. 24.26

TOTAL NUMBER OF PLOTS : 49NOS

AC. 16.83

RCIRCI

TO

SRISAILAM

LAYOUT BOUNDARY :OF APPROVED BY D.T.C.P. : ACS.168.27

Page 7: S E Z A r e a 656 UDL - TSIICtsiic.telangana.gov.in/wp-content/uploads/2018/04/Shamshabad.pdf · udl udl roads area 15.58acs open space 16.27 acs 9.92acs utility 0.40acs plotted area

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

B

D

L

L

A

N

D

S

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

S

Y

.

N

O

-

1

0

8

P

A

R

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

GREEN BUFFER 7 - 1.48 AC

COMMERCIAL 2 0.78 AC

PROPO

SED 15 M W

IDE ROAD M

.R 1 LEFT

PROPO

SED 15 M W

IDE ROAD M

.R 1 RIGH

T

PROPOSED 18 M W

IDE ROAD A.R LEFT

PROPOSED 36 M WIDE APPROACH ROAD

PROPOSED 18 M W

IDE ROAD A.R LEFT

PROPOSED 18

M W

IDE R

OAD C.R

2 LEFT

PROPOSED 18 M W

IDE ROAD A.R RIG

HT

PROPO

SED 15M W

IDE ROAD M

.R 1 LEFT

PROPO

SED 15 M W

IDE ROAD M

.R 1 RIGH

T

PRO

POSE

D 24 M

WID

E R

OA

D M

.R 2

PRO

POSE

D 18 M

WID

E R

OA

D M

.R 4

PRO

POSE

D 1

8 M

WID

E R

OA

D M

.R 6

PRO

POSE

D 1

8 M

WID

E R

OA

D M

.R 6

PRO

POSE

D 3

6 M

WID

E A

PPR

OA

CH

RO

AD

PROPOSED 18 M W

IDE ROAD A.R RIG

HT

PROPOSED 18

M W

IDE R

OAD C.R

2 RIG

HT

PROPOSED 18 M WIDE ROAD C.R 2 LEFT

PROPOSED 18 M WIDE ROAD C.R 2 RIGHT

PROPOSED 18 M WIDE ROAD C.R 1

GREEN BUFFER 2 - 2.24 AC

GREEN BUFFER 3

- 1.74

AC

GREEN BUFFER 4 - 1.16 AC

GREEN BUFFER 5 - 1.20 AC

GREEN BUFFER 8 - 1.07 AC

N

SCALE : 1:4000

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

COMMON UTILITIES

0

.84 AC

PRO

POSE

D 18 M

WID

E R

OA

D M

.R 4

PRO

POSE

D 18 M

WID

E R

OA

D M

.R 5

PRO

POSE

D 18 M

WID

E R

OA

D M

.R 3

T

S

I

I

C

L

A

N

D

F

O

R

F

U

T

U

R

E

E

X

P

A

N

I

S

I

O

N

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

HT

H

T

H

T

HT

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

HT

H

T

H

T

HT

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

HT

H

T

H

T

HT

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

HT

H

T

H

T

HT

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

HT

H

T

H

T

HT

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

HT

H

T

H

T

HT

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

HT

H

T

H

T

H

T

H

T

H

T

H

T

HT

H

T

H

T

H

T

H

T

HT

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

HT

H

T

H

T

H

T

H

T

HT

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

HT

H

T

H

T

H

T

H

T

HT

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

HT

H

T

H

T

H

T

H

T

HT

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

HT

H

T

H

T

H

T

H

T

HT

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

HT

H

T

H

T

H

T

H

T

HT

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

HT

H

T

H

T

H

T

H

T

HT

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

HT

H

T

H

T

H

T

H

T

HT

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

HT LINE

HT LINE

HT LINE

HT LINE

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

HT

3

2

.

0

6

M

37.6

2M

2

0

5

.

9

6

M

9

3

.

4

8

M

66.1

3M

7

0

.

1

4

M

101.47M

241.63M

3

0

7

.

3

2

M

1

2

7

.

5

6

M

1

6

8

.3

4

M

2

0

7

.

7

5

M

7

8

4

.

3

9

M

1

1

4

.

1

1

M

24.68M

4

4

4

.7

3

M

5

1

.2

3

M

2

6

.

8

1

M

663.98M

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

H

T

O

P

E

N

S

P

A

C

E

1

-

1

.

5

5

A

C

G B 2

- 0.14

AC

PROPOSED 18 M WIDE ROAD C.R 3

PROPOSED 18 M WIDE ROAD C.R 4

OP

EN

S

PA

CE

2 - 0.88 A

C

PLOT NO 29

0.88 AC

PLOT NO 30

1.00 AC

PLOT NO 31

1.00 AC

PLOT NO 32

0.47 AC

PLOT NO 34

1.16 AC

PLOT NO 35

1.00 AC

PLOT NO 36

0.40 AC

PLOT NO 37

0.77 AC

PLOT NO 38

0.74 AC

PLOT NO 33

2.08 AC

PLOT NO 73

1.37 AC

PLOT NO 74

0.95 AC

PLOT NO 132

2.38 AC

4

4

.

9

2

M

AREA STATEMENT

Land taken from Rev Dept. 345.00 ACSDeduct Nala 32.56 ACSDeduct TSIIC LAND (Future expanision) 45.87 ACS

Total Area 266.57 ACS

MSE IP 123.00 ACSTSIIC AREA 143.57 ACSTotal Area 266.57 ACS

MSE (IP) BOUNDARY

PROJECT SITE

KEY PLAN

NOT TO SCALE

HMWSSB SERVICE ROAD

ACCESS ROAD TO SITE

N

S

G

C

A

M

P

U

S

OPEN SPACE -4

3.96 ACS

OPEN SPACE-3

2.37 ACS

( ADMINISTRATIVE BLOCK,

WATER WORKS CETP/STP,

FIRE STATION ,POLICE STATION,

BUS SHELTER,

SOCIAL WELFARE CENTRE )

MSE IP

TSIIC LANDS

TSIIC LANDS

COMMERCIAL -1 2.99 AC

ENTRY/EXIT

TO HMWSSB SERVICE ROAD/NAGARJUN

SAGAR ROAD

ENTRY/EXIT

COMMERCIAL-30.59 AC

PLOT NO 1

0.68 AC

PLOT NO 2

0.69 AC

PLOT NO 3

0.50 AC

PLOT NO 4

0.50 AC

PLOT NO 5

0.50 AC

PLOT NO 6

0.50 AC

PLOT NO 7

0.69 AC

PLOT NO 8

0.69 AC

PLOT NO 9

0.50 AC

PLOT NO 10

0.50 AC

PLOT NO 11

0.50 AC

PLOT NO 16

0.67 AC

PLOT NO 39

1.30 AC

PLOT NO 40

0.86 AC

PLOT NO 41

0.73 AC

PLOT NO 42

0.83 AC

PLOT NO 43

0.83 AC

PLOT NO 44

1.00 AC

PLOT NO 45

1.16 AC

PLOT NO 48

0.57 AC

PLOT NO 49

0.99 AC

PLOT NO 50

1.00 AC

PLOT NO 51

1.00 AC

PLOT NO 52

1.00 AC

PLOT NO 53

1.00 AC

PLOT NO 54

1.00 AC

PLOT NO 55

1.00 AC

PLOT NO 56

1.00 AC

PLOT NO 57

1.00 AC

PLOT NO 58

1.00 AC

PLOT NO 59

1.00 AC

PLOT NO 60

0.52 AC

PLOT NO 61

1.00 AC

PLOT NO 62

1.00 AC

PLOT NO 63

1.00 AC

PLOT NO 64

1.00 AC

PLOT NO 65

1.00 AC

PLOT NO 66

0.64 AC

PLOT NO 67

0.75 AC

PLOT NO 68

0.87 AC

PLOT NO 69

0.98 AC

PLOT NO 70

1.09 AC

TSIIC LTD, HYDERABAD

73.50M

73.50M

77.84M

GREEN BUFFER 1 - 1.28 AC

61.45M

1

8

3

.

0

8

M

2

1

5

.

9

0

M

1

8

2

.

3

8

M

2

0

7

.

4

3

M

1

1

1

.

5

7

M

1

0

0

.

4

7

M

GREEN BUFFER 1

- 0.49

AC

REVISED PROPOSED LAYOUT PLANFOR MSME(Micro & Small Enterprises)IN SURVEY NO. 74(P), 75(P), 90(P),91(P), 92, 93, 94(P), 95(P), 96, 98 to 104105(P), 106(P), 107 & 108(P) OFIBRAHIMPATNAM KHALSA (V),IBRAHIMPATNAM(M),RANGAREDDY(DIST),TELANGANA STATE.

REVISED PROPOSED LAYOUT PLAN FOR MSME PARK (Micro & Small Enterprises) (FIBER GLASS)

PLOT NO 15

0.67 AC

PLOT NO 17

0.71 AC

PLOT NO 14

0.71 AC

PLOT NO 18

1.00 AC

PLOT NO 13

1.00 AC

PLOT NO 19

0.71 AC

PLOT NO 12

0.71 AC

PLOT NO 26

1.00 AC

PLOT NO 27

1.00 AC

PLOT NO 28

1.00 AC

O

P

E

N

S

P

A

C

E

-5

0

.4

0

A

C

S

GREEN BUFFER 6 -0 .54 AC

T

S

I

I

C

L

A

N

D

F

O

R

F

U

T

U

R

E

E

X

P

A

N

I

S

I

O

N

21.89M

COMMON UTILITIES

3.1

4 A

CS

:

:

:

:

PLOTTED AREA

ROADS AREA

OPENSPACE

(INCLUDING PATHWAY)

GREEN BUFFER

COMMERCIAL

COMMON UTILITIES

66.39 ACS

28.20 ACS

12.30 ACS

53.98 %

22.93%

10.00 %

:

:

:

LAYOUT AREA : 123.00 ACS 100.00 %

( ADMINISTRATIVE BLOCK,WATER WORKS CETP/STP,GSLR,SUB-STATIONFIRE STATION , POLICE STATION,BUS SHELTER, SOCIAL WELFARE CENTRE )

NUMBER OF PLOTS : 74 No's

18.22M

436.25M

153.05M

196.16M

104.45M

287.27M

93.95M

329.60M

81.95M

5

7

.

7

4

M

2

1

8

.

5

2

M

2

8

.

4

1

M

4

8

.

5

9

M

PLOT NO 20

1.25 AC

PLOT NO 24

1.24AC

PLOT NO 25

1.37 AC

PLOT NO 22

1.36 AC

PLOT NO 21

1.23 AC

PLOT NO 23

0.99 AC

PRO

POSE

D 12 M

WID

E R

OA

D M

.R 2

PLOT NO 46

1.16 AC

PLOT NO 47

0.99 AC

PLOT NO 71

1.11 AC

PLOT NO 72

0.57AC

PATHWAY 3 M WIDE

PA

TH

WA

Y 3

M

W

ID

E

07.77 ACS

04.36 ACS

03.98 ACS

:

:

:

:

:

:

06.32 %

03.54%

03.23%

PATHWAY 3 M WIDE

OPEN SPACE -6

1.25 ACS

OPEN SPACE -7

1.08 ACS

OPEN SPACE -8

0.81 ACS

PATHWAY 3 M WIDE

PATHWAY 3 M WIDE

PATHWAY 3 M WIDE

SUB-STATION

G-SL-R

AutoCAD SHX Text
BT ROAD
AutoCAD SHX Text
MUD ROAD
AutoCAD SHX Text
TO SRI GOPALA GOSHALA
AutoCAD SHX Text
MUD ROAD
AutoCAD SHX Text
MUD ROAD
AutoCAD SHX Text
HITENSION POWERLINE 400000 VOLTS
AutoCAD SHX Text
HITENSION POWERLINE 400000 VOLTS
AutoCAD SHX Text
PYLON
AutoCAD SHX Text
PYLON
AutoCAD SHX Text
PYLON
AutoCAD SHX Text
PYLON
AutoCAD SHX Text
PYLON
AutoCAD SHX Text
PYLON
AutoCAD SHX Text
MUD ROAD
AutoCAD SHX Text
SLUICE
AutoCAD SHX Text
PIPE CULVERT
AutoCAD SHX Text
SIZE:1NO X 0.600m%%C
AutoCAD SHX Text
COMPOUNDWALL
AutoCAD SHX Text
COMPOUNDWALL
AutoCAD SHX Text
HITENSION POWERLINE 400 KV
AutoCAD SHX Text
HITENSION POWERLINE
AutoCAD SHX Text
HITENSION POWERLINE HIGHT:45.042
AutoCAD SHX Text
TEMPLE
AutoCAD SHX Text
N
AutoCAD SHX Text
N
AutoCAD SHX Text
HITENSION POWERLINE 400000 VOLTS
AutoCAD SHX Text
HITENSION POWERLINE
AutoCAD SHX Text
HITENSION POWERLINE 400000 VOLTS
AutoCAD SHX Text
HITENSION POWERLINE
AutoCAD SHX Text
BT ROAD
AutoCAD SHX Text
MUD ROAD
AutoCAD SHX Text
TO SRI GOPALA GOSHALA
AutoCAD SHX Text
MUD ROAD
AutoCAD SHX Text
MUD ROAD
AutoCAD SHX Text
HITENSION POWERLINE 400000 VOLTS
AutoCAD SHX Text
HITENSION POWERLINE 400000 VOLTS
AutoCAD SHX Text
PYLON
AutoCAD SHX Text
PYLON
AutoCAD SHX Text
PYLON
AutoCAD SHX Text
PYLON
AutoCAD SHX Text
PYLON
AutoCAD SHX Text
PYLON
AutoCAD SHX Text
MUD ROAD
AutoCAD SHX Text
PRIVATE LAND
AutoCAD SHX Text
PIPE CULVERT
AutoCAD SHX Text
SIZE:1NO X 0.600m%%C
AutoCAD SHX Text
COMPOUNDWALL
AutoCAD SHX Text
COMPOUNDWALL
AutoCAD SHX Text
TEMPLE
AutoCAD SHX Text
PRIVATE LAND
AutoCAD SHX Text
HITENSION POWERLINE
AutoCAD SHX Text
HITENSION POWERLINE HIGHT:19.564
AutoCAD SHX Text
HITENSION POWERLINE HIGHT:45.042
AutoCAD SHX Text
N
AutoCAD SHX Text
N
AutoCAD SHX Text
P1
AutoCAD SHX Text
P2
AutoCAD SHX Text
P3
AutoCAD SHX Text
P4
AutoCAD SHX Text
P4A
AutoCAD SHX Text
P5
AutoCAD SHX Text
BT ROAD
AutoCAD SHX Text
MUD ROAD
AutoCAD SHX Text
TO SRI GOPALA GOSHALA
AutoCAD SHX Text
MUD ROAD
AutoCAD SHX Text
MUD ROAD
AutoCAD SHX Text
HITENSION POWERLINE 400000 VOLTS
AutoCAD SHX Text
HITENSION POWERLINE 400000 VOLTS
AutoCAD SHX Text
PYLON
AutoCAD SHX Text
PYLON
AutoCAD SHX Text
2E
AutoCAD SHX Text
2K
AutoCAD SHX Text
2L
AutoCAD SHX Text
PYLON
AutoCAD SHX Text
PYLON
AutoCAD SHX Text
PYLON
AutoCAD SHX Text
PYLON
AutoCAD SHX Text
MUD ROAD
AutoCAD SHX Text
SLUICE
AutoCAD SHX Text
PIPE CULVERT
AutoCAD SHX Text
SIZE:1NO X 0.600m%%C
AutoCAD SHX Text
SHED
AutoCAD SHX Text
SINTEX TANK
AutoCAD SHX Text
COMPOUNDWALL
AutoCAD SHX Text
COMPOUNDWALL
AutoCAD SHX Text
HITENSION POWERLINE 400 KV
AutoCAD SHX Text
NALA
AutoCAD SHX Text
NALA
AutoCAD SHX Text
HITENSION POWERLINE
AutoCAD SHX Text
HITENSION POWERLINE HIGHT:19.564
AutoCAD SHX Text
HITENSION POWERLINE HIGHT:45.042
AutoCAD SHX Text
TEMPLE
AutoCAD SHX Text
94.221
AutoCAD SHX Text
262.023
AutoCAD SHX Text
38.36
AutoCAD SHX Text
17.998
AutoCAD SHX Text
N
AutoCAD SHX Text
N
AutoCAD SHX Text
NALA
AutoCAD SHX Text
NALA
AutoCAD SHX Text
NALA
Page 8: S E Z A r e a 656 UDL - TSIICtsiic.telangana.gov.in/wp-content/uploads/2018/04/Shamshabad.pdf · udl udl roads area 15.58acs open space 16.27 acs 9.92acs utility 0.40acs plotted area

COMMON

FACILITIES

(acs.2.24)

OPEN

SPACE

P L O T S

80' x 135'

P

L

O

T

S

6

0

'

x

9

0

'

P

L

O

T

S

8

0

'

-

0

"

x

1

3

5

'

-

0

"

P L O T S

88' x 135'

P L

O

T

S

90' x 120'

P

L

O

T

S

8

0

'

x

1

3

5

'

P

L

O

T

S

8

0

'

x

1

3

5

'

P

L

O

T

S

P

L

O

T

S

6

0

'

x

9

0

'

P

L

O

T

S

6

0

'

x

9

0

'

P

L

O

T

S

6

0

'

x

9

0

'

P

L

O

T

S

6

0

'

x

9

0

'

OPEN

SPACE

O

P

E

N

S

P

A

C

E

F

U

T

U

R

E

E

X

P

A

N

S

I

O

N

A

C

:

5

0

.

0

0

GADWAL MUNICIPALITY

PROPOSED LAYOUT PLAN IN SNO.S 633 TO

643 ,646 TO 650 AND 652 TO 654 AT

GADWAL TOWN MAHBOOBNAGAR DIST.

FOR INDUSTRIAL PLOTS PHASE-I

T.S.I.I.C LTD ESTABLISHMENT OF IDA

L.P.NO.8/96 APIIC

C.NO.9120/94/H2

REF.NO.EW.T1/25(38)/89,DT.25.5.94

REFERENCE

LAYOUT BOUNDARY

EXISTING ROADS

PROPOSED ROADS

TOTAL AREA

ACS. 157.45

NO.OF PLOTS

2

58 NOS.

% OF OPEN SPACE ( 1

0.85 % ) ACS. 11.65

% OF ROADS

( 22.52 % ) ACS. 24.20

% OF COMMON FACILITIES ( 02.10 % ) ACS. 02.25

OP

EN

S

PA

CE

acs.0.45

PROPOSED

SITE

1 23

12

13

2438

31

32

39

68

53

54

69

76

77

84

85

92

93

100

101

112

113

124

106

107

118

119

125

128

127

129

150

139

140

175

174

167

183

151

166

158

159

236

235

237

191

192

184

200

205

206

208

203

201

202

209

210

211

234

222

223

242

243

258

251

250

P

L

O

T

S

8

0

'

-

0

"

x

1

3

5

'

-

0

"

P

L

O

T

S

1

0

0

'

x

1

6

0

'

P

R

O

P

O

S

E

D

R

O

A

D

4

0

'

-

0

"

P

R

O

P

O

S

E

D

R

O

A

D

4

0

'

-

0

"

P

R

O

P

O

S

E

D

R

O

A

D

4

0

'

-

0

"

P

R

O

P

O

S

E

D

R

O

A

D

4

0

'

-

0

"

P

R

O

P

O

S

E

D

R

O

A

D

4

0

'

-

0

"

P

R

O

P

O

S

E

D

4

0

'

-

0

"

W

I

D

E

R

O

A

D

P

R

O

P

O

S

E

D

4

0

'

-

0

"

W

I

D

E

R

O

A

D

P

R

O

P

O

S

E

D

4

0

'

-

0

"

W

I

D

E

R

O

A

D

P

R

O

P

O

S

E

D

4

0

'

-

0

"

W

I

D

E

R

O

A

D

PROPOSED 60'-0" WIDE ROAD

PROPOSED 60'-0" WIDE ROAD

PROPOSED 40'-0" WIDE ROAD

PROPOSED 40'-0" WIDE ROAD

P R O

P O

S

E D

195'135'

1

3

0

'

1

7

0

'

O

P

E

N

W

E

L

L

1

7

0

'

1

6

0

'

1

6

0

'

1

7

0

'

1

7

0

'

170'

120'

120'

250'

450'154'

154'137'

130'

410'

310'

412'

3

0

0

'

270'

135'

1200'

1450'

163'

3

1

7

'

6

6

4

'

1

0

4

'

1

5

9

'

1

9

1

'

7

4

3

'

2

6

0

'

6

7

8

'

5

9

2

'

7

8

6

'

9

7

2

'

4

0

0

'

5

6

0

'

8

5

9

'

8

1

4

'

7

4

2

'

5

3

3

'

3

0

0

'

2

7

4

'

8

2

'

bore well

4

5

0

'

4

2

0

'

1

1

0

'

1

2

0

'

8

0

'

1

2

0

'

1

3

0

'

1

4

0

'

1

4

0

'

1

6

0

'

1

6

0

'

1

6

0

'

1

6

0

'

9

5

'

8

0

'

8

0

'

1

1

0

'

8

0

'

8

0

'

building line 20'-0"

building line 20'-0"

b

u

i

l

d

i

n

g

l

i

n

e

2

0

'

-

0

"

b

u

i

l

d

i

n

g

l

i

n

e

2

0

'

-

0

"

b

u

i

l

d

i

n

g

l

i

n

e

2

0

'

-

0

"

b

u

i

l

d

i

n

g

l

i

n

e

2

0

'

-

0

"

b

u

i

l

d

i

n

g

l

i

n

e

2

0

'

-

0

"

b

u

i

l

d

i

n

g

l

i

n

e

2

0

'

-

0

"

b

u

i

l

d

i

n

g

l

i

n

e

2

0

'

-

0

"

b

u

i

l

d

i

n

g

l

i

n

e

2

0

'

-

0

"

b

u

i

l

d

i

n

g

l

i

n

e

2

0

'

-

0

"

b

u

i

l

d

i

n

g

l

i

n

e

2

0

'

-

0

"

b

u

i

l

d

i

n

g

l

i

n

e

2

0

'

-

0

"

b

u

i

l

d

i

n

g

l

i

n

e

2

0

'

-

0

"

b

u

i

l

d

i

n

g

l

i

n

e

2

0

'

-

0

"

bu

ild

in

g lin

e 20'-0"

b

u

i

l

d

i

n

g

l

i

n

e

2

0

'

-

0

"

80'80'68'

80'80'68'

88'

88'

88'

84'

135'

135'

135'

135'

135'

65'

320'

135'

190'

190'

360'

580'

4

1

0

'

H I L L O C K

PR

OP

OS

ED

60'-0" W

ID

E R

OA

D

PR

OP

OS

ED

60'-0" W

ID

E R

OA

D

P

R

O

P

O

S

E

D

6

0

'

-

0

"

W

I

D

E

R

O

A

D

P

R

O

P

.

6

0

'

-

0

"

W

I

D

E

R

O

A

D

P

R

O

P

.

4

0

'

-

0

"

W

I

D

E

R

O

A

D P

R

O

P

.

4

0

'

-

0

"

W

I

D

E

R

O

A

D

P

R

O

P

.

4

0

'

-

0

"

W

I

D

E

R

O

A

D

P

R

O

P

.

4

0

'

-

0

"

W

I

D

E

R

O

A

D

P

R

O

P

.

4

0

'

-

0

"

W

I

D

E

R

O

A

D

P

R

O

P

.

4

0

'

-

0

"

W

I

D

E

R

O

A

D

P

R

O

P

.

4

0

'

-

0

"

W

I

D

E

R

O

A

D

P

R

O

P

.

4

0

'

-

0

"

W

I

D

E

R

O

A

D

c

h

a

n

n

e

l

f

i

e

l

d

4

0

'

-

0

"

W

I

D

E

R

O

A

D

P

R

O

P

O

S

E

D

R

O

A

D

4

0

'

-

0

"

PR

OP

. 60'-0" W

ID

E

R

O

A

D

635

633

634

649

650

636

637499

498

638

1

0

0

'-0

"

639

640

643

647

645651

651

657

658

119

118

660

4

3

652

641

648

EXTRACT OF GADWAL MASTER PLAN

S C A L E : 1" = 660'

SITE UNDER REF :

DIRECTOR OF TOWN & COUNTRY PLANNING

GOVT. OF A.P., HYDERABAD

SD/-10-9-96

" T R U E C O P Y "

DRG.NO.APIIC/TP/96-6 DT.6-11-1996

ASST.DIRECTOR / TP

APIIC.HYD.

SD/-06-11-96

1

6

5

'

1

7

6

'

2

6

0

'

2

1

0

'

3

7

0

'

3

0

8

'

P

L

O

T

S

EXISTING

KRISHNA

RIVER

ROAD 100'

WIDE

TO RIVER KRISHNA AGRAHARAM

TO GADWAL TOWN

SRI ANJANEYA TEMPLE

S.NO.644

S.NO.645

N

F

I

E

L

D

C

H

A

N

N

E

L

Page 9: S E Z A r e a 656 UDL - TSIICtsiic.telangana.gov.in/wp-content/uploads/2018/04/Shamshabad.pdf · udl udl roads area 15.58acs open space 16.27 acs 9.92acs utility 0.40acs plotted area

1412985

1425101

143/A2067

143/B2031

144/A2151

144/B2115

1454096

1464210.90

14714629

1483125

148/A1730

1608875.39

149/B1055

149/A 696

1608875.39

1334591

1324665

1294787 129

1530 1405263

1344717

1394667 138

2222

1314779

1304881

1375867

1363289

1354324

83/D

53382.20

81

9285

.50

80/A

2648

.3591

/B21

06

80/B

3017

91/C

304491/A

2058

92/A

1908

92/B

161

213.

86

126716

SHEET ROCK

MOSQUE

OPEN SPACE

1271356.40

90/D1950

90/N

2017

79

9719.02

78

8360

.75

754840

857482

90/D

611.11

90/C

928.76

90/B

2032

.29

90/A

89/C

89/B

270

1.23

89/B1

1635

89/A

299

3.63

89/A

1

84/A

1432.30

83/C

1055.30

83/B

1823.00

83/A

1857

.00

82

84/B

1346

84/A

1964

90/M

2133

.83

90/C

2805

.55

90/B

1431

90/E

1708

.66

77500

7615

00

OPEN S

PACE

1

967.9

090

/H17

73.70

90/I

2337

.95 9

0/J30

78.46

90/L

2443

.97 8

9/D25

19.43

89E

2399

.82

3.5 LAKSH CAPACITY

HILL SIDE RESERVOIR

73/0

4611

47

9680

46

9680

73/D

1560

48/64

OPEN

72/A9378

E7

E8

E9

E10

E11

E12

E13

E14

125/D 2811

E18

E19

E20

E21

E15

E16

E22

E23

E24

E25

E26

E27

E28

E29

E30

E31

E32

E33

E34

E35

E17

E36

E37

E38

E39

E40

942397

931124 99/A

118999/B127

961180

971420

HANUMAN TEMPLE

HILLOCK

OPEN SPACE 124 & 125

124/A 1600

1222333

1213106

1205844

100/B2808

100/C 1521

100/A 1339

60/A

1312.2753/C

58/E58/C

593630

111

3325.22 110

2640

1093032.78

60

3968.80

108

4604.33

107

5829.13

106 4835

119/B2680.416

119/C3936.33

119/A3933.33

1183975.34

1175084.54 116

4991 115 5033

114 4945

113/A 3037

113/B 3301

112/A

OPEN SPACE

LOW LAYING AREA

WITH STAGANATION

OF WATER.

1504824.61

156/H 3196

151 4625 152

3642 153 4222

154 3882.38

155 3637.20

156/A 1778

156/B 1806 156/C

1809156/D1859

105/B 1969

105/A 2783 104

4768.89

103 4784.44

102 4256

101/B 1400

101/A 1348

983444

992938

well

HILLOCK

OPEN SPACE

73/A

74 2265

162344.67

87

4333.33

86

2000 73/C

268

Space ForPower Line

48/65

48/52

48/67

43

1016

4

4438

97.48

43/A

2273 4

3/B

2332

.64

23

6050

66

2371

.60

65

2224

.80

6424

20

6324

80

63/A

756

0

63/B

300 BW

67

2420

68

2518.80

69

1605

72

1740

711843.80

73

10658

70/A

10562.80

62

563

2.16

61

6154.06

67

4340

53

2420

54

2420

55

3337

.72

5625

46.84

38

7540

37

1000

36

600

35

12100

27/A

4062

.81

27/B

3607

28

2420

18

1691.80

17

24

20

73TO

77

83TO

89

34/C

643

34/A

800

34/B

720.4

831452

49TO

62

63TO

67

97TO

103

BA

GIX

48/51

48/50

48/49

42

243

0

41

664

40

242

0

39

242

0

39/B

200

0

INDIA

N

MEDIC

INE

PHARMACY28

82.40

BW

30'0"

WID

E

ROAD

48 &

49

6924

.20

51

2331

.36 5

2

2143

50/D

50/A

50/C

50/B

1934

5

BW

TEMPLE

48/48

21

1790

.80

20/A

1025

.51 20

1263

11 24

21

12

4395

.60

13

484

0

14

282

2.22

16/E

7260

16/o

2081.20

16/B

1250

16/A

2470

25TO

34

35TO

43

121TO

130

131TO

137

193TO

202

203TO

301452

32

1961.60

29

1605

15TO

24

145TO

151

159TO

183

169TO

1TO

14

183TO

187

E4

E5

E6

15

2

420

16

20

81.20

16/C

125

0

1200

1200

1300

48/3948/40

G.8/A

1048

G.6/

B

1043

8/C826

8/B58

0

8/A8/D

4

2924

3

2689

.44

2

3723

.90

1

4730

.98

30'0"

W

I D E

R O

A D

APPR

OAC

H

RO

AD

2

268

08.6

0

25

2835

.33

26

419

1

24

665

16

3

183

3

111TO

115

217TO

223

234TO

240

48/16

E3

E2

48/32 E1

88

2202.30

0.455AC

48/66

48/33

48/37

48/35

48/34

48/41

GVIII

48/21

F1

F2F3

F4F5

F8

F9

F6

F7

48/5548/38

48/36

48/53

937.50937.50

2620

OPEN SPACE

912.501050937.50

133/A

48/62

40' W I D E R O A D No: 26

48/58

60' 0" W I D E R O A D No : 25

48/54B. W 14

B.W 9

40'0" W I D E R O A D

40'0" WIDE ROAD

937.50

937.50 937.50 937.50 937.50

123

40'0" W I D E R O A D

40'0"

W

I D

E

R O

A D

30'0" W I D E R O A D NO.17

60'0

"

W I

D

E

R O

A D

48/59

48/6148/60

48/57 48/56

48/15

60'0

"

W

I D

E

R O

A

D

No.

29

APPR

OAC

H

RO

AD

TO

G

LSR

W I D E R O A D NO.22

30'0"

30'0"

R O A D No.23

40'0" WIDE ROAD No.30

40'0

" W

IDE

RO

AD

N

o.31

30'0" WIDE R

OAD

N

O.18

30'0" WIDE

ROAD NO.19

30'0" WIDE ROAD NO.4

30'0" WIDE ROAD N

O.20

30'0" WIDE ROAD

W I D

E

30'0" W I D E R O A D

30'0" W I D E ROAD

40'0

"

W

I D

E

R O A

D

N

o.13

WEL

L

30'0

" W

IDE

RO

AD

4806 PROPOSED COMMERCIAL

COMPLEX

60'0

"

W

I D

E

48/46

73To

86

87To

96

97To

110

111To

112

49To

53

59To

72

121To

134132

To13

7

25To

31

39To

43

156To

161

145To

154

217To

223

231To

235

1To

10

11To

124

23To

192

169To

182

193To

202

203To

216

G

l

GII

GIII

D1

D2

D3

D4

D5

D6

G

IV

G

V

1/A

5494

48/43

48/30

48/22

48/29

48/28

30'0

" W

IDE

ROAD

NO.2

30'0"

R

OAD N

o:15

30'0"

W

IDE

R

OAD N

O:11

30'0"

W

IDE

ROAD

30'0"

WID

E

ROAD

30'0"

WID

E

ROAD

30'0"

W I

D E

R O A

D

5/G2699

5/D2311

5/D2990

5/E5567

5/A12

00

5/B20

00

5/C15

70

164907

DISTRIBUATION

PUMP

50000 GALLONS

HILL SIDE RESERVOIR

HILLOCK

OPEN SPACE

48/45

48/47

48/68

TO N.H.7 E X I S T I N GP. W. D

R O A DTO CHANDRAYANA GUTTA

60'0" W I D E R O A D NO.1

30'0

" W

I D

E

R O

A D

NO

.

60'0" WIDE ROAD NO.3

210

60'0" W I D E R O A D NO.2

R O

A

D

NO.8

NO.6

Sd/- in note file on 29-3-88

VICE-CHAIRMAN

TRUE COPY

DY- CHIEF ENGINEER A.P.I.I.C. LTD HYDERABAD

TSIIC LTD HYDERABADREVISED LAYOUT PLAN OFSEC KATTEDAN PHASE-I & II HYDERABAD A.P

GVI

GVII

REFERENCE

SITE BOUNDARYPROPOSEDNO.OF PLOTS 350TOTAL AREA AC.245.00

LAND USE ANALYSIS

SCALE : 100' TO AN INCH

60'0

"

W

I D

E

R O

A

D

TO N.H

PLOTTED AREA 799950.36 Sqyds 67.47%

ROADS AREA 197747.88 Sqyds 16.68%

OPEN AREA 168432.00 Sqyds 14.20%

AMENITIES 19747.20 Sqyds 1.67%

TOTAL AREA 1185829.00 Sqyds 100.00%

PERMIT NO:14280 / 83 LETTER NO:14280/MP2/HUDA/83 DT:5-4-88LAYOUT IS RELESED SUBJECT TO CONDITIONSMENTIONED IN LETTER NO :14280/MP2 DATE: 5-4-88 HUDA/83

SD/-5/4/88 FOR VICE CHAIRMANHYDERABAD URBAN DEVELOPMENT AUTHORITY

AutoCAD SHX Text
40'
Page 10: S E Z A r e a 656 UDL - TSIICtsiic.telangana.gov.in/wp-content/uploads/2018/04/Shamshabad.pdf · udl udl roads area 15.58acs open space 16.27 acs 9.92acs utility 0.40acs plotted area

213.86M

REFERENCEBOUNDARYOF PHASE -IBOUNDARYOF PHASE -IIBOUNDARYOF PHASE -IIIEXISTING ROADSPROPOSED ROADSTOTAL AREA OF PHASE -I% OF ROADS AREA ( 12.79%)NO OF PLOTSNO OF SHEDS

TOTAL AREA OF PHASE -II% OF ROADS AREA ( 12.79%)

NO OF PLOTS

NO OF SHEDS

TOTAL AREA OF PHASE -III

PROPOSED 8 NOS SHEDS

T. S. I. I. C. LTD , HYDERABADEXISTING LAYOUT OF PHASE- I & IIPROPOSED PHASE - III, IN KOTHUR

MAHBOOBNAGAR- DIST

DRG. NO. HI - / 85-86 DATED SCALE1:20

DRAUGHTSMAN

CIVIL ENGINEER

TECH. ASSTDY. CHIEF ENGINEER CHIEF ENGINEER

LOCATION PLANSCALE 8"= 1 MILESITE REF:-

TO M

AHBOOBN

AGAR

EXISTINGPHASE -II

S NO. 103

EXISTING PHASE -I

L. P

. NO

. 133

/81

PROPOSED PHASE -III

139140

138

137

141

145

146136

135 134

132

133105

133

140

100

101

102

1949

S NO 1948

AC. 69.11C

38 NOS13NOSAC. 21. 25 C

13NOS08NOS

AC. 91. 24 CEXISTING 12.0 MTS ROAD 12.0 MTS ROAD PROP. 12.0 MTS ROAD

HILLOCK PORTION

OIL CONTRACTION CO.

M/S.NEW VIJAYA LAXMI

2726

28 29

B.L

M/S. VIJAYA LAXMI CONTAINERS

POWER LINESPROPOSED 10 M ROAD

BANK

M/S VIKAS TININDUSTRIES

SITE RESERVED FOR ADMN BLOCK WORKERS CANTEEN

M/S ARTH STEEL INDUSTRIES

M/S KANNAIAH INDUSTRIES

M/S RAJ PHARMA6 5 7 6

4 3 45

8 78 9

1211 10

15

16

17

M/S KUAAUD TECHNO ASSOCIATES

M/S MOHAN TEXPRINTS

2 1

9

10 11

13

7.5 B.L

M/S KOYAM/S KOYA & CO

24 25

22 23M/S KOYA & CO

2688SQM

2352SQM

2352SQM

1120SQM

1500SQM

20M 10M

42M 14M42M48M

48M

34M50M

60M

18M20M20M24M

24M

48M

56M

26M20MM/S DEVI SILK MILLS21 20

M/S EPACHPAPER MILLS

18 19

M/S VIJAY SHANKASI MFG CO.

PLOTS2018 SQM

M/S INVENTA COMPANY

M/S VIJAYAAPPLIANCES

M/S CHOUDARYINDUSTRIES

14

M/S TELENGANA ROLLERAND FLOOR MILLS

12 13

M/S SAPTHAGIRI ELECTRICAL

EXISITING 12.0 MTS ROAD 12.0 MTS WIDE ROAD

EXISITING 12.0 MTS WIDE ROAD 12.0 MTS WIDE ROAD

EXISITING 12.0 MTS WIDE ROAD

PROPOSED ROAD EXISITING 12.0 MTS WIDE ROAD

HILLOCK

EX

ISIT

ING

18

.0 M

TS

W

IDE

RO

AD

3

R O

A

D

PLOTSPROP.PHASE-III

LAND ALLOTTED TO M/S KAP STEEL LTDAREA:84.378 ACREA

1344Sqm 1120

Sqm1120Sqm

2184Sqm

56M

PLOTS 3

293.50 81.0 98.45

163.37

125.8

61.87146.430

270.052

R

O

A

DPR

OPO

SED

20M 820

SQM

103.936

144.00

NATIONAL HIGH WAY 71.8192.1080.5119.0

82.0

46.40

67.86

73.8274.18

123.0

121.030.0

42.30 50.60

68.90

69.50

77.50

L.P.NO.133/81

PHASE-II

PHASE-I

7.5 B.L

7.5 B.L

EX

ISIT

ING

1

2.0

MT

S

R

OA

D

120.0

33.0

OPENWELL

PLOTS

2

4

64.92

43.89

119.68

39.62

174.65

388.31M

147.828M

310.890M

115.824M

200.216M

FENCING

7.5 B.L

72.5

wew

FactorySHED

POWER LINE

PROPOSED S E R V I C S 10M WIDE ROAD

M/S. TAMRIND STEEL PRODUCTS INDIA LTD.

PROPOSED 10M SERVICE ROAD7.5 BULD. LINE

30.00 MTS WIDE ROAD

ROADTO HYDERABAD

130.

5M

PUMP ROOM

156.0M

119.

5 M

76.5M

S.NO.102

1

TO KURNOOL

PROPOSED 10M ROAD

RAILWAY LINE

95M

35M

TO KURNOOL

TO SECUNDRABAD

30.00MTS234.696M

W I D E

R O A D

TOTHIGAPUR

VILLAGE

35771.00 Sq.m

10027.00 Sq.m

N

L.P.NO.133/81

Page 11: S E Z A r e a 656 UDL - TSIICtsiic.telangana.gov.in/wp-content/uploads/2018/04/Shamshabad.pdf · udl udl roads area 15.58acs open space 16.27 acs 9.92acs utility 0.40acs plotted area

TO JEDCHERLA

EXISTIN

G 24.40 M

W

IDE

ROAD

TO NAGAR K

URNOOL

C.NO.10634/92/H2

REF.NO.CD2/25 (19)/75 1843 DT.13.10.93

T.S.I.I.C LTD HYDERABAD

AT IDA PALEM

COMPREHENSIVE REVISED TENTATIVE LAYOUT

PLAN IN SNO.327 AND 333 OF I.D.A PALEM AT

BIJINAPALLY VILLAGE NAGAR KURNOOL

TQ.MAHBOOB NAGAR .DIST

REFERENCE

LAYOUT BOUNDRY

EXISTING ROADS

PROPOSED ROADS

TOTAL AREA AC :13.877

% OF OPEN SPACE AC:1.105

% OF ROADS Ac:2.350

NO OF PLOTS. 32

(16.9)

(10.12)

Ac.18.150

Ac.1.779

Ac.3.58

(9.8)

(19.73)

27

PHASE-II

PHASE-I

11 KV LINE

11 KV LINE

LT

L

IN

E

1

3

7

'-

0

"

1

1

6

.0

M

3

2

M

210.0M

65.0M

20M

2

1

8

.

0

M

3

5

M

3

6

M

45M

66M

47M

47.2

0M

78.0

M

34.0M

34.0M

OP

EN

SP

AC

E

PR

OP

. RO

AD

12.0M W

IDE

PR

OP

. R

OA

D 15.0M

W

ID

E

EXT 10.0M WIDE ROAD TO BE WIDENED TO 15.0 M

EX

TIS

TIN

G 10.0M

W

ID

E R

OA

D

EXT 10.0M WIDE ROAD

EX

TIS

TIN

G 10.0M

W

ID

E R

OA

D

PR

OP

. R

OA

D12.20 W

ID

E

57

55

54

56

49

48

42.0M

40.0M

66M

7

0

M

66M

65M

65M

38.0M

38.0M

30.0M

30.0M

22.0M

38.0M

4

2

.0

M

3

6

.0

M

43

39

39/A

45/A

37

53

87.2

0M

76.0

M

66.0

M

58.0

M

52.0

M

50

R

OA

D 12.0M

W

ID

E

34

36

&

33

35

&

OPEN SPACE

3

5

.0

M

3

4

.0

M

3

8

.0

M

82.0M

90.0M

B

5

3

4

2

1

20x14m

well

OPEN SPACE

33.0M

29.0M

65M

65M

65M

50M

31.0M

30.0M

29.0M

42

40

47

46

35.0M

35.0M

30.0M

65M

38M

32

24

BO

RE

W

EL

L

KANDASARY

FACTORY

11

10

9

14

13

12

SH

ED

-II

SH

ED

- I

EX

IS

S

HE

D-III

OH

T

19

23

18

17

15

PHASE -I

SCALE :1:1000

PR

OP

. RO

AD

12 M W

IDE

210.0M

LT

L

IN

E

N A

L

A

PHASE -II

WE

LL

10.00 MTS.

N

25

Page 12: S E Z A r e a 656 UDL - TSIICtsiic.telangana.gov.in/wp-content/uploads/2018/04/Shamshabad.pdf · udl udl roads area 15.58acs open space 16.27 acs 9.92acs utility 0.40acs plotted area

PROPOSED LAYOUT PLAN OF INDUSTRIALDEVELOPMENT AREA IN SY.NOS.460/2,461,462/2, 479/P,481/P, & 482/P OF MANKAL (V), PHASE - I, MAHESWARAM (M), RANGA REDDY DIST. S C A L E :- 1 : 1000

T.S.I.I..C LIMITED HYDERABAD

PLOT NO. 2963 X 90 MTS. PLOT

36 X 93 MTS.PLOT

53 X 93 MTS.PLOT NO. 26

61 X 90 MTS.

PLOT NO. 2150 X 90 MTS.

PLOT36 X 93 MTS.

56 X 93 MTS.

61 X 90 MTS.

PLOT NO. 2461 X 90 MTS.

PLOT NO. 3040 X 100 MTS.

PLOT NO.3338 X 70 MTS.

40 X100 MTS.

40 X100 MTS.

OPEN SPACE

ACS.1.07

PRO

POSE

D

12

.00

MTS

.

W

IDE

RO

AD

OPE

N SP

ACE

A

CS.5

.78

PLOT NO. 1353 X 159 MTS. PLOT

63 X 164 MTS.

PLOT NO. 1560 X 120 MTS.

PLOT NO. 1660 X 120 MTS.

PLOT NO. 1760 X 120 MTS.

PLOT45 X 97 MTS.

PLOT45 X 98 MTS.

PLOT45 X 102 MTS.

PLOT NO. 165 X 105 MTS.

PLOT NO. 1265 X 92 MTS.

45 X 92 MTS. 45 X 92 MTS. 45 X 92 MTS. 45 X 92 MTS.P L O T

6

38.00 MTS.

PLOT NO.20225 X 109 MTS.

P L O T NO.19

PLO

T NO

. 1

864

X 1

20 M

TS.

POST OFFICE

WEIGH BRIDGEB A N K

F I R E

CANTEEN

A.P.I.I.C.

201.00M

202.00M

PRO

POSE

D

12

.00

MTS

.

W

IDE

RO

AD

PRO

POSE

D

12

.00

MTS

.

W

IDE

RO

AD

PRO

POSE

D

12

.00

MTS

.

W

IDE

RO

AD

PROPOSED 18.00 MTS. WIDE ROAD

PROPOSED 18.00 MTS. WIDE ROAD

PROPOSED 12.00 MTS. WIDE ROAD

PROPOSED 18.00 MTS. WIDE ROAD

PROPOSED 18.00 MTS. WIDE ROAD

L T L I N E

PLOT NO. 3655 X 70 MTS.

PLOT50 X 55 MTS.

PLOT NO. 3450 X 65 MTS.

58.00 mts.

50.00 mts.

290 mts.168.

00 M

TS.

290 mts.

PRIV

ATE

LAN

DS44

0 m

ts.

189

mts.

220.0

0 m

ts.

162.

00 m

ts.

PRIV

ATE

LAN

DS

688.

00 m

ts.

sy.no.478

598.00 mts.

sy.no.477

630.00 mts.

100.00 mts.

138.

00 m

ts.

P R

O

P

O

S E

D

H T L I N E

H T L I N

E

246.00 MTS

P R O P O S E D 12.00 MTS. WIDE ROAD P R O P O S E D 12.00 MTS. WIDE ROAD

24.0

0 m

IN OUT

E X I S T I N G 30.00 MTS. WIDE R & B ROADTO SRISAILAM TO HYDERABAD

62.00 MTS.

62.00 MTS.

189.

00 M

70.0

0 M

189.

00 M

70.0

0 M

124.00 MTS.

124.00 MTS.

SECUNDRABAD

HYDERABADGOLKONDA

CHARMINAR

CHANDRAYANGUTTA

KOTTAPSTAJALAPATHI

PAHADISHARIB

MAMIDIPALLY

ANTHIREDDYGUDA

SHAMSHABAD

TUKKUGUDA

MANKAL

22ND KM STONE

TEMPLE

HARPAGUDA

MUMABADNAGAR

MAISARAM

RAJENDRANAGAR

TO

SR

ISA

ILA

M

KEY PLAN OF MANKAL

FUTURE EXTENTION ( PHASE - II )

NOTTO SCALE

L.P.NO.60/99/APIICC.NO.5850/99/H2REF.NO.EW/TP/778/95-96/DT.19-5-99

N

478 477478 454

452

479 480481

482

460/2461

2

3

3

460/1

462/1

561.00 mts.

630.00 mts.

220.

00 m

ts

458

440.

00 m

ts

162.

00 m

ts.

688.

00 m

ts

459

FUTURE EXTENSION598.00 mts.

LAND USE ANLYSIS

LAYOUT BOUNDARY

EXISTING ROADPROPOSED ROADTOTAL LAYOUT AREAPHASE-I-AREA(PRESENT)PHASE-II-AREA(FUTURE)% OF ROADS AREA (13.86) AC:10.45% OF OPEN SPACE (10.00) AC: 7.54NO OF PLOTS :- 36

PHASE-IPHASE-II

EXTRACT OF REV (V) MAP MANKHALSCALE:660'0" TO AN INCH SITE U/R

ASSISTANT DIRECTORDIRECTOR

TOWN & COUNTRY PLANNING HYD

TOWN PLANNING ASST JOINT DIRECTOR

SURVEYOR DEPUTY DIRECTOR

sd/- 9 / 6 /99

sd/- 11 / 6 /99

sd/- 10 / 6 /99 sd/- 10 / 6 /99

sd/- sd/- 9 / 6 /99

Page 13: S E Z A r e a 656 UDL - TSIICtsiic.telangana.gov.in/wp-content/uploads/2018/04/Shamshabad.pdf · udl udl roads area 15.58acs open space 16.27 acs 9.92acs utility 0.40acs plotted area

OPEN SPACEArea:1.675 Ac

84.46

77.51

42.54

SUB-STATIONArea:0.73 Ac

25.97

38.82

33.40 36.73

45.06

CFCArea:0.258 Ac

PLOT NO-1Area:1.987 Ac

OPEN SPACEArea:0.348 Ac

70.11

75.21

176.28

46.28 68.9

9

71.81

60.40

106.

28

PLOT NO-1/AArea:1.354 Ac

PLOT NO-3/AArea:2000Sqm

PLOT NO-3Area:2000Sqm

90.00

90.00

47.51

90.00PLOT NO-2Area:0.497 Ac

90.58 27.4

817.2

7

PLOT NO-4Area:4904 Sqm37

.26

51.6

7

55.9668.93

29.4

8131.77

51.2

1

50.0

3

49.3

6

19.64 40.03 39.95 46.09

39.3419.78 40.33 32.31

33.9

717

.91

Area:1014 Sqm4A 4B

Area:2014 Sqm Area:2000 Sqm

4C

Area:2000 Sqm

4D

PLOT NO-6Area:2.341 Ac

71.4

6

49.3

1

103.

58

Area:1372 Sqm5F

5E

5D

5C

Area:1000 Sqm

Area:1000 Sqm

Area:1000 Sqm

45.84

19.7434.5

8

26.3

122

.20

22.2

0

45.02

45.10

22.2

0

PLOT NO-5BArea:3757 Sqm

45.07 59.31

PLOT NO-5AArea:1.00 Ac

85.4

5

199.10

43.1

7

54.46

EXISTIN

G 20.00

M W

IDE

ROAD TO PARIGI

TO MAHABUB N

AGAR

MAP SHOWING THE BOUNDARY OF SITE SURVEY.NO SITUATED AT NANCHARLA(V) GANDIDU (M) RANGA REDDY (DIST).

AREA ANALYSIS

PLOT NO PLOT AREA OPEN AREA CFC ROAD AREA

PLOT NO- 1

PLOT NO- 1/APLOT NO- 2PLOT NO- 3

PLOT NO- 4

PLOT NO- 5

PLOT NO- 6

1.987 AC

1.354 AC0.497 AC1.110 AC

2.946 AC3.013 AC

2.341 AC

13.248 AC 2.023 AC 0.258 AC TOTAL EXTENT 18.936 AC

PLOTTED AREA

OPEN AREA

CFC AREA

ROAD AREA

TOTAL AREA

13.248 AC

2.023 AC

0.258 AC

3.407 AC

18.936 AC

69.96 %10.68 %

1.36 %

18.00 %

100.00 %

1.675 AC 0.258 AC 3.407 AC

0.348 AC

PROPOSED 18.30 M WIDE ROAD

PRO

POSE

D

1

0.00

M W

IDE

R

OA

D

PRO

POSE

D

1

0.00

M W

IDE

R

OA

D

PRO

POSE

D

1

0.00

M W

IDE

R

OA

D

PRO

POSE

D

1

0.00

M W

IDE

R

OA

D

PROPOSED 10.00 M WIDE ROAD

N

SCALE :1:1000

Page 14: S E Z A r e a 656 UDL - TSIICtsiic.telangana.gov.in/wp-content/uploads/2018/04/Shamshabad.pdf · udl udl roads area 15.58acs open space 16.27 acs 9.92acs utility 0.40acs plotted area

. .

Pylon

Pylon

Pylon

Existin

g road

E

xis

tin

g

ro

a

d

R

AIN

W

AT

ER

C

O

LLE

C

TIO

N

P

IT

5.8

6 A

c

Pylon

H

T

P

o

w

e

r

l

i

n

e

H

T

P

o

w

e

r

l

i

n

e

H

T

P

o

w

e

r

l

i

n

e

H

T

P

o

w

e

r

l

i

n

e

H

T

P

o

w

e

r

l

i

n

e

H

T

P

o

w

e

r

l

i

n

e

HT Power line

HT Power line

HT Power line

3

0

M

M

T

S

W

I

D

E

M

P

R

O

A

D

469

468

467

462

461

468

460

449

448

447

446

445

444

373

367

351

352

269

353

350

349

470

472

473

471

475

474

MAHESHWARAM

KO

NG

AR

KH

UR

D

O

R

R

Z

.

P

R

o

a

d

V

illa

g

e

B

o

u

n

d

a

ry

o

f K

o

n

g

a

rk

a

lla

n

3

0

M

ts W

I D

E

M

P

R

O

A

D

3

0

M

ts

W

I D

E

M

P

R

O

A

D

0

.

6

K

M

T

S

1

.

4

2

K

M

T

S

1

.4

2

K

M

T

S

350.0

0M

2

3

5

.

6

0

M

209.47M

1

3

6

.

0

3

M

162.1

1M

1

6

4

.4

1

M

1

3

7

.

4

2

M

1

4

3

.

5

0

M

84.97M

1

2

4

.

0

9

M

6

6

.

8

8

M

84.32M

254.40M

3

5

2

.2

2

M

2

8

7

.

5

4

M

5

2

5

.

0

0

M

2

1

3

.

6

6

M

1

0

0

.

7

9

M

4

5

0

.

8

2

M

1

0

7

.

7

8

M

1

2

5

.1

3

M

2

3

6

.

1

7

M

156.40M

1

2

3

.

1

4

M

171.20M

3

4

.6

0

M

3

6

4

.

7

8

M

243.16M

201.23M

9

3

.

6

1

M

1

1

4

.

2

7

M

1

9

0

.4

3

M

6

7

.

1

3

M

129.1

9M

9

5

.8

3

M

285.40M

247.80M

1

5

5

.2

1

M

1

2

2

.

4

5

M

8

0

.

8

2

M

6

0

.

8

5

M

135.87M

1

8

7

.4

0

M

95.47M

9

9

.4

1

M

2

5

.

2

3

M

3

0

.

0

0

M

P

R

O

A

D

O

P

E

N

S

P

A

C

E

9.7

5 A

C

S

O

P

E

N

S

P

A

C

E

5

.32 A

C

S

KONGARAKALAN VILLAGE

K

O

N

G

A

R

A

K

A

L

A

N

T

A

N

D

A

EX

IS

TIN

G

R

O

AD

K

O

N

G

A

R

A

K

A

L

A

N

T

A

N

D

A

E

X

IS

T

IN

G

R

O

A

D

E

X

IS

T

IN

G

R

O

A

D

E

X

IS

T

IN

G

R

O

A

D

PROPOSED LAYOUT FOR LOCATION OF RICE HUB

IN SYNO .300/1-27 OF KONGARA KALAN VILLAGE,

IBRAHIMPATNAM MANDAL,RANGA REDDY DISTRICT.

T.S.I.I.C LIMITED HYDERABAD

LAYOUT AREA 349.88 ACS 100.00 %PLOTTED AREA 215.60 ACS 61.62%ROADS AREA 57.19 ACS 16.36 %OPEN SPACE 35.00 ACS 10.00 %BUFFER AREA(UNDER TOWERLINE) 20.61 ACS 5.89 %COMMERCIAL AREA 3.50 ACS 1.00 %

COMMON UTILITIES 17.98 ACS 5.13 %(ADMIN BLOCK,OHT,CETP,SECURITY,SUB-STATION,POWER PANT,SUMP,RAINWATERCOLLECTION PIT,FIRE STATION)

LAYOUT BOUNDARYPROPOSED ROADSEXISTING ROADS

S

N

EW

SCALE 1:6000

LAND USE ANANALYSIS:-

30M M.P. ROAD DELETED

& REALIGNED UNDER TOWER LINE

NOTE:-

287

. .

300/3

. .

SYNO.

300/1

347

. .

342

. .

338

. .

337

. .

328

. .

336

. .

335

. .

334

. .

301

. .

254

. .

256

. .

259

. .

260

. .

259

. .

261

. .

269

. .

270

. .

273

. .

274

. .

275

. .

276

. .

279

. .

280

. .

297

. .

298

. .

25.60

25.93

25.83

25.43

25.83

25.47

26.16

25.91

25.55

25.31

25.98

26.73

26.77

26.01

26.25

Stone Quarry

SYNO.300/5

SYNO.300/5

SYNO.

300/4

3

0

M

M

T

S

W

I D

E

M

P

R

O

A

D

V

i

l

l

a

g

e

B

o

u

n

d

a

r

y

o

f

F

e

r

o

z

g

u

d

a

1.67 Ac

SUB STATIO

N

30 M

ts W

I D

E

R

O

A

D

PROPOSED 1

8M W

IDE R

OAD

PROPOSED 1

8M W

IDE R

OAD

PROPOSED 1

8M W

IDE R

OAD

PROPOSED 1

8M W

IDE R

OADPROPOSED

18M

WID

E ROAD

PROPOSED 1

8M W

IDE R

OAD

CETP

3.96 Ac

PROPOSED 1

8M W

IDE R

OAD

PROPOSED 1

8M W

IDE R

OAD

18M WIDE R

OAD

18M WIDE R

OAD

18M WIDE ROAD

18M WIDE ROAD

EACH PLOT

AREA

1000 SQMTS

40 X 25 M

25.00M

40

.0

0M

40

.0

0M

32.85M

EACH PLOT

AREA

1000 SQMTS

40 X 25 M

30.62M

40

.0

0M

42.86M

30.11M

40

.0

0M

EACH PLOT

AREA

1000 SQMTS

40 X 25 M

25.11M

28.30M

36.10M

32.20M

40.00M

48.62M

43.21M

88.20M

73.58M

60.29M

47.00M

39.13M

50

.0

0M

50.00M

55.00M

EACH PLOT

AREA

2000 SQMTS

40 X 50 M

EACH PLOT

AREA

2000 SQMTS

40 X 50 M

53.85M

40

.0

0M

53.85M

40.00M

53.85M

53.85M

40

.0

0M

40.00M

EACH PLOT

AREA

5.00 ACS

PR

OP

OS

ED

24M

W

ID

E R

OA

D

PR

OP

OS

ED

24M

W

ID

E R

OA

D

PR

OP

OS

ED

24M

W

ID

E R

OA

D

24M

W

ID

E R

OA

D

PR

OP

.24M

W

ID

E R

OA

D

PR

OP

OS

ED

24M

W

ID

E R

OA

D

PR

OP

OS

ED

24M

W

ID

E R

OA

D

277.74M

UDL LAND

50.00 ACS

UDL LAND

32.49ACS

51

.4

8M

AREA

1.00 Acs

64.41M

AREA

1.00 Acs

78.62M

AREA

1.00 Acs

51

.4

8M

AREA

1.00 Acs

78.62M

AREA

1.00 Acs

51.48M

AREA

1.00 Acs

78.62M

AREA

1.00 Acs

51

.4

8M

AREA

1.00 Acs

78.62M

AREA

1.00 Acs

51.48M

AREA

1.00 Acs

78.62M

AREA

1.00 Acs

51

.4

8M

AREA

1.00 Acs

78.62M

AREA

1.00 Acs

51.48M

AREA

1.00 Acs

78.62M

AREA

1.00 Acs

51.48M

AREA

1.00 Acs

78.62M

AREA

1.00 Acs

51

.4

8M

AREA

1.00 Acs

78.62M

AREA

1.00 Acs

51

.4

8M

AREA

1.00 Acs

78.62M

AREA

1.00 Acs

51.48M

AREA

1.00 Acs

78.62M

64.36M

AREA

1.00 Acs

78.62M

139.46M

139.46M

145.00M

145.00M

145.00M

71.21M

139.46M

139.46M

222.77M

284.09M

73.93M

139.46M

139.46M

145.00M

145.00M

14

5.0

0M

14

2.7

1M

139.46M

139.46M

7

0

.

7

4

M

7

3

.

5

5

M

19

3.5

8M

3

0

.7

1

M

4

4

.

7

0

M

7

9

.

3

7

M

14

8.9

4M

124.82M

175.65M

100.00M

1

1

2

.

1

8

M

73.99M

100.00M

1

1

2

.

9

7

M

145.57M

1

6

2

.

5

0

M

61.78M

40

.0

0M

40

.0

0M

54M

40

M

40M

94.25M

46.04M

48.20M80.01M

46.08M 46.06M

80.00M

97.99M

114.35M

4

9

.

0

0

M

52

.7

1M

50.00M

181.67M

37.48M

3

5

2

.2

2

M

1

8

2

.

0

4

M

O

P

E

N

S

P

A

C

E

2

.9

5

A

c

s

126.72M

32.56M

EACH PLOT

AREA

2000 SQMTS

40 X 50 M

46.11M

50.00M

40.00M

40

.0

0M

74.24M

50.00M

18.00M

13

.0

0M

UDL LAND

14.87ACS

PR

OP

OS

ED

24M

W

ID

E R

OA

D

PR

OP

OS

ED

24M

W

ID

E R

OA

D

390.11M

40.05M

91.26M

89.19M