Upload
ram-subramanian
View
213
Download
0
Embed Size (px)
Citation preview
8/6/2019 RV Kraftwerk Eng
1/5
nREITZ power plant / steel plant
INNOVATIVE POWER FOR
STATE-OF-THE-ART PLANTS.
8/6/2019 RV Kraftwerk Eng
2/5
EASY PLANNING FROM A TO Z: THE COMPLETE UNIT BY REITZ.
here is no doubt that an systems rom Reitz are becoming increasingly important or designing uture power plants and
teel works. And there are good reasons or that: In the frst place, our ans o course possess the required high eciency
.g. pressure increase up to 4,000 daPa). But Reitz as a leading supplier has got more to oer: a complete package that
uarantees maximum reliability and eciency in th e daily system operation along with modern energy eciency.
REITZ IN STEEL WORKSBlast urnace gas dedusting/
Converter gas dedusting/
Cast house dedusting
REITZ IN POWER PLANTScoal/gas/oil/dual fred/special combusti-
bles/biomass/waste incineration
VARIABLE SPEED CONTROL
Up to 30% savings in energy without loss
in eciency
WEAR PROTECTION TECHNIQUE
Individual protection against abrasive and corro-sive wear for maximum operational availability
HIGH END PROCESS FANS
Primary and secondary air fans up to 4,000 daPaID fans up to 31,500 m/min with drive powersup to 10,000 kW
SOUND INSULATION
Protection for employees and environmentin accordance with EC directives
ONLINE CONDITION MONITORING
The REITZ remote control system for highestprocess stability
100% MADE IN GERMANY
Maximum vertical integration with morethan 400 employees in the Centre of FanProduction in Hxter
MOUNTING / SERVICE
From on-schedule commissioning to individualmaintenance concepts
8/6/2019 RV Kraftwerk Eng
3/5
i n r hn n r n l n - r i h
- -- -
-
3150 4000 5000 6300 8000 10000 12500 16000 20000 25000 31500 400003550 4500 5600 7100 9000 11200 14000 18000 22400 28000 35000
250
315
400
500
630
800
1000
1250
1600
2000
2500
2800
3150
3550
3750
4000
4250
volume ow V in m/min
totalpressure
pt
in
daPa
1500
min
-1
1000
min-1
750mi
n-1
500mi
n-1
250kW
500kW
1000kW
2000 kW
4000kW
6300kW
8000kW
10000kWanti-fri
ctionbearin
gsle
eve
bearing
POWER FOR EFFICIENCY AND PROFITABILITY.
EITZ is so popular amongst the operating companies o the steel and power plant industry due to the total number o
s advantages. REITZ combines ecological and energy-saving engineering with high perormance and reliability made
Germany.
ou can rely on REITZ uid bed blowers with
000 daPa pressure increase doing a very good job
herever maximum pressures are required. Reitz
gh-performance fans are applied in all stages of
e process chain: primary and secondary air fans,
ue gas circulation fans, combustion air fans or gasoosters.
EITZ ID fans meet the highest requirements in
e production process with volume ows up to
1,500 m/min and drive powers up to 10,000 kW.
PERFORMANCE RANGE OF REITZ PROCESS FANS
TRUE GREATNESS MATTERS: HIGH END PROCESS FANS.
COMPLETE SYSTEMS FOR
FIRING
grate/uid bed/carbon dust/gas/oil ring
FLUE GAS CLEANING
crude gas and clean gas dedusting/DeNOx units/
ue gas desulfurization
++ =100
100
P
VP
C1
C3
C2
0
BP 100
requency converteran max. energy eciency
Perormance requirements curvesC1 = control with damperC2 = inlet guide vane control
C3 = speed control
The advantages o REITZ variable speed control at a glance:
100% as-needed consumption / linear control characteristic /
adverse vortex is avoided / wear and tear reduction / silent running /
perfect starting behaviour / mechanical smoothness
Unlike the classic control techniques, the variable speed control is a method that takes up only that amount of energy in each individual
operating point that is actually needed. Without loss in eciency, approximately 30% of the energy expenditure can be saved.
The topic of sound insulation is becoming increasingly important. In line
with our ecological engineering, REITZ consequently develops eective
solutions in this area to minimize the sound level.
MAGIC FORMULA FOR ENERGY EFFICIENCY:
VARIABLE SPEED CONTROL.
LONG LIVE THE AVAILABILITY: WEAR PROTECTION.
PLENTY OF GOOD SOLUTIONS: NOISE CONTROL.
Be it abrasive wear in the crude gas area upstream the scrubber or cor-
rosion in the clean gas area downstream the scrubber: REITZ oers hard
facing of extreme durability optimised by research and tailored to any kind
of application for particulary long life spans up to 16,000 operating hours
and more.
8/6/2019 RV Kraftwerk Eng
4/5
MAXIMUM VERTICAL INTEGRATION TO MEET THE HIGHEST EXPECTATIONS.
othing but the best an qu ality will do or innovative power and steel plants. To us, it is especially important that all our
anuacturing is done at our parent plant in Hxter to guarantee the top-grade quality o our ans and to excel in coming
p to all individual customer wishes.
ore important than to make mere promises is to actually keep
em. The Centre of Fan Production at our main production fa-
lity in Hxter provides all prerequisites for doing so. About 400
mployees work at 20,000 sqm according to the European quality
standard DIN EN ISO 9001. And we can optimally support com-
plex projects throughout the world with our subsidiaries and agen-
cies in India, Poland, Russia, China, The Middle East, France and
Switzerland.
ne of our biggest strengths is our experience that we have gained
most challenging projects for the power and steel plant industry
l over the world. We do know where little hiccups might possibly
ccur. On our customers demand, we undertake the on-schedule
project coordination and mounting of the complete unit including
commissioning, maintenance and subsequent Online Condition
Monitoring to identify potential problems at an early stage and
eliminate them systematically.
MOUNTING / MAINTENANCE / ONLINE CONDITION MONITORING.
00 % MADE IN GERMANY. REITZ TRENDSETTING IN MOST MODERN PLANTS.
Biomass power plant Drnrohr, equipped with REITZ ans.
Photo: AE&E Inova, Kln
Power plant Flensburg, equipped with REITZ ans
Photo: Stadtwerke Flensburg
Biomass power plant Lnen, completely equipped with REITZ
variable speed controlled primary air ans, secondary air ans,
exhaust air re-circulation ans and ID ans.
Photo: REMONDIS, Lnen
Steelworks SIEMENS VAI Linz, equipped with REITZ ans or
secondary dedusting. Photo: Siemens VAI, Linz
Oxyuel pilot project Schwarze Pumpe by Vattenall. Equipped
with REITZ ans, the worlds frst CO-ree lignite-fred power
plant is coming into existence . Photo: Vattenall, Berlin
Natural gas power plant Lingen, equipped with REITZ ans.
Photo: RWE Power
Our goal is to mitigate the CO
emission with highly ecient fan technology and thus to sustainably preserve natural
resources and protect the environment in cooperation with our partners.
8/6/2019 RV Kraftwerk Eng
5/5
Konrad Reitz Ventilatoren GmbH & Co. KGKonrad-Reitz-Strae 1 37671 Hxter-Albaxen Germany
phone: +49 (5271) 9 64- 0 00 fax: +49 (5271) 9 64- 2 [email protected] www.reitz-ventilatoren.de