Russia – DPRK Electricity Cooperation: the Role of INTER RAO UES Company at Current Stage Alexander OGNEV, Deputy Director, Ph.D. Eastern Branch of INTER RAO UES Company – Vostokenergo Ruslan GULIDOV, Research Fellow, Ph.D. Economic Research Institute, Far Eastern Branch, Russian Academy of Sciences DPRK Energy Experts Working Group Meeting, Beijing, March 8-9, 2008

Russia – DPRK Electricity Cooperation: the Role of INTER RAO UES Company at Current Stage

  • Upload
    damita

  • View
    35

  • Download
    0

Embed Size (px)

DESCRIPTION

Russia – DPRK Electricity Cooperation: the Role of INTER RAO UES Company at Current Stage. DPRK Energy Experts Working Group Meeting, Beijing, March 8-9, 2008. Alexander OGNEV, Deputy Director, Ph.D. Eastern Branch of INTER RAO UES Company – Vostokenergo - PowerPoint PPT Presentation

Citation preview

Page 1: Russia – DPRK Electricity Cooperation: the Role of INTER  RAO UES Company at Current Stage

Russia – DPRK Electricity Cooperation:

the Role of INTER RAO UES Company

at Current Stage

Alexander OGNEV, Deputy Director, Ph.D. Eastern Branch of INTER RAO UES Company – Vostokenergo

Ruslan GULIDOV, Research Fellow, Ph.D. Economic Research Institute, Far Eastern Branch, Russian Academy of Sciences

DPRK Energy Experts Working Group Meeting, Beijing, March 8-9, 2008

Page 2: Russia – DPRK Electricity Cooperation: the Role of INTER  RAO UES Company at Current Stage

22

INTER RAO UES is a Transnational Energy Holding Company

Russia’s single operator of electricity export/import supplies

Shareholders are JSC RAO UES of Russia (60%) and JSC Rosenergoatom (40%)

Affiliates more than 20 companies in 14 countries of Europe and Asia

Controls a number of generating and distributing energy assets in Russia and abroad

Total staff ~ 17,000 people

Headquarters – Moscow, Russian Federation

Page 3: Russia – DPRK Electricity Cooperation: the Role of INTER  RAO UES Company at Current Stage

3

Electricity Generation and Distribution

AssetManagement

InvestmentActivities

2

Electricity Export-Import

1

3

Core Business Areas of the Company

43

Page 4: Russia – DPRK Electricity Cooperation: the Role of INTER  RAO UES Company at Current Stage

44

Russia’s Electricity Export and Import Turnover over 2004-2007, bln kWh

ChinaAzerbaijanGeorgia

Moldova

Norway Finland

BelarusLatvia

LithuaniaUkraine

Export Import

Kazakhstan Mongolia

10

2004 2005 2006

10.010.5

20.9

10.1

20.5

5.1

2007

5.6

19.1

Page 5: Russia – DPRK Electricity Cooperation: the Role of INTER  RAO UES Company at Current Stage

55

In Our Further Development We Are Guided to 5 Priority - Oriented Regions

Baltic states

Scandinavia

Central and Eastern Europe

The Black Sea region

North East Asia and the Far East

Page 6: Russia – DPRK Electricity Cooperation: the Role of INTER  RAO UES Company at Current Stage

6

Company’s Activity at North-East Asia and the Far East

Branch of Inter RAO UES company – Vostokenergo was established in 2005 (headquarters in Khabarovsk)

Export supplies from Russia are carried out to China and Mongolia

3 Transmission Lines 110-220kV – from Amurskaya Oblast to Heilongjiang province (Northeast China)

4 Transmission Lines 6-220kV – from Irkutskaya Oblast, Buryat Republic and Zabaikalskiy Krai to Mongolia

The project of large-scale electricity export from Eastern Russia to China is currently under discussion and elaboration (60 bln kWh)

Country of export 2005 2006 2007

China, mln kWh 492 523 35

Mongolia, mln kWh 174 174 184

Share of total Russia’s Export, % 3.2 3.4 1.1

Page 7: Russia – DPRK Electricity Cooperation: the Role of INTER  RAO UES Company at Current Stage

7

Profile of Russia – Korean Peninsula Energy Bridge Project (2001-2004)

1. Construction of AC Transmission Line 500kV Vladivostok – Chonjin

380 km (250 km through Russia,130 km – DPRK)capital costs ~ $200 mlntime-frame – 3-4 years

2. Construction of DC Transmission Line ± 500-600 kV Vladivostok – Seoul

1280 km (250 km through Russia, 1030 km – DPRK)capital costs ~ $1.3 blntime-frame – 5-6 years

Chonjin

Russia – ROK DC transmission line

500-600 kV

Russia – DPRK 500 kV AC transmission line

Page 8: Russia – DPRK Electricity Cooperation: the Role of INTER  RAO UES Company at Current Stage

8

Recent History of Promotion Russia – DPRK Electricity Cooperation

Memorandum between Inter RAO UES company and Ministry for Electric Power and Coal Industry of DPRK (Pyongyang, August 18, 2005)

Protocol on negotiations of the delegations of Ministry for Electric Power and Coal Industry of DPRK and branch of Inter RAO UES company – Vostokenergo (Pyongyang, August 7-10, 2006)

Protocol of 4th meeting of DPRK – Russia Intergovernmental Commission on trade, economic, scientific and technical cooperation (Moscow, March 19-23, 2007)

Protocol of working meeting of the delegations of Ministry for Electric Power of DPRK and Inter RAO UES company on discussion of the project of electric power supplies from Russia to DPRK (Pyongyang, January 26-31, 2008)

Page 9: Russia – DPRK Electricity Cooperation: the Role of INTER  RAO UES Company at Current Stage

9

Main Directions of Russia – DPRK Cooperation in the Field of Electricity

1. Modernization of CHP plants of DPRK

2. Construction of 500 kV transmission power line for electricity supplies from Unified Power Grid of Eastern part of Russia to DPRK

3. Supply of transmission and transformer equipment

Most of power plants, transmission lines and substations were built with the technical assistance of USSR.It is reasonable to reconstruct them with the Russian assistance as well

It is recommended for JSC Technopromexport (Russia) and Korean Society on Export and Import of Complete Plant to prepare relevant offers

Source: Protocol of the 4th meeting of DPRK – Russia Intergovernmental Commission on trade, economic, scientific and technical cooperation (Moscow, March 19-23, 2007)

Page 10: Russia – DPRK Electricity Cooperation: the Role of INTER  RAO UES Company at Current Stage

10

Developments since the Project was Suspended: Case of Russia

problem of electricity cooperation between Russia and DPRK was raised to the governmental level

most of the problems of domestic power supply in the Russian Far East were resolved/be resolved in near term

construction of Bureyskaya HPP is finishing (1700 MW – 01/01/2008, 2010 MW in 2009)

T&D infrastructure in the Southern part of the Russian Far East was/is enhanced greatly (built ~ 1000 km of TL 500 kV, SS 500 kV Vladivostok – starting point of export supplies – in 2009)

construction of new power plant and expansion of existing capacities was planned (400 MW for APEC Summit 2012)

These changes provide real preconditions to match demand for Russian electricity announced by DPRK

Page 11: Russia – DPRK Electricity Cooperation: the Role of INTER  RAO UES Company at Current Stage

11

Developments since the Project was Suspended: Case of DPRK

At the working meeting of Ministry for Electric Power of DPRK and Inter RAO UES (Pyongyang, Jan. 26-31, 2008) delegation from DPRK

confirmed again that electricity import from Russia is of high importance for DPRK due to hard economic conditions argued that development of electric power sector is the most important task to solve for Government of DPRK in recent years announced another time about impossibility to pay in monetary funds for electricity and financing investment of the Project (necessity to pay in money for import of food and fertilizers for food production)

Energy sector of DPRK keeps on experiencing serious problems power plant and transmission facilities equipment is out-of-date and wore outstable shortage in feedstock fuel due to decline in coal production (inundation of a number of mines) supplies of fuel oil in exchange for consent to cease the nuclear program are insufficient and interrupted; China and ROK informed that instead of fuel oil they will supply coal and industrial equipment, respectively

Under such circumstances demand for electricity import from Russia becomes more and more urgent and crucial for rehabilitation of DPRK

Page 12: Russia – DPRK Electricity Cooperation: the Role of INTER  RAO UES Company at Current Stage

12

Up-to-date Profile of the Project

AC transmission line 500 kV Vladivostok – Kraskino (Russia) – Chonjing (DPRK) Electricity export from Southern part of the Russian Far East to Northeast of DPRK into loading islands due to various frequency of AC in Russia and DPRK (50 vs. 60 Hz)Distance – 390 km, of that – 240 km on the Russian territoryLoad – up to 500 МW (2,5-3 bln kWh annually)Investments estimates – $250 mln

The major problem is the source of payment for the electricity supplies Korean party offered joint development of Sanson deposit of complex ore and payment for electricity imported from profit of Korean party as preliminary assessment of Sanson project showed it can be efficient but under certain circumstances to attract investors INTER RAO UES held preliminary talks with Russian metallurgical companies (RUSAL, Mechel, NLMK). For the reasons of high investment risks due to political situation in DPRK the positive decision has not been received INTER RAO UES suggested to expand the list of mineral deposits and to include that of coal but DPRK delegation refused and offered as alternative option to implement modernization of CHP plant in Chonjin town

Realization of the investment project of Interstate Transmission Line by INTER RAO UES singly, without involvement of other Russian energy and

metallurgical companies is likely to be not profitable and highly risky

Page 13: Russia – DPRK Electricity Cooperation: the Role of INTER  RAO UES Company at Current Stage

13

Next Steps ahead Towards Implementation of the Project (1)

to achieve the political decision in the form of Intergovernmental Agreement on reconstruction of DPRK’s electric power industry as it was made for reconstruction of the railway up to Rangin

to enlist support of Ministry for Industry and Energy Sector of Russia and Ministry for Economic Development and Trade of Russia to attract into the project Russian metallurgical company(es)

to keep on strengthening the power network in the south of Primorskiy Krai and to achieve inclusion into investment program of Federal Grid Company 500 kV transmission line SS Vladivostok – Kraskino. This line will

secure current and future demand of domestic consumers in Hasan area of Primorskiy Krai

make feasible the project of electricity supplies from Russia to DPRK as well as will meet future electricity requirements of Russian Railway company under the projects of unification of Trans-Korean and Trans-Siberian railroads and expansion of North Korean sea port in RaSon economic trade zone

bring the starting point of electricity export to DPRK closer for 190 km and, therefore, will reduce capital costs of the Interstate Transmission Line almost twice

Russia’s Potential

Page 14: Russia – DPRK Electricity Cooperation: the Role of INTER  RAO UES Company at Current Stage

14

Next Steps ahead Towards Implementation of the Project (2)

to expand the list of mineral deposits (and to include coal deposits) being offered as guarantees for investments returns and payments for electricity imported

DPRK’s Potential

to participate in the Project more actively with money, technology, political influence

to consider the Project as a first stage of cooperation between Russia and the countries of Korean peninsula and even broader context as an initial stage of realization of an idea of the power interconnection among counties of Northeast Asia

ROK’s Potential

Page 15: Russia – DPRK Electricity Cooperation: the Role of INTER  RAO UES Company at Current Stage

15

NEAREST Project Sheme

ROKROKROKROK

JPJPJPJP UnderseaUndersea cable(DC)cable(DC)

DPRKDPRKDPRKDPRK

Under discussionUnder discussion

CHCHCHCH

RFRFRFRF

Under discussionUnder discussionMOMOMOMO

UnderseaUnderseacable(DC)cable(DC)

Existing Lines

Future Lines

Quite weak tie (110/220kV)Quite weak tie (110/220kV)

Page 16: Russia – DPRK Electricity Cooperation: the Role of INTER  RAO UES Company at Current Stage

16

Thank you for attention!

Page 17: Russia – DPRK Electricity Cooperation: the Role of INTER  RAO UES Company at Current Stage

17

Scheme of RFE power lines 500 kV

Zejskaja Hydro Station

SS Amurskaja

SS Dalnevostochnaja

SS Nakhodka

SS Khabarovskaja

Primorskaja power station

SS Hehtcir

BurejskajaHydro Station

SS Chuguevka

SS Kraskino

SS Vladivostok

Hunchun (China)Chonjin (DPRK)

PerevoznajaZarubino

250 km

130 kmSource: Federal Grid Company

•Blue – existing lines•Red – under construction•Green – plan for 2009-2011•Lilac – under discussion now

Tumen project