51
ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of Nuclear Facility Components 2017 ASME Boiler and Pressure Vessel Code An International Code

Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

ASME BPVC. I I I .2-2017

Div is ion 2Code for Concrete Containments

SECTION I I IRules for Construct ion ofNuclear Faci l i ty Components

2017 ASME Boiler andPressure Vessel CodeAn International Code

Page 2: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

Markings  such as  “ASME,”  “ASME Standard,” or any other marking  including  “ASME,” ASME logos,  or  the  Certification Mark  shall  not  be  used  on  any  item  that  is  not  constructed  in accordance with all of the applicable requirements of the Code or Standard. Use of ASME’s name, logos, or Certification Mark  requires  formal ASME  certification;  if no  certification program  is available, such ASME markings may not be used. (For Certification and Accreditation Programs, see https://www.asme.org/shop/certification‐accreditation.)  

Items produced by parties not formally certified by ASME may not be described, either explicitly or implicitly, as ASME certified or approved in any code forms or other document. 

Page 3: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

(ACI Standard 359-17)

IIIRULES FOR CONSTRUCTIONOF NUCLEAR FACILITYCOMPONENTS

Division 2

Code for ConcreteContainmentsASME Boiler and Pressure Vessel Committeeon Construction of Nuclear Facility Components

ACI-ASME Joint Technical Committee

AN INTERNATIONAL CODE

2017 ASME Boiler &Pressure Vessel Code2017 Edition July 1, 2017

Two Park Avenue • New York, NY • 10016 USA

Page 4: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

Date of Issuance: July 1, 2017

This international code or standard was developed under procedures accredited as meeting the criteria forAmerican National Standards and it is an American National Standard. The Standards Committee that approvedthe code or standard was balanced to assure that individuals from competent and concerned interests havehad an opportunity to participate. The proposed code or standard was made available for public review and com-ment that provides an opportunity for additional public input from industry, academia, regulatory agencies, andthe public-at-large.ASME does not “approve,” “rate,” or “endorse” any item, construction, proprietary device, or activity.ASME does not take any position with respect to the validity of any patent rights asserted in connection with any

items mentioned in this document, and does not undertake to insure anyone utilizing a standard against liabilityfor infringement of any applicable letters patent, nor assume any such liability. Users of a code or standard areexpressly advised that determination of the validity of any such patent rights, and the risk of infringement of suchrights, is entirely their own responsibility.Participation by federal agency representative(s) or person(s) affiliated with industry is not to be interpreted as

government or industry endorsement of this code or standard.ASME accepts responsibility for only those interpretations of this document issued in accordance with the es-

tablished ASME procedures and policies, which precludes the issuance of interpretations by individuals.The endnotes and preamble in this document (if any) are part of this American National Standard.

ASME collective membership mark

Certification Mark

The above ASME symbol is registered in the U.S. Patent Office.

“ASME” is the trademark of The American Society of Mechanical Engineers.

No part of this document may be reproduced in any form, in an electronicretrieval system or otherwise, without the prior written permission of the

publisher.

Library of Congress Catalog Card Number: 56-3934Printed in the United States of America

Adopted by the Council of The American Society of Mechanical Engineers, 1914; latest edition 2017.

The American Society of Mechanical EngineersTwo Park Avenue, New York, NY 10016-5990

Copyright © 2017 byTHE AMERICAN SOCIETY OF MECHANICAL ENGINEERS

All rights reserved

Page 5: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

TABLE OF CONTENTS

List of Sections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xiForeword . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xiiiStatement of Policy on the Use of the Certification Mark and Code Authorization in Advertising . . . . . . . . . . xvStatement of Policy on the Use of ASME Marking to Identify Manufactured Items . . . . . . . . . . . . . . . . . . . . . . xvSubmittal of Technical Inquiries to the Boiler and Pressure Vessel Standards Committees . . . . . . . . . . . . . . . xviPersonnel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xixThe American Concrete Institute . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xxxviiiIntroduction to Section III, Division 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xxxixOrganization of Section III . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xlSummary of Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xliiiList of Changes in Record Number Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xlvCross-Referencing and Stylistic Changes in the Boiler and Pressure Vessel Code . . . . . . . . . . . . . . . . . . . . . . . xlvii

Subsection CC Concrete Containments (Prestressed or Reinforced) . . . . . . . . . . . . . 1

Article CC-1000 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1CC-1100 Scope and General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1CC-1110 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1CC-1120 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1CC-1130 Rules for Concrete Containments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1CC-1140 Boundaries of Jurisdiction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

Article CC-2000 Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2CC-2100 General Requirements for Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2CC-2110 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2CC-2120 Pressure-Retaining and Load-Bearing Material . . . . . . . . . . . . . . . . . . . . . 2CC-2130 Certification of Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3CC-2140 Deterioration of Material and Coatings During Service . . . . . . . . . . . . . . 4CC-2150 Heat Treatment to Enhance Mechanical Properties of Metallic Material 4CC-2160 Dimensional Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

CC-2200 Concrete and Concrete Constituents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4CC-2210 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4CC-2220 Concrete Constituents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5CC-2230 Concrete Mix Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6CC-2240 Cementitious Grout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11CC-2250 Marking and Identification of Concrete Constituents . . . . . . . . . . . . . . . . 14

CC-2300 Material for Reinforcing Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14CC-2310 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14CC-2320 Material Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14CC-2330 Special Material Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

CC-2400 Material for Prestressing Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15CC-2410 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15CC-2420 Prestressing Steel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15CC-2430 Component Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15CC-2440 Performance Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17CC-2450 System Approval Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20CC-2460 Performance Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20CC-2470 Marking and Identification of Prestressing Material . . . . . . . . . . . . . . . . . 21

CC-2500 Material for Liners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22CC-2510 Permitted Material Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22

iii

Page 6: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

CC-2520 Fracture Toughness Requirements for Materials . . . . . . . . . . . . . . . . . . . 23CC-2530 Examination and Repair of Liner Material . . . . . . . . . . . . . . . . . . . . . . . . . 29CC-2540 Material Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35

CC-2600 Welding Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35CC-2610 Welding Material Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35CC-2620 Stud Welding Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38CC-2630 Identification of Welding Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43

CC-2700 Material for Embedment Anchors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43CC-2710 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43CC-2720 Fracture Toughness Requirements for Embedment Anchor Materials . . 43CC-2730 Examination and Repair of Embedment Anchor Material . . . . . . . . . . . . 43CC-2740 Marking of Embedment Anchor Material . . . . . . . . . . . . . . . . . . . . . . . . . . 44

CC-2800 Material Manufacturer’s Quality System Programs . . . . . . . . . . . . . . . . . . 44CC-2810 Documentation and Maintenance of Quality System Programs . . . . . . . . 44

Article CC-3000 Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45CC-3100 General Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45

CC-3110 Concrete Containment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45CC-3120 Metallic Liner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45CC-3130 Definition of Terms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45CC-3140 Tolerances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46

CC-3200 Load Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46CC-3210 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46CC-3220 Load Categories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46CC-3230 Load Combinations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48CC-3240 Load Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48

CC-3300 Containment Design Analysis Procedures . . . . . . . . . . . . . . . . . . . . . . . . . 48CC-3310 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48CC-3320 Shells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49CC-3330 Base Mat, Frames, Box‐Type Structures, and Assemblies of Slabs . . . . . 49CC-3340 Penetrations and Openings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49

CC-3400 Concrete Containment Structure Design Allowables . . . . . . . . . . . . . . . . . 49CC-3410 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49CC-3420 Allowable Stress for Factored Loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50CC-3430 Allowable Stresses for Service Loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56CC-3440 Concrete Temperatures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58

CC-3500 Containment Design Details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58CC-3510 Design for Flexure and Axial Loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58CC-3520 Design of Shear Reinforcement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58CC-3530 Reinforcing Steel Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61CC-3540 Prestressed Concrete . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66CC-3550 Separation of Structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66CC-3560 Foundation Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67CC-3570 Containment External Anchors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67

CC-3600 Liner Design Analysis Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67CC-3610 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67CC-3620 Liner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67CC-3630 Liner Anchors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67CC-3640 Penetration Assemblies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67CC-3650 Brackets and Attachments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68

CC-3700 Liner Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68CC-3710 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68CC-3720 Liner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68CC-3730 Liner Anchors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68CC-3740 Penetration Assemblies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68CC-3750 Brackets and Attachments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68CC-3760 Fatigue . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68

iv

Page 7: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

CC-3800 Liner Design Details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69CC-3810 Liner Anchors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69CC-3820 Penetration Liners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69CC-3830 Transitions from Concrete to Steel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69CC-3840 Welded Construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71

CC-3900 Design Criteria for Impulse Loadings and Missile Impact . . . . . . . . . . . . 71CC-3910 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71CC-3920 Design Allowables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71CC-3930 Design Assumptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72

Article CC-4000 Fabrication and Construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73CC-4100 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73CC-4110 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73CC-4120 Certification of Material and Fabrication or Construction by Component

Fabricator or Constructor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73CC-4200 Concrete . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74CC-4210 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74CC-4220 Storing, Batching, Mixing, and Placing . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74CC-4230 Preplaced Aggregate Concrete . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75CC-4240 Curing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75CC-4250 Formwork and Construction Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75CC-4260 Cold and Hot Weather Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76CC-4270 Repairs to Concrete . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76CC-4280 Grout for Grouted Tendon Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76

CC-4300 Fabrication of Reinforcing Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77CC-4310 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77CC-4320 Bending of Reinforcing Bar . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77CC-4330 Splicing of Reinforcing Bars and Anchoring of Mechanically Headed De-

formed Bars . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78CC-4340 Placing Reinforcement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82CC-4350 Spacing of Reinforcement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83CC-4360 Surface Condition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83

CC-4400 Fabrication and Installation of Prestressing Systems . . . . . . . . . . . . . . . . 83CC-4410 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83CC-4420 Receiving, Storing, and Handling of Material . . . . . . . . . . . . . . . . . . . . . . . 83CC-4430 Tendon Fabrication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83CC-4440 Tendon Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84CC-4450 Tendon Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84CC-4460 Post‐Tensioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84CC-4470 Record of Stressing Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85CC-4480 Protection of Post-Tensioning Anchorages and Prestressing Steel . . . . . 86

CC-4500 Fabrication of Liners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86CC-4510 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86CC-4520 Forming, Fitting, and Aligning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86CC-4530 Welding Qualifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88CC-4540 Rules Governing Making, Examining, and Repairing Welds . . . . . . . . . . . 92CC-4550 Heat Treatment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 106CC-4560 Protection of Attachments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 108

CC-4600 Fabrication of Embedment Anchors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 109CC-4610 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 109CC-4620 Forming, Fitting, and Aligning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 109CC-4630 Welding Qualifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 109CC-4640 Rules Governing Making, Examining, and Repairing Welds . . . . . . . . . . . 110CC-4650 Heat Treatment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 111CC-4660 Bolted Construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 111

v

Page 8: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

Article CC-5000 Construction Testing and Examination . . . . . . . . . . . . . . . . . . . . . . . . . 112CC-5100 General Requirements for Examination . . . . . . . . . . . . . . . . . . . . . . . . . . . 112

CC-5110 Procedures, Qualification, and Evaluations . . . . . . . . . . . . . . . . . . . . . . . . 112CC-5120 Qualification and Certification of Nondestructive Examination

Personnel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 112CC-5130 Qualification of Concrete Inspection and Testing Personnel . . . . . . . . . . 113CC-5140 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 113

CC-5200 Concrete Examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 113CC-5210 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 113CC-5220 Concrete Constituents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 114CC-5230 Concrete . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 117CC-5240 Grout for Grouted Tendon Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 118

CC-5300 Examination of Reinforcing Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 119CC-5310 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 119CC-5320 Examination of Mechanical Splices and Mechanically Headed Deformed

Bars . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 119CC-5340 Examination of Bends . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 120

CC-5400 Examination of Prestressing Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 120CC-5410 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 120CC-5420 Required Examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 120

CC-5500 Examination of Welds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 121CC-5510 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 121CC-5520 Required Examination of Welds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 121CC-5530 Examination Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 122CC-5540 Acceptance Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 123

Article CC-6000 Structural Integrity Test of Concrete Containments . . . . . . . . . . . . . . 125CC-6100 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 125

CC-6110 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 125CC-6120 Test and Instrument Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 125CC-6130 Testing of Division 1 Parts, Appurtenances, and Components . . . . . . . . 125CC-6140 Pretest Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 125CC-6150 Classification of Structure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 125CC-6160 Structural Response Predictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 125

CC-6200 Test Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 126CC-6210 Pretest Examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 126CC-6220 Instrumentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 126CC-6230 Pretest of Instrumentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 126

CC-6300 Structural Test Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 126CC-6310 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 126CC-6320 Pressurization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 127CC-6330 Temperature . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 127CC-6340 Data Required . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 127CC-6350 Surface Cracking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 127CC-6360 Displacement Measurements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 127CC-6370 Strain Measurements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 128CC-6380 Temperature Measurements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 129CC-6390 Post‐Test Examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 129

CC-6400 Evaluation of Test Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 129CC-6410 Acceptance Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 129CC-6420 Surface Cracks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 129CC-6430 Retest . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 129CC-6440 Strains . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 129

vi

Page 9: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

CC-6500 Analysis of Data and Preparation of Report . . . . . . . . . . . . . . . . . . . . . . . 129CC-6510 Resolution of Test Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 129CC-6520 Presentation of Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 130CC-6530 Minimum Report Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 130

Article CC-7000 Overpressure Protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 131

Article CC-8000 Nameplates, Stamping With Certification Mark, and Reports . . . . . 132CC-8100 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 132

Mandatory Appendix D2-I Tables of Prestressing and Liner Material . . . . . . . . . . . . . . . . . . . . . . 133

Mandatory Appendix D2-II Glossary of Terms and Nomenclature . . . . . . . . . . . . . . . . . . . . . . . . . . 138

Article D2-II-1000 Terms and Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 138

Article D2-II-2000 Nomenclature . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 140

Mandatory Appendix D2-III Approval of New Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 142

Article D2-III-1000 Procedure for Obtaining Approval for New Material . . . . . . . . . . . . . 142D2-III-1100 Code Policy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 142D2-III-1200 Data Required to Be Submitted With Requests for Approval . . . . . . . . . 142D2-III-1300 Proprietary Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 143D2-III-1400 Code Case . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 143

Mandatory Appendix D2-IV Rounded Indications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 144

Mandatory Appendix D2-V Qualifications of Concrete Inspection Personnel . . . . . . . . . . . . . . . . . 145

Article D2-V-1000 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 145D2-V-1100 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 145D2-V-1200 Responsibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 145

Article D2-V-2000 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 146D2-V-2100 Planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 146D2-V-2200 Certification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 146

Article D2-V-3000 Qualifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 148D2-V-3100 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 148D2-V-3200 Qualification of Concrete Inspection and Testing Personnel . . . . . . . . . . 148

Article D2-V-4000 Performance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 150D2-V-4100 Concrete Inspection and Testing Functions . . . . . . . . . . . . . . . . . . . . . . . . 150D2-V-4200 Concrete Inspection and Testing Functions . . . . . . . . . . . . . . . . . . . . . . . . 150

Article D2-V-5000 Review of Qualifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 152D2-V-5100 Records of Qualifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 152D2-V-5200 Certification of Concrete Inspection Personnel . . . . . . . . . . . . . . . . . . . . . 152

Mandatory Appendix D2-VI Leak Testing by Vacuum Box Technique . . . . . . . . . . . . . . . . . . . . . . . . 153

Article D2-VI-1000 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 153D2-VI-1100 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 153

Article D2-VI-2000 Vacuum Box Testing of Welds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 154D2-VI-2100 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 154D2-VI-2200 Application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 154D2-VI-2300 Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 154D2-VI-2400 Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 155D2-VI-2500 Procedure Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 155D2-VI-2600 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 155

vii

Page 10: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

Mandatory Appendix D2-VIII Qualifications for Arc Welding Reinforcing Bars . . . . . . . . . . . . . . . . . 156

Article D2-VIII-1000 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 156D2-VIII-1100 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 156D2-VIII-1200 Application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 156D2-VIII-1300 Qualifications, Records, and Identifying Stamps . . . . . . . . . . . . . . . . . . . . 156D2-VIII-1400 General Welding Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 156D2-VIII-1500 Procedure Qualification Requirements for Welding Procedures and

Welders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 159D2-VIII-1600 Examination of Welded Joints of Reinforcing Bar . . . . . . . . . . . . . . . . . . . 161

Nonmandatory Appendix D2-A Typical CRV Load Combinations (Optional) . . . . . . . . . . . . . . . . . . . . . 163

Article D2-A-1000 Typical Load Combinations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 163

Nonmandatory Appendix D2-B Nonmandatory Preheat Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . 164

Article D2-B-1000 Nonmandatory Preheat Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . 164D2-B-1100 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 164D2-B-1200 Ferrous Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 164

Nonmandatory Appendix D2-C Certification of Levels I and II Concrete Inspection Personnel . . . . 165

Article D2-C-1000 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 165D2-C-1100 Objective of Certification Program . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 165D2-C-1200 Organization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 165D2-C-1300 Implementation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 165

Article D2-C-2000 Level I Concrete Inspection Technician . . . . . . . . . . . . . . . . . . . . . . . . . 166D2-C-2100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 166D2-C-2200 Assignment and Description of Duties . . . . . . . . . . . . . . . . . . . . . . . . . . . . 166

Article D2-C-3000 Level II Concrete Inspector . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 167D2-C-3100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 167D2-C-3200 Description of Duties . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 167

Article D2-C-4000 Training . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 168D2-C-4100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 168D2-C-4200 Suggested Classroom Training Courses . . . . . . . . . . . . . . . . . . . . . . . . . . . 168D2-C-4300 On‐The‐Job Training . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 171

Article D2-C-5000 Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 172D2-C-5100 Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 172D2-C-5200 Examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 172D2-C-5300 Scope of the Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 172D2-C-5400 Typical Questions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 172

Nonmandatory Appendix D2-D Liner Dimensional Tolerances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 174

Article D2-D-1000 Liner Dimensional Tolerances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 174D2-D-1100 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 174D2-D-1200 Cylindrical Liners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 174D2-D-1300 Dome Liners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 174

Nonmandatory Appendix D2-E Certified Material Test Reports for Liner Materials . . . . . . . . . . . . . . 178

Article D2-E-1000 Certified Material Test Reports for Liner Materials . . . . . . . . . . . . . . 178D2-E-1100 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 178D2-E-1200 General Required Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 178D2-E-1300 Information Required Under Specific Circumstances . . . . . . . . . . . . . . . . 178D2-E-1400 Execution . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 179

viii

Page 11: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

Nonmandatory Appendix D2-F Reinforcement Fabrication and Placing Tolerances . . . . . . . . . . . . . . 180

Article D2-F-1000 Reinforcement Fabrication and Placing Tolerances . . . . . . . . . . . . . . 180D2-F-1100 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 180D2-F-1200 Fabrication Tolerances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 180D2-F-1300 Placing Tolerances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 180

FIGURESCC-2310-1 Maximum Dimensions of Obstruction or Interruptions of Bar Deformations and Nonplanar

Features of the Bearing Face . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14CC-2462-1 Manufacturer’s Record of Tendon Performance Qualification Tests . . . . . . . . . . . . . . . . . . . 21CC-2465-1 Record of Mechanical Test Results Obtained From Tendon Performance Qualification Tests 22CC-2521.1-1 Determination of Permissible Lowest Service Metal Temperature . . . . . . . . . . . . . . . . . . . . 24CC-2521.1-1M Determination of Permissible Lowest Service Metal Temperature . . . . . . . . . . . . . . . . . . . . 25CC-2613.3.1-1 Delta Ferrite Content . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39CC-2620-1 Dimensions and Tolerances of Standard Studs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40CC-2620-2 Typical Tensile Test Fixture . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41CC-2620-3 Bend Testing Device . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41CC-2620-4 Typical Device for Bend Testing of Small Studs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42CC-3421-1 Allowable Compression Stresses for Factored Loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50CC-3431-1 Allowable Compression Stresses for Service Loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57CC-3831-1 Illustration of Welded Joint Locations Typical of All Categories . . . . . . . . . . . . . . . . . . . . . . 70CC-3840-1 Tapered Transition Sections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72CC-4323-1 Allowable Bend Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77CC-4534-1 Typical Torque Testing Device . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 93CC-4542.2-1 Typical Category D Joints for Nozzle Diameters Over NPS 3 (DN 80) . . . . . . . . . . . . . . . . . 94CC-4542.2-2 Typical Category D Joints for Nozzle Diameters NPS 3 (DN 80) and Less . . . . . . . . . . . . . . 96CC-4542.2-3 Typical Category E Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 98CC-4542.2-4 Typical Category F Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 99CC-4542.2-5 Typical Category G Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 99CC-4542.2-6 Typical Category H Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100CC-4542.2-7 Typical Category J Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101CC-4542.9-1 Fillet and Socket Weld Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 102CC-4543.6-1 Weld Joint Producing Through‐Thickness Loading . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 105CC-4543.6-2 Special Deposition Technique for Weld Joint Producing Through‐Thickness Loading

(Typical) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 105D2-VIII-1420-1 Typical Direct Butt Splices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 158D2-D-1230-1 Measurements of Local Dimensions per D2-F-1230 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 175D2-D-1320-1 Measurement Points per D2-F-1320 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 176D2-D-1330-1 Measurement Points per D2-F-1330 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 177D2-F-1220-1 Standard Fabricating Tolerances for Bar Sizes #3 (10 mm) Through #11 (35 mm) . . . . . 181D2-F-1230-1 Standard Fabricating Tolerances for Bar Sizes #14 (43 mm) and #18 (57 mm) . . . . . . . . 184D2-F-1320-1 Location of Reinforcement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 186

TABLESCC-2222.1-1 Required Limits of Alkali-Silica Reactive Materials in Concrete Aggregates . . . . . . . . . . . . 5CC-2231.3-1 Required Minimum Levels of Cementitious Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6CC-2231-1 Concrete Properties . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7CC-2231.7.1-1 Exposure Categories and Classes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7CC-2231.7.2-1 Requirements for Concrete by Exposure Class . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8CC-2231.7.3-1 Requirements for Concrete Subject to Exposure Class F3 . . . . . . . . . . . . . . . . . . . . . . . . . . . 9CC-2231.7.4-1 Requirements for Establishing Suitability of Cementitious Materials Combinations Exposed

to Water-Soluble Sulfate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9CC-2231.7.5-1 Concrete Air Content for Various Sizes of Coarse Aggregates . . . . . . . . . . . . . . . . . . . . . . . . 9CC-2233.1.2-1 Modification Factor for Standard Deviation When Less Than 30 Tests Are Available . . . . 10

ix

Page 12: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

CC-2233.2.1-1 Required Average Compressive Strength When Data Are Available to Establish a SampleStandard Deviation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

CC-2233.2.2-1 Required Average Compressive Strength When Data Are Not Available to Establish aStandard Deviation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

CC-2243.3.2-1 Schupack Pressure Bleed Test Limits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13CC-2438.4.2-1 Analysis Limits of Permanent Coating Material for CRV Prestressing . . . . . . . . . . . . . . . . . 18CC-2521.1-1 Exemptions From Impact Testing Under CC-2521.1(h) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23CC-2524.2-1 Required Cv Lateral Expansion Values for Liner Material Other Than Bolting . . . . . . . . . . 26CC-2524.2-2 Required Cv Energy Values for Liner Material Other Than Bolting . . . . . . . . . . . . . . . . . . . . 27CC-2524.3(a)-1 Required Cv Values for Bolting Material Tested in Accordance With CC-2524.3(a) . . . . . . 27CC-2524.3(b)-1 Required Cv Values for Bolting Material Tested in Accordance With CC-2524.3(b) and

CC-2524.4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27CC-2524.4-1 Required Cv Energy Values for Liner Material for the Overpressure Test . . . . . . . . . . . . . . 28CC-2613.1-1 Sampling of Welding Materials for Chemical Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37CC-2613.2-1 Welding Material Chemical Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38CC-2623.2-1 Strength Requirements for Studs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43CC-3136.6-1 Classification of Forces in Concrete Containments for Steel Reinforcing and Concrete Al-

lowable Stresses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47CC-3230-1 Load Combinations and Load Factors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49CC-3720-1 Liner Plate Allowables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68CC-3730-1 Liner Anchor Allowables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69CC-4322-1 Minimum Diameter of Bend . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77CC-4333-1 Tensile Requirements for Mechanical Reinforcing Bar Splices, Mechanically Headed De-

formed Bars, and Welded Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81CC-4462-1 Time Limits for Grouting: Permissible Intervals Between Prestressing Steel Installation and

Grouting Without Use of Corrosion Protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85CC-4523-1 Maximum Allowable Offset in Final Welded Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88CC-4534-1 Required Torque for Testing Studs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 92CC-4542.8.1-1 Maximum Thicknesses Permitted . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101CC-4552-1 Mandatory Requirements for Postweld Heat Treatment (PWHT) of Welds . . . . . . . . . . . . 107CC-4552-2 Exemptions to Mandatory PWHT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 107CC-4552-3 Alternative PWHT Temperatures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 108CC-5200-1 Minimum Testing Frequencies for Concrete Constituents and Concrete . . . . . . . . . . . . . . . 115D2-I-1.2 Material for Containment Prestressing Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 133D2-I-2.2 Material for Containment Liners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 133D2-I-2.3 Material for Embedment Anchors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 137D2-V-4100-1 Minimum Levels of Capability for Functions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 150D2-VIII-1410-1 Filler Metal Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 157D2-VIII-1430-1 Minimum Preheat and Interpass Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 160D2-VIII-1620-1 Radiograph Acceptance Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 162

ENDNOTES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 187

x

Page 13: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

ð17ÞLIST OF SECTIONSSECTIONSI Rules for Construction of Power Boilers

II Materials• Part A — Ferrous Material Specifications• Part B — Nonferrous Material Specifications• Part C — Specifications for Welding Rods, Electrodes, and Filler Metals• Part D — Properties (Customary)• Part D — Properties (Metric)

III Rules for Construction of Nuclear Facility Components• Subsection NCA — General Requirements for Division 1 and Division 2• Appendices• Division 1*

– Subsection NB — Class 1 Components– Subsection NC — Class 2 Components– Subsection ND — Class 3 Components– Subsection NE — Class MC Components– Subsection NF — Supports– Subsection NG — Core Support Structures

• Division 2 — Code for Concrete Containments• Division 3 — Containment Systems for Transportation and Storage of Spent Nuclear Fuel and High-LevelRadioactive Material

• Division 5 — High Temperature Reactors

IV Rules for Construction of Heating Boilers

V Nondestructive Examination

VI Recommended Rules for the Care and Operation of Heating Boilers

VII Recommended Guidelines for the Care of Power Boilers

VIII Rules for Construction of Pressure Vessels• Division 1• Division 2 — Alternative Rules• Division 3 — Alternative Rules for Construction of High Pressure Vessels

IX Welding, Brazing, and Fusing Qualifications

X Fiber-Reinforced Plastic Pressure Vessels

XI Rules for Inservice Inspection of Nuclear Power Plant Components

XII Rules for Construction and Continued Service of Transport Tanks

* The 2015 Edition of Section III was the last edition in which Section III, Division 1, Subsection NH, Class 1 Components in Elevated Tem-perature Service, was published. The requirements located within Subsection NH were moved to Section III, Division 5, Subsection HB, SubpartB for the elevated temperature construction of Class A components.

xi

Page 14: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

INTERPRETATIONS

Interpretations are issued in real time in ASME’s Interpretations Database at http://go.asme.org/Interpretations. His-torical BPVC interpretations may also be found in the Database.

CODE CASES

The Boiler and Pressure Vessel Code committees meet regularly to consider proposed additions and revisions to theCode and to formulate Cases to clarify the intent of existing requirements or provide, when the need is urgent, rules formaterials or constructions not covered by existing Code rules. Those Cases that have been adopted will appear in theappropriate 2017 Code Cases book: “Boilers and Pressure Vessels” or “Nuclear Components.” Supplements will be sentor made available automatically to the purchasers of the Code Cases books up to the publication of the 2019 Code.

xii

Page 15: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

FOREWORD*

In 1911, The American Society of Mechanical Engineers established the Boiler and Pressure Vessel Committee to for-mulate standard rules for the construction of steam boilers and other pressure vessels. In 2009, the Boiler and PressureVessel Committee was superseded by the following committees:

(a) Committee on Power Boilers (I)(b) Committee on Materials (II)(c) Committee on Construction of Nuclear Facility Components (III)(d) Committee on Heating Boilers (IV)(e) Committee on Nondestructive Examination (V)(f) Committee on Pressure Vessels (VIII)(g) Committee on Welding, Brazing, and Fusing (IX)(h) Committee on Fiber-Reinforced Plastic Pressure Vessels (X)(i) Committee on Nuclear Inservice Inspection (XI)(j) Committee on Transport Tanks (XII)(k) Technical Oversight Management Committee (TOMC)Where reference is made to “the Committee” in this Foreword, each of these committees is included individually and

collectively.The Committee’s function is to establish rules of safety relating only to pressure integrity, which govern the

construction** of boilers, pressure vessels, transport tanks, and nuclear components, and the inservice inspection of nu-clear components and transport tanks. The Committee also interprets these rules when questions arise regarding theirintent. The technical consistency of the Sections of the Code and coordination of standards development activities of theCommittees is supported and guided by the Technical Oversight Management Committee. This Code does not addressother safety issues relating to the construction of boilers, pressure vessels, transport tanks, or nuclear components, orthe inservice inspection of nuclear components or transport tanks. Users of the Code should refer to the pertinent codes,standards, laws, regulations, or other relevant documents for safety issues other than those relating to pressure integ-rity. Except for Sections XI and XII, and with a few other exceptions, the rules do not, of practical necessity, reflect thelikelihood and consequences of deterioration in service related to specific service fluids or external operating environ-ments. In formulating the rules, the Committee considers the needs of users, manufacturers, and inspectors of pressurevessels. The objective of the rules is to afford reasonably certain protection of life and property, and to provide a marginfor deterioration in service to give a reasonably long, safe period of usefulness. Advancements in design and materialsand evidence of experience have been recognized.

This Code contains mandatory requirements, specific prohibitions, and nonmandatory guidance for construction ac-tivities and inservice inspection and testing activities. The Code does not address all aspects of these activities and thoseaspects that are not specifically addressed should not be considered prohibited. The Code is not a handbook and cannotreplace education, experience, and the use of engineering judgment. The phrase engineering judgment refers to technicaljudgments made by knowledgeable engineers experienced in the application of the Code. Engineering judgments mustbe consistent with Code philosophy, and such judgments must never be used to overrule mandatory requirements orspecific prohibitions of the Code.

The Committee recognizes that tools and techniques used for design and analysis change as technology progressesand expects engineers to use good judgment in the application of these tools. The designer is responsible for complyingwith Code rules and demonstrating compliance with Code equations when such equations are mandatory. The Codeneither requires nor prohibits the use of computers for the design or analysis of components constructed to the

* The information contained in this Foreword is not part of this American National Standard (ANS) and has not been processed in accordancewith ANSI's requirements for an ANS. Therefore, this Foreword may contain material that has not been subjected to public review or a con-sensus process. In addition, it does not contain requirements necessary for conformance to the Code.

** Construction, as used in this Foreword, is an all-inclusive term comprising materials, design, fabrication, examination, inspection, testing,certification, and pressure relief.

xiii

Page 16: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

requirements of the Code. However, designers and engineers using computer programs for design or analysis are cau-tioned that they are responsible for all technical assumptions inherent in the programs they use and the application ofthese programs to their design.The rules established by the Committee are not to be interpreted as approving, recommending, or endorsing any pro-

prietary or specific design, or as limiting in any way the manufacturer’s freedom to choose any method of design or anyform of construction that conforms to the Code rules.The Committee meets regularly to consider revisions of the rules, new rules as dictated by technological development,

Code Cases, and requests for interpretations. Only the Committee has the authority to provide official interpretations ofthis Code. Requests for revisions, new rules, Code Cases, or interpretations shall be addressed to the Secretary in writingand shall give full particulars in order to receive consideration and action (see Submittal of Technical Inquiries to theBoiler and Pressure Vessel Standards Committees). Proposed revisions to the Code resulting from inquiries will be pre-sented to the Committee for appropriate action. The action of the Committee becomes effective only after confirmationby ballot of the Committee and approval by ASME. Proposed revisions to the Code approved by the Committee are sub-mitted to the American National Standards Institute (ANSI) and published at http://go.asme.org/BPVCPublicReview toinvite comments from all interested persons. After public review and final approval by ASME, revisions are published atregular intervals in Editions of the Code.The Committee does not rule on whether a component shall or shall not be constructed to the provisions of the Code.

The scope of each Section has been established to identify the components and parameters considered by the Committeein formulating the Code rules.Questions or issues regarding compliance of a specific component with the Code rules are to be directed to the ASME

Certificate Holder (Manufacturer). Inquiries concerning the interpretation of the Code are to be directed to the Commit-tee. ASME is to be notified should questions arise concerning improper use of an ASME Certification Mark.When required by context in this Section, the singular shall be interpreted as the plural, and vice versa, and the fem-

inine, masculine, or neuter gender shall be treated as such other gender as appropriate.

xiv

Page 17: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

STATEMENT OF POLICY ON THE USE OF THE CERTIFICATIONMARK AND CODE AUTHORIZATION IN ADVERTISING

ASME has established procedures to authorize qualified organizations to perform various activities in accordancewith the requirements of the ASME Boiler and Pressure Vessel Code. It is the aim of the Society to provide recognitionof organizations so authorized. An organization holding authorization to perform various activities in accordance withthe requirements of the Code may state this capability in its advertising literature.

Organizations that are authorized to use the Certification Mark for marking items or constructions that have beenconstructed and inspected in compliance with the ASME Boiler and Pressure Vessel Code are issued Certificates ofAuthorization. It is the aim of the Society to maintain the standing of the Certification Mark for the benefit of the users,the enforcement jurisdictions, and the holders of the Certification Mark who comply with all requirements.

Based on these objectives, the following policy has been established on the usage in advertising of facsimiles of theCertification Mark, Certificates of Authorization, and reference to Code construction. The American Society of MechanicalEngineers does not “approve,” “certify,” “rate,” or “endorse” any item, construction, or activity and there shall be no state-ments or implications that might so indicate. An organization holding the Certification Mark and/or a Certificate ofAuthorization may state in advertising literature that items, constructions, or activities “are built (produced or per-formed) or activities conducted in accordance with the requirements of the ASME Boiler and Pressure Vessel Code,”or “meet the requirements of the ASME Boiler and Pressure Vessel Code.”An ASME corporate logo shall not be usedby any organization other than ASME.

The Certification Mark shall be used only for stamping and nameplates as specifically provided in the Code. However,facsimiles may be used for the purpose of fostering the use of such construction. Such usage may be by an association ora society, or by a holder of the Certification Mark who may also use the facsimile in advertising to show that clearly spe-cified items will carry the Certification Mark. General usage is permitted only when all of a manufacturer’s items areconstructed under the rules.

STATEMENT OF POLICY ON THE USE OF ASME MARKING TOIDENTIFY MANUFACTURED ITEMS

The ASME Boiler and Pressure Vessel Code provides rules for the construction of boilers, pressure vessels, and nuclearcomponents. This includes requirements for materials, design, fabrication, examination, inspection, and stamping. Itemsconstructed in accordance with all of the applicable rules of the Code are identified with the official Certification Markdescribed in the governing Section of the Code.

Markings such as “ASME,” “ASME Standard,” or any other marking including “ASME” or the Certification Mark shall notbe used on any item that is not constructed in accordance with all of the applicable requirements of the Code.

Items shall not be described on ASME Data Report Forms nor on similar forms referring to ASME that tend to implythat all Code requirements have been met when, in fact, they have not been. Data Report Forms covering items not fullycomplying with ASME requirements should not refer to ASME or they should clearly identify all exceptions to the ASMErequirements.

xv

Page 18: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

ð17Þ SUBMITTAL OF TECHNICAL INQUIRIES TO THE BOILER ANDPRESSURE VESSEL STANDARDS COMMITTEES

1 INTRODUCTION

(a) The following information provides guidance to Code users for submitting technical inquiries to the applicableBoiler and Pressure Vessel (BPV) Standards Committee (hereinafter referred to as the Committee). See the guidelineson approval of new materials under the ASME Boiler and Pressure Vessel Code in Section II, Part D for requirements forrequests that involve adding new materials to the Code. See the guidelines on approval of new welding and brazing ma-terials in Section II, Part C for requirements for requests that involve adding new welding and brazing materials (“con-sumables”) to the Code.Technical inquiries can include requests for revisions or additions to the Code requirements, requests for Code Cases,

or requests for Code Interpretations, as described below:(1) Code Revisions. Code revisions are considered to accommodate technological developments, to address admin-

istrative requirements, to incorporate Code Cases, or to clarify Code intent.(2) Code Cases. Code Cases represent alternatives or additions to existing Code requirements. Code Cases are writ-

ten as a Question and Reply, and are usually intended to be incorporated into the Code at a later date. When used, CodeCases prescribe mandatory requirements in the same sense as the text of the Code. However, users are cautioned thatnot all regulators, jurisdictions, or Owners automatically accept Code Cases. The most common applications for CodeCases are as follows:

(-a) to permit early implementation of an approved Code revision based on an urgent need(-b) to permit use of a new material for Code construction(-c) to gain experience with new materials or alternative requirements prior to incorporation directly into the

Code(3) Code Interpretations(-a) Code Interpretations provide clarification of the meaning of existing requirements in the Code and are pre-

sented in Inquiry and Reply format. Interpretations do not introduce new requirements.(-b) If existing Code text does not fully convey the meaning that was intended, or conveys conflicting require-

ments, and revision of the requirements is required to support the Interpretation, an Intent Interpretation will be issuedin parallel with a revision to the Code.(b) Code requirements, Code Cases, and Code Interpretations established by the Committee are not to be considered

as approving, recommending, certifying, or endorsing any proprietary or specific design, or as limiting in any way thefreedom of manufacturers, constructors, or Owners to choose any method of design or any form of construction thatconforms to the Code requirements.(c) Inquiries that do not comply with the following guidance or that do not provide sufficient information for the Com-

mittee’s full understanding may result in the request being returned to the Inquirer with no action.

2 INQUIRY FORMAT

Submittals to the Committee should include the following information:(a) Purpose. Specify one of the following:

(1) request for revision of present Code requirements(2) request for new or additional Code requirements(3) request for Code Case(4) request for Code Interpretation

(b) Background. The Inquirer should provide the information needed for the Committee’s understanding of the In-quiry, being sure to include reference to the applicable Code Section, Division, Edition, Addenda (if applicable), para-graphs, figures, and tables. Preferably, the Inquirer should provide a copy of, or relevant extracts from, the specificreferenced portions of the Code.

xvi

Page 19: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

(c) Presentations. The Inquirer may desire to attend or be asked to attend a meeting of the Committee to make a for-mal presentation or to answer questions from the Committee members with regard to the Inquiry. Attendance at a BPVStandards Committee meeting shall be at the expense of the Inquirer. The Inquirer’s attendance or lack of attendance ata meeting will not be used by the Committee as a basis for acceptance or rejection of the Inquiry by the Committee. How-ever, if the Inquirer’s request is unclear, attendance by the Inquirer or a representative may be necessary for the Com-mittee to understand the request sufficiently to be able to provide an Interpretation. If the Inquirer desires to make apresentation at a Committee meeting, the Inquirer should provide advance notice to the Committee Secretary, to ensuretime will be allotted for the presentation in the meeting agenda. The Inquirer should consider the need for additionalaudiovisual equipment that might not otherwise be provided by the Committee. With sufficient advance notice to theCommittee Secretary, such equipment may be made available.

3 CODE REVISIONS OR ADDITIONS

Requests for Code revisions or additions should include the following information:(a) Requested Revisions or Additions. For requested revisions, the Inquirer should identify those requirements of the

Code that they believe should be revised, and should submit a copy of, or relevant extracts from, the appropriate require-ments as they appear in the Code, marked up with the requested revision. For requested additions to the Code, the In-quirer should provide the recommended wording and should clearly indicate where they believe the additions should belocated in the Code requirements.

(b) Statement of Need. The Inquirer should provide a brief explanation of the need for the revision or addition.(c) Background Information. The Inquirer should provide background information to support the revision or addition,

including any data or changes in technology that form the basis for the request, that will allow the Committee to ade-quately evaluate the requested revision or addition. Sketches, tables, figures, and graphs should be submitted, as appro-priate. The Inquirer should identify any pertinent portions of the Code that would be affected by the revision or additionand any portions of the Code that reference the requested revised or added paragraphs.

4 CODE CASES

Requests for Code Cases should be accompanied by a statement of need and background information similar to thatdescribed in 3(b) and 3(c), respectively, for Code revisions or additions. The urgency of the Code Case (e.g., project un-derway or imminent, new procedure) should be described. In addition, it is important that the request is in connectionwith equipment that will bear the Certification Mark, with the exception of Section XI applications. The proposed CodeCase should identify the Code Section and Division, and should be written as a Question and a Reply, in the same formatas existing Code Cases. Requests for Code Cases should also indicate the applicable Code Editions and Addenda (if ap-plicable) to which the requested Code Case applies.

5 CODE INTERPRETATIONS

(a) Requests for Code Interpretations should be accompanied by the following information:(1) Inquiry. The Inquirer should propose a condensed and precise Inquiry, omitting superfluous background infor-

mation and, when possible, composing the Inquiry in such a way that a “yes” or a “no” Reply, with brief limitations orconditions, if needed, can be provided by the Committee. The proposed question should be technically and editoriallycorrect.

(2) Reply. The Inquirer should propose a Reply that clearly and concisely answers the proposed Inquiry question.Preferably, the Reply should be “yes” or “no,” with brief limitations or conditions, if needed.

(3) Background Information. The Inquirer should provide any need or background information, such as described in3(b) and 3(c), respectively, for Code revisions or additions, that will assist the Committee in understanding the proposedInquiry and Reply.

If the Inquirer believes a revision of the Code requirements would be helpful to support the Interpretation, the In-quirer may propose such a revision for consideration by the Committee. In most cases, such a proposal is not necessary.

(b) Requests for Code Interpretations should be limited to an Interpretation of a particular requirement in the Code orin a Code Case. Except with regard to interpreting a specific Code requirement, the Committee is not permitted to con-sider consulting-type requests such as the following:

(1) a review of calculations, design drawings, welding qualifications, or descriptions of equipment or parts to de-termine compliance with Code requirements

xvii

Page 20: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

(2) a request for assistance in performing any Code-prescribed functions relating to, but not limited to, materialselection, designs, calculations, fabrication, inspection, pressure testing, or installation

(3) a request seeking the rationale for Code requirements

6 SUBMITTALS

(a) Submittal. Requests for Code Interpretation should preferably be submitted through the online Interpretation Sub-mittal Form. The form is accessible at http://go.asme.org/InterpretationRequest. Upon submittal of the form, the In-quirer will receive an automatic e-mail confirming receipt. If the Inquirer is unable to use the online form, theInquirer may mail the request to the following address:

SecretaryASME Boiler and Pressure Vessel CommitteeTwo Park AvenueNew York, NY 10016-5990

All other Inquiries should be mailed to the Secretary of the BPV Committee at the address above. Inquiries are unlikelyto receive a response if they are not written in clear, legible English. They must also include the name of the Inquirer andthe company they represent or are employed by, if applicable, and the Inquirer’s address, telephone number, fax num-ber, and e-mail address, if available.(b) Response. The Secretary of the appropriate Committee will provide a written response, via letter or e-mail, as ap-

propriate, to the Inquirer, upon completion of the requested action by the Committee. Inquirers may track the status oftheir Interpretation Request at http://go.asme.org/Interpretations.

xviii

Page 21: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

ð17ÞPERSONNELASME Boiler and Pressure Vessel Standards Committees,

Subgroups, and Working GroupsJanuary 1, 2017

TECHNICAL OVERSIGHT MANAGEMENT COMMITTEE (TOMC)

T. P. Pastor, ChairS. C. Roberts, Vice ChairJ. S. Brzuszkiewicz, Staff SecretaryR. W. BarnesR. J. BasileT. L. BedeauxD. L. BergerD. A. CanonicoA. ChaudouetD. B. DeMichaelR. P. DeublerP. D. EdwardsJ. G. FeldsteinR. E. GimpleT. E. HansenG. W. Hembree

J. F. HenryR. S. Hill IIIG. G. KarcherW. M. LundyG. C. ParkM. D. RanaR. F. Reedy, Sr.B. W. RobertsF. J. Schaaf, Jr.B. F. ShelleyW. J. SperkoD. SrnicR. W. SwayneC. WithersJ. E. Batey, Contributing Member

HONORARY MEMBERS (MAIN COMMITTEE)

F. P. BartonT. M. CullenG. E. FeigelO. F. HeddenM. H. JawadA. J. Justin

W. G. KnechtJ. LeCoffT. G. McCartyG. C. MillmanR. A. MoenR. F. Reedy, Sr.

ADMINISTRATIVE COMMITTEE

T. P. Pastor, ChairS. C. Roberts, Vice ChairJ. S. Brzuszkiewicz, Staff SecretaryR. W. BarnesT. L. BedeauxD. L. BergerG. W. Hembree

J. F. Henry

R. S. Hill III

G. C. Park

M. D. Rana

B. F. Shelley

W. J. Sperko

MARINE CONFERENCE GROUP

H. N. Patel, ChairJ. S. Brzuszkiewicz, Staff SecretaryJ. G. Hungerbuhler, Jr.

G. PallichadathN. ProkopukJ. D. Reynolds

CONFERENCE COMMITTEE

D. A. Douin — Ohio, SecretaryM. J. Adams — Ontario, CanadaJ. T. Amato — MinnesotaW. Anderson — MississippiR. D. Austin — ArizonaR. J. Brockman — MissouriJ. H. Burpee — MaineM. Byrum — AlabamaC. B. Cantrell — NebraskaS. Chapman — TennesseeD. C. Cook — CaliforniaB. J. Crawford — GeorgiaE. L. Creaser — New Brunswick,Canada

J. J. Dacanay — HawaiiC. Dautrich — North CarolinaR. Delury — Manitoba, CanadaP. L. Dodge— Nova Scotia, CanadaD. Eastman — Newfoundland andLabrador, Canada

J. J. Esch — DelawareA. G. Frazier — FloridaT. J. Granneman II — OklahomaD. R. Hannon — ArkansasE. G. Hilton — VirginiaC. Jackson — City of Detroit,Michigan

M. L. Jordan — KentuckyE. Kawa, Jr. — MassachusettsA. Khssassi — Quebec, CanadaJ. Klug — City of Milwaukee,Wisconsin

K. J. Kraft — MarylandK. S. Lane — AlaskaL. C. Leet — City of Seattle,Washington

J. LeSage, Jr. — LouisianaA. M. Lorimor — South DakotaM. Mailman — NorthwestTerritories, Canada

D. E. Mallory — New HampshireW. McGivney — City of New York,New York

S. V. Nelson — ColoradoA. K. Oda — WashingtonM. Poehlmann — Alberta, CanadaJ. F. Porcella — West VirginiaC. F. Reyes — City of Los Angeles,California

M. J. Ryan — City of Chicago,Illinois

D. Sandfoss — NevadaM. H. Sansone — New YorkA. S. Scholl — British Columbia,Canada

T. S. Seime — North DakotaC. S. Selinger — Saskatchewan,Canada

J. E. Sharier — OhioN. Smith — PennsylvaniaR. Spiker — North CarolinaD. J. Stenrose — MichiganR. J. Stimson II — KansasR. K. Sturm — UtahS. R. Townsend — Prince EdwardIsland, Canada

R. D. Troutt — TexasM. C. Vogel — IllinoisT. Waldbillig — WisconsinM. Washington — New Jersey

INTERNATIONAL INTEREST REVIEW GROUP

V. FelixY.-G. KimS. H. LeongW. LinO. F. Manafa

C. MinuT. S. G. NarayannenY.-W. ParkA. R. R. NogalesP. Williamson

xix

Page 22: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

COMMITTEE ON POWER BOILERS (BPV I)

D. L. Berger, ChairR. E. McLaughlin, Vice ChairU. D’Urso, Staff SecretaryJ. L. ArnoldD. A. CanonicoK. K. ColemanP. D. EdwardsJ. G. FeldsteinG. W. GalanesT. E. HansenJ. F. HenryJ. S. HunterG. B. KomoraW. L. LowryF. MassiL. MoedingerP. A. Molvie

Y. OishiE. M. OrtmanJ. T. PillowM. SlaterJ. M. TanzoshD. E. TompkinsD. E. TuttleJ. VattappillyR. V. WielgoszinskiF. ZellerY. Li, DelegateH. Michael, DelegateB. W. Roberts, ContributingMember

D. N. French, Honorary MemberT. C. McGough, Honorary MemberR. L. Williams, Honorary Member

Subgroup on Design (BPV I)

J. Vattappilly, ChairD. I. Anderson, SecretaryD. DeweesH. A. Fonzi, Jr.J. P. GlaspieG. B. Komora

P. A. MolvieL. S. TsaiM. WadkinsonC. F. Jeerings, Contributing MemberS. V. Torkildson, ContributingMember

Subgroup on Fabrication and Examination (BPV I)

J. L. Arnold, ChairP. BeckerD. L. BergerS. FincherG. W. GalanesP. F. GilstonJ. Hainsworth

T. E. HansenC. T. McDarisR. E. McLaughlinR. J. NewellY. OishiJ. T. PillowR. V. Wielgoszinski

Subgroup on General Requirements and Piping (BPV I)

E. M. Ortman, ChairD. Tompkins, Vice ChairF. Massi, SecretaryP. BeckerD. L. BergerP. D. EdwardsG. W. GalanesT. E. HansenM. LemmonsW. L. Lowry

R. E. McLaughlinB. J. MollitorJ. T. PillowD. E. TuttleM. WadkinsonR. V. WielgoszinskiC. F. Jeerings, Contributing MemberS. V. Torkildson, ContributingMember

R. Uebel, Contributing Member

Subgroup on Locomotive Boilers (BPV I)

L. Moedinger, ChairS. M. Butler, SecretaryP. BoschanJ. R. BraunR. C. Franzen, Jr.G. W. GalanesD. W. Griner

S. D. Jackson

M. A. Janssen

S. A. Lee

G. M. Ray

R. B. Stone

M. W. Westland

Subgroup on Materials (BPV I)

G. W. Galanes, ChairJ. F. Henry, Vice ChairM. Lewis, SecretaryS. H. BowesD. A. CanonicoK. K. ColemanK. L. HayesJ. S. HunterO. X. Li

F. Masuyama

D. W. Rahoi

J. M. Tanzosh

J. Vattappilly

F. Zeller

M. Gold, Contributing Member

B. W. Roberts, ContributingMember

Subgroup on Solar Boilers (BPV I)

E. M. Ortman, ChairR. E. Hearne, SecretaryH. A. Fonzi, Jr.G. W. GalanesJ. S. Hunter

P. JenningsD. J. KozaF. MassiS. V. Torkildson, ContributingMember

Germany International Working Group (BPV I)

H. Michael, ChairH. P. Schmitz, SecretaryM. BremickerP. ChavdarovB. DaumeJ. FleischfresserE. HelmholdtR. KauerS. Krebs

T. LudwigR. A. MeyersF. MiunskeP. PaluszkiewiczH. SchroederA. SpangenbergM. SykoraJ. Henrichsmeyer, ContributingMember

India International Working Group (BPV I)

U. Revisanakaran, ChairA. J. Patil, Vice ChairH. Dalal, SecretaryK. AsokkumarM. R. KalahasthiI. KalyanasundaramA. R. Patil

G. V. S. Rao

M. G. Rao

N. Satheesan

G. U. Shanker

D. Shrivastava

S. Venkataramana

Task Group on Modernization of BPVC Section I

D. I. Anderson, ChairU. D’Urso, Staff SecretaryJ. L. ArnoldD. DeweesG. W. GalanesJ. P. GlaspieT. E. HansenJ. F. Henry

R. E. McLaughlin

P. A. Molvie

E. M. Ortman

J. T. Pillow

B. W. Roberts

D. E. Tuttle

J. Vattappilly

xx

Page 23: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

COMMITTEE ON MATERIALS (BPV II)

J. F. Henry, ChairJ. F. Grubb, Vice ChairC. E. O’Brien, Staff SecretaryF. AbeA. AppletonJ. CameronD. A. CanonicoA. ChaudouetD. B. DenisJ. R. FouldsD. W. GandyM. H. GilkeyJ. A. HallK. M. HottleM. IshikawaO. X. LiF. MasuyamaR. K. NanstadK. E. OrieD. W. RahoiE. ShapiroM. J. SlaterR. C. SutherlinR. W. Swindeman

J. M. TanzoshR. G. YoungF. ZellerO. Oldani, DelegateH. D. Bushfield, ContributingMember

M. Gold, Contributing MemberW. Hoffelner, Contributing MemberM. Katcher, Contributing MemberM. L. Nayyar, Contributing MemberE. G. Nisbett, Contributing MemberD. T. Peters, Contributing MemberB. W. Roberts, ContributingMember

E. Thomas, Contributing MemberE. Upitis, Contributing MemberT. M. Cullen, Honorary MemberW. D. Edsall, Honorary MemberG. C. Hsu, Honorary MemberR. A. Moen, Honorary MemberC. E. Spaeder, Jr., HonoraryMember

A. W. Zeuthen, Honorary Member

Executive Committee (BPV II)

J. F. Henry, ChairC. E. O’Brien, Staff SecretaryA. AppletonA. ChaudouetJ. R. FouldsM. Gold

J. F. GrubbR. W. MikitkaB. W. RobertsM. J. SlaterR. C. SutherlinR. W. Swindeman

Subgroup on External Pressure (BPV II)

R. W. Mikitka, ChairD. L. Kurle, Vice ChairJ. A. A. Morrow, SecretaryL. F. CampbellH. ChenD. S. GriffinJ. F. GrubbS. Guzey

J. R. Harris III

M. H. Jawad

C. R. Thomas

M. Wadkinson

M. Katcher, Contributing Member

C. H. Sturgeon, ContributingMember

Subgroup on Ferrous Specifications (BPV II)

A. Appleton, ChairK. M. Hottle, Vice ChairP. Wittenbach, SecretaryH. ChenB. M. DingmanM. J. DosdourianO. ElkadimJ. D. FritzM. GoldT. GrahamJ. M. GrockiJ. F. GrubbJ. Gundlach

C. HydeD. S. JanikowskiL. J. LavezziS. G. LeeW. C. MackA. S. MelilliK. E. OrieJ. ShickE. UpitisJ. D. WilsonR. ZawieruchaE. G. Nisbett, Contributing Member

Subgroup on International Material Specifications (BPV II)

A. Chaudouet, ChairA. R. Nywening, Vice ChairT. F. Miskell, SecretaryD. A. CanonicoH. ChenA. F. GarbolevskyD. O. Henry

M. IshikawaO. X. LiW. M. LundyE. UpitisF. ZellerO. Oldani, DelegateH. Lorenz, Contributing Member

Subgroup on Nonferrous Alloys (BPV II)

R. C. Sutherlin, ChairM. H. Gilkey, Vice ChairJ. CallandD. B. DenisJ. F. GrubbT. HartmanA. HeinoM. KatcherJ. A. McMasterL. Paul

D. W. Rahoi

W. Ren

J. Robertson

E. Shapiro

M. H. Skillingberg

J. Weritz

R. Wright

S. Yem

D. T. Peters, Contributing Member

Subgroup on Physical Properties (BPV II)

J. F. Grubb, ChairD. B. Denis, Vice ChairE. Shapiro

H. D. Bushfield, ContributingMember

Subgroup on Strength, Ferrous Alloys (BPV II)

M. J. Slater, ChairS. W. Knowles, SecretaryF. AbeD. A. CanonicoA. Di RienzoJ. R. FouldsJ. A. HallJ. F. HenryK. KimuraF. MasuyamaT. Ono

M. OrtolaniD. W. RahoiM. S. SheltonR. W. SwindemanJ. M. TanzoshR. G. YoungF. ZellerM. Gold, Contributing MemberM. Nair, Contributing MemberB. W. Roberts, ContributingMember

Subgroup on Strength of Weldments (BPV II & BPV IX)

W. F. Newell, Jr., ChairS. H. BowesK. K. ColemanM. DenaultP. D. FlennerJ. R. FouldsD. W. GandyM. GhahremaniK. L. Hayes

J. F. HenryE. LieblJ. PensoD. W. RahoiB. W. RobertsW. J. SperkoJ. P. Swezy, Jr.J. M. TanzoshM. Gold, Contributing Member

Working Group on Materials Database (BPV II)

R. W. Swindeman, ChairC. E. O’Brien, Staff SecretaryF. AbeJ. R. FouldsJ. F. HenryM. J. SlaterR. C. SutherlinD. Andrei, Contributing Member

J. L. Arnold, Contributing MemberJ. Grimes, Contributing MemberW. Hoffelner, Contributing MemberT. Lazar, Contributing MemberD. T. Peters, Contributing MemberW. Ren, Contributing MemberB. W. Roberts, ContributingMember

xxi

Page 24: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

Working Group on Creep Strength Enhanced Ferritic Steels (BPV II)

J. F. Henry, ChairJ. A. Siefert, SecretaryF. AbeS. H. BowesD. A. CanonicoK. K. ColemanP. D. FlennerJ. R. FouldsG. W. GalanesM. GoldF. MasuyamaT. Melfi

W. F. Newell, Jr.M. OrtolaniJ. ParkerW. J. SperkoR. W. SwindemanJ. M. TanzoshR. H. WorthingtonR. G. YoungF. ZellerG. Cumino, Contributing MemberB. W. Roberts, ContributingMember

Working Group on Data Analysis (BPV II)

J. F. Grubb, ChairF. AbeJ. R. FouldsM. GoldJ. F. HenryM. KatcherF. Masuyama

W. Ren

M. Subanovic

M. J. Swindeman

R. W. Swindeman

B. W. Roberts, ContributingMember

China International Working Group (BPV II)

B. Shou, ChairA. T. Xu, SecretaryW. FangQ. C. FengS. HuoF. KongH. LiJ. LiS. LiZ. RongcanS. TanC. WangJ. WangQ.-J. Wang

X. WangF. YangG. YangH.-C. YangR. YeL. YinD. ZhangH. ZhangX.-H. ZhangYingkai ZhangYong ZhangQ. ZhaoS. ZhaoJ. Zou

COMMITTEE ON CONSTRUCTION OF NUCLEAR FACILITYCOMPONENTS (BPV III)

R. S. Hill III, ChairR. B. Keating, Vice ChairJ. C. Minichiello, Vice ChairA. Byk, Staff SecretaryT. M. AdamsA. AppletonR. W. BarnesW. H. BorterC. W. BrunyT. D. BurchellR. P. DeublerA. C. EberhardtR. M. JesseeR. I. JetterC. C. KimG. H. KooV. KostarevK. A. ManolyD. E. MatthewsR. P. McIntyreM. N. Mitchell

M. MorishitaD. K. MortonT. NagataR. F. Reedy, Sr.I. SaitoS. ShamC. T. SmithW. K. Sowder, Jr.W. J. SperkoJ. P. TuckerK. R. WichmanC. S. WithersY. H. Choi, DelegateT. Ius, DelegateH.-T. Wang, DelegateM. Zhou, Contributing MemberE. B. Branch, Honorary MemberG. D. Cooper, Honorary MemberD. F. Landers, Honorary MemberR. A. Moen, Honorary MemberC. J. Pieper, Honorary Member

Executive Committee (BPV III)

R. S. Hill III, ChairA. Byk, Staff SecretaryT. M. AdamsC. W. BrunyP. R. DonavinR. M. JesseeR. B. KeatingR. P. McIntyre

J. C. Minichiello

M. Morishita

D. K. Morton

J. A. Munshi

C. A. Sanna

S. Sham

W. K. Sowder, Jr.

Subcommittee on Design (BPV III)

P. R. Donavin, ChairD. E. Matthews, Vice ChairG. L. Hollinger, SecretaryT. M. AdamsR. L. BrattonC. W. BrunyR. P. DeublerR. I. JetterC. JonkerR. B. KeatingK. A. ManolyR. J. Masterson

M. N. Mitchell

W. J. O’Donnell, Sr.E. L. Pleins

S. Sham

J. P. Tucker

W. F. Weitze

K. Wright

T. Yamazaki

J. Yang

R. S. Hill III, Contributing Member

M. H. Jawad, Contributing Member

Subgroup on Component Design (SC-D) (BPV III)

T. M. Adams, ChairR. B. Keating, Vice ChairS. Pellet, SecretaryG. A. AntakiS. AsadaJ. F. BallC. BasavarajuR. P. DeublerP. HirschbergO.-S. KimR. KleinH. KobayashiK. A. ManolyR. J. MastersonD. E. MatthewsJ. C. MinichielloD. K. Morton

T. M. MustoT. NagataA. N. NguyenE. L. PleinsI. SaitoG. C. SlagisJ. R. StinsonG. Z. TokarskiJ. P. TuckerP. VockC. WilsonJ. YangC. W. Bruny, Contributing MemberA. A. Dermenjian, ContributingMember

K. R. Wichman, Honorary Member

Working Group on Core Support Structures (SG-CD) (BPV III)

J. Yang, ChairJ. F. Kielb, SecretaryL. C. HartlessD. KeckT. LiszkaiH. S. Mehta

M. NakajimaM. D. SnyderA. TsirigotisR. VollmerR. Z. ZieglerJ. T. Land, Contributing Member

Working Group on Design of Division 3 Containment Systems(SG-CD) (BPV III)

D. K. Morton, ChairD. J. AmmermanG. BjorkmanV. BrozS. HorowitzD. W. LewisJ. C. Minichiello

E. L. Pleins

C. J. Temus

X. Zhai

I. D. McInnes, Contributing Member

H. P. Shrivastava, ContributingMember

xxii

Page 25: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

Working Group on HDPE Design of Components (SG-CD) (BPV III)

T. M. Musto, ChairJ. Ossmann, SecretaryT. M. AdamsT. A. BaconM. BrandesD. BurwellS. ChoiJ. R. Hebeisen

P. KrishnaswamyK. A. ManolyM. MartinJ. C. MinichielloD. P. MunsonF. J. Schaaf, Jr.R. StakenborghsH. E. Svetlik

Working Group on Piping (SG-CD) (BPV III)

G. A. Antaki, ChairG. Z. Tokarski, SecretaryT. M. AdamsT. A. BaconC. BasavarajuJ. CatalanoF. ClaeysC. M. FaidyR. G. GiladaN. M. GrahamM. A. GrayR. J. GurdalR. W. HauptA. HiranoP. HirschbergM. KassarJ. Kawahata

R. B. KeatingV. KostarevD. LiebT. B. LittletonY. LiuJ. F. McCabeJ. C. MinichielloI.-K. NamM. S. SillsG. C. SlagisN. C. SutherlandC.-I. WuA. N. Nguyen, Contributing MemberN. J. Shah, Contributing MemberE. A. Wais, Contributing MemberE. C. Rodabaugh, HonoraryMember

Working Group on Pressure Relief (SG-CD) (BPV III)

J. F. Ball, ChairK. R. MayD. Miller

A. L. SzeglinD. G. ThibaultI. H. Tseng

Working Group on Pumps (SG-CD) (BPV III)

R. Klein, ChairD. Chowdhury, SecretaryP. W. BehnkeR. E. Cornman, Jr.X. DiM. D. EftychiouA. FraserC. GabhartR. Ghanbari

M. Higuchi

R. Ladefian

W. Lienau

K. J. Noel

R. A. Patrick

J. Sulley

R. Udo

A. G. Washburn

Working Group on Supports (SG-CD) (BPV III)

J. R. Stinson, ChairU. S. Bandyopadhyay, SecretaryK. AvrithiT. H. BakerF. J. BirchR. P. DeublerN. M. GrahamR. J. Masterson

S. Pellet

I. Saito

H. P. Srivastava

C. Stirzel

G. Z. Tokarski

P. Wiseman

C.-I. Wu

Working Group on Valves (SG-CD) (BPV III)

P. Vock, ChairS. Jones, SecretaryM. C. BuckleyR. FarrellG. A. JollyJ. KleinT. Lippucci

C. A. MizerJ. O’CallaghanH. O’BrienK. E. Reid IIJ. SulleyI. H. TsengJ. P. Tucker

Working Group on Vessels (SG-CD) (BPV III)

D. E. Matthews, ChairC. Wilson, SecretaryC. BasavarajuJ. V. Gregg, Jr.M. KassarR. B. KeatingD. KeckJ. KimO.-S. KimT. MitsuhashiM. Nair

T. J. Schriefer

M. C. Scott

P. K. Shah

J. Shupert

C. Turylo

D. Vlaicu

W. F. Weitze

T. Yamazaki

R. Z. Ziegler

A. Kalnins, Contributing Member

Subgroup on Design Methods (SC-D) (BPV III)

C. W. Bruny, ChairS. McKillop, SecretaryK. AvrithiW. CulpP. R. DonavinJ. V. Gregg, Jr.H. T. Harrison IIIK. HsuC. JonkerM. Kassar

D. Keck

M. N. Mitchell

W. J. O’Donnell, Sr.P. J. O’ReganW. D. Reinhardt

P. Smith

S. D. Snow

W. F. Weitze

K. Wright

Working Group on Design Methodology (SG-DM) (BPV III)

S. D. Snow, ChairC. F. Heberling II, SecretaryK. AvrithiC. BasavarajuD. L. CaldwellD. DeweesC. M. FaidyR. FarrellH. T. Harrison IIIP. HirschbergM. KassarR. B. KeatingJ. KimH. KobayashiT. Liszkai

J. F. McCabeS. McKillopS. RanganathW. D. ReinhardtD. H. RoartyP. K. ShahR. VollmerS. WangW. F. WeitzeJ. WenT. M. WigerK. WrightJ. YangR. D. Blevins, Contributing MemberM. R. Breach, Contributing Member

Working Group on Environmental Effects (SG-DM) (BPV III)

C. Jonker, ChairB. D. Frew, SecretaryW. CulpP. J. Dobson

J. KimJ. E. NestellM. OsterfossT. J. Schriefer

xxiii

Page 26: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

Working Group on Environmental Fatigue Evaluation Methods(SG-DM) (BPV III)

K. Wright, ChairM. A. Gray, Vice ChairW. F. Weitze, SecretaryT. M. AdamsS. AsadaK. AvrithiR. C. CipollaT. M. DamianiC. M. FaidyT. D. Gilman

S. R. GosselinY. HeP. HirschbergH. S. MehtaT. MetaisJ.-S. ParkD. H. RoartyI. SaitoD. VlaicuR. Z. Ziegler

Working Group on Fatigue Strength (SG-DM) (BPV III)

P. R. Donavin, ChairM. S. Shelton, SecretaryT. M. DamianiD. DeweesC. M. FaidyS. R. GosselinR. J. GurdalC. F. Heberling IIC. E. HinnantP. HirschbergK. Hsu

S. H. Kleinsmith

S. Majumdar

S. N. Malik

S. Mohanty

D. H. Roarty

A. Tsirigotis

K. Wright

H. H. Ziada

W. J. O'Donnell, Sr., ContributingMember

Working Group on Graphite and Composites Design(SG-DM) (BPV III)

M. N. Mitchell, ChairM. W. Davies, Vice ChairT. D. Burchell, SecretaryA. AppletonS. R. CadellS.-H. ChiW. J. Geringer

S. T. GonczyM. G. JenkinsY. KatohJ. OssmannM. RoemmlerS. YuG. L. Zeng

Working Group on Probabilistic Methods in Design(SG-DM) (BPV III)

M. Golliet, ChairT. AsayamaK. AvrithiD. O. HenryR. S. Hill III

M. MorishitaP. J. O'ReganN. A. PalmI. Saito

Special Working Group on Computational Modeling for ExplicitDynamics (SG-DM) (BPV III)

G. Bjorkman, ChairD. J. Ammerman, Vice ChairV. Broz, SecretaryM. R. BreachJ. M. JordanS. KuehnerD. Molitoris

W. D. Reinhardt

P. Y.-K. Shih

S. D. Snow

C.-F. Tso

M. C. Yaksh

U. Zencker

Subgroup on Elevated Temperature Design (SC-D) (BPV III)

S. Sham, ChairT. AsayamaC. Becht IVF. W. BrustP. CarterB. F. HantzA. B. HullM. H. JawadR. I. Jetter

G. H. KooS. MajumdarJ. E. NestellW. J. O'Donnell, Sr.R. W. SwindemanD. S. Griffin, Contributing MemberW. J. Koves, Contributing MemberD. L. Marriott, ContributingMember

Working Group on Allowable Stress Criteria (SG-ETD) (BPV III)

R. W. Swindeman, ChairR. Wright, SecretaryJ. R. FouldsC. J. JohnsK. KimuraT. LeM. Li

D. MaitraS. N. MalikJ. E. NestellW. RenB. W. RobertsM. SenguptaS. Sham

Working Group on Analysis Methods (SG-ETD) (BPV III)

P. Carter, ChairM. J. Swindeman, SecretaryM. R. BreachM. E. CohenR. I. Jetter

T. KrishnamurthyT. LeS. ShamD. K. Williams

Working Group on Creep-Fatigue and Negligible Creep (SG-ETD)(BPV III)

T. Asayama, ChairF. W. BrustP. CarterR. I. JetterG. H. Koo

T. LeB.-L. LyowS. N. MalikH. QianS. Sham

Working Group on Elevated Temperature Construction (SG-ETD)(BPV III)

M. H. Jawad, ChairA. Mann, SecretaryD. I. AndersonR. G. BrownD. DeweesB. F. HantzR. I. JetterS. KrishnamurthyT. Le

M. N. Mitchell

B. J. Mollitor

C. Nadarajah

P. Prueter

M. J. Swindeman

J. P. Glaspie, Contributing Member

D. L. Marriott, ContributingMember

Working Group on High Temperature Flaw Evaluation (SG-ETD)(BPV III)

F. W. Brust, ChairN. BroomP. CarterT. LeS. N. Malik

H. QianD. L. RudlandP. J. RushD.-J. ShimS. X. Xu

xxiv

Page 27: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

Special Working Group on Inelastic Analysis Methods (SG-ETD)(BPV III)

S. Sham, ChairS. X. Xu, SecretaryR. W. BarnesJ. A. BlancoB. R. Ganta

T. HassanG. H. KooB.-L. LyowM. J. SwindemanG. L. Zeng

Subgroup on General Requirements (BPV III)

R. P. McIntyre, ChairL. M. Plante, SecretaryV. ApostolescuA. AppletonS. BellJ. R. BerryJ. DeKleineJ. V. GardinerJ. W. HighlandsE. V. ImbroK. A. KavanaghY.-S. Kim

E. C. RenaudJ. RogersD. J. RoszmanC. T. SmithW. K. Sowder, Jr.R. SpuhlG. E. SzabaturaD. M. VickeryC. S. WithersH. Michael, DelegateG. L. Hollinger, ContributingMember

Working Group on Duties and Responsibilities (SG-GR) (BPV III)

J. V. Gardiner, ChairG. L. Hollinger, SecretaryD. ArrigoS. BellJ. R. BerryP. J. CocoM. CusickJ. DeKleineN. DeSantis

Y. Diaz-Castillo

K. A. Kavanagh

J. M. Lyons

L. M. Plante

D. J. Roszman

B. S. Sandhu

E. M. Steuck

J. L. Williams

Working Group on Quality Assurance, Certification, and Stamping(SG-GR) (BPV III)

C. T. Smith, ChairC. S. Withers, SecretaryV. ApostolescuA. AppletonO. ElkadimS. M. GoodwinJ. GrimmJ. W. HighlandsY.-S. KimB. McGloneR. P. McIntyre

D. T. MeischR. B. PatelE. C. RenaudT. RezkJ. RogersW. K. Sowder, Jr.R. SpuhlJ. F. StrunkG. E. SzabaturaD. M. VickeryC. A. Spletter, Contributing Member

Special Working Group on General Requirements Consolidation(SG-GR) (BPV III)

J. V. Gardiner, ChairC. T. Smith, Vice ChairS. BellM. CusickY. Diaz-CastilloJ. GrimmJ. M. LyonsB. McGloneR. PatelE. C. RenaudT. Rezk

J. Rogers

D. J. Roszman

B. S. Sandhu

G. J. Solovey

R. Spuhl

G. E. Szabatura

J. L. Williams

C. S. Withers

S. F. Harrison, ContributingMember

Subgroup on Materials, Fabrication, and Examination (BPV III)

R. M. Jessee, ChairB. D. Frew, Vice ChairS. Hunter, SecretaryW. H. BorterT. D. BurchellG. R. CannellP. J. CocoM. W. DaviesR. H. DavisD. B. DenisG. B. GeorgievS. E. GingrichM. GollietJ. GrimmL. S. Harbison

J. Johnston, Jr.C. C. KimM. LashleyT. MelfiH. MurakamiJ. OssmannJ. E. O’SullivanM. C. ScottW. J. SperkoJ. R. StinsonJ. F. StrunkR. WrightS. YeeH. Michael, DelegateR. W. Barnes, Contributing Member

Working Group on Graphite and Composite Materials (SG-MFE)(BPV III)

T. D. Burchell, ChairM. W. Davies, Vice ChairM. N. Mitchell, SecretaryA. AppletonR. L. BrattonS. R. CadellS.-H. ChiA. CovacS. W. DomsS. F. Duffy

W. J. GeringerS. T. GonzcyM. G. JenkinsY. KatohJ. OssmannM. RoemmlerN. SalstromT. ShibataS. YuG. L. Zeng

Working Group on HDPE Materials (SG-MFE) (BPV III)

M. Golliet, ChairM. A. Martin, SecretaryW. H. BorterG. BrouetteM. C. BuckleyJ. HakiiJ. Johnston, Jr.P. Krishnaswamy

D. P. Munson

T. M. Musto

S. Patterson

S. Schuessler

R. Stakenborghs

M. Troughton

B. Hauger, Contributing Member

Joint ACI-ASME Committee on Concrete Components for NuclearService (BPV III)

J. A. Munshi, ChairJ. McLean, Vice ChairA. Byk, Staff SecretaryK. Verderber, Staff SecretaryC. J. BangL. J. ColarussoA. C. EberhardtF. FarzamP. S. GhosalB. D. HovisT. C. InmanC. JonesO. JovallN.-H. Lee

N. OrbovicC. T. SmithJ. F. StrunkT. TonyanS. WangT. J. Ahl, Contributing MemberJ. F. Artuso, Contributing MemberJ.-B. Domage, Contributing MemberJ. Gutierrez, Contributing MemberT. Kang, Contributing MemberT. Muraki, Contributing MemberB. B. Scott, Contributing MemberM. R. Senecal, ContributingMember

xxv

Page 28: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

Working Group on Design (BPV III-2)

N.-H. Lee, ChairM. AllamS. BaeL. J. ColarussoA. C. EberhardtF. FarzamP. S. GhosalB. D. HovisT. C. InmanC. JonesO. Jovall

J. A. MunshiT. MurakiS. WangM. Diaz, Contributing MemberS. Diaz, Contributing MemberA. Istar, Contributing MemberB. R. Laskewitz, ContributingMember

B. B. Scott, Contributing MemberZ. Shang, Contributing MemberM. Sircar, Contributing Member

Working Group on Materials, Fabrication, and Examination(BPV III-2)

P. S. Ghosal, ChairT. Tonyan, Vice ChairM. AllamC. J. BangJ.-B. DomageA. C. EberhardtC. JonesT. Kang

N. LeeC. T. SmithJ. F. StrunkD. UfukJ. F. Artuso, Contributing MemberJ. Gutierrez, Contributing MemberB. B. Scott, Contributing MemberZ. Shang, Contributing Member

Special Working Group on Modernization (BPV III-2)

J. McLean, ChairN. Orbovic, Vice ChairA. AdediranO. JovallC. T. SmithM. A. Ugalde

S. Wang

S. Diaz, Contributing Member

J.-B. Domage, Contributing Member

F. Lin, Contributing Member

N. Stoeva, Contributing Member

Subgroup on Containment Systems for Spent Nuclear Fuel andHigh-Level Radioactive Material (BPV III)

D. K. Morton, ChairD. J. Ammerman, Vice ChairG. R. Cannell, SecretaryG. BjorkmanV. BrozS. HorowitzD. W. LewisE. L. PleinsR. H. SmithG. J. Solovey

C. J. TemusW. H. Borter, Contributing MemberR. S. Hill III, Contributing MemberP. E. McConnell, ContributingMember

A. B. Meichler, ContributingMember

T. Saegusa, Contributing MemberN. M. Simpson, ContributingMember

Subgroup on Fusion Energy Devices (BPV III)

W. K. Sowder, Jr., ChairD. Andrei, Staff SecretaryD. J. Roszman, SecretaryL. C. CadwalladerB. R. DoshiM. HiguchiG. HoltmeierM. KalseyK. A. KavanaghK. KimI. KimihiroS. Lee

G. LiX. LiP. MokariaT. R. MuldoonM. PortonF. J. Schaaf, Jr.P. SmithY. SongM. TrosenC. WaldonI. J. ZatzR. W. Barnes, Contributing Member

Working Group on General Requirements (BPV III-4)

D. J. Roszman, Chair W. K. Sowder, Jr.

Working Group on In-Vessel Components (BPV III-4)

M. Kalsey, Chair Y. Carin

Working Group on Magnets (BPV III-4)

S. Lee, Chair K. Kim, Vice Chair

Working Group on Materials (BPV III-4)

M. Porton, Chair P. Mummery

Working Group on Vacuum Vessels (BPV III-4)

I. Kimihiro, ChairL. C. Cadwallader

B. R. Doshi

Subgroup on High Temperature Reactors (BPV III)

M. Morishita, ChairR. I. Jetter, Vice ChairS. Sham, SecretaryN. BroomT. D. BurchellM. W. DaviesS. Downey

G. H. Koo

D. K. Morton

J. E. Nestell

G. L. Zeng

X. Li, Contributing Member

L. Shi, Contributing Member

Working Group on High Temperature Gas-Cooled Reactors(BPV III-5)

J. E. Nestell, ChairM. Sengupta, SecretaryN. BroomT. D. BurchellM. W. DaviesR. S. Hill IIIE. V. ImbroR. I. JetterY. W. Kim

T. LeT. R. LupoldS. N. MalikD. L. MarriottD. K. MortonS. ShamG. L. ZengX. Li, Contributing MemberL. Shi, Contributing Member

Working Group on High Temperature Liquid-Cooled Reactors(BPV III-5)

S. Sham, ChairT. Asayama, SecretaryM. ArcaroR. W. BarnesP. CarterM. E. CohenA. B. Hull

R. I. JetterG. H. KooT. LeS. MajumdarM. MorishitaJ. E. NestellG. Wu, Contributing Member

xxvi

Page 29: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

Argentina International Working Group (BPV III)

O. Martinez, Staff SecretaryA. AcroglianoW. AgreloG. O. AnteriM. AnticoliC. A. ArayaJ. P. BalbianiA. A. BetervideD. O. BordatoG. BourguigneM. L. CappellaA. ClausR. G. CoccoA. ColeffA. J. Dall’OstoL. M. De BarberisD. P. DelfinoD. N. Dell’ErbaF. G. DiezA. DominguezS. A. EcheverriaJ. FernándezE. P. Fresquet

M. M. GamizoA. GomezI. M. GuerreiroI. A. KnorrM. F. LiendoL. R. MiñoJ. MonteR. L. MorardA. E. PastorE. PizzichiniA. PolitiJ. L. RacamatoH. C. SanziG. J. ScianG. G. SebastianM. E. SzarkoP. N. ToranoA. TurrinO. A. VerasteguiM. D. ViglianoP. YamamotoM. Zunino

China International Working Group (BPV III)

J. Yan, ChairW. Tang, Vice ChairC. A. Sanna, Staff SecretaryY. He, SecretaryL. GuoY. JingD. KangY. LiB. LiangH. LinS. LiuW. LiuJ. MaK. MaoW. Pei

G. SunZ. SunG. TangL. TingY. TuY. WangH. WuX. WuS. XueZ. YinG. ZhangW. ZhangW. ZhaoY. ZhongZ. Zhong

Germany International Working Group (BPV III)

C. Huttner, ChairH.-R. Bath, SecretaryB. ArndtM. BauerG. DaumR. DoringL. GerstnerG. HaenleK.-H. HerterR. E. HueggenbergE. IacopettaU. JendrichD. KoelblG. Kramarz

C. KrumbW. MayingerD. MoehringD. OstermannG. RoosJ. RudolphC. A. SannaH. SchauR. TrieglaffP. VöllmeckeJ. WendtF. WilleM. WinterN. Wirtz

India International Working Group (BPV III)

B. Basu, ChairG. Mathivanan, Vice ChairC. A. Sanna, Staff SecretaryS. B. Parkash, SecretaryA. D. BagdareV. Bhasin

S. KovalaiD. KulkarniM. PonnusamyR. N. SenK. R. ShahA. Sundararajan

Korea International Working Group (BPV III)

G. H. Koo, ChairS. S. Hwang, Vice ChairO.-S. Kim, SecretaryH. S. ByunG.-S. ChoiS. ChoiJ. Y. HongN.-S. HuhJ.-K. HwangC. JangI. I. JeongH. J. KimJ. KimJ.-S. KimK. KimM.-W. KimY.-B. KimY.-S. Kim

D. KwonB. LeeD. LeeSanghoon LeeSangil LeeS.-G. LeeH. LimI.-K. NamB. NohC.-K. OhC. ParkH. ParkJ.-S. ParkT. ShinS. SongJ. S. YangO. Yoo

Special Working Group on Editing and Review (BPV III)

D. E. Matthews, ChairR. L. BrattonR. P. DeublerA. C. EberhardtJ. C. Minichiello

D. K. MortonL. M. PlanteR. F. Reedy, Sr.C. Wilson

Special Working Group on HDPE Stakeholders (BPV III)

D. Burwell, ChairS. Patterson, SecretaryT. M. AdamsM. BrandesS. BruceS. ChoiC. M. FaidyM. GollietJ. GrimesR. M. JesseeJ. Johnston, Jr.

D. Keller

M. Lashley

K. A. Manoly

D. P. Munson

T. M. Musto

J. E. O’SullivanV. Rohatgi

F. J. Schaaf, Jr.

R. Stakenborghs

M. Troughton

Special Working Group on Honors and Awards (BPV III)

R. M. Jessee, ChairA. AppletonR. W. Barnes

D. E. MatthewsJ. C. Minichiello

xxvii

Page 30: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

Special Working Group on Industry Experience for New Plants(BPV III & BPV XI)

J. T. Lindberg, ChairE. L. Pleins, ChairJ. Ossmann, SecretaryT. L. ChanH. L. GustinP. J. HennesseyD. O. HenryJ. HoncharikE. V. ImbroC. G. Kim

O.-S. Kim

Y.-S. Kim

K. Matsunaga

D. E. Matthews

R. E. McLaughlin

D. W. Sandusky

T. Tsuruta

R. M. Wilson

S. M. Yee

Special Working Group on International Meetings (BPV III)

C. T. Smith, ChairA. Byk, Staff SecretaryT. D. BurchellS. W. CameronR. L. Crane

R. S. Hill IIIM. N. MitchellR. F. Reedy, Sr.C. A. Sanna

Special Working Group on New Plant Construction Issues (BPV III)

E. L. Pleins, ChairM. C. Scott, SecretaryA. BykA. CardilloP. J. CocoJ. HoncharikE. V. ImbroO.-S Kim

M. Kris

J. C. Minichiello

D. W. Sandusky

R. R. Stevenson

R. Troficanto

M. L. Wilson

J. Yan

Special Working Group on Regulatory Interface (BPV III)

E. V. Imbro, ChairP. Malouines, SecretaryS. BellA. CardilloP. J. CocoJ. GrimmJ. Honcharik

K. Matsunaga

D. E. Matthews

B. McGlone

A. T. Roberts III

R. R. Stevenson

M. L. Wilson

COMMITTEE ON HEATING BOILERS (BPV IV)

J. A. Hall, ChairT. L. Bedeaux, Vice ChairG. Moino, Staff SecretaryB. CalderonJ. CallandJ. P. ChicoineJ. M. DownsB. J. IskeJ. KlugP. A. Molvie

G. ScribnerR. D. TrouttM. WadkinsonR. V. WielgoszinskiH. Michael, DelegateD. Picart, DelegateA. Heino, Contributing MemberS. V. Voorhees, ContributingMember

J. L. Kleiss, Alternate

Subgroup on Care and Operation of Heating Boilers (BPV IV)

M. Wadkinson, ChairT. L. BedeauxJ. CallandJ. M. Downs

J. A. HallP. A. MolvieC. Lasarte, Contributing Member

Subgroup on Cast Boilers (BPV IV)

J. P. Chicoine, ChairT. L. Bedeaux, Vice ChairJ. M. Downs

J. A. HallJ. L. Kleiss

Subgroup on Materials (BPV IV)

M. Wadkinson, ChairJ. CallandJ. M. Downs

J. A. HallA. HeinoB. J. Iske

Subgroup on Water Heaters (BPV IV)

J. Calland, ChairL. BadziagowskiJ. P. ChicoineC. DinicB. J. Iske

R. E. OlsonM. A. TaylorT. E. TrantR. D. Troutt

Subgroup on Welded Boilers (BPV IV)

P. A. Molvie, ChairL. BadziagowskiT. L. BedeauxB. CalderonJ. CallandC. Dinic

J. L. KleissR. E. OlsonG. ScribnerR. D. TrouttM. WadkinsonR. V. Wielgoszinski

COMMITTEE ON NONDESTRUCTIVE EXAMINATION (BPV V)

G. W. Hembree, ChairF. B. Kovacs, Vice ChairJ. S. Brzuszkiewicz, Staff SecretaryS. J. AkrinJ. E. BateyP. L. BrownM. A. BurnsB. CaccamiseC. EmslanderN. Y. FaranssoN. A. FinneyA. F. GarbolevskyJ. F. HalleyJ. W. HoufS. A. Johnson

R. W. KruzicC. MayA. B. NagelT. L. PlasekF. J. SattlerP. B. ShawG. M. Gatti, DelegateX. Guiping, DelegateA. S. Birks, Contributing MemberJ. Bennett, AlternateH. C. Graber, Honorary MemberO. F. Hedden, Honorary MemberJ. R. MacKay, Honorary MemberT. G. McCarty, Honorary Member

Executive Committee (BPV V)

F. B. Kovacs, ChairG. W. Hembree, Vice ChairJ. S. Brzuszkiewicz, Staff SecretaryJ. E. BateyB. Caccamise

N. Y. FaranssoN. A. FinneyS. A. JohnsonA. B. Nagel

Subgroup on General Requirements/Personnel Qualifications andInquiries (BPV V)

C. Emslander, ChairJ. W. Houf, Vice ChairS. J. AkrinJ. E. BateyN. CarterN. Y. FaranssoN. A. FinneyG. W. Hembree

S. A. Johnson

F. B. Kovacs

D. I. Morris

A. B. Nagel

A. S. Birks, Contributing Member

J. P. Swezy, Jr., ContributingMember

xxviii

Page 31: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

Special Working Group on NDE Resource Support (SG-GR/PQ & I)(BPV V)

N. A. Finney, ChairD. AdkinsJ. AndersonD. BajulaJ. BennettC. T. BrownT. ClausingJ. L. GarnerK. Hayes

R. KelsoC. MagruderJ. W. Mefford, Jr.K. PageD. TompkinsD. Van AllenT. VidimosR. WardM. Wolf

Subgroup on Surface Examination Methods (BPV V)

S. A. Johnson, ChairJ. Halley, Vice ChairS. J. AkrinJ. E. BateyP. L. BrownB. CaccamiseN. CarterN. Y. FaranssoN. FarenbaughN. A. Finney

G. W. HembreeR. W. KruzicB. D. LaiteC. MayL. E. MullinsA. B. NagelF. J. SattlerP. B. ShawG. M. Gatti, DelegateA. S. Birks, Contributing Member

Subgroup on Volumetric Methods (BPV V)

A. B. Nagel, ChairN. A. Finney, Vice ChairS. J. AkrinJ. E. BateyP. L. BrownB. CaccamiseJ. M. DavisN. Y. FaranssoA. F. GarbolevskyJ. F. HalleyR. W. Hardy

G. W. Hembree

S. A. Johnson

F. B. Kovacs

R. W. Kruzic

C. May

L. E. Mullins

T. L. Plasek

F. J. Sattler

C. Vorwald

G. M. Gatti, Delegate

Working Group on Acoustic Emissions (SG-VM) (BPV V)

N. Y. Faransso, ChairJ. E. Batey, Vice Chair

S. R. DoctorR. K. Miller

Working Group on Radiography (SG-VM) (BPV V)

B. Caccamise, ChairF. B. Kovacs, Vice ChairS. J. AkrinJ. E. BateyP. L. BrownC. EmslanderN. Y. FaranssoA. F. GarbolevskyR. W. Hardy

G. W. HembreeS. A. JohnsonR. W. KruzicB. D. LaiteC. MayR. J. MillsA. B. NagelT. L. PlasekB. White

Working Group on Ultrasonics (SG-VM) (BPV V)

N. A. Finney, ChairJ. F. Halley, Vice ChairB. CaccamiseJ. M. DavisC. EmslanderN. Y. FaranssoP. T. HayesS. A. Johnson

R. W. Kruzic

B. D. Laite

C. May

L. E. Mullins

A. B. Nagel

F. J. Sattler

C. Vorwald

Working Group on GuidedWave Ultrasonic Testing (SG-VM) (BPV V)

N. Y. Faransso, ChairJ. E. Batey, Vice ChairD. AlleyneN. AmirJ. F. Halley

S. A. JohnsonG. M. LightP. MudgeM. J. QuarryJ. Vanvelsor

Italy International Working Group (BPV V)

P. L. Dinelli, ChairA. Veroni, SecretaryR. BertolottiF. BrescianiG. CamposN. CaputoM. ColomboF. FerrareseE. Ferrari

M. A. Grimoldi

G. Luoni

O. Oldani

P. Pedersoli

A. Tintori

M. Zambon

G. Gobbi, Contributing Member

G. Pontiggia, Contributing Member

COMMITTEE ON PRESSURE VESSELS (BPV VIII)

R. J. Basile, ChairS. C. Roberts, Vice ChairE. Lawson, Staff SecretaryS. J. Rossi, Staff SecretaryG. Aurioles, Sr.J. CameronA. ChaudouetD. B. DeMichaelJ. P. GlaspieJ. F. GrubbL. E. Hayden, Jr.G. G. KarcherD. L. KurleK. T. LauM. D. LowerR. MahadeenR. W. MikitkaU. R. MillerB. R. MorelockT. P. PastorD. T. PetersM. J. PischkeM. D. Rana

G. B. Rawls, Jr.F. L. RichterC. D. RoderyE. SoltowJ. C. SowinskiD. B. StewartD. A. SwansonJ. P. Swezy, Jr.S. TeradaE. UpitisR. Duan, DelegateP. A. McGowan, DelegateH. Michael, DelegateK. Oyamada, DelegateM. E. Papponetti, DelegateX. Tang, DelegateM. Gold, Contributing MemberW. S. Jacobs, Contributing MemberK. Mokhtarian, ContributingMember

C. C. Neely, Contributing MemberK. K. Tam, Honorary Member

Subgroup on Design (BPV VIII)

D. A. Swanson, ChairJ. C. Sowinski, Vice ChairM. Faulkner, SecretaryG. Aurioles, Sr.S. R. BabkaO. A. BarskyR. J. BasileM. R. BreachF. L. BrownD. ChandiramaniB. F. HantzC. E. HinnantC. S. HinsonM. H. JawadD. L. KurleM. D. LowerR. W. MikitkaU. R. MillerT. P. Pastor

M. D. RanaG. B. Rawls, Jr.S. C. RobertsC. D. RoderyT. G. SeippD. SrnicS. TeradaJ. VattappillyR. A. WhippleK. XuK. Oyamada, DelegateM. E. Papponetti, DelegateW. S. Jacobs, Contributing MemberP. K. Lam, Contributing MemberK. Mokhtarian, ContributingMember

S. C. Shah, Contributing MemberK. K. Tam, Contributing Member

xxix

Page 32: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

Working Group on Design-By-Analysis (BPV VIII)

B. F. Hantz, ChairT. W. Norton, SecretaryR. G. BrownD. DeweesR. D. DixonZ. GuC. F. Heberling IIC. E. HinnantR. JainM. H. Jawad

S. KrishnamurthyA. MannG. A. MillerC. NadarajahP. PrueterM. D. RanaT. G. SeippM. A. ShahS. TeradaD. Arnett, Contributing Member

Subgroup on Fabrication and Examination (BPV VIII)

J. P. Swezy, Jr., ChairD. I. Morris, Vice ChairE. A. Whittle, Vice ChairB. R. Morelock, SecretaryN. CarterS. FlynnS. HeaterO. MuletM. J. PischkeM. J. RiceC. D. Rodery

B. F. Shelley

P. L. Sturgill

E. Upitis

K. Oyamada, Delegate

W. J. Bees, Contributing Member

L. F. Campbell, ContributingMember

W. S. Jacobs, Contributing Member

J. Lee, Contributing Member

R. Uebel, Contributing Member

Subgroup on General Requirements (BPV VIII)

M. D. Lower, ChairJ. P. Glaspie, Vice ChairF. L. Richter, SecretaryR. J. BasileD. T. DavisD. B. DeMichaelM. FaulknerF. HamtakL. E. Hayden, Jr.

K. T. LauT. P. PastorS. C. RobertsJ. C. SowinskiP. SperanzaD. B. StewartD. A. SwansonR. UebelC. C. Neely, Contributing Member

Task Group on Subsea Applications (BPV VIII)

R. Cordes, ChairL. P. AntalffyR. C. BielP. BunchJ. EllensS. HarbertX. KaculiK. Karpanan

F. Kirkemo

C. Lan

N. McKie

S. K. Parimi

M. Sarzynski

Y. Wada

D. T. Peters, Contributing Member

Task Group on UG-20(f) (BPV VIII)

S. Krishnamurthy, ChairT. AndersonK. BagnoliR. P. DeublerB. F. Hantz

B. R. MacejkoJ. PensoM. PragerM. D. Rana

Task Group on U-2(g) (BPV VIII)

G. Aurioles, Sr.S. R. BabkaR. J. BasileD. K. ChandiramaniR. MahadeenU. R. MillerT. W. NortonT. P. Pastor

R. F. Reedy, Sr.S. C. RobertsM. A. ShahD. SrnicD. A. SwansonJ. P. Swezy, Jr.R. UebelK. K. Tam, Contributing Member

Subgroup on Heat Transfer Equipment (BPV VIII)

G. Aurioles, Sr., ChairS. R. Babka, Vice ChairP. Matkovics, SecretaryD. AngstadtM. BahadoriJ. H. BarbeeO. A. BarskyL. BowerA. ChaudouetM. D. ClarkS. JeyakumarG. G. KarcherD. L. KurleR. MahadeenS. Mayeux

U. R. MillerD. SrnicA. M. VoytkoR. P. WibergI. G. Campbell, ContributingMember

I. Garcia, Contributing MemberJ. Mauritz, Contributing MemberT. W. Norton, Contributing MemberF. Osweiller, Contributing MemberJ. Pasek, Contributing MemberR. Tiwari, Contributing MemberS. Yokell, Contributing MemberS. M. Caldwell, Honorary Member

Task Group on Plate Heat Exchangers (BPV VIII)

P. Matkovics, ChairS. R. BabkaK. DevlinS. FlynnJ. F. GrubbF. Hamtak

R. MahadeenD. I. MorrisM. J. PischkeC. M. RomeroE. SoltowD. Srnic

Subgroup on High Pressure Vessels (BPV VIII)

D. T. Peters, ChairG. M. Mital, Vice ChairA. P. Maslowski, Staff SecretaryL. P. AntalffyR. C. BielP. N. ChakuR. CordesR. D. DixonL. FridlundR. T. HallmanA. H. HonzaJ. A. KappJ. KeltjensA. K. KhareN. McKieS. C. MordreG. T. Nelson

E. A. RodriguezE. D. RollK. C. Simpson, Jr.J. R. SimsD. L. StangF. W. TatarS. TeradaJ. L. TraudR. WinkK.-J. YoungR. M. Hoshman, ContributingMember

D. J. Burns, Honorary MemberD. M. Fryer, Honorary MemberG. J. Mraz, Honorary MemberE. H. Perez, Honorary Member

xxx

Page 33: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

Subgroup on Materials (BPV VIII)

J. Cameron, ChairP. G. Wittenbach, Vice ChairK. Xu, SecretaryA. Di RienzoJ. D. FritzJ. F. GrubbM. KowalczykW. M. LundyJ. Penso

D. W. RahoiR. C. SutherlinE. UpitisG. S. Dixit, Contributing MemberM. Gold, Contributing MemberM. Katcher, Contributing MemberJ. A. McMaster, ContributingMember

E. G. Nisbett, Contributing Member

Subgroup on Toughness (BPV II & BPV VIII)

D. L. Kurle, ChairK. Xu, Vice ChairN. CarterW. S. JacobsK. E. OrieM. D. RanaF. L. RichterK. SubramanianD. A. Swanson

J. P. Swezy, Jr.

S. Terada

E. Upitis

J. Vattappilly

K. Oyamada, Delegate

K. Mokhtarian, ContributingMember

C. C. Neely, Contributing Member

Subgroup on Graphite Pressure Equipment (BPV VIII)

A. Viet, ChairG. C. BechererF. L. Brown

C. W. CaryE. SoltowA. A. Stupica

China International Working Group (BPV VIII)

X. Chen, ChairB. Shou, Vice ChairZ. Fan, SecretaryY. ChenZ. ChenJ. CuiR. DuanW. GuoB. HanJ. HuQ. HuH. Hui

D. LuoY. LuoC. MiaoX. QianB. WangF. XuF. XuanK. ZhangY. ZhangS. ZhaoJ. ZhengG. Zhu

Germany International Working Group (BPV VIII)

P. Chavdarov, ChairA. Spangenberg, Vice ChairH. P. Schmitz, SecretaryB. DaumeA. EmrichJ. FleischfresserA. GastbergR. HelmholdtR. Kauer

D. Koelbl

S. Krebs

T. Ludwig

R. A. Meyers

H. Michael

P. Paluszkiewicz

H. Schroeder

M. Sykora

Italy International Working Group (BPV VIII)

G. Pontiggia, ChairA. Veroni, SecretaryB. G. AlboraliP. AngeliniR. BoattiA. CamanniP. ContiP. L. DinelliF. Finco

M. GuglielmettiP. MantovaniM. MassobrioL. MoracchioliC. SangalettiS. SartiA. TeliI. VenierG. Gobbi, Contributing Member

Special Working Group on Bolted Flanged Joints (BPV VIII)

R. W. Mikitka, ChairW. BrownH. ChenW. J. Koves

J. R. PayneG. B. Rawls, Jr.M. S. Shelton

Working Group on Design (BPV VIII Div. 3)

E. D. Roll, ChairC. Becht VR. C. BielR. CordesR. D. DixonL. FridlundR. T. HallmanK. KarpananJ. KeltjensN. McKieG. M. MitalS. C. MordreG. T. NelsonD. T. Peters

K. C. SimpsonJ. R. SimsD. L. StangK. SubramanianS. TeradaJ. L. TraudR. WinkY. XuF. Kirkemo, Contributing MemberD. J. Burns, Honorary MemberD. M. Fryer, Honorary MemberG. J. Mraz, Honorary MemberE. H. Perez, Honorary Member

Working Group on Materials (BPV VIII Div. 3)

F. W. Tatar, ChairL. P. AntalffyP. N. Chaku

J. A. KappA. K. Khare

Task Group on Impulsively Loaded Vessels (BPV VIII)

E. A. Rodriguez, ChairG. A. AntakiJ. K. AsahinaD. D. BarkerA. M. ClaytonJ. E. Didlake, Jr.T. A. DuffeyB. L. HaroldsenK. HayashiD. HildingK. W. KingR. Kitamura

R. A. LeishearP. O. LeslieF. OhlsonC. RomeroN. RushtonJ. H. StoflethQ. Dong, Contributing MemberH.-P. Schildberg, ContributingMember

J. E. Shepherd, ContributingMember

M. Yip, Contributing Member

xxxi

Page 34: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

Subgroup on Interpretations (BPV VIII)

U. R. Miller, ChairE. Lawson, Staff SecretaryG. Aurioles, Sr.R. J. BasileJ. CameronR. D. DixonM. KowalczykD. L. KurleM. D. LowerR. MahadeenG. M. Mital

D. I. MorrisD. T. PetersS. C. RobertsC. D. RoderyD. B. StewartP. L. SturgillD. A. SwansonJ. P. Swezy, Jr.J. VattappillyP. G. WittenbachT. P. Pastor, Contributing Member

COMMITTEE ON WELDING, BRAZING, AND FUSING (BPV IX)

D. A. Bowers, ChairM. J. Pischke, Vice ChairS. J. Rossi, Staff SecretaryM. BernasekM. A. BoringJ. G. FeldsteinP. D. FlennerS. E. GingrichK. L. HayesR. M. JesseeJ. S. LeeW. M. LundyT. MelfiW. F. Newell, Jr.D. K. PeetzE. G. ReicheltM. J. RiceM. B. Sims

W. J. SperkoM. J. StankoP. L. SturgillJ. P. Swezy, Jr.P. L. Van FossonE. W. WoelfelA. Roza, DelegateM. Consonni, Contributing MemberS. A. Jones, Contributing MemberA. S. Olivares, ContributingMember

S. Raghunathan, ContributingMember

R. K. Brown, Jr., Honorary MemberM. L. Carpenter, Honorary MemberB. R. Newmark, Honorary MemberS. D. Reynolds, Jr., HonoraryMember

Subgroup on Brazing (BPV IX)

M. J. Pischke, ChairE. W. BeckmanL. F. CampbellM. L. Carpenter

A. F. GarbolevskyN. MohrA. R. NyweningJ. P. Swezy, Jr.

Subgroup on General Requirements (BPV IX)

P. L. Sturgill, ChairE. W. BeckmanJ. P. BellD. A. BowersG. ChandlerP. R. EvansS. FlynnP. GilstonF. HamtakA. Howard

R. M. JesseeD. MobleyD. K. PeetzJ. PillowH. B. PorterJ. P. Swezy, Jr.K. R. WillensE. W. WoelfelE. Molina, DelegateB. R. Newmark, Honorary Member

Subgroup on Materials (BPV IX)

M. Bernasek, ChairT. AndersonJ. L. ArnoldE. CutlipS. S. FioreS. E. GingrichL. S. HarbisonR. M. JesseeT. Melfi

M. J. Pischke

A. Roza

C. E. Sainz

W. J. Sperko

M. J. Stanko

P. L. Sturgill

J. Warren

C. Zanfir

Subgroup on Plastic Fusing (BPV IX)

E. W. Woelfel, ChairD. BurwellM. GhahremaniK. L. HayesR. M. JesseeJ. Johnston, Jr.

J. E. O’SullivanE. G. ReicheltM. J. RiceS. SchuesslerM. TroughtonJ. Wright

Subgroup on Welding Qualifications (BPV IX)

M. J. Rice, ChairJ. S. Lee, Vice ChairM. BernasekM. A. BoringD. A. BowersR. B. CorbitP. D. FlennerL. S. HarbisonK. L. HayesW. M. LundyT. MelfiW. F. Newell, Jr.B. R. NewtonS. Raghunathan

E. G. ReicheltM. B. SimsW. J. SperkoS. A. SpragueP. L. SturgillJ. P. Swezy, Jr.P. L. Van FossonT. C. WiesnerA. D. WilsonD. Chandiramani, ContributingMember

M. Consonni, Contributing MemberM. Degan, Contributing Member

Italy International Working Group (BPV IX)

A. Camanni, ChairA. Veroni, SecretaryP. AngeliniR. BoattiP. L. DinelliF. FerrareseA. GhidiniE. LazzariL. Lotti

N. Maestri

M. Mandina

M. Massobrio

L. Moracchioli

G. Pontiggia

S. Verderame

A. Volpi

G. Gobbi, Contributing Member

COMMITTEE ON FIBER-REINFORCED PLASTIC PRESSURE VESSELS(BPV X)

D. Eisberg, ChairB. F. Shelley, Vice ChairP. D. Stumpf, Staff SecretaryA. L. BeckwithD. BentleyF. L. BrownJ. L. BustillosB. R. ColleyT. W. CowleyI. L. DinovoM. R. GormanB. HebbM. J. Hendrix

D. H. HodgkinsonL. E. HuntD. L. KeelerB. M. LinnemannD. H. McCauleyN. L. NewhouseD. J. PainterA. A. PollockG. RamirezJ. R. RichterD. O. Yancey, Jr.P. H. Ziehl

xxxii

Page 35: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

COMMITTEE ON NUCLEAR INSERVICE INSPECTION (BPV XI)

G. C. Park, ChairS. D. Kulat, Vice ChairR. W. Swayne, Vice ChairL. Powers, Staff SecretaryV. L. ArmentroutJ. F. BallW. H. BamfordS. B. BrownT. L. ChanR. C. CipollaD. R. CordesD. D. DavisR. L. DyleE. V. Farrell, Jr.M. J. FerlisiP. D. FisherE. B. GerlachT. J. GriesbachJ. HakiiD. O. HenryW. C. HolstonD. W. LamondD. R. LeeG. A. LofthusE. J. MaloneyG. Navratil

S. A. NormanJ. E. O’SullivanR. K. RhyneA. T. Roberts IIID. A. ScarthF. J. Schaaf, Jr.J. C. Spanner, Jr.D. J. TillyD. E. WaskeyJ. G. WeicksH. D. Chung, DelegateC. Ye, DelegateR. E. Gimple, Contributing MemberR. D. Kerr, Contributing MemberB. R. Newton, Contributing MemberR. A. West, Contributing MemberR. A. Yonekawa, ContributingMember

M. L. Benson, AlternateJ. T. Lindberg, AlternateR. O. McGill, AlternateC. J. Wirtz, AlternateC. D. Cowfer, Honorary MemberF. E. Gregor, Honorary MemberO. F. Hedden, Honorary MemberP. C. Riccardella, Honorary Member

Executive Committee (BPV XI)

S. D. Kulat, ChairG. C. Park, Vice ChairL. Powers, Staff SecretaryW. H. BamfordR. L. DyleM. J. FerlisiE. B. Gerlach

W. C. HolstonD. W. LamondJ. T. LindbergR. K. RhyneJ. C. Spanner, Jr.R. W. SwayneM. L. Benson, Alternate

Argentina International Working Group (BPV XI)

O. Martinez, Staff SecretaryD. A. CipollaA. ClausD. CostaD. P. DelfinoD. N. Dell’ErbaA. DominguezS. A. EcheverriaE. P. FresquetM. M. GamizoI. M. GuerreiroM. F. LiendoF. Llorente

R. J. LopezM. MagliocchiL. R. MiñoJ. MonteM. D. PeredaA. PolitiC. G. RealF. M. SchroeterG. J. ScianM. J. SolariP. N. ToranoO. A. VerasteguiP. Yamamoto

China International Working Group (BPV XI)

J. H. Liu, ChairY. Nie, Vice ChairC. Ye, Vice ChairM. W. Zhou, SecretaryJ. F. CaiD. X. ChenH. ChenH. D. ChenY. B. GuoY. HouD. M. KangS. W. LiX. Y. LiangS. X. LinL. Q. Liu

Y. LiuW. N. PeiC. L. PengG. X. TangQ. WangQ. W. WangZ. S. WangL. WeiF. XuZ. Y. XuQ. YinK. ZhangX. L. ZhangY. ZhangZ. M. Zhong

Germany International Working Group (BPV XI)

H.-R. BathR. DoringB. ErhardM. HagenbruchB. HoffmannE. Iacopetta

U. Jendrich

H. Schau

H.-J. Scholtka

X. Schuler

J. Wendt

Special Working Group on Editing and Review (BPV XI)

R. W. Swayne, ChairC. E. MoyerK. R. Rao

J. E. StaffieraD. J. TillyC. J. Wirtz

Task Group on Inspectability (BPV XI)

J. T. Lindberg, ChairM. J. Ferlisi, SecretaryW. H. BamfordA. CardilloD. R. CordesD. O. HenryE. HenryJ. HoncharikJ. HowardR. KleinC. Latiolais

D. Lieb

G. A. Lofthus

D. E. Matthews

P. J. O’ReganJ. Ossmann

R. Rishel

S. A. Sabo

P. Sullivan

C. Thomas

J. Tucker

Task Group on ISI of Spent Nuclear Fuel Storage and TransportationContainment Systems (BPV XI)

K. Hunter, ChairA. Alleshwaram, SecretaryD. J. AmmermanW. H. BorterJ. BroussardS. BrownC. R. BryanT. CarraherD. DunnN. FalesR. C. FolleyB. GuthermanS. HorowitzM. W. JosephH. JungM. Liu

R. M. MeyerB. L. MontgomeryM. MoranT. NuofferM. OrihuelaR. PaceE. L. PleinsR. SindelarH. SmithJ. C. Spanner, Jr.C. J. TemusG. WhiteX. J. ZhaiP.-S. Lam, AlternateJ. Wise, Alternate

xxxiii

Page 36: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

Subgroup on Evaluation Standards (SG-ES) (BPV XI)

W. H. Bamford, ChairN. A. Palm, SecretaryH. D. ChungR. C. CipollaR. L. DyleC. M. FaidyB. R. GantaT. J. GriesbachK. HasegawaK. HojoD. N. HopkinsK. KoyamaD. R. Lee

Y. S. LiR. O. McGillH. S. MehtaK. MiyazakiR. PaceJ. C. PoehlerS. RanganathD. A. ScarthT. V. VoK. R. WichmanS. X. XuM. L. Benson, AlternateT. Hardin, Alternate

Task Group on Evaluation of Beyond Design Basis Events (SG-ES)(BPV XI)

R. Pace, ChairK. E. Woods, SecretaryG. A. AntakiP. R. DonavinR. G. GiladaT. J. GriesbachH. L. GustinM. HayashiK. Hojo

S. A. Kleinsmith

H. S. Mehta

D. V. Sommerville

T. V. Vo

K. R. Wichman

G. M. Wilkowski

S. X. Xu

T. Weaver, Contributing Member

Working Group on Flaw Evaluation (SG-ES) (BPV XI)

R. C. Cipolla, ChairS. X. Xu, SecretaryW. H. BamfordM. L. BensonB. BezensekM. BrumovskyH. D. ChungT. E. DemersC. M. FaidyB. R. GantaR. G. GiladaH. L. GustinF. D. HayesP. H. HoangK. HojoD. N. HopkinsY. KimK. KoyamaV. Lacroix

D. R. LeeY. S. LiM. LiuH. S. MehtaG. A. A. MiessiK. MiyazakiR. K. QashuS. RanganathP. J. RushD. A. ScarthW. L. ServerD.-J. ShimA. UdyawarT. V. VoB. WasilukK. R. WichmanG. M. WilkowskiD. L. Rudland, Alternate

Task Group on Crack Growth Reference Curves (BPV XI)

D. A. Scarth, ChairH. I. Gustin, SecretaryW. H. BamfordM. L. BensonF. W. BrustR. C. CipollaR. L. DyleK. Hasegawa

D. N. HopkinsK. KashimaK. KoyamaD. R. LeeH. S. MehtaK. MiyazakiS. RanganathT. V. Vo

Task Group on Evaluation Procedures for Degraded Buried Pipe(WG-PFE) (BPV XI)

R. O. McGill, ChairS. X. Xu, SecretaryG. A. AntakiR. C. CipollaK. HasegawaK. M. Hoffman

G. A. A. MiessiM. MoenssensD. P. MunsonR. PaceP. J. RushD. A. Scarth

Working Group on Operating Plant Criteria (SG-ES) (BPV XI)

N. A. Palm, ChairA. E. Freed, SecretaryV. Marthandam, SecretaryK. R. BakerW. H. BamfordM. BrumovskyT. L. DicksonR. L. DyleS. R. GosselinT. J. GriesbachM. HayashiS. A. KleinsmithH. KobayashiH. S. Mehta

A. D. OdellR. PaceJ. C. PoehlerS. RanganathW. L. ServerD. V. SommervilleC. A. TomesA. UdyawarT. V. VoD. P. WeaklandK. E. WoodsH. Q. XuT. Hardin, Alternate

Working Group on Pipe Flaw Evaluation (SG-ES) (BPV XI)

D. A. Scarth, ChairG. M. Wilkowski, SecretaryK. AzumaW. H. BamfordM. L. BensonM. BrumovskyF. W. BrustH. D. ChungR. C. CipollaN. G. CofieJ. M. DavisT. E. DemersC. M. FaidyB. R. GantaS. R. GosselinC. E. Guzman-LeongK. HasegawaP. H. HoangK. HojoD. N. Hopkins

E. J. HoustonR. JanowiakS. KalyanamK. KashimaV. LacroixY. S. LiR. O. McGillH. S. MehtaG. A. A. MiessiK. MiyazakiS. H. PelletH. RathbunP. J. RushD.-J. ShimA. UdyawarT. V. VoB. WasilukS. X. XuA. Alleshwaram, Alternate

Subgroup on Nondestructive Examination (SG-NDE) (BPV XI)

J. C. Spanner, Jr., ChairD. R. Cordes, SecretaryT. L. ChanS. E. CumblidgeF. E. DohmenK. J. HackerJ. HarrisonD. O. Henry

J. T. LindbergG. A. LofthusG. R. PerkinsS. A. SaboF. J. Schaaf, Jr.R. V. SwainC. J. WirtzC. A. Nove, Alternate

xxxiv

Page 37: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

Working Group on Personnel Qualification and Surface Visual andEddy Current Examination (SG-NDE) (BPV XI)

J. T. Lindberg, ChairJ. E. Aycock, SecretaryC. Brown, SecretaryS. E. CumblidgeA. DiazN. Farenbaugh

D. O. HenryJ. W. HoufC. ShinskyJ. C. Spanner, Jr.J. T. TimmC. J. Wirtz

Working Group on Procedure Qualification and VolumetricExamination (SG-NDE) (BPV XI)

G. A. Lofthus, ChairJ. Harrison, SecretaryG. R. Perkins, SecretaryM. T. AndersonM. BrileyA. BushmireD. R. CordesM. DennisS. R. Doctor

F. E. DohmenK. J. HackerD. A. KullC. A. NoveD. NowakowskiS. A. SaboR. V. SwainS. J. ToddD. K. Zimmerman

Subgroup on Repair/Replacement Activities (SG-RRA) (BPV XI)

E. B. Gerlach, ChairE. V. Farrell, Jr., SecretaryJ. F. BallS. B. BrownR. ClowP. D. FisherK. J. KarwoskiS. L. McCrackenB. R. Newton

J. E. O’Sullivan

S. Schuessler

R. R. Stevenson

R. W. Swayne

D. J. Tilly

D. E. Waskey

J. G. Weicks

P. Raynaud, Alternate

Working Group on Welding and Special Repair Processes (SG-RRA)(BPV XI)

D. E. Waskey, ChairD. J. Tilly, SecretaryD. BarborakS. J. FindlanP. D. FisherM. L. HallK. J. KarwoskiC. C. Kim

M. Kris

S. L. McCracken

D. B. Meredith

B. R. Newton

J. E. O’Sullivan

D. Segletes

J. G. Weicks

Working Group on Nonmetals Repair/Replacement Activities(SG-RRA) (BPV XI)

J. E. O'Sullivan, ChairS. Schuessler, SecretaryJ. Johnston, Jr.M. LashleyM. P. Marohl

T. M. MustoS. PattersonA. PridmoreP. RaynaudF. J. Schaaf, Jr.

Task Group on Repair by Carbon Fiber Composites(WGN-MRR) (BPV XI)

J. E. O'Sullivan, ChairB. DavenportM. GollietL. S. GordonM. P. MarohlN. MeyerR. P. OjdrovicD. PegueroA. Pridmore

P. RaynaudC. W. RowleyV. RoyJ. SealeyN. StoevaM. F. UddinJ. WenT. Jimenez, AlternateG. M. Lupia, Alternate

Working Group on Design and Programs (SG-RRA) (BPV XI)

S. B. Brown, ChairA. B. Meichler, SecretaryO. BhattyR. ClowR. R. CroftE. V. Farrell, Jr.E. B. Gerlach

H. Malikowski

M. A. Pyne

P. Raynaud

R. R. Stevenson

R. W. Swayne

R. Turner

Subgroup on Water-Cooled Systems (SG-WCS) (BPV XI)

D. W. Lamond, ChairG Navratil, SecretaryJ. M. AgoldV. L. ArmentroutJ. M. BoughmanS. B. BrownS. T. ChesworthD. D. DavisH. Q. DoM. J. Ferlisi

K. W. Hall

P. J. Hennessey

K. Hoffman

S. D. Kulat

T. Nomura

T. Nuoffer

G. C. Park

H. M. Stephens, Jr.

M. J. Homiack, Alternate

Task Group on High Strength Nickel Alloys Issues (SG-WCS) (BPV XI)

R. L. Dyle, ChairB. L. Montgomery, SecretaryW. H. BamfordP. R. DonavinK. HoffmanK. KoyamaC. Lohse

H. MalikowskiS. E. MarletteG. C. ParkG. R. PolingJ. M. ShupingJ. C. Spanner, Jr.D. P. Weakland

Working Group on Containment (SG-WCS) (BPV XI)

H. M. Stephens, Jr., ChairS. G. Brown, SecretaryP. S. GhosalH. T. HillR. D. HoughB. Lehman

J. McIntyre

J. A. Munshi

M. Sircar

S. Walden, Alternate

T. J. Herrity, Alternate

Working Group on Inspection of Systems and Components(SG-WCS) (BPV XI)

M. J. Ferlisi, ChairN. Granback, SecretaryJ. M. AgoldR. W. BlydeC. Cueto-FelguerosoH. Q. DoK. W. HallK. M. Hoffman

S. D. Kulat

A. Lee

G. J. Navratil

T. Nomura

J. C. Nygaard

R. Rishel

J. C. Younger

xxxv

Page 38: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

Working Group on Pressure Testing (SG-WCS) (BPV XI)

J. M. Boughman, ChairS. A. Norman, SecretaryT. AnselmiY.-K. ChungM. J. Homiack

A. E. KeyserD. W. LamondJ. K. McClanahanB. L. MontgomeryC. Thomas

Task Group on Buried Components Inspection and Testing(WG-PT) (BPV XI)

D. W. Lamond, ChairJ. M. Boughman, SecretaryM. Moenssens, SecretaryT. Anselmi

B. DavenportA. HiserJ. Ossmann

Working Group on Risk-Informed Activities (SG-WCS) (BPV XI)

M. A. Pyne, ChairS. T. Chesworth, SecretaryJ. M. AgoldC. Cueto-FelguerosoR. HaesslerJ. HakiiK. W. HallM. J. HomiackS. D. Kulat

D. W. Lamond

R. K. Mattu

A. McNeill III

G. J. Navratil

P. J. O’Regan

N. A. Palm

D. Vetter

J. C. Younger

Working Group on General Requirements (BPV XI)

R. K. Rhyne, ChairC. E. Moyer, SecretaryJ. F. BallT. L. Chan

P. J. HennesseyE. J. MaloneyR. K. MattuT. Nuoffer

Special Working Group on Reliability and Integrity ManagementProgram (BPV XI)

F. J. Schaaf, Jr., ChairA. T. Roberts III, SecretaryN. BroomS. R. DoctorS. DowneyJ. D. FletcherJ. T. FongT. GrahamN. GranbackJ. Grimm

D. M. Jones

A. L. Krinzman

D. R. Lee

R. K. Miller

M. N. Mitchell

R. Morrill

T. Roney

R. W. Swayne

S. Takaya

JSME/ASME Joint Task Group for System-Based Code (SWG-RIM)(BPV XI)

T. Asayama, ChairS. R. DoctorK. DozakiS. R. GosselinM. HayashiD. M. JonesY. KamishimaA. L. Krinzman

D. R. Lee

H. Machida

M. Morishita

A. T. Roberts III

F. J. Schaaf, Jr.

S. Takaya

D. Watanabe

COMMITTEE ON TRANSPORT TANKS (BPV XII)

M. D. Rana, ChairN. J. Paulick, Vice ChairR. Lucas, Staff SecretaryA. N. AntoniouP. ChilukuriW. L. GarfieldG. G. Karcher

M. PittsT. A. RogersS. StaniszewskiA. P. VargheseJ. A. Byers, Contributing MemberR. Meyers, Contributing MemberM. R. Ward, Contributing Member

Executive Committee (BPV XII)

N. J. Paulick, ChairR. Lucas, Staff SecretaryM. Pitts

M. D. RanaS. StaniszewskiA. P. Varghese

Subgroup on Design and Materials (BPV XII)

A. P. Varghese, ChairR. C. Sallash, SecretaryD. K. ChandiramaniP. ChilukuriY. DoronR. D. HayworthG. G. KarcherS. L. McWilliamsN. J. PaulickM. D. Rana

T. A. Rogers

S. Staniszewski

K. Xu

A. T. Duggleby, ContributingMember

T. J. Hitchcock, ContributingMember

M. R. Ward, Contributing Member

J. Zheng, Contributing Member

Subgroup on Fabrication, Inspection, and Continued Service(BPV XII)

M. Pitts, ChairP. Chilukuri, SecretaryR. D. HayworthK. ManskerG. McRaeO. MuletT. A. RogersM. RudekR. C. Sallash

L. SelenskyS. StaniszewskiS. E. Benet, Contributing MemberJ. A. Byers, Contributing MemberA. S. Olivares, ContributingMember

L. H. Strouse, Contributing MemberS. V. Voorhees, ContributingMember

Subgroup on General Requirements (BPV XII)

S. Staniszewski, ChairB. F. Pittel, SecretaryA. N. AntoniouY. DoronJ. L. FreilerW. L. GarfieldO. MuletM. PittsT. RummelR. C. SallashL. Selensky

P. Chilukuri, Contributing MemberK. L. Gilmore, Contributing MemberT. J. Hitchcock, ContributingMember

G. McRae, Contributing MemberS. L. McWilliams, ContributingMember

T. A. Rogers, Contributing MemberD. G. Shelton, Contributing MemberL. H. Strouse, Contributing MemberM. R. Ward, Contributing Member

xxxvi

Page 39: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

Subgroup on Nonmandatory Appendices (BPV XII)

N. J. Paulick, ChairS. Staniszewski, SecretaryP. ChilukuriR. D. HayworthK. ManskerS. L. McWilliamsN. J. PaulickM. PittsT. A. RogersR. C. Sallash

D. G. Shelton

S. E. Benet, Contributing Member

D. D. Brusewitz, ContributingMember

T. J. Hitchcock, ContributingMember

A. P. Varghese, ContributingMember

M. R. Ward, Contributing Member

COMMITTEE ON OVERPRESSURE PROTECTION (BPV XIII)

D. B. DeMichael, ChairC. E. O’Brien, Staff SecretaryJ. F. BallJ. BurgessS. CammeresiJ. A. CoxR. D. DanzyJ. P. Glaspie

S. F. HarrisonW. F. HartD. MillerB. K. NutterT. PatelM. PoehlmannZ. WangJ. A. West

COMMITTEE ON BOILER AND PRESSURE VESSEL CONFORMITYASSESSMENT (CBPVCA)

P. D. Edwards, ChairL. E. McDonald, Vice ChairK. I. Baron, Staff SecretaryM. Vazquez, Staff SecretaryJ. P. ChicoineD. C. CookT. E. HansenK. T. LauD. MillerB. R. MorelockJ. D. O’LearyG. ScribnerB. C. TurczynskiD. E. TuttleR. UebelE. A. WhittleR. V. Wielgoszinski

D. Cheetham, Contributing MemberT. P. Beirne, AlternateJ. B. Carr, AlternateJ. W. Dickson, AlternateJ. M. Downs, AlternateB. J. Hackett, AlternateB. L. Krasiun, AlternateD. W. Linaweaver, AlternateP. F. Martin, AlternateI. Powell, AlternateR. Rockwood, AlternateL. Skarin, AlternateR. D. Troutt, AlternateS. V. Voorhees, AlternateP. Williams, AlternateA. J. Spencer, Honorary Member

COMMITTEE ON NUCLEAR CERTIFICATION (CNC)

R. R. Stevenson, ChairJ. DeKleine, Vice ChairE. Suarez, Staff SecretaryG. GobbiS. M. GoodwinJ. W. HighlandsK. A. HuberJ. C. KraneM. A. LockwoodR. P. McIntyreL. M. PlanteH. B. PrasseT. E. QuakaC. T. SmithC. TuryloD. M. VickeryE. A. WhittleC. S. Withers

S. F. Harrison, ContributingMember

S. Andrews, AlternateD. Arrigo, AlternateJ. Ball, AlternateP. J. Coco, AlternateP. D. Edwards, AlternateD. P. Gobbi, AlternateK. M. Hottle, AlternateK. A. Kavanagh, AlternateP. Krane, AlternateD. Nenstiel, AlternateM. Paris, AlternateG. Szabatura, AlternateA. Torosyan, AlternateS. V. Voorhees, AlternateS. Yang, Alternate

Subcommittee on Safety Valve Requirements (SC-SVR)

D. B. DeMichael, ChairC. E. O’Brien, Staff SecretaryJ. F. BallJ. BurgessS. CammeresiJ. A. CoxR. D. DanzyJ. P. GlaspieS. F. Harrison

W. F. Hart

D. Miller

B. K. Nutter

T. Patel

M. Poehlmann

Z. Wang

J. A. West

S. R. Irvin, Sr., Alternate

Subgroup on Design (SC-SVR)

D. Miller, ChairC. E. BeairB. JoergensenB. J. Mollitor

T. PatelJ. A. WestR. D. Danzy, Contributing Member

Subgroup on General Requirements (SC-SVR)

J. F. Ball, ChairG. BrazierJ. BurgessD. B. DeMichaelS. T. French

J. P. GlaspieB. F. PittelM. PoehlmannD. E. TuttleJ. White

Subgroup on Testing (SC-SVR)

W. F. Hart, ChairT. P. BeirneJ. E. BrittJ. BuehrerS. CammeresiJ. A. CoxJ. W. Dickson

A. DonaldsonG. D. GoodsonB. K. NutterC. SharpeZ. WangA. WilsonS. R. Irvin, Sr., Alternate

U.S. Technical Advisory Group ISO/TC 185 Safety Relief Valves

T. J. Bevilacqua, ChairC. E. O’Brien, Staff SecretaryJ. F. BallG. BrazierD. B. DeMichael

D. MillerB. K. NutterT. PatelJ. A. West

xxxvii

Page 40: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

THE AMERICAN CONCRETE INSTITUTE

The American Concrete Institute was organized in 1905 to provide industry standards in the field of concrete usage.The organization, which was formed as a result of meetings begun during the Engineering Congress at the LouisianaPurchase Exposition in St. Louis in 1904, was initially entitled the National Association of Cement Users. In 1913, thename of the Society was changed to the American Concrete Institute to better fit the actual scope of its activities andaims, which are to further engineering education, scientific investigation, and scientific research by organizing the ef-forts of its members for a nonprofit, public service in gathering, correlating, and disseminating information for the im-provement of the design, construction, manufacture, use, and maintenance of concrete products and structures.The day-to-day operation of ACI is administered by an Executive Director, under general supervision of its 18-member

Board of Direction, which assigns a part of its administrative duties to standing committees, the ACI Standards Board,and various technical committees.

ACI — TECHNICAL ACTIVITIES COMMITTEE

The Technical Activities Committee, which is appointed by the Board of Direction, is responsible for Institute technicalpublications, review of standards, the technical program at conventions, and continuing studies of technical committees,from which arise recommendations for the activities, and the formation or discharge of these groups. TAC members areselected by the ACI Board to represent ACI’s varied interests.

ACI — STANDARDS BOARD

The Standards Board, also appointed by the Board of Direction, is responsible for matters of policy, procedure, andappeal pertaining to ACI Standards. All proposed new standards or revisions to existing standards, including minorityreports from sponsoring technical committees, are forwarded to the Standards Board through the Technical ActivitiesCommittee. On release by the Standards Board, these are published, and after ratification by letter ballot of the ACI mem-bership at large are then available for public use. The primary functions of the Standards Board are to verify that properstandardization procedures have been followed and to rule on matters of policy as related to standards.

ACI — TECHNICAL AND EDUCATIONAL COMMITTEES

Much of the important work of the American Concrete Institute is performed by technical committees that preparecommittee reports and standards. Technical committees, composed of volunteer personnel, develop ACI recommenda-tions in their respective fields. Their work, subject to review and approval by the Board of Direction through the Tech-nical Activities Committee and the Standards Board, forms the basis for Institute Standards.Educational committees, also composed of volunteer personnel, develop seminars, workshops, curriculum guides, and

student manuals to further ACI’s involvement in education. Their work, subject to review and approval by the ACI Edu-cational Activities Committee, forms the basis for Institute manuals and training programs.

xxxviii

Page 41: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

INTRODUCTION TO SECTION III, DIVISION 2

This document has been prepared by the Joint ACI-ASME Technical Committee on Concrete Pressure Components forNuclear Service under the sponsorship of the American Concrete Institute and the American Society of Mechanical En-gineers. The two Societies have agreed that it will be published as Section III, Division 2, of the ASME Boiler and PressureVessel Code. Any changes to it shall be subject to the standardization procedures of the two sponsoring Societies.

The basic materials for this document were provided by two committee reports, one by ACI and the other by ASME.The ACI Committee 349, Criteria for Nuclear Containment Vessels, and the ASME Boiler and Pressure Vessel Code Com-mittee, Section III, Division 2, Subgroup on Concrete Components, submitted their completed committee reports in Sep-tember 1971 to ACI and ASME, respectively.

These two documents were melded into a single document dated January 17, 1972, and entitled Proposed Standard—Code for Concrete Reactor Vessels and Containments. A second draft was published August 1, 1972, that included newand revised technical material plus administrative agreements reached by the two Societies. Finally, after approval wasreceived from the two Societies, a third and final draft was published in April 1973 for public “trial use and comment” fora period of about one year. During that year numerous public comments and suggestions were received from differentsegments of industry and regulatory agencies. In addition, two public hearings were held on the Code: the first on Oc-tober 10, 1973, in Ottawa, Canada, the second on November 28, 1973, in Atlanta, Georgia. The consideration of all com-ments received as of November 28, 1973, resulted in a series of six Committee Addenda which were incorporated in theCode. The results of these three years of effort by the Committee have culminated in the present document.

The Joint Committee, whose membership includes individuals from both ACI and ASME and many others actively in-volved in the field, was formed in September 1971. The three primary goals established for the Committee are

(a) to establish rules in the form of a code for the design, construction, inspection, and testing of reinforced and pre-stressed concrete containments, including metallic liner, for nuclear power reactors

(b) to interpret these rules when questions arise regarding their intent(c) to periodically update code provisions, making full use of the expedited procedure for revision of standards as

necessaryIt is expected that comments and discussions will continue to be received by the Joint Committee for review. Com-

ments shall state clearly which area and wording of the Code is being discussed. Suggested revisions shall be wordedas parallel text, giving both the present wording and showing how the proposed changed paragraphs should read,and shall be accompanied by a commentary (including references where appropriate) to support the proposed recom-mendations. Discussions, commentaries, and committee actions will be printed in the publications of the two Societies.Discussions may be sent to either the ACI or ASME headquarters marked to the attention of the Joint ACI-ASMECommittee.

xxxix

Page 42: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

ð17Þ ORGANIZATION OF SECTION III

1 GENERAL

Section III consists of Division 1, Division 2, Division 3, and Division 5. These Divisions are broken down into Subsec-tions and are designated by capital letters preceded by the letter “N” for Division 1, by the letter “C” for Division 2, by theletter “W” for Division 3, and by the letter “H” for Division 5. Each Subsection is published separately, with the exceptionof those listed for Divisions 2, 3, and 5.• Subsection NCA — General Requirements for Division 1 and Division 2• Appendices• Division 1*

– Subsection NB — Class 1 Components– Subsection NC — Class 2 Components– Subsection ND — Class 3 Components– Subsection NE — Class MC Components– Subsection NF — Supports– Subsection NG — Core Support Structures

• Division 2 — Code for Concrete Containments– Subsection CC — Concrete Containments

• Division 3 — Containment Systems for Transportation and Storage of Spent Nuclear Fuel and High-Level RadioactiveMaterial– Subsection WA — General Requirements for Division 3– Subsection WB — Class TC Transportation Containments– Subsection WC — Class SC Storage Containments– Subsection WD — Class ISS Internal Support Structures

• Division 5 — High Temperature Reactors– Subsection HA — General Requirements

Subpart A — Metallic MaterialsSubpart B — Graphite MaterialsSubpart C — Composite Materials

– Subsection HB — Class A Metallic Pressure Boundary ComponentsSubpart A — Low Temperature ServiceSubpart B — Elevated Temperature Service

– Subsection HC — Class B Metallic Pressure Boundary ComponentsSubpart A — Low Temperature ServiceSubpart B — Elevated Temperature Service

– Subsection HF — Class A and B Metallic SupportsSubpart A — Low Temperature Service

– Subsection HG — Class A Metallic Core Support StructuresSubpart A — Low Temperature ServiceSubpart B — Elevated Temperature Service

– Subsection HH — Class A Nonmetallic Core Support StructuresSubpart A — Graphite MaterialsSubpart B — Composite Materials

2 SUBSECTIONS

Subsections are divided into Articles, subarticles, paragraphs, and, where necessary, subparagraphs andsubsubparagraphs.

* The 2015 Edition of Section III was the last edition in which Section III, Division 1, Subsection NH, Class 1 Components in Elevated Tem-perature Service, was published. The requirements located within Subsection NH were moved to Section III, Division 5, Subsection HB, SubpartB for the elevated temperature construction of Class A components.

xl

Page 43: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

3 ARTICLES

Articles are designated by the applicable letters indicated above for the Subsections followed by Arabic numbers, suchas NB-1000. Where possible, Articles dealing with the same topics are given the same number in each Subsection, exceptNCA, in accordance with the following general scheme:

Article Number Title

1000 Introduction or Scope2000 Material3000 Design4000 Fabrication and Installation5000 Examination6000 Testing7000 Overpressure Protection8000 Nameplates, StampingWith Certification Mark, and Reports

The numbering of Articles and the material contained in the Articles may not, however, be consecutive. Due to the factthat the complete outline may cover phases not applicable to a particular Subsection or Article, the rules have been pre-pared with some gaps in the numbering.

4 SUBARTICLES

Subarticles are numbered in units of 100, such as NB-1100.

5 SUBSUBARTICLES

Subsubarticles are numbered in units of 10, such as NB-2130, and generally have no text. When a number such asNB-1110 is followed by text, it is considered a paragraph.

6 PARAGRAPHS

Paragraphs are numbered in units of 1, such as NB-2121.

7 SUBPARAGRAPHS

Subparagraphs, when they aremajor subdivisions of a paragraph, are designated by adding a decimal followed by oneor more digits to the paragraph number, such as NB-1132.1. When they are minor subdivisions of a paragraph, subpar-agraphs may be designated by lowercase letters in parentheses, such as NB-2121(a).

8 SUBSUBPARAGRAPHS

Subsubparagraphs are designated by adding lowercase letters in parentheses to the major subparagraph numbers,such as NB-1132.1(a). When further subdivisions of minor subparagraphs are necessary, subsubparagraphs are desig-nated by adding Arabic numerals in parentheses to the subparagraph designation, such as NB-2121(a)(1).

9 REFERENCES

References used within Section III generally fall into one of the following four categories:(a) References to Other Portions of Section III.When a reference is made to another Article, subarticle, or paragraph, all

numbers subsidiary to that reference shall be included. For example, reference to Article NB-3000 includes all materialin Article NB-3000; reference to NB-3100 includes all material in subarticle NB-3100; reference to NB-3110 includes allparagraphs, NB-3111 through NB-3113.

(b) References to Other Sections. Other Sections referred to in Section III are the following:(1) Section II, Materials.When a requirement for a material, or for the examination or testing of a material, is to be in

accordance with a specification such as SA-105, SA-370, or SB-160, the reference is to material specifications in SectionII. These references begin with the letter “S.”

xli

Page 44: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

(2) Section V, Nondestructive Examination. Section V references begin with the letter “T” and relate to the nondes-tructive examination of material or welds.

(3) Section IX, Welding and Brazing Qualifications. Section IX references begin with the letter “Q” and relate to weld-ing and brazing requirements.

(4) Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components. When a reference is made to inser-vice inspection, the rules of Section XI shall apply.

(c) Reference to Specifications and Standards Other Than Published in Code Sections

(1) Specifications for examination methods and acceptance standards to be used in connection with them are pub-lished by the American Society for Testing and Materials (ASTM). At the time of publication of Section III, some suchspecifications were not included in Section II of this Code. A reference to ASTM E94 refers to the specification so desig-nated by and published by ASTM, 100 Barr Harbor Drive, West Conshohocken, PA 19428.

(2) Dimensional standards covering products such as valves, flanges, and fittings are sponsored and published byThe American Society of Mechanical Engineers and approved by the American National Standards Institute.** When aproduct is to conform to such a standard, for example ASME B16.5, the standard is approved by the American NationalStandards Institute. The applicable year of issue is that suffixed to its numerical designation in Table NCA-7100-1, forexample ASME B16.5-2003. Standards published by The American Society of Mechanical Engineers are available fromASME (https://www.asme.org/).

(3) Dimensional and other types of standards covering products such as valves, flanges, and fittings are also pub-lished by the Manufacturers Standardization Society of the Valve and Fittings Industry and are known as Standard Prac-tices. When a product is required by these rules to conform to a Standard Practice, for example MSS SP-100, the StandardPractice referred to is published by the Manufacturers Standardization Society of the Valve and Fittings Industry, Inc.(MSS), 127 Park Street, NE, Vienna, VA 22180. The applicable year of issue of such a Standard Practice is that suffixedto its numerical designation in Table NCA-7100-1, for example MSS SP-89-2003.

(4) Specifications for welding and brazing materials are published by the American Welding Society (AWS), 8669Doral Boulevard, Suite 130, Doral, FL 33166. Specifications of this type are incorporated in Section II and are identifiedby the AWS designation with the prefix “SF,” for example SFA-5.1.

(5) Standards applicable to the design and construction of tanks and flanges are published by the American Petro-leum Institute and have designations such as API-605. When documents so designated are referred to in Section III, forexample API-605–1988, they are standards published by the American Petroleum Institute and are listed in Table NCA-7100-1.

(d) References to Appendices. Section III uses two types of appendices that are designated as either Section III Appen-dices or Subsection Appendices. Either of these appendices is further designated as either Mandatory or Nonmandatoryfor use. Mandatory Appendices are referred to in the Section III rules and contain requirements that must be followed inconstruction. Nonmandatory Appendices provide additional information or guidance when using Section III.

(1) Section III Appendices are contained in a separate book titled “Appendices.” These appendices have the potentialfor multiple subsection applicability. Mandatory Appendices are designated by a Roman numeral followed, when appro-priate, by Arabic numerals to indicate various articles, subarticles, and paragraphs of the appendix, such as II-1500 orXIII-1210. Nonmandatory Appendices are designated by a capital letter followed, when appropriate, by Arabic numeralsto indicate various articles, subarticles, and paragraphs of the appendix, such as D-1200 or Y-1440.

(2) Subsection Appendices are specifically applicable to just one subsection and are contained within that subsec-tion. Subsection-specific mandatory and nonmandatory appendices are numbered in the same manner as Section III Ap-pendices, but with a subsection identifier (e.g., NF, NH, D2, etc.) preceding either the Roman numeral or the capital letterfor a unique designation. For example, NF-II-1100 or NF-A-1200 would be part of a Subsection NF mandatory or non-mandatory appendix, respectively. For Subsection CC, D2-IV-1120 or D2-D-1330 would be part of a Subsection CC man-datory or nonmandatory appendix, respectively.

(3) It is the intent of this Section that the information provided in both Mandatory and Nonmandatory Appendicesmay be used to meet the rules of any Division or Subsection. In case of conflict between Appendix rules and Division/Subsection rules, the requirements contained in the Division/Subsection shall govern. Additional guidance on Appendixusage is provided in the front matter of Section III Appendices.

** The American National Standards Institute (ANSI) was formerly known as the American Standards Association. Standards approved by theAssociation were designated by the prefix “ASA” followed by the number of the standard and the year of publication. More recently, the Amer-ican National Standards Institute was known as the United States of America Standards Institute. Standards were designated by the prefix“USAS” followed by the number of the standard and the year of publication. While the letters of the prefix have changed with the name ofthe organization, the numbers of the standards have remained unchanged.

xlii

Page 45: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

SUMMARY OF CHANGES

Errata to the BPV Code may be posted on the ASME Web site to provide corrections to incorrectly published items, or tocorrect typographical or grammatical errors in the BPV Code. Such Errata shall be used on the date posted.

Information regarding Special Notices and Errata is published by ASME at http://go.asme.org/BPVCerrata.

Changes given below are identified on the pages by a margin note, (17), placed next to the affected area.

The Record Numbers listed below are explained in more detail in “List of Changes in Record Number Order” followingthis Summary of Changes.

Page Location Change (Record Number)

xi List of Sections Updated

xvi Submittal of TechnicalInquiries to the Boilerand Pressure VesselStandards Committees

Revised in its entirety (13-2222)

xix Personnel Updated

xl Organization of Section III (1) In “1 General,” title of Section III, Division 3 revised (13-1594)(2) In “1 General,” for Section III, Division 3, Subsection WD added(3) In “1 General,” entry for Subsection NH deleted and footnote

editorially revised(4) In “9 References,” subparas. (a) and (d)(1) revised (16-148)

6 CC-2231.4 Subparagraph (a) revised (15-2225)

7 Table CC-2231.7.1-1 (1) For first category, conditions in third column revised (15-2401)(2) For third category from top, entries revised (15-2401)(3) Note (1) revised (14-2245)

8 Table CC-2231.7.2-1 (1) Under Exposure Class, F3 row revised (15-2401)(2) Exposure Classes “P0” and “P1” redesignated as “W0” and “W1,”

respectively, and repositioned as first two lines of table(15-2401)

(3) Note (1) revised (15-2401)

20 CC-2461 Last sentence added (16-1887)

29 CC-2528 (1) In subpara. (a), cross-reference to NCA revised (16-2074)(2) In subpara. (b), first and last cross-reference to NCA revised

(16-2074)

35 CC-2540 In first sentence, cross-reference to NCA revised (16-2074)

35 CC-2611 Subparagraph (b) revised in its entirety (16-836)

43 CC-2630 In subpara. (a), cross-reference to NCA revised (16-2074)

43 CC-2733 Revised (14-700)

44 CC-2741 In first paragraph, cross-reference to NCA revised (16-2074)

54 CC-3421.8.3 Subparagraph (a)(2) revised (15-1118)

55 CC-3424.1 Revised (15-1246)

55 CC-3424.4 Revised (15-1118)

xliii

Page 46: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

Page Location Change (Record Number)

56 CC-3424.8 Revised (15-1246)

65 CC-3533.1 Subparagraph (a)(5) deleted (14-2216)

65 CC-3535 Subparagraph (c) added (15-795, 16-3119)

68 CC-3650 Revised (16-936)

68 CC-3740 Subparagraph (c) revised (16-936)

68 CC-3750 Subparagraph (a) revised (16-936)

73 CC-4121.1 Revised (16-2106)

75 CC-4225.1 Last sentence revised (14-2428)

75 CC-4252 Revised (15-1246)

78 CC-4333.2.3 Subparagraph (a) revised (14-2430, 15-741, 16-1244)

80 CC-4333.4 Revised (14-2226, 14-2430, 15-747, 16-1244)

82 CC-4333.5.4 (1) First paragraph revised (14-2430, 16-1244)(2) Subparagraph (b) revised (14-2360)

82 CC-4333.5.5 Subparagraphs (c) and (d) revised (14-2360)

83 CC-4432.5 Subparagraph (a)(1) revised (15-2147)

104 CC-4543.1 Third cross-reference corrected by errata to “CC-4552” (15-1963)

115 Table CC-5200-1 (1) For Compressive strength Concrete Material, entries in theFrequency columns revised (14-2251, 14-2427)

(2) Note (9) added (14-2251, 14-2427)

138 Article D2-II-1000 First paragraph revised (16-936)

161 D2-VIII-1554 Subparagraph (b) revised (14-2360)

161 D2-VIII-1555 Subparagraph (c) revised (14-2360)

178 D2-E-1200 Subparagraph (e) revised (16-2074)

xliv

Page 47: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

LIST OF CHANGES IN RECORD NUMBER ORDER

Record Number Change

13-1594 Revised the Organization of Section III to address the incorporation of a new proposed Subsec-tion WD that addresses internal support structures.

13-2222 Revised the front guidance on interpretations in its entirety.14-700 Revised CC-2733 to include the ASTM references.14-2216 Deleted CC-3533.1(a)(5) as it has been replaced by the language in the current

CC-3533.1(a)(4).14-2226 Revised CC-4333.4 to add clarifying language with respect to tensile strength requirements for

Initial Qualification Tests. The revised language will address the concerns for clarity and avoidany potential misunderstanding that could arise from the current language.

14-2245 Revised Note (1) of Table CC-2231.7.1-1 to read: “Water-soluble sulfate (SO4) in soil, percentsulfate by mass of sample as determined by ASTM C1580.”

14-2251 Added Note (9) to Table CC-5200-1 to read: “Set of cylinders shall be in accordance withCC-5232.3.2(a).”

14-2360 Revised CC-4333.5.4(b), CC-4333.5.5(c) and (d), and Appendix D2-VIII, D2-VIII-1554(b) andD2–VIII-1555(c) to clarify intent.

14-2427 Added Note (9) to Table CC-5200-1 by Record 14-2251 as per request of ACI TAC.14-2428 Replaced the last sentence at the end of CC-4225.1.14-2430 Added “accordance with the monotonic test method of ASTM A1034/A1034M” in lieu of

“SA-370” to provide proper reference in CC-4333.2.3 (a), CC-4333.4, and CC-4333.5.4.15-741 Errata correction. See Summary of Changes for details.15-747 Added clarifying language to CC-4333.4 with respect to the reinforcing bar to be used for the

Initial Qualification Tests.15-795 The Committee approved these changes as per Record 12-1045 (Code Case N-833). Added

CC-3535(c) with a note in latest revision.15-1118 Revised CC-3421.8.3(a)(2) and CC-3424.4 to consider the latest update for bracket and corbels

in the ACI 349 Code.15-1246 Revised CC-3424.1 to provide a general description of where it is appropriate to use shear fric-

tion concept for transfer of shear across a given plane.Revised CC-3424.8 to provide interface roughening requirement.Revised CC-4252 to refer to CC-3424 for shear friction design provisions.

15-1963 Errata correction. See Summary of Changes for details.15-2147 Revised CC-4432.5(a)(1) to indicate a maximum strand size of 0.63 in. (16 mm).15-2225 Revised CC-2231.4(a) to add a new description, “For non-prestressed containments, creep test-

ing of concrete in compression is not required unless such testing is specified in the Construc-tion Specification.”

15-2401 Made the following changes to Table CC-2231.7.1-1 in order to align with ACI 318-14:(a) Changed “occasional” in class F1 to “limited.”(b) Changed “continuous” in class F2 and F3 to “frequent.”(c) Replaced “Requiring low permeability” with “In contact with water” in Category P (W).(d) Terminology PW, PW0, and PW1 changed to W, W0, and W1, respectively.(e) Added “Concrete dry in service. Concrete” in W0 condition.

Made the following changes in Table CC-2231.7.2-1: for exposure class F3, the values for Max.w/cm and corresponding Min. f ′ c revised. Also, Note (1) revised from “…materials of those…” to“…materials to those…”

16-148 Revised numerous sections of text related to incorporation of revised Mandatory Appendix XIII.16-836 Revised Section III Division 2, CC-2611.16-936 Updated Table NCA-7100-3 Standards and Specifications referenced in Division 2.16-1244 Revised CC-4333.2.3(a), CC-4333.4, and CC-4333.5.4 to separate the tensile testing require-

ments for traditional bar splice specimens from mechanically headed deformed bar specimensand reference the correct standard to be used to perform the tensile testing for bar splices andmechanically deformed headed bars.

xlv

Page 48: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

Record Number Change

16-1887 Revised CC-2461.16-2074 Revised CC-2528, CC-2540, CC-2630, CC-2741, and Article D2-E-1000 in Appendix D2-E to cor-

rect NCA-3800, NCA-3900, and Article NCA-4000 paragraph citations.16-2106 Revised CC-4121.1 to align the phrasing of Division 1 with Divisions 2 and 3 for consistency.16-3119 Editorial clarification of record 16–836. See Summary of Changes for details.

xlvi

Page 49: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

CROSS-REFERENCING AND STYLISTIC CHANGES IN THE BOILERAND PRESSURE VESSEL CODE

There have been structural and stylistic changes to BPVC, starting with the 2011 Addenda, that should be noted to aidnavigating the contents. The following is an overview of the changes:

Subparagraph Breakdowns/Nested Lists Hierarchy

• First-level breakdowns are designated as (a), (b), (c), etc., as in the past.• Second-level breakdowns are designated as (1), (2), (3), etc., as in the past.• Third-level breakdowns are now designated as (-a), (-b), (-c), etc.• Fourth-level breakdowns are now designated as (-1), (-2), (-3), etc.• Fifth-level breakdowns are now designated as (+a), (+b), (+c), etc.• Sixth-level breakdowns are now designated as (+1), (+2), etc.

Footnotes

With the exception of those included in the front matter (roman-numbered pages), all footnotes are treated as end-notes. The endnotes are referenced in numeric order and appear at the end of each BPVC section/subsection.

Submittal of Technical Inquiries to the Boiler and Pressure Vessel Standards Committees

Submittal of Technical Inquiries to the Boiler and Pressure Vessel Standards Committees has been moved to the frontmatter. This information now appears in all Boiler Code Sections (except for Code Case books).

Cross-References

It is our intention to establish cross-reference link functionality in the current edition and moving forward. To facil-itate this, cross-reference style has changed. Cross-references within a subsection or subarticle will not include the des-ignator/identifier of that subsection/subarticle. Examples follow:

• (Sub-)Paragraph Cross-References. The cross-references to subparagraph breakdowns will follow the hierarchy ofthe designators under which the breakdown appears.– If subparagraph (-a) appears in X.1(c)(1) and is referenced in X.1(c)(1), it will be referenced as (-a).– If subparagraph (-a) appears in X.1(c)(1) but is referenced in X.1(c)(2), it will be referenced as (1)(-a).– If subparagraph (-a) appears in X.1(c)(1) but is referenced in X.1(e)(1), it will be referenced as (c)(1)(-a).– If subparagraph (-a) appears in X.1(c)(1) but is referenced in X.2(c)(2), it will be referenced as X.1(c)(1)(-a).

• Equation Cross-References. The cross-references to equations will follow the same logic. For example, if eq. (1) ap-pears in X.1(a)(1) but is referenced in X.1(b), it will be referenced as eq. (a)(1)(1). If eq. (1) appears in X.1(a)(1) butis referenced in a different subsection/subarticle/paragraph, it will be referenced as eq. X.1(a)(1)(1).

xlvii

Page 50: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

INTENTIONALLY LEFT BLANK

Page 51: Rules for Construction of Nuclear Facility Components 2017 · 2018. 5. 12. · ASME BPVC.III.2-2017 Division 2 Code for Concrete Containments SECTION III Rules for Construction of

SUBSECTION CCCONCRETE CONTAINMENTS (PRESTRESSED

OR REINFORCED)

ARTICLE CC-1000INTRODUCTION

CC-1100 SCOPE AND GENERALREQUIREMENTS

CC-1110 SCOPESubsection CC establishes rules for material, design,

fabrication, construction, examination, testing, marking,stamping, and preparation of reports for prestressedand reinforced concrete containments. The containmentscovered by this Subsection shall include the following:

(a) structural concrete pressure resisting shells andshell components

(b) shell metallic liners(c) penetration liners extending the containment liner

through the surrounding shell concrete

CC-1120 GENERAL REQUIREMENTSThe rules of Division 1 shall apply as required in this

Subsection for parts and appurtenances not backed bystructural concrete for load carrying purposes. Thoseparts or appurtenances stamped in accordance with Divi-sion 2 shall meet the requirements of Subsection NCA,

Articles CC-1000, CC-6000, CC-7000, and CC-8000 in lieuof the corresponding requirements of Division 1. Thoseparts or appurtenances stamped in accordance with Divi-sion 1 shall meet all the requirements of Division 1 andNCA‐2134(e).

CC-1130 RULES FOR CONCRETECONTAINMENTS

Containments having a Design Pressure greater than5 psi (35 kPa) that are classified as Subsection CC contain-ments shall be constructed in accordance with the rules ofthis Subsection.

CC-1140 BOUNDARIES OF JURISDICTION

(a) The jurisdiction of this Subsection for the contain-ment shall conform to the requirements of NCA‐3254.2supplemented by the provisions below.

(b)When a structural concrete support is constructedas an integral part of the containment, it shall be includedwithin the jurisdiction of these criteria.

1