188
ROADS AND TRAFFIC AUTHORITY ANNUAL REPORT 2000 RTA: 2000

RTA Annual Report 2000 See Pg 24

Embed Size (px)

Citation preview

Page 1: RTA Annual Report 2000 See Pg 24

ROADS AND TRAFFICAUTHORITY ANNUALREPORT 2000 RTA:2000

RTA A_Report Cover 30/11/00 1:04 PM Page 1

Page 2: RTA Annual Report 2000 See Pg 24

integrated solutions innovation efficiency

FRONT COVER – FOR THE CORROBOREE 2000 AND THE WALK FOR RECONCILIATION IN MAY 2000, THE RTA CLOSED THE SYDNEY HARBOUR BRIDGE FOR NINE HOURS AND ASSISTED IN CROWD MANAGEMENT OF ABOUT 150,000 PEOPLE (PHOTO COURTESY AAP)

THIS PAGE – CAPTAIN COOK BRIDGE, SANS SOUCI

© ROADS AND TRAFFIC AUTHORITY, NSWISSN 1037-3276Published November 2000. RTA/Pub 00.113Printed on recycled paper (50% recycled fibre, 50% chlorine free)

This report, and many other publications referred to within it, are available on our website at www.rta.nsw.gov.au

RTA A_Report NEW GUTTER 30/11/00 9:54 AM Page b

Page 3: RTA Annual Report 2000 See Pg 24

2 Profile of the RTA

3 Our Vision, Mission and Priorities

4 Letter to the Minister

5 Chief Executive’s Message

6 Management Structure

8 1999/2000 Highlights

12 Delivering Results

14 Financial Overview

16 Ensuring Transport Efficiency

22 Developing the Road Network

28 Maintaining Roads and Bridges

34 The Road Safety Challenge

40 Working with our Customers

44 Drivers and Vehicles

50 Business Efficiency

56 Whole of Government Planning

60 Our People

64 Caring for the Environment

70 Corporate Governance

71 Financial Statements

119 Appendices

RTA A_Report NEW GUTTER 30/11/00 9:54 AM Page 1

Page 4: RTA Annual Report 2000 See Pg 24

HISTORYThe Roads and Traffic Authority(RTA) was established on 16January 1989 under the TransportAdministration Act 1988 throughan amalgamation of the formerDepartment of Main Roads,Department of Motor Transportand the Traffic Authority.

RESPONSIBILITIESWe provide road management,design, construction andmaintenance solutions for theNSW community within anintegrated urban and regionaldesign framework with anemphasis on meeting community,environmental, regulatory andaesthetic needs.

We promote road safety andtraffic management and areresponsible for driver licensingand vehicle registration.

We manage the operations,maintenance and enhancementof 17,783km of State Roads,including 3,128km of NationalHighways. We also managenearly 3,000km of RegionalRoads and Local Roads in theunincorporated area of NSWwhere there are no localcouncils. We assist local councilsin managing about 18,430km ofRegional Roads and, to a limitedextent, Local Roads, throughfunding and other support.

Roads in which we have aninterest also take in 4,275bridges, including major culvertsand tunnels, and nine vehicularferries. We are also responsiblefor traffic facilities such as traffic lights, roundabouts, signs and linemarking.

ASSETSThe written down value of the road, bridge and trafficinfrastructure we look after is$44 billion, including the valueof land under roads. Property,plant, equipment, private sectorprovided infrastructure and othernon-current assets, includingmajor works in progress, arevalued at $4.3 billion.

FUNDINGAnnual funding for the RoadsProgram is about $2.2 billion,derived principally from roaduser charges.

OUR PEOPLEWe employ 6,425 staff in morethan 200 offices throughout NSWincluding 130 Motor Registries.

OUR CUSTOMERSWe have a vast and varied range of customers, includingindividuals, private organisations,community and road transportgroups, local councils and Stateand Federal Government agencies.

The 4.1 million drivers and theowners of 4.3 million vehicles inNSW generate about 405,000transactions and 57,000 phonecalls a week.

PROFILE OF THE RTA

>

(2) Roads and Traffic Authority Annual Report 2000

RTA A_Report NEW GUTTER 30/11/00 9:54 AM Page 2

Page 5: RTA Annual Report 2000 See Pg 24

OUR VISIONTo be recognised by the people of NSW as the leader in providing cost effective, safe and accessible road basedtransport solutions within anintegrated transport system.

OUR MISSIONIn the delivery of the besttransport outcomes we willbalance the needs of publictransport passengers, cyclists,pedestrians, motorists andcommercial vehicles by:

– placing our customers’ needs first– working with innovation,

openness and integrity– achieving value for money, and– being environmentally responsible.

GOVERNMENT PRIORITIES

FOR THE RTAOur strategies and programsfocus on delivering the prioritiesof the NSW Government inmeeting the road transportneeds of the community.

Meeting customer needsWe put in place strategies andpolicies to:

– develop and maintain fast,reliable passenger and freighttransport corridors betweenregional centres, capital citiesand ports

– provide leadership in nationalland transport reform to deliverefficiency, productivity and safetybenefits to NSW

– continue to develop a customerfocus, especially in the areas oftraffic management, motorregistry services and communityconsultation, and

– facilitate ease of access to essentialGovernment services by providinga suitable spread and range ofoutlets, including the internet.

Using funds wiselyWe actively pursue the best value for money in theperformance of activities and the delivery of services.

Managing NSW’s transportneedsWe fulfil our responsibilities by:

– managing and developing theroad network in a way thatbalances the needs of publictransport passengers, cyclists,pedestrians, motorists andcommercial vehicles, and

– preparing and implementing anintegrated transport plan whichmeets the needs of all road usersand which contributes to theachievement of Government airquality targets.

Key ResponsibilitiesOur key responsibilities are to:

– enable road users to make moreefficient travel decisions byproviding timely informationabout routes and trafficconditions

– maintain roads and bridges ingood condition, at minimumwhole of life cost

– make New South Wales roadsthe safest in the world, and

– provide fair and consistentlicence administration andpenalty structures to promoteresponsible road use.

Caring for our environmentWe minimise impacts on thenatural and built environmentboth from road use and fromour own activities.

OUR VISION, MISSION AND PRIORITIES

THE JOURNEY AHEADThe Journey Ahead 1998–2003is the RTA's corporate strategicplan, which builds on ourachievements of recent years and outlines our vision for thefuture. It sets the organisation'sdirection and priorities, andreflects the challenges andinitiatives of the NSWGovernment's Action forTransport 2010 – An IntegratedTransport Plan for NSW.

This Annual Report includesinformation on our performanceand achievements against TheJourney Ahead 1998–2003: itsobjectives, initiatives andperformance measures.

(3) Roads and Traffic Authority Annual Report 2000

RTA A_Report NEW GUTTER 30/11/00 9:54 AM Page 3

Page 6: RTA Annual Report 2000 See Pg 24

(4) Roads and Traffic Authority Annual Report 2000

The Honourable Carl Scully, MPMinister for Transport and Minister for RoadsLevel 34, Governor Macquarie Tower1 Farrer Place, Sydney NSW 2000

Dear Minister,

I have pleasure in submitting the Annual Report and FinancialStatements of the Roads and Traffic Authority for presentation to theParliament of New South Wales for the financial year ended 30 June,2000. It has been prepared in accordance with the Annual Reports(Statutory Bodies) Act 1984 and the Public Finance and Audit Act 1983.

Yours sincerely,

Paul ForwardChief Executive

LETTER TO THEMINISTER

THE HON. CARL SCULLY, MP

THE NEW BULAHDELAH TOCOOLONGOLOOK FREEWAY

RTA A_Report NEW GUTTER 30/11/00 9:55 AM Page 4

Page 7: RTA Annual Report 2000 See Pg 24

(5) Roads and Traffic Authority Annual Report 2000

CHIEFEXECUTIVE’SMESSAGE

PAUL FORWARD, CHIEF EXECUTIVE

The last twelve months have seen a number of significantachievements for the RTA and a sharpening of our focus. Wecontinued to refine the structure of the organisation to betterdeliver the Government’stransport strategies. Our emphasisis firmly based on our corebusiness, clearer accountabilitiesand delivering results in a costeffective manner.

In 1999/2000, the RTA continuedto develop and improve the State’sroad network, with over $1.5billion spent on construction andmaintenance in both metropolitanand regional areas.

The RTA’s maintenance program was improved with the implementation of a reformpackage that included theintroduction of a road maintenance prequalificationscheme for local councils.

The State’s heritage legacy andthe preservation of the naturalenvironment have been paramountin the network infrastructureprograms undertaken by the RTAduring the past year. Also, urbandesign considerations played anincreasingly important role.

We worked consistently in 1999/2000 to maximise theefficiency of the road network,promote alternative forms oftransport and contribute to theState Government’s “whole ofgovernment” approach totransport planning.

Undoubtedly the greatest challengewe encountered in 1999/2000was preparing for the Sydney2000 Olympic Games and theParalympic Games. Over the lasttwelve months and more, the RTA has worked closely withorganisations such as the OlympicRoads and Transport Authority,SOCOG, OCA and other StateGovernment agencies to developcomprehensive traffic andpedestrian plans for the Sydneygames. The RTA’s new TransportManagement Centre has played akey role in coordinating major testevents, such as New Year’s Eve1999, in preparation for being thenerve centre for the entire Olympicand Paralympic transport network.

Road Safety, and particularly theroad toll, remained a criticalfocus for the RTA. We continuedour efforts to further reduce thetoll with the release of RoadSafety 2010, a framework whichsets out a strategy to halve theroad toll by 2010.

The RTA is well positioned totake advantage of the challengesand opportunities facing us. We have and will continue tosensitively balance the oftencompeting needs of thecommunity, interest groups andindividuals, and the competingdemands for funding.

I would like to extend my thanksto the Minister for Roads, theHon. Carl Scully, for his continuingsupport and encouragement,and also to our other stakeholdersand commercial partners fortheir positive involvementthroughout 1999/2000. I wouldespecially extend my thanks toall the staff of the RTA for theirloyalty and commitment.Without them, the achievementsof the past twelve months wouldnot have been possible.

Paul ForwardChief Executive

RTA A_Report NEW GUTTER 30/11/00 9:55 AM Page 5

Page 8: RTA Annual Report 2000 See Pg 24

MANAGEMENTSTRUCTURE

ROAD SAFETY AND ROAD

USER MANAGEMENTReduce the trauma and cost tothe community of road deathsand injuries.Ensure that driversand motorcyclists are eligible,competent and safety-conscious.Ensure that vehicles meet roadworthiness, road impact androad emission standards and thatthey operate safely. Ensure thatdriver and vehicle transactionsare accessible and a highstandard of customer service is maintained.

ROAD NETWORK

INFRASTRUCTUREMaintain State Roads and bridgesin good condition at minimumwhole-of-life cost. Develop theState Road network focusing onstrategic routes. Contribute tothe ‘Whole of Government’approach to transport planning.Manage National Highway andthe Roads of NationalImportance programs.

TRAFFIC AND TRANSPORTImprove the operationalperformance of the road networkthrough traffic control, driverinformation systems, managementof incidents and integrated routemanagement strategies. Plan and organise public transportinfrastructure improvements.Improve pedestrian and cyclistfacilities and maintain traffic facility assets.

CLIENT SERVICESAct as the RTA’s principal agent in managing the provision and procurement of road transportservices to ensure best value formoney. Provide professional advice in the development and delivery of integrated roadtransport solutions, specialisttechnical support, and expertmanagement of programs,projects, assets and the network.Ensure consistency of practiceacross the State, the integration of programs at the local level, andknowledge of local Governmentand community needs.

(6) Roads and Traffic Authority Annual Report 2000

ROAD SAFETY AND ROAD

USER MANAGEMENT Director Sue Sinclair

ROAD NETWORK

INFRASTRUCTUREDirectorMike Hannon

TRAFFIC AND

TRANSPORTDirectorChris Ford

CLIENT SERVICESDirectorDavid Stuart-Watt

Funder Purchaser

RTA A_Report NEW GUTTER 30/11/00 9:55 AM Page 6

Page 9: RTA Annual Report 2000 See Pg 24

OPERATIONSProvide comprehensive road,bridge, traffic and driver andvehicle services across NSW. Actas the RTA’s principal serviceprovider and deliver services toagreed levels of time, cost andquality on a commercial basis.

STRATEGIC PROJECTSDevelop and co-ordinate specialprojects that impact on the long-term role of the RTA and the roadand traffic systems of NSW. Thisarea links the responsibilities of anumber of Directorates. Examplesof strategic projects includeElectronic Toll Collection Systemsand Intelligent Transport Systems.

FINANCEDevelop and implement policies and practices to provide a contem-porary financial and commercialmanagement framework andmanage the RTA’s finance functions.Lead corporate and finance strategicplanning, facilitate businessplanning and development ofperformance indicators across theRTA. Monitor, evaluate and reporton the financial performance of theRTA in all key result areas.

ENVIRONMENT AND

COMMUNITY POLICYDevelop the RTA’s environmentalmanagement system and communityconsultation processes. Providepolicy advice and guidance onvarious environmental and planningissues. Ensure comprehensiveenvironmental impact assessment,community consultation,environmental management and compliance across the RTA.

CORPORATE SERVICESDevelop and implement strategichuman resource plans andpolicies. Plan and manage thedeployment of informationtechnology resources across the RTA. Provide legal andbusiness services to the RTA.Manage internal and externalcommunications, includingmedia relations, communicationspolicy development, Ministerialcoordination, the developmentand implementation of publiceducation campaigns in supportof RTA core programs, and thecorporate identity of the RTA.

(7) Roads and Traffic Authority Annual Report 2000

CHIEF EXECUTIVE

OFFICERPaul Forward

ENVIRONMENT AND

COMMUNITY POLICYGeneral ManagerJay Stricker

OPERATIONS DirectorUlf Fraser

FINANCEA/Director Noel Hancock

CORPORATE SERVICES

A/DirectorCatherine Herriman

STRATEGIC PROJECTSDirectorDavid Thomson

Provider Corporate Support

WARRINGAH FREEWAY, NORTH SYDNEY

RTA A_Report NEW GUTTER 30/11/00 9:55 AM Page 7

Page 10: RTA Annual Report 2000 See Pg 24

HIGHLIGHTS

AugustNorthbound carriageway of theFederal Highway at Lake Georgeopened (2)

JulyDual carriageway on the PacificHighway between Henry ParryDrive & Renwick St, Wyoming,completed (1)

Windale Pedestrian Bridge, partof the West Charlestown Bypassproject, opened to pedestriansand cyclists

SeptemberTransport Management Centre(TMC) opened (3)

Traffic Emergency Patrolscommenced full-scale operationsin Sydney and surrounds (4)

Action for Bikes 2010 cyclingstrategy released

2

4

3

1

(8) Roads and Traffic Authority Annual Report 2000

RTA A_Report NEW GUTTER 30/11/00 9:55 AM Page 8

Page 11: RTA Annual Report 2000 See Pg 24

(9) Roads and Traffic Authority Annual Report 2000

99/00>

OctoberBulahdelah to CoolongolookFreeway opened (5)

Roadcrack won the EngineeringR&D, Training and Processescategory of the 1999 EngineeringExcellence Awards (6)

Vehicle Identification InspectionUnits commenced operations toidentify high risk and suspectvehicles

NovemberRoad Safety 2010 strategy released

New primary school road safetyeducation resource Move Aheadwith Street Sense launched

Country Road Safety Campaignfeaturing Testimonials televisioncommercial commenced (7)

DecemberEastern Distributor opened incentral Sydney (8)

On-line purchasing of numberplates commenced

Australian Road Rules introducedin NSW (9)

Final stage of Kamilaroi HighwayUpgrade in north west NSWofficially opened

Fixed digital speed cameraprogram introduced in NSW

Contract to install a newElectronic Tolling System on theSydney Harbour Bridge andTunnel signed

6

5 7

9

8

RTA A_Report NEW GUTTER 30/11/00 9:55 AM Page 9

Page 12: RTA Annual Report 2000 See Pg 24

(10) Roads and Traffic Authority Annual Report 2000

JanuaryTraffic arrangements plannedand successfully managed forNew Year's Eve/New Year's Daycelebrations (10)

Successful implementation ofY2K-compliant business systems

FebruaryRTA 1999 Environment Reportreleased (11)

Erina Roundabout, at theintersection of The Entrance Rdand Carlton Rd, completed (12)

MarchVariable Speed Limit signs inSydney commenced operation (13)

RTA Big Ride cycling event held (14)

Widening of Cowpasture Road tofour lanes between Elizabeth Driveand the Horsley Drive at BossleyPark completed

11

12

14

10

13

HIGHLIGHTS

RTA A_Report NEW GUTTER 30/11/00 9:55 AM Page 10

Page 13: RTA Annual Report 2000 See Pg 24

(11) Roads and Traffic Authority Annual Report 2000

99/00>

AprilTaree Bypass (final stage),Tyndale, Woodburn & EversonsCreek works on the PacificHighway opened to traffic

Meadowbank Railway BridgePedestrian-Cycleway opened (15)

Traffic arrangements planned andmanaged for World CupTriathalon and Host CityMarathon Olympic Test Eventsheld in Sydney

Unveiling of the ANZAC statueon the ANZAC Bridge (16)

MayNewcastle Call Centre opened (17)

Traffic arrangements planned andmanaged for Corroboree 2000and Walk for Reconciliation acrossthe Sydney Harbour Bridge

First Community Road Safety Forumheld in Bathurst

JuneNew Graduated Licensing Scheme community informationcampaign commenced

106 councils introduced 50km speed zones by end of 1999/2000 (18)

5km of new bus lanes and 28km of transit lanes added to the road network by end of1999/2000 (19)

City West Link Road from BalmainRoad to Boomerang Street openedto traffic

16

15

17

19

18

50

RTA A_Report NEW GUTTER 30/11/00 9:55 AM Page 11

Page 14: RTA Annual Report 2000 See Pg 24

(12) Roads and Traffic Authority Annual Report 2000

Develop the State Road networkfocusing on strategic routes to:

– promote economic growth– improve road safety– encourage greater use of public

transport– meet environment targets.

Task

– Achieve 40% dual carriagewayalong the Pacific Highway by2003.

– M5 East Motorway open totraffic in 2002.

How we are measured

– 22% of dual carriageway completed along Pacific Highway.– 91% of major projects (over $1M) completed were within budget or

within 10% over budget.– 94% of major projects (over $1M) completed were within planned

duration or within 10% over planned duration.– M5 East Motorway on target for 2002 opening to traffic.– Eastern Distributor opened to traffic.– Continued the Pacific Highway upgrade program with openings of the

Bulahdelah to Coolongolook Freeway, completion of the TyndaleRealignment north of Grafton, and the final section of the TareeBypass. Construction began on the Yelgun to Chinderah Freeway. The improvements so far completed in this program have reduced thejourney times between Sydney and Brisbane by over half an hour.

– Other Country NSW improvements included the Hume HighwayInterchange at South Gundagai, the Illalong Deviation on the BurleyGriffin Way (MR84), completion of dual carriageway construction onthe New England Highway in Tamworth, the sealing of the KidmanWay, and the construction of the Gobba Bridge Deviation.

– Completed and opened the remaining section of the 602km KamilaroiHighway to provide a continuous, dependable all weather road to thenorth west portion of New South Wales.

– EISs for Cross City and Lane Cove Tunnels progressed on schedule.– Completed the improvements to City West Link Road and

Heathcote Road.– Woronora Bridge on schedule.

What we achieved in 1999/2000

Actively contribute to the "Wholeof Government" approach toland use and transport planning.

– Achieve zero growth in VehicleKilometres Travelled per capitaby 2011.

– EIS for Liverpool–Parramatta Transitway prepared for August 2000 release.

– Implementation of real time bus passenger system on Sydney NorthernBeaches trial route.

– Teleworking trial at Gosford conducted and to be extended to othercentres, including Penrith.

Maximise the efficiency ofmoving people and goods by:

– better managing the existingroad network.

– encouraging people to usealternative forms of transport tothe motor car (public transport,cycling and walking).

– Maintain average peak travelspeeds in Sydney at existinglevels.

– Increase the proportion of peopleusing Bus and Transit Lanes.

– Average peak travel speeds at or near 98/99 levels achieved even with increased traffic volumes.

– Transport Management Centre opened September 1999.– 5km of new bus lanes and 28km of transit lanes added to the road

network.– Commencement of Traffic Emergency Patrols and Traffic Commander

operations for Sydney Metropolitan Area and F3 Freeway.– Variable Speed Limit Signs along the M4 Motorway commenced

operation.– Traffic management of various major events including the Walk for

Reconciliation, New Year's Eve celebrations, Gay and Lesbian Mardi Gras,Host City Marathon, World Cup Triathalon, and Royal Easter Show.

– Contract signed for the development and installation of ElectronicTolling systems for the Sydney Harbour Bridge and Tunnel.

– Action for Bikes – Bike Plan 2010 released September 1999.– Opening of pedestrian and cycle way on the converted Meadowbank

rail bridge.– RTA Big Ride from Tweed Heads to Sydney conducted.– Support for Walk to Work Day

MEETING STATE TRANSPORT NEEDS

Actively participate in theNational road transport reformprocess to achieve National lawswhich improve efficiency,productivity and safety.

– Reduce the cost to the NewSouth Wales freight industry of vehicles operating across State borders.

– Changes to NSW road laws under the Australian Road Rulesimplemented from 1 December 1999.

– NSW implemented Combined Vehicle Standards to provide uniformconstruction and equipment standards for all vehicles. This will benefit the community through increased consistency in vehicledimensions, common basic vehicle safety standards and uniform smoke and noise standards.

>RTA A_Report NEW GUTTER 30/11/00 9:55 AM Page 12

Page 15: RTA Annual Report 2000 See Pg 24

(13) Roads and Traffic Authority Annual Report 2000

Maintain State Roads andbridges to agreed economic,technical and environmentalstandards.

– 88% of State Roads quality rated"good or better".

– 90% of State Roads ride quality rated "good or better".– 36 targeted timber bridges were replaced or restored under the

Rebuilding Country Roads Program.– Bulahdelah to Coolongolook project received the International Erosion

Control Association Environment Award.– Completed the sealing of the Cobb Highway (SH21) from Booligal to

Ivanhoe.– Implemented a road maintenance reform package including the

introduction of single invitation contracts and a road maintenanceprequalification scheme for local councils.

– 1999 RTA Environment Report released.– Roadcrack won the Engineering R&D, Training and Processes category

of the 1999 Engineering Excellence Awards.

Reduce the trauma and cost tothe community of road deathsand injuries.

– Reduce road fatalities to 500 perannum by 2000.

Ensure that drivers and motorcyclists are eligible and competent.

– Maintain licensed driver levelsabove 94% (Australian average).

– Licensed driver levels above Australian average.– The Graduated Licensing Scheme developed for introduction from

1 July 2000.– Passage of Road Transport (Driver Licensing) Amendment Act 1999

which provides for storage of images used to produce drivers licences,proof of age cards and other licences produced by RTA.

DELIVERINGRESULTS

Ensure that vehicles meetroadworthiness, road impact andemission standards and that theyoperate safely.

– Vehicles with serious defectsreduced.

– Proportion of New South Walesmotor vehicles tested againstexhaust emission standards.

– Vehicle Identification Inspection Units commenced operations.– A survey of heavy and public passenger vehicles including B-doubles,

road trains and buses indicated major defect rates of 4% or less. Thisresult was less than the overall rate of 7% for all vehicle categories inthe 1998 survey.

– Botany and Penrith vehicle exhaust emission testing facilities operating.

Ensure that drivers and vehicletransaction services areaccessible and that the highstandard of customer service ismaintained.

– Maintain "good or very good"Motor Registry customersatisfaction at 90% or above.

– Increase the range of RTA servicesprovided at Motor Registries.

– Customer satisfaction rated at "good or very good" by 91% ofcustomers surveyed.

– Newcastle Call Centre commenced operations.– Online selection and ordering of number plates from the RTA website

implemented.– E-commerce transactions over the internet trialed for selected car

dealers, and registration renewal of trailers and some business vehicles.– Driver Knowledge Test question bank published on the RTA website to

improve knowledge of road rules, particularly for new drivers.– Successfully implemented Y2K-compliant business systems.

Task How we are measured What we achieved in 1999/2000

KEY RESPONSIBILITIES

CUSTOMER SERVICE

– At 577 fatalities, the 1999 road toll was the third lowest since 1950.– The "Road Safety 2010" strategy was released in November 1999.– 106 Councils (covering 90% of the NSW population) have adopted

50 km/h urban speed zones. – The Country Road Safety public education campaign was developed and

implemented to specifically address the rising road toll in country NSW.– 23 fixed digital speed cameras were erected at sites with high crash

rates across the State.– The ‘‘Three strikes and you're out’’ speeding program was established

to ensure that owners of heavy vehicles are also accountable for thebehaviour of their drivers.

– 21 Safe-T-Cam sites operating to monitor and modify behaviour ofheavy vehicle drivers and owners.

– Conducted a trial of vehicle-alcohol interlock devices aimed ataddressing recidivist drink drivers.

– Introduced Move Ahead with Street Sense, a new resource for educatingKindergarten–Year 6 children about road safety.

– Community Road Safety Forum held in Bathurst to facilitatecommunication with stakeholders.

– 1,162 primary schools participating in Safer Routes to School Program.

RTA A_Report NEW GUTTER 30/11/00 9:55 AM Page 13

Page 16: RTA Annual Report 2000 See Pg 24

(14) Roads and Traffic Authority Annual Report 2000

TOTAL ROADS PROGRAMThe amount expended on the 1999/00 roads program was $2,310million, compared with the revised budget of $2,311 million for theyear. Accounting adjustments of $134 million, which relate to anactuarial reduction to the unfunded superannuation liability, reducesthe RTA's total expenditure in the year to $2,176 million. In achievingthis result, we met Government commitments to specific initiatives,including Action for Transport 2010, the Pacific Highway Upgrading,Western Sydney Roads, and Rural and Regional Roads Programs.

FUNDING SOURCESOf the funding received during the year, State sources contributedsome $1,855 million or 85 percent which was approximately $61million more than in 1998/99. The Federal Government contributed$326 million, or 15 percent of total funding, for National Highways inNSW, roads of national importance, accident blackspot treatments andunder the Interstate Road Transport Act, 1985. The FederalGovernment contribution was approximately $0.9 million more thanthe funding provided in 1998/99.

OUR FINANCIAL PERFORMANCEA summary of our financial performance in 1999/00, as compared to previous years, is shown in the Table below:

General Notes

The RTA is a budget dependent agency funded by the State andFederal Governments. Many standard financial ratios are therefore not applicable.

1. Sale of surplus real properties including those acquired forroadworks, and which are no longer required. All dollar amountsreported in nominal terms.

2. Target represents benchmark rate as advised by Treasury Corporation.

Notes Result Result Result Target Result Target

96/97 97/98 98/99 99/00 99/00 00/01

Financial Performance Indicators

Debt Servicing Cost as % of Roads Program 6.8 7.1 5.4 5.3 4.4 5.3

Asset Sales ($M) 1 16.1 31.5 34.5 35.1 38.7 29.1

Interest Earned

– Hourglass Facility 2 6.8 5.0 5.0 5.5 5.5 5.5

– Other Institutions 6.6 5.2 5.0 5.4 5.4 5.4

> FINANCIALOVERVIEW

RTA A_Report NEW GUTTER 30/11/00 9:55 AM Page 14

Page 17: RTA Annual Report 2000 See Pg 24

(15) Roads and Traffic Authority Annual Report 2000

FEDERAL EXCISE DUTIESFollowing a High Court decision in August 1997 that declared State-based franchise fees invalid, arrangements were entered into betweenthe States and the Federal Government to increase excise duty on fuelimposed by the Federal Government. The increase in duty on fuel waspaid to the States, less an administration fee. During the year $616million was received, which excluded rebates paid by State Treasuryfrom gross Federal excise payments. This arrangement ceases as part ofthe Federal Government Tax Reform Package commencing 1 July 2000.

In accordance with an amendment enacted to the Road Improvement(Special Funding) Act in 1998, 44.5 percent of funds received from theFederal Government under the above arrangements, less certainrebates paid by the State, were made available for the ‘3x3’ program.

GOODS AND SERVICES TAX (GST)The legislation passed on 8 July 1999, as part of the FederalGovernment’s tax reform package requires business enterprises with aturnover exceeding $50,000 a year to be registered for GST purposes.The official commencement date is 1 July 2000 although under certaintransitional arrangements announced by the Australian Taxation Office,some contracts entered into before this date to provide goods andservices may be subject to GST.

We will be affected by the introduction of the GST in a similar mannerto most other business enterprises that are registered for GSTpurposes. In many instances we will be required to adjust our businessprocesses and systems to account for the GST. However, under theInter-Government Agreement there are provisions to exclude particularRTA fees and charges from the GST. The mechanism by which this isachieved is Division 81, titled A New Tax System (Goods and ServicesTax) (Exempt Taxes, Fees and Charges) Determination 2000 (No.2).The Federal Treasurer’s determination exempts the fees and charges onthe Division 81 listing from being subject to GST.

A project team was created as part of the RTA’s preparation forimplementing the GST.

The project team presented GST information sessions in corporate and regional offices to representatives of all Directorates and technicalsessions were also delivered to administrative staff to create anawareness of tax invoice processing requirements.

Federal $326M

M4/M5 Cashback $35M

Motor Vehicle Tax $728M

RTA Revenue & Other Funds $280M

Other Consolidated Funds $67M

Fuel Levies $616M

Untied Road Funding $124M

Figure 1 – Source of Funds 1999/00 $2,176M

Voluntary Redundancies $4M

Infrastructure Maintenance $563M

Debt Servicing $100M

Road Safety & Road User Management $327M

Network Development $933M

Traffic & Transport $213M

M4/M5 Cashback $36M

Figure 2 – Expenditure 1999/00 $2,176M

RTA A_Report NEW GUTTER 30/11/00 9:55 AM Page 15

Page 18: RTA Annual Report 2000 See Pg 24

(16) Roads and Traffic Authority Annual Report 2000

ENSURING TRANSPORTEFFICIENCY

>>RTA A_Report NEW GUTTER 30/11/00 9:55 AM Page 16

Page 19: RTA Annual Report 2000 See Pg 24

(17) Roads and Traffic Authority Annual Report 2000

> THE MAIN CONTROL ROOM OF THE RTATRANSPORT MANAGEMENT CENTRE,OPENED IN SEPTEMBER 1999

RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 17

Page 20: RTA Annual Report 2000 See Pg 24

(18) Roads and Traffic Authority Annual Report 2000

There is an ever-growing demandon existing roads and trafficfacilities as our economy growsand more drivers and vehicles usethe road system. In response, wehave put an increasing emphasison continually improving themanagement and use of theexisting network. A key challengefor transport efficiency is toencourage people to use their carsless and opt for the use of publictransport, bicycles and walking.

KEEPING THE TRAFFIC

FLOWINGImprovements in 1999/00focussed on:

– maintaining consistent traveltimes for motorists, particularlyduring peak hours, by reducingcongestion and delays

– minimising disruption to trafficflow by responding moreefficiently to incidents, and

– helping road users navigate theroad system more effectively.

More consistent travel times

During 1999/00 our programssucceeded in maintainingconsistency of peak travel timeson the State Road network in Sydney. For the overallmetropolitan network, averagespeeds in 1999/00 were 36km/hfor the AM peak and 39km/h forthe PM peak, which were similarto speeds over the last four years.

On the seven major routes toand from the Sydney CBD,average speeds in 1999/00 were31km/h for the AM peak and38km/h for the PM peak. Thetrends in the average speeds forthese major routes are comparedwith the increase in traffic volumeson these routes in Figure 3.

Despite traffic volume growthover the past ten years of 38percent, the average peak speedson the seven major routes areconsistent with previous years.

ENSURING TRANSPORTEFFICIENCY

0

5

10

15

20

25

30

35

40

45

10

0

20

30

40

50

60

70

1990

% C

hang

e in

Vol

ume

Sinc

e 19

90

Aver

gae

Spee

d (k

m/h

)

1991

1992

1993

1994

1995

/96

1996

/97

1997

/98

1998

/99

1999

/00

PM Speed AM Speed % Change in Traffic Volume

Figure 3 – Speed and traffic volume trends for seven major routes to and from Sydney

Maximise the efficiency ofmoving people and goods by:

– better managing the existingroad network

– encouraging people to usealternative forms of transport to the motor car(public transport, cycling and walking).

RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 18

Page 21: RTA Annual Report 2000 See Pg 24

(19) Roads and Traffic Authority Annual Report 2000

closing the Bridge to traffic forsome nine hours and assisting incrowd management of about150,000 people. The success ofthis event demonstrated ourability to handle the challenges of major community events.

ELECTRONIC TOLLINGThe RTA is installing a newElectronic Tolling System on theSydney Harbour Bridge and isworking with the Sydney HarbourTunnel company to install it forthe tunnel. A contract for theinstallation of this system wassigned in December 1999 withAbigroup/Q-Free and a stagedtrial of all aspects of operation iscontinuing. The system will makeit easier for motorists to pay thetoll and ease congestion aroundthe tollbooths.

In March 2000 a field trialdemonstrated that Melbournetags could be read by the systembeing installed on the HarbourBridge. This is a major milestonein achieving interoperability fortolling systems within Australia.This was a vision of the AustralianTransport Council in 1998 when itadopted a standard for ElectronicTolling in Australia. Other tollwaysare working with the RTA to maketheir systems compatible.

IMPROVED SIGNPOSTINGIn partnership with Tourism NSW and the NSW Council of Tourist Associations, wecontinued to play a lead role inthe development of new touristsignposting strategies. Emphasiswas on new Visitor InformationNetwork signposting (‘i’ signs)and State border and tourismregion ‘welcome’ signs.

Reducing traffic disruptions

The management of unplannedincidents and planned communityevents that occur on NSW roadsis an issue of key importance tothe community and the NSWGovernment. Because of theextra activities and major eventsscheduled for the lead-up to theSydney 2000 Olympic andParalympic Games we placedgreater emphasis on this areaduring the year.

TRANSPORT

MANAGEMENT CENTREOur Transport ManagementCentre (TMC) was opened inSeptember 1999 and is providinginnovative and integratedmanagement of the State’s roadnetwork. It is designed to take awhole-of-Government approachto meeting road based transportneeds, including public transport,by placing key operators and thePolice Service side-by-side.

The TMC will also provide acommand capability for managingthe transport task of the Sydney2000 Olympic and ParalympicGames as well as other majorevents leading up to, andbeyond, 2000.

The main role of the TMC is toensure the road network isavailable to run to its capacityand this is achieved by managingunplanned incidents and specialevents, disseminating informationand optimising the operation oftraffic systems. It is the hub foridentifying and directing theresponse to incidents such ascrashes, breakdowns and spills,passing on information throughradio reporters and variablemessage signs, fine tuningcoordinated traffic signals andcontrolling other traffic operations.

Some key initiatives for themanagement of road incidentsfor the year included:

– appointment of TrafficCommanders to assume primaryresponsibility for trafficmanagement around incidentscenes on major roads

– establishment of 24 hour-a-day,7 day-a-week Traffic EmergencyPatrol service for motorists alongmajor routes in Sydney and onthe F3 Freeway

– development of a Driver AidScheme of Variable MessageSigns (VMS) and cameras on theF3 Freeway

– installation of 45 Variable SpeedLimit (VSL) signs on the M4Motorway to allow displayedspeed limits to be adjusted inresponse to prevailing trafficconditions

– implementation of 30 new VMS across the Sydneymetropolitan area

– further expansion of closedcircuit television coverage acrossSydney, and

– attachment of a Police LiaisonOfficer, and two support officersto the Transport ManagementCentre, to further assist theworking relationship betweenthe two agencies.

OLYMPIC ROADS &

TRANSPORT AUTHORITY

(ORTA)ORTA was established by theState Government in 1997 tocoordinate all transport duringthe Sydney 2000 Olympic andParalympic Games, includingroads, public transport andpedestrian and cyclist movementin Sydney.

The RTA has a key role to play inORTA's plans by providing andmanaging the road system(including route and trafficmanagement) which will transportthe Olympic and ParalympicFamily, spectators and Gamesworkforce to Sydney OlympicPark, Homebush, and the manyother Olympic venues aroundSydney. As well, the RTA isresponsible for ensuring that the daily non-Games travellershave maximum access to theroad network.

Other State departments andagencies working with ORTA areDepartment of Transport, StateRail Authority, State TransitAuthority, Bus 2000 and NSWTaxi Council.

SPECIAL EVENTS AND 2000

OLYMPIC AND PARALYMPIC

GAMESTraffic Management OperationPlans were completed for allSydney 2000 Olympic andParalympic Games venues, routesand road events.

The Royal Easter Show atHomebush Bay in April 2000 wasan official test event for the Games.It provided further opportunityfor the RTA and ORTA to worktogether to develop transportoptions for Homebush Bay, suchas regional bus services, andspecial event clearways andparking schemes, while stillcatering for the other road usersin the area. Some 275,600spectators used regional busesduring the 2000 Easter Show.

Similar arrangements weretrialed during events at StadiumAustralia at Homebush Bay,including the 1999 NRL GrandFinal and Bledisloe Cup matcheswith near capacity crowds. Wewere also involved in planningand operations for sporting andcultural test events at the otherHomebush Bay venues andpreparation for Olympic venuesacross Sydney, including specialevent traffic arrangements formajor events held in the MoorePark precinct at the SydneyCricket Ground and SydneyFootball Stadium. The on-roadOlympic events such as theMarathon and Triathlon weresuccessfully trialed. We alsoplayed a significant role in theplanning of the Olympic TorchRelay throughout NSW.

NEW YEAR’S EVE 1999The success of the traffic andtransport arrangements for the1999 New Year’s Eve celebrationswas a major achievement for theRTA and the other agenciesinvolved. The planning forCorroboree 2000 and the Walkfor Reconciliation across theSydney Harbour Bridge whichtook place in May 2000 involved

VARIABLE MESSAGE SIGNS CONTROLLEDFROM THE TMC INFORM MOTORISTSOF CHANGING TRAFFIC CONDITIONS

RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 19

Page 22: RTA Annual Report 2000 See Pg 24

(20) Roads and Traffic Authority Annual Report 2000

SHARING THE ROADFor some years we have beenrunning public educationcampaigns under the theme The Road is There to Share topromote a better understandingof traffic facilities and the rightsof different road users. Thisprogram continued in 1999/00.

This year, public educationcampaigns were largely associatedwith the introduction of uniformAustralian Road Rules, includingnew rules for roundabouts andgiving way to buses pulling outfrom the kerb. Themes of otherpublic education campaignsincluded promoting buses as amode of travel, introducing thenew variable speed limit signsand generally reinforcingmessages on sharing the road withbuses, bicycles and pedestrians.

CYCLISTSCycling is an economic andefficient means of travel, as well as being healthy andenvironmentally friendly. In NSW,there are nearly 2 million bicycleswith almost half of all householdshaving at least one bicycle.

We are committed to promotingfacilities for cyclists and makingit safer to cycle. In September1999, the Government releasedAction for Bikes – BikePlan 2010, a four-point plan designed toimprove the bike network, make it safer to cycle, improve personaland environmental health andraise community awareness of thebenefits of cycling.

Action for Bikes – BikePlan 2010sets out a costed 10-year planfor the provision of cycle facilitiesand for the promotion ofcycling. It includes commitmentfor the RTA to build off-roadcycleways wherever practicablewhen new roads are built and tocreate off-road cyclewayswherever possible.

More and better cyclingnetworks

In Sydney, eight cyclewayprojects which form part of theprincipal bicycle network werefully funded by the RTA and weassisted councils on a dollar-for-dollar basis with a further 40local cycleway projects.

Major cycleways completedincluded:

– conversion of the old railwaybridge from Meadowbank toRhodes to a pedestrian andcyclist path

– construction of a pedestrian andbicycle path ramp from VictoriaRoad to the ANZAC Bridge

– stage I of the Homebush toSydney CBD cycleway, and

– concept design of HomebushBay to Fairfield cycleway.

In rural and regional NSW, 100cycleway projects were completedduring the year including:

– Swansea: Channel Street Stage Icycleway, Sandgate RoadCycleway at Newcastle

– West Charlestown: bypasscycleway

– Minnamurra to Dunmore:cycleway

– Gwynneville to North Wollongong:cycleway

– Nyngan: extension of cycleway– Grafton: cycleway from bridge to

Charles Street – Tamworth: Calala Lane cycleway,

and– Wagga Wagga: cycleway.

Signposting was also a majorfeature of the transportpreparations for the Sydney 2000Olympic and Paralympic Games.We developed, designed andinstalled an estimated 15,000guidance and regulatory signs for venues, Olympic family andregional bus routes, special event clearways, special eventparking arrangements, park and ride schemes, and bus and rail interchanges.

PUBLIC TRANSPORTIn line with the Government’sintegrated transport objectivesoutlined in Action for Transport2010, we are committed toimproving priority for busesalong major road corridors, oncross regional bus routes and totransport interchanges, througha program of improvements topublic transport infrastructure.Bus priority measures targetimpediments to efficient busoperation and include bus lanes,transit lanes, priority traffic signalsand bus bays along existing majorbus corridors as well as rapid bus-only transitways.

In 1999/00, the programachieved:

– an increase in the total length of transit lanes by over 28km

– an increase in the total length of bus lanes by over 5km

– provision of a comprehensiveSydney CBD bus priority scheme,including red colouring ofdedicated bus lanes to makethem easily visible to motorists

– implementation of a package ofbus priority works, associatedwith the opening of the EasternDistributor

– upgrading of signposting andlinemarking on every transit lanein the Sydney metropolitan area

– progress on the Liverpool toParramatta Transitway

– improved bus stop facilitiesthroughout rural NSW,

– public education campaignsencouraging the use of publictransport, and

– a trial of bus passengerinformation systems on theNorthern Beaches.

The red colouring of the GeorgeStreet bus lane in the city has ledto reductions in illegal usage byup to 70 percent.

RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 20

Page 23: RTA Annual Report 2000 See Pg 24

(21) Roads and Traffic Authority Annual Report 2000

Australian Road Rules for Cyclists

In December 1999, the newAustralian Road Rules introducedseveral changes to cycling rules,including permitting childrenunder 12 years of age to ride onfootpaths and allowing cycliststo turn right from left-hand lanesat multi-lane roundabouts. The new rules were promotedthrough a statewide publiceducation campaign.

Special events andpromotions

We sponsored a number ofbicycle events including:

– Bike Week which encourages theuse of bicycles and promotessafe cycling

– the RTA Big Ride whichcelebrated its 10th anniversarywith a 1,100km trip from TweedHeads to Sydney, and

– RTA Cycle Sydney whichencourages new cyclists, includingfamilies, to cycle in Sydney.

PEDESTRIANSDuring the year we worked on anumber of initiatives to improvepedestrian movement and safety.

One major initiative known asPedestrian Access and MobilityPlans (PAMPs) continued inpartnership with local councils toimprove planning for pedestrians.It involved drawing up plans for aspecific locality, which recognisedthe particular needs of

commuters, school children, theelderly, people with disabilities,recreational walkers and tourists.The plans identified existingfacilities and determined whereaccess and mobility needed tobe improved.

PAMPs have been developed for Marrickville, North Sydney,Bankstown, Burwood, Canterburyand Hurstville. Other plans arebeing developed in Auburn,Blacktown, Blue Mountains,Campbelltown, Fairfield,Liverpool, Penrith, Strathfieldand Willoughby.

We supported the PedestrianCouncil of Australia, whichfacilitated the 1999 PedestrianSummit and Walk to Work Day1999. These activities encouragewalking as a travel option andeducate the community toreconsider travel choices andreduce car use.

Other programs for pedestriansincluded:

– pedestrian bridge programfunded by commercialadvertising with priority given toproviding bridges near schools

– installation of tactile pushbuttons and kerb ramps to assistpedestrians with visual andmobility impairments

– installation of traffic signals andconstruction of pedestriancrossings at various locations

– implementation of school zonesto enhance pedestrian amenityand safety at 130 sites, and

– appointment of supervisors at anextra 19 school crossing sites.

Traffic in local streets

Our partnership with localcouncils is the cornerstone oflocal street environmentinitiatives which promote themanagement and reduction ofthrough-traffic in mainly highpedestrian concentration areas,such as residential and towncentres. Measures to improvethe amenity of these streetsincluded traffic calmingtreatments such as roundaboutsand slow points. Projectscompleted in 1999/00 included:

– Balmoral: The Esplanade– Rydalmere: Kirby Street, and– Morpeth: Main Street.

TELEWORKING Following the successful1998/99 trial of the WestGosford telecentre establishedfor our staff who live on theCentral Coast and commute toeither Sydney or Newcastle, we expanded teleworkingopportunities for other staff. Thecentre provides opportunities forstaff to work for part of the timecloser to home. Plans are alsounderway to establish a secondtelecentre at Penrith for staffliving in western Sydney and the Blue Mountains areas.

The telecentres are models for the NSW GovernmentTelecentre Program currentlybeing established by the NSWPremier’s Department. We continued to provideinformation on teleworking to business, commuters, otherGovernment departments andagencies and the communitythrough our website(www.rta.nsw.gov.au/telework).

We continued to assist ORTA inits promotion of teleworking asan alternative to commutingduring the Sydney 2000 Olympicand Paralympic Games. Thisincluded responding to enquiriesfrom businesses seeking assistancein setting up teleworkingprograms and alternative officesites (satellite offices/telecentres)for the Games period.

CAR POOLING We undertook market researchto investigate the potential forproviding car parking facilitiesfor commuters who live on theCentral Coast and who informallycar pool to and from Sydney eachday. Key findings were:

– the majority of people start theirjourney between 5am and 6am

– 92 percent use their own vehicleto get to the car park

– on average, each vehicle carriesthree people including the driver

– the majority car pool five days a week

– surfaces and security are themain problems with car parks,and

– with the exception of Kariong,the majority are satisfied withlocation of car parks.

WORKING WITH OTHERSAlthough we have the lead rolein managing traffic, we do notwork alone. In 1999/00, we:

– continued to work in partnershipwith local councils in managingthe road network, deliveringtraffic and transport programs,and meeting local communityneeds

– consulted with major communitygroups representing differentroad users, ensuring trafficmanagement solutions balancedoften conflicting requirements,and

– conducted ongoing research intocommunity expectations andsatisfaction with traffic facilitiesand services.

RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 21

Page 24: RTA Annual Report 2000 See Pg 24

(22) Roads and Traffic Authority Annual Report 2000

>>DEVELOPING THE ROADNETWORK

RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 22

Page 25: RTA Annual Report 2000 See Pg 24

(23) Roads and Traffic Authority Annual Report 2000

> THE $140 MILLION BULAHDELAH TOCOOLONGOLOOK FREEWAY, NORTH OFNEWCASTLE, OPENED IN OCTOBER 1999

RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 23

Page 26: RTA Annual Report 2000 See Pg 24

By providing an efficient roadnetwork for both passenger andfreight requirements, the RTAmakes a vital contribution to theeconomic development of NSWand to the NSW Government’sAction for Transport 2010. Launchedin 1998, this ten year strategicplan outlines the transport androad initiatives NSW needs totake into the new millennium.

Improvements to the roadnetwork impact directly on themore efficient movement ofproduce which, in turn, enablesindustry to be more efficient,reduces costs and leads to jobcreation. During the year, inconsultation with the Departmentof Urban Affairs and Planning andother regulatory authorities, wecontinued developing thefollowing projects:

Cross City Tunnel

The Cross City Tunnel willcomprise twin, two-lane tunnelswhich link the Kings Cross tunnelwith the Western Distributor. Theproject is estimated to cost $400million and will be electronicallytolled. By removing the east-westtraffic from the surface roadnetwork, the environmentalquality of central Sydney will be improved, travel timesreduced and accessibility withincentral Sydney greatly improved.The network of bus lanes will bealso extended.

During 1999/2000 there wasextensive consultation over designoptions and an EnvironmentalImpact Statement (EIS) wasprepared for release in August2000. Subject to satisfactoryenvironmental assessment, workwill commence in 2001 and becompleted in 2004.

(24) Roads and Traffic Authority Annual Report 2000

Transitways

One of the strategies proposed in Action for Transport 2010 is a network of rapid bus-onlytransitways for western Sydney.The first of these transitways tobe constructed will be theLiverpool to Parramatta transitway(LPT) which will enhance travelchoice and reduce travel timesfor the 500,000 people who live in the Liverpool, Fairfield,Holroyd and Parramatta LocalGovernment areas. It will linkmajor residential areas with theemployment zones of Smithfieldand Wetherill Park.

The LPT will be 30km long and is estimated to cost $200million. During 1999/00 anEnvironmental Impact Statement(EIS) was drafted and conceptplans prepared. The EIS will bereleased in August 2000.Expressions of interest for theoperation of the network havebeen evaluated and, subject tosatisfactory environmentalassessment, construction will becompleted in 2003. Further workon the Western Sydney TransitwayNetwork Overview Report isunderway and is expected to be released in 2001.

Western Sydney Orbital

The proposed Western SydneyOrbital (WSO) will compriseabout 39km of new dividedcarriageway motorway including major grade separatedinterchanges at 15 locationsbetween the M5 and the HumeHighway at Prestons, and the M2at West Baulkham Hills. It will bepart of the National Highwaysystem through Sydney and, assuch the Federal Government isresponsible for funding itsconstruction and maintenance.Estimated cost of the project is$1.2 billion.

The WSO will be the final link inSydney’s high standard orbitalroad network, connecting all ofSydney’s motorways (M5, M4and M2) and providing highstandard access to and from allparts of Sydney as well as linkingall major employment andresidential areas. It will bypass 56 sets of traffic signals and save up to one hour in traveltime between Liverpool andPennant Hills.

The proposal will encouragefurther investment in newindustries due to potentialsavings in transport costs, create up to 1,200 jobs duringconstruction, and, by loweringtransport costs, encourage morejobs in western Sydney. TheEnvironmental Impact Statementis being prepared in consultationwith the Federal Government.

Some 200,000 newsletters on the proposed WSO weredistributed in Arabic, Chinese,Croatian, Greek, Japanese,Korean, Serbian, Spanish, Turkish,and Vietnamese. An 1800information line was providedusing the same ten languages.

Lane Cove Tunnel

The Lane Cove Tunnel projectwill link the M2 with the GoreHill Freeway and complete amissing motorway linkconnecting the north west sectorof Sydney with the CBD. It willbe 3.4km long and is estimatedto cost $550 million. The projectis proposed to consist of twin,two-lane tunnels and will beelectronically tolled. It includeswidening the Gore Hill Freewayto provide transit lanes toimprove bus travel. North facingramps at Falcon Street on theWarringah Freeway will also formpart of the project.

An overview report on the LaneCove-Gore Hill corridor whichexamined the impact of theproposed tunnel on the corridorwas released in December 1999.

DEVELOPING THEROAD NETWORK

Develop the State Roadnetwork focussing on strategicroutes to:

– promote economic growth– improve road safety– encourage greater use of

public transport– meet environmental targets.

RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 24

Page 27: RTA Annual Report 2000 See Pg 24

(25) Roads and Traffic Authority Annual Report 2000

City West Link

The section of the City West Linkbetween Balmain Road andDobroyd Parade, Haberfield wassubstantially completed in1999/2000. Involving complexconstruction above the railwayat Lilyfield, and a new bridgeover the Hawthorne Canal, thelink provides a new arterial roadfrom the west to the City Centrevia the new Anzac Bridge.

Woronora Bridge

Construction is continuing onschedule on a new four lanebridge over the Woronora Riverat Woronora. With upgradedapproach roads, the bridge willreplace the old two lane low-level bridge and its hairpin bendapproaches, which are notoriousfor traffic delays and for largevehicles becoming stuck. Thecommunities on both sides ofthe river will no longer besubject to such delays when the new bridge opens to trafficlater in 2000.

Windsor Road/Old WindsorRoad

Construction continued onupgrading Old Windsor Roadwith the following worksscheduled:

– upgrading of Old Windsor Road from Seven Hills Road toSchofields Road/Windsor Road to a four-lane divided road

– upgrading of Windsor Road to afour-lane divided road fromSchofields Road to Garfield Road

– construction of a high level floodevacuation route across SouthCreek at Windsor, in conjunctionwith Department of Land andWater Conservation

– provision of new traffic signals ata number of intersections onWindsor and Old Windsor Roads

– completion of works on theWindsor Road intersection atSchofields Road and on the OldWindsor Road at Sunnyholt Roadand Balmoral Road, and

– upgrading of Windsor Road to afour-lane divided road fromRoxborough Park Road toShowground Road.

Cowpasture Road

In March 2000 the widening ofCowpasture Road to four laneswas completed betweenElizabeth Drive and The HorsleyDrive at Bossley Park. In a rapidlydeveloping part of south westernSydney, this widening hasprovided safe access to and fromlocal residential side streets, aswell as an important north-southroute for commercial traffic.

Elizabeth Drive

As an important bus route andaccess road between the growingsuburbs of south western Sydneyand the town centres of Liverpooland Cabramatta, Elizabeth Drive has been widened between Cowpasture Road and Cabramatta Road.

IMPROVING ACCESS

BETWEEN CITIES AND

REGIONSWe are undertaking programs onfive of the major routes that linkthe greater metropolitan areaand regional NSW.

Princes Highway

Our goal is to provide four lanes from Sydney to Kiama by 2010 as outlined in the State’sAction for Transport 2010. Works underway include the Oak Flats interchange andpreconstruction work for theNorth Kiama Bypass. New rampsto and from Helensburgh areunder construction.

F5/Hume Highway

Investigations into the provisionof additional on/off ramps onthis National Highway in theCampbelltown area are underway.

Great Western Highway

In August 1998, the NSWPremier announced a $360million program for the provisionof four lanes from Penrith toKatoomba and other works to thewest of Katoomba. Subsequently,the Federal Minister for Transportand Regional Services committedan additional $100 million to theroute as a Road of NationalImportance. Works currentlyunderway are at Linden Bends and Faulconbridge. Advancedplanning is underway for Leurato Katoomba, Shell Corner,Medlow Bath bridge replacement,Soldiers Pinch and Hartley Vale.

New England Highway

Our goal is to provide 80 percent dual carriageway between Newcastle andMuswellbrook by 2010. Planningfor the Muswellbrook bypass iswell advanced and furtherconsultations were held overoptions in the vicinity of Allandalefor the F3 to Branxton link. The progress of these works isdependant upon the level offunding provided by the FederalGovernment as part of theNational Highway Program.

Federal Highway

The third stage of the FederalHighway upgrade at LakeGeorge was opened in August1999. This 12km stretch ofnorthbound carriageway alongthe scenic shores of LakeGeorge, completes 24km of road works that began in 1996.The completion of the Federallyfunded Lake George project wasa major step in the provision ofdual carriageway conditionsfrom the Hume Highway to theACT and provides motorists with improved travel times and road safety benefits.

Travel times for motorists andbus passengers will be significantlyreduced. Less traffic will useEpping Road and the Local Roadnetwork. Pedestrian safety willalso improve. An EnvironmentalImpact Statement (EIS) will bereleased in early 2001 andsubject to approval, constructionis planned to begin in 2002.

IMPROVING ACCESS

WITHIN SYDNEYDuring 1999/2000 several majorroad projects were completedand opened to traffic, and otherswere under construction.

Eastern Distributor

In December 1999 the EasternDistributor was opened to trafficas a toll road. Together with the widening of Southern CrossDrive it provided motorwayconditions between the SydneyHarbour Tunnel and Sydneyairport. It forms an easternsegment of the Sydney Orbital.In addition to providingcongestion-free access to theairport from the City centre and the north shore, the EasternDistributor has rejuvenated theenvironment of East Sydney,Darlinghurst and Surry Hills.

M5 East Motorway

Work on this $750 millionproject, the largest infrastructureroad project to be built to dateunder an RTA contract, is onschedule to open mid-2002. The new 10km four-lane dualcarriageway will run from theexisting M5 at King GeorgesRoad, Beverly Hills, to GeneralHolmes Drive at Sydney Airport.

The construction of the 4kmlong tunnel between BexleyRoad and Marsh Street began in June 1999 and the 0.5kmlong tunnel under the CooksRiver in September 1999. A3.3km section for a cyclewayaround the western side ofSydney Airport was opened inDecember 1999.

The completed M5 EastMotorway will provide a fast,reliable freight link between thegrowing industrial areas in SouthWestern Sydney, Sydney Airportand Port Botany. It will reducenoise and traffic on local streets,particularly from heavy vehicles,and improve road safety.

TUNNELLING WORK IN PROGRESS ONTHE M5 MOTORWAY EXTENSION

RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 25

Page 28: RTA Annual Report 2000 See Pg 24

(26) Roads and Traffic Authority Annual Report 2000

UPGRADING THE PACIFIC

HIGHWAY In January 1996 the PacificHighway Reconstruction ProgramAgreement was signed by theFederal and NSW Governments. It involves Federal financialassistance for improvements tothe Pacific Highway from July1996 to June 2006.

The ten-year agreement requiresthe NSW Government to maintainits existing commitment of $100million a year to the PacificHighway for major projects,maintenance and minor works,plus an additional $120 million ayear funded equally by the NSWand Federal Governments ($60million each).

The $2.2 billion program hasalready achieved some importantmilestones during its first fouryears, with 14 major projects and 16 additional projectsopened to traffic, constructioncurrently underway at 9 sites and 16 projects being planned.

The NSW Government iscommitted to developing thewhole Pacific Highway as a dualcarriageway route. Action forTransport 2010, released inDecember 1998, confirms thiscommitment and the NSWGovernment is looking to theFederal Government to match theNSW commitment by continuingthe existing joint fundingarrangement beyond 2006.

Major highlights of the upgradeprogram during 1999/2000included:

– August 1999environmental approval forBrunswick Heads to Yelgun project to proceed

– September 1999display of Environmental ImpactStatement for Bangalow to St Helena

– October 1999completion of the Bulahdelah toCoolongolook Freeway

– December 1999commencement of constructionof Coolongolook to Wang Wauk

– December 1999display of Environmental ImpactStatement for Karuah bypass

– February 2000 commencement of studies forupgrade at Bulahdelah

– March 2000commencement of constructionof Yelgun to Chinderah Freeway

– March 2000 environmental approval forBonville Deviation project toproceed

–March 2000 commencement of constructionof Tandys Lane upgrade

– March 2000display of Environmental ImpactStatement for Coopernook to Moorland

– April 2000completion of the final sectionon the Taree Bypass, and

– June 2000completion of the TyndaleRealignment, north of Grafton.

Bulahdelah to CoolongolookFreeway opened

The $140 million Bulahdelah toCoolongolook Freeway, north ofNewcastle, was officially openedin October 1999, two monthsahead of schedule. The 22kmdual carriageway project is thebiggest single stage of the $2.2billion Pacific Highway upgradingprogram completed to date.

The project bypasses over 60bends, including two of the mostnotorious highway blackspots atWootton and O’Sullivans Gap. Inthe last 10 years the old section ofhighway saw 658 accidents inwhich 35 people died and 402were injured.

The new freeway now provides a safer, easier journey for the11,000 vehicles that travel theroute each day.

The project also includedextensive environmentalinitiatives including:

– landscaping with more than85,000 native trees and shrubs

– construction of five green-thighed frog underpasses andextensive biological studies ofthe species

– 18 fauna underpasses and 30kmof ‘floppy top’ fencing to directanimals to underpasses andprevent them accessing thehighway, and

– preservation of Aboriginalartefacts.

The project also included ninebridges, four arch structures andtwo cattle and machineryunderpasses. It has two fullyequipped rest areas and 21 carpull-over spots to encouragemotorists to break their journeyand Stop. Revive. Survive. toprevent driver fatigue.

Yelgun to Chinderah Freeway

A $2 million road safety packagewas put in place on theBurringbar Range, south ofMurwillumbah, after a spate ofserious and fatal accidentsidentified parts of the road asblackspots.

The Yelgun to ChinderahFreeway, which commenced thisyear will completely bypass theBurringbar Range bringingenormous benefits in terms ofimproved safety and travel timesfor motorists passing throughthe scenic Tweed Valley. It willbe the biggest project undertakenin the $2.2 billion 10 year PacificHighway upgrading program.The new freeway, which will bebuilt at a cost of $348 millionwill be a major engineeringachievement and will include:

– 28.6km divided dual carriagewayseparated by medians up to 11m wide

– 59 bridges over creeks, roadsand drains

– 3 major road interchanges/intersections, and

– a tunnel under Cudgen Road.

A number of features have alsobeen included to make sure localfauna and flora are protected.These include fauna over/underpasses, seed collection andgermination of local species for future landscaping and soilerosion and sediment controls.Archaeological site managementand koala studies have also been included.

Rebuilding Country RoadsProgram (RCRP)

Under Action for Transport 2010,the RTA is committed to spendingat least $100 million a year onthis program, with $117 millionspent in 1999/00. The programaims to:

– support the rural industry andunderpin export competitivenessby focussing road investmentstowards the needs of the roadtransport industry, including itsrole in providing efficient railtransport, and

– ensure country roads are wideand strong enough for legaltravel as well as being availablefor travel in a safe, reliable,consistent manner withoutundue delays, especially duringprolonged periods of wetweather or flooding.

The program involves majorworks to renew road and bridgeinfrastructure to the lateststandards, rather than simplypatching roads that were built to previous standards. Roads and bridges that are importantto rural industry are beingrestored or replaced. It illustratesthe State Government's longterm commitment to rural areas by investing for the nextgeneration of country industriesand communities.

The first stage of the RCRPincludes the $129 millionCountry Timber Bridge Program.140 timber bridges are beingreplaced or restored. Thirty sixwere completed by 30 June 2000.

Kamilaroi Highway

On 13 February 1999, the602km Kamilaroi Highway was officially proclaimed by theMinister for Roads, with the final 64km sealed link beingcompleted in December 1999.The project was a team effortwith funding provided by theState Government, the sealingprogram managed by the RTA,and the work carried out by theWalgett and Brewarrina Councils.

The highway, named after theKamilaroi Aboriginal people of north western NSW, nowprovides a dependable allweather road to the north westportion of NSW for local residents,the trucking industry and thetourist industry.

RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 26

Page 29: RTA Annual Report 2000 See Pg 24

(27) Roads and Traffic Authority Annual Report 2000

PROGRAMS WITH

ECONOMIC RETURNSDuring the year, our RoadNetwork Development Programexpenditure was nearly $750million (including State andFederal funding) on majorconstruction projects of over $1million each. This expenditurecontinued to provide thecommunity benefits at least threetimes greater than its cost – thefourth consecutive year this hasbeen achieved. Figure 4 illustratesthe distribution of projectbenefit/cost ratios from projectfunding over the past four years.

More than 75 percent of our1999/00 construction fundinghas been spent on projects withbenefits amounting to more thantwice the cost.

ON TIME AND WITHIN

BUDGETDuring the year, 28 majorprojects with individual projectcosts of more than $1 millioneach were completed. Totalexpenditure on these projectswas $517 million. Project timeand budget performancesummaries are shown in thefollowing table:

PROJECT TIME AND BUDGET PERFORMANCE

Project delivery Number of Total % of projects

projects expenditure weighted by

$ million project

cost

Completed within budget or 22 473 91within 10% over budget

Completed within planned 17 487 94duration or within 10% over planned duration

0

10

20

30

40

50

% o

f pro

gram

med

fund

s

>54 to 53 to 42 to 3

Benefit Cost Ratio

1 to 2<=1

95/96 Funds

96/97 Funds

97/98 Funds

98/99 Funds

99/00 Funds

Figure 4 – Return on Construction ExpenditureCONTRACT MANAGEMENTAs an outcome of thecooperative approach developedthrough the NSW ConstructionPolicy Steering Committee(CPSC) we continued to support industry developmentto improve productivity.

There was continued focus onimproving the management of occupational health andsafety and improving theenvironmental responsiveness of the construction industry.Opportunities were identifiedto make greater use ofinformation technology toimprove productivity. Ourmodel specifications and testmethods are freely available onthe internet and our officeshave direct access to AustralianStandards through the StandardsAustralia online facility.

In line with Government policy,new requirements for themanagement of industrialrelations were introducedthrough the Building andConstruction Industry Security ofPayment Act 1999 (NSW).

RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 27

Page 30: RTA Annual Report 2000 See Pg 24

(28) Roads and Traffic Authority Annual Report 2000

MAINTAINING ROADSAND BRIDGES

>>

RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 28

Page 31: RTA Annual Report 2000 See Pg 24

(29) Roads and Traffic Authority Annual Report 2000

> THE STONEWORK ON THE SYDNEYHARBOUR BRIDGE IS CLEANEDUSING AN ABSEILING TECHNIQUE

RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 29

Page 32: RTA Annual Report 2000 See Pg 24

(30) Roads and Traffic Authority Annual Report 2000

0

10

20

30

40

50

60

70

80

90

100

2000

1999

1998

1997

1996

1995

1994

1993

1992

1991

1990

1989

Good Fair Poor

Figure 5 – Ride Quality % on State Roads (including National Highways)

MAINTAINING ROADSAND BRIDGES

The NSW road network is asignificant public asset whichmust be continually maintainedto ensure reliability, safety and toretain its value. Our responsibilitiesare far reaching and includespending more than $610million a year maintaining:

– 17,783km of State Roads whichcarry 70 percent of all traffic in NSW

– traffic facilities such as trafficlights, roundabouts, signs andlinemarking

– 4,275 bridges and major culvertson State, Regional and LocalRoads

– 2,919km of Regional and LocalRoads in the unincorporatedarea, and

– 9 vehicular ferries.

We also:

– resurface about 10 percent of all NSW roads annually, and

– assist local councils manage18,430km of Regional Roads.

KEEPING THE NETWORK IN

GOOD ORDERIn 1999/00 roads with significanteconomic importance and highvehicle use were targeted forimprovement via the RebuildingCountry Roads Program in linewith our objective to make roadconditions throughout the Statesuit the particular use of roadsand transport routes.

Maintain State Roads andbridges to agreed economic,technical and environmentalstandards.

RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 30

Page 33: RTA Annual Report 2000 See Pg 24

(31) Roads and Traffic Authority Annual Report 2000

PAVEMENTS‘Ride quality’ (a measure of theroughness of travel over roadsurfaces) is a primary indicator of road conditions and customerneeds. During 1999/00, ridequality on National and StateRoads recovered after a slight fall in that year as a result ofsubstantial flooding in NSWduring 1998/99. The recoveryreflects the $119 millionprogram of disaster repairs.Rating of ride quality as ‘good’exceeded 90% for the first time.(Figures 5, 6, 7)

The level of service on keyNational Highways and Statefunded corridors has becomemuch more consistent over thepast five years.

‘Pavement durability’ is a measureof road surface cracking. Weachieved a level of 77.3% ‘good’,an improvement on the previousyear. (Figure 8 )

BRIDGESDeficient bridges cause a negativeimpact on freight transport.Currently nine out of 4,127 (0.2percent) bridges on State Roadsare considered deficient, seeFigure 9.

Deficient bridges are those that are:

– washed away and closed to traffic – load and/or speed limited, or– supported by undertrussing,

bailey bridging or replaced withemergency bridging.

The NSW Government’s $129million Country Roads TimberBridge Replacement Programwhich will restore or replacewhere necessary 140 countrytimber bridges has reduced thenumber of deficient bridges onState Roads from 16 to nineduring 1999/00, and willcontinue to reduce bridgedeficiencies. Thirty six bridgeswere completed by 30 June 2000.

ROADCRACKOur multi-award winningRoadCrack technology,developed in partnership withthe CSIRO over the past fiveyears, has been an outstandingsuccess and paid dividends, bothin terms of road maintenancerepairs and commercial success.In 1999 RoadCrack won theNSW Engineering ExcellenceAward presented by the Institutionof Engineers Australia’s SydneyDivision, the Institution’sNational AusIndustry InnovationAward and the CSIRO Medal forExcellence in Research.

RoadCrack comprises sophisticatedcomputer equipment installedinto a 6-tonne truck with a lap topcomputer providing informationto the operator. The vehicle,which can operate at up to100km/h, gives instant feedbackon the surface condition of arange of road surfaces. Cracks as small as 1mm in width can be detected and classified aseither transverse, longitudinal or ‘crocodile’ in pattern.

RoadCrack has been accessed bythree other States, most notablySouth Australia where the RTAcompleted about 10,000km of their road network survey for 1999. Expressions of interestto commercialise the technologyare being assessed.

60

80

75

70

65

100

95

90

85

19

89

19

90

19

91

19

92

19

93

19

94

19

95

19

96

19

97

19

98

19

99

20

00

% G

ood

Mitchell Princes

Western All National Highways

Pacific

Figure 6 – Roughness on Major Country State Roads

RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 31

Page 34: RTA Annual Report 2000 See Pg 24

(32) Roads and Traffic Authority Annual Report 2000

Existing contracts for maintenanceworks on State Roads currentlyundertaken by the private sector are continuing. We havedeveloped contract documentsin consultation with our in-houseservice providers and localgovernment. The contracts,which are managed under our Prequalification Scheme for Construction IndustryContractors, require that allproviders develop adequatemanagement control systems forsafety, environmental control,cost control and product quality.

We have conducted informationsessions with local governmentto advise on how to develop andimplement management systemswhich were adapted to suit thescope of the works.

AUDIT ON ROAD

MAINTENANCEIn December 1999 the State AuditOffice completed a program auditof our maintenance planning. TheOffice was of the opinion that“the RTA is taking positive stepsin planning for road maintenanceand in many instances followsbest practice. There are, however,some important improvementswhich need to be implementedin order to enhance the efficiency and effectiveness of road maintenance”. We are implementing therecommendations of the report.

ROAD MAINTENANCE

REFORM PACKAGEThis NSW Government packageannounced in November 1999represents a significant stepforward for road maintenance. Itinitiates major improvements inroad safety, road environmentalmanagement, worker safety, thequality of roadworks and valuefor taxpayers’ money whilesupporting the long term viabilityof rural communities and re-investment in a rural road networkand supports viable industries.Local Government and the RTARoad Services have respondedvery positively to the program.

The package has also establishedminimum response times forrepairing defects which couldaffect road safety. This will limitroad user exposure to unexpecteddefects such as potholes.

There are three key reforms.Firstly, maintenance works wouldcontinue to be undertaken byexisting providers, primarily ourRoad Services organisation andlocal councils, thereby securingcountry and regional employment.

Secondly, the reforms wouldestablish minimum standards forworker safety, traffic control andsafety, as well as environmentalprotection. Thirdly, we willpursue efficiency gains viabenchmarking using consistentstandards of work quality arisingfrom the introduction of acontractual relationship.

80

82

84

86

88

90

92

94

96

98

100

2000

1999

1998

1997

1996

1995

1994

1993

1992

1991

1990

1989

Hume Newell

Sydney/Newcastle Sturt

New England Cumberland

Canberra All National Highways

Figure 7 – Roughness % Good on National Highway Routes

RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 32

Page 35: RTA Annual Report 2000 See Pg 24

(33) Roads and Traffic Authority Annual Report 2000

Bridges with load or speed limits Bridges closed

Bridges with temporary strengthening

0

5

10

15

20

20001999199819971996199519941993

Figure 9 – Deficient bridges on State Roads ( including National Highways)

% P

avem

ent

area

0%

10%

20%

30%

40%

50%

60%

70%

80%

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

Figure 8 – Pavement Durability on Sealed Country State Roads (including National Highways)

Good Fair Poor

Since 1998, new automated technology has been used to collect Pavement Durability data.

RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 33

Page 36: RTA Annual Report 2000 See Pg 24

(34) Roads and Traffic Authority Annual Report 2000(34) Roads and Traffic Authority Annual Report 2000

> STUDENTS DEMONSTRATE THE CORRECT WEARINGOF BICYCLE HELMETS, JUST ONE COMPONENT OFTHE MOVE AHEAD WITH STREET SENSE PROGRAM>>

RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 34

Page 37: RTA Annual Report 2000 See Pg 24

(35) Roads and Traffic Authority Annual Report 2000

THE ROAD SAFETY CHALLENGE

RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 35

Page 38: RTA Annual Report 2000 See Pg 24

0

100

200

300

400

500

600

700

800

1995 1996 1997 1998 1999

Fatalities

* Provisional data for 1999

Figure 10 – Fatalities in NSW 1995–1999*

(36) Roads and Traffic Authority Annual Report 2000

ROAD SAFETY 2010In November 1999, the Ministerfor Roads released Road Safety2010 – a Framework for Saving2000 Lives by the Year 2010 inNSW (Road Safety 2010). Thismajor road safety strategyreplaces the previous Road Safety2000 and reflects the evolutionof ideas since 1990. Road Safety2010 has four prime actions –safer people, safer roads, safervehicles and community basedaction. It sets out the keyinitiatives being addressed overthe next few years and describesthe directions for road safetyover the next decade.

FACTS AND FIGURES In the twelve months ending 30 June 2000, there were 587fatalities on NSW roads, up 5percent (29) from the 558 deathsin the year to 30 June 1999. SeeFigure 10.

Although the 1999 road toll of577 fatalities was higher than for1998, it was still the third lowestfatality total since 1950.Significantly reduced road crashfatalities were recorded in anumber of key road user groups:

– passenger fatalities were down 6 percent on 1998 (the third-lowest total since 1945), and

– fatalities aged 21 to 25 and over70 were down 21 percent and12 percent respectively.

Overall, NSW’s performance in minimising road fatalitiescompared favourably with themost recent results from otherindustrialised countries. SeeFigure 11. However, we arecommitted to achieving the StateGovernment’s Road Safety 2010target of halving the road toll by the end of 2010.

THE ROAD SAFETYCHALLENGE

SOME CAUSES OF

ACCIDENTSAnalysis of 506 fatal crashes in1999 revealed:

– speeding was a factor in around40 percent of fatal crashes

– driver fatigue contributed toabout 18 percent

– illegal alcohol levels were evidentin at least 17 percent, and

– at least 91 people killed in motorvehicles were not wearingavailable seat belts.

Our core road safety strategiesfor 2000/01 include workingwith our key partners to reducethe above factors. Figure 12demonstrates the reductions in fatalities for each of thesecontributing factors over the past decade.

REDUCING THE COUNTRY

ROAD TOLLWhile fatalities have tended todecline in metropolitan areas inrecent years, they have tendedto increase in country NSW. In 1998/99 this trend wasparticularly evident in the farnorth of the State.

To combat the rising toll oncountry roads, several countryroad safety initiatives wereimplemented:

– In November 1999, the Ministerfor Roads launched a newcountry road safety publiceducation campaign usingtelevision and radio advertisingfeaturing the testimonials of thefamilies of road victims. Themain message was that localpeople were dying on countryroads, and that local peoplecould do something about theissue. In the commercial, country people who had actuallylost a relative, friend or mate in a country road crash speakabout their loss and feelings of bereavement.

RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 36

Page 39: RTA Annual Report 2000 See Pg 24

(37) Roads and Traffic Authority Annual Report 2000

–As a follow-up, a hard-hittingcountry speeding public educationcampaign was launched in January 2000 which focussed on speeding, especially aroundcurves in 100 km/h speed zones.A country seatbelt publiceducation campaign was also run in March 2000, targetingrural men.

–The RTA joined with StateEmergency Services to trial a new model for reporting wetroad conditions in the far northcoast of NSW, Central Coast andLithgow areas. The trial, betweenDecember and the end of April,provided up-to-date road weatherconditions to local radio stationsthrough the use of weather radarand fax stream technology.Feedback from radio stations was favourable.

– In May 2000 the Minister forRoads opened a community-based road safety forum atBathurst with people from theregion discussing a variety ofroad safety issues includingmatters affecting heavy vehicles,roadsides, speeding, youth,pedestrians, cyclists, motorcyclists, drink driving andfatigue. The outcomes will beused in developing actions forfuture road safety initiatives.Another two forums are plannedfor later in 2000 for Maitlandand Campbelltown.

A number of support activitiessuch as increased Policeenforcement and the use ofVariable Message Signs alongmajor country routes were alsoadopted. During the first half of2000, fatalities in our NorthernRegion declined by more than35 percent on the correspondingperiod for 1999.

SPEED MANAGEMENTA Speed Limit Zoning AdvisoryGroup (comprising representativesfrom the NSW Police Service,NRMA, Local Government andthe Institute of Public Works andEngineering Australia) continuedto oversee a review of speedzoning, speed limits and signagepractices in NSW. The review isdue for completion in the secondhalf of 2000.

In order to assist with speedenforcement, we have installed23 fixed digital speed camerasthroughout NSW, including inthe northbound and southboundtunnels of the Eastern Distributorin east Sydney. Sites for thecameras were determined byapplying a series of criteriawhich included the crash andspeeding history of the site.

Public education campaignsdesigned to discourage speedingincluded television commercialsbased on the Safe Speeding.There's no such thing strategy:

– Kid Brother, targeting youngdrivers in metropolitan areas, and

– Mates, which targeted countrypeople who speed on countryroads.

– There were also statewidepromotions of enhanced Policeenforcement and double demeritpoints during key holiday periods,using television, radio, press andbridge banners, together with‘live reads’ of safe driving tips on radio.

We also ran an Older PedestrianSafety public educationcampaign using radio, includingethnic radio, press advertisingand bus shelter posters.

INTRODUCTION OF 50KM/H

SPEED LIMITSIn June 1998, the Minister forRoads invited each local councilin NSW to implement 50 km/hspeed limits on urban roadsthroughout their local governmentareas. The lowered limit wasimplemented as a partnershipbetween councils, localcommunities and the RTA. Theintroduction of 50km/h urbanspeed limits contributes to areduction in the number andseverity of crashes in urbanareas, particularly for vulnerableolder and younger pedestriansand cyclists.

By the end of June 2000, 106councils across NSW (housing inexcess of 90 percent of the NSWpopulation) were participating inthe initiative. All councils in theSydney metropolitan area areinvolved. A major evaluationfound there were 262 fewercrashes than otherwise expectedon streets zoned at 50 km/h inthe study area.

The cost saving to the communityin the study area from avoidedaccidents over the 21 monthperiod has been estimated at$6.5 million. There were largereductions in the proportions ofvehicles exceeding 60, 70 and 80 km/h on the 50 km/h speed-zoned streets.

A television and radio campaign,including ethnic media,promoted the new speed limitand brochures were printed inChinese, Vietnamese, Arabic,Italian and Spanish. Communityattitude surveys showed 70percent of the community werein favour of the reduced limit.

DRIVER FATIGUEPublic education campaigns ondriver fatigue included the Morethan 2 Hours Gets Deadly Boring– Every 2 Hours Stop. Revive.Survive message on television,radio, billboards and bridgebanners across the State duringpeak travel periods.

We continued to support thecommunity-based Driver Reviverprogram. Almost 100 sites nowoperate across the State. All sitesin our Western Region wereaudited during the year and anew rest area signage system was trialed in Northern Region.Bushells Tea, the new nationalsponsor of Driver Reviver, willprovide product free of charge toall sites for the next three years.

The Federal Parliament House of Representatives StandingCommittee on Communications,Transport and the Arts conductedan inquiry into managing fatiguein transport. We made a jointsubmission with the NSWDepartment of Transport onfatigue management in the land transport industry. Ourofficers provided evidence at the hearing which was held inNovember 1999.

We continued to convene the tri-State National Highway 39Driver Fatigue Strategy Groupwhich comprises representativesof the NSW, Victorian andQueensland Police and transportauthorities as well as communityand industry groups. Its aim is toreduce the number and severityof fatigue related crashes on theNational Highway 39 (NewellHighway) between Melbourneand Brisbane.

The Strategy Group alsopromoted joint enforcementactivities along National Highway39, and played a significant rolein the development of the DriverReviver Program by bringingtogether Queensland Transportand RTA program managers at regular meetings.

DRINK/DRUG DRIVING

PROGRAMThe trial of the use of vehicle-alcohol interlock devices beganin July 1999 and was completedin March 2000. The devicesrequire the driver to be breathtested for alcohol before theirvehicle can start. Some 23volunteer offenders participatedand had the devices fitted totheir vehicles for 3–6 months.

The evaluation revealed thedevices performed adequatelythroughout the trial andprevented people who had been drinking from driving thevehicle. Ninety four percent ofvolunteers involved in the trialsupported a statewide interlockprogram. Some 88 percentreported the device acted as astrong deterrent and said theexperience would permanentlyimprove their drink-drivingbehaviour.

We are currently considering theimplementation of an alcoholinterlock program as an optionfor courts to use in sentencingtargeted drink-drive offenders.

THE MATES TELEVISION CAMPAIGNHIGHLIGHTED THE DANGERS OFSPEEDING ON COUNTRY ROADS

RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 37

Page 40: RTA Annual Report 2000 See Pg 24

5

10

15

20

25

3019

80

1981

1982

1983

1984

1985

1986

1987

1988

1989

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

NSW Great Britain

USA Japan

Australia

Figure 11 – Fatalities Per 100,000 Population, InternationalComparisons

0

50

100

Num

ber

of F

atal

ities

150

200

250

300

350

Seatbelt Non UseageAlcoholFatigueSpeed

-24%

-43%-54%

-27%

1988–1990 Average 1999* Provisional data

Figure 12 – Fatalities, Contributing Factors

(38) Roads and Traffic Authority Annual Report 2000

Our ongoing drink-driving public education campaignfocussed on strengtheningcommunity understanding of the consequences of drink-driving, increasing awareness ofpolice random breath testing and the promotion of strategiesfor avoiding or preventing drink-driving.

Statewide advertising targeteddrivers likely to risk low rangedrink-driving and emphasisedthe criminality of drink-driving,particularly through a newtelevision commercial Courtroomwhich was also supported bybillboard advertising.

Regional campaigns promotedalternative transport arrangementssuch as the Wollongong area’s‘Summer Bus’, a joint initiativewith local licensed hotels,restaurants and local buscompanies, which provided busservices on Friday and Saturdayevenings during summer whennormal services did not operate.

TRAFFIC OFFENDERS

PROGRAM Following the evaluation of thisprogram in 1999, a steeringcommittee was formed to overseethe development of guidelinesand standards to ensureconsistency of program design,content and data collection. The steering committee reportoutlined options for futuredevelopment of the programand will be presented to theGovernment Agencies RoadSafety Council for cross-agencyconsideration.

SCHOOL ROAD SAFETY

EDUCATION PROGRAMThis program aims to influencethe development of road useknowledge, attitudes andbehaviour in children andadolescents. The 1999 evaluationshowed an increase in roadsafety education in schools, with 85 percent of respondentsdelivering road safety educationin the previous 12 months.

Other initiatives in 1999/2000included:

– 121 workshops conducted across the State to supportteachers from 2,200 primaryschools in the delivery of roadsafety education and the use ofthe newly released Move Aheadwith Street Sense resource. Thispackage, developed through the NSW Board of Studies,includes age-appropriatematerial on road safety messagesusing a variety of formats andalso provides opportunities fordiscussion, problem solving,interviewing, role playing andfamily involvement

– creation of new resources forearly childhood road safetyeducation including the TertiaryResource Folder for child carersin training, and three editions of the Kids and Traffic Gazette,which provides road safetyinformation for parents and carers

– support for high school teachersin implementing road safetyaspects of the new Year 11 and12 courses, and

– initiation of a review of the road safety education resourcesfor high schools to ensure theprogram addresses all issues for young pedestrians, cyclists,passengers and drivers.

SAFER ROUTES TO

SCHOOL PROGRAMThis program, which focusses on primary schools, entered itsthird year in 1999/2000. Itinvolves parents, schools, P&CCommittees, local councils andPolice working together todesign action plans to makechildren’s travel to and fromschool safer.

Some 1,162 schools wereregistered in the program by the end of June 2000, with 958 completing stage I whichqualified them to be self-sustaining in the program.

RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 38

Page 41: RTA Annual Report 2000 See Pg 24

(39) Roads and Traffic Authority Annual Report 2000

YOUTH ROAD SAFETY

PROGRAMS Activities for these programs,which target young people aged between 17 and 25 years, included: Consultation with young

people

– nineteen focus groups were heldacross NSW with young menaged between 17–19 years and20–22 years on issues related tospeeding, risk taking and unsafedriving. This work was undertakenby the RTA, in partnership withNSW Health and the MotorAccidents Authority (MAA). Thefindings of these focus groupsmake valuable contributions tothe development of our programsand initiativesConsultation with key

stakeholders

– the NSW Youth Road SafetySteering Group which hasmembers representing key youthand road safety stakeholders(MAA, NRMA, Office of Childrenand Young People, NSW Health,NSW Police Service and peakyouth organisations) continuedto meet throughout 1999/2000.This expert group advises onprogram development for youth programs

– NSW discussion paper on youthroad safety – this highlights theachievements of the RTA in roadsafety for young people, reviewscurrent road crash involvementby young people and the factorsinfluencing this behaviour, and

– Youth activity guidelines – thesewere developed in consultationwith local council road safetyofficers, MAA, Institute of PublicWorks Engineering Australia(IPWEA) and RTA staff with theaim of adopting a consistentapproach to youth road safetyprograms and projects.

ROAD SAFETY CAMPAIGNS

FOR YOUNG PEOPLEPublic education campaignsfocussing on children and youth included:

– television and radio publiceducation campaigns about the 40km/h speed limit around school buses and the supervisionof children travelling to and from school (eg Right side of the Road), and

– a television commercial based on the theme Safe Speeding.There’s No Such Thing aimed at younger drivers.

Most public education campaignsincluded material and mediacoverage for young people.

ROAD SAFETY INITIATIVES

FOR ABORIGINAL PEOPLEA major research project into theroad safety profile of Aboriginaland Torres Strait Islandcommunities was completed inSeptember 1999. The 8-volumereport includes a demographicand socio-economic profile ofindigenous NSW communities,an overview of Aboriginal andnon-Aboriginal road trauma inNSW, an investigation intohospitalisation data, and a studyof accident and emergencydepartment injury statistics in the Far West, Bourke and Barwonareas. The report also looked at the most effective way we can communicate road safetymessages to indigenouscommunities and the awarenessand receptivity of communitiesto current road safety publiceducation messages and strategies.

We are participating in thedevelopment of the NationalAboriginal and Torres StraitIslander Road Safety Strategy,along with Queensland, theNorthern Territory, SouthAustralia and Western Australia. A draft National IndigenousPeople’s Road Safety Strategywas circulated for comment toour Aboriginal Liaison Officers.

Nominations for representationon the NSW Aboriginal andTorres Strait Islander Road SafetyStrategy Reference Group werecalled for from RTA regions inJune 2000. The reference groupwill assist us develop the NSWAboriginal and Torres StraitIslander Road Safety Strategythroughout the following year.

We mounted a road safetydisplay at the NSW AboriginalRugby League AssociationKnockout Competition in Dubbo in October 1999. Thecompetition attracted over 61Aboriginal football teams and2,000 players over the weekend.

We are consulting with theAboriginal community on thedevelopment of our parentworkshops to ensure theprogram supporting the newGraduated Licensing Scheme is appropriate to their needs.

MAKING ROADS SAFERWe progressed the NSWGovernment’s commitment toimprove road safety by carryingout improvements to targetedroads and roadsides. Some $15million was spent in 1999/2000,with $10.3 million of this beingin country regions. These workscomplemented the $12.1 millionFederal ‘blackspot’ expenditureadministered by the RTA.

These funds allowed a number ofimprovements to be made across

the road network ranging fromtraffic signal improvements tointersection reconstruction andsafety barrier installation. Theseimprovements targeted knownhigh risk locations and alsoallowed us to respond to localconcerns about road safety.

The accelerated $3.2 millionbridge screening program,announced in 1998, wascompleted. Over 70 bridges inNSW have now been screenedto prevent objects being thrownfrom them. Work is continuingto screen further bridges as part of an ongoing program toidentify and treat the locationsof greatest potential risk.

SAFER VEHICLESA brochure detailing results of theAustralian New Car AssessmentProgram, was released inNovember 1999 showing therange of safety performance of each car tested and thecontinuing improvements inperformance since the programbegan in 1993. Work continuedto develop more comprehensivetests and to forge stronger linkswith overseas programs to leadto the sharing of informationand joint development of new procedures.

A large study into defects incrashed vehicles was completedresulting in the establishment of a large database ofinformation to assist researchers in understanding the role of defects and other vehiclecharacteristics in vehicle crashes.The study examined 4,426vehicles involved in 2,705crashes across the State.

OCCUPANT RESTRAINTSPublic education programs wereconducted targeting seat beltuse by rural males including awidespread seat belt advertisingcampaign on radio andtelevision in country NSW inFebruary 2000.

Surveys of seat belt wearing rates showed a slight increase inthe already high rates of usage.Overall, wearing rates weremeasured as 96 percent (up from 95 percent in the lastsurvey in 1996). For drivers the rate exceeded 97 percent.

Testing for the Child RestraintEvaluation Program wascompleted with 177 tests carried out to determine therelative safety performance ofcurrently available childrestraints. These results werecollated into a comprehensiveguide for prospective childrestraint purchasers, which is now available as a freepublication and on our website.

Our support for the AuthorisedRestraint Fitting Station networkcontinued. These independentbusinesses are supported by theRTA to ensure that consumershave ready access to services toprovide safe seat belt and childrestraint installations. Nine newstations were authorised duringthe year and, at 30 June 2000,138 organisations were operatingfrom more than 145 locations.

SAFE-T-CAMSafe-T-Cam comprises 21 digitalcamera sites on major interstatetransport routes throughoutNSW. The system records andprocesses data on the travelpatterns of heavy vehicles,providing us with information tomonitor both drivers and ownersin the road transport industry to ensure they operate in a safeand legal manner. Safe-T-Camcontributes to a reduction inspeeding and driver fatigueaccidents involving heavyvehicles. Over 6,000 warningletters were sent to vehicleoperators and just over 1,000breaches were subsequentlyissued to operators who did not comply during the year.

RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 39

Page 42: RTA Annual Report 2000 See Pg 24

WORKING WITH OUR CUSTOMERS

(40) Roads and Traffic Authority Annual Report 2000

RTA A_Report NEW GUTTER 30/11/00 9:57 AM Page 40

Page 43: RTA Annual Report 2000 See Pg 24

>>(41) Roads and Traffic Authority Annual Report 2000

> THE NEWCASTLE CALL CENTREOPENED IN MAY 2000

RTA A_Report NEW GUTTER 30/11/00 9:57 AM Page 41

Page 44: RTA Annual Report 2000 See Pg 24

(42) Roads and Traffic Authority Annual Report 2000

Over four million people arelicensed to drive in NSW. Westrive to ensure that driver andvehicle services are accessibleand delivered in an efficient,professional and friendly manner.

MOTOR REGISTRIESWe have a network of 130Motor Registry outlets, 38agencies and three Governmentaccess centres across NSW. Atotal of 68 Motor Registries offerSaturday trading, and nine ofthese are open until 2.00pm.

In May 2000 we conducted anindependent survey throughoutNSW to measure customersatisfaction with registries. Atotal of 6,447 interviews werecarried out at 128 registryoutlets. The results were pleasingwith 91 percent of customerssurveyed rating the overallservice as ‘good’ or ‘very good’.

NEWCASTLE CALL CENTREIn May 2000, the ParramattaCall Centre, Newcastle CallCentre and a number of smallercall centres were consolidatedinto a single centre at Newcastleto realise business efficiencies,improve customer service andcontribute to the developmentof Newcastle.

In addition, five other businessunits were relocated to the newpremises: DRIVES Help Desk,Registry Services (North), VehicleRegulation (North), InformationManagement & InformationTechnology (Newcastle) andFleet Services (North).

The new call centre will employsome 128 people, representing a major boost for the Hunter region and the NSWGovernment’s commitment todecentralise and create morejobs in rural and regional NSW.One hundred of the newpositions include two-yeartraineeships carrying a CertificateIII in Communications (CallCentre) qualification and haveattracted Federal and StateGovernment funding whichincludes salary subsidies,traineeship salary rates, fullyfunded training and access tospecialist training.

Our Interactive Voice Response(IVR) system was expanded tooffer customers the opportunityto choose basic information viarecorded voice messages or tospeak with staff for moreinvolved enquiries. Operatinghours of the new centre wereextended to 8.30am–5pmMonday to Friday and 9am–2pm Saturdays.

E-COMMERCEOur internet service whichenables customers to check theavailability of registration numberplates was expanded in December1999 to allow customers toplace orders and make paymentby credit card over the internet.Around 1,900 enquiries werereceived each day and 2,800 on-line orders placed during the year.

We began a trial to allow motordealers to register new vehicleson the internet in November1999. This service allows dealers to print the certificate of registration, issue the labeland finalise the transaction atthe dealership. It is planned toextend the service to additionalnew vehicle motor dealers in2000/2001.

A trial began in December 1999to allow customers to renewlight trailer registrations via theinternet and the Interactive Voice Response (IVR) telephonesystem. This trial has beenexpanded to include eligiblebusiness-registered vehicles lessthan three years old. A total of3,670 vehicles were registeredusing this process.

WORKING WITHOUR CUSTOMERS

RTA A_Report NEW GUTTER 30/11/00 9:57 AM Page 42

Page 45: RTA Annual Report 2000 See Pg 24

(43) Roads and Traffic Authority Annual Report 2000

SYDNEY 2000 OLYMPIC

NUMBER PLATESWe developed two styles ofSydney 2000 Olympic Gamesnumber plates with the SydneyOrganising Committee for theOlympic Games (SOCOG).During 1999/2000, over 32,500sets of the standard Olympicplates with the Share the Spiritslogan and about 4,500 sets ofthe premium Olympic plateswere sold.

LISTENING TO OUR

CUSTOMERSWe encourage feedback, which we monitor and use with our own customer researchto continually improve all RTA services. Our CommunityAttitudes Survey was conductedduring late November to mid-January 2000 to gaugecommunity attitudes to ouractivities and obtain feedback.This was the fourth major survey, the others having beenconducted in 1994, 1996 and1998. Some 1,400 householdswere surveyed throughout NSW.Interviews were held on a 35minute face-to-face basis withpeople 16 years and over in their own homes.

GOVERNMENT ACCESS

CENTRESThe Government Access Programis a NSW Government initiativeto provide better service forpeople in remote rural areas. It involves providing a singleaccess point for a range ofGovernment services andeliminates the need for localresidents to make lengthy return journeys to other regional centres.

A development strategy, drawnup in consultation with the NSWPremier’s Department is beingproduced to progress theGovernment Access Programwith the RTA taking a broadermanagement role.

The centre at Dorrigo successfullytrialed a DRIVES internet facilityand an enhanced version of the internet system is beingdeveloped for release at othercentres during 2000.

FLEXIBLE SERVICETo increase customer convenienceand improve accessibility,Fairfield Heights Motor Registrywas relocated to Greenway Plazashopping complex at WetherillPark and Kogarah Registry wasrelocated to Rockdale Plazashopping complex at Rockdale.The two new registries provideimproved facilities for customersand staff with the upgrading ofthe DRIVES equipment andcounter layout, installation of the Q-matic queuing system,provision of improved facilitiesfor driver testing and moreconvenient customer parking.

CENTRALISED BOOKING

SYSTEMWe currently have a CentralisedDriver Test Booking System toenable customers to book drivingtests by phone or at a MotorRegistry. Research is beingundertaken to expand thebooking system to other tests and develop an internet interfaceto allow customers to make their own bookings.

Major areas identified as apriority for the RTA were:

– ensuring drivers remaincompetent throughout theirdriving life

– minimising air pollution fromvehicle emissions

– educating people about trafficcontrol systems (eg roundaboutsand electronic signage)

– timing and coordination of trafficlights

– reducing accident prone areas– building and maintenance of

country freeways/major roads,and

– regulating trucks and buses.

Some major findings indicatecommunication between the RTA and the community hasimproved with the RTA seen tobe communicating better. Roadusers showed a general rise insatisfaction with their needsbeing met. Bus users’ satisfactionis much improved. Satisfaction of cyclists also improved slightlycompared to previous surveys.Our performance on minimisingnoise from major roads andlandscaping was well regardedby the community.

To ensure the community’s needs are met, the survey findingsform an important input into the development of our strategicdirection, as well as business plansand performance measurementthroughout the RTA.

OMBUDSMAN’S ‘MYSTERY

SHOPPERS’Mystery shoppers from theOmbudsman’s Office visited asample of our Motor Registriesbetween December 1999 andJanuary 2000 as part of a randomsampling of customer service inthe public sector following theGovernment’s Guarantee ofService initiative of the early1990s. They sampled 115separate customer interactions(34 telephone calls, 22 letters, 37 face-to-face meetings and 22email requests). The ‘shoppers’represented a mix of gender,ages and ethnic origin to reflectthe variety of customers we deal with.

The report found our level ofservice was of ‘good professionalstandard’ with 97 percent ofcustomer enquiries handled onfirst contact. The report suggestedreducing standard response timesto written enquiries and emails as a measure to further improvecustomer service.

MOTOR REGISTRIES OFFER A RANGE OFSERVICES TO THE COMMUNITY OF NSW

RTA A_Report NEW GUTTER 30/11/00 9:57 AM Page 43

Page 46: RTA Annual Report 2000 See Pg 24

(44) Roads and Traffic Authority Annual Report 2000

>>DRIVERS ANDVEHICLES

RTA A_Report NEW GUTTER 30/11/00 9:57 AM Page 44

Page 47: RTA Annual Report 2000 See Pg 24

(45) Roads and Traffic Authority Annual Report 2000

> HEAVY VEHICLE INSPECTION FACILITIESPLAY A KEY ROLE IN MONITORINGVEHICLE STANDARDS AND COMPLIANCE

RTA A_Report NEW GUTTER 30/11/00 9:57 AM Page 45

Page 48: RTA Annual Report 2000 See Pg 24

(46) Roads and Traffic Authority Annual Report 2000

New drivers will be required topass through three licensingstages, Learner, Provisional P1and Provisional P2, over aminimum of three and a halfyears before obtaining anunrestricted driver licence.

Drivers will be phased-in to on-road driving allowing themto get initial experience underconditions that involve lowerrisk. A learner’s experience must be recorded in a log bookand signed off by the learner’ssupervisor. Drivers are requiredto pass four tests:

– the computer-based DriverKnowledge test, beforeobtaining a Learner licence

– the Driving Ability Road Testwhich must be passed beforegraduating to a Provisional P1licence

– the Hazard Perception Testwhich must be passed beforegraduating to Provisional P2licence, and

– the Driver Qualification Testwhich must be passed beforegraduating to an unrestrictedlicence.

Under the new scheme, a driverwho holds a Provisional P1licence will have the licencesuspended if he/she reaches atotal of four or more demeritpoints. A driver who holds aProvisional P2 licence will havethe licence suspended if a totalof seven or more demerit pointsis reached.

DRIVERS ANDVEHICLES

DRIVER AND RIDER

COMPETENCEOur management of a safe andequitable transport system inNSW includes ensuring all roadusers are capable and competent.The licensing of novice driversand riders is a vital part of thisresponsibility.

Accident statistics consistentlydemonstrate that young,inexperienced drivers, particularlyyoung men, are at greater risk of death or injury on our roads.While 17 to 25-year old drivershold 16 percent of licences, theyaccount for some 26 percent of all drivers involved in fatal or injury crashes.

Changes to driver licensing

To address this problem, wehave developed a comprehensiverevamp of the licensing of newdrivers in NSW which involves a phased progression throughvarious licence stages and the use of the latest technologyto assess the new driver’scompetence.

The new system, developed forintroduction on 1 July 2000, andknown as the new GraduatedLicensing Scheme, is the mostsignificant change to the licensingsystem since the introduction ofprovisional licences in 1966.

THE GRADUATED LICENSINGSCHEME PROVIDES NEWRESOURCES AND SYSTEMS FOREDUCATING NOVICE DRIVERS.

RTA A_Report NEW GUTTER 30/11/00 9:57 AM Page 46

Page 49: RTA Annual Report 2000 See Pg 24

(47) Roads and Traffic Authority Annual Report 2000

We are developing a new set ofprocedures so that replacementlicence applications will be subjectto further checks before issue, toenhance measures againstfraudulent licences. In some cases, photo licences will be sentby mail to enable checks to becompleted with the applicantbeing given an interim receipt toallow continued driving.

The Road Transport (DriverLicensing) Act 1999 wasamended in February 2000 to allow for storage of imagesused to produce photo licenceidentifications on our computersystem. This will significantlyenhance the integrity of thelicensing system by reducing the possibility of fraudulenttransactions.

ABORIGINAL AND TORRES

STRAIT ISLANDERSWe continued programs andactions in accordance with therecommendations of the 1991Royal Commission into AboriginalDeaths in Custody including:

Motor vehicle offences

(Recommendation No. 95)

Community Based Knowledge

Testing Program (CBKT)

This program, which helpsprepare people for the driverknowledge test, is available atcentres such as Broken Hill,Forbes and Moree. Aboriginalpeople have been accredited totranslate the test to participants at community agencies and other locations where communitymembers feel comfortableattending and practising the test.

Following the successfuloperation of the scheme at theMannus Correctional Centre, nearTumbarumba, and agreementwith the Department of CorrectiveServices, the program has beenadopted at other correctionalcentres including Broken Hill,Bathurst, Oberon, Ivanhoe andKirkconnell. It has also beentaken up by the AboriginalServices Office in Nowra.

Hazard perception testing

Road safety research hasconsistently shown that novicedrivers find it difficult to identifyand react appropriately tohazardous situations which may arise while they are driving.

Development of a hazardperception test was completedduring the year. It will be used in the new licensing scheme toassess an applicant’s ability torecognise and react to hazardoussituations. It is expected that thetest will play a significant role inensuring new drivers have theskills necessary to drive safely.

Driver knowledge test

In order to improve drivers’knowledge of the road rules and better prepare applicants tobecome safer drivers, the test’squestion bank was expandedand published, together with a demonstration version of thetest, on our website.

Our Driver Knowledge Test and Road User Handbook forobtaining a driver’s learninglicence is available in Arabic,Chinese, Croatian, Greek,Korean, Serbian, Spanish, Turkishand Vietnamese.

AUSTRALIAN ROAD RULESAustralia-wide road rules weredeveloped by the National RoadTransport Commission followingcomprehensive discussions and negotiations between allAustralian States and Territories.From 1 December 1999,individual jurisdictions beganimplementing the changes totheir road rules to make themmore consistent throughoutAustralia. A more uniform set ofroad rules for all States andTerritories will improve road safetyand contribute to National RoadTransport Reform objectives.

In NSW, most road rules did not change as they were already consistent with the new Australian Road Rules. Thechanges that did occur wereexplained to the communitythrough an extensive publiceducation campaign that includedtelevision, print, radio andoutdoor advertising. The NewRoad Rules for NSW brochure wasalso delivered to each householdin NSW and a Changes to RoadRules in NSW Guide madeavailable through our registriesand website.

The campaign included television,print and radio advertising andbrochures in ten communitylanguages: Arabic, Chinese,Croatian, Greek, Japanese, Korean,Serbian, Spanish, Turkish, andVietnamese.

NEW CONTROLSWe completed a trial of birthcertificate validation with theNSW Registry of Births, Deathsand Marriages which we areplanning to implement statewide.It involved on-line computerchecks by motor registry staff toensure the particulars on birthcertificates tendered as proof-of-identity were valid. We are also seeking the cooperation ofFederal agencies for validationarrangements for Australianpassports, citizenship,naturalisation or immigrationpapers.

RTA A_Report NEW GUTTER 30/11/00 9:57 AM Page 47

Page 50: RTA Annual Report 2000 See Pg 24

(48) Roads and Traffic Authority Annual Report 2000

Petrol vehicles

Motorists took advantage of thefree, voluntary emission testsavailable at our emission testingfacilities at Botany and Penrith.Members of the public are ableto have a no-obligation check oftheir car's exhaust performanceby means of sophisticatedtesting equipment which checkslevels of hydrocarbons, oxides ofnitrogen and carbon monoxide,all of which are major contributorsto Sydney's photochemical smog.In addition, the test providesinformation on fuel consumption.

Diesel testing

One of the biggest air qualityproblems in Sydney is caused byparticulate matter. Diesel vehiclesare the biggest contributors toparticulates despite comprising a small sector of NSW vehicles.We have been working with theEnvironment Protection Authority(EPA) and Environment Australiato develop a suitable test formeasuring pollution levels ofdiesel vehicles. During the year,a method was identified with aview to adopting it as a nationaltest standard. This groundbreaking project is a world firstin the provision of a short,accurate test for diesel vehicles.

Testing of a sample of 600vehicles will be completed before the end of 2000 todetermine the condition of thediesel vehicle fleet and to identifythe benefits obtainable from atesting program.

VEHICLE STANDARDSCompared to 20 or 30 yearsago, today’s vehicles give farmore protection to drivers andpassengers. Better structuraldesign, improved seats, moreadvanced seatbelts and airbagshave all contributed to a dramatic reduction in serious or fatal injuries. Drivers, too, are increasingly aware of theimportance of safety in motorvehicles and demand highersafety standards and performance.We continued to activelyimprove vehicle safety fordrivers, occupants and otherroad users.

Roadworthy vehicles

In a follow-up to our 1998 HeavyVehicle and Public PassengerVehicle Road-worthiness Survey,B-Doubles, road trains andcoaches were randomly inspectedfor defects in late 1999. Majordefect rates of 4 percent or lesswere reported for all three groupswhich was less than the overallrate of 7 percent for all vehiclecategories in the 1998 survey.

Uniform vehicle standards

NSW implemented CombinedVehicle Standards duringDecember 1999 which provideduniform construction andequipment standards for allvehicles. This will result in anumber of benefits, includingincreased consistency in vehicledimensions, common basic vehiclesafety standards and uniformsmoke and noise standards.

Unregistered vehicle survey

A survey of about 5,000stationary vehicles revealed 1.9percent were unregistered, thesame rate as revealed in the1998 road survey. Comparisonwith other jurisdictions whichconduct similar surveys revealsthat this rate is lower than thatfound in Victoria, Queenslandand Tasmania.

RTA A_Report NEW GUTTER 30/11/00 9:57 AM Page 48

Page 51: RTA Annual Report 2000 See Pg 24

(49) Roads and Traffic Authority Annual Report 2000

Alternative fuels

One way of reducing pollution is by the use of fuels other thanpetrol and diesel. We have beenexamining practical ways toincrease the number of cleanervehicles registered in NSW.Federal subsidies are currentlyavailable for vehicles fuelled bycompressed natural gas and weare currently identifying whichparticular vehicle applications are most suited to conversion.

The implementation of theconversion program is scheduled to coincide with theannouncement of an expandednetwork of natural gas refuellingstations at the end of 2000.

We support the LiverpoolCouncil’s program of convertingtheir fleet to natural gas and the Western Sydney Natural GasVehicle Taskforce’s assistance in expanding the conversionprogram to other councils inwestern Sydney.

Third heavy vehicle reform package

We have been working with roadagencies from other jurisdictionsand the National Road TransportCommission to develop thisreform package which drawstogether initiatives with thepotential to deliver considerablebenefits in productivity, safety,environmental impacts and/orefficiency for freight andpassenger tasks. Key areasinclude Driver Health andFatigue Management, LoadRestraint for heavy vehicles andlight commercial vehicles andHeavy Vehicle Noise and DieselEmissions. The package wasendorsed by Australian TransportMinisters at the AustralianTransport Council in May 2000.

New vehicle configurations

We began trials of B-Triple freightvehicles on selected road trainroutes in the north west of NSW.B-Triples are an alternative todouble-trailer road trains, withimproved productivity and vehicle stability.

Checking on heavy vehicles

RTA Inspectors were engaged ina number of major operationslast year targeting heavy vehicles.A key operation was AUSTRANSwhich is a major joint operationwith road authority enforcementagencies throughout Australia.National data was collected for a week in February 2000.

Our Inspectors focussed theirefforts on the main transportroutes and intercepted over9000 vehicles. Some 629 vehicledefects were issued of which15.4 percent were for majordefects. In addition, 882driving/operating offences were detected. Of these 49percent were for exceedingregulated driving hours.

Plain English information

We introduced a series of plainEnglish information sheets forheavy vehicle operations toprovide clear, concise informationto the transport industry on restricted access vehicleoperations such as controlledaccess buses, 14.6m semi-trailersand 14.9m refrigerated semi-trailers. The information was alsomade available on our website.

Heavy vehicle checkingstation

We are currently constructing anew high volume heavy vehiclechecking facility at Twelve MileCreek, north of Newcastle on thePacific Highway which willprovide vehicle checking facilitiesat a strategic location betweenSydney and the Queenslandborder. The site has beendesigned to take advantage ofthe latest technology includingautomatic truck scanning andSafe-T-Cam monitoring.

Routes for high vehicles

We approved route assessmentcriteria for selecting roadwaysand passageways suitable for use by 4.6m high vehicles. Thecriteria cover livestock crates,multi-deck car carriers andvehicles carrying baled wool, hay and other primary products.

National stolen vehicleinitiatives

The RTA led a National StolenVehicle initiative by providinginput to the National MotorVehicle Theft Reduction Council(NMVTRC) for the managementof written-off vehicles.

The package is being used todevelop national best practiceprinciples for written-off vehicleregisters in all states andterritories, and most jurisdictionsnow plan to implement NSWwritten-off vehicle business rules.It is expected that the adoptionof nationally consistent practicesin all jurisdictions will significantlyreduce the incidence of motorvehicle theft and rebirthing.

Identifying high risk orsuspect vehicles

We set up Vehicle IdentificationInspection Units (VIIU), a newthird tier inspection process, forhigh risk or suspect vehicles inOctober 1999 to help reducethe registration of stolen andrebirthed vehicles. Since the unitbegan operating, some 17,503vehicles have been inspectedwith 400 referred to the Policefor further investigation. Thisrepresents a substantialreduction in the number ofunnecessary inspection referralsto the Police compared to theprevious procedure involvingAuthorised Inspection Stations.

Inspections were carried out byRTA officers beginning in thegreater urban areas of Sydney,Newcastle and Wollongong. By the end of June 2000, therewere eight inspection siteslocated at Unanderra, Penrith,Liverpool, Five Dock, Botany, West Gosford, Carrington andSingleton. Over the next year wewill be extending VIIUs to otherregional locations through the use of mobile inspection crews.

Faster communication

We are trialing a mobilecommunications system innorthern NSW which will provideheavy vehicle inspectors with awide range of up-to-dateinformation to assist in carryingout their duties. It comprises acomputer and modem carried in the vehicle which allowsInspectors to validate driverlicences and logbooks by gainingimmediate access to driver,vehicle and Safe-T-Cam records.The information available will beexpanded as the system isdeveloped over time. If the trial is successful the mobilecommunications will be extendedacross the State.

Faded number plates

A faded plate program wasimplemented in northern NSW in November 1998 and extendedto Sydney in November 1999.Since the introduction of theprogram, almost 19,000deteriorated number plates havebeen replaced, free of charge tomotorists. It is planned to extendthe program across NSW in thesecond half of 2000.

Strong ties with industry

Regular meetings with transportindustry groups and primaryproducers greatly improvedrelationships between the RTAand industry. We participated inthe agricultural equipmentexhibition (Agquip) held inGunnedah and with Grain Corpat pre-harvest meetings incountry locations where our staff made presentations on issuessuch as registration, licensing andenforcement. We are working to establish similar forums withother primary industry groups.

RTA A_Report NEW GUTTER 30/11/00 9:57 AM Page 49

Page 52: RTA Annual Report 2000 See Pg 24

(50) Roads and Traffic Authority Annual Report 2000

BUSINESS EFFICIENCY

>>

RTA A_Report NEW GUTTER 30/11/00 9:57 AM Page 50

Page 53: RTA Annual Report 2000 See Pg 24

(51) Roads and Traffic Authority Annual Report 2000

> A ROAD CREW APPLYINGPAVEMENT MARKINGS

RTA A_Report NEW GUTTER 30/11/00 9:58 AM Page 51

Page 54: RTA Annual Report 2000 See Pg 24

(52) Roads and Traffic Authority Annual Report 2000

BUSINESSEFFICIENCY

There is an ongoing need forgovernment agencies andstatutory authorities to reviewthe efficiency and effectiveness of their operations. Through itschange management processesthe RTA has implementedstructures and functions that aim to deliver better services tocustomers and internal clients.

MANAGING CHANGEThe second stage of our changemanagement program, whichbegan in May 1999, furtherfocussed on delivering bettervalue for taxpayer dollars.

The first stage of the program,completed last year, resulted inthe redirection of more than $38million from efficiency savingsback into the Roads Program.This stage looked at eliminatingduplication and overlap offunctions performed in variousparts of our operations andintroduced more commercialisedbusiness operating procedures.

The second stage is expected totake two years to complete, andhas involved the restructure ofsome Corporate Directorates andthe establishment of statewideOperations and Client ServicesDirectorates. These Directorateswere restructured as a funder/purchaser/provider model which creates clearer roles and accountabilities. FunderDirectorates establish standards,policy and determine fundingpriorities. Client ServicesDirectorate purchases services onbehalf of the funders to ensurebest value for money outcomes.Operations Directorate deliversroad services, driver and vehicleservices, technical services, fleetservices and environmentaltechnology services on acommercial basis.

Implementation of the changemanagement program has beenundertaken through the use ofconsultative work groups andproject teams comprising staff,union representatives and keystakeholders.

A key feature was a commitmentto transfer over 229 permanentjobs from Sydney to rural andregional NSW (Newcastle,Grafton, Dubbo, and Glen Innes)as part of the NSW Government’sRural Employment Strategy.

Thirteen positions servicing aHeavy Vehicle RegulationProsecution Unit, and auditingactivities associated withAuthorised Inspection Stations,previously based in Sydney weremoved to Glen Innes in April2000. Our Sydney and countrycustomer call centres wereconsolidated into a single baseat Newcastle in May 2000resulting in 128 positions beingrelocated to Newcastle.

A further 46 positions formingour Driver and VehicleAdministration Section are beingrelocated to Grafton in September2000, and up to 42 positions(full-time and part time) will beestablished in Dubbo inNovember 2000 to processCashback scheme payments. In all of these locations, a largenumber of the positions havealready been filled by localworkers, or are expected to be.

Other initiatives which progressedthrough the change managementprogram during 2000/01 were proposals to design andimplement a skills based wagesclassification structure, completionof trials of team based workingarrangements in road services,and the introduction of process improvement initiatives to enhance managementoperating systems in ouradministrative centres.

CLIENT SERVICES

DIRECTORATEThe primary responsibility ofClient Services Directorate is todeliver value for money whenpurchasing services on behalf of clients. Core programs of road development, roadmaintenance, road safety andtraffic management amountingto $1.62 billion were delivered.

Asset Management

A system of Single InvitationMaintenance Contracts (SIMC)was implemented for assetmaintenance to provide moreefficient and effective projectmanagement and projectsurveillance in the purchase of maintenance.

Quality procedures weredeveloped and implemented for management of the SIMC, to facilitate consistency ofapproach and provide a basis for ongoing improvement of the management of maintenancecontracts. The quality system ison the RTA intranet to make itreadily accessible to staff.

Project Management

The Project Management Officewas established as a ‘Centre of Excellence’ to implement best practices and driveconsistency in project andcontract management across the State. Quality certification to ISO 9000 standards wassecured for the integratedproject management system.

A project to benchmark theproject management functionagainst other Australian stateroad authorities was completed.The findings determined thatproject and constructionmanagement costs werecompetitive. Best practices thatwere identified are now beingimplemented across the projectmanagement function.

Business Development

A number of initiatives weresuccessfully implemented insupport of the RTA'scommercialisation model,including the following:

– A commercial budgeting modelwas developed and implementedto ensure consistency across theState. The model promoted theprinciples of fee for service basedon standardised charge out ratesacross the Directorate.

RTA A_Report NEW GUTTER 30/11/00 9:58 AM Page 52

Page 55: RTA Annual Report 2000 See Pg 24

(53) Roads and Traffic Authority Annual Report 2000

–The timesheet system has beenenhanced and an improveddatabase linked version is beingtrialed across the Directorate.This will link to the financialsystem and thereby allow projectsto be charged accurately andconsistently across the State.

– An improved overtime reportingsystem has been developed toassist managers to monitor andcontrol overtime expenses moreeffectively.

– An RTA-wide video conferencingsystem was successfully establishedlinking Centennial Plaza,Blacktown, the TransportManagement Centre and allregional offices. Significantsavings in travel time and othercosts, estimated at $0.5 millionper annum, are being realised.

Road Pavements

The Pavement Projects Branchhas been established as aspecialised consultancy providingadvice and technology transferacross the RTA in all aspects of pavements includingmaterials, design, construction,maintenance and life cyclecosting of pavement options.

Pacific Highway Office

A Pacific Highway roadworkinformation service whichenables road users and membersof the community to obtainaccurate, timely and relevantinformation regarding possibletraffic delays, due to roadworksor unplanned incidents, wasestablished as an integralelement of the Pacific HighwayDelay Management Strategy. The 1800 number is nowtransferred to the TransportManagement centre outside ofnormal working hours toimprove the current informationservice, reduce the need for arecorded message, and moreeffectively utilise staff resources.

OPERATIONS DIRECTORATEOur Operations Directorate was created in July 1999 to help achieve our objectives ofdelivering road, bridge, traffic,driver and vehicle services ascost effectively as possible forthe benefit of the people ofNSW. It operates on commercialprinciples and increasingly has tocompete for work from clientsboth within and outside the RTA.With some 4,300 staff, Operationsemploys around two thirds ofour entire workforce andencompasses an extensive base of skills and experience.

In 1999/2000, Operationssuccessfully delivered works andservices to the value of $774million and made a surplus of$59 million.

Road Services

Road Services income for thefinancial year totalled $481million and resulted in a surplusof $36 million.

Projects, totalling over $39million were won in opencompetition, including diverseprojects such as the new OakFlats Interchange, New EnglandHighway reconstruction atPamger Drive and the design,manufacture and installation of30 Variable Message Signs onmajor arterial routes in Sydney.$16 million of the incomeearned was from external clients.

To meet the performancerequirements for preferredsupplier status and theintroduction of single invitationcontracts for maintenance ofState Roads, Road Servicesestablished its business credentialsfor example prequalification andbenchmarking and made majorimprovements to its businesssystems and business rules.

Driver and Vehicle Services

Improvements in customerservice levels in Motor Registries, the opening of a new consolidated Customer Call Centre and the relocation of the DRIVES computer HelpDesk to Newcastle werehighlights of the year.

Vehicle Regulation

Vehicle Regulation Inspectorsmaintained an extended presenceat Quarry Hill on the PacificHighway in the Burringbar Rangeduring the year following anincrease in heavy vehicle crashesin this area in the early part of1999. The 24-hour, 7 day aweek strategy supplementedother engineering modificationsto the road asset providing asafer journey for heavy vehicledrivers and road users in general,pending completion of the newYelgun to Chinderah section ofthe Pacific Highway.

Technical Services

Crashlab, an independent testfacility operating as a commercialbusiness unit within the RTA, was accredited by the UK basedVehicle Certification Authority to conduct motor vehicle frontal and side impact tests inaccordance with the EuropeanUnion directives.

Provision of technical services forthe Western Sydney Transitwayproject provided a significantnew market. Strategic plans forthe survey and project designfunctions of the branch were also developed to reinforcecommitment to an RTA-wideapproach.

Business Development

Ongoing coordination across alldelivery branches was achievedduring the year by developingclient relationships and buildingfuture business opportunities.

A single Directorate-wide qualitysystem was implemented andprequalification under RTAcategories R20 and M for workswithin NSW was achieved.Prequalification for roadworks in the ACT was also gained inmid-2000.

Commercial Services

Commercial performancereporting formats were developedand corporate contributiontargets for the year set. Businessrules, including bid policies andprocedures and the commercialprocurement policy andprocedures were developed, and more than 20 commercialprojects, including functional/product reviews and systemsimprovements, were completed.

CONSULTATION WITH STAFFCONTRIBUTES TO THE CHANGEMANAGEMENT PROCESS

RTA A_Report NEW GUTTER 30/11/00 9:58 AM Page 53

Page 56: RTA Annual Report 2000 See Pg 24

(54) Roads and Traffic Authority Annual Report 2000

BUSINESS SERVICES

GROUPThe Business Services Group (BSG)was established in our CorporateServices Directorate in November1999 to better align the RTA with NSW Government policy. It provides business supportservices to RTA Directorates usinga shared services model enablingelimination of unnecessaryprocesses and providingeconomies from amalgamationand standardisation of services.

The BSG has approximately 400 staff who provide productsand services that can be broadlyclassified under the followingareas:

Employment and WorkforceServices

Delivers support services inaccordance with our humanresources policies and standardsto meet legislative requirements

Logistic and Facility Services

Delivers security, record keeping,fleet management, mail systems,procurement and disposal,inventory management, buildingmanagement services and theRTA Library

Financial and AdministrativeServices

Provides financial performancereporting, revenue and banking,and financial administrationsupport, and

Continuous ImprovementServices

Provides quality management,continuous improvement,process improvement andbenchmarking services.

In July 2000 the BSG beganformal operation across NSW asa business, delivering productsand services on a full costrecovery basis through pricedService Level Agreements withDirectorates. As a preferredsupplier for two to three years, the BSG is required todemonstrate improved customer-centred services in an efficientand effective delivery framework.This will enable it to returnproductivity savings to the RTAand ensure the long termviability of the business.

FINANCIAL MANAGEMENTThe RTA constantly implementsimprovements to its riskmanagement and financialinformation reporting processesto facilitate managementdecisions and enhance businessefficiency across the organisation.

Risk management

Large organisations as diverse asours have many inherent risksthat may directly or indirectlyresult in loss:

Operating risks

Our investment in theimprovement of OccupationalHealth and Safety (OHS)management resulted in a rebateof $6.33 million on the depositpremium of $14.95 million paidto the Treasury Managed Fundfor the 1996/97 premium year.

The focus on improving OHSperformance also translated into financial savings for the1999/2000 financial year as theworkers compensation depositpremium payment of $12.15million represented a reductionof $1.55 million on the previousyear. This was the lowest depositpremium levied by the TreasuryManaged Fund on the RTA since1994/1995.

Commercial risk

Contemporary financial andeconomic analysis techniqueswere used to assess infrastructureand business asset investmentproposals to ensure all projectswere subject to appropriatecriteria including predeterminedrates of return.

The pre-qualification processapplied to potential suppliersand contractors providedassurance on the financialcapacity of service providers to fulfil their obligations.

Interest rate risk

Interest rates on the RTA’s debtare a mixture of fixed andfloating rates. The RTA initiallymanaged this exposure bybuying and selling semi-government bonds in thephysical market with TCorphandling all transactions.

In January 2000, the RTA agreedthat TCorp should manage theRTA Debt Portfolio.

In March 1999, the Treasurerapproved our use of TCorp’sCome and Go Facility which willbe in place until 31 December2001. It allows us to use ourinvestment funds to repay debtin the short term and benefitfrom the gains on the marginbetween investments andborrowing rates.

Following agreements with StateTreasury, as part of the 1999/00State budget allocation process,savings generated from furtherefficiencies in the RTA will beused to reduce debt.

Superannuation liability

There was a marked decrease inour net unfunded superannuationliability. This occurred as a resultof our continued extra paymentsand changes to actuarialassumptions. We have an ongoingcommitment entered into with the State SuperannuationBoard in 1992 to eliminate theunfunded liability over 20 years.

RTA A_Report NEW GUTTER 30/11/00 9:58 AM Page 54

Page 57: RTA Annual Report 2000 See Pg 24

(55) Roads and Traffic Authority Annual Report 2000

Integrated ManagementSystem

We embarked on a project toacquire and implement apackaged Integrated ManagementSystem (IMS) to replace theexisting Finance and HumanResources/Payroll systems. Thekey benefits of implementing theIMS will include developmentand application of uniformbusiness processes, benchmarkingcapabilities and enhancedmanagement information tosupport decision making.

In addition, the new system willreduce interfaces, streamline andautomate workflow and businessprocesses, promote employeeself service capabilities, whichwill achieve significant savings.

e-Business

Significant efficiency gains wereachieved using new technologyto conduct business electronically.Examples included the use ofpurchasing cards to buy and payfor goods and services, and fordownloading data, such aspurchase card usage details andbank statements from the ANZBank, and loan account balancesfrom TCorp. Direct debiting ofthe Sydney Harbour Bridge tollcollections was successfullyimplemented for a number ofcustomers, including the taxiindustry.

Research and Development

Investment in research anddevelopment (R&D) continuedto improve our work practicesand knowledge. The R&DProgram funded 37 projects witha total expenditure of $2.80million, including research into:

– fauna passages across roads, airquality, koala movements, andsleep disturbance

– Roadcrack pavement system,timber bridge assessmenttechniques, pavement stabilityand skid resistance, geotextileuse and soil stabilisation, andWhisper concrete trial, and

– development of traffic incidentmodelling software, crashsimulation and testing ofcollapsible sign structures,perceptual countermeasure roadsafety treatments, and a trial ofalcohol ignition interlock devices.

Property Management

Our property portfolio isreviewed regularly. Propertysurplus to current and futurerequirements for roadconstruction and relatedpurposes was disposed of inaccordance with Governmentpolicy. Revenue raised wasreturned to the Roads Program.Further details regarding landdisposal are provided inAppendix 14.

Control ManagementServices

The quality system accreditedControl Management ServicesBranch provided seniormanagers and other customerswith a high quality, cost-effective auditing service acrossour full range of activities. It alsosupplied corruption preventionand investigation services, andassistance in improving the RTA’scontrol environment. Furtherdetails of internal audit andother services are provided inAppendix 8.

M4/M5 Cashback Scheme

In October 1996 the StateGovernment announced thatfrom 1 January 1997 drivers ofNSW privately registered motorvehicles using the M4 and M5motorways would be eligible toreceive a refund on the tollspaid under the M4/M5Cashback scheme. This isadministered by the RTA withrefund claims made quarterly.During the year 232,721rebate claims were processed,representing a 26.7 percentincrease over last year. Totalcost of the scheme during1999/00, includingadministration, was $36.2m,compared with $27.9m in1998/99. At 30 June 2000,there were in excess of 104,000Cashback accounts registeredwith the motorway companies.The scheme is funded fromconsolidated revenue.

RTA A_Report NEW GUTTER 30/11/00 9:58 AM Page 55

Page 58: RTA Annual Report 2000 See Pg 24

WHOLE OF GOVERNMENT PLANNING

(56) Roads and Traffic Authority Annual Report 2000

RTA A_Report NEW GUTTER 30/11/00 9:58 AM Page 56

Page 59: RTA Annual Report 2000 See Pg 24

(57) Roads and Traffic Authority Annual Report 2000

> ONE OF THE MOST DISTINCTIVE FEATURES OFTHE EASTERN DISTRIBUTOR IS THE LANDBRIDGEOVER THE CAHILL EXPRESSWAY THAT REUNITESTHE TWO HALVES OF THE DOMAIN

>>RTA A_Report NEW GUTTER 30/11/00 9:58 AM Page 57

Page 60: RTA Annual Report 2000 See Pg 24

(58) Roads and Traffic Authority Annual Report 2000

WHOLE OFGOVERNMENTPLANNING

An RTA Urban Design AdvisoryPanel was set up to ensure weachieve the highest possiblestandards of urban and regionaldesign excellence. An RTA UrbanDesign Noise Wall Panel was alsoset up to specifically review noisewall proposals and provideadvice. We also established aRegister of Urban DesignContractors which was compiledfollowing our call for Expressionsof Interest for urban designproviders. The register will beupdated periodically.

Completion of the EasternDistributor in December 1999delivered to NSW a landmarkproject with significant urbandesign outcomes which providesa gateway to Sydney. It improves the quality of adjacentenvironments by taking traffic off local streets, allows for theenhancement of key publicspaces such as Taylor Square,and for major improvements tobus services on Oxford andFlinders Streets. One of its most distinctive features is the landbridge over the CahillExpressway that reunites the twohalves of The Domain, improvesthe setting of the NSW Art Galleryand creates major landscapedgreen space.

We contributed $50,000 to anational urban design competitionfor Parramatta Road 2000 and Beyond, which is beingcoordinated by the InnerMetropolitan RegionalOrganisation of Councils.

We undertook urban design work,or issued urban design briefs, fornumerous programs and projectsin urban and rural areas includingthe Transitways program forSydney, the Pacific HighwayDevelopment Program, a range

In 1998 the NSW Governmentreleased its visionary plan Actionfor Transport 2010 which setsforth a whole-of-Governmentapproach for meeting thetransport needs of NSW up to2010. The Plan contains detailedconstruction programs for theintegrated expansion of the railand bus network as well as majorroads. The RTA made a significantcontribution to the objectives ofthe Plan by undertaking thefollowing projects:

URBAN DESIGN

In December 1999 we launchedour urban design guidelinesmanual Beyond the Pavement –RTA Urban and Regional DesignPractice Notes which is aimed atchanging the way we operate,to improve the design quality ofour projects in the context oftheir urban and regional settingsand to improve the publicdomain. The manual also reflectsa renewed interest around theworld in the urban design ofroad projects. It addresses newroads, bus-only transitways andthe upgrading and retrofitting ofexisting roads in both urban andregional environments.

As well as this initiative, we are asignatory to the NSW GovernmentUrban Design Charter, preparedby the Urban Design AdvisoryService of the Department ofUrban Affairs and Planning. The charter aims at raising thestandard of urban design inNSW. It sets out strategies forGovernment agencies in NSW to optimise their responsibility,show leadership and collaborateto create high quality towns,cities and scenic areas.

RTA A_Report NEW GUTTER 30/11/00 10:00 AM Page 58

Page 61: RTA Annual Report 2000 See Pg 24

(59) Roads and Traffic Authority Annual Report 2000

of projects on the Great WesternHighway, the Northern DistributorExtension and Mount OusleyDrive in Wollongong, theCastlereagh Bypass, and OldWindsor Road in Sydney.

PLANNING TRANSPORT

AND LAND USE TOGETHERWe ran a major workshop withstakeholders to review our Guide to Traffic GeneratingDevelopments which resulted in a series of recommendationsincluding a need to align thepolicy content with current andemerging NSW Governmentstrategies and policies governingtransport and land use.

We played a key role in enteringTransport DevelopmentAgreements to achieveintegrated transport solutionsand funding contributions forrequired road infrastructure for major development sitesincluding the ADI site at StMary’s and the Boral site atGreystanes.

The RTA is a major contributor($700,000 in 1999/00) to the Household Travel Surveyconducted by the Transport DataCentre. This is a comprehensivesurvey of household travelpatterns in the GreaterMetropolitan Area and assists in the detailed planning of the area’s road network.

MAKING ROAD FREIGHT

MORE COMPETITIVEA variety of studies by the RTAand Department of Transportinto the freight needs of NSWcontributed to the developmentof the NSW Government’s Actionfor Transport 2010.

We were represented on varioussteering committees and helpedfund important studies, includingthe City South Freight Study,and the Port Botany ContainerOrigin-Destination Survey.

We provided over $300,000 infunding for two projects tocollect detailed freight data. Thefirst, the Commercial TransportStudy, is being managed by theTransport Data Centre and willproduce detailed trip tables forSydney. The second, an ABSFreight Movement Survey, is amulti-modal national survey offreight flows.

ALLIANCES AND

PARTNERSHIPSWe utilised and promotedalliances and partnerships with industry, national bodies,academia and other State andinternational road agencies.

Local Government

The Local Government LiaisonCommittee provided effectivecommunication and enhancedcoordination between the RTAand the Local Government andShires Associations on roadmanagement policy.

The Committee’s quarterlymeetings discussed joint actionsand common understandingacross a range of issues including:

– improving value for money inthe delivery of roadworksthrough the Road MaintenanceReform Package

– Federal proposals to increasetruck mass limits, and

– reviews of funding arrangementsfollowing the introduction ofFederal tax reform initiatives.

The Committee also commissioneda Local Government MaintenanceContracting ReferenceCommittee to supportimplementation of the RoadMaintenance Reform Package.

The Local Government RoadSafety Program Memorandum ofUnderstanding (MOU) detailsthe roles of the RTA and LocalGovernment in this program, aswell as their joint responsibilities.Signatories to the MOU are theHon. Carl Scully, Minister forRoads, and representatives of the three organisations whichrepresent local government inthe Program: the NSW LocalGovernment Association; theNSW Shires Association and the Institute of MunicipalEngineering Australia (now the Institute of Public WorksEngineering Australia).

The Memorandum ofUnderstanding demonstrates thatthe RTA and Local Governmentagree to work in partnership todevelop and implement strategiesaimed at improving road safetyand reducing road trauma onlocal roads throughout the State.It also specifically affirms thegovernment’s commitment tofunding the Road Safety OfficerProgram to the Year 2010, andrelates the objectives of theProgram to Road Safety 2010.

Currently 65 councils across theState are participating, employingbetween them a total of 55 RoadSafety Officer (RSO) positions.

Of these, 28 councils are based inSydney and 37 in regional centres.Together, these councils representover six million residents in NSW.

Additionally, a VocationalEducation and Training AdvisoryBoard (VETAB) approvedCertificate IV in Road Safety courseis being piloted in six councilsacross NSW. The course provides aframework for competency-basedtraining for RSOs and will be fullyimplemented in July 2001.

NSW Police Service

Our Enhanced Enforcementprogram, run with the NSWPolice Service, is aimed atdiscouraging unsafe road userbehaviour by putting in place ahigher level of police visibility atcritical times of the year. Duringthe year, our funding providedalmost a 30 percent increase inenforcement hours duringenhanced funded policeoperations targeting speeding,drink-driving, fatigue and seatbelt use.

A Memorandum ofUnderstanding (MOU) betweenthe RTA and the NSW PoliceService has underpinned thecooperative and coordinated waythe two organisations haveworked together to develop andimplement road safety policiesand strategies since 1990. TheMOU details the roles of the RTAand the NSW Police Service inthis program, as well as theirjoint responsibilities to achievethe goals of Road Safety 2010.

To ensure close liaison with theNSW Police Service, the RTAChief Executive and relevantsenior RTA staff meet formally withthe Police Deputy Commissioner(Operations) and relevant seniorpolice on a quarterly basis. Policy,legislation and upcoming issuesare discussed to facilitatecomprehensive interagencyprogram delivery.

Austroads

Our involvement with Austroadsincluded the management of the National Business SystemsProgram and RTA staffrepresentation on referencegroups and R&D project teams.We chaired national groupsoverseeing research and nationalpolicy development on roadstructures and environmentalissues associated with the roadsystem. Our work with Austroadsallowed national R&D funds tobe pooled to allow exchange ofinformation, identify best practice,eliminate duplication and provide efficiency gains throughinnovation, consistent standardsand practice.

We continued our stronginternational involvementthrough cooperative researchwith the Organisation forEconomic Co-operation andDevelopment (OECD) and theWorld Road Association (PIARC). We were represented on international committeesconsidering issues associated withroad tunnels and the environment.

Safe communities

We are jointly funding with NSW Health three-year NSWSafeComm pilot programs in Gundagai, Kiama andMacleay/Hastings. The programsare based on the World HealthOrganisation (WHO) SafeCommunities Program model,the objective being to encouragelocal residents to develop a safecommunities approach towardsroad trauma and general injuryprevention.

CONCEPT DRAWINGS OF PROPOSEDPROJECTS ASSIST IN THE PLANNING ANDCOMMUNITY CONSULTATION PROCESS.

RTA A_Report NEW GUTTER 30/11/00 10:00 AM Page 59

Page 62: RTA Annual Report 2000 See Pg 24

(2) Roads and Traffic Authority Annual Report 2000(60) Roads and Traffic Authority Annual Report 2000

OUR PEOPLE >>

RTA A_Report NEW GUTTER 30/11/00 10:00 AM Page 60

Page 63: RTA Annual Report 2000 See Pg 24

(2) Roads and Traffic Authority Annual Report 2000(61) Roads and Traffic Authority Annual Report 2000

> RTA STAFF INVOLVED INCOMMUNITY CONSULTATIONON THE PACIFIC HIGHWAY>

RTA A_Report NEW GUTTER 30/11/00 10:00 AM Page 61

Page 64: RTA Annual Report 2000 See Pg 24

(62) Roads and Traffic Authority Annual Report 2000

We place great importance ondeveloping the skills of our staffat all levels and ensuring that, as they retire, we have skilledpeople to replace them. We wererecognised at the AustralianTraining Awards in the Industrycategory for Public Administrationfor best practice in the provisionof learning and development.

In addition, on an ongoing basiswe offer staff a range of trainingoptions including formal courses,on-the-job training, coaching,mentoring, workplace basedprojects, involvement in projectteams and secondments.

RECRUITING THE BESTAs part of our recruitmentprogram, we recruited our fourthannual intake of graduates underour Graduate Recruitment andDevelopment Program followinga rigorous selection processthrough universities in Sydney,around NSW and interstate. The 13 graduates hold a varietyof degrees and were given jobplacements in various parts ofour operations including CivilEngineering, Traffic and TransportEngineering, EnvironmentalEngineering, Transport Planning,Public Policy, InformationTechnology and Business/Commerce. In addition, theyeach undertook at least oneregional placement. A mentorwas allocated to each graduateto help build strong internalnetworks and offer assistanceand advice as needed.

We employed 34 apprenticeswho were trained as plantmechanics, electricians, carpenters(including bridge and wharf andcarpenter joiners), painters,boilermakers and welders. Theywere employed all around theState as part of our commitmentto youth employment andtraining, and rural and regionalemployment.

We have partnerships withindustry groups and otherGovernment departments toensure our training provides all the skills necessary for ourapprentices to continue to meetcurrent and future needs.

LEARNING AND

DEVELOPMENTWe are a Registered TrainingOrganisation (RTO) under S.22cof the Vocational Education andTraining Accreditation (VETA) Act 1990 with the VocationalEducation and TrainingAccreditation Board (VETAB),qualified to deliver recognisedvocational education andtraining courses and assessmentservices. During the year weoffered a range of courses aswell as in-house training to ourstaff, many in flexible options to fit in with work demands.Courses and training includedManagement Development,specific learning courses for RoadServices (eg OHS for bituminousworks), Project Management,Environmental Issues andtraining for staff working for the Sydney 2000 Olympic andParalympic Games.

WORK WELL DONE For the 1999 RTA Staff ExcellenceAwards, some 93 awards and commendations werepresented to staff over 11different categories: communityconsultation, customer service,environmental awareness,occupational health and safety,road safety, team performance,innovation and urban design.Also included were awards forleadership and equity, the latterrecognising efforts to ensure allstaff have equal access toinformation, opportunity anddevelopment. Awards were alsomade for the Customer ServiceOfficer of the Year, MotorRegistry of the Year andApprentice of the Year.

COUNSELLING SUPPORTA free Employee AssistanceProgram (EAP) continued tooperate for staff and theirfamilies. EAP counsellors reflectour diverse community, andamong them speak Italian,French, Swiss, German, Afrikaans, Zulu, Maltese,Mandarin, Greek, Thai, Dutch,Indonesian, Malaysian, Spanishand Portuguese. A toll free TTY(teletypewriter) number isavailable for the hearing impaired.

WOMEN’S STRATEGYThe RTA’s Women’s Strategy aimsto increase the representation ofwomen in the RTA workforce. Asat June 2000, 27 percent of staffwere women, with 15 percentholding management positions.

In May 2000, the Office of the Director of EEO in PublicEmployment (ODEOPE) examinedthe strategies of some 200government departments andstatutory authorities across theState. The RTA was subsequentlydescribed as being one of theleading employers in terms of EEO.

Our initiatives included the TopSteps Program aimed at womenin middle management to furtherdevelop career opportunities; theopportunity to participate in apart-time MBA program offeredthrough the University ofTechnology; and the FrontlineManagement Initiative whichoffers the opportunities todevelop team leadership andpeople management skills.

An Alternative Duties DuringPregnancy policy enabledsupervisors/managers and staffto examine options available tovary duties or temporarily transferstaff to another position for theduration of their pregnancy.

OCCUPATIONAL HEALTH

AND SAFETYWe continually reduce risks ofworkplace incidents, injuries and illness, and provide timelyinterventions to our staff throughsystematic management of OHSby all levels of management withthe assistance of a network ofOHS practitioners throughout the State.

Our responsibility to ensure asafe and healthy workplaceextends to contractors and theirstaff. Tenderers for major or highrisk projects must have a corporateOHS management systemaccredited by the RTA and thesuccessful tenderer must developapproved project and site specificsafety management plans beforecommencing work. Contractors’work sites are periodicallyaudited against OHS specifications.

OUR PEOPLE

RTA A_Report NEW GUTTER 30/11/00 10:00 AM Page 62

Page 65: RTA Annual Report 2000 See Pg 24

(63) Roads and Traffic Authority Annual Report 2000

ABORIGINAL AND TORRES

STRAIT ISLANDERSWe continued programs andactions in accordance with therecommendations of the 1991Royal Commission into AboriginalDeaths in Custody including:

Employment and training(Recommendation No. 305)Approval was given to commencethe recruitment of five peoplewith Aboriginal and Torres StraitIslander backgrounds to belocated in our regional offices at Glen Innes (2), Grafton,Parkes and Wagga Wagga. Thepositions, which carry Federaland State Government fundingand training subsidies, includeenrolment in Certificate III(Business Administration).

We appointed Aboriginal LiaisonOfficers at Wagga Wagga andBlacktown making a total of fouremployed by the RTA, the othersbeing at Parkes and Kempsey.We created and filled a newposition of Aboriginal ProgramStrategy Manager to developand lead targeted strategiesacross the State.

Our two-year Aboriginal CustomerService Traineeship Scheme(ACSTS) providing training inregional Motor Registries, due to end in September 2000, is being replaced with a nationallyaccredited NSW registeredtraineeship program offering eight positions in regional andmetropolitan locations. Thepositions will attract State andFederal Government funding,salary and training subsidies.

We employed Australia’s firstAboriginal female engineer who recently graduated aftercompleting a six year RTAengineering cadetship under ajoint State and Federal incentivescheme for Aboriginal and TorresStrait Islanders.

Our Aboriginal EmploymentEquity Plan 1998–2003, for whichwe received the 1999 Premier’sPublic Sector Gold Award, haswithin its objectives, the designand delivery of cultural awarenessworkshops across the RTA, basedon business needs. The aim is toensure that all staff gain a primaryunderstanding of Aboriginalculture, and can provide qualityservice to the Aboriginalcommunity, based on customerand local service delivery needs.

We sponsored a female AboriginalLiaison Officer to attend the World Indigenous Conference inHonolulu in August 1999 andprovided a senior managementpresenter at the recent NSWReconciliation Convention as well as sponsoring 10 delegates to the convention.

ETHNIC AFFAIRSWe provide services to people inthe most culturally diverse Statein Australia. Our vast and diverserange of customers includeindividuals, private organisations,community and road transportgroups, local councils and StateGovernment agencies.

In all our road safety and trafficmanagement public educationcampaigns conducted ingeographic areas with ethnicpopulations, we met therequirements for ethnic advertisingas stated by the Government forprint and electronic media.

We spent $468,937 advertisingin the ethnic media in 1999/2000.

Materials for numerous publiceducation initiatives, roadprojects, and driver licensinginformation are printed in several community languages.

Publications on safe cycling,passenger safety, pedestriansafety and safe play are availablein Arabic, Vietnamese, Italian,Chinese, Spanish and GreekCroatian, Filipino, Khmer,Portuguese, Russian, Samoan,Serbian, Spanish, Tongan, Turkishand Vietnamese. Interpreterswere available at school safetycommittees for ethnic families tobetter understand road safetyissues for children.

PEOPLE LESS MOBILEOur Disability Action Plan wasdeveloped and the followingactions taken:

– we initiated design andfabrication of four poles toaccommodate the solarpowered/cellular network (GSM)roadside emergency phones. The main design variation was a reduction in the height of thecavity where the telephone sitsfrom 950mm to 780mm toimprove access for people inwheelchairs

– our staff bulletin board link onour internal intranet site containsdisability related web sites andorganisations with an interest indisability issues

– we engaged registered architectsto undertake the design ofbuilding fitout and extensionworks to ensure all relevantstandards were complied with

– we included the words‘including those requiringadjustment at work’ in ouremployment advertisements

– over the past few years, MirandaMotor Registry has assisted theMinerva Special School atSutherland prepare schoolstudents with special learningneeds to apply for a driver’slicence. The program is part ofour ongoing involvement withcommunity projects and ameans of promoting road safety

– we provided school crossingsupervisors (SCS) at an annualcost of $2 million to assist schoolchildren cross the road safely.This is extremely helpful tochildren with a disability asnearly 89 percent of NSWchildren with a disability (around76,600 children) attend school.The program also providedemployment opportunities forpeople with a disability and/orolder people as school crossingsupervisors

– our mobility parking schemecontinued to operate with ourbrochure including a tear-offsection that allowed people witha disability or older people toeducate others who misused theparking spaces

– our special disability driving test allowed disabled driversadditional time for their test, and

– our circular on modified vehiclesfor people with a disability andour register of persons authorisedto make modifications wasupdated and published.

Our comprehensive OHS plan,covering our own people andcontractors, includes policies,standards and performanceindicators to guide and measureour progress in achieving a saferwork environment.

Achievements for the yearincluded:

– a saving of $6.33 million (inrebate from the 1996/97 premium)and $1.55 million in the workers’compensation deposit premiumpayment, and associated costs,through OHS and injurymanagement strategies. Thisincluded the availability of suitable duties to allow carefullymonitored return to work

– a 10 percent reduction in workers’compensation claims fromprevious year down from 11.1claims per 100 employees in1998/99 to 10.0 claims per 100 employees in 1999/2000

– the receipt of the Premier’sPublic Sector Award (in thecorporate services reformcategory) and Public Sector RiskManagement Award (fromGIO/Treasury Managed Fund) for our OHS program, and

– the development and launch of the RTA Contractor Healthand Safety Information Pack forcontractors wanting to do workfor the RTA. The pack is alsoavailable on our internet site.

Despite our efforts anddemonstrable improvements inOHS performance there weretwo workplace fatalities recordedduring the year. One of theseresulted from a vehicle accidentwithin a work site and the other from skin cancer due to exposure to the sun overmany years.

Our Ethnic Affairs prioritystatement:

We provide services to

people in the most culturally

diverse State in Australia.

Our vast and diverse range

of customers include

individuals, private

organisations, community

and road transport groups,

local councils and State

Government agencies.

We are committed to

delivering quality services to

road users and customers,

including the ethnic

communities, people with

disabilities, pedestrians and

cyclists. We will continue to

implement our Ethnic

Affairs programs throughout

2000/2001. Most will be

accomplished in the current

financial year whilst others,

to be successfully integrated

and adopted, may take

longer.

ABORIGINAL LIAISON OFFICERS PLAYAN IMPORTANT ROLE IN THE RTA.

RTA A_Report NEW GUTTER 30/11/00 10:00 AM Page 63

Page 66: RTA Annual Report 2000 See Pg 24

CARING FORTHE ENVIRONMENT

(64) Roads and Traffic Authority Annual Report 2000

>>RTA A_Report NEW GUTTER 30/11/00 10:00 AM Page 64

Page 67: RTA Annual Report 2000 See Pg 24

(65) Roads and Traffic Authority Annual Report 2000

> TWO COMPENSATORY FROG PONDSHAVE BEEN BUILT AT ARNCLIFFE FOR THEGREEN AND GOLDEN BELL FROG,ADJACENT TO THE M5 EAST MOTORWAY

RTA A_Report NEW GUTTER 30/11/00 10:00 AM Page 65

Page 68: RTA Annual Report 2000 See Pg 24

(66) Roads and Traffic Authority Annual Report 2000

The RTA recognises that the roadnetwork and the community’suse of roads affects both thenatural and built environment as well as the patterns of life ofindividuals and communities.Environmental planning andmanagement is a core part of our business. In recognition ofthis we work cooperatively withcommunities and all levels ofgovernment on environmentalissues while also developing and implementing strategies, policies and procedures to ensure improved RTA-wideenvironmental performance.

ROADS AND NOISEWe apply the NSW GovernmentEnvironmental Criteria for RoadTraffic Noise to all new road androad redevelopment projects.The site specific requirements of each project are taken intoaccount in the design process to meet the criteria, subject toan assessment of practicality,cost-effectiveness, visual impacts, equity issues andcommunity preferences.

Stages of project developmentwhere potential road traffic noiseimpacts are examined beginwith the initial network analysis,route/option selection, conceptdesign, detailed design rightthrough to construction andcompletion.

Construction noise emissions are assessed against the EPA’sconstruction noise guidelines as part of the environmentalimpact assessment andsubsequent environmentalmanagement processes.

Funding was allocated throughthe Noise Abatement Program to reducing noise on selectedexisting State and Federal Roads.A variety of methods was usedincluding barriers, earth mounds,architectural acoustic treatmentsand quieter pavement surfaces.See Figure 13.

CARING FOR THEENVIRONMENT

0

3

6

9

$ M

illio

ns

12

15

1999/001998/991997/981996/971995/96

Total Expenditure State Expenditure Federal Expenditure

Figure 13 – Noise Abatement Program Expenditure Summary In all, $5.54 million was spent on State Roads benefiting 177residences, two schools, onepublic reserve and one caravanpark and $1.89 million on Federal Roads, benefiting 113residences and one school.Locations included Sydney, theBlue Mountains and the Southern,Hunter and Northern Regions.

ENVIRONMENTAL IMPACT

ASSESSMENTWe undertake environmentalassessments of proposed projectsto determine the significance oflikely impacts on the environmentand to develop measures toavoid or minimise these impacts.

Environmental Impact Statements(EIS) are prepared where impactsare likely to be significant underPart 5 of the EnvironmentalPlanning and Assessment Act,1979 or where the proposeddevelopment is designatedunder Part 4 of the Act. EISsdetailing the significance of likelyimpacts on the environment and outlining measures tominimise them were exhibitedfor the following major roaddevelopments:

Pacific Highway Upgrading:– Karuah bypass (55km north of

Newcastle)– Bangalow–St Helena (35km

north of Ballina) – Coopernook–Moorland (25km

north of Taree)

Great Western Highway Upgrading:– Little Hartley (16km east of

Lithgow)– Princes Highway – Trunkatabella

Creek Bridge Replacement(17km south of Moruya).

We prepared 403 Reviews ofEnvironmental Factors (REFs) ofproposed works across the State.REFs assist us in consideringenvironmental matters whendeciding whether a proposal is likely to significantly affect the environment.

RTA A_Report NEW GUTTER 30/11/00 10:00 AM Page 66

Page 69: RTA Annual Report 2000 See Pg 24

(67) Roads and Traffic Authority Annual Report 2000

THREATENED FLORA We have commitments in fourplans of recovery for threatenedflora species as established underthe Threatened SpeciesConservation Act, 1995. They are:

– Acacia pubescens (Downy Wattle)Sydney region

– Microtis angusii (Angus’ OnionOrchid) Sydney region

– Grevillea caleyi (Caley’s Grevillea),Sydney region

– Eleocharis tetraquetra (Square-stemmed Spike-rush) mid-NorthCoast region.

A detailed report on our actionto meet our commitments isprovided in Appendix 5.

THREATENED FAUNA

Compensatory Frog Ponds

A population of the endangeredGreen and Golden Bell Frog(Litoria aurea) exists at Arncliffe,adjacent to the M5 EastMotorway development. Thepopulation has declined inrecent years due to deteriorationof the habitat. The route of theM5 East does not impact on the primary habitat of the frogpopulation, but does affect theirforaging habitat. To compensatefor the loss of foraging habitat,the RTA has constructed twocompensatory frog ponds. Tocontribute to the conservationand management of the Greenand Golden Bell Frog, the RTAsupplied four adult frogs fromthe Arncliffe site (two males andtwo females) to Taronga Zoo foruse in their captive breedingprogram. Captive bred Greenand Golden Bell Frog tadpoleswere released in January 2000 at the Arncliffe compensatoryponds. These actions haveassisted in the long term survivalof the Green and Golden BellFrog population in the local area.

Koalas and roads

A major six-year researchprogram investigated the impactof road development on koalapopulations. Two Pacific Highwaydevelopment projects that passadjacent to koala populations are being used as trial sites. TheAustralian Museum is currentlymonitoring the movementpatterns and home ranges of the koalas, and will continue tomonitor their movements duringthe construction and operation ofnew roads. This project will seekto determine the success of faunamitigation measures in providingsafe passage across roads, andwill improve our ability tominimise impacts on koalas and other fauna in the future.

NATURAL AND CULTURAL

HERITAGEWe received the Energy AustraliaNational Trust Heritage Awardfor the Study of the RelativeHeritage Significance of TimberTruss Road Bridges in NSW atthe annual National TrustHeritage Awards. Heritageinformation on bridges in thestudy was incorporated into ourHeritage and ConservationRegister. The register, arequirement under Section 170of the NSW Heritage Act 1977,assists in asset management bylisting and providing informationon assets in our ownership, careor control which have heritagesignificance. During the year theregister was made available onour web site. The status of itemscurrently on the register isshown in Appendix 4.

Other achievements included:– completion of our Heritage

Strategic Plan drawing togetherthe many facets of heritagemanagement and providingdirection for management to2004

– the Heritage Committee, whichmet quarterly, provided aproactive approach to heritageissues and gave advice ondevelopment of policy andmanagement of our heritageportfolio, and

– guidelines were drawn up givinga clear direction for the RTA OralHistory program set up in 1997to record interviews with peoplewho have historical knowledgeabout roads, bridges and relatedarchival topics.

MANAGING OUR ROADSIDESWe supported the NSW RoadsideEnvironment Committee whichencouraged and assisted roadsidemanagers such as local councils,Rural Lands Protection Boards,utility providers and Landcaregroups to improve theirmanagement of importantnatural, cultural and economicresources on roadsides and stockroutes. Specific programs andactivities included:

– conducting regional,multidisciplinary workshops on best practice roadsideenvironmental management.Workshops were held in Bega,Nyngan and Lismore. Thecommittee also joined withEnvironment Australia and theEnvironment Protection Authority(EPA) in conducting workshops inGunnedah and Rylstone

– participation in the NSWGovernment's litter preventionprogram, involving State andLocal Government agencies and community organisations

– continuing development of anaccredited curriculum on linear reserve conservation, incollaboration with the IndustryTraining Advisory Boards forForestry, Public Sector,Construction and PrimaryIndustries. Development of thecurriculum was funded by theNSW Department of Education

– provision of publications andadvice on the development ofroadside environmentalmanagement plans. A bulletinoutlining progress and activitieswas published and distributed in April 2000 and a Landcarepackage developed anddistributed through more than30 Landcare publications, and

– research into the costs andbenefits of a variety of roadsidemanagement techniques,currently being carried out bythe University of Western Sydney.

A two-year Roadside Assessmentand Management Program was set up to develop plans forroadsides across NSW. It willinclude an assessment of roadsidenatural and cultural resources andpreparation of plans to assist inprotecting these resources duringroad maintenance activities.

CENTRAL WEST ROADSIDE

CORRIDOR PROJECT

1999/2000 This is a joint RTA-GreeningAustralia initiative aimed atpreserving and enhancingroadside corridors and enhancingtheir value. The project links Statehighways between Lithgow in theeast, Marsden in the southwestand Gilgandra in the north.

Two guidelines were completedduring the year: State Highway 6Mid-Western Highway RoadsideManagement Guidelines andState Highway 27 GoldenHighway Roadside ManagementGuidelines.

Significantly, approximately25,000 trees were planted and6km of direct seeding carriedout at 20 different sites. Amonitoring system to measurethe success of roadside treeplanting and direct seeding wasestablished. From commencementof the project an average survivalrate of 82 percent of trees plantedwas achieved and a directseeding average of 16 plants per 100m of roadside.

All existing roadside corridorassessment data for the CentralWest region was put onto aspatial information system toincrease access to datathroughout the region.

RTA A_Report NEW GUTTER 30/11/00 10:00 AM Page 67

Page 70: RTA Annual Report 2000 See Pg 24

(68) Roads and Traffic Authority Annual Report 2000

MANAGING WATER

QUALITY Our core business of roaddevelopment and managementincorporates many activities thatmay impact on the water qualityof inland waterways and estuarineenvironments. Consequently wehave developed appropriatewater quality managementpolicy and procedures. Keywater quality managementinitiatives were:

– development of a trainingprogram on our watermanagement system. A seminarseries for our staff working inenvironment management,project management, assetmanagement and maintenancewill be delivered in 2000/2001.

– communicating the intent anddirection of our Code of Practicefor Water Management – RoadDevelopment and Maintenance

– assessment of the technicalcomponents of the NSWDepartment of Housing’s manualManaging Urban Stormwater

– development of a practical guideand user friendly model for thesizing of sedimentation basinsfor RTA projects, and

– review and update of the watermanagement sections of ourRoad Design Guide.

STORMWATER

ENVIRONMENT

IMPROVEMENT PROGRAMWe continued to work with localcouncils in the preparation ofstormwater management plans(SMPs) with priority given tourban catchments. A revisedStormwater EnvironmentImprovement Program wasdeveloped comprising actionsidentified in the SMPs to helpcouncils implement the SMPs.We also began investigatingtreatment options for StateRoads as identified in the SMPs.

Tunnel ventilation workshop

In June 2000, the RTA convenedan International Workshop onTunnel Ventilation which broughtexperts in a range of technicaldisciplines from around theworld to Sydney. The Workshop'saim was to foster the exchangeof knowledge and ideas abouttunnel ventilation techniques,technologies and strategies that are being used around theglobe. It provided a uniqueforum in which experts andcommunity representatives couldexplore the different aspects ofroad tunnel ventilation designand operations.

Integrated land use andtransport planning

The RTA is ensuring that newresidential developments andemployment areas are integratedwith Sydney's public transportsystem. As an example, the ADIsite at St Marys will be served by two transitways with directconnection to Penrith and StMarys Stations. In addition,planning has involved cyclewaysand pedestrian facilities designedto reduce the level of car activitypreviously associated with‘‘greenfields’’ site development.

As well, the RTA has commencedrevising its Guide to TrafficGenerating Developments tosupport Action for Air and otherGovernment initiatives that would moderate traffic growth.We are working closely with theDepartment of Transport and theDepartment of Urban Affairs andPlanning in developing guidelinesfor integrating land use andtransport planning.

MANAGING AIR QUALITY

Action for air

The RTA contributes to the NSWGovernment’s Action for Air planby implementing several majorinitiatives to encourage the use of public transport. Theseinclude the provision of bus-onlytransitways, dedicated bus lanesand bus priority signalling on keyroad transport corridors and cross-regional bus routes, electronic buspassenger information systems,and greater use of publictransport for special events, asemphasised in the managementof Olympic test events.

As well as being good for yourhealth, cycling and walking areenvironmentally friendlyalternatives to travel by car. Our implementation of Action forBikes – BikePlan 2010 is workingtowards a comprehensive, linkedbicycle network, to provideaccess for people to cycle totheir desired destinations andmake cycling a more attractiveoption. Similarly, developingPedestrian Access and MobilityPlans will lead to improvedaccessibility and quality ofpedestrian environments.Teleworking initiatives such asthe provision of telecentres andprograms associated with theOlympics are further influencingtransport choices.

This encouragement of publictransport, cycling, walking andteleworking will benefit airquality and contribute to thetargets in Action for Transport onlimiting the growth of traffic.

Another important initiative isthe development of the M5 East Subregional Air QualityManagement Plan that willinvestigate local sources of airpollutants and develop strategiesto improve the local air quality.The Plan is being developed inconsultation with communityand local governmentrepresentatives.

THE RTA WORKED WITH MEMBERSOF THE LOCAL COMMUNITY INTHE CENTRAL WEST ROADSIDECORRIDOR PROJECT.

RTA A_Report NEW GUTTER 30/11/00 10:00 AM Page 68

Page 71: RTA Annual Report 2000 See Pg 24

(69) Roads and Traffic Authority Annual Report 2000

RECYCLING – A USER

AND SUPPLIERThe RTA is a participant in therecycling market, both in the use of recycled materials for newwork and in the promotion ofrecycling of its waste materialssuch as asphalt pavement, spoil,bridge timber, greenwaste,vehicle licence plates and other recyclable metals. We alsopurchase waste products fromheavy industry such as slag, and fly ash for use onconstruction projects.

RTA ENERGY

CONSUMPTIONEnergy use for 1999/2000 isreported in the 2000 RTAEnvironment Report due forrelease in early 2001.

ENVIRONMENTAL

MANAGEMENT SYSTEM An important milestone in our continual improvement ofenvironmental performance wasthe release in June of the RTAEnvironmental Management System(EMS) Manual. The manualformalises our environmentalmanagement direction anddescribes the planning,implementation, reporting andreview mechanisms that are inplace for improving overallenvironmental performance. It includes:

– requiring contractors seekingwork on major RTA projects tohave their own accredited EMS

– establishment of an environmentallegislation register, easilyaccessible on our internal intranet,to help staff identify theirobligations under environmentallegislation, and

– implementation of a newcontract specification forenvironmental managementmaintenance works.

The EMS completed in July 1999by our Operations Road ServicesBranch was accredited in August 1999 and our ClientServices Directorate EMS Manual,the last of three major projectmanagement systems ClientServices has produced over the last 18 months, was alsocompleted and made available to staff.

REGULATORY COMPLIANCEA penalty infringement notice,carrying a fine of $1,500, wasissued to the RTA in February for inappropriate cleaning of abitumen sprayer at a roadsidestockpile site near Bowenfels. The infringement related toundertaking the activity in alocation that created thepotential to pollute waters.

ENVIRONMENTAL

REPORTINGWe produced our second RTAEnvironment Report which was also published on our website.

RESEARCH AND

DEVELOPMENTA number of projects wereundertaken, including:

Sleep disturbance

Research was carried out on the relationships between noisemeasures, sleep disturbance,cardiovascular effects andwakefulness the next day. The project also deliveredmethodologies that could beused in future studies to gainfurther understanding of therelationship between road trafficnoise and sleep disturbance.

Base-line noise study

This project involves identifyingambient noise levels and noisesensitive localities in theNewcastle and Wollongongregions using monitored andmodelled data. The project willbe completed in 2000 and willassist in developing noiseabatement program priorities.

Vehicle wake modelling

This project aims to quantify the impact of vehicle waketurbulence on the dispersion andconcentration of traffic-generatedair pollution near roads. Thework was awarded to theUniversity of New South Wales as a three year Ph.D project.

The study includes investigatingthe wake turbulence effect of airpollutants from multiple vehiclesincluding trucks, buses and cars.

Open and sheltered valleys

A project to monitor roadside airquality in open and shelteredvalleys was begun. It aims toprovide information on dispersionpatterns in valleys and assist withthe assessment of dispersionmodel performances.

The monitoring work at shelteredvalley sites was completed and a draft report on the resultssubmitted to the RTA. Themonitoring work at open valleyswill commence once the selectionof suitable sites is finalised.

Overpasses for possums and other marsupials

Methods to encourage the safepassage of arboreal (tree living)marsupials such as ringtailpossums and gliders across roads were investigated by theAustralian Museum. The researchincluded monitoring themovement patterns of possumsand gliders in relation to roads.Trial structures were erectedadjacent to roads in the Sydneyand South Coast regions andmonitoring equipment installed totest whether they are being usedby arboreal fauna. Preliminaryresults are encouraging and theresearch will continue into thenext financial year.

Roadside fencing to

protect fauna

Fauna fencing along selectedroadsides has been in existencefor some time. The purpose ofthe fencing is to prevent nativefauna from crossing roads and to direct fauna to safe crossingpoints such as underpasses.Research is continuing ondeveloping installation andmaintenance principles to ensurethe fences remain effective in the long term.

WHAT’S AHEAD FOR THE

RTA AND THE

ENVIRONMENT

Habitat Edge Effects

The development of roads oftencreates changes to naturalhabitat adjacent to the clearedroad corridor. These changes arecalled habitat edge effects. Weare investigating the extent andimpact of these habitat edgeeffects so that appropriateresponses can be determined.This investigation will also assist in the development of policy and guidelines for the provisionof mitigation measures.

Noise management andabatement

A noise management manual will be completed to assist staffand contractors to manage road traffic noise, vehicle noise,construction noise and vibration.The provision of noise abatementmeasures for existing roads willcontinue in 2000/01 using $3.25million of allocated State fundingand $0.75 million of allocatedFederal funding.

Heritage and conservation

Our Heritage and ConservationRegister is scheduled to becompleted within the next twoyears. Studies of three of our sixregions will be undertaken in thecoming year.

Theme-based studies of groupsof heritage items will continuewith a study of pre-1930s castand wrought iron bridges.

The next RTA Oral History projectwill be the Construction of theGladesville Bridge. Interviews forthe "Developments in VehicleRegistration, Driver Testing andLicensing Procedures" oral historywere completed during the year.A compilation tape will be placedon the RTA website next year.

Sediment Basins

Funding was approved for theassessment of deposited sediment in sedimentation basins. This project will determinethe pollutant concentrations in deposited material insedimentation basins and assessthe annual input to basins. Keyobjectives are to provide:

– information for the design ofsedimentation basins

– a basis for monitoringrequirements for basins, and

– information for assessment ofdisposal options for sediments.

Environmental ManagementSystems (EMS)

Our Environmental Strategic Plan will be reviewed in the year ahead and organisationalperformance measures furtherdeveloped to evaluate ourenvironmental performance.Performance against thesemeasures will be recorded infuture reports. Contractorsseeking work on mid-sizedprojects will be required to havean EMS accredited with the RTA.

RTA A_Report NEW GUTTER 30/11/00 10:00 AM Page 69

Page 72: RTA Annual Report 2000 See Pg 24

(70) Roads and Traffic Authority Annual Report 2000

CORPORATEGOVERNANCE

We implemented corporategovernance practices to achievehigh standards of business ethicsand accountability throughout theorganisation and to ensure wedelivered cost effective productsand services to the community.

STATUTORY FRAMEWORKThe RTA is a NSW statutoryauthority established under theTransport Administration Act1988. We administer theTransport Administration Act1988, the Roads Act 1993, RoadTransport (General Act) 1999,Road Transport (Safety and TrafficManagement) Act 1999, MotorVehicles Taxation Act 1988, RoadTransport (Heavy VehiclesRegistration) Act 1995, RoadTransport (Driver Licensing) Act1998, Road Transport (VehicleRegistration) Act 1999 and theDriving Instructors Act 1992.

CORPORATE STRUCTUREOur Chief Executive is responsibleand accountable to the Ministerfor Roads and Parliament for ouroverall performance and forensuring we perform in a mannerconsistent with legislativecompliance and best practiceprinciples. Senior management,advisory bodies and committees(see Appendix 6) assist the ChiefExecutive in his duties.

AUDIT COMMITTEEAn Audit Committee is chairedby the Chief Executive andcomprises our senior executives,a non-public sector representativefrom the audit profession and anobserver from the Audit Office of NSW.

The committee meets everythree months to advise the ChiefExecutive, consider progressunder the strategic audit plan,generally oversee the direction of the audit function and toconsider our financial controland reporting systems. It makesan effective contribution tointernal controls and improvedaccountability by monitoring the implementation of auditrecommendations arising fromthe audit reports.

CODE OF CONDUCT

AND ETHICSThis details the standards andvalues we apply in relationshipswith customers, contractors,employees and the community.The code is reviewed regularlyand enhanced to ensure itprovides practical assistance tostaff on standards of behaviourand in solving ethical issues.

STRATEGIC AND BUSINESS

PLANNINGThe Chief Executive and seniormanagement set the corporateobjectives and strategies in linewith NSW Government prioritiesand the community’s road basedtransport needs. Our CorporateStrategic Plan, The Journey Ahead1998–2003, sets out our visionand priorities. It is supportedwith five-year strategic andbusiness plans that are reviewedannually. Progress is monitoredand reported against these plans and against communityoutcomes. Strategic managementand planning is a cyclic processinvolving analysis of internal andexternal environments, strategicdevelopment and planning,service delivery and performancemonitoring and evaluation.

CORPORATE CREDIT AND

PURCHASING CARDSThe introduction and use ofcorporate credit and purchasingcards throughout the RTA hasbeen in accordance with thePremier’s memoranda and theTreasurer’s Directions.

YEAR 2000 COMPLIANCEThe RTA's systems operatednormally during and after thechangeover from 1999 to 2000.For more information seeAppendix 15 for the Y2KCompliance Report.

EXECUTIVE APPOINTMENTS

AND REMUNERATIONThe Minister for Roads isresponsible for approving theChief Executive’s appointmentand contract. The Chief Executiveis responsible for approvingdirectors’ appointments andcontracts. These contracts mayhave a duration of up to five yearsand include annual performanceagreements.

The Chief Executive’sremuneration is determined bythe Minister for Roads and theChief Executive determines theremuneration of directors inaccordance with determinationsissued by the Statutory andOther Offices RemunerationTribunal on 1 October of eachyear (see also Appendix 7).

RTA A_Report NEW GUTTER 30/11/00 10:00 AM Page 70

Page 73: RTA Annual Report 2000 See Pg 24

FINANCIALSTATEMENTS

(71) Roads and Traffic Authority Annual Report 2000

RTA A_Report NEW GUTTER 30/11/00 10:00 AM Page 71

Page 74: RTA Annual Report 2000 See Pg 24

(72) Roads and Traffic Authority Annual Report 2000(72) Roads and Traffic Authority Annual Report 2000

73 Independent Audit Report

74 Statement by Chief Executive and Director Finance

75 Operating Statement

76 Statement of Financial Position

77 Statement of Cash Flows

78 Program Statement – Expenses and Revenues

80 Summary of Compliance with Financial Directives

Notes To and Forming Part of the Financial Statements

82 Summary of Significant Accounting Policies

88 Expenses

91 Revenues

92 Gain/(Loss) on Sale of Non-Current Assets

92 Abnormal Items

92 Appropriations

93 Programs/Activities of the Agency

94 Current Assets – Cash

94 Current Assets – Investments

95 Current/Non-Current Assets – Receivables

95 Non-Current Assets – Land and Building, Plant and Equipment and Infrastructure Systems

100 Current/Non-Current Assets – Other

103 Current Liabilities – Accounts Payable

103 Current/Non Current Liabilities – Borrowings

104 Financial Instruments

106 Current/Non Current Liabilities – Employee Entitlements

107 Current/Non- Current Liabilities – Other Liabilities

108 Changes in Equity

108 Commitments for Expenditure

109 Contingent Assets

109 Contingent Liabilities

109 Native Title

109 Year 2000

110 Budget Review

111 Cash and Cash Equivalents

111 Reconciliation of Net Cost of Services to Net Cash Flows from Operating Activities

111 End of Audited Financial Statements

112 Supplementary Financial Information

>

RTA FINANCIALS MELINDA 14.11 4/12/00 12:41 PM Page 72

Page 75: RTA Annual Report 2000 See Pg 24

(73) Roads and Traffic Authority Annual Report 2000

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 73

Page 76: RTA Annual Report 2000 See Pg 24

(74) Roads and Traffic Authority Annual Report 2000

ROADS AND TRAFFIC AUTHORITYYear Ended 30 June 2000

Pursuant to Section 41C (1B) and (1C) of the Public Finance and Audit Act 1983, we declare that in our opinion:

1. The accompanying financial statements exhibit a true and fair view of the Authority’s financialposition as at 30 June 2000 and transactions for the year then ended.

2. The statements have been prepared in accordance with the provisions of the Public Finance andAudit Act 1983, the Public Finance and Audit (General) Regulation 1995, the Treasurer’s Directionsand the directives of the Financial Reporting Code.

Further, we are not aware of any circumstances which would render any particulars included in thefinancial statement to be misleading or inaccurate.

Noel HancockA/Director, Finance31August 2000

Paul ForwardChief Executive 31 August 2000

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 74

Page 77: RTA Annual Report 2000 See Pg 24

(75) Roads and Traffic Authority Annual Report 2000

OPERATING STATEMENTRoads & Traffic Authority for the year ended 30 June 2000

1999/2000 1999/2000 1998/1999Actual Budget Actual

Notes $’000 $’000 $’000

ExpensesOperating ExpensesEmployee Related 2(a) 140,011 178,266 180,652Other Operating Expenses 2(b) 316,176 280,675 257,961

Maintenance 2(c) 609,971 605,026 676,524Depreciation and Amortisation 2(d), 24 443,098 18,973 124,213Grants and Subsidies 2(e) 33,662 25,020 18,452Finance Costs 2(f) 78,654 97,600 110,664Other Expenses 2(g) – – 228,652

Total Expenses 1,621,572 1,205,560 1,597,118

Less:

Retained RevenueSale of Goods and Services 3(a) 143,890 122,059 128,504Investment Income 3(b) 18,247 20,006 23,859Retained Taxes, Fees and Fines 3(c) 3,203 3,424 2,235Grants and Contributions 3(d) 39,914 12,001 23,352Other Revenue 3(e), 5, 24 1,737,638 27,061 1,802,928

Total Retained Revenue 1,942,892 184,551 1,980,878

Gain/(Loss) on Sale of Non-Current Assets 4 783 – (1,298)

NET COST OF SERVICES 24, 26 (322,103) 1,021,009 (382,462)

Government ContributionsRecurrent Appropriation 6 1,042,464 1,020,478 971,058Capital Appropriation 6 853,151 847,394 875,022

Total Government Contributions 1,895,615 1,867,872 1,846,080

SURPLUS/(DEFICIT) FOR THE YEAR 2,217,718 846,863 2,228,542

The accompanying notes form part of these statements.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 75

Page 78: RTA Annual Report 2000 See Pg 24

(76) Roads and Traffic Authority Annual Report 2000

STATEMENT OF FINANCIAL POSITIONRoads & Traffic Authority as at 30 June 2000

1999/2000 1999/2000 1998/1999Actual Budget Actual

Notes $’000 $’000 $’000

ASSETS

Current AssetsCash 8 41,334 40,573 22,818Investments 9 4,477 41 4,260Receivables 10 26,975 18,827 27,887Inventories 7,865 5,900 7,101Other 12 2,146 1,436 2,415

Total Current Assets 82,797 66,777 64,481

Non Current AssetsLand and Buildings 11 2,490,894 2,166,819 1,844,684Plant and Equipment 11 78,913 97,493 85,358Infrastructure Systems 11 44,992,883 42,421,830 44,302,467Receivables 10 48,413 50,887 43,662Other 12 670,543 574,340 625,182

Total Non Current Assets 48,281,646 45,311,369 46,901,353

Total Assets 48,364,443 45,378,146 46,965,834

LIABILITIES

Current LiabilitiesAccounts Payable 13 251,393 280,037 255,923Borrowings 14 149,563 54,854 271,456Employee Entitlements 16 96,885 75,683 96,696Other 17 41,367 37,348 36,637

Total Current Liabilities 539,208 447,922 660,712

Non Current LiabilitiesBorrowings 14 890,509 978,141 680,147Employee Entitlements 16 204,659 317,940 325,170Other 17 442,447 442,319 455,686

Total Non Current Liabilities 1,537,615 1,738,400 1,461,003

Total Liabilities 2,076,823 2,186,322 2,121,715

Net Assets 46,287,620 43,191,824 44,844,119

EQUITY

Reserves 18 9,036,811 4,401,131 5,495,529Accumulated Funds 18 37,250,809 38,790,693 39,348,590

Total Equity 46,287,620 43,191,824 44,844,119

The accompanying notes form part of these statements.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 76

Page 79: RTA Annual Report 2000 See Pg 24

(77) Roads and Traffic Authority Annual Report 2000

STATEMENT OF CASH FLOWSRoads & Traffic Authority for the year ended 30 June 2000

1999/2000 1999/2000 1998/1999Actual Budget Actual

Notes $’000 $’000 $’000

CASH FLOWS FROM OPERATING ACTIVITIES

PaymentsEmployee Related (187,957) (182,367) (158,766)Grants and Subsidies (33,662) (25,020) (18,452)Finance Costs (96,372) (97,600) (112,137)Other (979,585) (874,682) (962,378)

Total Payments (1,297,576) (1,179,669) (1,251,733)

ReceiptsSale of Goods and Services 139,067 123,084 128,954Retained Taxes, Fees and Fines 3,203 3,424 2,235Investment Income Received 18,247 16,898 20,751Other 37,069 12,001 23,352

Total Receipts 197,586 155,407 175,292

Cash Flow from GovernmentRecurrent Appropriation 1,042,464 1,020,478 971,058Capital Appropriation 853,151 847,394 875,022

Net Cash Flows from Government 1,895,615 1,867,872 1,846,080

NET CASH FLOWS FROM

OPERATING ACTIVITIES 26 795,625 843,610 769,639

CASH FLOWS FROM INVESTING ACTIVITIES

Proceeds from Sale of Land and Buildings, Plant and Equipment and Infrastructure Systems 41,115 33,132 76,870

Purchases of Land and Buildings, Plant andEquipment and Infrastructure Systems (911,656) (977,342) (817,238)

NET CASH FLOWS FROM

INVESTING ACTIVITIES (870,541) (944,210) (740,368)

CASH FLOWS FROM FINANCING ACTIVITIES

Proceeds from borrowings and advances 110,000 110,000 –Repayment of Borrowings and Advances (16,351) (22,400) (157,317)

NET CASH FLOWS FROM

FINANCING ACTIVITIES 93,649 87,600 (157,317)

NET INCREASE/(DECREASE) IN CASH 18,733 (13,000) (128,046)

Opening Cash and Cash Equivalents 27,037 53,573 155,083

CLOSING CASH AND CASH EQUIVALENTS 25 45,770 40,573 27,037

The accompanying notes form part of these statements.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 77

Page 80: RTA Annual Report 2000 See Pg 24

(78) Roads and Traffic Authority Annual Report 2000

PROGRAM STATEMENT – EXPENSES AND REVENUESRoads & Traffic Authority for the year ended 30 June 2000

Road Safety & Road*Road Network Infrastructure User Management Traffic & Transport

1999/2000 1998/1999 1999/2000 1998/1999 1999/2000 1998/1999$’000 $’000 $’000 $’000 $’000 $’000

EXPENSESOperating ExpensesEmployee Related 6,221 10,555 117,925 151,482 15,865 18,615Other Operating Expenses 38,017 38,674 163,376 133,581 78,574 55,252

Maintenance 539,121 606,281 – – 70,850 70,243Depreciation and Amortisation 435,458 113,520 6,655 9,032 985 1,661Grants & Subsidies 27,409 13,624 6,080 4,553 173 275Finance Costs 78,602 110,597 52 67 – –Other Expenses – 228,652 – – – –

Total Expenses 1,124,828 1,121,903 294,088 298,715 166,447 146,046

Retained RevenueSale of Goods and Services 79,699 73,862 59,093 51,485 5,098 3,157Investment Income 17,980 22,320 118 741 149 798Retained Taxes, Fees and Fines 691 669 2,512 1,566 – –Grants and Contributions 30,597 9,043 4,043 6,622 5,274 7,687Other Revenue 1,737,638 1,802,928 – – – –

Total Retained Revenue 1,866,605 1,908,822 65,766 60,414 10,521 11,642

Gain (Loss) on Sale of Non-Current Assets 783 (1,298) – – – –

NET COST OF SERVICES (742,560) (785,621) 228,322 238,301 155,926 134,404

Government Contributions ** – – – – – –

NET EXPENDITURE/(REVENUE) (742,560) (785,621) 228,322 238,301 155,926 134,404

ADMINISTERED REVENUES

See Note 1(c)

Consolidated Fund– Taxes, Fees and Fines – – – – – –– Other – – – – – –

Total – – – – – –

** The description and objectives of each program are summarised in Note 7.

** Appropriations are made on an agency basis and not to individual programs. Consequently, government contributions are included in the ‘Not Attributable’ column.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 78

Page 81: RTA Annual Report 2000 See Pg 24

(79) Roads and Traffic Authority Annual Report 2000

M4 / M5 Cashback Scheme Not Attributable Total

1999/2000 1998/1999 1999/2000 1998/1999 1999/2000 1998/1999$’000 $’000 $’000 $’000 $’000 $’000

– – – – 140,011 180,65236,209 30,454 – – 316,176 257,961

– – – – 609,971 676,524– – – – 443,098 124,213– – – – 33,662 18,452– – – – 78,654 110,664– – – – – 228,652

36,209 30,454 – – 1,621,572 1,597,118

– – – – 143,890 128,504– – – – 18,247 23,859– – – – 3,203 2,235– – – – 39,914 23,352– – – – 1,737,638 1,802,928

– – – – 1,942,892 1,980,878

– – – – 783 (1,298)

36,209 30,454 – – (322,103) (382,462)

– – 1,895,615 1,846,080 1,895,615 1,846,080

36,209 30,454 (1,895,615) (1,846,080) (2,217,718) (2,228,542)

– – 340,429 291,888 340,429 291,888– – 509,233 571,258 509,233 571,258

– – 849,662 863,146 849,662 863,146

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 79

Page 82: RTA Annual Report 2000 See Pg 24

(80) Roads and Traffic Authority Annual Report 2000

SUMMARY OF COMPLIANCE WITH FINANCIAL DIRECTIVESRoads & Traffic Authority for the year ended 30 June 2000

1999/2000

Expenditure/ Expenditure/Net Claim on Net Claim on

Recurrent Consolidated Capital ConsolidatedAppropriation Fund Appropriation Fund

$’000 $’000 $’000 $’000

Original Budget Appropriation/Expenditure– Appropriation Act 1,020,478 1,020,478 847,394 847,394

1,020,478 1,020,478 847,394 847,394

Other Appropriation / Expenditure– Additional Appropriation – – 470 470– Treasurer’s Advance 9,127 9,127 – –– Adjustment to capital allocation – – (8,386) (8,386)– Section 22 expenditure for certain works 700 700 7,700 7,700– Section 22A (2) Motor Vehicles Taxation Act

(hypothecation of motor vehicle tax) 19,111 19,111 – –– Section 225 Roads Act (hypothecation of heavy vehicle overloading fines) 155 155 – –– Section 26 PF&AA – Commonwealth specific purpose payments 15,458 15,458 5,973 5,973– Reduction in Commonwealth specific purpose payments (5,152) (5,152) – –– Transfer to Capital Appropriation (48) (48) – –– Transfers from another agency (Section 26 of the Appropriation Act) 3,806 3,806 – –– Reduction in Commonwealth fuel excise funds (21,171) (21,171) – –

21,986 21,986 5,757 5,757

Total Appropriations/Expenditure/Net Claim on Consolidated Fund 1,042,464 1,042,464 853,151 853,151

Amount drawn down against Appropriation – 1,042,464 – 853,151

Liability to Consolidated Fund – – – –

In compiling the Summary of Compliance with Financial Directives for the year ended 30 June 2000, it is assumed thatConsolidated Fund appropriations are expended prior to any other RTA revenue source.

Consolidated funding for the RTA’s Roads Program is classified as recurrent and capital appropriation based upon the way inwhich the appropriations are expended. The Program, as part of its appropriation, receives all the revenue from motorvehicle taxes in accordance with the Motor Vehicles Taxation Act, with the level of the funds from the motor vehicle taxesnot known until 30 June each year.

In 1999/2000 the Roads Program Recurrent Appropriation increased primarily as a result of additional motor vehicle taxrevenue, Commonwealth funding, vehicle registration fees revenue and an adjustment relating to the 1998/99appropriations, offset by a decrease in fuel excise revenue.

In 1999/2000 the Roads Program Capital Appropriation increased primarily as a result of additional Commonwealth fundingfor National Roads and the Blackspots Program and increased motor traffic fines revenue, offset by an adjustment in relationto the 1998/99 appropriations.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 80

Page 83: RTA Annual Report 2000 See Pg 24

(81) Roads and Traffic Authority Annual Report 2000

1998/1999

Recurrent CapitalAppropriation Expenditure Appropriation Expenditure

$’000 $’000 $’000 $’000

943,358 943,358 875,022 875,022

943,358 943,358 875,022 875,022

– – – –25,460 15,448 – –

– – – –– – – –

12,252 12,252 – –– – – –– – – –– – – –– – – –– – – –– – – –

37,712 27,700 – –

981,070 971,058 875,022 875,022

– 971,058 – 875,022

– – – –

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 81

Page 84: RTA Annual Report 2000 See Pg 24

(82) Roads and Traffic Authority Annual Report 2000

NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTSRoads & Traffic Authority as at 30 June 2000

(a) Reporting EntityThe Roads and Traffic Authority (RTA), as an entity for reportingpurposes, is responsible for the development and maintenance of the state road network, road safety and road user management, traffic and transport management and administration of the M4/M5Cashback Scheme.

(b) Basis of AccountingThe RTA’s financial statements are a general purpose financial reportwhich has been prepared on an accruals basis and in accordance withapplicable Australian Accounting Standards, other authoritivepronouncements of the Australian Accounting Standards Board (AASB),Urgent Issues Group (UIG) Consensus Views and the requirements ofthe Public Finance and Audit Act 1983 and Regulations. The financialstatements also comply with the Financial Reporting Directionspublished in the Financial Reporting Code (FRC) for Budget DependentGeneral Government Sector Agencies or issued by the Treasurer underSection 9(2)(n) of the Public Finance and Audit Act. Where there areinconsistencies between the above requirements, the legislativeprovisions have prevailed.

In the absence of a specific Accounting Standard, other authoritativepronouncement of the AASB or UIG Consensus View, the hierarchy of other pronouncements as outlined in AAS6 “Accounting Policies”is considered.

The Urgent Issues Group (UIG) issued Abstract 30 “Depreciation ofLong-Lived Assets, including Infrastructure Assets: Condition-BasedDepreciation and Other Related Methods” on 16 December 1999. The Consensus advised that the Abstract applies to reporting periodsending on or after 16 December 1999, the date on which theConsensus was agreed. As a result, a review of the RTA’s ConditionBased Depreciation (CBD) methodology was undertaken by the RTA,with assistance from the Audit Office and NSW Treasury whichindicated that the CBD methodology did not fully conform to the UIG Consensus View. Accordingly, the RTA has adopted a straight-line

depreciation model for infrastructure assets for the 1999/2000 andfuture accounting periods. The provision for depreciation establishedin respect of infrastructure assets now recognises the loss of servicepotential over time on a straight-line depreciation basis in accordancewith UIG Abstract 30 and AAS4 ”Depreciation of Non Current Assets”.

The financial statements are prepared in accordance with the historicalcost convention except where otherwise stated. All amounts arerounded to the nearest one thousand dollars and are expressed inAustralian currency. The accounting policies adopted are, with theexception of the adoption of the straight-line depreciationmethodology for infrastructure assets for 1999/2000 and futureaccounting periods, consistent with those of the previous year.However, the classifications of some revenue and expenditure itemshave been amended, with the amounts disclosed in the OperatingStatement for both 1998/99 and 1999/2000 presented in theamended classifications for comparison purposes.

(c) Administered ActivitiesThe RTA administers, but does not control, the collection of variousfees, fines and levies on behalf of the Crown Transactions Entity.Monies collected on behalf of the Crown Transactions Entity are notrecognised as the RTA’s revenues but are separately disclosed in theProgram Statement – Expenses and Revenues.

Expenses incurred in collecting monies on behalf of the CrownTransactions Entity are recognised as the RTA’s expenses and arereported within the Road Safety and Road User Management Program.

The accrual basis of accounting and all applicable accounting standardshave been adopted for the reporting of administered revenues.

1. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 82

Page 85: RTA Annual Report 2000 See Pg 24

(83) Roads and Traffic Authority Annual Report 2000

NOTES (continued)Roads & Traffic Authority as at 30 June 2000

(d) Revenue RecognitionRevenue is recognised when the RTA has control of the good or rightto receive, it is probable that the economic benefits will flow to the RTAand the amount of the revenue can be reliably measured. Additionalcomments regarding the accounting policies for the recognition ofrevenue are provided below:

(i) Parliamentary Appropriations and Contributions from other BodiesParliamentary appropriations are recognised as revenues when the RTAobtains receipt of the cash. The split between recurrent and capital isbased on the way the appropriations are to be spent.

Contributions are usually recognised when control of the cash or otherasset, including a right to receive, is gained. In relation to the right toreceive infrastructure assets, the recognition is on a progressive basisrelative to the contract period.

(ii) Sale of Goods and ServicesRevenue from the sale of goods and services comprises revenue fromthe provision of products or services, ie: user charges. User charges arerecognised as revenue when the RTA obtains control of the assets thatresult from them.

(iii) Investment IncomeInterest revenue is recognised as it accrues. Rent revenue is recognisedin accordance with AAS17 “Accounting for Leases”.

(e) Employee Entitlements(i) Wages and Salaries, Annual Leave, Sick Leave and OncostsLiabilities for wages, salaries and annual leave are measured as theamount unpaid at the reporting date at current pay rates in respect of employees’ services up to that date.

Sick leave accrued by employees of the RTA is all non-vesting and does not give rise to a liability as it is not considered probable that sickleave taken in the future will be greater than the entitlements accruedin the future.

Payroll tax payable on employee entitlements has been calculated andthe liability recognised. Workers compensation that may be applicableto leave entitlements has not been recognised as this expense is basedon actual premiums paid, determined from past claims history, and notas a general percentage raised on salaries and wages.

(ii) Long Service Leave and SuperannuationLong service leave is measured on a nominal basis. This method is used because the difference arising from using the nominal methodcompared to the present value method would not result in a materialdifference in the financial statements.

Long service leave is calculated on the basis of entitlements of allemployees who have completed five or more years of service togetherwith an estimate for employees with less than five years service, basedon the percentage who are expected to remain employed by the RTAlong enough to be entitled to long service leave.

The superannuation expense for the Basic Benefit and First State Superschemes is calculated as a percentage of the employees’ salary. For theState Superannuation Scheme and the State Authorities SuperannuationScheme, the expense is calculated as a multiple of the employees’superannuation contributions. The final expense is adjusted at 30 Juneeach year to take account of the actuarial assessment.

(f) InsuranceThe RTA’s insurance is arranged through the NSW Treasury ManagedFund Scheme as a self insurance scheme for Government agencies. The premiums are determined by the Fund Manager based on pastexperience and risk exposures. An outstanding liability also exists inrespect of the former Department of Motor Transport self-insuredscheme. CTP Insurance is arranged with a private sector provider bythe NSW Treasury.

1. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (continued)

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 83

Page 86: RTA Annual Report 2000 See Pg 24

(84) Roads and Traffic Authority Annual Report 2000

NOTES (continued)Roads & Traffic Authority as at 30 June 2000

(g) Asset Management PolicyThe RTA is exempt from the “Recoverable Amount Test” under the provision of paragraph 5.2.3 of AAS10 – “Accounting for the Revaluation of Non-Current Assets” as it is a not-for-profit entity.

Valuation and depreciation policies are summarised below.

(i) Land and Buildings

Asset

1. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (continued)

Valuation Policy Depreciation Policy

Land & Buildings in Service

– Works Administration Properties

– Officers Residences

Land and buildings in service aregenerally valued at value in use(land) and written downreplacement cost (buildings).Where such properties are rentedexternally they are valued atcurrent market value.

Buildings – straight line (2.5%)

Land & Buildings Acquired forFuture Roadworks

– Rentable or Surplus Properties

– Vacant land

– Current Market Value

– Average Rateable Value PerHectare of Urban and RuralAreas within each LocalGovernment Area (LGA)

No depreciation charged asbuildings are not purchased togenerate revenue but ultimatelyto be demolished for roadworks

Leasehold Improvements(Minimum capital value $5,000)

Written down historiccost/revalued amount

Amortised over the period of thelease, or the useful life of theimprovement to the RTA,whichever is shorter

Included in the value of land and buildings in service is an amount of $6.121 million (1998/99; $5.435 million)for buildings on Crown land. As the RTA effectively “controls” this Crown land, it has been included in theRTA’s Statement of Financial Position. Should such Crown land be transferred or disposed of, associatedbuildings are written off in the year the transfer or disposal takes place. Crown land, to the value of $77,000,was transferred to the Department of Land and Water Conservation during 1999/2000.

The RTA’s land and buildings are valued by registered valuers on a progressive basis. To accord with therequirements of AAS10, the RTA values its land and buildings over a 3 year progressive time frame. During1999/2000 approximately one third of the RTA’s land and buildings were revalued.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 84

Page 87: RTA Annual Report 2000 See Pg 24

(85) Roads and Traffic Authority Annual Report 2000

NOTES (continued)Roads & Traffic Authority as at 30 June 2000

(ii) Plant and Equipment

Asset Valuation Policy Depreciation Policy

Plant, Equipment & Vehicles Written down historic cost Straight line (5%–20%) over the(Minimum capital value $5,000) estimated useful life to the RTA

Computer Hardware Written down historic cost Straight line (20%–33.33%) overand Software the estimated useful life to(Minimum capital value of $500 the RTAand $5,000 respectively)

Electronic Office Equipment Written down historic cost Straight line (20%) over(Minimum capital value $5,000) the estimated useful life to

the RTA

The written down historic cost is considered to reflect the market value of these assets.

Depreciation and valuation policies in respect of operational assets are subject to annual review. Estimates ofuseful life for depreciation purposes have been determined with due regard to a number of factors includingthe expected retention period by the entity and the underlying physical, technical and commercial nature ofthe assets as defined in AAS4. In accordance with this standard the shortest alternative useful life is applied.Approximately 35% (1998/99; 48%) of the RTA’s assets in the categories of plant, equipment, vehicles,computer hardware and software and electronic office equipment are fully depreciated.

(iii) Infrastructure Systems

Asset Valuation Policy Depreciation Policy

Roads Written down replacement cost

Earthworks Depreciated over estimateduseful life of 100 years

Pavement Depreciated over estimateduseful life dependant onpavement surface

15 years (unsealed)

20–40 years (flush seal/asphalt)

40–50 years (concrete)

Bridges Written down replacement cost Depreciated over estimateduseful life dependant onbridge type

Timber structures 60 years

Concrete structures 100 years

Steel structures 100 years

X Trusses (timber and steel) 60 years

High Value Bridges 200 years

Traffic Signals Written down replacement cost Depreciated over estimateduseful life of 20 years

Traffic Signal Control Network Written down replacement cost Depreciated over estimateduseful life of 7 years

Land under roads and Average rateable value per No depreciation applied as landwithin road reserves hectare of urban and rural areas does not have a limited useful life

within each Local Government Area (LGA)

1. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (continued)

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 85

Page 88: RTA Annual Report 2000 See Pg 24

(86) Roads and Traffic Authority Annual Report 2000

NOTES (continued)Roads & Traffic Authority as at 30 June 2000

The RTA, being responsible for the development and management ofthe State’s road network, has recognised the control aspect of someinfrastructure assets and the ownership of other infrastructure assetswhen formulating policy in respect of the valuation and reporting of infrastructure.

Roads, bridges and traffic signals and related equipment constructedduring any year are brought to account in that year at construction cost.In subsequent years those assets are included with other infrastructureassets and subject to the valuation policies outlined below.

The valuation policies provide for roads, bridges and the traffic signalcontrol network, comprising the traffic control network and the trafficsignal network, to be valued using the modern equivalent replacementcost method. Each road is assigned a value which equates to the costof replacing that road to a modern equivalent asset and discountingthe estimated value of modern features, such as noise walls, notpresent in the existing asset. In the case of bridges, such replacementcost is the cost to construct a new bridge to the modern standard.High value bridges are valued on an individual basis. The replacementcost of the traffic control signal network is based on the current cost toreplace the SCATS system computers and peripherals. The replacementcost of the traffic signal network is the cost to reconstruct each siteusing the number and current cost of lanterns and electroniccontrollers at each site as the major components to determine thereplacement cost.

The determination of unit replacement rates for road, bridge and trafficcontrol signal infrastructure valuations is carried out at least every fiveyears by suitably qualified engineering contractors and employees ofthe RTA. Assets are recorded initially at construction cost and theannual percentage increase in the Road Cost Index is applied each year until the following unit replacement review is undertaken.Subsequent to the review, infrastructure is valued using the unitreplacement rates, adjusted by the Road Cost Index as applicable. Unitreplacement rates for roads and traffic signals were reviewed during1999/2000. High value bridges and bridge size culverts were alsorevalued during 1999/2000.

In respect of land under roads and within road reserves, valuations areassessed according to the average rateable value per hectare of urbanand rural areas within each Local Government Area. Such valuations,which are undertaken annually by the RTA’s registered valuers, arebased upon the data provided by the Local Government GrantsCommission and the Valuer General.

Major works-in-progress are valued at construction cost and excludethe cost of land, which is currently disclosed as land under roads. It isconsidered that, in their current use, these assets have no market andas such, a market valuation is not possible.

Accounting Standard AAS4 – “Depreciation of Non Current Assets”outlines factors to be considered in assessing the useful life of an assetfor depreciation purposes. These factors include wear and tear fromphysical use and technological and commercial obsolescence.

Prior to the 1999/2000 accounting period, the RTA utilised a conditionbased depreciation methodology to determine the annual depreciationcharge and accumulated depreciation of infrastructure assets. Followingthe Consensus reached by the Urgent Issues Group on 16 December1999 and the issue of Abstract 30 “Depreciation of Long-Lived PhysicalAssets, including Infrastructure Assets: Condition-Based Depreciationand Other Related Methods”, the condition based depreciationapproach has been discontinued for financial reporting purposes.

The methodology adopted for 1999/2000 and future accountingperiods is straight-line depreciation in accordance with AAS4“Depreciation of Non Current Assets”. The road assets are consideredto consist of two components, pavement and earthworks, each with a corresponding useful service life.

Depreciation is calculated for each of the current 17,000 (approximately)road management segments and aggregated for each road andpavement type. Bridge assets are assessed by bridge type anddepreciation is calculated on a straight line basis.

The respective provisions for depreciation of infrastructure assetsrecognise the total accumulated depreciation of those assets on astraight-line basis over the assessed useful life of those assets as at30/6/2000.

(iv) Private Sector Provided InfrastructureThe RTA has recognised an infrastructure asset in respect of the SydneyHarbour Tunnel. It has been valued at the estimated current writtendown replacement cost of the Tunnel at the date of transfer to the RTAin 2022 (refer Note 12(b)).

In respect of the M2, M4, and M5 Motorways and the EasternDistributor the RTA values the asset by reference to the RTA’s emergingshare of the written down replacement cost of each asset apportionedover the respective period of the concession agreement.

(v) Cultural Collection AssetsThe RTA has for the first time in 1999/2000 recognised its CulturalCollection items as assets where those items can be reliably valued.These assets have been brought to account in accordance with AAS1.

Other Cultural Collection items are disclosed by way of a note.

1. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (continued)

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 86

Page 89: RTA Annual Report 2000 See Pg 24

(87) Roads and Traffic Authority Annual Report 2000

NOTES (continued)Roads & Traffic Authority as at 30 June 2000

(h) InvestmentsDue to the short-term nature of the RTA’s investments, book, face andmarket values are equivalent. Investments held are not quoted on a stock exchange.

(i) Provision of Material AssetsNo material assets were provided free of charge to the RTA during the1999/2000 financial year. However, at a small number of locations,Crown land was provided at peppercorn rentals.

(j) InventoriesInventories are stated at the lower of cost and net realisable value. Costis calculated using weighted average cost. Inventories consist mainly ofraw materials and supplies used for the construction and maintenanceof roads, bridges and traffic signals.

(k) Capitalisation of ExpenditureExpenditure (including employee related costs and depreciation) inrespect of road development, bridge and tunnel replacement and someroad safety and traffic management works are capitalised as part ofInfrastructure Systems.

(l) Financial InstrumentsFinancial Instruments give rise to positions that are a financial asset orliability of the RTA and a financial liability or asset of another party. TheRTA includes cash at bank, receivables, creditors and borrowings asfinancial instruments. In accordance with AAS33 “Presentation andDisclosure of Financial Instruments”, information is disclosed in Note 15in respect of the credit risk and interest rate risk of those instruments.All such amounts are carried in the accounts at values as disclosedwithin each of the respective notes to the accounts relating to thosefinancial instruments.

(m) Year 2000 Compliance CostsAll expenditure incurred concerning the upgrading or replacement ofcomputer systems in order to make them 2000 compliant wasexpensed as it occurred in line with the generally accepted accountingpolicy. All external consulting costs and other external costs areincluded, except those of a capital nature.

(n) Goods and Services TaxAmounts paid for works which are to be undertaken after 1 July 2000include a component for the Goods and Services Tax (GST). Almost all of the amount payable for GST is claimable by the RTA from theAustralian Taxation Office (ATO). GST has also been collected by theRTA in respect of sales of its goods and services which are to bedelivered after 1 July. The GST collected is payable to theCommonwealth. As such, the RTA determines, and discloses the netamount of GST claimable from, or payable to the ATO at period end.

1. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (continued)

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 87

Page 90: RTA Annual Report 2000 See Pg 24

(88) Roads and Traffic Authority Annual Report 2000

NOTES (continued)Roads & Traffic Authority as at 30 June 2000

2. EXPENSES

The RTA, being a capital works organisation, capitalises a significant portion of expenditure, includingemployee related costs and depreciation, to Infrastructure Systems.

(a) Employee Related ExpensesTotal employee related expenses are detailed as follows:

1999/2000 1998/1999$M $M

Salaries and Wages (including Annual Leave) 342.658 343.184Long Service Leave 12.055 17.836Superannuation (refer Note 16) (76.280) 64.228Workers Compensation Insurance 12.150 13.400Payroll Tax and Fringe Benefits Tax 23.907 24.668Other 4.444 5.303

318.934 468.619

Of the total employee related expenses, $66.294 million (1998/99; $120.179 million) was capitalised toinfrastructure and $112.629 million (1998/99; $167.788 million) is attributable to maintenance with thebalance of $140.011 million (1998/99; $180.652 million) attributable to other operating programs.

In respect of superannuation, $57.723 million related to the accrued liability recognised as payroll oncost;with a reduction of $134.003 million attributable to actuarial adjustments and interest.

A total negative expense of $15.856 million in relation to superannuation has been included in theexpenditure capitalised to infrastructure assets.

(b) Other Operating Expenses1999/2000 1998/1999

$M $M

Registry Customer Services * 89.912 75.918Driver and Vehicle Management * 27.438 20.017Road Safety * 45.879 37.430Traffic and Transport * 78.484 55.132Ensured Revenue Stream Payments 33.095 32.847SHB Toll Collections * 3.541 2.554M4/M5 Cashback Scheme 36.209 30.454Other 1.618 3.609

316.176 257.961

* These expense categories exclude employee related expenses and depreciation incurred in providing these services.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 88

Page 91: RTA Annual Report 2000 See Pg 24

(89) Roads and Traffic Authority Annual Report 2000

NOTES (continued)Roads & Traffic Authority as at 30 June 2000

2. EXPENSES (continued)

The following key expense items are included in other operatingexpenses, infrastructure maintenance expenses and infrastructuresystem assets as appropriate.

(i) Audit FeesDuring 1999/2000 an expense of $0.454 million (1998/99; $0.454million) was incurred for the audit of the financial statements by TheAudit Office of NSW. In addition, special audits in respect of the RTA’sproject planning for the GST, its accounting for the Eastern Distributorand a review of the M2 Motorway documentation were undertakenas part of the services provided during 1999/2000 by the NSW AuditOffice at a total cost of $0.080 million (1998/99; $0.026 million).

(ii) Bad and Doubtful DebtsThe bad and doubtful debts expense for 1999/2000 amounted to$0.307 million (1998/99; $0.098 million).

(iii) Rental Expense (Operating Leases)The Rental Expenses (Operating Leases) relate to Property, ITEquipment and Light Motor Vehicles.

Total rental expenses in respect of property operating leases for1999/2000 amounted to $16.091 million (1998/99; $15.443 million).For IT Equipment total expenses for operating leases was $21.149million in 1999/2000 (1998/99, $11.017) with expenses for LightMotor Vehicles operating leases being $17.560 million in 1999/2000(1998/99, $14.835 million).

(iv) InsuranceInsurance costs for 1999/2000 amounted to $16.309 million(1998/99; $16.676 million).

(v) ConsultantsThe total amount paid to consultants during 1999/2000 amounted to$0.439 million (1998/99; $0.646 million).

The RTA also engages numerous contractors for professional servicesnot classed as consultancies, including valuers, legal services, roadand bridge design, investigation , construction supervision andpreparation of Environmental Impact Statements as well as contractagency services and personnel.

(c) MaintenanceMaintenance expenditure relates to the maintenance of roads, bridges and the traffic signal control network and includes employeerelated costs.

The RTA expended $35.553 million in 1999/2000 (1998/99; $72.510million) on natural disaster restoration works from State funds. Some $9.952 million (1998/99; $9.464 million) was also spent on naturaldisaster restoration works on National Highways during the year. The total cost of natural disaster restoration work in 1999/2000 was$45.505 million (1998/99; $81.974 million), which was included aspart of maintenance expenditure.

(d) Depreciation and Amortisation(i) Operational AssetsTotal depreciation raised against operational assets during 1999/2000amounted to $18.804 million (1998/99; $25.365 million). Of thisamount, $7.521 million (1998/99; $10.144 million) was capitalised,with the balance of $11.283 million (1998/99; $15.221 million) relatedto operating activities. In addition, operational assets were writtendown by $0.420 million in 1999/2000 (1998/99; $3.852 million).

(ii) Infrastructure SystemsDuring 1999/2000 a road network loss of service potential of$431.395 million was recorded against depreciation. For 1999/2000,and future accounting periods, the RTA has adopted a straight linedepreciation methodology in respect of Infrastructure Systems,following the release by the Urgent Issues Group of Abstract 30“Depreciation of Long-Lived Assets, including Infrastructure Assets:Condition-Based Depreciation and the other Related Methods”. Referto Note 1 (b).

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 89

Page 92: RTA Annual Report 2000 See Pg 24

(90) Roads and Traffic Authority Annual Report 2000

NOTES (continued)Roads & Traffic Authority as at 30 June 2000

2. EXPENSES (continued)

1999/2000 1998/1999$M $M

(e) Grants and SubsidiesCapital Grants– to Councils for Local Roads 20.665 12.762– to other Agencies 4.500 –Grants Under Road Safety Program 5.797 4.269Other 2.700 1.421

33.662 18.452

(f) Finance CostsInterest 74.766 101.725Debt Guarantee 3.000 3.000Amortisation of premium/discount on Borrowings 0.888 5.939

78.654 110.664

(g) Other ExpensesRevaluation Decrement of Traffic Signals – 227.459Loan to Sydney Harbour Tunnel Company – 1.193

– 228.652

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 90

Page 93: RTA Annual Report 2000 See Pg 24

(91) Roads and Traffic Authority Annual Report 2000

NOTES (continued)Roads & Traffic Authority as at 30 June 2000

3. REVENUES

1999/2000 1998/1999$M $M

(a) Sale of Goods and ServicesSale of GoodsNumber Plates 32.000 29.243Other 1.477 0.796Rendering of ServicesThird Party Insurance Data Access Charges 8.824 8.472Toll Revenue (Sydney Harbour Bridge) 56.911 56.362Other 44.678 33.631

143.890 128.504

(b) Investment IncomeInterest 1.340 7.693Rent 16.907 16.166

18.247 23.859

(c) Retained Taxes, Fees and FinesHeavy Vehicle Permit Fees 0.691 0.669Fine Default Fees 2.512 1.566

3.203 2.235

(d) Grants and ContributionsNSW Government Agencies 7.850 12.353Local Government 1.133 2.012Other Government Agencies 1.952 3.224Private Firms & Individuals 6.963 5.763Natural Disaster funds 22.016 –

39.914 23.352

(e) Other RevenueRevaluation of Infrastructure Systems – Land Under Roads and within Road Reserves (Refer Note 5) 1,693.981 1,770.565Value of Emerging Interest of Private Sector Provided Infrastructure– M2 (Refer Note 12 (b)) 10.439 7.832– M4 (Refer Note 12 (b)) 15.341 8.183– M5 (Refer Note 12 (b)) 9.546 8.962– Eastern Distributor (Refer Note 12 (b)) 3.997 –– Loan to Sydney Harbour Tunnel Company (Refer Note 9 (b)) 4.334 –Privately funded pedestrian overbridges – 7.386

1,737.638 1,802.928

All revenue brought to account in 1999/2000 arises from operating activities.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 91

Page 94: RTA Annual Report 2000 See Pg 24

(92) Roads and Traffic Authority Annual Report 2000

NOTES (continued)Roads & Traffic Authority as at 30 June 2000

4. GAIN/(LOSS) ON SALE OF NON-CURRENT ASSETS

1999/2000 1998/1999$M $M

Gain on Sale of Property, Plant & Equipment– Net Proceeds from Sale * 36.355 72.113– Written Down Value of Assets Sold 35.572 73.411

Net Gain/(Loss) 0.783 (1.298)

Gain on Sale of Investments– Proceeds from Sale – 98.669– Written Down Value of Assets Sold – 98.669

Net Gain/(Loss) – –

Net Gain/(Loss) on Sale of Non-Current Assets 0.783 (1.298)

* Net proceeds from sale are determined after taking into account the direct costs associated with property saleswhich totalled $4.104 million in 1999/2000 (1998/99; $4.473 million).

5. ABNORMAL ITEMS

1999/2000 1998/1999$M $M

Revaluation of Infrastructure Systems– Land Under Roads and Within Road Reserves (1,693.981) (1,770.565)

(1,693.981) (1,770.565)

Abnormal items relating to the revaluation of Infrastructure Systems have been reclassified as Other Revenuein the Operating Statement. In respect of Land Under Roads and Within Road Reserves, valuations areassessed according to the average rateable value per hectare of urban and rural areas within each LocalGovernment Area. Such valuations are based upon the data provided by the Local Government GrantsCommission and the Valuer General. The revaluation increment has been taken through the OperatingStatement to offset decrements of previous years.

Reduction in Superannuation Expense due to Tax, Actuarial and Interest Adjustments. (Refer Note 16) (134.003) –

(134.003) –

The reduction in Superannuation is offset against the superannuation expense for 1999/2000 which has beenallocated in accordance with the capitalisation of expenditure policy to capital and operating expenditures –See Note 2(a).

6. APPROPRIATIONS

1999/2000 1998/1999$M $M

Recurrent Appropriation– State 925.226 843.104– Commonwealth 117.238 127.954

1,042.464 971.058

Capital Appropriation– State 643.810 677.259– Commonwealth 209.341 197.763

853.151 875.022

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 92

Page 95: RTA Annual Report 2000 See Pg 24

(93) Roads and Traffic Authority Annual Report 2000

NOTES (continued)Roads & Traffic Authority as at 30 June 2000

7. PROGRAMS/ACTIVITIES OF THE AGENCY

(a) Road Network Infrastructure

Network DevelopmentDescription: Planning, designing, scheduling and organising the development of

road and bridge works.

Objectives: To develop the State’s road network focusing on strategic routes topromote economic growth, improve road safety, encourage greater use of public transport and meet environmental targets.

Actively contribute to the ‘Whole of Government’ approach to land use and transport planning.

MaintenanceDescription: Planning, designing, scheduling and organising of work for the

maintenance of roads and bridges, including restoration after natural disasters.

Objective: To maintain State roads and bridges to agreed economic, technical and environmental standards.

(b) Road Safety and Road User ManagementDescription: Implementing initiatives to ensure safety of people by ensuring safer

roads and safer vehicles. Improve road user, pedestrian and cyclistbehaviour through community education, driver testing and promotionalprograms to target compliance with road rules, and address drinkdriving, speeding, driver fatigue, and the use of seat belts and child restraints. Identify safety risks through road safety audits andinvestigations. Ensure vehicles meet road worthiness, road impact andemission standards. Manage the delivery of services through a range of outlets and channels.

Objective: To reduce the trauma and cost to the community of road deaths andinjuries by ensuring that:

– drivers and motor cyclists are eligible and competent;

– vehicles meet road worthiness, road impact, vehicle emissionstandards and that they operate safely; and

– driver and vehicle transactions are accessible and a high standard of customer service is maintained.

(c) Traffic and TransportDescription: Improving the operational performance of the road network, through

traffic control and driver information systems, management of incidentsand integrated route management strategies. Planning and organisingpublic transport infrastructure improvements, improving pedestrian andcyclist facilities and maintaining traffic facility assets.

Objective: To maximise the efficiency of moving people and goods by bettermanaging the existing road network and encouraging people to usealternative forms of transport to the motor car.

(d) M4/M5 Cashback SchemeDescription: Reimbursing motorists directly for tolls paid using Cashback Cards on

the M4 and M5 Motorways when driving NSW privately registered carsand motorcycles.

Objective: To reimburse tolls to motorists driving NSW privately registered vehicleson the M4 and M5 Motorways.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 93

Page 96: RTA Annual Report 2000 See Pg 24

(94) Roads and Traffic Authority Annual Report 2000

NOTES (continued)Roads & Traffic Authority as at 30 June 2000

8. CURRENT ASSETS – CASH

The cash balance comprises:1999/2000 1998/1999

$M $M

RTA Operating Account 16.427 4.161Remitting Account, Cash in Transit & Cash on Hand 24.907 18.657

41.334 22.818

9. CURRENT ASSETS – INVESTMENTS

The RTA’s investments are detailed as follows:1999/2000 1998/1999

$M $M

TCORP – Hour Glass Facility 0.658 0.936On Call Deposits 3.453 3.091Other 0.366 0.233

4.477 4.260

10. CURRENT ASSETS/NON-CURRENT ASSETS – RECEIVABLES

The RTA’s receivables are detailed as follows:1999/2000 1998/1999

$M $M

(a) CurrentSale of Goods and Services 12.399 8.547Goods and Services Tax – Claimable from the Commonwealth 0.012 –Police Security Identification Licence 0.052 –Other (including cost recoveries relating to motor vehicle accident damage to RTA property and road clearing) 1.618 1.576

14.081 10.123Deduct: Provision for Doubtful Debts 1.309 1.513

12.772 8.610Unissued Debtors 4.526 4.756Dishonoured Credit Cards 0.003 0.004

17.301 13.370Accrued Income– Interest 0.176 0.100– Property Sales 9.493 14.253– Other 0.005 0.164

Total Current 26.975 27.887

Most of the RTA’s doubtful debts relate to amounts owing as a result of road accidents where the RTA’sproperty is damaged (eg traffic signals & roadside furniture) and tenants who vacate premises without noticewhilst in arrears.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 94

Page 97: RTA Annual Report 2000 See Pg 24

(95) Roads and Traffic Authority Annual Report 2000

NOTES (continued)Roads & Traffic Authority as at 30 June 2000

10. CURRENT ASSETS/NON-CURRENT ASSETS – RECEIVABLES (continued)

Summary of Debts Written Off1999/2000 1998/1999

$M $M

Motor Vehicle Accident Damage to RTA Property and Costs for Clearing of Roadway 0.229 0.043

Rental Arrears 0.093 0.073Works and Services 0.155 0.017Towing Service Charges for Unattended Vehicles – 0.003Other 0.034 0.012

0.511 0.148

(b) Non-CurrentNon-Current receivables are summarised as follows:

1999/2000 1998/1999$M $M

Loan to Sydney Harbour Tunnel Company 47.996 43.662Promissory Notes 0.417 –

48.413 43.662

Repayment of the interest free $222.6 million Net Bridge Revenue Loan by the Sydney Harbour TunnelCompany is due on 31 December 2022. The Loan has been assessed as recoverable as at 30 June 2000 andthe receivable is valued on a Net Present Value (NPV) basis.

The loan is considered to be part of the RTA’s interest in the Tunnel and, as at 30 June 2000, has beenassessed at $47.996 million (30/6/99; $43.662 million).

Promissory Notes relate to amounts receivable under the Private Sector Road Toll agreement in respect of theM2 Motorway and the Eastern Distributor.

11. NON CURRENT ASSETS – LAND & BUILDING, PLANT & EQUIPMENT

AND INFRASTRUCTURE SYSTEMS

This asset category consists of Land & Building, Plant and Equipment and Infrastructure Systems.

1999/2000 1998/1999$M $M

Land and Buildings (See Note 11a) 2,490.894 1,844.684Plant & Equipment (See Note 11a & 11c) 78.913 85.358Infrastructure Systems (See Note 11b) 44,992.883 44,302.467

47,562.690 46,232.509

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 95

Page 98: RTA Annual Report 2000 See Pg 24

(96) Roads and Traffic Authority Annual Report 2000

NOTES (continued)Roads & Traffic Authority as at 30 June 2000

11. NON CURRENT ASSETS – LAND & BUILDING, PLANT & EQUIPMENT AND INFRASTRUCTURE SYSTEMS (continued)

(a) Land & Building and Plant & Equipment

Land & Works Administration BuildingsProperties & Officers Acquired

Residences for Future LeaseholdLand Buildings Roadworks Improvements Total

$M $M $M $M $MValuation Valuation Valuation Valuation Valuation

Balance 1 July 1999 58.202 90.756 1,693.630 9.470 1,852.058Additions – 5.630 82.760 0.699 89.089Disposals – – (32.743) (2.168) (34.911)Reclassifications (0.280) (3.162) 0.657 2.785 –Revaluations 10.133 11.196 509.020 – 530.349Transfer to Infrastructure – – (97.316) – (97.316)Asset Write down – – – – –Prior Years Adjustment – – 156.843 – 156.843

Balance 30 Jun 2000 68.055 104.420 2,312.851 10.786 2,496.112

Accumulated DepreciationBalance 1 July 1999 – 3.661 – 3.713 7.374Depreciation Expense – 2.185 – 1.310 3.495Write Back on Disposal – – – (2.168) (2.168)Revaluation – (3.483) – – (3.483)Prior Years Adjustments – – – – –

Balance 30 Jun 2000 – 2.363 – 2.855 5.218

Written Down Value

As at 30 June 2000 68.055 102.057 2,312.851 7.931 2,490.894As at 1 July 1999 58.202 87.095 1,693.630 5.757 1,844.684

Land and buildings for future roadworks comprise untenanted land for road works (average rateable value – $1,697.998million), surplus properties (market value – $268.318 million), of which properties with an estimated value of up to $35million could be disposed of during 2000/2001, and rentable properties (market value – $346.535 million).

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 96

Page 99: RTA Annual Report 2000 See Pg 24

(97) Roads and Traffic Authority Annual Report 2000

NOTES (continued)Roads & Traffic Authority as at 30 June 2000

PlantEquipment Computer Electronicand Motor Hardware Office

Vehicles and Software Equipment Total$M $M $M $M

Cost Cost Cost Cost

155.961 119.290 8.203 283.45419.582 0.284 0.627 20.493

(13.185) (31.041) (1.080) (45.306)(5.455) 4.861 0.594 –

– – – –– – – –– – – –

(0.041) (1.121) – (1.162)

156.862 92.273 8.344 257.479

85.254 105.961 6.881 198.0968.344 6.115 0.849 15.308

(4.126) (29.481) (1.034) (34.641)– – – –

(0.005) (0.192) – (0.197)

89.467 82.403 6.696 178.566

67.395 9.870 1.648 78.91370.707 13.329 1.322 85.358

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 97

Page 100: RTA Annual Report 2000 See Pg 24

(98) Roads and Traffic Authority Annual Report 2000

NOTES (continued)Roads & Traffic Authority as at 30 June 2000

11. NON CURRENT ASSETS – LAND & BUILDING, PLANT & EQUIPMENT AND INFRASTRUCTURE SYSTEMS (continued)

(b) Infrastructure SystemsInfrastructure systems are valued as follows:

1999/2000 1998/1999$M $M

Roads – Written Down Replacement CostOpening Balance – Replacement Cost 24,293.284 23,219.460Add: New Roads at cost 449.538 700.190Transfer to Traffic Signals – (422.581)Revaluation 4,569.125 796.215

29,311.947 24,293.284Less: Accumulated DepreciationOpening Balance 4,313.280 4,029.931Adjustment for change in accounting policy 3,106.646 –

Adjusted Opening Balance 7,419.926 4,029.931Revaluation 1,959.121 –Inflation Adjustment – 191.425Current Year Expense 376.080 91.924

9,755.127 4,313.280Roads – Written Down Value 19,556.820 19,980.004

Land Under Roads and Within Road ReservesOpening Balance 18,887.907 16,926.839Transfer in from “Land and Buildings acquired for Future Roadworks” (Refer Note 11 (a)) 97.311 190.503

Revaluation 1,696.981 1,770.565

Total Land under Roads and Within Road Reserves 20,682.199 18,887.907

Bridges – Written Down Replacement CostOpening Balance – Replacement Cost 4,534.998 4,004.464Prior Year Adjustment – (34.158)Add: New Bridges 70.905 104.984Revaluation 322.613 459.708

4,928.516 4,534.998Less: Accumulated DepreciationOpening Balance – Replacement Cost 52.173 50.455Adjustment for change in accounting policy 1,234.514 –

Adjusted Opening Balance 1,286.687 50.455Revaluation 72.992 –Current Year Expense 42.911 1.718

1,402.590 52.173Bridges – Written Down Value 3,525.926 4,482.825

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 98

Page 101: RTA Annual Report 2000 See Pg 24

(99) Roads and Traffic Authority Annual Report 2000

NOTES (continued)Roads & Traffic Authority as at 30 June 2000

11. NON CURRENT ASSETS – LAND & BUILDING, PLANT & EQUIPMENT AND INFRASTRUCTURE SYSTEMS (continued)

1999/2000 1998/1999$M $M

Traffic Signals Network – Written Down Replacement CostOpening Balance – Replacement Cost 199.731 –Transfer from Roads – 422.581Add: New Traffic Signals 1.408 4.609Less: Traffic Signals Deleted (0.333) –Revaluation 10.453 (227.459)

211.259 199.731Less: Accumulated DepreciationOpening Balance 9.987 –Current Year Expense 10.563 9.987

20.550 9.987Traffic Signals Network – Written Down Value 190.709 189.744

Traffic Signal Control Network – Written Down Replacement CostOpening Balance – Replacement Cost 10.565 7.208Add: Additions 10.822 1.420Prior Year Adjustment – 1.937

21.387 10.565Less: Accumulated DepreciationOpening Balance 4.571 3.060Current Year Expense 1.841 1.511

6.412 4.571Work-in-Progress 4.624 9.423

Traffic Signal Control Network – Written Down Value 19.599 15.417

Major Works in ProgressOpening Balance 746.570 794.927Net Additions 271.060 (48.357)

Major Works in Progress 1,017.630 746.570

Total Infrastructure Systems 44,992.883 44,302.467

The network was improved during the year with a number of major projects being opened to traffic. These included the final stage of the Taree Bypass, the City West Link Road – Section 3, Pacific Highwayimprovements at Tyndale, dual carriageway on the Pacific Highway from Bulahdelah to Coolongoolook andthe widening of Southern Cross Drive at Mascot.

The depreciation expense in respect of roads $376.080 million (1998/99; $91.924 million) reflects the loss of service potential based on the straight-line depreciation methodology adopted following the issue of UIGAbstract 30 on 16 December 1999 (Refer Notes 1 (b), 1 (g) (iii)). In accordance with the transitional provisionsspecified in Paragraph 19 of the Abstract, net adjustments totalling $4,341.160 million has been made to theopening balances of accumulated depreciation in respect of the 1999/2000 reporting period, being thereporting period to which the UIG Consensus was first applied. These adjustments ensure that the carryingamounts of assets and accumulated depreciation reflect the amounts that would have been recognised hadtheir depreciation methods complied with the requirements of the UIG Consensus at commencement.

Traffic signals and most bridges, were subject to a full revaluation in 1998/1999. High value bridges and allbridge size culverts were revalued in 1999/2000. Unit replacement rates for roads and traffic signals werereviewed in 1999/2000.

(c) Cultural Collection AssetsAt 30 June 2000 Cultural Collection Assets, including original art works , have been brought to account at a value of $0.033 million.

Other Cultural Collection items, including prints, drawings and artifacts, were also identified as being underthe control of the RTA, but could not be reliably valued.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 99

Page 102: RTA Annual Report 2000 See Pg 24

12. CURRENT/NON CURRENT ASSETS – OTHER

(a) CurrentThese comprise:

1999/2000 1998/1999$M $M

Prepayments 2.146 2.415

2.146 2.415

(b) Non-CurrentThe RTA’s Other Non Current Assets are represented by Private Sector Provided Infrastructure and prepaidsuperannuation contributions as follows:

1999/2000 1998/1999$M $M

Sydney Harbour TunnelOpening Balance 513.642 434.392Revaluation 3.238 79.250

516.880 513.642

M2 MotorwayOpening Balance 15.772 7.940Annual Increment – Emerging Right to Receive 10.439 7.832

26.211 15.772

M4 MotorwayOpening Balance 47.316 39.133Annual Increment – Emerging Right to Receive 15.341 8.183

62.657 47.316

M5 MotorwayOpening Balance 48.452 39.490Annual Increment – Emerging Right to Receive 9.546 8.962

57.998 48.452

Eastern DistributorOpening Balance – –Annual Increment – Emerging Right to Receive 3.997 –

3.997 –Prepaid Superannuation Contributions 2.800 –

670.543 625.182

(100) Roads and Traffic Authority Annual Report 2000

NOTES (continued)Roads & Traffic Authority as at 30 June 2000

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 100

Page 103: RTA Annual Report 2000 See Pg 24

(101) Roads and Traffic Authority Annual Report 2000

NOTES (continued)Roads & Traffic Authority as at 30 June 2000

Sydney Harbour TunnelThe RTA’s interest in the Sydney Harbour Tunnel has been valued basedon the RTA’s right to the time share of its ownership, total servicepotential and remaining useful life at the date of its transfer to the RTAin 2022. At the date of this transfer, the value will equate to the thencurrent written down replacement cost of the Tunnel. The cost ofconstructing the Tunnel was $683.3 million. The current written down replacement cost of the Tunnel is $516.880 million (30/6/99;$513.642 million).

In separately classifying the Sydney Harbour Tunnel as an infrastructureasset, the RTA recognises that the contractual arrangements relating tothe Tunnel are unique.

The construction of the Tunnel was financed by 30 year inflation linkedbonds issued by the Sydney Harbour Tunnel Company to the privatesector of $486.7 million, Sydney Harbour Tunnel Company shareholders’loans (repaid in 1992) of $40 million, and an interest free, subordinatedloan (the Net Bridge Revenue Loan) provided by the RTA of $222.6million, based on the projected net toll revenue from the SydneyHarbour Bridge during the construction period. Under the EnsuredRevenue Stream Agreement (ERS), the Government has agreed to makeERS payments (net of tolls collected from the Tunnel) to enable the SHTCto meet financial obligations arising from the operation and maintenanceof the Tunnel and repayment of principal and interest on funds borrowedby it for the design, construction and operation of the Tunnel.

During the year ended 30 June 2000, tolls collected from the Tunnelamounted to $27.623 million (1998/99; $25.509 million). These tollswere applied to the financial obligations of the Tunnel and resulted in areduction in ERS payments from $70.220 million to $42.597 million(1998/99; $67.275 million to $41.766 million).

NSW Treasury guidelines on the valuation of non-current assets statethat asset revaluations must be conducted at least every five years.Revaluations were effected in 1994 and 1999, the Tunnel beingrevalued using the RTA’s Road Cost Index. The RTA however nowrevalues the Tunnel each year. Based on movements in the Road CostIndex during the 1999/2000 reporting period, the RTA’s interest in theTunnel was $516.880 million at 30 June 2000, a revaluation increase of$3.238 million (1998/99, $79.250 million) over the value of $513.642million recognised at 30 June 1999.

M2 MotorwayTo facilitate the financing, design and construction of the Motorway,the RTA leased land detailed in the M2 Motorway Project Deed for the term of the Agreement.

Until the project realises a real after tax internal rate of return of 12.25 per cent per annum, the rent is payable, at the Lessee’sdirection, in cash or by promissory note. On achievement of therequired rate, the rent is payable in cash. Under the terms of the lease,the RTA must not present any of the promissory notes for paymentuntil the earlier of the end of the term of Agreement or theachievement of the required rate of return.

Payments for the rents for the Trust Lease and the Trust ConcurrentLease for the year ended 30 June 2000 have been made by promissorynotes in the value of $5.828 million and $1.457 million respectively. The RTA, as at 30 June 2000, has received promissory notes for rent onthe above leases totalling $28.372 million. The term of the Agreementends on the forty fifth anniversary of the M2 commencement date(ie.26 May 2042), subject to the provisions of the M2 Motorway ProjectDeed. The net present value of these promissory notes, as at 30 June2000, is $0.167 million.

The RTA has, from the date of completion of the M2 Motorway on 26 May 1997, valued the asset by reference to the RTA’s emergingshare of the written down replacement cost of the asset at date ofhandback over the concession period.

Under the terms of the Project Deed, ownership of the M2 Motorwaywill revert to the RTA on the earlier of the achievement of specifiedfinancial returns outlined in the Deed or 45 years from the M2Commencement Date of 26 May 1997. The conservative period of45 years has been used to calculate the RTA’s emerging share of the asset.

12. CURRENT/NON CURRENT ASSETS – OTHER (continued)

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 101

Page 104: RTA Annual Report 2000 See Pg 24

(102) Roads and Traffic Authority Annual Report 2000

NOTES (continued)Roads & Traffic Authority as at 30 June 2000

The RTA’s remaining financial commitment to the project is to fund the cost of land acquisition, project management and the widening ofSouthern Cross Drive. On 26 June 1997, the Government approved afinancial contribution by the RTA of $20 million towards theseconstruction costs. This is consistent with current estimates with work continuing in relation to those local traffic improvement works.

In consideration of the RTA granting to AML the right to levy and retaintolls on the Eastern Distributor, AML is required to pay concession feesin accordance with the Agreement. From the date of Financial Close,which occurred on 18 August 1997, AML has paid $45 million by way of promissory notes (being $15 million on Financial Close and $15 million on each of the first and second anniversaries of FinancialClose). A further $2.2 million was received in cash six months afterFinancial Close. Under the Agreement, the promissory notes show apayment date (subject to provisions in the Project Deed) of 31December 2042 and, as at 30 June 2000, the promissory notes havea net present value of $0.250 million.

Under the terms of the Project Deed, ownership of the EasternDistributor will revert to the RTA on the earlier of the achievement ofspecified financial returns outlined in the Deed or 48 years from theEastern Distributor Commencement Date of 18 December 1999. The conservative period of 48 years has been used to calculate theRTA’s emerging share of the asset.

12. CURRENT/NON CURRENT ASSETS – OTHER (continued)

M4 and M5 MotorwaysThe RTA has valued the infrastructure assets in respect of the M4 andM5 Motorways by reference to the RTA’s emerging share of the writtendown replacement cost of each asset apportioned over the period ofthe respective concession agreement.

Ownership of the M4 Motorway and M5 Motorway will revert to theRTA in 2010 and 2022 respectively.

The M5 Motorway Call Option Deed provides that if, after at least 25 years from the M5 Western Link commencement date of 26 June1994, the RTA determines that the expected financial return has beenachieved, the RTA has the right to purchase either the business from ILRor the shares in ILR from Infrastructure Trust of AustralAsia Ltd (ITA) andthe Commonwealth Bank of Australia (CBA). The exercise price underthe M5 Call Option Deed will be based on open market valuation ofthe business or shares.

Eastern DistributorAn agreement was signed with Airport Motorway Limited (AML) inAugust 1997 to finance, design, construct, operate, maintain and repairthe Eastern Distributor. Work commenced in August 1997, with the roadto be open to traffic before the Sydney Olympics in September 2000.The Eastern Distributor was opened to traffic on 18 December 1999.

The total cost, including operational and maintenance costs, of theEastern Distributor is calculated at $700 million.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 102

Page 105: RTA Annual Report 2000 See Pg 24

(103) Roads and Traffic Authority Annual Report 2000

NOTES (continued)Roads & Traffic Authority as at 30 June 2000

13. CURRENT LIABILITIES – ACCOUNTS PAYABLE

1999/2000 1998/1999$M $M

Trade Creditors 43.073 27.358Creditors Arising from Compulsory Acquisitions – 1.417Accrued Expenses– Contract Expenditure 115.680 105.740– Work Carried out by Councils 30.980 49.786– Interest 14.630 27.168– Other 46.317 43.700Other 0.713 0.754

251.393 255.923

14. CURRENT/NON-CURRENT LIABILITIES – BORROWINGS

1999/2000 1998/1999$M $M

CurrentTcorp Borrowings 149.563 271.256Other – 0.200

149.563 271.456

Non-CurrentTcorp Borrowings 888.409 678.047Other 2.100 2.100

890.509 680.147

Loan Borrowings are due as follows:Face Unamortised Adjusted

Value Expense Book Value$M $M $M

Semi-Government LoansWithin 1 year 39.563 – 39.563Between 1 and 5 years 503.506 19.858 483.648After 5 years 423.576 18.815 404.761

966.645 38.673 927.972

The weighted average interest rate on the Semi-Government loan portfolio as at 30 June 2000 is 7.01% (30 June 1999; 8.98%).

Come and Go FacilityThe Treasurer in 1998/99 approved of the RTA utilising a “Come and Go” Facility with Treasury Corporationup to the value of $150 million for a three year period ending December 2001.

This enabled the RTA to use its investment funds to repay semi government debt, and, over the periodmentioned above, draw back through the facility funds as required to meet the RTA’s expenditurecommitments. Additional funds will be provided to the Roads Program from the net difference between the lower debt servicing costs of loans and the investment income foregone.

In 1999/2000 an amount of $110 million, included in Current Tcorp Borrowings, was drawn-down from the Facility to assist in funding major road projects.

1999/2000 1998/1999$M $M

Other Loan BorrowingsRepayable within 1 year – 0.200Between 1 and 5 years – –After 5 years 2.100 2.100

2.100 2.300

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 103

Page 106: RTA Annual Report 2000 See Pg 24

(104) Roads and Traffic Authority Annual Report 2000

NOTES (continued)Roads & Traffic Authority as at 30 June 2000

15. FINANCIAL INSTRUMENTS

(a) Interest Rate RiskInterest rate risk is the risk that the value of the financial instruments will fluctuate due to changes in market interestrates. The RTA’s exposure to interest rate risks and the effective interest rates of financial assets and liabilities at thebalance sheet date are as follows:

Financial Instrument Floating Interest Rate Fixed Interest Rate

1 Year or Less Over 1 to 5 years1999 2000 1999 2000 1999 2000

$M $M $M $M $M $M

Financial AssetsCash 13.472 31.872 – – – –Receivables – – – – – –Treasury Corp Hourglass 0.936 0.426 – – – –Futures Margin – – – – – –On call Deposits 3.091 3.648 0.148 0.326 – –

Total – Financial Assets 17.499 35.946 0.148 0.326 0.000 0.000

Financial LiabilitiesBorrowings – Treasury Corp 47.741 0.606 223.515 38.957 359.407 483.648– Tcorp Come & Go – 110.000 – – – –– Other – – 0.200 – – –Creditors 0.307 0.238 – – – –Contract Security Deposits – – – – – –

Total – Financial Liabilities 48.048 110.844 223.715 38.957 359.407 483.648

(b) Credit RiskCredit Risk is the risk of financial loss arising from another party to a contract or financial obligation. The RTA’smaximum exposure to credit rate risk is represented by the carrying amounts of the financial assets net of anyprovisions for doubtful debts included in the Balance Sheet. The repayment of the Sydney Harbour Tunnel Loan ranksbehind all creditors to be paid. Redemption of the M2 and Eastern Distributor promissory notes is dependent uponcounterparties generating sufficient cash flows to enable the face value to be repaid.

Banks Governments Other1999 2000 1999 2000 1999 2000

$M $M $M $M $M $M

Financial AssetsCash 13.472 31.872 – – 9.346 9.462Receivables – – 0.863 0.994 70.686 74.394Investments 4.027 3.778 – 0.658 0.233 0.041

Total – Financial Assets 17.499 35.650 0.863 1.652 80.265 83.897

(c) Net Fair ValuesThe carrying value of debtors, investments, creditors and borrowings approximate net fair value. The future cash flowsof the Sydney Harbour Tunnel loan and M2 and Eastern Distributor promissory notes are discounted using standardvaluation techniques at the applicable yield having regard to the timing of the cash flows.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 104

Page 107: RTA Annual Report 2000 See Pg 24

(105) Roads and Traffic Authority Annual Report 2000

NOTES (continued)Roads & Traffic Authority as at 30 June 2000

Total Carrying Amount Weighted AverageFixed Interest Rate Non Interest Bearing as per Balance Sheet Effective Interest Rate

More than 5 Years1999 2000 1999 2000 1999 2000 1999 2000

$M $M $M $M $M $M % %

– – 9.346 9.462 22.818 41.334 – –– – 71.549 75.388 71.549 75.388 – –– – – – 0.936 0.426 5.21 5.53– – – 0.036 – 0.036 – –– – 0.085 0.041 3.324 4.015 4.96 5.38

0.000 0.000 80.980 84.927 98.627 121.199

318.640 404.761 – – 949.303 927.972 8.98 7.01– – – – – 110.000 – 5.46

2.100 2.100 – – 2.300 2.100 6.70 6.62– – 24.914 38.693 25.221 38.931 – –– – 1.335 1.418 1.335 1.418 – –

320.740 406.861 26.249 40.111 978.159 1,080.421

Total1999 2000

$M $M

22.818 41.33471.549 75.3884.260 4.477

98.627 121.199

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 105

Page 108: RTA Annual Report 2000 See Pg 24

(106) Roads and Traffic Authority Annual Report 2000

NOTES (continued)Roads & Traffic Authority as at 30 June 2000

16. CURRENT/NON-CURRENT LIABILITIES – EMPLOYEE ENTITLEMENTS

1999/2000 1998/1999$M $M

CurrentSuperannuation 54.751 53.664Annual Leave 26.131 25.062Long Service Leave 6.754 10.540Accrued Employee Related Costs 8.382 6.465Voluntary Redundancies 0.867 0.965

96.885 96.696

Non-CurrentSuperannuation 98.383 226.456Long Service Leave 105.580 97.996Workers Compensation (Liability under the former Department of Motor Transport self-insured scheme) 0.696 0.718

204.659 325.170

Total Employee Entitlements 301.544 421.866

The Government Actuary completed an assessment of the Gross Superannuation Liabilities for the definedbenefits schemes administered by the SAS Trustee Corporation for the year ended 30 June 2000, identifyingthe unfunded superannuation liability of the RTA. The assessment was based on the full requirements ofAAS25 which requires that a “market determined risk adjusted discount rate” be applied as the valuationinterest rate in the calculation on the value of the accrued benefits. A review of the key economic assumptionsused in the 1998 valuation was undertaken prior to calculating the gross superannuation liability of thevarious defined benefit schemes as at 30 June 2000.

The economic assumptions used are as follows:2000/2001 2001/2002 Thereafter

% % %

Rate of Investment Return 7.0 7.0 7.0Rate of Salary Increase * 4.0 4.0 4.0Rate of Increase in the CPI 2.5 2.5 2.5

* A promotional scale also applies.

This assessment resulted in the RTA’s liability being reduced by $134.003 million.

Payments are made by the RTA to the Superannuation Administration Authority (SAA) to reduce thesuperannuation liability and during 1999/2000 these totalled $54.751 million (1998/99; $53.664 million).These payments are held in Investment Reserve Accounts.

The unfunded liability disclosed in the Statement of Financial Position is composed of:

SASS SANCS SSS Total Total$M $M $M 1999/2000 1998/1999

Gross Liability Assessed by Actuaries as at 30 June 2000 176.804 38.972 349.938 565.714 601.141

Less: Investment Reserve Account Balance (including actuarial, tax and interestadjustments) 69.349 41.772 304.259 415.380 321.021

Unfunded Liability 107.455 (2.800) 45.679 150.334 280.120

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 106

Page 109: RTA Annual Report 2000 See Pg 24

(107) Roads and Traffic Authority Annual Report 2000

NOTES (continued)Roads & Traffic Authority as at 30 June 2000

17. CURRENT/NON-CURRENT LIABILITIES – OTHER LIABILITIES

1999/2000 1998/1999$M $M

CurrentStatutory Creditors 15.359 14.741Principal Outstanding on Bonds Issued to Private Sector 10.131 9.502Unearned Rent on M4 and M5 Motorways 3.108 3.108Income Received in Advance 4.075 0.904Holding Accounts 8.492 7.199FIRST Scheme 0.041 0.041Suspense Items 0.161 1.142

41.367 36.637

Non-CurrentPrincipal Outstanding on Bonds Issued to Private Sector 406.463 416.594Unearned Rent on M4 and M5 Motorways 35.984 39.092

442.447 455.686

The liability in respect of the Sydney Harbour Tunnel has been recognised at the Net Present Value (NPV) of the Ensured Revenue Stream Agreement (ERS). This has been calculated at $416.594 million (1998/99;$426.096 million), being the principal outstanding as at 30 June 2000 on the bonds issued by the SydneyHarbour Tunnel Company to the private sector.

Under the M4 lease agreement, $46.615 million was received from Statewide Roads Pty Ltd (SWR) as rent inadvance. In accordance with generally accepted accounting principles, this revenue is brought to accountover the period of the lease.

This treatment is summarised as follows:

1999/2000 1998/1999$M $M

Rent earned in prior years 21.372 18.997Rent earned in current year 2.375 2.375Unearned rent as at 30 June 2000 22.868 25.243

46.615 46.615

The land acquisition loan of $22 million, based on the cost of land under the M5 originally purchased by the RTA, was repaid in June 1997 by Interlink Roads Pty Ltd (ILR). The repayment of the loan is considered tobe a prepayment of the remaining rental over the period of the concession agreement. In accordance withAAS17, this revenue is brought to account over the period of the lease.

This treatment is summarised as follows:1999/2000 1998/1999

$M $M

Rent earned in prior years 5.043 4.310Rent earned in current year 0.733 0.733Unearned rent as at 30 June 2000 16.224 16.957

22.000 22.000

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 107

Page 110: RTA Annual Report 2000 See Pg 24

(108) Roads and Traffic Authority Annual Report 2000

NOTES (continued)Roads & Traffic Authority as at 30 June 2000

18. CHANGES IN EQUITY

Accumulated Funds Asset Revaluation Total Equity1999/2000 1998/1999 1999/2000 1998/1999 1999/2000 1998/1999

$M $M $M $M $M $M

Opening Balance 39,348.590 37,132.871 5,495.529 4,056.500 44,844.119 41,189.371

Adjustment to opening balance for change in accounting policy for depreciation (4,341.205) (35.622) – – (4,341.205) (35.622)

Transfers from AssetRevaluation Reservefor asset disposals 25.706 22.799 (25.706) (22.799) – –

Surplus/Deficit for Year 2,217.718 2,228.542 – – 2,217.718 2,228.542

Increment/Decrement on:– Land & Buildings – – 690.675 331.133 690.675 331.133– Authority Infrastructure – – 2,876.313 1,130.695 2,876.313 1,130.695

Closing Balance 37,250.809 39,348.590 9,036.811 5,495.529 46,287.620 44,844.119

19. COMMITMENTS FOR EXPENDITURE

(a) Operating Lease CommitmentsOperating Lease Commitments relate to Property, IT Equipment and Light Motor Vehicles.

Operating lease commitments are not recognised in the financial statements as liabilities.

In respect of Property Leases, the RTA has various lessors with leases which have specific lease periods rangingfrom 1 year to 20 years.

The Property Operating Lease Commitments are as follows:1999/2000 1998/1999

$M $M

No later than 1 year 14.167 11.737Later than 1 and not later than 5 years 39.904 30.662Later than 5 years 28.844 28.071

82.915 70.470

IT Equipment Operating Leases have been negotiated with Dell Computer Pty Ltd, Fujitsu Australia Ltd, andMacquarie IT Pty Ltd. The leases are scheduled to cease in June 2002 and June 2004.

The IT Equipment Operating Lease Commitments are as follows:1999/2000 1998/1999

$M $M

No later than 1 year 9.000 2.900Later than 1 and not later than 5 years 11.000 8.200Later than 5 years – –

20.000 11.100

The Light Motor Vehicle Lease is with State Fleet Services and is financed by Macquarie Bank. The lease isscheduled to cease in September 2008.

The Light Motor Vehicle Operating Lease Commitments are as follows:1999/2000 1998/1999

$M $M

No later than 1 year 18.000 18.000Later than 1 and not later than 5 years 72.000 72.000Later than 5 years 58.500 76.500

148.500 166.500

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 108

Page 111: RTA Annual Report 2000 See Pg 24

(109) Roads and Traffic Authority Annual Report 2000

NOTES (continued)Roads & Traffic Authority as at 30 June 2000

19. COMMITMENTS FOR EXPENDITURE (continued)

1999/2000 1998/1999$M $M

(b) Capital CommitmentsPayable no later than 1 year– Value of work to be completed on road and bridge contracts over $100,000 469.863 421.476– Plant, light vehicles, trucks 0.840 0.381Payable later than 1, but not later than 5 years 427.952 439.248Payable later than 5 years 8.199 22.738

906.854 883.843

(c) Other Expenditure CommitmentsPayable no later than 1 year 10.528 13.975Payable later than 1, but not later than 5 years 1.042 2.476Payable later than 5 years 0.021 0.071

11.591 16.522

20. CONTINGENT ASSETS

The total commitments detailed above include GST input tax credits of $108.561 million that are expected tobe recoverable from the ATO.

21. CONTINGENT LIABILITIES

There are some 19 claims (1998/99; 28 claims) for damage or injury currently being litigated with anestimated total contingent liability to the RTA of $5.035 million (1998/99; $4.267 million). There are also 7 significant contractual disputes (1998/99; 6 disputes) with an estimated total contingent liability of$38.692 million (1998/99; $46.783 million).

Any claims resulting from incidents which have occurred since 1 July 1989 are not included in the abovefigures as costs for such claims are now covered by the RTA’s Insurance with the Treasury Managed Fund.

An additional liability could arise under Clause 4.1(c) of the Ensured Revenue Stream Agreement (ERS) if ataxation deduction for a claim for depreciation for the immersed tube section of the Tunnel is disallowed tothe Sydney Harbour Tunnel Company. Under such circumstance the ERS provides for a renegotiation of themethod by which ERS payments are calculated which could result in an increased liability to the RTA ofbetween $31 million and $75 million over the period of the agreement to 2022.

22. NATIVE TITLE

The Commonwealth’s legislation (Native Title Act) and the New South Wales statute (Native Title (New SouthWales) Amendment Act) have financial implications for New South Wales Government Agencies generally.

In this regard the RTA has undertaken an assessment of the impact on its financial position. This assessmentindicates that as at 30 June 2000 there were no Native Title claims which had been initiated against the RTA.

23. YEAR 2000

The RTA established a project team to investigate the effect of the date change from 1999 to 2000 on itsactivities. A program was established to help ensure that the impact of the transition to year 2000 on RTAcustomers was minimised. In this regard, the project team assessed the Year 2000 risk to the RTA, while aseparate test environment was set up to ensure Year 2000 compliance.

The date change from 1999 to 2000 had no impact on RTA operations or its financial result.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 109

Page 112: RTA Annual Report 2000 See Pg 24

(110) Roads and Traffic Authority Annual Report 2000

NOTES (continued)Roads & Traffic Authority as at 30 June 2000

24. BUDGET REVIEW

Net Cost of ServicesThe actual net cost of services was $1,343.112 million less than the budget principally due a higher level of revenue than was included in the budget. This increase in revenue related to Sale of Goods and Services($21.831 million), Grants & Contributions, including funding for natural disaster restoration works ($27.913 million) and Other Revenue ($1,710.577 million). The Other Revenue included an amount of$1,693.981 million to recognise the revaluation of infrastructure systems. This increase in revenue was inpart offset by an increase of $416.012 million in total expenses. This increase was principally due to anincrease in depreciation of $424.125 million mainly related to infrastructure systems which was not includedin the budget. In addition, Other Operating Expenses increased by $35.501 million. In contrast, finance costswere $18.946 million lower than budget, with employee related costs also down by $38.255 million,following an actuarial assessment of the RTA’s superannuation liability.

Assets and LiabilitiesNet assets have increased by $3,095.796 million compared to budget. This is principally due to increases in the values of Land & Buildings ($324.075 million) and Infrastructure Systems ($2,571.053 million). These increases relate to revaluations and the impact of changes in depreciation policies in respect ofinfrastructure assets which were not included in the budget. Other Non Current Assets which include therecognition of the RTA’s right to receive private sector provided infrastructure is also $96.203 million higherthan the budget estimate.

In this regard, the 1999/2000 budget was prepared prior to the finalisation of 1998/99 financial statements.As such, the changes in the land & buildings, infrastructure and private sector asset values as compared tothe budget take into account revaluations and other adjustments undertaken both at 30 June 1999 and 30 June 2000.

The change in net assets is also impacted by a decrease in total liabilities of $109.499 million compared tothe budget. This is principally due to a reduction in employee entitlements ($92.079 million) following anactuarial assessment of the RTA’s superannuation liability.

Cash FlowsNet cash flow from operating activities is $47.985 million less than the budget primarily due an increase intotal payments ($117.907 million), offset by increases in cash flow from Government ($27.743 million) andtotal receipts ($42.179 million).

Net cash outflow in relation to investing activities is $73.669 million less than the budget primarily due to lowerthan expected purchases of land & buildings, plant & equipment and infrastructure systems ($65.686 million).

Net cash flow from financing activities is $6.049 million more than the budget primarily due to lower thanexpected repayments of borrowings and advances ($6.049 million).

A variance of $26.536 million in respect of the opening cash as compared to the budget has occurred due tothe fact that the 1999/2000 budget was prepared prior to the finalisation of 1998/99 financial statements.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 110

Page 113: RTA Annual Report 2000 See Pg 24

(111) Roads and Traffic Authority Annual Report 2000

NOTES (continued)Roads & Traffic Authority as at 30 June 2000

25. CASH AND CASH EQUIVALENTS

For the purposes of the Cash Flow Statement, cash includes cash on hand, cash at bank and cash equivalentsin the form of investments in accordance with the definition of “cash equivalents” in AAS28.

1999/2000 1998/1999$M $M

RTA Operating Account 16.427 4.161Remitting Account, Cash in Transit & Cash on Hand 24.907 18.657Cash Equivalents (Investments) 4.436 4.219

45.770 27.037

26. RECONCILIATION OF NET COST OF SERVICES

TO NET CASH FLOWS FROM OPERATING ACTIVITIES

1999/2000 1998/1999$M $M

Net Cash used on Operating Activities (795.625) (769.639)Depreciation 443.098 124.213Revaluation of Infrastructure (1,693.981) (1,550.492)Increase in Provisions and Entitlements (95.268) 21.886Rent Revenue in respect of M4 and M5 Motorways (3.108) (3.108)Value of Emerging Interest of Private Sector Provided Infrastructure (43.657) (23.784)ERS payments utilised to redeem current principal portion of bonds issued to Private Sector (10.131) (9.502)

Increase in Payables and Other Liabilities (10.703) (19.845)Decrease in Receivables and Other Assets (7.560) 0.431(Profit)/Loss on Sale of Assets (0.783) 1.298Contributions from Government 1,895.615 1,846.080

Net Cost of Services (322.103) (382.462)

END OF AUDITED FINANCIAL STATEMENTS

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 111

Page 114: RTA Annual Report 2000 See Pg 24

(112) Roads and Traffic Authority Annual Report 2000

SUPPLEMENTARY FINANCIAL INFORMATIONRoads & Traffic Authority as at 30 June 2000

THE YEAR IN BRIEF – 1999/2000

InitialBudget Actual

$M $M

New Funds Available

CommonwealthNational Highway 211 210Roads of National Importance 78 85Australian Transport Safety Bureau – Blackspots Program 12 18Other 9 13

Total Commonwealth 310 326

StateMotor Vehicle Taxes 709 728Fuel Levies/Excise 636 616Untied – Commonwealth Road Funds 124 124M4/M5 Cashback Scheme 35 35Other Consolidated Revenue 54 67RTA Revenue 218 285

Total State 1,776 1,855

Total New Funds 2,086 2,181

Use of Cash Balances 13 (18)

2,099 2,163

Use of Come and Go Facility 110 110Increase in Liabilities/Reduction in Operational Assets 56 (97)

Total Funds Utilised 2,265 2,176

ExpenditureRoad Network Infrastructure– Network Development 969 933– Infrastructure Maintenance 578 563Traffic & Transport 225 213Road Safety & Road User Management 333 327Debt Servicing & Repayment 120 100M4/M5 Cashback 35 36Voluntary Redundancies 5 4

Total Expenditure 2,265 2,176

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 112

Page 115: RTA Annual Report 2000 See Pg 24

(113) Roads and Traffic Authority Annual Report 2000

SUPPLEMENTARY FINANCIAL INFORMATION (continued)Roads & Traffic Authority as at 30 June 2000

1999/2000 BUDGET

Funds budgeted to be available to the Roads and Traffic Authority for 1999/2000 as published in StateBudget Paper No. 3 amounted to $2,265 million. Variations to the initial budget were as follows:

$M $M

Total Initial Budget 2,265

Increase in ReceiptsCommonwealth Funds – RONI’s & ATSB Blackspot Program 21Motor Vehicle Taxation 15General Consolidated Revenue 11Authority Revenue 36 83

2,348Less:Decrease in ReceiptsCommonwealth Funds – National Highways 5Fuel Levies/Excise 20 25

2,323Less:Decrease in Balance Sheet Movements 3Decrease in use of Cash Balances 9

Total Revised Budget 2,311

Total funds available for 1999/2000 amounted to $2,311 million and variances from the revised budget were as follows:

$M $M

Total Revised Budget 2,311

Increase in ReceiptsCommonwealth Funds – National Highways 4Motor Vehicle Tax 4Authority Revenue 32General Consolidated Revenue 4 44

2,355Less:Decrease in ReceiptsCommonwealth Funds – ATSB Blackspots Program & Interstate Vehicle Registration Scheme 8 8

2,347Less:Decrease in Balance Sheet Movements 150Decrease in use of Cash Balances 21

Actual Total Funds Available 2,176

The most significant variations between the revised budget and actual funds available were due to:

– an increase in Authority Revenue particularly for Plate Fees, Minor User Charges and Right to Receive PrivateSector Infrastructure revenue; offset by

– a reduction in Commonwealth Grants provided to the Australian Transport Safety Bureau BlackspotsProgram and the Interstate Vehicle Registration Scheme; and

– decreases in the use of cash balances and the funds derived from balance sheet movements. The decreasein balance sheet movements primarily relates to an actuarial adjustment to the liability for unfundedsuperannuation.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 113

Page 116: RTA Annual Report 2000 See Pg 24

(114) Roads and Traffic Authority Annual Report 2000

SUPPLEMENTARY FINANCIAL INFORMATION (continued)Roads & Traffic Authority as at 30 June 2000

COMMONWEALTH GRANTS

Australian Land Transport Development Act, 1988Under funding arrangements introduced in 1994, the Commonwealthresponsibility for the funding of roads is confined to the constructionand maintenance of National Highways.

During 1999/2000 the RTA received $228.8 million, including $18.3 million for the Road Safety Blackspots Program, under theprovisions of the Australian Land Transport Development Act, 1988(1998/99; $251.4 million).

Roads of National ImportanceIn the 1996/97 Federal Budget, it was formally announced that a newFederally funded road transport category was to be established to caterfor Roads of National Importance.

During 1999/2000 the Authority received $85.3 million for roads underthis category (1998/99; $68 million).

Interstate Road Transport Act, 1985The Interstate Road Transport Act, 1985 enables heavy vehicles to haveFederal registration if they are not registered in a State or Territory andare involved only in interstate trade.

Under the Federal Scheme vehicle owners are required to pay either aflat rate or a charge based on distance travelled. The moneys arecollected in NSW by the RTA on behalf of the Commonwealth and paidinto the Interstate Road Transport Trust Fund. The proceeds are thendistributed to the States as a contribution towards road repair andmaintenance costs.

Funds received by the RTA under this scheme during 1999/2000amounted to $12.5 million (1998/99; $6.2 million).

50

100

150

200

250

1999

/00

1998

/99

1997

/98

1996

/97

1995

/96

1994

/95

1993

/94

1992

/93

1991

/92

1990

/91

$ M

illio

n

Figure 15 – Commonwealth Grants per registered vehicle (Constant Dollar 1999/2000 terms)

State Commonwealth

0

500

1000

1500

2000

1999

/00

1998

/99

1997

/98

1996

/97

1995

/96

1994

/95

1993

/94

1992

/93

1991

/92

1990

/91

$ M

illion

National Roads Arterial & Other Roads

0

100

200

300

400

500

1999

/00

1998

/99

1997

/98

1996

/97

1995

/96

1994

/95

1993

/94

1992

/93

1991

/92

1990

/91

$ M

illio

n

Figure 16 – Commonwealth Grants (Constant Dollar 1999/2000 terms)

Figure 14 – Funding of the State Road Network (Constant Dollar 1999/2000 terms)

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 114

Page 117: RTA Annual Report 2000 See Pg 24

(115) Roads and Traffic Authority Annual Report 2000

1999/2000 3X3 PROGRAM

– Financial Report for Period 1/7/99 to 30/6/2000

Total1999/2000

$M

(A) Income

Fuel Levies 273.929Interest Earned 1.072

Total Income 275.001

(B) Approved Expenditure

Development 172.718Rehabilitation 44.499Council Determined 14.993Public Transport Infrastructure 28.074Traffic & Safety 14.717

Total Expenditure 275.001

SUPPLEMENTARY FINANCIAL INFORMATION (continued)Roads & Traffic Authority as at 30 June 2000

STATE SOURCES

Fuel Levies/Excise

On 5 August 1997, the High Court handed down a decision on twochallenges to franchise fees on tobacco, effectively stopping the Statesfrom levying business franchise licence fees, including the fees appliedto petroleum products.

From 6 August 1997, the Commonwealth introduced a fuel excisesurcharge of 8.1 cents per litre, nation wide, in order to place theStates in a revenue position that was no worse than existed prior to theHigh Court decision.

Some of the revenue from the fuel excise surcharge is paid to NSW.The RTA in 1999/2000 received $615.6 million from the fuel excisesurcharge paid to NSW. The amount paid to the RTA excludes rebatesand subsidies for certain border areas and the off road diesel scheme,which were paid out by State Treasury prior to the net funds beingpassed on to the RTA.

During 1999/2000, $341.6 million (1998/99 – $344 million) was dedicated to the general Roads program and $273.9 million(1998/99 – $276 million) was used to fund the 3x3 Program.

In order to continue the funding arrangements for the 3x3 Programfollowing the High Court decision, the Road Improvement (SpecialFunding) Amendment Act, 1998 was passed during 1998/99 whichprovided for an annual standing appropriation to be made out ofConsolidated Funds for the funding of road improvement, road safetyand road related public transport infrastructure authorised by theprogram. The amount appropriated was equal to 44.5 percent of the revenue collected by the Commonwealth and was paid to theStates less subsidies paid by the State under the scheme to matchinterstate petroleum prices in certain border areas and under the off-road diesel scheme.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 115

Page 118: RTA Annual Report 2000 See Pg 24

(116) Roads and Traffic Authority Annual Report 2000

SUPPLEMENTARY FINANCIAL INFORMATION (continued)Roads & Traffic Authority as at 30 June 2000

Motor Vehicle TaxationMotor vehicle taxation, collected by the RTA when vehicles areregistered, is hypothecated to the Roads Program. During 1999/2000receipts from motor vehicle taxation totalled $728.1 million (1998/99;$698.2 million).

Number of Registered Motor Vehicles in NSW

Number of % Change Motor Over

Vehicles PreviousYear Registered* Year

1987/88 3,102,709 2.5(+)1988/89 3,147,232 1.4(+)1989/90 3,227,798 2.5(+)1990/91 3,246,703 0.6(+)1991/92 3,234,814 0.4(–)1992/93 3,199,756 1.1(–)1993/94 3,290,594 2.8(+)1994/95 3,311,402 0.6(+)1995/96 3,367,092 1.7(+)1996/97 3,421,409 1.6(+)1997/98 3,493,340 2.1(+)1998/99 3,535,732 1.2(+)1999/2000 3,636,353 2.8(+)

* Excluding plant, tractors, trailers and caravans1992/93–1999/2000 figures exclude vehicles on register without currentregistration

Contributions for Specific Works

The following contributions towards specific works were receivedduring 1999/2000:

$M

State Government Departments for– General Purposes 7.019– Sydney Harbour Bridge 2.783Councils 1.133Private Firms and Individuals 6.963

17.898

Untied Commonwealth Road Grants

Since 1990/91, Commonwealth road funds have been provided to the States under the Australian Land Transport Development program.However, the Commonwealth decided that funds previously allocatedfor the State’s arterial roads were to be untied from 1 January 1994and were to be provided to the States under the heading of “IdentifiedRoads Grants within the General Revenue Assistance to the States”.

The basis of the distribution of these funds to the States has beentransitioned from the proportions issued in 1993/94 to the proportionsutilised in 1999/2000, when the untied funding was fully distributed inaccordance with the Financial Assistance Grants (FAGs) formula.

The Commonwealth Government untied road funding to NSW for1999/2000 was $124.3 million (1998/99; $118.3 million).

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 116

Page 119: RTA Annual Report 2000 See Pg 24

(117) Roads and Traffic Authority Annual Report 2000

SUPPLEMENTARY FINANCIAL INFORMATION (continued)Roads & Traffic Authority as at 30 June 2000

ROAD COST INDEX

The Authority's Road Cost Index, which is used to adjust money valuesin various tables and graphs within this Annual Report, is shown in thetable 'Roads and Traffic Authority Road Cost Index'.

The index, which has been specially developed by the RTA, is widelyaccepted as a measure of change in the cost of roadworks, bridgeworksand traffic facilities. It is based upon changes in prices of sampleswithin the broad elements of wages, stores, plant, haulage, corporateand regional administration, property acquisitions and financing costs.Each index component has been allocated a predetermined weightingwhich is reviewed at 3 to 4 yearly intervals to adjust for changes in theproportions used in RTA roadwork activities.

Roads and Traffic Authority Road Cost Index(Base Year – 1996/97)

% Increase/(Decrease)

Over PreviousYear Index Year

1989/90 84.03 6.51990/91 90.63 7.91991/92 92.90 2.51992/93 91.07 (2.0)1993/94 90.89 (0.2)1994/95 92.62 1.91995/96 97.36 5.11996/97 100.00 2.71997/98 102.50 2.51998/99 107.00 4.41999/2000 107.40 0.4

PAYMENTS TO COUNCILS

Payments made to local government councils during 1999/2000 wereas follows:

$M $M

Classified Roads– Development 29.923– Maintenance 203.250– Vehicle Management 0.490– Road Safety 15.445– Traffic Management 33.052 282.160Local Roads– Natural Disasters 29.889

312.049

ADMINISTERED REVENUES – COLLECTIONS

The RTA administers, but does not control, the collection of variousfees, fines and levies on behalf of the Crown Transactions Entity.Monies collected on behalf of the Crown Transactions Entity are not recognised as the RTA’s revenues.

The RTA’s Administered Revenue Collections are as follows:

1998/99 1999/2000$M $M

Consolidated Fund ReceiptsVehicle Registration Fees 157.929 160.481Drivers Licence Fees 78.495 127.854Vehicle Transfer Fees 28.587 29.707Other Fees & Charges 18.963 20.213Registration Levy 7.914 2.174

TOTAL 291.888 340.429

Collection – Other AuthoritiesTranscover Levy 110.576 32.429Stamp Duty 451.841 470.353Interstate Road Transport Scheme Receipt 3.641 4.047

Firearms Licence Fees 1.443 1.896Security Licence Fees 3.748 0.009Proof of Age – 0.491Other Fees & Charges 0.009 0.008

TOTAL 571.258 509.233

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 117

Page 120: RTA Annual Report 2000 See Pg 24

(118) Roads and Traffic Authority Annual Report 2000

SUPPLEMENTARY FINANCIAL INFORMATION (continued)Roads & Traffic Authority as at 30 June 2000

THE YEAR AHEAD

2000/2001Budget

$M

New Funds Available

CommonwealthALTD Act 216Roads of National Importance 94Australian Transport Safety Bureau Blackspots Program 13Other 9

Total Commonwealth 332

StateMotor Vehicle Taxes 756Fuel Levies/Excise 656Untied Road Funds 127M4/M5 Cashback Scheme 44Other Consolidated Revenue 5RTA Revenue 225

Total State 1,813

Total New Funds 2,145

Use of Cash Balances 0

2,145

Use of Come & Go Facility 40Increase in Liabilities/Reduction in Operational Assets 15

Total Funds Utilised 2,200

ExpenditureRoad Network Infrastructure– Network Development 885– Infrastructure Maintenance 576Traffic & Transport 225Road Safety & Road User Management 341Debt Servicing & Repayment 122M4/M5 Cashback 44Voluntary Redundancies 7

Total Expenditure 2,200

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 118

Page 121: RTA Annual Report 2000 See Pg 24

(119) Roads and Traffic Authority Annual Report 2000

APPENDICES120 Appendix 1, Major Works – Sydney

124 Appendix 2, Review of Environmental Issues Relating to the Eastern Distributor

127 Appendix 3, Major Projects – Country

138 Appendix 4, Heritage and Conservation Register

154 Appendix 5, Species Recovery

158 Appendix 6, Advisory Bodies

160 Appendix 7, Senior Executive Performance Statements (Level 5 and Above)

163 Appendix 8, Internal Audit

164 Appendix 9, Risk Management

166 Appendix 10, Staffing

170 Appendix 11, Overseas Visits by RTA Officers

171 Appendix 12, Freedom of Information

177 Appendix 13, Legal Change

178 Appendix 14, Land Disposal

179 Appendix 15, Year 2000 Millennium Bug Control

179 Appendix 16, Publications

181 Appendix 17, Details of Payments to Consultants

182 Appendix 18, Account Payment Performance

182 Appendix 19, Funds Granted to Non-Government Community Organisations

183 Appendix 20, Driver and Vehicle Statistics and Heavy Vehicle Infringements

RTA FINANCIALS MELINDA 14.11 4/12/00 2:06 PM Page 119

Page 122: RTA Annual Report 2000 See Pg 24

(120) Roads and Traffic Authority Annual Report 2000

APPENDIX 1Major Works – Sydney

EASTERN DISTRIBUTOR

Estimated Cost: $685.0MCost to Date: Net cost to RTA limited to $20.0M, remaining

costs to private sector.1999/2000 (RTA): $10.0MCompleted: December 1999

The Eastern Distributor is being financed, designed, constructed,operated and maintained as a private toll road to provide a high qualitylink between the Cahill Expressway at Woolloomooloo and BotanyRoad at Mascot. Construction started in August 1997. A Landbridgelinking the grounds of the Art Gallery with the Domain and BotanicGardens was completed in December 1998. The Eastern Distributorwas opened in December 1999. The William Street ramps were openedin July 2000.

SOUTHERN CROSS DRIVE

Estimated Cost: $11.0MCost to Date: $9.2M1999/2000: $3.4MCompleted: December 1999

The widening of the existing road from four to six lanes between Link Road, Rosebery and Botany Road, Botany was opened to traffic in December 1999. A cycleway is to be constructed along WentworthAvenue and local streets.

CITY WEST LINK ROAD SECTION 3

Balmain Road to Boomerang StreetEstimated Cost: $50.7MCost to Date: $46.5M1999/2000: $15.3MCompleted: July 2000

The City West Link connects the Glebe Island Arterial with ParramattaRoad at Five Dock. The section from Balmain Road to BoomerangStreet was opened to traffic in June 2000.

M4 MOTORWAY

M4 Granville ViaductEstimated Cost: $9.0MCost to Date: $7.1M1999/2000: $5.6MEstimated Completion: 2001

Noise walls in conjunction with linemarking to provide six lanes werecompleted in May 2000.

M5 MOTORWAY

M5 EastEstimated Cost: $784.0MCost to Date: $382.5M1999/2000: $223.0MEstimated Completion: 2002

A four-lane motorway from General Holmes Drive, south of SydneyAirport to King Georges Road, Beverly Hills. Construction commencedFebruary 1999.

Fairford Road to King Georges RoadEstimated Cost: $40.0MCost to Date: $3.1M (RTA cost)1999/2000: $1.6MCompleted: September 1999

Duplication between King Georges Road, Beverly Hills and FairfordRoad, Padstow is designed, financed and constructed by the Motorwayoperator, Interlink Roads Pty Ltd. It provides four lanes and new, eastfacing on-load ramps at The River Road and Fairford Road.

OLD WINDSOR ROAD/WINDSOR ROAD

Estimated Cost: $76.0M (RTA costs)Cost to Date: $38.1M1999/2000: $12.7MEstimated Completion: 2003

Upgrading of Old Windsor Road and Windsor Road between SevenHills Road and Schofields Road, Rouse Hill, to provide a four-lanedivided road with provision for future transitway. Construction startedMarch 1997.

STACEY STREET EXTENSION, BANKSTOWN

Estimated Cost: $18.9MCost to Date: $17.4M1999/2000: $1.6MCompleted: September 1999

Construction of a four-lane link road between Rookwood Road and Hume Highway at Stacey Street intersection. Open to traffic in June 1999.

CUMBERLAND HIGHWAY

Estimated Cost: $30.0MCost to Date: $11.0M1999/2000: $8.5MEstimated Completion: 2002

Widen to six lanes with central median and turn lanes from MerrylandsRoad to The Horsley Drive. The first stage from Merrylands Road toCanal Road was opened to traffic in December 1999.

HEATHCOTE ROAD

Estimated Cost: $11.5MCost to date: $11.1M1999/2000: $5.6MCompleted: July 2000

Road widening to four lanes between Infantry Parade and NuwarraRoad, Holsworthy was opened to traffic in July 2000.

(3x3) denotes projects partly or wholly funded by the 3x3 fuel levy

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 120

Page 123: RTA Annual Report 2000 See Pg 24

(121) Roads and Traffic Authority Annual Report 2000

APPENDIX 1 (Continued)Major Works – Sydney

WORONORA BRIDGE

Estimated Cost: $47.0MCost to Date: $29.2M1999/2000: $19.6MEstimated Completion: December 2000

Construction of a new bridge and approaches commenced January 1999.

LINDEN STREET, SUTHERLAND

Estimated Cost: $8.5MCost to Date: $0.8M1999/2000: $0.7MEstimated Completion: December 2000

Widen to a four-lane divided road to match the capacity of theadjacent Woronora Bridge.

TRANSITWAY

Liverpool to ParramattaEstimated Cost: $203.0MCost to Date: $38.2M1999/2000: $21.6MEstimated Completion: 2003/04

Construction of a new, rapid and substantially exclusive buswaytransport system, linking Liverpool to Parramatta, via Wetherill Park.

WESTERN SYDNEY ORBITAL

Estimated Cost: $1,200.0M (Year 2000$)Cost to Date: $53.5M1999/2000: $12.5MEstimated Completion: Not programmed

Proposed construction of a National Highway from the M5 at Prestonsto the M2 at West Baulkham Hills. Land was acquired in the roadcorridor and environmental assessments are well advanced. Progressdepends on funding from the Federal Government.

ELIZABETH DRIVE

Estimated Cost: $27.0MCost to Date: $25.5M1999/2000: $7.1MEstimated Completion: August 2000

Upgrading between Brown Road and Cowpasture Road, Bonnyrigg toprovide two lanes in each direction. New travel lanes were opened totraffic in December 1999.

THE HORSLEY DRIVE

Carramar Railway BridgeEstimated Cost: $20.0MCost to Date: $13.1M1999/2000: $9.0MEstimated Completion: October 2000

Construction of a new bridge over railway line.

COWPASTURE ROAD

The Horsley Drive to Elizabeth Drive,Estimated Cost: $25.4MCost to Date: $20.9M1999/2000: $4.9MEstimated Completion: February 2001

Widening to four-lane divided road. Section from Elizabeth Drive toEdensor Road opened to traffic February 1997. Section from EdensorRoad to Prairie Vale Road was opened to traffic in August 1999. Sectionfrom Prairie Vale Road to Restwell Road was opened to traffic inDecember 1998. Section Restwell Road to The Horsley Drive opened totraffic in March 2000.

CAMDEN VALLEY WAY

Final Cost: $7.4M1999/2000: $2.1MCompleted: December 1999

A new intersection to link Cowpasture Road deviation to CamdenValley Way was opened to traffic in October 1999.

CAMPBELLTOWN ROAD

Final Cost: $12.6M1999/2000: $1.8MCompleted: September 1999

Widening to four-lane divide road from Rudd Road to Blaxland Road,Campbelltown, including replacement of Morgans Gate railway bridgewith new twin bridges. Queen Street intersection and new southboundbridge completed April 1998.

THE NORTHERN ROAD

Estimated Cost: $5.3MCost to date: $5.1M1999/2000: $4.5MCompleted: July 2000

Upgrade to a four-lane undivided road between the M4 Motorway andSmith Street, Penrith. Improves traffic flow on an Olympic route andlocal access.

CASTLEREAGH ROAD

Estimated Cost: $26.0MCost to Date: $25.0M1999/2000: $11.7MEstimated Completion: September 2000

Reconstruction and widening to four-lane divided road from Jane Streetto New McCarthys Lane, Penrith. An important link between Penrith,Richmond and Windsor and an access route to the Olympic rowingvenue at Penrith. This work was opened to traffic in August 2000.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 121

Page 124: RTA Annual Report 2000 See Pg 24

(122) Roads and Traffic Authority Annual Report 2000

APPENDIX 1 (Continued)Major Works – Sydney

HAWKESBURY/NEPEAN FLOOD PLAIN MANAGEMENT STRATEGY

Londonderry RoadFinal Cost: $5.7M1999/2000: $5.2MCompleted: July 1999

Flood evacuation route upgrade to ensure safe evacuation fromRichmond.

GREAT WESTERN HIGHWAY

Blaxland to Valley HeightsCost to Date: $55.5M1999/2000: $1.8MCompleted: September 1999

Widening and reconstruction of a 5 km section to provide a four-lanedivided road. Includes grade separated interchange at Railway Parade,service roads and new pedestrian bridges at Warrimoo and ValleyHeights stations. Opened to traffic as four lanes October 1998.

FaulconbridgeEstimated Cost: $25.0MCost to Date: $12.6M1999/2000: $7.8MEstimated Completion: August 2001

Reconstruction and widening to four-lane divided road between Grose Road and Parkes Crescent, including transport interchange at railway station.

LindenEstimated Cost: $28.7MCost to Date: $4.5M1999/2000: $4.1MEstimated Completion: 2002

Widening to four-lane divided road between Weemala Avenue andTollgate Drive including a duplicate bridge over the railway.

CENTENARY DRIVE

Final Cost: $1.8MCompleted: June 2000

Pavement rehabilitation from Arthur Street to Weeroona Road.

CASTLEREAGH ROAD

Final Cost: $2.1MCompleted: January 2000

Pavement rehabilitation and shoulder strengthening from Andrews Road to Sheens Lane

PORT HACKING ROAD

Final Cost: $1.6MCompleted: March 2000

Asphalt resurfacing from the Princes Highway to The Boulevarde

STONEY CREEK ROAD

Final Cost: $1.7MCompleted: July 2000

Pavement rehabilitation from Croydon Road to King Georges Road.

SYDNEY NEWCASTLE FREEWAY ROCK STABILISATION

Wahroonga to BrooklynEstimated Cost: $24.3MCost to Date: $18.9M1999/2000: $5.4MEstimated Completion: 2001

Maintenance of sandstone cuttings along Sydney–Newcastle Freewayto minimise risk to traffic.

SYDNEY HARBOUR BRIDGE NORTHERN APPROACH PAINTING

Estimated Cost: $24.6MCost to date: $24.1M1999/2000: $2.8MCompleted: December 1999

First major repaint of the northern approach to Sydney Harbour Bridgein over 20 years.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 122

Page 125: RTA Annual Report 2000 See Pg 24

(123) Roads and Traffic Authority Annual Report 2000

APPENDIX 1 (Continued)Major Works – Sydney

TRAFFIC MANAGEMENT

COMPLETED IN 1999/2000

Transport Management Centre (3x3)Estimated Cost: $34.7M (for building and major associated

technical systems)Cost to Date: $34.9M1999/2000: $6.7MOpened: September 1999

The Transport Management Centre manages and co-ordinates activitieson the NSW road network. Key services include traffic management ofincidents, traffic information and network and system operations.

Eastern Distributor Bus Priority Works (3x3)Estimated Cost: $6.0MCost to Date: $2.7M1999/2000: $0.4MCompleted: June 2000

Improvements at key intersections along Anzac Parade and trafficmanagement initiatives in Flinders, Oxford and William Streets, toimprove priority for buses.

CONTINUING IN 2000/01

M4 Electronic Incident Management SystemEstimated Cost: $12.0MCost to Date: $10.7M1999/2000: $3.3MEstimated Completion: June 2001

This project includes the development and installation of an automatictraffic data monitoring system, variable speed limit signs, an incidentdetection system, a number of variable message signs, and a networkcommunications system with fibre optic cables to the TransportManagement Centre.

BICYCLES

COMPLETED IN 1999/2000

Meadowbank Railway BridgeEstimated Cost: $1.1MCost to Date: $1.1M1999/2000: $0.4MCompleted: April 2000

Conversion of a disused heritage railway bridge for pedestrian andcyclist access across Parramatta River between Meadowbank andRhodes. Conversion works commenced in 1998/99.

ANZAC Bridge Bicycle and Pedestrian PathEstimated Cost: $2.0MCost to Date: $2.0M1999/2000: $2.0MCompleted: June 2000

A new 450m combined pedestrian/cycle path on the ANZAC Bridgeprovides a safer and more direct route from Victoria Road to theANZAC Bridge.

CONTINUING IN 2000/01

Parramatta to Liverpool Rail Trail CyclewayEstimated Cost: $5.0MCost to Date: $4.0M1999/2000: $3.5MEstimated Completion: October 2000

A 17 km cycleway between Parramatta and Liverpool, along the railcorridor, to provide quick access for cyclists to local and regionalcentres. The rail trail is part of the network of cycleways planned forSydney as described in the State Government’s document Action forBikes – BikePlan 2010.

The Horsley Drive, Cowpasture Road and Elizabeth DriveEstimated Cost: $2.0MCost to Date: $0.9M1999/2000: $0.9MEstimated Completion: January 2001

A 7.5km off-road cycle and pedestrian path along The Horsley Drive,Cowpasture Road and Elizabeth Drive will improve the safety for cyclistsand pedestrians in the local area and will also benefit students whoattend Bonnyrigg and Bossley Park High Schools.

M5 MOTORWAY

Bexley to Mascot CyclewayEstimated Cost: $8.0MCost to Date: $1.8M1999/2000: $1.3MEstimated Completion: 2002

An off-road cycleway adjacent to the M5 Motorway corridor, beingdelivered as part of the extensive bike network outlined in Action forBikes – BikePlan 2010.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 123

Page 126: RTA Annual Report 2000 See Pg 24

(124) Roads and Traffic Authority Annual Report 2000

APPENDIX 2Review of Environmental Issues Relating to the Eastern Distributor

The Centennial Park and Moore Park Trust Amendment (Eastern Distributor)Act 1997 requires the Minister for Roads to appoint a communityconsultative committee for the Eastern Distributor. The Act also requiresthe RTA to conduct an annual review of environmental issues relatingto the project.

The Eastern Distributor Community Consultative Committee wasappointed in July 1998 and held its first meeting on 6 August 1998.The 10-member committee included representatives from the RoyalBotanic Gardens and Domain Trust, Art Gallery of NSW Trust,Centennial Park and Moore Park Trust (CPMPT), and Randwick CityCouncil, Sydney and South Sydney Councils. There were also twobusiness and two community representatives.

In June 2000 the RTA engaged PPK Environment and Infrastructure P/Lto review environmental matters associated with the Eastern Distributorfrom 1 July 1999 to 30 June 2000. The company was also engaged toconduct the previous reviews from the start of construction to 30 June1998 and for the year 1998/1999. The 1999/2000 review by PPKEnvironment and Infrastructure P/L forms the basis of this report.

The review assessed the effectiveness of environmental management,including Airport Motorway Limited/Leighton Contractors Pty Ltd’senvironmental management plan. It assessed compliance withconditions set by the Minister for Urban Affairs and Planning. It alsohighlighted areas of positive environmental management as well asareas of concern, and made recommendations to address the latter.

The measures used to assess environmental performance includedtransparency of process; effective communication and responsiveness;environmental management and monitoring; and meeting statutoryrequirements.

Consultation took place with the Environment Protection Authority(EPA) and the Eastern Distributor Community Consultative Committee,government agencies (such as the Department of Land and WaterConservation) and interested parties such as consultants engaged bythe RTA and Leighton Contractors for the project, local councils,business and community groups, to identify issues for the review toconsider.

Environmental issues raised by these groups have been in the areas ofcommunity interest and involvement, urban design, impacts on localtraffic and pedestrian safety.

Copies of the complete report on the review of environmental issues,including the report prepared by PPK Environment and Infrastructureand the submission by the Eastern Distributor Community ConsultativeCommittee, are available for reference at the RTA Corporate Office(Surry Hills) and the RTA Client Services Directorate (Blacktown).

KEY FINDINGS OF THE 1999/2000 REVIEW

1. Statutory Requirements

Stage 1 of the Eastern Distributor was completed and the Motorwaywas opened to traffic on 19 December 1999.

Stage 2 of the Eastern Distributor comprised the northbound off rampto William Street including a Toll Plaza between William Street andStanley Street and a southbound on-ramp from Bourke Street justnorth of William Street. Work on completion of Stage 2 of the EasternDistributor has continued and these ramps were opened to traffic on23 July 2000.

Measures undertaken to satisfy the Minister for Urban Affairs andPlanning approval and Environment Protection Authority licenceconditions in relation to noise and vibration, air quality and dust, waterquality, groundwater and settlement and flora and fauna are detailed inLeighton Contractors’ Environmental Management Plan.

The 1999/2000 Review has assessed compliance with the statutoryrequirements and it is considered that the requirements have generallybeen satisfied during the 12 months to June 2000 and in some casesthe RTA, Airport Motorway Ltd (AML) and Leighton Contractors haveundertaken activities that have exceeded these requirements.

Some generally minor issues need to be addressed to fully satisfy therequirements.

The following conditions relating to operational components of thedevelopment consent require ongoing monitoring and review:

– Maintenance of Landscape Works (Condition No. 48);

– Compliance with Operational Air Quality ManagementProcedure (Condition No. 92).

2. Environmental Management and Monitoring

The statutory requirements for the construction of the EasternDistributor have been expressed as commitments within AML/LeightonContractors’ Environmental Management Plan. The EnvironmentalManagement Plan was amended during the previous review period andthese amendments simplified the plan. The plan is supported by a setof procedures that contain more detailed controls, measures andmonitoring requirements for environmental management.

An Operational Environmental Management Plan was prepared in thelast 12 month period and was approved by the Minister for UrbanAffairs and Planning on the 17 December 1999. The OperationalEnvironmental Management Plan details how AML will maintain andoperate the Motorway to achieve compliance with the conditions ofdevelopment consent from the Minister for Urban Affairs and Planning.

The main issue during the construction of the Eastern Distributor hasbeen the impact of construction noise and disruption caused to thelocal community. During the last 12 month period it is considered thatin respect of noise and vibration issues AML/Leighton Contractors haveresponded fairly and reasonably to regenerated noise and vibrationissues raised by local residents. There has been a considerable decreasein noise impacts, evidenced by a significant decrease in the number ofcomplaints, received to the complaints hotline.

The 2000 Review concludes that AML/Leighton Contractors’ actionshave been undertaken in accordance with the commitments set out inthe Environmental Management Plan

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 124

Page 127: RTA Annual Report 2000 See Pg 24

(125) Roads and Traffic Authority Annual Report 2000

APPENDIX 2 (Continued)Review of Environmental Issues Relating to the Eastern Distributor

3. Transparency of Process

The 2000 Review has found that reporting is generally beingcompleted in accordance with the Minister for Urban Affairs andPlanning’s approval and Environment Protection Authority licenceconditions and relevant exceedences are highlighted and preventativeactions described.

The level of reporting for this review period has generally been ofreasonably high standard, however the reporting on the status ofconditions yet to be fulfilled or the implementation of plans in relationto urban design and landscaping could have been better. In particular,better communication regarding program and responsibilities for workon the western side of South Dowling Street would have beendesirable.

In regard to the reporting of community inquiries and complaints, it isconsidered that the six monthly Environmental Report provides anadequate summary of construction related complaints and inquiries.

4. Effective Communication and Responsiveness

Both the RTA and Leighton Contractors have met and in some casesexceeded the statutory requirements relating to communityconsultation. The issues raised in the 1998 and 1999 Reviewssuggesting a more pro-active approach to consultation have generallybeen adopted throughout the three year construction period.

The 2000 Review has found that generally the community has felt thatthe consultation approach introduced for the Eastern Distributorprocess, both pre-construction and during construction has exceededthe requirements of the conditions of development consent. It isconsidered that the RTA and Leighton Contractors have undertaken ahigh level of community consultation in regard to the preparation of allplans as required under conditions of development consent.

Now that construction activities have ceased, all plans developed aftercommunity consultation have been implemented (with the exceptionof the Integrated Transport Strategy for servicing major events in theMoore Park area). This review has found that the level of informationprovided to the community regarding the development of detailedplans was above expectations. However, it appears that informationregarding the implementation status of some small parts of variousplans prepared or reasons why components of these plan/s have notbeen implemented, for example the Urban Design Plan or theLandscaping Plan for the South Dowling Street footpath, was not madeavailable to the wider community.

The extended length of time taken to resolve some issues in relation tothe restoration of affected property has been noted. Delay in thesettlement of these claims has been due not so much to a lack ofresponsiveness, but to the time taken to establish the reasons andresponsibility for damage (eg the damage could have been pre-existing) and negotiate settlement of the claims.

KEY ISSUES AND RECOMMENDATIONS OF THE REVIEW AND

RTA RESPONSE

The following key issues have been identified as requiring action arisingfrom the 1999/2000 Review of Environmental Issues for the EasternDistributor:

ISSUE 1: COMMUNITY INTEREST AND INVOLVEMENT

Feedback received on the annual review of the Eastern Distributorindicates that the community is generally very positive about the levelof community consultation that has been undertaken during the periodof this project. The high level of community consultation engaged inthe construction phase of the project is recommended for future roadrelated proposals of similar magnitude.

Nevertheless, members of the community have expressed complaintsthat plans prepared with community consultation have not beenimplemented in full to the satisfaction of the general community. Infuture major projects more attention needs to be given to theimplementation of plans.

Recommendations:– That the range of consultation and communication activitiesundertaken by the RTA and Leighton Contractors throughout theEastern Distributor process be seen as an example of a thoroughconsultation process. In previous reviews activities were identified thatrequired further attention and future major projects of this natureshould address these issues, in particular any noisy constructionactivities and how to minimise inconvenience to the local community,when to notify about local traffic changes and how, and how best tocommunicate the process and issues to the local community.

– Provisions need to remain for community feedback on operationalissues, such as the introduction of local area improvement planinitiatives, the implementation of urban design and landscapingelements and the restoration of affected properties. It is recommendedthat the complaints hotline be continued until all works associated withthe Eastern Distributor and the local area improvement plan arecompleted.

– Information on the implementation status of various local areaimprovement programs and other urban design plans should beupdated regularly on the project website.

Response:– The RTA will continue to improve its community consultationstrategies and plans for future projects so that the community is kept informed regarding relevant issues through the development,implementation and operational phases of this type of project.

– RTA and Council officers’ phone numbers will continue to beavailable to the community until the project and the Local AreaImprovement Program are completed.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 125

Page 128: RTA Annual Report 2000 See Pg 24

(126) Roads and Traffic Authority Annual Report 2000

APPENDIX 2 (Continued)Review of Environmental Issues Relating to the Eastern Distributor

ISSUE 2: ENVIRONMENTAL MANAGEMENT

That RTA continues to monitor and manage environmental matters inaccordance with the relevant conditions of approval stipulated by theEnvironment Protection Authority and the Minister for Urban Affairsand Planning and the procedures contained in AML’s OperationalEnvironmental Management Plan. In addition the RTA is to monitor airquality impacts of the post-construction phase of the Motorway.

Overall it is considered that the proponent has adequately managedthe environmental impacts of the construction stage of the Motorway.Potential environmental impacts are expected to substantially decline inthe post construction phase.

Recommendation:– That the RTA continues to maintain and monitor the procedurescontained in AML’s Operational Environmental Management Plan.

Response:– The RTA will continue to maintain and monitor the procedurescontained in the AML’s Environmental Management Plan.

ISSUE 3: TRAFFIC MANAGEMENT

Remaining issues relating to traffic management yet to be resolvedneed finalisation as soon as practicable. These include the fullimplementation of Bus Priority Measures and the completion of theIntegrated Transport Plan for the Moore Park area.

Recommendation:– The RTA facilitates the preparation of the Integrated Transport Planfor the Moore Park area bringing together Rail Access Corporation,Sydney Buses, Local Councils, Sydney Cricket Ground Trust, CPMPTand Department of Transport.

– The finalisation of the Local Area Improvement Plan; andimplementation of Bus Priority Measures.

Response:– The RTA is currently undertaking preparation of Traffic ManagementPlans in conjunction with other agencies for events in the Moore Parkarea. A draft Integrated Transport Management Plan has also beenprepared and will be finalised soon.

– Most of the Local Area Improvement Program has beenimplemented. Measures impacting on traffic on local streets andintrusive traffic have been completed. The final Local AreaImprovement Program is much bigger than originally envisaged ($6m vs $2m). The Bus Priority Measures agreed to by the Bus PriorityTask Force immediately with or following the opening of the EasternDistributor have been implemented.

ISSUE 4: URBAN DESIGN AND LANDSCAPING

A number of minor issues remain outstanding in relation to theimplementation of urban design and landscaping initiatives after the construction phase.

Recommendation:– It is recommended that discrepancies in works undertaken from that proposed within urban design and landscape plans should beexplained. Information should be made available to the public onrequest, on what is implemental status of such plans. The samerecommendations should apply to the overseeing of works proposed in the local area improvement programs.

Response:– There have been some necessary changes within the scope of theMaster Plans during the detail design development. Stakeholders suchas the councils have been consulted and made aware of the reasons forsuch changes. More emphasis will be put in future in providing theinformation.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 126

Page 129: RTA Annual Report 2000 See Pg 24

(127) Roads and Traffic Authority Annual Report 2000

APPENDIX 3 Major Projects – Country

MAJOR PROJECTS – HUNTER

F3 – SYDNEY TO NEWCASTLE FREEWAY

North of Hawkesbury RiverFinal Cost: $4.2M1999/2000 $4.2MCompleted: May 2000

Pavement rehabilitation at various locations north of the HawkesburyRiver.

F3 Driver Aid Scheme – Wahroonga to KariongEstimated cost: $10.0MCost to date: $3.1Estimated completion: March 2002

An electronic Driver Aid Scheme which includes variable message signs,closed circuit television cameras, automatic incident detection andvariable speed limit signs, is being progressed on the F3 Freewaybetween Wahroonga and Kariong.

PACIFIC HIGHWAY

Lake MunmorahFinal Cost: $1.2M1999/2000: $1.2MCompleted: June 2000

Pavement Rehabilitation – 300m northbound and 1.2 km southbound.

NEW ENGLAND HIGHWAY

Rixs CreekFinal Cost: $0.7M1999/2000: $0.0MCompleted: August 1999

Pavement rehabilitation 51.0 km north of Maitland.

CamberwellFinal Cost: $1.2M1999/2000: $0.5MCompleted: August 1999

Pavement rehabilitation 57.0 km north of Maitland.

MuswellbrookFinal Cost: $0.9M1999/2000: $0.3MCompleted: August 1999

Pavement rehabilitation.

South of MuswellbrookFinal Cost: $1.3M1999/2000: $1.2MCompleted: February 2000

Improvements to the intersection of Pamger Drive and New EnglandHighway.

NEWCASTLE INNER CITY BYPASS

West Charlestown BypassEstimated Cost: $79.0MCost to Date: $33.1M1999/2000: $10.0MEstimated Completion: December 2002

Construction of a western bypass as part of Newcastle Inner CityBypass from Windale to Sandgate.

THE ENTRANCE ROAD

Erina HeightsFinal Cost: $2.4M1999/2000: $1.8MCompleted: May 2000

Construction of a roundabout at Serpentine Road.

ErinaFinal Cost: $2.6M1999/2000: $2.1MCompleted: February 2000

Construction of a roundabout at Carlton Road.

MAIN ROAD, GLENDALE

Estimated Cost: $5.1MCost to Date: $4.2M1999/2000: $3.8MEstimated Completion: August 2000

Construction of dual carriageways and pavement rehabilitation fromSturt Street, Cardiff to Glendale Drive, Glendale, including widening ofthe Cardiff Subway overbridge.

LAKE ROAD, ELERMORE VALE

Estimated Cost: $3.5MCost to Date: $2.7M1999/2000: $2.6MEstimated Completion: September 2000

Construction of dual carriageways between Reservoir Road andCroudace Road, Elermore Vale.

MORPETH BRIDGE (Country Timber Bridge Program)

Final Cost: $2.4M1999/2000: $0.9MCompleted: April 2000

Major repairs to Morpeth Bridge to maintain this heritage listed bridge.

PORTERS CREEK BRIDGE

Estimated Cost: $0.5M (including RTAcontribution)

1999/2000: $0.1MCompleted: July 2000

Replacement of timber bridge and approaches to improve roadcapacity and safety.

CLARENCETOWN BRIDGE (Country Timber Bridge Program)

Final Cost: $2.4M1999/2000: $0.9MCompleted: March 2000

Major truss repairs and strengthening to bridge over Williams River.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 127

Page 130: RTA Annual Report 2000 See Pg 24

(128) Roads and Traffic Authority Annual Report 2000

APPENDIX 3 (Continued)Major Projects – Country

JOHN RENSHAW DRIVE

Estimated Cost: $2.0MCost to Date: $1.5M1999/2000: $1.4MEstimated Completion: October 2000

Eastbound overtaking lane to improve traffic flow and safety betweenKurri Kurri and Beresfield.

STEWART AVENUE

Estimated Cost: $5.5MCost to Date: $3.6M1999/2000: $3.1MEstimated Completion: July 2000

New connection across the railway linking Stewart Avenue, NewcastleWest (Pacific Highway) with Hannell Street, Wickham, and thence tothe Newcastle waterfront dock and industrial areas.

MAJOR PROJECTS – SOUTH WESTERN

(3x3) denotes projects partly or wholly funded by the 3x3 fuel levy

HUME HIGHWAY

BookhamEstimated Cost: $80.2MCost to Date: $48.7M1999/2000: $26.5MEstimated Completion: April 2001

Construction of dual carriageways 19.0 to 39.0 km south of Yass,including a bypass of Bookham. Southern 4.0 km section opened totraffic on 18 February 1998.

JugiongFinal Cost: $0.5M1999/2000: $0.5MCompleted: April 2000

Concrete slab replacement 48.0 to 77.0 km south of Yass.

GundagaiFinal Cost: $11.1M1999/2000: $0.9MCompleted: September 1999

Construction of a grade separated interchange at South Gundagai.

AlburyEstimated Cost: under reviewCost to Date: $21.8M1999/2000: $4.8MEstimated Completion: under review

Construction of 37.0 km of dual carriageways on the Albury/WodongaNational Highway route in NSW is currently under review.

NEWELL HIGHWAY

Near Colombo CreekFinal Cost: $1.6M1999/2000: $1.6MCompleted: December 1999

Pavement rehabilitation 42.0 to 49.0 km and 64.5 to 65.7 km north ofJerilderie.

GillenbahFinal Cost: $1.7M1999/2000: $0.8MCompleted: October 1999

Pavement rehabilitation and intersection improvements south ofNarrandera.

Near NarranderaFinal Cost: $1.1M1999/2000: $1.1MCompleted: April 2000

Pavement rehabilitation 9.9 to 12.5 km north of Narrandera.

Near Grong GrongFinal Cost: $1.0M1999/2000: $1.0MCompleted: December 1999

Pavement rehabilitation 36.9 to 39.3 km north of Narrandera.

STURT HIGHWAY

Wagga WaggaFinal cost: $0.8M1999/2000: $0.7MCompleted: October 1999

Construction of a new roundabout at the Kooringal Road intersection.

Near Darlington PointEstimated Cost: $2.7MCost to Date: $2.4M1999/2000: $2.4MEstimated Completion: August 2000

Pavement rehabilitation 46.0 to 49.0 km and 55.5 to 58.3 km west ofNarrandera.

Near Gum CreekEstimated Cost: $3.3MCost to Date: $2.9M1999/2000: $2.9MEstimated Completion: August 2000

Pavement rehabilitation 89.9 to 94.3 km west of Narrandera.

EustonFinal cost: $1.8M1999/2000: $1.0MCompleted: December 1999

Construction of a new roundabout at the Murray Terrace intersection.

MID WESTERN HIGHWAY

GoolgowiFinal cost: $0.7M1999/2000: $0.7MCompleted: February 2000

Pavement rehabilitation from Goolgowi to 6.0 km east.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 128

Page 131: RTA Annual Report 2000 See Pg 24

(129) Roads and Traffic Authority Annual Report 2000

APPENDIX 3 (Continued)Major Projects – Country

RIVERINA HIGHWAY

FinleyEstimated Cost: $1.2MCost to Date: $0.9M1999/2000: $0.9MEstimated Completion: December 2000

Pavement rehabilitation from Finley to 6.0 km east.

COBB HIGHWAY

Jumping Sandhills to Mossgiel (3x3)Final Cost: $6.9M1999/2000: $1.1MCompleted: December 1999

Reconstruction and sealing to provide all-weather access from Booligalto Ivanhoe.

OLYMPIC HIGHWAY

Between Culcairn and Henty (3x3)Final cost: $0.8M1999/2000: $0.8MCompleted: March 2000

Pavement rehabilitation 6.0 to 7.0 km and 26.7 to 28.6 km north ofCulcairn.

Gerogery (3x3)

Final cost: $2.9M1999/2000: $2.9MCompleted: March 2000

Pavement rehabilitation from the Hume Highway intersection to 7.9 km north of Gerogery.

BURLEY GRIFFIN WAY

Illalong Creek (3x3)Final Cost: $19.3M1999/2000: $3.7MCompleted: November 1999

Construction of a new deviation 15.0 km north west of Bowning.

LACHLAN VALLEY WAY

North of Boorowa (3x3)Final cost: $0.8M1999/2000: $0.8MCompleted: June 2000

Pavement rehabilitation 9.0 to 13.0 km and 34.0 to 35.3 km north of Boorowa.

OTHER WORKS

Young to Boorowa RoadEstimated Cost: $1.2MCost to Date: $0.7M1999/2000: $0.7MEstimated Completion: December 2000

Initial sealing 14.5 to 24.2 km west of Boorowa.

Gundagai to Tumut Road (3x3)Estimated Cost: $1.3MCost to Date: $1.3M1999/2000: $0.7MEstimated Completion: July 2000

Realignment of substandard curves on approaches to Gundagai inconjunction with Hume Highway interchange works.

Jingellic to Gilmore Road (3x3)Estimated Cost: $0.7MCost to Date: $0.6M1999/2000: $0.6MEstimated Completion: August 2000

Pavement rehabilitation 32.0 to 35.0 km north of Tumbarumba.

Visy Pulp and Paper Mill – TumutFinal Cost: $7.3M1999/2000: $7.3MCompleted: June 2000

Construction of a new 2.4 km access road from the Snowy MountainsHighway to the Visy development at Tumut.

Yarrangobilly Caves RoadFinal cost: $0.2M1999/2000: $0.2MCompleted: May 2000

Pavement rehabilitation and drainage improvement to this touristdestination.

Murray River Crossings – Howlong (3x3)Estimated Cost: $12.9MCost to Date: $7.7M1999/2000: $1.9MEstimated Completion: March 2001

Replacement of deficient timber bridges over the Murray River andapproaches at Howlong. Black Swan Lagoon Bridge completed in July 1999.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 129

Page 132: RTA Annual Report 2000 See Pg 24

(130) Roads and Traffic Authority Annual Report 2000

APPENDIX 3 (Continued)Major Projects – Country

PACIFIC HIGHWAY UPGRADING PROGRAM

Pacific Highway – Hexham to NSW/Queensland Border

On 25 January 1996 the Pacific Highway Upgrading ProgramAgreement was signed by the then Federal Minister for Transport and NSW Minister for Roads. This agreement confirmed the programobjectives and funding arrangements.

This important program aims to:

– Significantly reduce road accidents and injuries

– Reduce travel times

– Reduce freight transport costs

– Be responsive to the community in making key project decisions

– Manage the upgrading of the route in accordance with EcologicallySustainable Development principles

– Maximise the effectiveness of expenditure.

The NSW State Government will contribute $60 million (year 1996$)per annum to joint projects, in addition to a continuing commitment of $100 million per annum for development and maintenance of the highway.

The Federal Government has committed a total of $60 million (year1996$) per annum over the 10 years for joint projects on the PacificHighway in NSW.

The net impact of the Agreement and the NSW State Budget allocationis that $2.2 billion will be available for reconstruction of the PacificHighway NSW, including a maintenance component of $30 million per annum.

Overall, this represents almost a three-fold increase in developmentactivity over the 10 years from July 1996.

Enormous economic, road safety and reduced travel time benefits willbe generated by the Upgrading Program. In addition, the need topreserve and protect our environment is an important consideration in developing projects for this program.

Now at the end of its Fourth Year, the Upgrading Program has alreadyachieved some important milestones, with 14 major projects and 16 minor projects opened to traffic, construction currently underway at 9 sites and 16 projects being planned.

Extensive community consultation will continue for the life of the program.

COMPLETED MAJOR PROJECTS

Bulahdelah to Coolongolook FreewayEstimated cost: $203.5MFinal Cost: $140.0 M1999/2000: $17.7MOpened to Traffic: 24 October 1999

Construction of 22.0 km dual carriageway Freeway between Bulahdelahand Coolongolook eliminating at least sixty bends including thenotorious O’Sullivans Gap and Wootton Bends section, and improvingsafety, motoring conditions and travel times.

Taree BypassEstimated Cost: $125.0MCost to Date: $126.9M1999/2000: $10.0MOpened to Traffic: Final stage opened to traffic

12 April 2000Final completion: May 2000

Construction of a 14.5 km dual carriageway bypass to remove highwaytraffic from the town centre of Taree. Work on the final stage atDumaresq Island was completed 12 April 2000.

Tyndale RealignmentEstimated Cost: $5.6MCost to date: $5.9M1999/2000: $4.2MCompleted: June 2000

Realignment of the highway adjacent to Tyndale. The projectincorporated a single access point for the Tyndale village. The projectwill improve road safety and travel times as well as improving access forTyndale village.

MAJOR PROJECTS UNDERWAY

Raymond Terrace to Karuah DuplicationEstimated Cost: $67.0MCost to Date: $66.4M1999/2000: $41.7MEstimated Completion: Late 2000

Construction of 18.2 km northbound carriageway next to the existingcarriageway between Raymond Terrace and Karuah. The existingcarriageway will also be upgraded to provide high standard dualcarriageway, which will improve safety, travel conditions and traveltimes. Construction commenced in August 1998 and continuedthroughout the year.

Coolongolook to Wang Wauk UpgradeEstimated Cost: $49.0MCost to Date: $13.3M1999/2000: $10.2MEstimated Completion: Mid 2001

Provision of 11.7 km dual carriageways between Coolongolook andWang Wauk. Construction commenced in December 1999.

Lyons Road to Englands Road, Coffs Harbour ReconstructionEstimated Cost: $64.5MCost to Date: $52.3M1999/2000: $20.5MEstimated Completion: Mid 2001

Construction of 5.3 km dual carriageways from Lyons Road to EnglandsRoad, Coffs Harbour, including grade-separated interchanges at Lyonsand Sawtell/Lindsays Roads. Construction commenced in October 1997and continued throughout the year.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 130

Page 133: RTA Annual Report 2000 See Pg 24

(131) Roads and Traffic Authority Annual Report 2000

Bray Street to Arthur Street, Coffs Harbour UpgradeEstimated Cost: $27.0MCost to Date: $25.2M1999/2000: $11.9MEstimated Completion: August 2000

Upgrade of Pacific Highway between Bray/Orlando Streets and ArthurStreet at the northern end of Coffs Harbour, including traffic signals atPark Beach Road, grade separated interchange at Arthur Street with aroundabout under the highway, widening of railway over-bridge andprovision of facilities for pedestrians and cyclists. Constructioncommenced in March 1998 and continued throughout the year.

Byrons Lane to Shark Creek RealignmentEstimated Cost: $14.0MCost to Date: $5.3M1999/2000: $3.1MCompleted: Stage 1 – June 2000Estimated Completion: Stage 2 – TBD

Realignment of 4.5 km section of the Pacific Highway north of Tyndale.Stage 1 involved the realignment of the existing highway for 1 km, andStage 2 will involve the construction of 3.5 km including overtakinglane. Construction of Stage 1 was completed in June 2000.

Eversons Creek Overtaking LaneEstimated Cost: $4.1MCost to Date: $3.6M1999/2000: $1.4MEstimated Completion: End 2000

Construction of an overtaking lane at Eversons Creek. Adjustments toEversons Creek culvert in 2000/01 to complete the project.

Ewingsdale InterchangeEstimated Cost: $24.0MCost to Date: $18.6M1999/2000: $12.7MEstimated Completion: December 2000

Construction of grade separated interchange for access to Byron Bay to reduce traffic congestion, improve travel times and road safety.Extensive landscaping including a ‘gateway’ into Byron Bay is includedin the project. Construction commenced in February 1999 andcontinued throughout the year.

Tandys Lane UpgradeEstimated Cost: $49.0MCost to Date: $12.3M1999/2000: $6.8MEstimated Completion: Late 2001

Construction of 5.5 km dual carriageways at Tandys Lane betweenTyagarah and Brunswick Heads. Construction commenced in February2000.

Yelgun to Chinderah UpgradeEstimated Cost: $348.0MCost to Date: $64.5M1999/2000: $52.8MEstimated Completion: End 2002

Construction of 28.6 km dual carriageways between Yelgun andChinderah. The project will bypass the notorious Burringbar Range. A design, construct and maintain contract was awarded. Constructioncommenced in March 2000.

MAJOR PROJECTS BEING PLANNED

Karuah BypassEstimated Cost: $113.0MCost to Date: $4.5M1999/2000: $1.4MEstimated Completion: TBD

Construction of 10.0 km dual carriageways at Karuah, to bypass thetownship of Karuah to the north. The project will improve safety andaccess conditions and provide increased flood immunity. Considerationof responses to EIS display is in progress.

Karuah to Bulahdelah UpgradeEstimated Cost: $225.0MCost to Date: $9.3M1999/2000: $3.1MEstimated Completion: TBD

Construction of 34.2 km dual carriageways between Karuah andBulahdelah. Community comments received in response to the displayof the Environmental Impact Statement are being assessed.

Bulahdelah UpgradeEstimated Cost: $145–165.0MCost to Date: $1.0M1999/2000: $1.0MEstimated Completion: TBD

Construction of 7.7 km dual carriageways between 92.0 and 99.7 kmnorth of Newcastle. Community consultation has commenced androute options are being investigated.

Bundacree Creek to Possum Brush UpgradeEstimated Cost: $85.0MCost to Date: $2.2M1999/2000: $1.2MEstimated Completion: TBD

Provision of 9.0 km dual carriageway between Bundacree Creek andPossum Brush (existing dual carriageway north of Nabiac). Conceptdevelopment and environmental studies in progress.

Taree to Coopernook UpgradeEstimated Cost: $59.0MCost to Date: $3.2M1999/2000: $1.7MEstimated Completion: TBD

Provision of 7.5 km dual carriageways between Cundletown (north ofTaree) and Coopernook. Final design is in progress and propertyacquisitions are almost complete.

Coopernook BypassEstimated Cost: $66.0MCost to Date: $3.9M1999/2000: $1.4MEstimated Completion: TBD

Construction of a 4.2 km dual carriageway bypass east of the existinghighway at Coopernook. Final design is in progress and propertyacquisitions are almost complete.

APPENDIX 3 (Continued)Major Projects – Country

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 131

Page 134: RTA Annual Report 2000 See Pg 24

(132) Roads and Traffic Authority Annual Report 2000

Coopernook to Moorland UpgradeEstimated Cost: $56.0MCost to Date: $1.1M1999/2000: $0.3MEstimated Completion: TBD

Provision of 10.2 km dual carriageway from the northern end of theCoopernook Bypass to near Camp Obadiah. Consideration of responsesto EIS display is in progress.

Moorland to Herons Creek UpgradeEstimated Cost: $110–140.0MCost to Date: $0.4M1999/2000: $0.1MEstimated Completion: TBD

Provision of approximately 22.0 km of dual carriageway between theproposed Coopernook to Moorland Upgrade and the completed HeronsCreek Deviation. Route selection studies commenced June 2000.

Warrell Creek RealignmentEstimated Cost: $50.0MCost to Date: $3.8M1999/2000: $1.5MEstimated Completion: TBD

Provision of 4.9 km dual carriageways between Crouches Creek and theexisting Allgomera Deviation. The project will also incorporate therelocation of a section of the North Coast railway line. Final design andproperty acquisitions are in progress.

Bonville DeviationEstimated Cost: $127.0MCost to Date: $4.6M1999/2000: $1.7MEstimated Completion: TBD

Construction of 9.6 km dual carriageways from Perrys Road, Repton toLyons Road, Bonville (approximately 12.0 km south of Coffs Harbour).Property acquisitions are in progress.

Halfway Creek RealignmentEstimated Cost: $18.0MCost to Date: $1.4M1999/2000: $0.2MEstimated Completion: TBD

Construction of 3.4 km dual carriageway upgrade between DunmarsLane and BP Truckstop, Halfway Creek, 46.9 to 50.3 km north of Coffs Harbour. Final design and property acquisition are in progress.

Ulmarra BypassEstimated Cost: $29.0MCost to Date: $1.4M1999/2000: $0.3MEstimated Completion: TBD

Construction of a 4.8 km single carriageway bypass of Ulmarratownship and northbound overtaking lane (11.1 to 15.9 km north ofGrafton). Community comments received in response to the display ofthe Environmental Impact Statement are being assessed.

Ballina BypassEstimated Cost: $198.0MCost to Date: $8.2M1999/2000: $2.8MEstimated Completion: TBD

Construction of 12.6 km dual carriageway bypass of Ballina.Community comments received in response to the display of theEnvironmental Impact Statement are being assessed.

Bangalow to St Helena UpgradeEstimated Cost: $63.0MCost to Date: $1.9M1999/2000: $0.9MEstimated Completion: TBD

Construction of 5.2 km of dual carriageways between the completedBangalow Bypass in the south to the Ewingsdale Interchange project in the north. Consideration of responses to the display of the EIS is in progress.

Brunswick Heads to Yelgun UpgradeEstimated Cost: $154.0MCost to Date: $5.6M1999/2000: $2.3MEstimated Completion: TBD

Construction of 6.7 km dual carriageways from the Brunswick River to Yelgun including the second carriage way of the Brunswick HeadsBypass. Acquisitions and final design are in progress.

MAJOR PROJECTS – SOUTHERN

(3X3) denotes projects partly or wholly funded by the 3x3 fuel levy

HUME HIGHWAY

Menangle to GunningFinal Cost: $3.2M1999/2000: $3.2MCompleted: June 2000

Asphalt overlay on several sections of highway north and south of Goulburn.

PRINCES HIGHWAY

Waterfall to YallahFinal Cost: $1.8M1999/2000: $1.8MCompleted: June 2000

Pavement rehabilitation at Bulli Tops, Figtree and Dapto.

Interchange at HelensburghEstimated Cost: $8.7MCost to Date: $5.9M1999–2000: $4.7MEstimated Completion: October 2000

Provision of north and southbound on/off-loading ramps at Helensburgh.

APPENDIX 3 (Continued)Major Projects – Country

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 132

Page 135: RTA Annual Report 2000 See Pg 24

(133) Roads and Traffic Authority Annual Report 2000

Oak FlatsEstimated Cost: $28.0MCost to Date: $17.3M1999/2000: $2.3MEstimated Completion: May 2001

Construction of an interchange as part of the future route betweenYallah and Oak Flats and to connect with an “east-west” link to Albion Park.

GerringongFinal Cost: $4.5M1999/2000: $3.0MCompleted: April 2000

Realignment south of Belinda Street to eliminate sub standard curvesand extend north and southbound overtaking lanes.

Wollongong to south of EdenFinal Cost: $4.8M1999/2000: $4.8MCompleted: June 2000

Pavement rehabilitation at Falls Creek, Ulladulla, Moruya and south of Eden.

Mogo to MoruyaEstimated Cost: $8.5MCost to Date: $4.7M1999/2000: $2.4MEstimated Completion: 2002

Widening at various locations.

Kiama to Batemans BayFinal Cost: $1.0M1999/2000: $0.9MCompleted: June 2000

Junction improvements at Rose Valley, Berry, Moruya and Eden.

Harts Creek (Country Timber Bridge Program)Estimated Cost: $1.0M1999/2000: $0.6MCompleted: September 2000

Construction of new concrete bridge and approaches at Harts Creek, 7.0 km south of Pambula.

EdenFinal Cost: $1.0M1999/2000: $0.7MCompleted: December 1999

Construction of new bridge and approaches at Government Road,Eden.

ILLAWARRA HIGHWAY

Albion Park and Moss ValeFinal Cost: $0.7M1999/2000: $0.7MCompleted: December 1999

Pavement rehabilitation at Albion Park and Moss Vale.

Macquarie PassFinal Cost: $0.9M1999/2000: $0.6MCompleted: December 1999

Widen Tongarra Creek bridge and upgrade approaches near the foot ofMacquarie Pass.

RobertsonFinal Cost: $5.1M1999/2000: $4.2MCompleted: July 2000

Realignment west of Jamberoo Road including a new concrete bridgeover Moss Vale – Port Kembla Rail Line.

FEDERAL HIGHWAY

South of GoulburnFinal Cost: $0.2M1999/2000: $0.2MCompleted: June 2000

Pavement rehabilitation 2.0 km south of Hume Highway.

Lake GeorgeFinal Cost: $117.0M1999/2000: $4.4MCompleted: August 1999

Construction of 24.0km of dual carriageways. Southbound carriagewaybetween Remembrance Driveway and south of Brooks Creek wasopened to traffic on 27 May 1998. Full project opened to traffic on 13 August 1999.

ACT to SuttonEstimated Cost: $42.6MCost to Date: $32.5M1999/2000: $21.8MCompleted: September 2000

Dual carriageways from Sutton in NSW to ACT border opened to trafficSeptember 2000, completing dual carriageway conditions betweenSydney and Canberra.

SNOWY MOUNTAINS HIGHWAY

Bega to KiandraFinal Cost: $0.3M1999/2000: $0.3MCompleted: June 2000

Pavement rehabilitation between Brown Mountain and Bemboka.

MONARO HIGHWAY

ACT Border to BombalaFinal Cost: $0.6M1999/2000: $0.6MCompleted: May 2000

Pavement rehabilitation at Michelago, Ingelara and Bobingah.

South of Bombala (3x3)Final Cost: $10.7M1999/2000: $0.8MCompleted: November 1999

Realignment and sealing, 31.8 to 37.2 km south of Bombala, toeliminate the final unsealed section of this route.

APPENDIX 3 (Continued)Major Projects – Country

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 133

Page 136: RTA Annual Report 2000 See Pg 24

(134) Roads and Traffic Authority Annual Report 2000

APPENDIX 3 (Continued)Major Projects – Country

KINGS HIGHWAY

Batemans Bay to Queanbeyan (3x3)Final Cost: $1.0M1999/2000: $1.0MCompleted: March 2000

Pavement rehabilitation at Nelligen, Bungendore and Queanbeyan.

Batemans Bay to QueanbeyanFinal Cost: $1.1M1999/2000: $0.7MCompleted: February 2000

Reconstruction and realignment 35.0 to 37.0 km east of Queanbeyan.

Braidwood (Country Timber Bridge Program)Estimated Cost: $0.7MCost to Date: $0.6M1999/2000: $0.6MCompleted: September 2000

Construction of new concrete bridge and approaches at NorthangeraCreek 12 km east of Braidwood.

OTHER

Lanyon Drive, QueanbeyanFinal Cost: $1.6M1999/2000: $1.5MCompleted: February 2000

Duplication McRae Street to Jerrambomberra Road.

Goulburn to Crookwell RoadFinal Cost: $0.5M1999/2000: $0.5MCompleted: May 2000

Pavement rehabilitation between Crookwell and Binda.

Goulburn to Doughboy RoadFinal Cost: $0.7M1999/2000: $0.7MCompleted: March 2000

Pavement rehabilitation between Goulburn and Tarago.

Mt Ousley RoadEstimated Cost: $1.5MCost to Date: $0.7M1999/2000: $0.6MEstimated Completion: December 2000

Construction of new concrete bridge over Mt Ousley Road at New Mt Pleasant Road.

Nowra–Mittagong RoadFinal Cost: $0.8M1999/2000: $0.8MCompleted: May 2000

Pavement rehabilitation at Kangaroo Valley.

Kosciuszko RoadCooma to Perisher ValleyFinal Cost: $1.2M1999/2000: $1.2MCompleted: April 2000

Pavement rehabilitation near Cooma Airport, at East Jindabyne and Perisher Valley.

JindabyneFinal Cost: $1.1M1999/2000: $0.2MCompleted: December 1999

Capacity improvements between Thredbo Terrace and Kalkite Streetand Barry Way, including roundabout at Kalkite Street.

Alpine WayJindabyne to National Park EntranceFinal Cost: $0.2M1999/2000: $0.2MCompleted: March 2000

Pavement rehabilitation and minor widening 7.8 km west of Kosciuszko Road.

Shellharbour RoadFinal Cost: $0.3M1999/2000: $0.3MCompleted: March 2000

Pavement rehabilitation at Warilla.

BulliFinal Cost: $0.2M1999/2000: $0.2MCompleted: June 2000

Upgraded commuter parking at Bulli Railway Station.

MAJOR PROJECTS – WESTERN

NEWELL HIGHWAY

AlawaEstimated Cost: $4.7MCost to Date: $4.8M1999/2000: $0.2MCompleted: April 2000

Pavement rehabilitation and widening 60.3 to 68.0 km north of Moree.

Gil GilEstimated Cost: $3.2MCost to Date: $3.0M1999/2000: $2.0MEstimated Completion: November 2000

Pavement rehabilitation 30.7 to 36.9 km north of Moree.

Moree By-PassEstimated Cost: $27.0MCost to Date: $0.8M1999/2000: $0.3MEstimated Completion: December 2003

Planning for future construction of heavy vehicle by-pass of Moree.

Five Mile, Sandy and Bulga Creek BridgesEstimated Cost: $3.0MCost to Date: $3.2M1999/2000: $2.2MCompleted: April 2000

Widening of 5 Mile and Bulga Creek bridges and replacement of SandyCreek Bridge between 8.0 and 16.0 km north of Gilgandra.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 134

Page 137: RTA Annual Report 2000 See Pg 24

(135) Roads and Traffic Authority Annual Report 2000

YarrabahEstimated Cost: $4.2MCost to Date: $0.9M1999/2000: $0.8MEstimated completion: December 2000

Construction of 2 overtaking lanes near Yarrabah Creek, south of Dubbo.

UgumjilEstimated Cost: $3.4MCost to Date: $3.0M1999/2000: $2.0MEstimated Completion: July 2000

Pavement rehabilitation 85.9 to 90.7 km north of Parkes.

GREAT WESTERN HIGHWAY

Little HartleyEstimated Cost: $20.0MCost to Date: $1.0M1999/2000: $0.3MEstimated Completion: to be decided

Reconstruction and realignment at Mid Hartley.

CASTLEREAGH HIGHWAY

Lidsdale to Coxs RiverEstimated Cost: $6.8MCost to Date: $0.7M1999/2000: $0.3MEstimated Completion: June 2004

Pavement rehabilitation, widening and realignment from Lidsdale toCoxs River between 11.0 and 13.0 km north of Lithgow.

Lidsdale Rail OverbridgeEstimated Cost: $6.0MCost to Date: $3.1M1999/2000: $2.9MEstimated Completion: May 2001

Replacement of brick arch rail overbridge and pavementreconstruction, 9.0 to 10.5 km north of Lithgow.

MID WESTERN HIGHWAY

CarcoarEstimated Cost: $3.3MCost to Date: $3.2M1999/2000: $3.2MCompleted: March 2000

Pavement rehabilitation on Mid Western Highway at Carcoar.

Dicks and McLeans CreeksEstimated Cost: $6.7MCost to Date: $3.1M1999/2000 $2.7MEstimated Completion: February 2001

Reconstruction and realignment including replacement of two bridges,between 18.0 and 21.0 km west of Bathurst.

Kings PlainsEstimated Cost: $9.0MCost to Date: $0.7M1999/2000: $0.6MEstimated Completion: June 2002

Realignment of Mid Western Highway at Kings Plains Village.

GOLDEN HIGHWAY

West of Dunedoo to Cobborah (3x3)Estimated Cost: $1.5MCost to Date: $0.8M1999/2000: $0.5MEstimated Completion: June 2001

Widening 6.9 to 14.8 km west of Dunedoo.

Fitzells Creek (3x3)Estimated Cost: $1.8MCost to Date: $1.7M1999/2000: NilCompleted: February 2000

Reconstruction and widening of 4.0 km from Fitzells Creek to Ballimore.

Elong Elong (3x3)Estimated Cost: $0.8MCost to Date: $0.7M1999/2000: $0.7MEstimated Completion: August 2000

Rehabilitation of pavement 35.0 to 40.2 km west of Dunedoo.

CARNARVON HIGHWAY

Moree to MungindiEstimated Cost: $3.0MCost to Date: $3.0M1999/2000: $2.6MCompleted: April 2000

Completion of initial sealing of final 16.0 kms.

KAMILAROI HIGHWAY

Gunnedah to NarrabriEstimated Cost: $3.6MCost to Date: $3.7M1999/2000: $0.5MCompleted: March 2000

Widening north of Boggabri to enable use by B-Doubles.

Gunnedah BoundaryEstimated Cost: $1.5MCost to Date: $0.7M1999/2000: $0.7MEstimated Completion: December 2000

Pavement rehabilitation 28.8 to 34.1 km north of Gunnedah.

Wee Waa RoadFinal Cost: $3.0MCost to Date: $3.1M1999/2000: $1.7MCompleted: April 2000

Restoration of flood damage 29.0 to 39.0 km west of Narrabri.

Brewarrina Shire (3x3)Final Cost: $5.0M1999/2000: $0.9MCompleted: December 1999

Completion of bitumen sealing from Brewarrina to Walgett Boundary.

APPENDIX 3 (Continued)Major Projects – Country

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 135

Page 138: RTA Annual Report 2000 See Pg 24

(136) Roads and Traffic Authority Annual Report 2000

Walgett Shire (3x3)Final Cost: $3.6M1999/2000: $0.6MCompleted: November 1999

Completion of bitumen sealing from Walgett to Brewarrina ShireBoundary.

KIDMAN WAY

Western Rail Line to CobarEstimated Cost: $10.5MCost to Date: $9.8M1999/2000: $0.3MCompleted: May 2000

Completion of initial seal from the Western Rail Line to Cobar.

Sandy CreekEstimated Cost: $1.1MCost to Date: $0.7M1999/2000: $0.6MEstimated Completion: November 2000

Construction of new concrete bridge.

BATHURST TO ILFORD ROAD

Final Cost: $3.4MCost to Date: $3.0M1999/2000: $1.0MCompleted: December 1999

Completion of new bitumen sealing near Sofala.

WALGETT BRIDGES (Country Timber Bridge Program)

Castlereagh/Gwydir/Kamilaroi HighwaysEstimated Cost: $10.2MCost to Date: $6.2M1999/2000: $6.2MEstimated Completion: January 2001

Construction of 12 concrete bridges and approaches at:

Cumberdoon Creek 108.0 km north of CoonambleShallow Creek 109.0 km north of CoonambleBooroom Creek 56.0 km west of WalgettBorumbil Creek 43.0 km west of WalgettPian Creek 13.0 km east of WalgettPagans Creek 6.0 km north of Walgett5 mile Warramboo 9.0 km north of WalgettNarran River–Jim Harter Bridge 115.0 km north of WalgettCastlereagh River 68.0 km north of CoonambleNugal Swamp 75.0 km north of Coonamble2 mile Warramboo 4.0 km north of Walgett13 mile Warramboo 54.0 km south of Collarenebri.

MAJOR PROJECTS – NORTHERN

OXLEY HIGHWAY (SH11)

Congi Creek (Country Timber Bridge Program)Estimated Cost: $0.9MCost to Date: $0.1M1999/2000: $0.1MEstimated Completion: January 2001

Construction of new concrete bridge and approaches, 34.0 km west of Walcha.

SUMMERLAND WAY

Grafton Bridge approachesFinal Cost: $0.7M1999/2000: $0.6MCompleted: April 2000

Improvements to the northern Grafton Bridge approaches.

14 to 16 km north of GraftonFinal Cost: $0.9M1999/2000: $0.5MCompleted: November 1999

Pavement rehabilitation, 14.0 to 15.8 km north of Grafton.

Gordons BridgeFinal Cost: $2.0M1999/2000: $0.2MCompleted: November 1999

Gordons Bridge, north of Kyogle.

95.1 to 96.3 km north of GraftonEstimated Cost: $0.9MCost to Date: $0.5M1999/2000 $0.5MEstimated Completion: August 2000

Widen Summerland Way 95.1 to 96.3 km north of Grafton.

Newpark overtaking laneEstimated Cost: $0.5MFinal Cost: $0.5M1999/2000: $0.3MEstimated completion September 1999Overtaking lane at Newpark, 2.0 km north of Kyogle

Overtaking lanes north of GraftonEstimated Cost: $0.9MFinal Cost: $0.5M1999/2000: $0.5MEstimated completion October 2000Northbound overtaking lane, 18.0 to 19.1 km north of Grafton.

GWYDIR HIGHWAY (SH12)

Middle Creek (Country Timber Bridge Program)Final Cost: $0.5M1999/2000 $0.1MCompleted: August 1999

Construction of new concrete bridge and approaches, 65.0 km west of Grafton.

APPENDIX 3 (Continued)Major Projects – Country

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 136

Page 139: RTA Annual Report 2000 See Pg 24

(137) Roads and Traffic Authority Annual Report 2000

Nogulga Creek (Country Timber Bridge Program)Final Cost: $0.6M1999/2000: $0.5MCompleted: December 1999

Construction of new concrete bridge and approaches, 45.0 km west of Grafton.

Cangai Creek (Country Timber Bridge Program)Estimated Cost: $0.8MCost to Date: $0.8M1999/2000: $0.8MEstimated Completion: July 2000

Construction of new concrete bridge and approaches at Cangai Creek,52.0 km west of Grafton.

BRUXNER HIGHWAY (SH16)

Tabulam Overflow No.1 (Country Timber Bridge Program)Estimated Cost: $0.8M1999/2000: $0.3MCost to Date: $0.3MEstimated Completion: January 2001

Construction of new concrete bridge and approaches 56.0 km west of Casino.

Tabulam Overflow No.2 (Country Timber Bridge Program)Estimated Cost: $0.9M1999/2000: $0.2MCost to Date: $0.2MEstimated Completion: January 2001

Construction of new concrete bridge and approaches 56.0 km west of Casino.

Slatey Creek (Country Timber Bridge Program)Estimated Cost: $0.4M1999/2000: $0.0MCost to Date: $0.0MEstimated Completion: January 2001

Construction of new concrete bridge and approaches, 91.0 km west of Casino.

Swamp Oak Creek (Country Timber Bridge Program)Estimated Cost: $1.3M1999/2000: $0.3MCost to Date: $0.3MEstimated Completion: January 2001

Construction of new concrete bridge and approaches, 114.0 km west of Casino.

Barney Downs Creek (Country Timber Bridge Program)Estimated Cost: $1.2M1999/2000: $0.1MCost to Date: $0.1MEstimated Completion: January 2001

Construction of new concrete bridge and approaches, 118.0 km west of Casino.

Plumbago Creek (Country Timber Bridge Program)Estimated Cost: $1.2M1999/2000: $0.1MCost to date: $0.1MEstimated Completion: December 2000

Construction of new concrete bridge and approaches, 77.0 km west of Casino.

Sandy Creek (Country Timber Bridge Program)Final Cost: $0.7M1999/2000: $0.2MCompleted: July 1999

Construction of new concrete bridge and approaches, 58.0 km west of Casino.

Maguires Creek, Alstonville (Country Timber Bridge Program)Final Cost: $0.5M1999/2000: $0.1MCompleted: July 1999

Construction of new concrete bridge and approaches in Alstonville.

WATERFALL WAY

Connells Creek (Country Timber Bridge Program)Final Cost: $0.3M1999/2000: $0.0MCompleted: October 1999

Construction of new concrete bridge and approaches 3.6 km west of Pacific Highway.

Rocky Creek No.1 (Country Timber Bridge Program)Estimated Cost: $0.3M1999/2000: $0.2MCost to Date: $0.3MEstimated Completion: September 2000

Construction of new concrete bridge and approaches 3.0 km eastof Dorrigo.

Rocky Creek No.2 (Country Timber Bridge Program)Estimated Cost: $0.2M1999/2000: $0.1MCost to Date: $0.2MEstimated Completion: September 2000

Construction of new concrete bridge and approaches 3.0 km east of Dorrigo.

Cooney Creek No.1 (Country Timber Bridge Program)Final Cost: $0.5M1999/2000: $0.5MCompleted: June 2000

Construction of new concrete bridge and approaches 23.0 km east of Armidale.

Cooney Creek No.2 (Country Timber Bridge Program)Final Cost: $0.2M1999/2000: $0.2MCompleted: June 2000

Construction of new concrete bridge and approaches, 23.0 km east of Armidale.

APPENDIX 3 (Continued)Major Projects – Country

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 137

Page 140: RTA Annual Report 2000 See Pg 24

(138) Roads and Traffic Authority Annual Report 2000

APPENDIX 4Heritage and Conservation Register

The RTA has a responsibility to identify and manage the items of environmental heritage which are in its ownership, care or control. These items arepredominantly bridges. However, the RTA is also responsible for a number of other items including vehicular ferries and property assets.

To assist heritage management and to meet its statutory obligation under Section 170 of the Heritage Act 1977, the RTA holds a heritage andconservation register. Furthermore, in accordance with the Heritage Act, the RTA is required to inspect, and report annually on items in its registerincluding their condition.

Abbreviations:SHI – State Heritage Inventory reference numberLOS – Level of significance assigned in accordance with NSW Heritage ManualCMP – Conservation management plan (some are Heritage Council endorsed)SHR – State Heritage Register listing

SYDNEY REGION ITEMS

Alfords Point Bridge SHI: 15046 Location: Alfords Point LOS: Not AssessedCMP: No SHR: No Last Insp: 11/3/99Condition: Good Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Box Girder Bridge, Nepean River SHI: 12852 Location: Penrith LOS: Not AssessedCMP: No SHR: No Last Insp: 16/3/99Condition: Fair Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Cable Ferry SHI: 14052 Location: Mortlake LOS: Not AssessedCMP: No SHR: No Last Insp: Not AvailableCondition: Good Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Cable Ferry SHI: 4300311 Location: Wisemans Ferry LOS: Not AssessedCMP: No SHR: No Last Insp: Not AvailableCondition: Good Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Captain Cook Bridge, Southern Approach SHI: 14978 Location: Taren Point LOS: Not AssessedCMP: SHR: No Last Insp: 21/11/96Condition: Good Statutory Applications: NoneIn Use? Yes Activities/Changes: None

De Burghs Bridge SHI No: 14050 Location: Macquarie Park LOS: Not AssessedCMP: No SHR: No Last Insp: 29/7/98Condition: Fair Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Disused section of MR 181 adjacent Portion 32 SHI No: 5856 Location: Wisemans Ferry LOS: Not AssessedCMP: No SHR: No Last Insp: 6/99Condition: Poor, work required Statutory Applications: NoneIn Use? No Activities/Changes: None

Gladesville Bridge SHI No: 4300309 Location: Drummoyne LOS: Not AssessedCMP: No SHR: No Last Insp: 27/7/98Condition: Good Statutory Applications: NoneIn Use? Yes Activities/Changes: Oral history on

the bridge’s construction to be undertaken

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 138

Page 141: RTA Annual Report 2000 See Pg 24

(139) Roads and Traffic Authority Annual Report 2000

APPENDIX 4 (Continued)Heritage and Conservation Register

Glebe Island Bridge SHI No: 8791 Location: Glebe Island LOS: Not AssessedCMP: No SHR: No Last Insp: 21/9/97Condition: Fair Statutory Applications: NoneIn Use? No Activities/Changes: CMP on hold

Hawkesbury River Bridge SHI No: 5481 Location: North Richmond LOS: Not AssessedCMP: No SHR: No Last Insp: 23/3/99Condition: Good Statutory Applications: NoneIn Use? Yes Activities/Changes: None

House – 164 Ramsay St SHI No: 770 Location: Haberfield LOS: Not AssessedCMP: No SHR: No Last Insp: OngoingCondition: Fair Statutory Applications: NoneIn Use? Rented Activities/Changes: None

House – 1d River Rd SHI No: 15243 Location: Woronora LOS: Not AssessedCMP: No SHR: No Last Insp: OngoingCondition: Poor Statutory Applications: NoneIn Use? Vacant with project Activities/Changes: None

House – 46 Martin St SHI: 771 Location: Haberfield LOS: Not AssessedCMP: SHR: No Last Insp: OngoingCondition: Fair Statutory Applications: NoneIn Use? Rented Activities/Changes: None

House 48 Kingston St SHI No: 650 Location: Haberfield LOS: Not AssessedCMP: No SHR: No Last Insp: Ongoing toCondition: Good Statutory Applications: None sale dateIn Use? Sold Activities/Changes: Sold in

April 2000. To be removed from RTA register.

Knapsack Viaduct SHI No: 1584 Location: Lapstone LOS: Not AssessedCMP: No SHR: No Last Insp: 13/7/98Condition: Good Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Lansdowne Bridge SHI No: 4253 Location: Lansvale LOS: StateCMP: No SHR: Yes Last Insp: 16/3/93Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Lennox Bridge SHI No: 4300301 Location: Parramatta LOS: StateCMP: No SHR: Yes Last Insp: 5/00Condition: Good Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Macquarie St Gate House SHI No: 12597 Location: Parramatta LOS: Not AssessedCMP: No SHR: No Last Insp: 2/9/99Condition: Good Statutory Applications: NoneIn Use? Not operating asset Activities/Changes: Concrete pillars

subject to repair

Milestone – Liverpool Rd cnr Badmington Rd SHI No:2753 Location: Croydon LOS: LocalCMP: No SHR: No Last Insp: Early 1999Condition: Fair Statutory Applications: NoneIn Use? Not operating asset Activities/Changes: Heritage

assessment & conservation study completed

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 139

Page 142: RTA Annual Report 2000 See Pg 24

(140) Roads and Traffic Authority Annual Report 2000

Milestone – Parramatta Rd near Cheltenham Rd SHI No: 2756 Location: Croydon LOS: LocalCMP: No SHR: No Last Insp: Early 1999Condition: Statutory Applications: NoneIn Use? Not operating asset Activities/Changes: Heritage

assessment & conservation study completed

Milestone – Parramatta Rd SHI No: 10321 Location: Stanmore LOS: LocalCMP: No SHR: No Last Insp: Early 1999Condition: Currently missing Statutory Applications: NoneIn Use? Not operating asset Activities/Changes: Heritage

assessment & conservation study completed

Old Windsor Rd – Seven Hills to Kellyville SHI No: 1385 Location: Seven Hills to Kellyville LOS: Not AssessedCMP: No SHR: No Last Insp: 2/9/99Condition: Fair Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Pearces Creek Bridge SHI No: 4300009 Location: Galston Gorge LOS: StateCMP: Yes SHR: No Last Insp: 9/9/98Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: CMP completed

Peats Ferry Bridge Crown Land SHI No: 4300308 Location: Brooklyn LOS: Not AssessedCMP: No SHR: No Last Insp: Not availableCondition: Not available Statutory Applications: NoneIn Use? NA Activities/Changes: None

Pyes Creek Bridge SHI No: 4300310 Location: Cherrybrook LOS: Not AssessedCMP: No SHR: No Last Insp: Not availableCondition: Not available Statutory Applications: NoneIn Use? No Activities/Changes: Question of RTA

responsibility to be investigated.

Queen Anne House – London Terrace SHI No: 10287 Location: Enmore LOS: Not AssessedCMP: No SHR: No Last Insp: OngoingCondition: Good Statutory Applications: NoneIn Use? Rented Activities/Changes: None

Remains of Figtree Bridge SHI No: 7378 Location: Hunters Hill LOS: Not AssessedCMP: No SHR: No Last Insp: OngoingCondition: Good Statutory Applications: NoneIn Use? No Activities/Changes: None

Remains of Wandella & Garden SHI No: 7473 Location: Hunters Hill LOS: Not AssessedCMP: No SHR: No Last Insp: OngoingCondition: Fair Statutory Applications: NoneIn Use? No Activities/Changes: Vacant land

Slab Cottage, Western end – Neeve St SHI No: 1365 Location: Prospect LOS: Not AssessedCMP: No SHR: No Last Insp: Not availableCondition: Fair Statutory Applications: NoneIn Use? Information not available Activities/Changes: None

APPENDIX 4 (Continued)Heritage and Conservation Register

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 140

Page 143: RTA Annual Report 2000 See Pg 24

(141) Roads and Traffic Authority Annual Report 2000

Southern Gate House SHI No: 12615 Location: Parramatta Park LOS: Not AssessedCMP: No SHR: No Last Insp: 2/9/99Condition: Poor Statutory Applications: NoneIn Use? No Activities/Changes: None

Ryde Bridge SHI No: 14049 Location: Ryde LOS: Not AssessedCMP: No SHR: No Last Insp: 12/8/98Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Site of Figtree Tea Rooms & Aquatic Tea Room SHI No: 7380 Location: Hunters Hill LOS: Not AssessedCMP: No SHR: No Last Insp: OngoingCondition: NA Statutory Applications: NoneIn Use? Activities/Changes: None

Site of Figtree Wharf & Boatshed SHI No: 7386 Location: Hunters Hill LOS: Not AssessedCMP: No SHR: No Last Insp: OngoingCondition: NA Statutory Applications: NoneIn Use? No Activities/Changes: None

St Albans Bridge, MacDonald River SHI No: 4300129 Location: St Albans LOS: StateCMP: Yes SHR: Yes Last Insp: 24/9/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: CMP completed

Stone Setting, Tom Ugly’s Bridge SHI No: 14981 Location: Sylvania LOS: Not AssessedCMP: No SHR: No Last Insp: 15/9/99Condition: Fair Statutory Applications: NoneIn Use? Yes Activities/Changes: Stone walls

subject to runoff from under carriageway

Suspension Bridge, Northbridge SHI No: 18303 Location: Northbridge LOS: Not AssessedCMP: No SHR: No Last Insp: 1/3/99Condition: Good Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Harbour Bridge & Approaches SHI No: 15492 Location: Milsons Pt/Dawes Pt LOS: StateCMP: Yes (HC endorsed) SHR: Yes Last Insp: 29/3/99Condition: Fair Statutory Applications: S.60

approvals granted. Various works.In Use? Yes Activities/Changes: Regular

maintenance and alterations.

The Spit Bridge SHI No: 4300307 Location: Mosman LOS: Not AssessedCMP: No SHR: No Last Insp: 15/5/99Condition: Good Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Tom Ugly’s Bridge (1929) SHI No: 14982 Location: Sylvania LOS: Not AssessedCMP: No SHR: No Last Insp: 26/1/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Tom Ugly’s Bridge (1987) SHI No: 14983 Location: Sylvania LOS: Not AssessedCMP: No SHR: No Last Insp: 14/11/96Condition: Fair Statutory Applications: NoneIn Use? Yes Activities/Changes: None

APPENDIX 4 (Continued)Heritage and Conservation Register

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 141

Page 144: RTA Annual Report 2000 See Pg 24

(142) Roads and Traffic Authority Annual Report 2000

HUNTER REGION ITEMS

Barrington Bridge, Barrington River SHI No: 4300161 Location: Gloucester LOS: RegionalCMP: No SHR: No Last Insp: 18/5/99Condition: Fair Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Beckers Bridge over Webbers Creek SHI No: 4300128 Location: Gresford West LOS: StateCMP: No SHR: Yes Last Insp: 1/7/99Condition: Fair Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Bulga Bridge over Wollombi Brook SHI No: 4300181 Location: Bulga LOS: StateCMP: No SHR: Yes Last Insp: 7/2/00Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Clarencetown Bridge, Williams River SHI No: 4063 Location: Clarencetown LOS: StateCMP: Yes SHR: Yes Last Insp: 25/8/99Condition: Fair Statutory Applications: NoneIn Use? Yes Activities/Changes: CMP in

preparation.

Cooreei Bridge, Williams River SHI No: 4300177 Location: LOS: StateCMP: No SHR: Yes Last Insp: 1/10/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes:

Dunmore Bridge, Paterson River SHI No: 9544 Location: Woodville LOS: StateCMP: No SHR: Yes Last Insp: 23/9/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Elderslie Bridge over Hunter River SHI No: 14311 Location: Elderslie LOS: Not AssessedCMP: No SHR: No Last Insp: 11/8/99Condition: Fair Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Fitzgerald Bridge, Hunter River SHI No: 14109 Location: Aberdeen LOS: Not AssessedCMP: No SHR: No Last Insp: 1/7/98Condition: Fair Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Fitzgerald Bridge, Williams River SHI No: 4300313 Location: Raymond Terrace LOS: LocalCMP: No SHR: No Last Insp: 19/5/99Condition: Fair Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Gostwyck Bridge, Paterson River SHI No: 4016 Location: Paterson LOS: Not AssessedCMP: No SHR: No Last Insp: 29/9/99Condition: Good Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Hexham Bridge SHI No: 11526 Location: Hexham LOS: Not AssessedCMP: No SHR: No Last Insp: 11/5/98Condition: Fair Statutory Applications: NoneIn Use? Yes Activities/Changes: None

APPENDIX 4 (Continued)Heritage and Conservation Register

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 142

Page 145: RTA Annual Report 2000 See Pg 24

(143) Roads and Traffic Authority Annual Report 2000

Hinton Bridge, Paterson River SHI No: 9528 Location: Hinton LOS: StateCMP: No SHR: Yes Last Insp: 23/9/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Kayuga Bridge SHI No: 11196 Location: Muswellbrook LOS: Not AssessedCMP: No SHR: No Last Insp: 30/7/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Luskintyre Bridge, Hunter River SHI No: 4300305 Location: Lochinvar LOS: RegionalCMP: No SHR: No Last Insp: 30/9/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Martin Bridge, Manning River SHI No: 4300300 Location: Taree LOS: Not AssessedCMP: No SHR: No Last Insp: 10/2/99Condition: Fair Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Middle Falbrook Bridge, Glennies Creek SHI No: 4300131 Location: Middle Falbrook LOS: StateCMP: No SHR: Yes Last Insp: 29/7/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Monkerai Bridge, Karuah River SHI No: 4300133 Location: Monkerai LOS: StateCMP: No SHR: Yes Last Insp: 17/5/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Morpeth Bridge, Hunter River SHI No: 9702 Location: Morpeth LOS: StateCMP: No SHR: Yes Last Insp: 3/9/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Paterson River Road Bridge SHI No: 3931 Location: Paterson LOS: Not AssessedCMP: No SHR: No Last Insp: 21/5/98Condition: Fair Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Redbourneberry Bridge over Hunter River SHI No: 4300304 Location: Singleton West LOS: LocalCMP: No SHR: No Last Insp: 28/7/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Vacy Bridge, Paterson River SHI No: 3951 Location: Vacy LOS: StateCMP: No SHR: Yes Last Insp: 1/9/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Yarrawa Bridge, Goulburn River SHI No: 4300170 Location: Denman LOS: RegionalCMP: No SHR: No Last Insp: 29/7/99Condition: Good Statutory Applications: NoneIn Use? Yes Activities/Changes: None

APPENDIX 4 (Continued)Heritage and Conservation Register

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 143

Page 146: RTA Annual Report 2000 See Pg 24

(144) Roads and Traffic Authority Annual Report 2000

NORTHERN REGION ITEMS

Ashby Dry Dock SHI No: 4300303 Location: Ashby LOS: Not AssessedCMP: No SHR: No Last Insp: Not availableCondition: Good Statutory Applications: NoneIn Use? Yes Activities/Changes: Tenders

received for CMP preparation

Bean Tree Bridge, Richmond River SHI No: 4300168 Location: Wiangaree LOS: LocalCMP: No SHR: No Last Insp: 23/2/98Condition: Fair Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Bridge over Five Day Creek SHI No: 4300008 Location: Kempsey LOS: StateCMP: No SHR: No Last Insp: 12/1/99Condition: Fair Statutory Applications: DA to

demolish approved.In Use? Yes Activities/Changes: CMP

under preparation

Bridge over Orara River SHI No: 12485 Location: Coramba LOS: LocalCMP: No SHR: No Last Insp:7/6/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Briner Bridge over Upper Coldstream River SHI No: 4300158 Location: Tucabia LOS: RegionalCMP: No SHR: No Last Insp: 13/11/98Condition: Good Statutory Applications: NoneIn Use? Yes Activities/Changes: CMP in progress

Clarence River Bridge SHI No: 4505 Location: Grafton LOS: Not AssessedCMP: SRA has CMP SHR: No Last Insp: Not availableCondition: Good Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Clarence River Road Bridge SHI No: 8230 Location: Tabulam LOS: StateCMP: No SHR: Yes Last Insp: 17/9/98Condition: Fair Statutory Applications: NoneIn Use? Yes Activities/Changes:

CMP being prepared

Colemans Bridge, Leycester Creek SHI No: 9179 Location: Lismore LOS: StateCMP: No SHR: Yes Last Insp: 2/7/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Gwydir River Road Bridge SHI No: 17593 Location: Bundarra LOS: No AssessedCMP: No SHR: No Last Insp:2/12/98Condition: Fair Statutory Applications: NoneIn Use? Yes Activities/Changes: None

APPENDIX 4 (Continued)Heritage and Conservation Register

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 144

Page 147: RTA Annual Report 2000 See Pg 24

(145) Roads and Traffic Authority Annual Report 2000

Gwydir River/Halls Creek Road Bridges, Bingara (A) SHI No: 1345 Location: Bingara LOS: Not AssessedCMP: No SHR: No Last Insp: Not availableCondition: Good Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Gwydir River/Halls Creek Road Bridges, Bingara (B) SHI No: 1347 Location: Bingara LOS: Not AssessedCMP: No SHR: No Last Insp: 30/11/98Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Korns Crossing Bridge, Rous River SHI No: 4300160 Location: Crystal Creek LOS: RegionalCMP: No SHR: No Last Insp: 9/10/98Condition: Good Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Kynnumboon Bridge, Rous River SHI No: 4300169 Location: Kynnumboon LOS: RegionalCMP: No SHR: No Last Insp: 5/5/99Condition: Poor Statutory Applications: NoneIn Use? No from mid August 2000 Activities/Changes: Bridge being bypassed

Shark Creek Bridge, Pacific Hwy SHI No: 9518 Location: Shark Creek LOS: Not AssessedCMP: No SHR: No Last Insp: 14/9/98Condition: Good Statutory Applications: NoneIn Use? No Activities/Changes: None

Sportsmans Creek Road Bridge SHI No: 3595 Location: Lawrence LOS: StateCMP: No SHR: No Last Insp: 2/7/99Condition: Good Statutory Applications: NoneIn Use? No Activities/Changes: None

APPENDIX 4 (Continued)Heritage and Conservation Register

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 145

Page 148: RTA Annual Report 2000 See Pg 24

(146) Roads and Traffic Authority Annual Report 2000

SOUTHERN REGION ITEMS

Charleyong Bridge over Mongarlowe Rover SHI No: 4300172 Location: Charleyong LOS: LocalCMP: No SHR: No Last Insp: 13/2/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Crankies Plain Bridge SHI No: 4300006 Location: Bombala LOS: StateCMP: Yes SHR: Yes Last Insp: 4/3/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: Currently being repaired. Truss members replaced with similar agemembers.

Cunningham’s Point Bridge SHI No: 4300004 Location: Bombala LOS: RegionalCMP: Yes SHR: No Last Insp: 15/10/99Condition: Poor Statutory Applications: NoneIn Use? No Activities/Changes: None

Gundaroo Bridge, Yass River SHI No: 4300157 Location: Gundaroo LOS: LocalCMP: No SHR: No Last Insp: 15/11/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Hampden Bridge, Kangaroo Valley SHI No: 14251 Location: Kangaroo Valley LOS: StateCMP: Yes SHR: No Last Insp:27/2/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

House – 306 Princes Hwy SHI No: 4300521 Location: Bulli LOS: Not AssessedCMP: No SHR: No Last Insp: OngoingCondition: House demolished Statutory Applications: NoneIn Use? No Activities/Changes: Site no longer a heritage item. Removed from LEP.

House – 85 Farell Rd, SHI No: 19125 Location: Bulli LOS: Not AssessedCMP: No SHR: No Last Insp: OngoingCondition: Fair Statutory Applications: NoneIn Use? Rented Activities/Changes: None

Landsdowne Bridge over Mulwaree Ponds SHI No: 4300186 Location: Goulburn LOS: RegionalCMP: No SHR: No Last Insp: 10/99Condition: Poor Statutory Applications: In Use? Yes Activities/Changes: Repaired in

1999. Replacement of girders on approach span to truss. Replacement of handrails.

Maldon Bridge SHI No: 19064 Location: Picton LOS: Not AssessedCMP: No SHR: No Last Insp: 3/12/98Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: Control has

been passed to Wollondilly Council

New Buildings Bridge over Towamba River SHI No: 4300139 Location: Wyndham LOS: StateCMP: No SHR: Yes Last Insp: 10/9/96Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: Currently being

repaired. Replacement of top cord of truss with similar age member.

APPENDIX 4 (Continued)Heritage and Conservation Register

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 146

Page 149: RTA Annual Report 2000 See Pg 24

(147) Roads and Traffic Authority Annual Report 2000

Old Marulan Town SHI No: 4300302 Location: Marulan LOS: StateCMP: No SHR: Yes Last Insp: OngoingCondition: Fair Statutory Applications: NoneIn Use? No, Vacant land. Activities/Changes: None

Old Nowra Road Bridge, Shoalhaven River Road Bridge SHI No: 14236 Location: Nowra LOS: StateCMP: Yes SHR: No Last Insp: Not AvailableCondition: Good Statutory Applications: NoneIn Use? Yes Activities/Changes: Vertical truss

member and bracing replaced in December 1998 after accident.

Rossis Bridge SHI No: 4300156 Location: Goulburn LOS: StateCMP: No SHR: Yes Last Insp: 22/2/00Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Stone Lined Channel Outlet, Federal Highway SHI No: 5187 Location: Lake George LOS: Not AssessedCMP: No SHR: No Last Insp: 27/7/2000Condition: Good Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Thornes Bridge, Mulwaree River SHI No: 4300163 Location: Goulburn LOS: RegionalCMP: No SHR: No Last Insp: 2/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Towrang Bridge & Culverts SHI No: 11022 Location: Towrang LOS: CMP: No SHR: Last Insp: Not availableCondition: N/A Statutory Applications: NoneIn Use? Yes Activities/Changes: Not under RTA

ownership care or control. Will be removed from S.170 register.

Truss Bridge over Crookwell River SHI No: 4300130 Location: Crookwell LOS: RegionalCMP: No SHR: No Last Insp: 4/6/98Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Victoria Bridge, Stonequarry Creek SHI No: 19066 Location: Picton LOS: StateCMP: No SHR: Yes Last Insp: Not AvailableCondition: Good Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Yowaka Bridge SHI No: 4300515 Location: Eden LOS: StateCMP: No SHR: Yes Last Insp: 26/6/95Condition: Fair Statutory Applications: NoneIn Use? Yes Activities/Changes: repairs to

concrete and post tensioning cables after accident. Repairs completed June 2000

APPENDIX 4 (Continued)Heritage and Conservation Register

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 147

Page 150: RTA Annual Report 2000 See Pg 24

SOUTH-WESTERN REGION ITEMS

Abbotsford Bridge, Murray River SHI No: 18250 Location: Curlwaa LOS: RegionalCMP: No SHR: No Last Insp: 4/6/97Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: Traffic signals

installed on approaches.

Barham Bridge, Murray River SHI No: 17676 Location: Barham LOS: StateCMP: No SHR: Yes Last Insp: 27/11/96Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: Emergency lift

span strengthening.

Barmah Bridge, Murray River SHI No: 11047 Location: Barmah LOS: RegionalCMP: No SHR: No Last Insp:30/11/97Condition: Fair Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Biggara Bridge, Murray River SHI No: 17476 Location: Biggara LOS: LocalCMP: No SHR: No Last Insp: Not AvailableCondition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: Upgrade guard

rail on approaches. Add timber piles.

Bringenbrong Bridge, Murray River SHI No: 17471 Location: Bringenbrong LOS: LocalCMP: No SHR: No Last Insp: 15/12/94Condition: Good Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Bungambrawatha Creek Bridge SHI No: 15 Location: Albury LOS: Not AssessedCMP: No SHR: No Last Insp: 2/11/94Condition: Good Statutory Applications:In Use? Yes Activities/Changes:

Carrathool Bridge over Murrumbidgee River SHI No: 4300165 Location: Carrathool LOS: StateCMP: No SHR: Yes Last Insp: 12/11/96Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Cobram Bridge, Murray River SHI No: 1334 Location: Barooga LOS: StateCMP: No SHR: Yes Last Insp: 14/3/95Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: Like for like

substructure repairs. Lift span strengthening.

Coonamit Bridge, Wakool River SHI No: 4300142 Location: Swan Hill LOS: StateCMP: No SHR: Yes Last Insp: 11/3/96Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: Completion of

SLT deck. Pier repairs.

Coopers Bridge, Lachlan River SHI No: 4300164 Location: Willanthry LOS: Not AssessedCMP: No SHR: No Last Insp: Not AvailableCondition: Poor Statutory Applications: NoneIn Use? No Activities/Changes: None

APPENDIX 4 (Continued)Heritage and Conservation Register

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 148

Page 151: RTA Annual Report 2000 See Pg 24

(149) Roads and Traffic Authority Annual Report 2000

Derringullen Creek Area SHI No: 20433 Location: Yass LOS: Not AssessedCMP: SHR: No Last Insp: Not availableCondition: Good Statutory Applications: NoneIn Use? NA Activities/Changes: None

Echuca–Moama Road/Rail Bridge over Murray River SHI No: 11064 Location: Moama LOS: StateCMP: No SHR: Yes Last Insp: 5/4/98Condition: 5/4/98 Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Euroley Bridge over Murrumbidgee River SHI No: 4300141 Location: Yanco LOS: LocalCMP: No SHR: No Last Insp: Not AvailableCondition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Gee Gee Bridge, Wakool River SHI No: 4300138 Location: Murrabit LOS: StateCMP: No SHR: Yes Last Insp: 12/3/96Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

George Chaffey Bridge over Murray River SHI No: 18251 Location: Mildura LOS: RegionalCMP: No SHR: No Last Insp: 25/6/97Condition: Good Statutory Applications: NoneIn Use? Yes Activities/Changes: Scour repairs

at NSW abutment.

Gonn Crossing, Murray River SHI No: 17675 Location: Murrabit LOS: LocalCMP: No SHR: No Last Insp: 25/7/96Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Heywoods Bridge, Hume Dam SHI No: 7024 Location: Riverina Hwy LOS: LocalCMP: No SHR: No Last Insp: 17/12/94Condition: Fair Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Howlong Bridge, Murray River SHI No: 7026 Location: Howlong LOS: RegionalCMP: No SHR: No Last Insp: 26/3/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: Partial redecking.

Essential substructure repairs.

Indi Bridge, Murray River SHI No: 17470 Location: Indi LOS: LocalCMP: No SHR: No Last Insp: 9/12/96Condition: Good Statutory Applications: NoneIn Use? Yes Activities/Changes: Guard rail

on approaches

APPENDIX 4 (Continued)Heritage and Conservation Register

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 149

Page 152: RTA Annual Report 2000 See Pg 24

(150) Roads and Traffic Authority Annual Report 2000

Jingellic Bridge, Murray River SHI No: 17474 Location: Jingellic LOS: RegionalCMP: No SHR: No Last Insp: 16/12/94Condition: Fair Statutory Applications: NoneIn Use? Yes Activities/Changes: None

John Foord Bridge, Murray River SHI No: 3608 Location: Corowa LOS: StateCMP: No SHR: Yes Last Insp: 17/12/93Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: Weep hole

repairs to truss bottom chords. NSW approach correction.

Junction Bridge SHI No: 4300007 Location: Tumut LOS: StateCMP: No SHR: Yes Last Insp: Not AvailableCondition: Fair Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Mulwala Bridge, Murray River SHI No: 3606 Location: Mulwala LOS: RegionalCMP: No SHR: No Last Insp: 8/5/97Condition: Fair Statutory Applications: NoneIn Use? Yes Activities/Changes: Traffic barrier

railing improvements

Nyah Bridge, Murray River SHI No: 17673 Location: Nyah LOS: RegionalCMP: No SHR: No Last Insp: 1/12/94Condition: Good Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Prince Alfred Bridge SHI No: 5172 Location: Gundagai LOS: Not AssessedCMP: No SHR: No Last Insp: 17/11/94Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes:

Timber replacements

Robinvale Bridge, Murray River SHI No: 807 Location: Robinvale LOS: RegionalCMP: No SHR: No Last Insp: 23/1/95 Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: Decking repairs.

Speewa Ferry, Murray River SHI No: 17685 Location: Speewa LOS: LocalCMP: No SHR: No Last Insp: Every 6 monthsCondition: Good Statutory Applications: NoneIn Use? Yes Activities/Changes: Major overhaul

Swan Hill – Murray River Road Bridge SHI No: 17678 Location: Swan Hill LOS: StateCMP: No SHR: Yes Last Insp: 27/11/96Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: Emergency

lift span strengthening

APPENDIX 4 (Continued)Heritage and Conservation Register

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 150

Page 153: RTA Annual Report 2000 See Pg 24

(151) Roads and Traffic Authority Annual Report 2000

Tintaldra Bridge, Murray River SHI No: 17473 Location: Tintaldra LOS: RegionalCMP: No SHR: No Last Insp: 16/12/94Condition: Fair Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Tocumwal Bridge, Murray River SHI No: 1335 Location: Tocumwal LOS: LocalCMP: No SHR: No Last Insp: 3/1/96Condition: Good Statutory Applications: NoneIn Use? Yes Activities/Changes: NSW scour repair.

Tooleybuc Bridge, Murray River SHI No: 17674 Location: Tooleybuc LOS: StateCMP: No SHR: Yes Last Insp: 9/4/97Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: Truss and

substructure repairs. Replacement (strengthening) of truss cross girders.Lift span strengthening.

Towong Bridge, Murray River SHI No: 17472 Location: Towong LOS: RegionalCMP: No SHR: No Last Insp: 9/12/96Condition: Good Statutory Applications: NoneIn Use? Yes Activities/Changes: Guard rail

on approaches.

Union Bridge, Murray River SHI No: 7025 Location: Albury LOS: LocalCMP: No SHR: No Last Insp: 2/6/96Condition: Fair Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Wee Jasper Bridge over Goodradigbee River SHI No: 4300140 Location: Wee Jasper LOS: StateCMP: No SHR: Yes Last Insp: 7/4/94Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: Timber

replacements

Wymah Ferry, Murray River SHI No: 17475 Location: Wymah LOS: RegionalCMP: No SHR: No Last Insp: Every 6 monthsCondition: Good Statutory Applications: NoneIn Use? Yes Activities/Changes: None

APPENDIX 4 (Continued)Heritage and Conservation Register

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 151

Page 154: RTA Annual Report 2000 See Pg 24

(152) Roads and Traffic Authority Annual Report 2000

WESTERN REGION ITEMS

Abercrombie Bridge over Abercrombie River SHI No: 4300162 Location: Tuena LOS: LocalCMP: No SHR: No Last Insp: 24/11/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Beryl Bridge SHI No: 4300167 Location: Gulgong LOS: RegionalCMP: No SHR: No Last Insp: 26/10/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: CMP in

preparation.

Boonanga Bridge, Barwon River SHI No: 4300171 Location: Boomi (north) LOS: LocalCMP: No SHR: No Last Insp: Not AvailableCondition: Not Available Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Bridge over Turon River SHI No: 4300155 Location: Wallaby Rocks LOS: StateCMP: No SHR: Yes Last Insp: 26/10/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: CMP in

preparation

Collins Bridge, Namoi River SHI No: 9989 Location: Wee Waa LOS: LocalCMP: No SHR: No Last Insp: 1/12/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Dangar Bridge, Barwon River SHI No: 4300143 Location: Walgett LOS: LocalCMP: No SHR: No Last Insp: 8/12/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Holman Bridge, Lachlan River SHI No: 4300132 Location: Gooloogong LOS: LocalCMP: No SHR: No Last Insp: 20/4/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

McKanes Falls Bridge SHI No: 4300003 Location: Lithgow LOS: StateCMP: Yes (HC endorsed) SHR: Yes Last Insp: 18/5/98Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Mudgee Overpass Road Cutting SHI No: 4697 Location: Marrangaroo LOS: Not AssessedCMP: No SHR: No Last Insp: Not availableCondition: Fair Statutory Applications: NoneIn Use? NA Activities/Changes: None

Mungindi Bridge, Barwon River SHI No: 4300159 Location: Mungindi LOS: LocalCMP: No SHR: No Last Insp: 16/11/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Paytens Bridge, Lachlan River SHI No: 4300166 Location: Collets Crossing LOS: LocalCMP: No SHR: No Last Insp: 13/4/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: None

APPENDIX 4 (Continued)Heritage and Conservation Register

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 152

Page 155: RTA Annual Report 2000 See Pg 24

(153) Roads and Traffic Authority Annual Report 2000

Rawsonville Bridge, Macquarie River SHI No: 4300182 Location: Minore LOS: RegionalCMP: No SHR: No Last Insp: 25/10/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: CMP in

preparation

Road Bridge, Darling River SHI No: 3248 Location: Wilcannia LOS: Not AssessedCMP: No SHR: No Last Insp: 27/8/99Condition: Good Statutory Applications: NoneIn Use? Yes Activities/Changes: None

Scabbing Flat Bridge, Macquarie River SHI No: 4300179 Location: 4 km south of Guerie LOS: Not AssessedCMP: No SHR: No Last Insp: 9/4/98Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: CMP in

preparation

Stone Culvert & Retaining Wall near “Emoh” SHI No: 4796 Location: Old Bowenfels LOS: Not AssessedCMP: No SHR: No Last Insp: Not availableCondition: Good Statutory Applications: NoneIn Use? NA Activities/Changes: None

Victoria Pass Mitchell’s Pass SHI No: 4795 Location: Mt Victoria LOS: Not AssessedCMP: No SHR: No Last Insp: OngoingCondition: NA Statutory Applications: NoneIn Use? NA Activities/Changes: None

Yamble Bridge, Cudgegong River SHI No: 4300180 Location: Goolwa LOS: RegionalCMP: No SHR: No Last Insp: 25/10/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: CMP in

preparation

Warroo Bridge, Lachlan River SHI No: 4300178 Location: West of Forbes LOS: LocalCMP: No SHR: No Last Insp: 25/10/99Condition: Poor Statutory Applications: NoneIn Use? Yes Activities/Changes: CMP in

preparation

APPENDIX 4 (Continued)Heritage and Conservation Register

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 153

Page 156: RTA Annual Report 2000 See Pg 24

(154) Roads and Traffic Authority Annual Report 2000

APPENDIX 5Species Recovery

Measures

Consider the impact of any activitiesundertaken within areas under control of theRTA that are known to contain M. angusii orare potential habitat

Liaise with National Parks & Wildlife Service,Warringah Council, Pittwater Council andKu-ring-gai Council to achieve and maintaina permanent record of the location of M.angusii populations and potential habitats

Ensure that roadworks/maintenance will not cause destruction or degradation topopulations of M. angusii or potential habitat

Ensure that all environmental personnel arefamiliar with the location of M. angusiipopulations and potential habitat

Ensure that all site personnel are familiarwith the location of M. angusii populationsand potential habitat

Action taken to implement measures

Environmental Services Representative to adviseProject Manager of the need to consider the impact of proposed activities on M. angusiiProject Manager to advise EIA Consultant of the need to consider the impact of proposed activities on M. angusiiEnvironmental Assessor to ensure that the impact of a proposed activity on M. angusii is considered in allrelevant Environmental Impact Assessments (EIAs)Environmental Assessor to take known and potentiallocations of M. angusii and likely impact on M. angusiiinto account when preparing Decision Reports

RTA Recovery Team member to share informationwith other Recovery Team members, and updaterecords accordingly

Environmental Services Representative to adviseProject Manager of the need to consider the impactof roadworks/maintenance work on M. angusiiEnvironmental Assessor to ensure that the impact of roadworks/maintenance work on M. angusii isconsidered in all relevant EIAsEnvironmental Assessor to take known and potentiallocations of M. angusii and likely impacts on M. angusii into account when preparing DecisionReports

Environmental Services Branch (ESB) to establishcentral database for sensitive sites, including knownand potential locations for M. angusii populations

RTA Recovery Team Member to brief ESB on locationof M. angusii population and potential habitat

RTA Recovery Team Member to provide informationto Transfield (via Asset Management) regardingidentification of M. angusii known and potentiallocations of M. angusii populations and preferredweed control methods

Estimated

annual cost

NA

$750

NA

$1,124

$300

$1,050

Status

No activity affecting M. angusii has beenundertaken sinceendorsement of theRecovery Plan

Regular liaison occurringthrough Recovery Teammeetings. GIS establishedfor the recording oflocation data

Road maintenancecontractors informed ofthe location of M. angusii.No roadworks have beenproposed that may havean impact on the species

GIS established for therecording of sensitivelocations. M. angusii hasnot yet been mapped onsystemCompleted. ESB to beinformed of any changes

Transfield advised ofpreferred weed controland known locations ofM. angusii

Table 1: Status of RTA action taken to implement measures from the Microtis angusii (Angus’s Onion Orchid)

Species Recovery Plan, Sydney Region

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 154

Page 157: RTA Annual Report 2000 See Pg 24

(155) Roads and Traffic Authority Annual Report 2000

APPENDIX 5 (Continued)Species Recovery

Measures

Ensure that all Environmental ImpactAssessment surveys are conducted betweenMay and October

Notify NPWS of any new M. angusiipopulations discovered

Contribute to targeted survey of M. angusiito determine the full distribution of theplant, as appropriate

Action taken to implement measures

ESB Representative to advise Project Manager of thisrequirementProject Manager to advise EIA Consultant of thisrequirementEnvironmental Assessor to ensure that EIA surveyswere conducted between May and October in allrelevant EIAsEnvironmental Assessor to take this requirement into account when preparing Decision Reports

ESB Representative to notify RTA Recovery TeamMember upon becoming aware of any new M.angusii populations discovered during any EIA orother processRTA Recovery Team Member to pass this informationonto NPWS coordinator of M. angusii Recovery Team

ESB Representative to notify RTA Recovery TeamMember upon becoming aware of any new M.angusii populations discovered during any EIA orother processRTA Recovery Team Member to pass this informationon to NPWS coordinator of M. angusii Recovery TeamRTA to provide in-kind contribution to M. angusiisurveys being conducted by NPWS as appropriate

Estimated

annual cost

NA

$115

$115

$525

Status

No proposal affecting any M. angusii location or potential habitat has been undertaken sincethe endorsement of theplan

No new populations havebeen discovered

No new populations havebeen discovered since theendorsement of theRecovery Plan

No M. angusii surveyshave been conductedsince the endorsement of the plan

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 155

Page 158: RTA Annual Report 2000 See Pg 24

(156) Roads and Traffic Authority Annual Report 2000

Measures

Identify existing and potential threats to the A. pubescens population at BeverlyHills/Narwee on the F5 (north of Windarra Street)

Develop and implement a threat and habitatmanagement program for the A. pubescenspopulation at Berverly Hills/Narwee on theF5 (north of Windarra Street)

Monitor the A. pubescens population atBeverly Hills/Narwee on the F5 (north ofWindarra Street) on a regular basis to assessthe effectiveness of the threat and habitatmanagement programs

Assess development activities with referenceto the recovery plan, the EIA Guidelines forA. pubescens and future advice from NPWS

Prepare or review any relevantenvironmental policies or managementplans with reference to the recovery plansand any future advice from the NPWS

Forward information on all planningdecisions which affect populations of A. pubescens, including decisions thatprotect habitat as well as those that lead to reduction of habitat and/orindividuals, to the NPWS

Action taken to implement measures

Environmental Services Representative to visit site an identify existing and potential threats to thepopulation

Asset Services to develop a threat and habitatmanagement program to be incorporated into the Maintenance Plan for the F5, with advice from Environmental Services Representative Asset Services to ensure that the program isimplemented

ESB Representative to conduct at least an annual inspection of the population, includingphotographic surveyFollowing each inspection compare inspectionrecords and initiate corrective action if required

Environmental Services Representative to adviseProject Manager of this requirement if aware of the proposed activity prior to EIA processProject Manager to advise EIA Consultant of thisrequirementEnvironmental Assessor to ensure that the recoveryplan, EIA guidelines and NPWS advice have beenconsidered in all relevant EIAsEnvironmental Assessor to take this requirement into account when preparing Decision Reports

During next review of the Maintenance EMP for the F5, Asset Services to add references to the A. pubescens Recovery Plan with advice fromEnvironmental Services Representative

Environmental Services Representative to adviseProject Manager of this requirementRTA Project Manager to forward the information to NPWS

Estimated

annual cost

$525

$1,500

$525

NA

$750

NA

Status

Site visited and extent of population mapped.Awaiting informationfrom Interlink Roadsregarding maintenanceregimes before finalisingexisting and potentialthreats

Awaiting furtherinformation prior todeveloping threat andhabitat managementprogram

Inspection completed for 2000

No EIAs affecting A. pubescens in 2000since the endorsement of the Recovery Plan

Environmental Servicesawaiting informationregarding themaintenance regime inthis location. Interlink Roads reviewinglandscape plans withreference to the RecoveryPlan

No planning decisionswhich affect populationsof A. pubescens have beenmade since theendorsement of theRecovery Plan

Table 2: Status of RTA action taken to implement measures from the Acacia pubescens (Downy Wattle)

Species Recovery Plan, Sydney Region

APPENDIX 5 (Continued)Species Recovery

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 156

Page 159: RTA Annual Report 2000 See Pg 24

(157) Roads and Traffic Authority Annual Report 2000

Measures

Drainage runoff from Ryland Track in Ku-ring-gai Chase National Park

Sympathetic management of plants onroadways

Management of roadworks near BahaiTemple

Poster/ brochure

Action taken to implement measures

Investigations to be made to determine controls of runoff from other side of road

Meeting held with maintenance contractor, who wasinformed of appropriate maintenance techniques forminimising damage to G. caleyi. Training day held forWarringah Council

Review of Environmental Factors prepared.Temporary fencing erected to protect remainingplants. The cleared/weedy area in Garigal NP is to be revegetated with good topsoil removed

Draft RTA brochure prepared

Estimatedannual cost

Status

Underway

Completed

Underway

Underway

Table 3: Status of RTA action taken to implement measures from the Grevillea caleyi (Caley’s Grevillea) Species Recovery Plan, Sydney Region

*Costs are yet to be determined because final recovery plans are not fully developed.

Measures

Site management of public land at Boambee using the Precautionary Principle

Evaluate population size

Prepare maps

Mark sites

No adverse impacts from site management actions

Manage stock-piles of soil

Maintain drainage patterns

Monitor population

Reconsider works if the population is in decline

Control invasive weeds

Environmental management plan

Investigate translocation

Research– Census data– Population dynamics– Disturbance regimes

Establish ex situ collections

Action taken to implement measures

Ongoing

A flora specialist has been commissioned and is to report findings on 24/8/00

A flora specialist has been commissioned and is to report findings on 24/8/00

The site has been marked and a sign is to be drawn up to NPWS requirements

Completed

Completed

Completed

Completed

N/A – the population is expanding

This is subject to NPWS advice and a strategy is to be ratified on 24/8/00

Completed

A strategy is yet to be developed

Research is subject to specialist studyand report is due on 24/8/00

Collections are subject to recommendations from the specialist study

Estimatedannual cost

$500

$500

$750

$4,000

$1,500

$1,500

$5,000

$1,000

$500$1,000$1,500

$500

Status

Ongoing

Underway

Underway

Underway

Ongoing

Ongoing

Ongoing

Ongoing

Ongoing

Underway and ongoing

Completed

Under review

Underway and ongoing

Underway

Table 4: Status of RTA action taken to implement measures from the Eleocharis tetraquetra (Square-Stemmed Spike-Rush)

Species Recovery Plan, Mid North Coast Region

APPENDIX 5 (Continued)Species Recovery

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 157

Page 160: RTA Annual Report 2000 See Pg 24

(158) Roads and Traffic Authority Annual Report 2000

APPENDIX 6Advisory Bodies

Roads & Traffic Advisory Council

Established under the Transport Administration Act 1988, the Roadsand Traffic Advisory Council advises the RTA and the Minister for Roads on:– The promotion of traffic safety– Improvements in the movement of traffic– Improvements in the movement of freight– Requirements of vehicle drivers– Requirements for roads and vehicles– Promotion of industrial development, primary production and

tourism in relation to roads and traffic– Protection of the environment in relation to roads and traffic– Roads and traffic legislation, and– Any other matter relating to roads and traffic that the Council

considers appropriate

Membership of the Roads and Traffic Advisory Council is byappointment by the Minister for Roads and comprises representativesfrom various organisations. As at 30 June, the Council comprised:– Mr Bill Wallace (Chair) – the road freight industry– Mr George Karagiannakis – NRMA Limited– Councillor William Bott – Local Government and Shires Association– Mr Warrick Irvine – Labour Council of New South Wales– Emeritus Professor Ron Huckstep – the medical profession

There are also four ex-officio members, the:– Chief Executive of the RTA– Director-General of the Department of Urban Affairs and Planning– Director-General of the Department of Transport– Commissioner of the New South Wales Police Service

Government Agencies’ Road Safety Council (GARS)

The previous Road Safety Advisory Council was dissolved in December,1999 and replaced by a new committee:

The Government Agencies’ Road Safety Council, chaired by the RTAChief Executive, is a forum for high-level senior managers fromgovernment agencies involved in road safety practice to meet anddiscuss their priorities and programs. It aims to capture the synergiesavailable from ensuring that all agencies with road safety initiatives arekept informed of the whole range of road safety activity across the State.

As at 30 June 2000 the Council comprised:Mr Paul Forward (Chair) – RTAChief Supt Ron Sorrenson – NSW Police Service Traffic BranchMr David Bowen – Motor Accidents AuthorityMr Laurie Glanfield – Attorney General’s DepartmentMr Garry Payne – Department of Local GovernmentMr John Hall – Department of TransportDr Andrew Wilson – NSW Health, andMr Lindsay Wasson – Department of Education and Training.

3X3 Committee

This independent committee, representing the community, monitorsexpenditure to ensure ‘3x3’ funds are spent on road projects inaccordance with criteria contained in the legislation.

The independent committee in 1999/2000 consisted of:– Mr Don Mackay AM (Chair) – Senior Partner, Deacons, Graham &

James, former President NRMA and former Chairman NSW Police Board– Councillor Allan Fifield OAM – Culcairn Council, Grants Commissioner

and Past President Shires Association– Mrs Audrey Hardman OAM – Past President Country Women’s

Association, Deputy Chair NSW Women’s Consultative Committeeand Co-Chair Rural Women’s Network, and

– Mr Robert Lynn – Financial Services Industry Leader,PricewaterhouseCoopers and Chairman Australian Audit StandardsBoard.

Western Sydney Roads and Transport Committee

This independent committee, representing the community, wasestablished in 1996 to monitor and verify expenditure of road fundsapproved for western Sydney by the Minister for Roads. The NSWGovernment’s commitment to the people of western and south-western Sydney to spend an average of $160 million annually on roadand road-related public transport infrastructure works in westernSydney was achieved in 1999/2000.

The independent committee in 1999/2000 consisted of:– the late Mr Lindsay Barnett (Chair) – Chairman, Coal Compensation

Review Tribunal– Mr Marzi De Santi – Manager Transport and Economics, Nominee of

NRMA– Mr Jim Angel – Deputy Mayor, City of Blue Mountains, Nominee of

Western Sydney Regional Organisation of Councils, and– Mr Mike Veysey – RTA Advisor to the Committee.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 158

Page 161: RTA Annual Report 2000 See Pg 24

(159) Roads and Traffic Authority Annual Report 2000

Road Traffic Noise Committee

Meets every three months and produces an annual report of progresstowards achieving Road Traffic Noise Taskforce recommendations.Members:– Ms Jay Stricker (chair) – RTA– Ms Katye Jackett – Cabinet Office– Mr Ballabh Acharya – Department of Housing– Mr Norm Smith – Department of Local Government– Ms Karen Wyatt – Department of Transport– Ms Suzi Dryden – Department of Urban Affairs and Planning– Mr Geoff Mellor – EPA– Ms Debra Rae – Local Government and Shires Associations, and– Mr Murray Johnson – Rail Access Corporation.

RTA Heritage Committee

Advises on proactive management of heritage; reviews and endorsesrecommendations on the management of our heritage portfolio anddevelops appropriate policy in heritage management areas.Membership was made up of representatives from the RTA, NationalTrust, Institution of Engineers Australia, the NSW Heritage Office andthe community.

Environment Council

Committee membership has expired and is currently under review inaccordance with Premier’s Memorandum No. 99-3 Government Boardsand Committees.

Department of Urban Affairs and Planning Local Government

Liaison Committee

A statutory committee established under Section 20 of theEnvironmental Planning and Assessment Act, 1979. Its function is toadvise the Minister for Urban Affairs and Planning on a range of issuesincluding:– effective coordination of public authority and local council activities

and programs– policies and procedures relating to the function of councils under

the Environmental Planning and Assessment Act– information, advice and procedural needs of councils in connection

with their responsibilities under the Environmental Planning andAssessment Act, and

– local environmental planning policies and procedures.

The RTA is represented on the committee by the General Manager,Environment and Community Policy.

APPENDIX 6 (Continued)Advisory Bodies

Bicycle Advisory Council

The Council was established to provide the RTA with advice andrecommendations on all bicycle related matters; facilitate all activities of the RTA which impinge on bicycling; assist in the efficientcoordination of effective programs to benefit cyclists throughout thepublic and private sectors; facilitate, but not necessarily undertake,provisions for cyclists by all levels of government; assist in thedevelopment and ongoing review of RTA strategic plans for bicycles;and provide an effective consultative forum for cyclist organisations and Government.

As at 30 June 2000, the Council comprised six ex-officio members andchaired by Cr Patricia Gould – Local Government and Shires Association.

The organisations represented by members are:– Local Government and Shires Association– Bicycle NSW– Newcastle Cycleways Movement– Department of Transport– NSW Police Service, and– RTA.

Road Freight Advisory Council

The Council provides a consultative forum for industry and governmentto consider matters related to the development, coordination, planning,regulation and operation of road freight transport services in NSW.

Council members are:– Mr Bob Angus – (Chairman), Boral Transport– Mr Warrick Irvine – Transport Workers’ Union– Mr David Pierce – NatRoad Limited– Mr Robert Gunning – Livestock Transporters Assn of NSW– Mr Joe Sepos – Livestock Transporters Assn of NSW– Mr Geoff Tinney – NSW Road Transport Assn– Mr Terry Dene – NSW Road Transport Assn– Mr Paul Campbel – Charter Freightlines Pty Ltd– Mr David Anderson – NatRoad Limited– Mr Peter Lewis – Mr John Morris, Mr Trevor Smith – regional road

freight groups nominees, and– Mr Phil Leeds – RTA adviser.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 159

Page 162: RTA Annual Report 2000 See Pg 24

(160) Roads and Traffic Authority Annual Report 2000

APPENDIX 7Senior Executive Performance Statements (Level 5 and above)

Name: Paul ForwardPosition: Chief ExecutiveLevel: 8Period in position: 1999/2000Total Remuneration Package: $265,000

Mr Forward was appointed to the position in December 1999, and occupied the position since June 1999 on an acting basis.

Mr Forward led the development and implementation of key programsin the RTA’s core business areas of road network infrastructure, roadsafety and road user management and traffic management. Allprograms were delivered as per prearranged targets.

Mr Forward led organisational improvements to achieve theGovernment’s efficiency targets, with savings directed back into theroads program through the implementation of structural realignmentand initiatives in road maintenance service delivery. Rural employmentstrategies employed were the transfer of the telephone customerservice operations to a Call Centre in Newcastle, Cashback relocating toDubbo, the Enforcement Litigation unit transferring to Grafton and theVehicle Infringement Processing Unit transferring to Glen Innes.

Successful implementation of the Goods and Services Tax on tollwayincreases and impact on contracts and provision of services. The Y2Kproject was also successfully executed with full compliance.

Mr Forward led the development and maintenance of the State Roadnetwork, focusing on strategic routes to promote economic growth,providing safer roads and contributing to a totally integrated transport solution.

Initiatives accomplished included the development of a program toprovide suitable and reliable freight corridors and the provision of roadaccess to inter-modal freight terminals and ports, Road Safety 2010with a key focus on reducing road trauma due to speeding, drinkdriving and fatigue and the NSW Bike Plan 2010 with a key focus onimproving facilities for cyclists and making it safer to cycle.

Development of road safety initiatives by the RTA were led byMr Forward and road safety programs co-ordinated across Governmentagencies that contributed to improved overall road safety outcomes.Traffic management initiatives implemented included the officialopening of the Transport Management Centre, improvements to theSCATS system, variable message and variable speed limit signs,electronic tolling and other intelligent transport systems technology.

Major road infrastructure commitments included the completion ofthe construction of the Eastern Distributor, and the continuation ofconstruction works on the M5 East Motorway. Incident managementon major routes continued to be a priority with 24 hour trafficmanagement response capability.

The management of environmental issues continued to be a majorfocus. The second RTA Environment Report was released and theenvironmental and heritage aspects of RTA contracts werestrengthened to meet or exceed the requirements of the ConstructionPolicy Steering Committee Guidelines.

Initiatives undertaken in the Motor Registry include the extension ofaccess to services by using Internet technology, extending theGovernment Access Centre concept, improvements to the standard ofdriver licensing in NSW including a Graduated Licensing Scheme,trialing a hazard perception test system for novice drivers and anupgraded heavy vehicle driver test.

Improved performance of Occupational Health & Safety (OH&S), the rehabilitation of injured staff and the management of workerscompensation claims has continued to result in significant cost savings,reduced workers compensation premiums and improved workplacesafety. A corporate OH&S standard and audit instrument has beenimplemented and extensive work has been undertaken on refining the RTA’s project management of OH&S on contract works.

Name: Mike HannonPosition: Director, Road Network

InfrastructureLevel: 6Period in position: March 2000 – June 2000Total Remuneration Package: $210,985Performance Payment 1998-1999: $6,000 (SES Level 5 at the time

of payment)

Criteria applied for Strong performer – meetsperformance payment: objectives in performance

agreement

Mr Hannon was seconded to the position on 1 May 1999 and wasappointed to the position in March 2000.

Mr Hannon developed strategic priorities and consolidated the role ofRNI Directorate within the framework of the RTA's funder/purchaser/provider business model.

Mr Hannon continued to determine strategic road network prioritiesto meet Government objectives and managed the development ofmajor projects. Major road infrastructure commitments included thecompletion of the construction of the Eastern Distributor, theBulahdelah to Coolongolook freeway, and the continuation ofconstruction works on the M5 East Motorway. Under Mr Hannon'sdirection and client management a number of strategic projectsprogressed through the planning stages including the Sydney CrossCity Tunnel, the Lane Cove Tunnel, Liverpool Parramatta Transitwayand the Western Sydney Orbital.

The implementation of Action for Transport 2010 continued ensuringthe projects of strategic priority including the commencement of theGreat Western Highway – Blue Mountain projects and the Yelgun toChinderah project on the Pacific Highway. The Rebuilding CountryRoads Program continued to focus on the road infrastructureinvestment towards road transport industry needs, includingintermodal transport. As a part of this initiative Country Timber BridgeProgram proceeded with 36 of 140 bridges completed. A number ofroute strategies for key routes were prepared including the PrincesHighway and the Windsor Road.

Other major initiatives include ensuring the achievement of maximumvalue for money from the development and delivery of infrastructuremaintenance using business like principles and practices, and theongoing assessment of achievements of standards and targets appliedthrough reporting on the trends and outcomes of the InfrastructureMaintenance program.

Mr Hannon implemented the Roads Maintenance Reform Package toensure the delivery of value for money service through the introductionof Single Invitation Contracts arrangements for maintenance works andthe mandatory pre-qualification scheme for Councils and RTA RoadServices. Enhanced requirements for environmental management onprojects as well as OHS requirements in contracts were implemented.

Mr Hannon successfully negotiated the National Highway PerformanceAgreement as well as implemented the recommendations of the Reporton the Review of the Roads Act. The Urban and Regional DesignPractice Notes were finalised and implemented.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 160

Page 163: RTA Annual Report 2000 See Pg 24

(161) Roads and Traffic Authority Annual Report 2000

APPENDIX 7 (Continued)Senior Executive Performance Statements (Level 5 and above)

Name: Chris FordPosition: Director, Traffic and TransportLevel: 5Period in position: 1999 – 2000Total Remuneration Package: $161,304Performance Payment 1998-1999: $6,000Criteria applied for Strong performer – meetsperformance payment: objectives in performance

agreement

As Director Road Safety and Traffic Management until February 2000and subsequently as Director Traffic and Transport, Mr Ford successfullymanaged and implemented programs to improve road safety andtraffic management across NSW. Specific achievements in 1999/2000included successful transport arrangements for major events andOlympic Games test events, improved management of incidents,priority for buses, the launch of Action for Bikes - BikePlan 2010 andRoad Safety 2010 and improved road user programs addressingspeeding, driving impaired and fatigue.

Mr Ford played a major role in the planning and implementation of thetraffic and transport arrangements for major events and in particular,the Sydney 2000 Olympic and Paralympic Games test events and theTorch Relay. Major events included the highly successful New Year’s Eveand Australia Day celebrations, many parades and festivals and theCorroboree 2000 and Walk for Reconciliation across the SydneyHarbour Bridge, for which the RTA received a commendation from thePremier. Olympic test events included the trial Marathon and Triathlon,test events at all venues, the Royal Easter Show and major tests forStadium Australia, such as the NRL Grand Final and State of Originmatches and Bledisloe Cup and Tri-Nations rugby union, several ofwhich attracted crowds of over 100,000.

Mr Ford’s achievements in incident management included theTransport Management Centre commencing operations, theappointment of Traffic Commanders to assume primary responsibilityfor traffic management around incident scenes on major roads and theintroduction of a Traffic Emergency Patrol service for motorists alongmajor routes in and around Sydney. Mr Ford led other initiatives toimprove the reliability of traffic flow, including improvements to theSCATS coordinated traffic signal system, variable message and variablespeed limit signs, electronic tolling and other intelligent transportsystems technology.

Mr Ford also led enhancements to bus priority, including additional busand transit lanes, particularly in comprehensive schemes in the SydneyCBD and associated with the Eastern Distributor, the colouring of buslanes red to make them easily visible to motorists, and a pilot buspassenger information system for the northern beaches.

Mr Ford developed and began implementation of Action for Bikes –BikePlan 2010, integrated with Action for Transport 2010. BikePlan 2010was prepared in consultation with the Bicycle Advisory Council andother stakeholders, with a key focus on improving facilities for cyclistsand making it safer to cycle, through the creation of a network ofcycleways in Sydney and in regional areas.

As Director Road Safety and Traffic Management, Mr Fordimplemented a speed management and road user safety program,consistent with Road Safety 2010 which was launched in November1999, to reduce the incidence of speeding, driving while impaired anddriver fatigue. Automatic digital speed cameras were introduced, inconjunction with the NSW Police Service, on lengths of road identifiedwith a high incidence of speed-related crashes. The enhancedenforcement program with the Police Service was also continued.

Mr Ford led programs to improve the safety of roads, included thetreatment of accident blackspots, and with particular emphasis on

country roads. Public education campaigns for both road safety andtraffic management were again a feature of the year’s programs.

Mr Ford satisfactorily built partnerships on a number of major traffic androad safety issues, with stakeholders such as the Sydney City Council,developers, STAYSAFE, the NSW Police Service and local government.The development of the road event, route and venue traffic operationsplans for the Sydney 2000 Olympic and Paralympic Games also requiredcooperation and consultation with ORTA, OCA and SOCOG. A reviewduring the year of the Road Safety and Traffic Management Program,conducted by the Premier’s Department for the Council on the Cost andQuality of Government, resulted in a favourable report.

Name: Peter ScarlettPosition: Director, FinanceLevel: 5Period in position: 1999 – 18 June 2000Total Remuneration Package: $169,938Performance Payment 1998-1999: $12,000Criteria applied for Outstanding performer – exceedsperformance payment: Chief Executive’s expectations –

has capability for position ofincreased accountability

Mr Scarlett led the delivery of a range of projects which have resultedin improved efficiencies and savings.

Projects undertaken during the year included the assessment of theimpact of the Goods and Services Tax on RTA’s operations andimplementation of financial system changes to deal with the Y2K issue.

Mr Scarlett developed contemporary commercial and operationalpricing and accounting policies. Further enhancements were made tothe commercially based financial reporting framework

Risk Management procedures and policies were further strengthened.Mechanisms were implemented for the formalisation of the status ofland under road and improvements for the management of vacantroad corridor land. This year also saw the full implementation of theuse of Purchasing Cards as an ordering and payment mechanism.

The RTA’s 2000/2001 Budget was developed and the balance betweenthe RTA’s competing objectives and across core functions wasdetermined. In accordance with the NSW Government StrategicManagement Cycle, timely and accurate advice was provided for theState Budget, the RTA’s annual Accounts and other reportingrequirements.

Name: David Stuart-WattPosition: Director, Client ServicesLevel: 5Period in position: 1999/2000Total Remuneration Package: $169,938Performance Payment 1998-1999: $9,000Criteria applied for Excellent performer – exceedsperformance payment: Chief Executive’s expectations

Mr Stuart-Watt successfully established Client Services Directorate asthe RTA’s principal agent in managing the provision and procurementof road transport services with emphasis on ensuring value for money,integrating programs at the local level, and achieving consistency andimplementing best practices in the delivery of programs and projects.

Important milestones in achieving these outcomes have been theestablishment of ‘Centres of Excellence’ in project and contractmanagement, asset management, pavement technology andenvironmental services; securing quality certification to ISO 9000standards for the integrated project management system andenvironmental management system; benchmarking of projectmanagement activities against Australian and internationalorganisations; and facilitating the introduction of Single InvitationContracts for road maintenance across the State.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 161

Page 164: RTA Annual Report 2000 See Pg 24

(162) Roads and Traffic Authority Annual Report 2000

APPENDIX 7 (Continued)Senior Executive Performance Statements (Level 5 and above)

The core programs of road development, road maintenance, roadsafety and traffic management amounting to $1.62 billion weredelivered. This included the timber bridge replacement, rebuildingcountry roads, bicycles, and Western Sydney roads and transportprograms.

Significant accomplishments include the completion of the Bulahdelahto Coolongolook Deviation, the Taree and Tyndale Bypasses, andsealing of major roads including the Kamilaroi Highway, and theMonaro Highway south of Bombala. Some of the major workscompleted in Sydney include the M5 Motorway duplication betweenBeverly Hills and Revesby, the Cowpasture Road from Elizabeth Drive toHorsley Drive, the City West Link 3, and the replacement of timberculverts on the Putty Road.

Road safety behavioural programs successfully delivered throughincreasing use of variable message signs and speed cameras at strategiclocations, and partnership with local Councils.

Mr Stuart-Watt has ensured that key Government and client prioritieswere delivered on schedule and to budget. His leadership during aperiod of major organisational change has been instrumental intransforming the Directorate into a commercially focussed business,particularly the development of a client and customer service ethicamong staff.

Name: Ulf FraserPosition: Director, OperationsLevel: 5Period in position: 1999/2000Total Remuneration Package: $169,938Performance Payment 1998-1999: $9,000Criteria applied for Excellent performer – exceedsperformance payment: Chief Executive’s expectations

Following adoption by the RTA of a funder/purchaser/providerorganisational model, Mr Fraser focussed primarily throughout 1999/00on the establishment of RTA Operations as a viable statewide businessable to operate in open markets, and capable of winning work frominternal and external clients.

He has led the development and implementation of the systemsinfrastructure needed for successful participation in a competitiveenvironment. He has also led the development of a commerciallyattuned culture across RTA Operations based on integrity, innovation,customer focus and achievement of financial targets.

He paid particular attention during this period to Road Services, thebranch most subject to competition and which provided $36M of the$59M overall financial surplus achieved from the successful delivery ofworks and services to the value of $774M in 1999/00. While the vastbulk of this income came from internal clients, some $21M was earnedby the Road Services, Technical Services, Fleet Services andEnvironmental Technology branches from external clients. The surplusachieved enabled the RTA to fund some works and services across theprogram areas earlier than would otherwise have been the case.

Initiatives successfully completed during the year in the Driver andVehicle Services branch included relocation of all telephone customerservice operations to a new consolidated Call Centre in Newcastletogether with the Help Desk for the DRIVES computer basedregistration and licensing system. Two new Motor Registries were alsoopened at Wetherill Park and Rockdale.

Mr Fraser continued his senior role on the RTA’s Single Bargaining Unitinvolved in high level industrial negotiations with the unions/staffassociations during the year. He also continued to play an active part inthe RTA’s overall Change Management Program throughout 1999/00.

Name: Sue SinclairPosition: Director, Road Safety and Road

User ManagementLevel: 5Period in position: May 2000 – June 2000Total Remuneration Package: $174,890

Ms Sinclair led the integration of road safety strategies with themanagement of road users since May 2000. Regional forums wereinitiated to obtain community and road user input into the developmentof strategies to underpin the objectives of Road Safety 2010.

A load restraint training package was developed in consultation withthe transport industry and will be introduced as part of the nationalreform agenda of the National Road Transport Council (NRTC).

The new Graduated Licensing Scheme, aimed at improving the skills of novice drivers, was finalised for introduction on 1 July 2000. Thisincluded the development of comprehensive handbooks, mediacampaigns and information for industry and other stakeholders.

Final preparations were undertaken for the introduction of the storageof photographic images on DRIVES to increase the integrity of thelicensing system.

Ms Sinclair played a key role in planning and implementing RTA'scontribution to support the Sydney 2000 Olympic and Paralympic Games.

CES/SES Positions and Performance

Total CES/SES Total CES/SESLevel End of previous year End of current year

6 1 15 4 54 6 53 13 152 14 131 2 1CEO under S.11A* 1 1Total 41 41

*CEO position listed under S.11A of the Statutory and Other OfficesRemuneration Act 1975, not included in Schedule 3A of the PublicSector Management Act 1988.Number of positions filled by women in the current year is 5. Previous year 5.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 162

Page 165: RTA Annual Report 2000 See Pg 24

(163) Roads and Traffic Authority Annual Report 2000

APPENDIX 8Internal Audit

During the year the internal audit function was integrated into a newlycreated branch called Control Management Services (CMS).

A major driving force in the creation of CMS was the growing publicfocus on the issue of Corporate Governance which has been broadlydefined as “a process used for the effective management of the totalrisks of a business in order to optimise value for the Stakeholders”.

The creation of the CMS Branch facilitates the necessary coordinationand integration of a range of functions related to the CorporateGovernance issue, ie– Critical Control Management– Internal Audit,– Investigations, and– Corruption Prevention.

This in turn facilitates the provision of effective and efficient supportand advice to the CEO and senior management in meeting the greaterlevels of accountability required in regard to identifying, assessing andcontrolling “the total risks” associated with the operations of theAuthority.

In this regard the newly developed Critical Control Management(CCM) process is the focal point of our efforts.

CCM has as its aim the achievement of the following two objectives:– to raise line management’s awareness of their responsibilities in

regard to ensuring that the businesses for which they are responsibleoperate in an appropriately controlled environment, and

– to provide a tool/process to enable management to satisfy themselvesthat the critical controls within their operations remain appropriateand operate on an on-going basis.

The CCM process generally involves line management working withCMS staff to identify:– the critical functions within the business– the major risks which exist within these critical functions– controls to address these major risks, and– a means by which line management can confirm that the controls

continue to operate on an ongoing basis.

The project is currently being implemented in the Road Safety & RoadUser Management business and will eventually be implementedthroughout the Authority.

The internal audit function consists of three sections, InformationTechnology (IT), Engineering and Financial and Operations.

IT Audit had three areas of major focus during the year, ie:– pre-implementation reviews of new initiatives within the driver and

vehicle systems including Registration Renewals using Internetfacilities, Graduated Licensing System and online interface with theRegistry of Births, Deaths and Marriages

– review of contract negotiation and scoping study for a proposedIntegrated Management System, and

– review of computer system changes in relation to Year 2000 and GSTas well as other major system upgrades.

Financial and Operations Audit focussed on identifying and managingrisks. Systems, activities and asset categories identified as high risk weretargetted during the year. Major reviews included the administration ofroadworks carried out by local councils on the RTA’s behalf and of threeof the RTA’s seven regional administration centres.

Engineering Audit has undertaken both system and compliance auditson projects from the stage of concept to post-completion. The auditsidentified significant opportunities for improvements in systems,processes and procedures within the RTA and service providers. Someof the major audits undertaken were on projects such as the M5 East,the Transport Management Centre, Ballina Bypass, M4 Widening,Pacific Highway – Wang Wauk to Bundacree Creek and CouncilManagement of RTA funded projects.

All reported allegations of internal corruption are investigated by theInvestigations Section. Proven matters are forwarded to RTA seniormanagement for disciplinary considerations and recommendations aremade to line management to address any weaknesses or areas ofconcern relating to policies, procedures or controls highlighted by theinvestigations.

The Investigation Section was expanded and refocussed during theyear to enable it to more fully address allegations of external fraudimpacting on the motor registry environment. Outcomes from thesematters are primarily referred to the NSW Police for investigation andRTA senior management to address any policy, procedure and controlissues.

The Corruption Prevention Section continued to provide research,advice and education initiatives to facilitate the RTA’s commitment tomandatory ethical, probity and performance standards as expected bythe public, executive management and Government. Highlights of itsactivities during the year included:– the conducting of seminars around the state with new and existing

staff as part of their induction or in response to identified needs,investigations or organisational changes

– working collaboratively with Road Safety and Road UserManagement, to produce a Data Integrity and Customer Servicevideo and case studies, which were incorporated into the High RiskTransactions training package and delivered to all registry staff

– probity audits of contracting processes, particularly largeinfrastructure projects, and

– providing advice on ethical issues in the workplace to many differentstaff members. Advice matters and investigation data fuelled researchinto such areas as contracting and gifts/benefits.

A further highlight during the year was that the section won theinaugural NSW Premier’s Award in the Ethics category.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 163

Page 166: RTA Annual Report 2000 See Pg 24

General

The risk management focus in 2000 was the reduction of risk exposuresassociated with the engagement of contractors providing professionalservices to the RTA. New standard contracts for engagement ofcontractors were developed, clearly defining indemnification andinsurance requirements, and made available on a centralised databasefor use by project managers.

Insurable Risks

$0

$5

0

6

12

18

$10

$15

16.9

13

11.4 11.1

$20

Prem

ium

Cos

t ($

mill

ions

)

1995/96

Premium Cost ($millions) Claims per 100 employees

1996/97 1997/98Estimate

1998/99Estimate

1999/00Estimate

$14.

15

$8.9

8

$9.7

0

$10.

14

$11.

09

10

Cla

ims

per

10

0 em

plo

yees

Figure 17 – Workers Compensation Premium Costs and Claims Frequency

(164) Roads and Traffic Authority Annual Report 2000

Frequency of claims has fallen by over 40% when compared to1995/96. Premium costs appear to have peaked in 1995/96 and haveremained below that level in the following years. This improvement isthe direct result of senior management's commitment to improvingperformance in the areas of OHS & Rehabilitation.

Note: Premium costs are expressed as constant dollars using Sydney CPI

APPENDIX 9Risk Management

$0.00

$0.50

$1.00

$1.50

15.7

Cla

ims

per

10

0 ve

hicl

es

16.0

14.3

11.5

$2.00

0

5

10

15

20

Claims per 100 VehiclesMotor Vehicle Premium Cost ($millions)

99/0098/9997/9896/9795/96Estimate Estimate

$1.2

6 $1.5

4

13.4

$1.5

0

$1.3

1

$1.2

8

Mot

or V

ehic

le P

rem

ium

Cos

t ($

mill

ions

)

Figure 18 – Motor Vehicle Premium and Motor Vehicle Accident Claims Frequency

The number of claims per 100 vehicles has fallen by over 19% whencompared to last year. Premium cost remains low and it is estimated tobe 2.3% less than in 1998/1999.

Note: Premium costs are expressed as constant dollars using Sydney CPI

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 164

Page 167: RTA Annual Report 2000 See Pg 24

(165) Roads and Traffic Authority Annual Report 2000

APPENDIX 9 (Continued)Risk Management

Property

The 1999/2000 premium has reduced by over 8% when compared to1998/1999 due to low claims history.

Note: Premium costs are expressed as constant dollars using Sydney CPI

Liability Insurance Premium

The 1999/2000 liability insurance premium has decreased by 2.4%when compared to the previous year due to the RTA's focus onreducing this category of risk exposure and improving claimsmanagement. However, increased community awareness of litigationprocesses will require a maximum effort if future premium costs are tobe contained.

Note: Premium costs are expressed as constant dollars using Sydney CPI

Premium

0.00

0.50

1.00

1.50

2.00

Prem

ium

Cos

t ($

mill

ion)

$1.9

0

$1.7

8

$1.3

4

$1.3

4

$1.2

3

99/0098/9997/9896/9795/96

Figure 19 – Property Insurance Premium

0

3

6

9

12

15

Liability Premium

Prem

ium

Cos

t (

$mill

ion)

99/0098/9997/9896/9795/96

$7.1

1

$10.

44

$12.

16

$13.

76

$13.

43

Figure 20 – Liability Insurance Premium

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 165

Page 168: RTA Annual Report 2000 See Pg 24

GREAT AppealsSix promotional appeal were lodged with the Government and RelatedEmployees Appeal Tribunal (GREAT). Three appeals were successfullydefended by the RTA, two were withdrawn and the other is proceeding.

Reinstatement applicationsOn one occasion GREAT found that a staff member had not beenunfairly dismissed. This matter has been appealed to the Court ofAppeal and is yet to be decided. Another matter where a staff memberhas been reduced in rank has not been finalised under GREAT.

Notes:

1. Figures shown are as at the end of the 4th quarter

Claims liability figures are amounts paid plus estimated future payments for claims in the reporting period. The estimated amounts are subject tochange as claims management progresses.

(166) Roads and Traffic Authority Annual Report 2000

APPENDIX 10Staffing

Staff Numbers – 1995/96 to 1999/2000

Total EFT* NumbersYear Salaried Wages Casual Total

Staff Staff Staff Staff

1995/96 4,224 2,200 469 6,893

1996/97 4,128 2,196 334 6,658

1997/98 4,163 2,116 346 6,625

1998/99 4,368 1,893 238 6,499

1999/00 4,374 1,870 181 6,425

The RTA employs full time, part time and casual staff. Equivalent fulltime* staff at 30 June 2000 was 6,425, or 1.1% less than at 30 June1999. Total staff numbers decreased by 468, or nearly 7%, in the lastfive years to 30 June 2000.

WORKPLACE RELATIONS

Enterprise bargainingNearly 40% of staff are covered by four enterprise agreements. These cover professional engineers, wages staff, wages staff workingin Broken Hill and traffic signals salaried staff.

The Wages Classification Structure working party continued negotiationsthroughout the year, and is finalising the methods to implement thestructure in the RTA.

Communication and consultationConsultative groups representing management, spokeswomen, grievanceofficers and unions discussed matters under review, sought opinions toproposals including the implementation of outcomes resulting fromenterprise bargaining, change management and workplace reforms.

Movements in salaries, wages and allowancesThe Public Service Association of NSW (PSA) obtained sector-wide salaryincreases totalling 16% to cover the period January 2000 to July 2003.Increases were passed on to classifications in the RTA covered by the PSA.

Unions covering other staff in the RTA are currently negotiating similarincreases through enterprise bargaining.

Industrial relations policies and practicesThe RTA introduced an Award to cover staff redirected into other duties,including working for ORTA, during the Olympic and Paralympic Gamesand implemented the conditions for staff volunteering for the Games, as negotiated by Premier's Department.

Two new awards are currently being negotiated with the PSA – theCrown Employees (Roads & Traffic Authority of NSW – Salaried StaffConditions of Employment) Award 2000, and the Crown Employees(Roads & Traffic Authority of NSW – Unified Salary Scale) Award 2000(USS Award). These will replace the Crown Employees (Roads & TrafficAuthority of NSW) Officer's Salaries and Conditions Award.

Sick leave during the year increased by 9% after a reduction of 12% inthe previous year. During the year a total of 48 working days were lostthrough industrial action by staff. This is compared to 231 working dayslost because of industrial action in the 1998/99 financial year, a reduction of 79%.

Liability per 100 staff Claims per 100 staff

10

11

9

9.5

10.5

11.5

12

$0

$100

$200

$300

1999/001998/991997/98

Liab

ility

per

sta

ff

$400

$500

$600

Cla

ims

per

100

staf

f

WORKERS COMPENSATION

Figure 21 – Workers compensation claims performance

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 166

Page 169: RTA Annual Report 2000 See Pg 24

(167) Roads and Traffic Authority Annual Report 2000

EEO STRATEGIES 2000/2001

Our ongoing EEO programs will continue to be implemented andimproved in 2000/2001 and beyond. Our initiatives will include:

– ensuring our position as a best practice EEO organisation is maintainedand enhanced during a major review of the RTA, through the ChangeManagement Program Stage 2

– continuing to provide funding to the community-based knowledgetesting program in Aboriginal communities. Funding will provide moreresources at existing centres and establish other centres in areas withhigh Aboriginal populations

– implementing approved actions under the Disability Action Plan2000/2004

– promoting the reviewed and enhanced Employee Assistance Program(EAP) including the new managers’ helpline

– developing and delivering Aboriginal Cultural Awareness Training with components on Aboriginal ageing and disability issues

– recruiting Aboriginal trainees, including ATSI people with a disability, in motor registries, business administration areas and the NewcastleCall Centre

– replacing the Aboriginal Customer Service Traineeship Scheme (ACSTS)with a nationally accredited NSW registered traineeship program. Offerup to eight positions in regional and metropolitan locations. Expandthe trainee Customer Service Officer program and place new positionsin registries where high populations of Aboriginal people exist,including Dubbo, Blacktown, Coffs Harbour, Lismore, Gunnedah,Wagga Wagga, Albury and Batemans Bay

– ensuring completion of up to 14 Pedestrian Access and Mobility Plans(PAMPS) to assist people with a disability

– evaluating the Women's Strategy in the context of the major structuralreview underway and to update it to provide employment opportunitiesfor women, people with a disability and/or older people

– identify options to effectively address Aboriginal road safety issues acrossNSW and develop and deliver Aboriginal road safety programs, and

– continuing to identify opportunities for naming and/or renaming ofbridges and roads to reflect Aboriginal history and the refurbishmentof existing signs. Undertake relevant consultation with Aboriginalcommunities and local councils.

APPENDIX 10 (Continued)Staffing

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 167

Page 170: RTA Annual Report 2000 See Pg 24

(168) Roads and Traffic Authority Annual Report 2000

APPENDIX 10 (Continued)Staffing

Table 1 Percent of Total Staff by Level

Subgroup as % of Staff at each Level

EMPLOYMENT LEVEL TOTAL STAFF Men Women Respondents to(Number) EEO Survey

< $26,276 53 68% 32% 6%2

$26,276 – $38,582 2,528 78% 22% 50%$38,583 – $48,823 2,074 56% 44% 68%$48,824 – $63,137 995 79% 21% 72%> $63,137 (non SES) 836 91% 9% 77%SES 39 90% 10% 85%

TOTAL 6,525 73% 27% 62%

Estimated Subgroup Totals 4,769 1,756 4,069

1. This information is gathered from the staff responses to the EEO survey. Figures for EEO groups other than women have been adjusted to compensate for the effects of non-response to the EEO data collection. EEO statistics reported in previous years may not be comparable due to a change in the method of estimating EEO group representation.

2. Response was insufficient to generate a statistically valid estimate.

Table 2 Percent of Total Staff by Employment Basis

Subgroup as % of Staff at each Category

EMPLOYMENT BASIS TOTAL STAFF Men Women Respondents to(Number) EEO Survey

Permanent Full-Time 5,563 81% 19% 66%Part-Time 655 11% 89% 44%

Temporary Full-Time 205 77% 23% 33%Part-Time 63 21% 79% 3%3

Contract SES 39 90% 10% 85%SUB-TOTAL 6,525Casual 1,123 37% 63% 21%

TOTAL2 7,648 68% 32% 56%

Estimated Subgroup Totals 5,190 2,458 4,306

1. This information is gathered from the staff responses to the EEO survey. Figures for EEO groups other than women have been adjusted to compensate for the effects of non-response to the EEO data collection. EEO statistics reported in previous years may not be comparable due to a change in the method of estimating EEO group representation.

2. Total staff numbers include all casual and school crossing staff.3. Response was insufficient to generate a statistically valid estimate.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 168

Page 171: RTA Annual Report 2000 See Pg 24

(169) Roads and Traffic Authority Annual Report 2000

Subgroup as Estimated % of Total Staff in each Employment Category based on EEO Survey1

Aboriginal People People from Racial People whose Language People with a Disability People with a Disabilityand Torres Strait Ethnic, Ethno-Religious First Spoken as a Child Requiring Work-related

Islanders Minority Groups was not English Adjustment

4.0% 18% 17% 18% 7.0%1.3% 17% 16% 11% 4.0%0.7% 14% 11% 10% 2.6%0.2% 27% 26% 9% 1.5%

9% 9% 15% 3.0%

2.0% 18% 17% 13% 4.7%

133 1,177 1,115 875 307

Subgroup as Estimated % of Total Staff in each Employment Category based on EEO Survey1

Aboriginal People People from Racial People whose Language People with a Disability People with a Disabilityand Torres Strait Ethnic, Ethno-Religious First Spoken as a Child Requiring Work-related

Islanders Minority Groups was not English Adjustment

1.8% 18% 18% 13% 4.4%14% 13% 8% 2.8%

3.0% 21% 13% 12% 3.0%

9% 9% 15% 3.0%

1.7% 7% 7% 11% 0.8%

1.7% 16% 15% 13% 4.1%

128 1,248 1,167 972 311

APPENDIX 10 (Continued)Staffing

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 169

Page 172: RTA Annual Report 2000 See Pg 24

(170) Roads and Traffic Authority Annual Report 2000

APPENDIX 11Overseas Visits by RTA Officers

From 1 July 1999 to 30 June 2000, officers of the Roads and TrafficAuthority (RTA) travelled overseas on occasions to undertake officialduties for the RTA and the Government of NSW. The countries visitedwere Papua New Guinea, Singapore, New Zealand, China, Philippines,Malaysia, USA, France, England, Spain, Hungary, Sweden, Finland,Switzerland, Norway, Canada, Mexico and Austria.

Twenty three of these visits involved officers from the RTA’s TrafficTechnology Branch. Their duties included the installation, technicalsupport, Y2K compliance testing, reviewing and upgrading of the RTA’sSydney Co-ordinated Adaptive Traffic System (SCATS) operating orbeing established in Singapore, New Zealand, China, Mexico and thePhilippines as well as the training of, and providing expert advice to,customers.

All associated costs incurred by the RTA on the SCATS visits are fullyrecoverable along with a margin of profit.

Also, at no cost to the RTA, overseas visits were made by:– the Computer Systems Manager, Traffic Technology Branch to

New Zealand to help develop Bus Priority Specification forChristchurch City Council

– the Manager, Research and Development, Corporate Strategy to New Zealand to attend the meeting of the Austroads AssetManagement Reference Group

– the General Manager, Corporate Strategy, to Malaysia to attend the PIARC World Road Congress Conference

– an Inspector, Vehicle Regulation to Florida in the United States as part of a Rotary Group Study Exchange Program

– the Bitumen Sprayer, Inspector, Fleet Services, who visited PapuaNew Guinea to test and calibrate a bitumen sprayer, and

– the Pavement Condition Manager, Road Network Infrastructure, who travelled to the UK, Spain, France, Hungary, Sweden, Finlandand Canada and visited selected Road Agencies in relation to theRoadCrack pavement condition monitoring system.

In addition, the General Manager, Environment and Community Policyand the Manager, Sydney Motorway Projects, visited Paris to attend the PIARC Technical Committee Meeting. Half of the cost of the tripwas paid by Austroads, the other half by the RTA.

Visits during 1999/2000 for which the costs were met by the RTA wereas follows: – The Chief Executive travelled to Kuala Lumpur, Malaysia to represent

the Minister for Roads at the 21st World Road Congress, and toSingapore where he met with officials of the Singapore LandTransport Authority to discuss electronic tolling and transport issues

– The Director, Strategic Projects, went to Canada and the UnitedStates to attend the 6th World Intelligent Transport SystemsConference in Toronto and also visited various authorities in New York and Albany to gather information on smartcards andelectronic tolling

– The RTA’s Southern Region, Road Safety & Traffic ManagementManager also attended the Intelligent Transport Systems Conferencein Toronto

– The Manager, Traffic Facilities Asset went to New Zealand to attend a three day conference on performance based specifications

– The Director, Road Network Infrastructure, along with the GeneralManager, Infrastructure Maintenance, flew to New Zealand to discussdelivery arrangements for road maintenance in New Zealand withseveral road agencies

– The Acting Manager, Information and Technology, went to New Zealand in relation to the Austroads Asset ManagementReference Group

– The General Manager, National Policy and Regulation, visitedNew Zealand to discuss current developments in road user charges,the application of performance based standards to vehicle regulation,mass limits and options for research into the comparative pavementwear effects of road friendly and steel suspension systems

– The Manager of the Vehicle Emissions Management Programattended the 15th Annual Mobile Sources/Clean Air Conference inColorado, USA

– The General Manager, Transport Management Centre, visited anumber of key traffic management facilities and organisations in theUnited States

– The Manager, Intelligent Transport Systems went to Switzerland andNorway in relation to Electronic Tolling

– The Manager, Network Strategy, attended the Austroads Road SystemManagement Advisory Panel Meeting

– The General Manager, Environment and Community Policy, and theManager, Environment Compliance, travelled to New Zealand toattend the Transit New Zealand Environmental PerformanceIndicators Workshop and the Austroads Environmental ReferenceGroup Meeting, and

– The Sydney Motorway Projects Manager, visited Switzerland andAustria to attend a meeting of the Permanent International Associationof Road Congresses (PIARC) Technical Committee C5 – Road TunnelOperations. He also inspected road tunnels in relation toenvironmental issues, including air quality, fire safety and smoke control.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 170

Page 173: RTA Annual Report 2000 See Pg 24

(171) Roads and Traffic Authority Annual Report 2000

APPENDIX 12Freedom of Information

In 1999/2000 the RTA received 494 requests for information under the Freedom of Information Act 1989, compared with 286 in 1998/99ie 73 % increase. Sixteen applications were brought forward into thecurrent period, compared to 31 in 1998/99. Eight applications werenot completed at the end of the 1999/2000 reporting period.

FOI requests continued to be received for access to internal documentsconcerning decisions made, details of the history of motor vehicles, thenames and addresses of certain Authorised Inspection Stations (AIS),the sources of complaint letters, accident reports on motor vehicles,documents relating to the planning, construction, maintenance andfunding of roads and records relating to maintenance of the roadsystem. A significant number of applicants continue to use FOI toobtain accident reports on motor vehicles and to obtain details of theidentity of the authors of complaint letters concerning licence holders.The use of FOI by legal practitioners and insurance investigators hasundergone a significant increase.

Of the 498 requests completed, 348 were granted in full, 22 in part,and 108 were refused. However, of the 130 applications refused in fullor in part, 13 were refused on the grounds that the information wasotherwise available, 55 were refused as the documents were not heldby the RTA and 24 were refused as the applicant did not pay thenecessary fees.

Of those requests not granted in full, 10 applicants sought an internalreview of the decision (compared with nine in 1998/99) and 7 took thematter to the Ombudsman (compared with one in 1998/99). Two ofthe seven cases are dealt with under the section on the AdministrativeDecisions Tribunal.

There were 2 appeals to the Administrative Decisions Tribunal this year(compared with none last year).

One hundred and twenty-eight applications required consultation witha total of 212 third parties outside the RTA (85 applications required atotal of 186 consultations in 1998/99).

Processing FOI requests cost an estimated $26,487 ($18,754 in1998/99) and fees received totalled $27,440 ($22,604 in 1998/99).There were no requests for amendments to personal records (none in1998/99). There were no requests for a notation to personal records(none in 1998/99) and no Ministerial certificates have been issued inthe last two years.

A significant number of applications (168) were finalised after thenormal 35 day processing period. One of the major contributingfactors for this was the significant increase in applications during thereporting period (73%). The RTA initially provided additional assistanceand followed this up with recent review of the resources available tothe area responsible for Freedom of Information and Privacy. Thisresulted in a significant increase in the resources available for dealingwith these vital functions. The RTA will continue to monitor the areaover the next twelve months.

There continues to be increased awareness by management of theimportance of documenting the reasons for decisions.

The RTA continued with the identification, computerised recording andthe provision of policy documents in accordance with the requirementsof the FOI Act.

FOI Appeals to the Ombudsman

In the first case the applicant made an FOI application seeking access to reports, surveys, studies and any other documents preparedby Connell Wagner or the RTA regarding the assessment of routeoptions for the proposed Pacific Highway bypass of Ulmarra. The RTAdetermined a number of pages of documents were exempt. Theapplicant only appealed in relation to two pages of documents. The matter was referred to the Ombudsman in April 1998. In May2000 the Ombudsman recommended that the RTA reconsider itsdetermination in relation to the two pages. The RTA gave furtherconsideration to the two pages and determined to release threeadditional segments of one page. The remaining parts of both pageswere still considered exempt.

In the second and fourth cases the applicant, an RTA employee, madetwo separate FOI applications seeking access to copies of his personnelfile and copies of any documents relating to the applicant and held bynominated RTA employees.

The first application was lodged in January 1998 and a secondapplication was lodged in April 1998 for any documents created sincethe first application. Over 1,200 documents were located. Most of thedocuments were released. Determinations were made that somedocuments were exempt under clauses relating to law enforcement,personal affairs, internal working documents or legal professionalprivilege.

The applicant lodged an internal review application. The internal reviewupheld the original determination.

Both matters were referred to the Ombudsman in August 1998. InFebruary 2000 the Ombudsman recommended that the RTA reconsiderits determination in relation to the documents related to bothapplications. The RTA gave further consideration and determined torelease all remaining documents.

In the third case the applicant made an FOI application seeking accessto copies of documents related to a complaint concerning theapplicant’s ability to drive safely.

Four documents were located. A determination was made that part oftwo of the documents were exempt under clauses relating to lawenforcement and documents containing confidential material.

The applicant lodged an internal review application. The internal reviewupheld the original determination.

The applicant lodged a separate claim that an RTA report was incorrectand misleading. A statement was placed on the report followingnegotiations with RTA representatives.

In the fifth case the applicant made an FOI application seeking accessto copies of documents related to all submissions including confidentialsubmissions in reply to the Pacific Highway Ulmarra Bypass, also thatsubmissions have names attached.

The RTA located 125 pages of documents and determined 25 pageswere exempt. The applicant appealed in relation to the exemptdocuments. The original determination was upheld. The matter wasreferred to the Ombudsman in July 1999. In April 2000 theOmbudsman recommended that the RTA reconsider its determination.The RTA gave further consideration and determined that thedocuments were still considered exempt.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 171

Page 174: RTA Annual Report 2000 See Pg 24

(172) Roads and Traffic Authority Annual Report 2000

FOI REQUESTS

Personal Other Total

1998–1999 1999–2000 1998–1999 1999–2000 1998–1999 1999–2000

New (including transferred in) 59 44 227 450 286 494Brought forward 10 5 21 11 31 16(incomplete requests from previous year)

Total to process 69 49 248 461 317 510

Complete 63 39 227 439 290 478Transferred out 0 10 0 1 0 2Withdrawn 1 2 11 16 12 18

Total processed 64 42 238 456 302 498

Unfinished (carried forward) 5 6 10 2 15 8

RESULTS OF FOI REQUESTS

Personal Other

1998–1999 1999–2000 1998–1999 1999–2000

Grant in full 32 17 164 331Grant in part 13 7 22 15Refused 18 15 40 93Deferred 0 0 1 0

Completed 63 39 227 439

Pending FOI Appeals to the Ombudsman

One FOI matter has been referred to the Ombudsman and is yet to befinalised. The applicant applied for part of a copy of an RTA audit reportinto the way a number of local councils handled their road fundingallocations. The RTA stated that the report was still being finalised andthe part of the report requested would need to be read in conjunctionwith the general section of the report, covering all six councils examined.

FOI Appeals to the Administrative Decisions Tribunal

In the first case solicitors acting for the applicant made an FOIapplication seeking access to copies of documents related to acomplaint concerning the applicant’s ability to drive safely.

Four documents were located. A determination was made that part ofone and all of the other three documents were exempt under clausesrelating to law enforcement and documents containing confidentialmaterial.

The applicant lodged an internal review application. The internal reviewupheld the original determination.

The applicant then lodged an appeal with the Ombudsman’s Office. On 15 September 1999 the Ombudsman’s Office advised that it haddetermined not to take any further action.

The applicant lodged an appeal with the Administrative DecisionsTribunal on 29 November 1999.

The Administrative Decisions Tribunal upheld the RTA’s determinationthat the documents were exempt. The applicant subsequently lodgedan appeal with the Administrative Decisions Tribunal Appeal Panel. Theappeal is yet to be heard.

In the second case, on 9 February 1999, an RTA employee, made a FOIapplication seeking access to copies of documents relating to allegationsraised, subsequently investigated and disciplinary action taken againsthim, from the period 1 June 1996 to 8 January 1999. The documentsclaimed as exempt were forwarded to the Ombudsman.

Approximately 419 documents were located. Most of the documentswere released. Determinations were made that some documents wereexempt under clauses relating to law enforcement, documents containingconfidential material and the management of agency personnel.

The applicant lodged an internal review application. The internal reviewupheld the original determination.

In May 1999 the applicant lodged an appeal with the Ombudsman’sOffice. On a recommendation of the Ombudsman two of thedocuments were subsequently released. In February 2000 theOmbudsman’s Office advised that it would not continue with the caseas the applicant had lodged an appeal with the Administrative DecisionsTribunal, on 25 January 2000.

On 28 April 2000 the Administrative Decisions Tribunal determined thatthe documents were not exempt under the FOI Act and stated that theRTA should release the documents unless it intended to lodge anappeal. The RTA determined not to appeal and the documents weresubsequently released to the applicant.

APPENDIX 12 (Continued)Freedom of Information

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 172

Page 175: RTA Annual Report 2000 See Pg 24

(173) Roads and Traffic Authority Annual Report 2000

BASIS OF DISALLOWING OR RESTRICTING ACCESS

Personal Other

1998–1999 1999–2000 1998–1999 1999–2000

Section 19 (application incomplete, wrongly directed) 0 0 0 0Section 22 (deposit not paid) 1 1 6 23Section 25 (1) (a1) (Unreasonable diversion of resources) 0 0 0 1Section 25 (1) (a) (exempt) 14 12 27 21Section 25 (1) (b), (b1), (c), (d) (otherwise available) 8 6 4 7Section 28 (1) (b) (documents not held) 10 2 27 53Section 24 (2) (deemed refused, over 21 days) 0 1 0 2Section 31 (4) (released to medical practitioner) 0 0 0 1

Totals 33 22 64 108

DAYS TO PROCESS

1997/98 and 1998/99 Personal Other

1998–1999 1999–2000 1998–1999 1999–2000

0–21 41 20 157 23422–35 10 3 34 51Over 35 12 16 36 152Over 21 (Out of time) 0 0 0 0Over 35 (Out of time) 0 0 0 0

Totals 63 39 227 437

HOURS TO PROCESS

Personal Other

1998–1999 1999–2000 1998–1999 1999–2000

0–10 61 35 220 43011–20 2 2 6 221–40 0 3 1 3Over 40 0 1 0 2

Totals 63 39 227 437

TYPE OF DISCOUNT ALLOWED ON FEES CHARGED

Personal Other

1998–1999 1999–2000 1998–1999 1999–2000

Public interest 1 0 3 10Financial hardship – Pensioner/Child 13 6 15 16Financial hardship – Non profit organisation 0 1 5 12

Totals 14 7 23 38

Significant correction of personal records 0 0 3 0

GROUNDS ON WHICH INTERNAL REVIEW REQUESTED

Personal Other

Upheld Varied Upheld Varied

1998–1999 1999–2000 1998–1999 1999–2000 1998–1999 1999–2000 1998–1999 1999–2000

Access refused 1 0 0 0 3 0 0 0Deferred release 0 0 0 0 0 0 0 0Exempt matter 2 2 0 0 3 7 1 1Unreasonable estimate of charges 0 0 0 0 0 0 0 0Charges unreasonably incurred 0 0 0 0 0 0 0 0Amendment

Totals 3 2 0 0 6 7 1 1

APPENDIX 12 (Continued)Freedom of Information

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 173

Page 176: RTA Annual Report 2000 See Pg 24

(174) Roads and Traffic Authority Annual Report 2000

Ombudsman

The Ombudsman referred twenty-two complaints to the RTA comparedto eight the previous year. Complaints were received on the followingmatters:– a complaint from a man who had incurred a fine for late payment of

transfer on his motor vehicle and the RTA’s policy on rounding off thecharges. The RTA contacted the Ombudsman and providedinformation over the telephone. The Ombudsman was satisfied withthe response and did not require a written reply

– a complaint from a company that it had been excluded from tenderingfor the supply and planting of native seeds along the Pacific Highway,Coolongolook. The RTA advised the Ombudsman that it had alreadyresponded to the complaint and advised that it had obtained threequotes from specialist companies. It had also given an undertaking thatit would call public tenders in future

– a complaint from a man who alleged that there had been a seriouswaste of public monies by the RTA. The Audit Office was investigatingthe first issue raised and the Ombudsman stated that, therefore, itwould be inappropriate for the Ombudsman to duplicate theinvestigation. The Ombudsman declined to investigate the secondallegation as the alleged incident had occurred 12 years ago

– a complaint from a man concerning proposed changes to Moore ParkRoad and surrounding streets. The RTA explained the extensive publicconsultation process involved in the planning for the area

– a complaint from a man who had his driver’s licence cancelled. TheRTA advised the Ombudsman that the complainant had lodged anappeal to the NSW local court and that the matter was now in thehands of the court. No further action could be taken until the courthad made a determination

– a complaint from a woman who had received fines recorded againsther motor dealership but allegedly incurred by a former employee in aprevious dealership. The RTA advised that the name of thecomplainant’s dealership had been changed, following her request. TheRTA also advised the procedures for advising the Department of FairTrading over the misuse of a trading name and confirmedarrangements for the dealership to process notices of vehicle disposals

– a complaint from a man that his wife had incurred a fine for latepayment of transfer on his motor vehicle. The RTA confirmed the latefee was payable but waived the fee

– a complaint from a solicitor on behalf of a client who had purchaseda motor vehicle in NSW. The vehicle was confiscated as stolen when hetried to register it in Queensland. The RTA advised that the complainantdid not try to register the vehicle in NSW prior to returning toQueensland. The vehicle was not recorded as stolen in NSW

– a complaint from a man who had his driver’s licence cancelled. TheOmbudsman asked a number of questions concerning the legislationand RTA policies relating to the cancellation of drivers’ licences

– a complaint from a man concerning his dissatisfaction with speedsigns in a number of roads in the Moorebank area. The RTAresponded to the complainant’s eleven suggestions. The RTA agreedto three of the suggestions and provided reasons as to why the othersuggestions were not practical

– a complaint from a man who claimed that the RTA had not addresseda number of issues in relation to the wearing of bicycle helmets. Inparticular the complainant raised the question of the consideration ofa specific report. The RTA considered the report and advised thecomplainant that it contained no information relevant to the wearingof bicycle helmets

– a complaint from a man that he had incurred a fine for late paymentof transfer on his motor vehicle. The Ombudsman raised a number ofquestions concerning the policies associated with the transfer ofmotor vehicles

– a complaint from a man who had his driver’s licence cancelled forfines incurred for parking fines on number plates he had reported asbeing stolen. The RTA investigated the matter and, after consultationwith the Police Service and the SDRO, restored the complainant’sdriver’s licence

– a complaint from a woman who had her motor vehicle transferredfrom her name without her approval. The RTA contacted the newregistered owner and asked him to ‘show cause’ why the RTA shouldnot restore the registration to the name of the previous owner. Alldocumentation was forwarded to the Ombudsman for furtherinvestigation

– a further complaint from a woman who had received fines recordedagainst her motor dealership but allegedly incurred by a formeremployee in a previous dealership. The RTA advised that thecomplainant should contact the Department of Fair Trading

– a complaint from a company that it had been excluded fromtendering for the supply and planting of viro-tubes and viro cells aspart of landscaping works on a State Highway. The RTA advised thatit had decided not to proceed with the tender. The RTA would use itsown workforce.

– a complaint from a woman that the RTA had lost a file relating to aninvestigation of allegations that an Authorised Inspection Station hadpassed a motor vehicle that was not roadworthy. The RTA provideddetails of the investigation and the circumstances relating to the lossof the file. The right to inspect vehicles had already been taken awayfrom the Station for a previous offence

– a complaint from a man concerning delays in responding to hisrequest for information on a number of issues relating to the EasternDistributor. The RTA provided details on efforts made to contact thecomplainant and also responded to each of the points concerning theEastern Distributor

– a complaint from a woman that her motor vehicle had been defectedfor not complying with regulations. The complainant stated that anengineer’s certificate had already been obtained for the vehicle. Thecomplainant agreed to obtain a new engineer’s certificate for a non-standard engine that had been fitted after the issue of the originalcertificate

– a complaint from a man concerning alleged deficiencies in the RTA’s1996 investigation on the Alternative Inner and Outer Selection RouteAlbury/Wodonga Project. The RTA advised the Ombudsman that this matterhad been investigated by ICAC approximately two years previously

– further enquiries on behalf of a solicitor and his client who hadpurchased a motor vehicle in NSW. The Ombudsman requesteddetails of policies and procedures in place at the time the vehicle wasregistered. On receipt of the RTA’s reply the Ombudsman determinedto take no further action, and

– a complaint from a man concerning the level of customer service at anRTA motor registry. The RTA apologised for the delays experienced bythe complainant and undertook to examine the resources to ensure thatin future there would be sufficient staff available to meet peak demands.

Thirteen of the complaints were referred by the Ombudsman to theRTA for investigation and eight were referred for consideration andresponse direct to the complainants in the first instance.

Most matters were responded to by 30 June 2000.

In addition, an enquiry was received from the QueenslandOmbudsman’s Office concerning the policies and practices associatedwith registering motor vehicles arriving from interstate.

APPENDIX 12 (Continued)Freedom of Information

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 174

Page 177: RTA Annual Report 2000 See Pg 24

(175) Roads and Traffic Authority Annual Report 2000

APPENDIX 13Legal Change

LEGAL CHANGE

New Acts

The Road Transport (General) Act 1999 was assented to on 1 July1999 and commenced on 1 December 1999. This Act provides for theadministration and enforcement of road transport legislation. It alsomakes provision with respect to written off and wrecked vehicles,review of decisions made under road transport legislation, and the use of vehicles on roads and road related areas.

The Road Transport (Safety and Traffic Management) Act 1999was assented to on 1 July 1999 and commenced on 1 December 1999.This Act facilitates the adoption of nationally consistent road rules (the Australian Road Rules) in New South Wales as well as providing for matters concerning safety and traffic management on roads androad related areas.

The Road Transport Legislation Amendment Act 1999 was assentedto on 1 July 1999 and commenced on 1 December 1999 and it repealsthe Traffic Act 1909 and related legislation as well as amending otherlegislation consequent on those repeals and the enactment of the RoadTransport (General) Act 1999 and the Road Transport (Safety andTraffic Management) Act 1999.

The Road Transport (Safety and Traffic Management) Amendment(Camera Devices) Act 1999 was assented to on 3 December 1999 and commenced on 24 December 1999. It amends the Road Transport(Safety and Traffic Management) Act 1999 and makes further provisionfor the use and inspection of certain devices in connection with therecording of speeding and traffic light offences as well as makingconsequential amendments and an amendment of the Crimes Act 1900relating to evidentiary certificates.

The Road Improvement (Special Funding) Amendment Act 1998commenced on 30 July 1999. This Act permitted the continuation ofspecial funding arrangements for road improvement, road safety androad related public transport infrastructure under the ‘‘3x3 Program’’.

The Roads Amendment (Transitways) Act 1999 was assented to on 7 July 1999 and its provisions commenced on 16 July 1999 and 1 December 1999. The Act amends the Roads Act 1993 and enablescertain roads to be classified as transitways and makes provision withrespect to roads so classified.

The Road Transport (Driver Licensing) Amendment Act 1999was assented to on 24 November 1999 and fully commenced on 11 February 2000. The Act amends the Road Transport (DriverLicensing) Act 1998 setting out the circumstances in which the RTAmay retain and use photographs of applicants who have applied fordriver licences, ‘‘proof of age’’ cards or certain other licences. Schedule2, which commenced on 1 December 1999, to the Act provides for the cancellation and suspension of a driver licence for some speeding offences.

Uncommenced Acts

The Roads Amendment (Tolls) Act 1999 was assented to on 3 December 1999 and is expected to commence later in 2000. The Act amends the Roads Act 1993 to provide a substantially uniformenforcement regime for the collection of both government and privatetolls on tollways.

The Statute Law (Miscellaneous Provisions) Act 2000 whichcommenced on 1 July 2000 includes provisions clarifying the operationof section 25A of the Road Transport (Driver Licensing) Act 1998 andcorrecting cross-references not reproduced when section 7A of the nowrepealed Traffic Act 1909 was re-enacted as section 25A.

The Road Transport (Heavy Vehicles Registration Charges)Amendment Bill 2000 was passed by Parliament in late June 2000.The Bill will, once assented to, amend the Road Transport (HeavyVehicles Registration Charges) Act 1995 and the Road Transport (Heavy Vehicles Registration Charges) Regulation 1996 and will:– revise the charges payable for registration and renewal of registration

of heavy vehicles (in line with the charges developed by the NationalRoad Transport Commission); and

– provide for the indexation of those charges and heavy vehicle permitcharges in line with determinations, based on the Consumer PriceIndex, of the Australian Transport Council, but so as to enable theMinister to determine a lesser rate of increase.

New Regulations

The Motor Traffic Amendment (Fees, Charges and PenaltiesImposed by Penalty Notices) Regulation 1999 increased as from 1 July, 1999 fees and charges payable in connection with, as well ascertain penalties imposed by penalty notices issued under, the nowrepealed Traffic Act 1909.

The Recreation Vehicles (General) Amendment (Fees) Regulation1999 increased as from 1 July, 1999 fees on 3 types of applicationsunder the Recreation Vehicles Act 1983.

The Driving Instructors Amendment (Fees) Regulation 1999increased as from 1 July, 1999 licence related fees.

The Roads (General) Amendment (Penalties Imposed by PenaltyNotices) Regulation 1999 increased as from 1 July, 1999 penaltiesimposed by penalty notices for offences prescribed by the Roads(General) Regulation 1994.

The Motor Traffic Amendment (Penalty Notices and ShortDescriptions) Regulation 1999 prescribed short descriptions foroffences in the now repealed Motor Traffic Regulations 1935 andprovided for the issue of penalty notices for offences under the nowrepealed Traffic Act 1909.

The Road Transport (Safety and Traffic Management) (Road Rules)Regulation 1999 incorporates the Australian Road Rules into the law ofNSW and as well as additional NSW road rules. The Regulation alsoprovides for parking schemes and miscellaneous other matters relatingto the use of roads and road related areas by vehicles.

The Road Transport (Safety and Traffic Management) (Road Rules)Amendment (Digital Security Indicators) Regulation 1999 prescribesa security indicator for digital images taken by any approved digitalspeed camera.

The Road Transport (Safety and Traffic Management) (Road Rules)Amendment (Testing of Speed Measuring Devices) Regulation 2000empowers the RTA (in addition to the Police Commissioner) to approvethe manufacturer’s recommended calibration method for the purposeof testing for accuracy and functional requirements of certain non-radarbased speed measuring devices used by the RTA.

The Road Transport (Safety and Traffic Management) (DriverFatigue) Regulation 1999 contains provisions designed to minimisethe number of road accidents involving heavy trucks and commercialbuses that arise from driver fatigue. The Regulation deals with:– the regulation of driving hours,– the keeping of driving records,– the creation of offences in relation to acts that induce contraventions

of the requirements of the Regulation,– the issuing of logbooks,– the administration of the transitional fatigue management scheme, and– the granting of exemptions from certain requirements of the

Regulation.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 175

Page 178: RTA Annual Report 2000 See Pg 24

(176) Roads and Traffic Authority Annual Report 2000

APPENDIX 13 (Continued)Legal Change

The Road Transport (General) Regulation 1999 makes provision withrespect to:– information concerning written off and wrecked motor vehicles,– special service requirements for notices and documents,– fees in respect of the impounding of vehicles, and– matters relating to the maintenance by the RTA of a database of

certain types of declarations and orders.

The Road Transport (General) Amendment (Saving of BreathTesting Devices) Regulation 1999 provides for the continued validityof those breath analysing instruments and breath testing devices thatwere approved under the now repealed Traffic Act 1909.

The Road Transport (General) Amendment (Registration Appeals)Regulation 2000 enables appeals to be made to a Local Court againsta decision of the RTA to refuse to grant or renew, or to vary theconditions of, suspend or cancel, the registration of a vehicle.

The Road Transport (General) (Short Descriptions and PenaltyNotice Offences) Regulation 1999 prescribes:– certain offences as penalty notice offences,– short descriptions for such offences,– the authorised officers who may serve penalty notices for such

offences, and– the penalties payable for such offences if dealt with by way of penalty

notice.

The Road Transport (Driver Licensing) Amendment (Law Revision)Regulation 1999 exempts certain drivers from licensing requirementsand makes consequential amendments as a result of the enactment ofthe Road Transport (Safety and Traffic Management) Act 1999 and theRoad Transport (General) Act 1999.

The Road Transport (Driver Licensing) Amendment (Cancellation ofLicences) Regulation 1999 deals with the power of the RTA to cancelor suspend driver licences for certain serious speeding offences.

The Road Transport (Driver Licensing) Amendment (DoubleDemerit Points) Regulation 1999 expands the definition of ‘over along weekend’ for the purposes of calculating double demerit points toinclude public holidays declared on Tuesdays and Thursdays and publicholidays declared for part of a day and to include 29 December 1999.

The Road Transport (Driver Licensing) Amendment (Fees)Regulation 1999 increases from 1 July 1999 certain fees payable inconnection with the administration of the Road Transport (DriverLicensing) Act 1998 and by effecting law revision concerning demeritpoints offences and penalties.

The Road Transport (Vehicle Registration) Amendment(Miscellaneous) Regulation 1999:– provides that a registration charge must be paid before a registrable

vehicle can be registered,– makes further provision in respect of the display of registration labels

on trailers and caravans,– enables the RTA to alter the distinguishing number of a registrable

vehicle if its number-plates were issued in error,– enables the RTA to require the registered operator of a vehicle to

return number-plates issued in respect of a vehicle with expiredregistration,

– specifies the place in which the holders of trader’s plates are tokeep records concerning the plates,

– enables the RTA to waive and postpone payment of fees for number-plates,

– makes it clear that it is an offence for a person to cause or permit anunregistered vehicle to be used on a road or road related area,

– makes it an offence for the driver of a registrable vehicle to use thevehicle with an incorrectly affixed registration label,

– enables police officers to seize number-plates from certain vehiclesdriven while unregistered,

– exempts self-propelled elevating work platforms from the operationof the Road Transport (Vehicle Registration) Act 1997, and

– makes other amendments that are consequential from the enactmentof the Road Transport (Safety and Traffic Management) Act 1999 andthe Road Transport (General) Act 1999.

The Road Transport (Vehicle Registration) Amendment (VehicleStandards) Regulation 1999 adopts uniform national motor vehiclestandards applicable to registrable vehicles.

The Road Transport (Vehicle Registration) Further Amendment(Fees) Regulation 1999 increases certain fees as from 1 July, 1999.

The Roads (General) Amendment (Short Descriptions) Regulation1999 prescribes short descriptions for offences for the purposes ofsection 145B of the Justices Act 1902, including certain offences underthe Roads (General) Regulation 1994.

The Road Transport (Mass, Loading and Access) Amendment (RoadTrains and Other Vehicles) Regulation 1999 transfers certainprovisions from the repealed Motor Traffic Regulations 1935 to theRoad Transport (Mass, Loading and Access) Regulation 1996 as aconsequence of the replacement of the Motor Traffic Regulations 1935by the Road Transport (Safety and Traffic Management) (Road Rules)Regulation 1999.

The Road Transport (Mass, Loading and Access) Amendment (RearOverhang) Regulation 1999 exempts the rear overhang of a heavyvehicle complying with Regulation 118 of the now repealed MotorTraffic Regulations 1935 from rear overhang requirements. ThisRegulation will expire on 1 July 2005 and applies to heavy vehicles thathave been continuously registered on and from 1 July 1996 and theregistered operator of which has been the same since thecommencement of this amendment.

The Road Transport (Mass, Loading and Access) Amendment(Vehicle Checks and Fees) Regulation 1999 allows:– an authorised officer to direct the driver of a light vehicle (being a

vehicle with a gross vehicle mass, or a combination with a grosscombination mass, not exceeding 4.5 tonnes) to stop for mass checkswhere the officer is of the opinion that the vehicle is being used forbusiness or commercial purposes, and

– the RTA to exempt persons from certain application fees for permits.

The Road Transport (Mass, Loading and Access) Amendment (AxleSpacing and Exemptions) Regulation 2000:– enables the RTA to exempt a person or class of persons from the

operation of any of the provisions of clause 55 (1) of the RoadTransport (Mass, Loading and Access) Regulation 1996 relating to theprojection of loading or equipment of vehicles,

– provides for the payment, waiver or refund of fees for permitsexempting persons from the operation of any of the provisions ofclause 55 (1), and

– modifies the total mass limit for combinations of a particular axlespacing.

The Transport Administration (General) Amendment (TrafficControl Facilities) Regulation 2000 prescribes certain signs, markings,structures and other devices containing or relating to requirements ordirections the contravention of which are offences under the roadtransport legislation, as traffic control facilities in the context of Part 6of the Transport Administration Act 1988.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 176

Page 179: RTA Annual Report 2000 See Pg 24

(177) Roads and Traffic Authority Annual Report 2000

APPENDIX 13 (Continued)Legal Change

Uncommenced Regulations

The following regulations were gazetted on 30 June 2000 to take effecton 1 July 2000 increasing road transport fees, charges and fixedpenalties generally in line with the anticipated inflation rate of2000–2001 and including 10% GST:– Driving Instructors Amendment (Fees) Regulation 2000,– Roads (General) Amendment (Penalty Notices) Regulation 2000,– Road Transport (Mass, Loading and Access) Amendment (Fees)

Regulation 2000,– Road Transport (Vehicle Registration) Amendment (Fees) Regulation

2000,– Road Transport (Driver Licensing) Amendment (Fees) Regulation

2000,– Road Transport (General) Amendment (Fees) Regulation 2000,– Road Transport (General) (Short Descriptions and Penalty Notice

Offences) Amendment Regulation 2000,– Road Transport (Safety and Traffic Management) (Driver Fatigue)

Amendment (Fees) Regulation 2000, and– Road Transport (Safety and Traffic Management) (Road Rules)

Amendment (Tow-away Charge) Regulation 2000.

The following regulations were also gazetted on 30 June, 2000 tocommence on 1 July, 2000:– Road Transport (Driver Licensing) Amendment (Graduated Licensing)

Regulation 2000,– Road Transport (Driver Licensing) Amendment (Miscellaneous)

Regulation 2000,– Road Transport (General) (Short Descriptions and Penalty Notice

Offences) Amendment (Graduated Licensing) Regulation 2000,– Road Transport (Safety and Traffic Management) (Road Rules)

Amendment (Graduated Licensing) Regulation 2000,– Road Transport (Safety and Traffic Management) (Road Rules)

Amendment (Miscellaneous) Regulation 2000, and– Road Transport (Vehicle Registration) Amendment (Miscellaneous)

Regulation 2000.

Subordinate Legislation Act 1989

There were no departures from the Subordinate Legislation Act 1989.

JUDICIAL DECISIONS AFFECTING THE RTA

Thredbo Coronial Inquiry

The Coroner handed down his findings on the Thredbo Landslide on29 June 2000. The Coroner found the causes of the landslide that ledto the deaths of 18 people were:– The failure of any government authority responsible for the care,

control and management of the Kosciusko National Park and themaintenance of the Alpine Way to take any steps throughout therelevant period to ensure that the village was rendered safe fromexposure to the marginally stable embankment

– The approval and construction of a water main constructed ofmaterials which could not withstand the movement which was takingplace in the marginally stable Alpine Way embankment into which itwas laid, and

– Leakage from the water main leading to the saturation of themarginally stable Alpine Way fill embankment.

The Coroner also noted the history of landslides along the Alpine Waywas well known although not recorded in any systematic fashion. Healso stated that despite the propensity of the Alpine Way to landslidingwhich was known to relevant authorities throughout the period, nospecific recommendation was ever made to those directly responsiblefor the road that would have led to the reconstruction of the roadabove the village. In this regard the Coroner expressed grave concernthat the principal road maintenance authority, now the RTA, previouslythe DMR, never expressly advised NPWS of the need to reconstruct theroad adjacent to the village to avoid the risk of death or injury due tothe landslide.

The Coroner also expressed concern that despite a representative of theRTA inspecting the Alpine Way between 1991/1996 no recommendationwas ever made that the road above the village should be reconstructed.In this regard the Coroner was critical that although the RTA had thendeveloped a Slope Risk Assessment system, it was not used during thisperiod in assessing the Alpine Way.

WorkCover (Insp. Hannah –v– RTA)

On 11 February 1997 an RTA employee was standing in the bucket of askid steer loader operated by another RTA employee. The operator hadhis hands on the controls of the loader at the time and although theengine was switched off, the controls still operated the hydraulics. Theemployee’s foot was caught in the bucket, causing crush injuries. Hewas wearing safety boots at the time. WorkCover proceeded againstthe RTA for a breach of section 15(1) of the Occupational Health andSafety Act for failure to have a safe system of work, to which the RTApleaded guilty.

The maximum penalty which could have been payable was $55,000. A fine of $35,000 was imposed. The magistrate was of the view that itwas appropriate to award a penalty in the higher range of the scale.

WorkCover (Insp. Tyler –v– RTA)

On Thursday 21 March 1996 the RTA was undertaking roadworks onMiller and Bank Streets Pyrmont associated with the Glebe IslandBridge Project.

At approximately 11.00 am a mechanical excavator was being used todig a trench in sandstone for stormwater pipes when its rock breakerattachment struck a 5 kV low voltage underground power line. Theresulting flash burnt an RTA worker who was involved in guiding theexcavator. He was standing on the roadway adjacent to the excavatedarea. His clothes caught fire and he suffered serious burns to 45% of his body.

Following the accident WorkCover prosecuted the RTA alleging breachesof section 15 of the Occupational Health and Safety Act. The RTA entereda plea of guilty and the matter was heard before Kavanagh J in theIndustrial Court of NSW on 24 February 1999 and 15 March 1999.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 177

Page 180: RTA Annual Report 2000 See Pg 24

(178) Roads and Traffic Authority Annual Report 2000

APPENDIX 14Land Disposal

The RTA owns property for administrative purposes and acquiresproperty for road construction.

Properties that are surplus to requirements are disposed of inaccordance with Government policy.

During 1999/2000 contracts were brought to account for the sale of 159 properties for a total value of $38.736 million. Of these, 26 properties were valued over $0.5 million each, with a total value of $23.001 million.

No properties valued greater than $5 million were sold.

No properties were sold to people with family or business connectionsbetween the purchaser and the person responsible for approving the disposal.

Proceeds from property sales are returned to the Roads program.

All documents relating to the disposal of properties are available underthe Freedom of Information (FOI) Act.

In her judgment Kavanagh J found this offence to be of a seriousnature. In making this finding Her Honour referred to the fact that theRTA was aware of the existence of the cable within the vicinity of theexcavation works yet it did not ensure that prior to excavationadequate steps were taken to ensure that the cable was either locatedor de-energised. The Court also referred to the failure to provide theRTA’s employee with the usual induction training prior to carrying outhis duties. The RTA also had a record of eight prior breaches.

In considering penalty the Court had regard to the serious nature ofthe offence and also mitigating factors put forward by the RTA. Theseincluded the RTA’s early plea of guilty, its dedicated commitment to asafe working environment, its full co-operation with the WorkCoverAuthority in its investigation of the accident and the regard it has hadto improvement of the already established RTA safety procedures.

The Court applied section 51A of the Occupational Health and SafetyAct which provides that an additional penalty may be imposed where a Defendant has previously offended against the Act. The relevantmaximum penalty in this case was $750,000.

A penalty of $200,000 was imposed on the RTA in this matter.

RTA –v– Scroop and others

These proceedings arose out of a motor vehicle accident on the HumeHighway while roadworks were being carried out by a contractor to theRTA. The RTA had appealed the original findings that it was negligentand that it had in certain circumstances a non-delegable duty of caretowards users of the road, and argued that it was entitled to beindemnified by the contractor.

The Court of Appeal dismissed the RTA’s appeal and held that in thecircumstances the RTA had a non-delegable duty of care towardshighway users. The RTA filed an application for leave to appeal to theHigh Court on the grounds that it does not owe a non-delegable dutyof care to road users where roadworks are carried out by a contractorto it and that the RTA had not breached such a duty of care.

The High Court held that there was sufficient basis for a finding thatthe RTA was negligent independently of any act or omission on thepart of its contractor (which finding was made by the trial Judge andnot upset by the Court of Appeal). Thus the Court considered that thiscase was not a suitable vehicle to determine any question of generalprinciple with respect to a non-delegable duty of care.

Accordingly special leave to appeal to the High Court was refused.

RTA –v– Lonaport Pty Limited AND Chris Riley

Lonaport Pty Limited was the proprietor of a service station and wasauthorised to conduct inspections of motor vehicles pursuant to theRoad Transport (Vehicle Registration) Regulations. Following showcause letters being sent to this Company and to the authorisedexaminer, a recommendation was made to the Committee of Reviewprovided for in the Regulations and the authorities of each werecancelled on the grounds set out in the initial notice. The authorisedexaminer and proprietor appealed to a Local Court. The Magistrateconducted the appeal in the nature of judicial review of administrativeaction and, based upon evidence of the authorised examiner andauthorised proprietor that they had not received the show cause lettersallowed the appeal. The RTA appealed to the Supreme Court whichheld that the appeal provisions under the Road Transport (VehicleRegistration) Regulation concerning decisions by the RTA to suspend orcancel the relevant authorities is a hearing de novo. The jurisdiction ofthe Local Court is to determine whether the authorities should becancelled in light of material before the Court whether or not thatmaterial was before the RTA at the time the administrative action wastaken. On this basis the Supreme Court held that the Magistratemisapprehended the nature of the jurisdiction and referred the matterback to the Court for consideration accordingly.

APPENDIX 13 (Continued)Legal Change

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 178

Page 181: RTA Annual Report 2000 See Pg 24

(179) Roads and Traffic Authority Annual Report 2000

APPENDIX 15Year 2000 Millennium Bug Control

The RTA’s Year 2000 Program ran for over 2 years, from September1997 until January 2000. It involved numerous people across all areasand at all levels of the organisation.

While the total cost of the Program at some $13 million was smallcompared with many other projects tackled by the RTA, the extent,depth and length of the Program made it one of the largest and mostcomplex ever undertaken by the organisation.

A Final Project Summary was produced which aims to summarise whatwas done, how it was managed, and the lessons learned, so as toprovide a record and enable the learning to be applied to future largeprojects and programs.

The overall objective of the RTA’s systems to continue to operatenormally during and after the changeover from 1999 to 2000 wasachieved. Four minor problems occurred in programs in internalcorporate systems all of which were corrected very quickly. February 29(leap year) was also overcome apart from another minor concern andother significant milestones remaining include 30 June and the roll overfrom 2000 to 2001. However, all indications are that these will also besuccessfully negotiated.

As well as achieving a Y2K compliant environment the Year 2000Project was the catalyst for the delivery of other benefits to the RTAincluding the:– establishment of an inventory of IT systems and other items including

corporate and regional which will be useful for other post Y2Kactivities

– opportunity was taken to rationalise the environment, removing oldand/or superfluous systems

– efficiency gains should be realised in some systems with theconsolidation of multiple machines into single units, and

– creation of business contingency plans which can be activated wheninterruptions to service occur as a result of a problem other than Y2K.

Finally and overall, major areas of the organisation have been upgradedand improved where necessary to ensure a current and standardoperating environment. These include:– IT Infrastructure such as the central data centre, total desktop

environment and building systems– All corporate applications such as DRIVES, Human Resource and

Financial systems– Road network facilities such as traffic lights and bridge and tunnels

systems– Interfaces with external organisations, and– Several internal systems and items of equipment.

APPENDIX 16Publications

The RTA produces a wide range of publications to assist customers, to promote road safety and new technology and to fulfil statutoryrequirements under annual reporting, environmental and freedom of information legislation.

Publications on driver licensing, vehicle registration and road safety are available free from motor registries.

Technical and Austroads publications are available for sale from the RTALibrary at 52 Rothschild Avenue, Rosebery, Sydney, (tel 02 9662 5065).The Library’s collection of books, journals and CD-ROMs includeextensive coverage in the areas of road and bridge engineering, roadsafety, environment and management.

The following new or substantially revised titles were issued during1999/2000.

Bicycles

– Sydney Cycleways Map – Homebush Bay

Bridges

– Hume Highway – South Gundagai Interchange

– Great Western Highway – Medlow Bath Bridge Replacement

Construction

– Coopernook to Moorland EIS Summary– Cross City Tunnel Environment Assessment– Cross City Tunnel – Release of EIS– Upgrading the Pacific Highway – Progress to Date– Yelgun to Chinderah Freeway brochure– Deviation of Illalong Creek on the Burley Griffin Way– All weather sealing of the Cobb Highway between Booligal and

Ivanhoe– Great Western Highway – Soldiers Pinch– Route Development Study for The Entrance Road

Community newsletters

– Barton Highway – Murrumbateman– Barton Highway Route Selection– City West Link Road Section 3: Balmain Road, Leichhardt to

Boomerang Street, Haberfield– Coleman’s Bridge Study– Coonabarabran Bypass Selection Study– Country Timber Bridge Program: Bruxner Highway – Country Timber Bridge Program: Summerland Way– Dourrigans Gap Project Update – Extension of Northern Distributor – Bellambi Lane to Princes Highway– Five Islands Road Project– Lidsdale Project (Castlereagh Highway)– Moree Bypass– Northern Distributor– Proposed Bridge Replacement over Long Gully Creek– Proposed Bridge Replacement over Morongila Creek (MR 56)– Robinvale–Euston Bridge Replacement– West Charlestown Bypass– Wiangaree Project– New crossing of the Murray River between Robinvale and Euston– Great Western Highway – Shell Corner Realignment– Mona Vale Road Upgrade– Five Ways Roundabout, Miranda, Traffic Study– Great Western Highway – Faulconbridge

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 179

Page 182: RTA Annual Report 2000 See Pg 24

(180) Roads and Traffic Authority Annual Report 2000

APPENDIX 16 (Continued)Publications

Upgrading the Pacific Highway

– Bonville Deviation – Bray Street to Arthur Street, Coffs Harbour– Bulahdelah to Coolongolook Freeway – Bulahdelah Upgrade of the Pacific Highway– Bundacree Creek to Possum Brush– Coolongolook to Wang Wauk– Ewingsdale– Halfway Creek– Proposed Duplication of Brunswick Heads Bypass & Upgrade

Brunswick Heads to Yelgun– Raymond Terrace to Karuah– Tandys Lane

Corporate

– 1999 Annual Report: 2,000 copies at a unit production cost of$27.41. 2000 Annual Report: 2,500 copies are estimated to have aunit production cost of $30.85.

– Information Package for Volunteer Participation in NSW Interlock Trial– FMI Learning Activities Guide

Driver licensing

– New Driver’s Handbook – Mobility Parking Scheme – Points and Your Licence brochure – Road Users Handbook– Learner Driver Logbook– Penalties – Serious Traffic Offence Penalties

Environment

– 1999 RTA Environment Report– Parramatta ... a heritage of roads and transport– Parramatta Heritage Fun Run 2000– Roadside Management Guidelines Book 5: State Highway 27,

The Golden Highway, Belford–Merriwa–Dunedoo–Dubbo– Roadside Management Guidelines Book 6: Main Road 54,

Abercrombie River–Bathurst–Sofala–Ilford– State Highway 6 – Bathurst to Marsden – Environmental Guidelines

for Road Construction & Maintenance Workers– State Highway 1 – Milton to Ulladulla Overtaking Lanes – Review of

Environmental Factors– Great Western Highway – Shell Corner Realignment – Review of

Environmental Factors– Mona Vale Road Upgrade – Review of Environmental Factors– Great Western Highway – Linden Section 3 – Supplementary Review

of Environmental Factors– Great Western Highway – Linden Section 5, Review of Environmental

Factors

Freedom of Information

– Customer Information Directory 2000/2001– Inside the RTA 2000/2001– Interim Procedures for Dealing with Privacy Complaints and Reviewsof Conduct and Freedom of Information Internal Reviews– Interim Procedures for Handling Applications for Information and toAdjust Personal Information under FOI and Privacy Legislation

Road safety

– Road Safety 2010– 1999 Kids & Traffic Gazette – 1999/2000 RTA and Police Road Safety and Traffic Management

Action Planner– 50 km/h Urban Street Limit Evaluation: interim report (October 1999)– Buyer’s Guide for Child Restraints – Motorised Wheelchairs (Information for Motorised Wheelchair Safety)– Pedestrian Crossings – Preventing Driver Fatigue– Puzzle Information Sheet (for inclusion with Early Childhood Road

Safety Jigsaw Puzzles)– Research Report: Youth Road Safety in NSW – A Discussion Paper– Road Safety for Overseas Visitors – Safety Door Parent Note– Tertiary resource folder– The NSW Road Safety Education Program Catalogue: Early Childhood

for Principals and Teachers– The NSW Road Safety Education Program Catalogue: Primary for

Principals and Teachers– Their Safety in Our Hands– Travelling the Pacific Highway – Taking a Break– Annual Activity Report for Local Government Road Safety Officer

Projects – 1997/98– MR92 – Road Design, Nowra to Nerriga– Beyond Nerriga – Route Options– Move Ahead with Street Sense– Research Report: Working Together No 2 – Local Government Road

Safety Program Activity Report

Technology

– RTA Guide to Maintenance of Concrete Pavements

Traffic management

– A step-by-step guide to roundabouts – Australian Road Rules flyer– New Road Rules for NSW booklet & brochure

Vehicle registration

– 1998 NSW Driver & Vehicle Statistics Report – 4.6 Metre High Truck Routes and Loading Requirements – Check Your Vehicle’s Health– Registration Charges: National Heavy Vehicle Reform – Changes to

Special Purpose Vehicles– Registration Charges: National Heavy Vehicle Reform – Questions &

Answers for Operators of Heavy Vehicles– Registration – Stolen Vehicle Scams– Show Your Support for the Sydney 2000 Games

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 180

Page 183: RTA Annual Report 2000 See Pg 24

(181) Roads and Traffic Authority Annual Report 2000

APPENDIX 17Details of payments to Consultants

Details of the amounts paid to consultants in 1999/2000 are provided below.

Project Consultant $

Information technology benchmarking services Compass Analysis 209,900

Road network and traffic analysis in respect of the Sydney metropolitan road network Maunsell McIntyre Pty Ltd 77,490

Review and provide advice regarding the RTA’s e-mail system and related services Compaq Computer Australia Pty Ltd 46,670

Road network and traffic analysis in respect of the Sydney metropolitan road network Masson Wilson Twiney Pty Ltd 42,104

Consultants Costing $30,000 or less 5 62,870

Total 439,034

The RTA also engages numerous contractors for professional services not classified as consultancies, including valuation, legal services, road and bridge design, investigation, construction supervision, preparation of environmental impact statements, as well as contract agency services and personnel.

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 181

Page 184: RTA Annual Report 2000 See Pg 24

(182) Roads and Traffic Authority Annual Report 2000

Event/Sponsorship Description Organisation Cost Performance Area

Walk to Work day Encourage walking to work as part Pedestrian Council $25,000 Traffic and Transport1/10/1999 of a transport strategy of Australia Directorate

Pedestrian Summit 1999 Conference to promote walking as a Pedestrian Council $10,000 Traffic and Transport legitimate means of transport of Australia Directorate

RTA Big Bike Ride Promotion of safe cycling as part of Bicycle New South $141,000 Traffic and Transport(From Tweed Heads to Sydney) Share the road with Bicycles Wales Directorate

Australian Hotels Association – Promotion of responsible service of Australian Hotels $5,000 Road Safety and RoadPatron Transport Safety Award alcohol and alternative transport with Association User Management

the aim of reducing road related injury Directorateinvolving alcohol

1999 Engineering Excellence Awards Community and Environment Award Institute of Engineers $10,000 Corporate ServicesDirectorate

Angel II Cycle Classic Support for BikePlan 2010 by Westpac Rescue $10,000 Traffic and Transportencouraging cycling as a viable Helicopter Service in Directoratetransport alternative and promoting the Hunter areasafe cycling

Australian Institute of Traffic Promotion of technical development Australian Institute of $3,000 Finance DirectoratePlanning and Management and skills in Traffic Planning Traffic Planning and (Corporate Strategy)

and Management Management

ITS World Congress Support for Intelligent Transport Intelligent Transport $220,000 Strategic ProjectsSystems World Congress to be held Systems Australia Directorate/Traffic and in Sydney Transport Directorate

Outstanding Accounts at 30 June 2000

Period Number of Claims Value

Current (within Due Date) 4,135 $38,193,312

< 30 Days Overdue 16 $22,808

31 – 60 Days Overdue 0 0

61 – 90 Days Overdue 0 0

> 90 Days Overdue 9 $2,090

For Past 12 Months Value

Percentage of Accounts Paid on Time 86.33%

Value of Accounts Paid on Time $2,004,898,072

Value of Accounts Paid $2,154,061,183

Details of any payment under clause 18 of the Public Finance and Audit Act.

This clause deals with interest payable to a supplier of goods and/or services where payment of the account isnot made within the determined time. The RTA’s financial system records indicate that there have been nopenalties for late payments during 1999/00.

During the financial year the RTA has continued to encourage its customers to utilise Electronic Funds Transferfacilities to further improve payment performance throughout the RTA.

APPENDIX 18Account Payment Performance

APPENDIX 19Funds Granted to Non Government Community Organisations

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 182

Page 185: RTA Annual Report 2000 See Pg 24

(183) Roads and Traffic Authority Annual Report 2000

APPENDIX 20Driver and Vehicle Statistics and Heavy Vehicle Infringements

Year of Manufacture Total

Pre-1960 8,715

1960 to 1964 12,085

1965 to 1969 27,497

1970 to 1974 102,107

1975 to 1979 239,763

1980 to 1984 532,349

1985 to 1989 823,047

1990 to 1994 984,697

1995 240,210

1996 235,607

1997 275,713

1998 316,331

1999 298,243

2000 108,376

Unknown 83,805

Total 4,288,545

Vehicle Usage Total

Private 2,814,711

Pensioner Concession 554,925

Primary Producer Concession 103,746

Business 673,125

Taxi 5,608

Public Bus and Coach 6,437

FIRS 1,716

Other Vehicle Usages 128,277

Total 4,288,545

Vehicle Type Total

Passenger Vehicles 2,705,526

Utilities and Vans 588,122

Trailers 624,389

Motorcycles 84,639

Rigid Trucks 237,950

Buses 12,779

Plant 20,914

Prime Movers 14,226

Total 4,288,545

40-49 20.5%

50-59 15.8%

60-69 9.6%

70-79 6.2%

80 & over 1.3%

16 & under 1.1%

17 1.6%

18-25 13.7%

26-29 8.5%

30-39 21.7%

Figure 20 – NSW Licensed Drivers and Riders by Age Group

Female 47%1,950,665 licences

Male 53%2,191,153 licences

Figure 19 – NSW Licensed Drivers and Riders by Gender

Class HC 3%

Class HR 5.3%

Class MR 2.2%

Class LR 1.5%

Class MC 0.3%

Class R 8.6%

Class C 79%

Figure 21 – NSW Licensed Drivers and Riders on issue as at end June 2000

Offence numbers by Region, 1999/2000

Item Northern Hunter Southern Western South West Sydney Total

Defect notices (includes HVIS activities) 5,470 7,916 10,378 8,139 3,911 20,003 55,817

Traffic Infringement Notices 1,190 2,390 2,140 1,780 1,769 1,621 10,890

Breaches (weight and long hand) 193 1,616 3,903 1,020 232 759 7,723

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 183

Page 186: RTA Annual Report 2000 See Pg 24

(184) Roads and Traffic Authority Annual Report 2000

INDEX

Aborigines – 47, 63, 167, 168

Advisory bodies – 158

Annual report costs – 180

Assets – 94–100, 109

Auditor-General’s report – 73

Chief Executive performance statement – 160

Code of conduct – 70

Consultants – 181

Customer service – 3, 13, 40

Disability plan – 63

Driver and vehicle statistics – 58

Eastern Distributor – 25, 58, 120, 124

Environment – 64, 124, 154

Equal employment opportunity – 167

Ethnic affairs – 63

Ethnic affairs priorities statement – 63

Financial statements – 14, 71

Freedom of information – 171

Funds granted to non-government community organisations – 182

Human resources – 166

Land disposal – 178

Legal change – 175

Major projects – 120, 127

Management structure – 6

Occupational health and safety – 62

Ombudsman – 171, 175

Overseas visits – 170

Payment of accounts – 182

Publications – 179

Recycling – 69

Research and development – 55, 69

Risk management and insurance – 164

Senior executive performance statements – 160

Staff numbers – 166, 168

Women’s strategy – 62

Year 2000 millennium bug – 109, 179

RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 184

Page 187: RTA Annual Report 2000 See Pg 24

WHERE TO FIND US

Internethttp://www.rta.nsw.gov.au

Head Office

Centennial Plaza260 Elizabeth StreetSurry Hills 2010PO Box K198 Haymarket 1238DX 13 SydneyTelephone 131 782Facsimile 02 9218 6227

Motor RegistriesFor information on vehicleregistrations, drivers licences,motor registry locations andopening hours call 13 22 13 fromanywhere in NSW.

For all Regional offices, call 131 782 from anywhere in NSW.

Sydney RegionGround Floor 83 Flushcombe RoadBlacktown 2148PO Box 558Blacktown 2148DX 8120 BlacktownTelephone 131 782Facsimile 02 9831 0926Monday-Friday 8.30am–5.00pm

Hunter Region59 Darby StreetNewcastle 2300Locked Bag 30Newcastle 2300DX 7813 NewcastleTelephone 131 782Facsimile 02 4924 0344Monday-Friday 8.30am–5.00pm

Northern Region31 Victoria Street Grafton 2460PO Box 576Grafton 2460DX 7610 GraftonTelephone 131 782Facsimile 02 6640 1301Monday-Friday 8.30am–5.00pm

Southern Region71-77 Kembla StreetWollongong 2500PO Box 477 Wollongong East 2520DX 5178 WollongongTelephone 131 782Facsimile 02 4227 3705Monday-Friday 8.30am–5.00 pm

South Western Region1 Simmons StreetWagga Wagga 2650PO Box 484Wagga Wagga 2650DX 5407 Wagga WaggaTelephone 131 782Facsimile 02 6938 1183Monday-Friday 8.30am–5.00pm

Western Region51-55 Currajong StreetParkes 2870PO Box 334 Parkes 2870DX 20256 ParkesTelephone 131 782Facsimile 02 6861 1414Monday-Friday 8.30am–5.00pm

Goulburn Major Projects Office211 Bourke StreetGoulburn 2580PO Box 183,Goulburn 2580DX 5362 GoulburnTelephone 131 782Facsimile 02 4827 3744Monday-Friday 8.30am–5.00pm

Newcastle Major Projects Office47 Darby StreetNewcastle 2300Locked Bag 30Newcastle 2300DX 7813 NewcastleTelephone 131 782Facsimile 02 4929 5271Monday-Friday 8.30am–5.00pm

Grafton Major Projects Office21 Prince StreetGrafton 2460PO Box 546Grafton 2460DX 7610 GraftonTelephone 131 782Facsimile 02 6640 1003Monday-Friday 8.30am–5.00pm

Pacific Highway Development Office21 Prince StreetGrafton 2460PO Box 546Grafton 2460DX 7610 GraftonTelephone 131 782Facsimile 02 6640 1001Monday-Friday 8.30am–5.00pm

Transport Management Centre25 Garden Street Eveleigh 1430PO Box 1625 Strawberry Hills 2012Telephone 131 782Facsimile 02 8396 1425Monday-Friday 8.30am–5.00pmTo report traffic incidents 131 700 (24 hours)

Des

ign

and

Pro

duct

ion:

Spa

tchu

rst

RTA A_Report NEW GUTTER 30/11/00 10:00 AM Page 72

Page 188: RTA Annual Report 2000 See Pg 24

RO

AD

S A

ND

TR

AFFIC

AU

TH

OR

ITY

AN

NU

AL R

EP

OR

T 2000

RTA A_Report Cover 30/11/00 1:04 PM Page 2