Abrams ES - New
Allen ES - Refurb
Avery Alexander ES - New
Bradley ES - New
Carver HS - New D/B
Dunbar ES - New
Eisenhower ES - Refurb
Gentilly Terrace ES - Refurb
Green MS - Refurb
Habans ES - New D/B
Harney ES - Refurb
Lawless HS - New
McDonogh 28 ES - Refurb
McDonogh 42 ES - Reno
Morial ES - New
NO East HS @Abramson - New
Reed HS - Refurb
Rosenwald ES - Refurb
Schaumburg ES - Refurb
Sherwood Forest ES - New D/B
Sophie B Wright HS - Reno
Sylvanie Williams - Refurb
Village de L'Est ES - Refurb
Total: 23
A Jackson ES - Refurb
Bauduit ES - Refurb
Fischer ES-Refurb
Gaudet ES-Refurb
Johnson ES - Refurb
Lafayette ES - Refurb
Live Oak ES - Refurb
Marshall ES - Refurb
McDonogh 32 ES - Refurb
Tubman ES - Reno
Total: 10
ConstructionDesignCrossman ES - Refurb
Douglass HS - Refurb
Drew ES - Reno
Fisk-Howard ES - New
Martin L King ES - Refurb
Wicker ES - Refurb
Total: 6
CompleteBehrman ES - New
Clark HS - Reno
McDonogh 7 ES - Refurb
McNair ES - Reno
Schwarz HS - Refurb
Total: 5
PlanningBooker T. Washington - New
John McDonogh HS - Reno
Laurel ES - Refurb
Total: 3
Procurement
RSD Program Summary
RSD Program Summary-Phase II
Audubon School Renovation
Easton HS - Refurb
Fortier (Lusher) HS – Refurb
Lake Forest School @ Greater St. Stephens Site
Lusher ES - Refurb
McDonogh 35 (Phillips/Waters)
McMain School - Gymnasium
Nelson ES - Refurb
New PK-8 at North Kenilworth Park
Total: 9
Ben Franklin ES - Reno
Bethune Tureaud - Refurb
JoEllen Smith Med Ctr Demo
McMain School - Maint Upgrade
New Karr HS - CMAR
Timbers - Controls
Total: 6
ConstructionDesignHarte School (New Construction)
Karr HS - Assessment
McDonogh 7 ES - Stabilization
New Karr HS - D/B
Timbers - IT Room
Total: 5
CompleteBioMed District HS - New
Total: 1
PlanningMcMain School - Roof
Total: 1
Procurement
OPSB Program Summary
OPSB Program Summary-Phase III
Superintendent’s Report July, 2015
Dr. Henderson Lewis Jr. Orleans Parish School Board
Mr. John White Louisiana Department of Education
Mr. Patrick Dobard Recovery School District
Prepared By
Prepared By
TABLE OF CONTENTS 1
FINANCIAL OVERVIEW 4
COMMUNITY MEETINGS 5
BID OPENINGS 6
DBE OVERVIEW MONTHLY SUMMARY 7
NEW & MAJOR RENOVATION 13
Ray Abrams Elementary School (RSD) 13
Avery Alexander Elementary School (RSD) 13
James Audubon School (OPSB) 13
George Washington Carver School (RSD) 14
Benjamin Franklin Elementary School Renovation (OPSB) 14
Paul B. Habans School (RSD) 14
New Karr High School, CMAR (OPSB) 15
15
Lake Forest PK-8 at the Greater St. Stephens Site (OPSB) 15
Alfred Lawless School (RSD) 16
John McDonogh High School Selective Demolition (RSD) 16
John McDonogh High School Renovation (RSD) 16
McDonogh #35 School (Phillip/Waters Site) (OPSB) 17
Eleanor L. McMain School Gymnasium (OPSB) 17
Ernest "Dutch" Morial Elementary School (RSD) 17
Small New Orleans East High School at Abramson (RSD) 18
Sherwood Forest School (RSD) 18
Harriet R. Tubman Elementary School Renovation (RSD) 18
19
Booker T. Washington School (RSD) 19
Sophie B. Wright School (RSD) 19
Table of Contents Right-Click on the school name to proceed to that page
New PK-8 School at North Kenilworth Park at Curran Site (OPSB)
Booker T. Washington School Environmental Remediation (RSD)
1 Status Date: 31 July 2015
REFURBISHMENTS 20
Henry Allen Elementary School Refurbishment (RSD) 20
Henry Allen Elementary School Kitchen Refurbishment (RSD) 20
20
Agnes L. Bauduit Elementary School Refurbishment (RSD) 21
Bethune and Tureaud Elementary School Refurbishment (OPSB) 21
Walter L. Cohen High School Kitchen Refurbishment (RSD) 21
A. D. Crossman School Kitchen Refurbishment (RSD) 22
Frederick A. Douglass High School Science Lab (RSD) 22
Warren Easton School Refurbishment (OPSB) 22
23
23
William J. Fischer Elementary Refurbishment (RSD) 23
Fortier (Lusher) High School Refurbishment (OPSB) 24
Gaudet Elementary School Refurbishment (RSD) 24
Gentilly Terrace School Refurbishment (RSD) 24
Samuel J. Green Elementary School Refurbishment (RSD) 25
Edgar P. Harney Elementary School Refurbishment (RSD) 25
Andrew Jackson School Refurbishment (RSD) 25
J. W. Johnson Elementary School Refurbishment (RSD) 26
26
Lafayette Elementary School Refurbishment (RSD) 26
Laurel Elementary School Refurbishment (RSD) 27
27
Lusher Elementary School Refurbishment (OPSB) 27
Thurgood Marshall Elementary School Refurbishment (RSD) 28
McDonogh #28 School Refurbishment (RSD) 28
McDonogh #32 School Refurbishment (RSD) 28
Nelson Elementary School Refurbishment (OPSB) 29
Sarah T. Reed School Refurbishment (RSD) 29
Sarah T. Reed School Kitchen Refurbishment (RSD) 29
Rosenwald Elementary School Refurbishment (RSD) 30
30
Albert Wicker School Kitchen Refurbishment (RSD) 30
Sylvanie F. Williams School Refurbishment (RSD) 31
Live Oak Elementary School Refurbishment (RSD)
Village de l'Est Elementary School Refurbishment (RSD)
Benjamin Banneker Elementary Kitchen School Refurbishment (RSD)
Dwight D. Eisenhower Elementary School Refurbishment (RSD)
Dwight D. Eisenhower Elementary School Kitchen Refurbishment (RSD)
Dr. Martin L. King Elementary School Kitchen Refurbishment (RSD)
2 Status Date: 31 July 2015
OTHER PROJECTS 32
Eleanor L. McMain School Roof Replacement (OPSB) 32
Eleanor L. McMain School Maintenance Upgrades (OPSB) 32
Timbers III - Building Controls (OPSB) 32
Building Automation System Integration At Recovery School District Central And Remote Offices (RSD) 33
MOTHBALL OR SAFE & SECURE OF SELECTED SCHOOLS
34
Demolition of Modulars at Abramson and Carver (RSD) 34
Demolition of Modulars at Livingston (RSD) 34
COMPLETED PROJECTS 35
3 Status Date: 31 July 2015
Overview
FINANCIAL OVERVIEW - ALL PROJECTS
The RSD has $566 million in open contracts for the capital program after issuing no new contracts, change orders and amendments in July. In addition, the total change orders to date, $5.4 million, account for approximately one percent (1.02%) of the total open construction contracts. RSD anticipates issuing approximately $4 million in construction contracts/change orders, and $1 million in professional service contracts/amendments in August. The OPSB has $217.5 million in open contracts for the capital program after issuing $0 in new contracts and $829 thousand in change orders and amendments in July. In addition, the total change orders to date, $4.2 million, account for approximately two percent (2.26%) of the total open construction contracts. OPSB anticipates issuing approximately no construction contracts/change orders and $1.2 million in professional service contracts/amendments in August.
4 Status Date: 31 July 2015
Community Meetings
Future Community Meetings
August 18, 2015
Ribbon Cutting for Charles R. Drew Elementary School 3819 St. Claude Avenue New Orleans, LA 70117
August 19, 2015
Ribbon Cutting for McDonogh 42 Elementary School
1651 North Tonti Street New Orleans, LA 70119
August 25, 2015
Ribbon Cutting for Stuart R. Bradley Elementary School 2401 Humanity Street New Orleans, LA 70122
August 26, 2015
Ribbon Cutting for New 2 Section Elementary School @ Paul L Dunbar School
9330 Forshey Street New Orleans, LA 70118
August 27, 2015
Ribbon Cutting for Edward R. Livingston School 7301 Dwyer Road New Orleans, LA 70126
5 Status Date: 31 July 2015
Bid Openings
Bids that were opened in July, 2015
July 8, 2015
McMain High School Maintenance Upgrades
July 29, 2015
Laurel School Refurbishment
The following projects are scheduled to bid in the next 60 days
September 2, 2015
Kitchen Improvement at A. D. Crossman School
September 23, 2015
Bethune School Refurbishment and Tureaud School Refurbishment
6 Status Date: 31 July 2015
Disadvantaged Business Enterprises (DBE) Monthly Summary
Recovery School District
New & Renovations:
DBE Contractors secured subcontracts on 20 projects as of July 31, 2015. The DBE subcontracts value is $70,931,672 of the $346,275,187 total of awarded contracts.
Stabilization/Demolition/Mothballing:
DBE Contractors secured subcontracts on 37 projects as of July 31, 2015. The DBE subcontracts value is $10,620,934 of the $37,522,070 total of awarded contracts.
Design-Build New:
DBE Contractors secured subcontracts on 3 projects as of July 31, 2015. The DBE subcontracts value is $34,691,592 of the $109,137,557 total of awarded contracts.
Total Amount of Contracts: $ 492,934,814
Orleans Parish School Board
New & Renovations:
DBE Contractors secured subcontracts on 12 projects as of July 31, 2015. The DBE subcontracts value is $54,086,557 of the $199,371,360 total of awarded contracts.
Stabilization/Demolition/Mothballing:
DBE Contractors secured subcontracts on 2 projects as of July 31, 2015. The DBE subcontracts value is $296,520 of the $902,999 total of awarded contracts. Total Amount of Contracts: $200,274,359
* DBE provisions were included in projects bid after June 30, 2012
7 Status Date: 31 July 2015
Notes: Data Based On Pre-Construction and/or monthly DBE Reports.RSD DBE Participation Target = 25% of Total Contract Amount
56.3%
33.9%
66.8%
6.2%
100.0%
77.5%
32.0%
15.0%
10.0%
0.7%
19.1%
14.0%
29.7%
3.8%
29.8%
25.1%
25.2%
12.3%
1.8%
27.8%
12.8%
55.2%
33.8%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Louis D. Armstrong ES -Mothballing
Total Contract=$358,000
Fannie C. Williams -Demo of Modular BldgTotal Contract=$88,370
L.B. Landry Annex -Abatement & Demo
Total Contract=$199,000
Sylvanie Williams -AHU Replacement
Total Contract=$772,000
Village de L'Est -(Roof) & Modular DemoTotal Contract=$610,550
Andrew J Bell -Mothballing
Total Contract=$2,058,000
Cohen -HVAC Repars
Total Contract=$447,000
Fannie C. Williams -Outdoor Teaching Area
Total Contract=$165,000
John McDonogh -Sprinkler Installation
Total Contract=$175,912
John McDonogh -Bleacher Installation
Total Contract=$68,656
Douglass Refurb -Refurbishment
Total Contract=$8,588,000
Douglass Science Classroom -Refurbishment
Total Contract=$1,394,000
Albert Wicker Refurb -Refurbishment
Total Contract=$523,000
Crossman Refurb -Refurbishment
Total Contract=$239,000
Martin Luther King Jr. -Refurbishment
Total Contract=$342,400
L.D. Crocker -Playground RelocationTotal Contract=$70,400
Parkview -Playground RelocationTotal Contract=$73,800
Fannie C. Williams -Playground RelocationTotal Contract=$93,300
Osborne Little Woods -Playground Relocation
Total Contract=$169,000
Various Schools -Small Projects
Total Contract=$429,500
John F. Kennedy -Modular Demolition
Total Contract=$89,888
Henry Schaumburg -Refurbishment
Total Contract=$273,000
Samuel Green -Refurbishment
Total Contract=$6,170,000
Current RSD Program DBE Participation
8 Status Date: 31 July 2015
Notes: Data Based On Pre-Construction and/or monthly DBE Reports.RSD DBE Participation Target = 25% of Total Contract Amount
43.6%
4.2%
12.2%
2.3%
26.0%
25.6%
26.8%
20.1%
24.2%
23.7%
30.2%
33.6%
25.1%
40.9%
44.0%
15.0%
29.3%
25.8%
22.6%
27.3%
11.7%
30.3%
11.9%
0.0%
21.5%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Gentilly Terrace -Refurbishment
Total Contract=$993,000
Sylvanie Williams -Refurbishment
Total Contract=$1,145,000
Edgar P. Harney -Refurbishment
Total Contract=$649,600
Rosenwald ES -Refurbishment
Total Contract=$1,779,000
Andrew J. Bell -Cottage Demo
Total Contract=$42,560
Schwarz HS -Demolition
Total Contract=$72,373
Gregory & Abramson -Modular Demo
Total Contract=$322,361
Sarah T. Reed -Refurbishment
Total Contract=$405,000
McDonogh 28 ES -Refurbishment
Total Contract=$1,975,000
Henry Allen ES -Refurbishment
Total Contract=$1,625,000
Dwight Eisenhower ES -Refurbishment
Total Contract=$1,640,000
Village de L'Est ES -Refurbishment
Total Contract=$2,138,000
John McDonogh -Selective Demo
Total Contract=$778,400
Kitchens: MLK, Reed, -Allen & Eisenhower
Total Contract=$559,000
Thomy Lafon -Interpretive Display
Total Contract=$67,127
Phillis Wheatley -New Construction
Total Contract=$25,275,000
Sophie B. Wright -Selective Demo & Test Piles
Total Contract=$604,000
Sophie B. Wright -Renovaton
Total Contract=$24,308,000
Harriet Tubman -Investigative Demo
Total Contract=$268,000
Drew ES -Renovation
Total Contract=$15,296,000
McDonogh 42- Test PilesTest Pile (Renov)
Total Contract=$59,950
McDonogh 42 -RenoRenovation
Total Contract=$15,499,000
Livingston HS -New High School
Total Contract=$31,530,000
Paul L. Dunbar - Test Pilestest pile/new 2 Sec
Total Contract=$67,600
Paul L. Dunbar - NewNew 2 Sec
Total Contract=$24,492,000
Current RSD Program DBE Participation(Continued)
9 Status Date: 31 July 2015
Notes: Data Based On Pre-Construction and/or monthly DBE Reports.RSD DBE Participation Target = 25% of Total Contract Amount
29.1%
0.0%
16.7%
13.3%
20.5%
27.6%
33.9%
10.4%
10.6%
31.0%
32.3%
32.6%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Alfred Lawless -New Construction
Total Contract=$35,774,000
Stuart R. Bradley -test pile/new 3 Sec
Total Contract=$102,000
Stuart R. Bradley - NewNew 3 Sec
Total Contract=$25,446,000
N.O. East @Abramson -New Construction
Total Contract=$27,800,000
Morial / Abrams -New Construction
Total Contract=$63,078,000
Avery Alexander -New Construction
Total Contract=$27,960,000
Booker T. Washington -Slab Demo/Soil RemidiationTotal Contract=$2,984,110
Fisk-Howard Test Piles -test pile/new 3 Sec
Total Contract=$64,400
Fisk-Howard New -New Construction
Total Contract=$25,600,000
G.W. Carver -New Design/Build
Total Contract=$49,379,557
Sherwood Forest -New Design/Build
Total Contract=$29,355,000
Paul Habans -New Design/Build
Total Contract=$30,403,000
Current RSD Program DBE Participation(Continued)
10 Status Date: 31 July 2015
Notes: Data Based On Pre-Construction and/or monthly DBE Reports.OPSB DBE Participation Target = 35% of Total Contract Amount
Notes: Data Based On Pre-Construction and/or monthly DBE Reports.OPSB DBE Participation Target = 35% of Total Contract Amount
25.5%
24.0%
20.0%
34.0%
20.0%
50.0%
35.0%
35.0%
35.0%
35.0%
35.0%
35.0%
35.0%
13.8%
0.00% 10.00% 20.00% 30.00% 40.00% 50.00% 60.00% 70.00% 80.00% 90.00% 100.00%
McDonogh 35 (Phillip/Waters) -New HS
New PK-8 @ Kenilworth -New Construction
E. McMain School -New Gym Addition
Timbers III -HVAC Replacement
McDonogh #7 Elementary -Chiller Replacement
Sophie B. Wright HS -Shoring
Lake Forest Elementary -Test Pile/New PK-8
Lake Forest Elementary -New Construction
Lusher Fortier HS -Refurbishment
Warren Easton HS -Refurbishment
Ben Franklin ES -Chiller
Warren Easton HS -Chiller
Lusher Elementary -Refurbishment
Nelson Elementary -Refurbishment
Current OPSB Program DBE Participation
11 Status Date: 31 July 2015
Funding Source – FEMA Architect – Waggonner & Ball Architects, APCContractor – McDonnel Group, LLCConstruction Phase
• Re-steel fabrication has started• Pile driving over 50% complete• Installation of formwork for pile caps has started
Contractual Substantial Completion – May 2017Forecasted Substantial Completion – May 2017
Funding Source – FEMA Architect – Sizeler Thompson Brown ArchitectsContractor – Core ConstructionConstruction Phase
• Soil remediation is complete• Installation of auger cast piles is scheduled to start beginning of August
Contractual Substantial Completion – May 2017Forecasted Substantial Completion – May 2017
Funding Source – FEMA Architect – Blitch/Knevel ArchitectsContractor – FHP Tectonics CorporationConstruction Phase
• Kitchen equipment being installed• Substantial Completion is anticipated in August• Contractor working on the punch list for the existing building
Contractual Substantial Completion – September 2013Forecasted Substantial Completion – August 2015School Ready for Occupancy – August 2015
Avery Alexander Elementary School (RSD)
Ray Abrams Elementary School (RSD)
6519 Virgilian Street, New Orleans, LA 70126 District D Ward 9
Scope of work: New Pre-K – 8 School
New & Major Renovation – Project Status (Forecasted dates only include the next project phase)
Scope of work: Renovation of existing elementary school and new addition 428 Broadway Avenue, New Orleans, LA 70118 District A Ward 14
5800 St. Roch Avenue, New Orleans, LA 70122 District D Ward 8
Scope of work: New Pre-K – 8 School
James Audubon School (OPSB)
13 Status Date: 31 July 2015
Funding Source – FEMAContractor – Broadmoor LLCConstruction Phase
• Insulation and gypsum board installation is ongoing at classroom building• MEP and sprinkler rough-ins at both buildings• Storefront and curtain wall installation is ongoing on both buildings• Roofing installation continues on both buildings• Site work continues on south side of building
Contractual Substantial Completion – March 2016Forecasted Substantial Completion – March 2016
Funding Source – FEMA Architect – N-Y Associates, Inc.Contractor - TBDDesign Phase - CD
• A&E to submit phasing plan• Owner is waiting on structural report
Procurement Phase• Anticipated 1st Advertisement – TBD• Anticipated Bid Opening – TBD
Funding Source – FEMAArchitect – Grace HebertContractor – Core ConstructionConstruction Phase
• Deck being installed at classroom building• MEP rough-in is ongoing• CMU installation is ongoing at gym• Metal panels are scheduled to arrived in August
Contractual Substantial Completion – May 2016Forecasted Substantial Completion – May 2016
Scope of work: New High School, Design Build
1116 Jefferson Avenue, New Orleans, LA 70115 District CA Ward 14
Scope of work: Renovation of existing elementary school
Benjamin Franklin Elementary School Renovation (OPSB)
3501 Siene Drive, New Orleans, LA 70114 District C Ward 15
Scope of work: New School, Design Build
Paul B. Habans School (RSD)
George Washington Carver School (RSD)
3059 Higgins Blvd., New Orleans, LA 70126 District E Ward 9
14 Status Date: 31 July 2015
Funding Source – FEMAArchitect – VergesRome Architects, APAC Contractor – TBDDesign Phase - CD
• Scoring meetings were held on July 8th• Final Committee Selection was Complete July 31st
New PK-8 School at North Kenilworth Park at Curran Site (OPSB)
Funding Source – FEMA Architect – Mathes Brierre ArchitectsContractor – Woodrow Wilson Construction Company, Inc.Construction Phase
• HVAC startup is complete• VCT flooring installation continues• Installation of metal trim and flashing is ongoing• Installation of glazing is complete
Contractual Substantial Completion – September 2014Forecasted Substantial Completion – January 2016School Ready for Occupancy – January 2016
Funding Source – FEMA Architect – Imre Hegedus & Associates ArchitectsContractor – The McDonnel GroupConstruction Phase
• Installation of interior finishes is ongoing• Window installation continues• Substantial completion anticipate in September• Site work is ongoing
Contractual Substantial Completion – July 2015Forecasted Substantial Completion – September 2015School Ready for Occupancy – October 2015
Scope of work: New Pre-K – 8 School
8500 Curran Boulevard, New Orleans, LA 70127 District E Ward 9
11110 Lake Forest Boulevard 70128 District E Ward 9
New Karr High School CMAR (OPSB)
Scope of work: New Pre-K – 8 School
Lake Forest PK-8 at the Greater St. Stephens Site (OPSB)
4400 General Meyer Avenue, New Orleans, LA 70131 District C Ward 15
Scope of work: Demolition of existing medical center and construction of new high
15 Status Date: 31 July 2015
Funding Source – FEMA Architect – Sizeler Thompson Brown ArchitectsContractor – Core ConstructionConstruction Phase
• Interior painting continues• Data wiring is complete• Installation of terrazzo flooring is ongoing• Metal wall panel work continues• HVAC start up beginning of August• Installation of site paving continues
Contractual Substantial Completion – November 2015Forecasted Substantial Completion – November 2015School Ready for Occupancy – January 2016
Funding Source – FEMA Architect – VergesRome Architects, APACContractor - Zimmer-Eschette ServicesConstruction Phase
• 2nd and 3rd floor demolition is 75% complete• 1st floor demolition is 30% complete
Contractual Substantial Completion – October 2015Forecasted Substantial Completion – October 2015
Funding Source – FEMA Architect – VergesRome Architects, APACContractor - Core ConstructionConstruction Phase
• Contracts are being reviewed by both parties
Scope of work: New High School
Scope of work: Renovation of existing school to meet code requirements
2426 Esplanade Avenue, New Orleans, LA 70119 District D Ward 6
John McDonogh High School Renovation (RSD)
John McDonogh High School Selective Demolition (RSD)
2426 Esplanade Avenue, New Orleans, LA 70119 District D Ward 6
Scope of work: Exploratory and selective demolition of the existing school
Alfred Lawless School (RSD)
5300 Law Street, New Orleans, LA 70117 District E Ward 9
16 Status Date: 31 July 2015
Funding Source – FEMA Architect – Sizeler, Thompson, Brown ArchitectsContractor – Citadel Builders, LLCConstruction Phase
• Auditorium and Black box to be complete end of August• Brick masonry and window installation is complete• Contractor is finishing interior work and starting self punch list• Site work is ongoing
Contractual Substantial Completion – May 2015Forecasted Substantial Completion – August 2015School Ready for Occupancy – August 2015
Funding Source – FEMA Architect – Jahncke & Burns ArchitectsContractor – Gibbs ConstructionConstruction Phase
• Stucco installation has started• Gypsum board installation continues• Mechanical and electrical rough in is ongoing
Contractual Substantial Completion – April 2015Forecasted Substantial Completion – January 2016
Funding Source – FEMA Architect – Waggonner & Ball Architects, APCContractor – McDonnel Group, LLCConstruction Phase
• Pile driving is 50% complete• Pouring of pile caps is ongoing• Erection of forms for grade beams continues
Contractual Substantial Completion – January 2017Forecasted Substantial Completion – January 2017
Scope of work: New Pre-K – 8 School
Scope of work: New High School
7701 Grant Street, New Orleans, LA 70126 District E Ward 9
Scope of work: A new gym will be added to the site with a connecting breezeway to the main building.
5721 S. Claiborne Avenue, New Orleans, LA 70125 District A Ward 14
Ernest "Dutch" Morial Elementary School (RSD)
Eleanor L. McMain School Gymnasium (OPSB)
McDonogh #35 School (Phillip/Waters Site) (OPSB)
1200 Senate Street, New Orleans, LA 70122 District D Ward 7
17 Status Date: 31 July 2015
Funding Source – FEMA Architect – RozasWard / a.i.a. architects, Inc.Contractor – Gibbs ConstructionConstruction Phase
• Exterior metal wall panels 95% complete• Interior painting is finishing• Floor installation continues• Data wire installation is ongoing• Site paving continues
Contractual Substantial Completion – June 2015Forecasted Substantial Completion – September 2015School Ready for Occupancy – October 2015
Funding Source – FEMAArchitect – Grace HebertContractor – Core ConstructionConstruction Phase
• Classroom wing structural steel installation is ongoing• MEP rough is ongoing in kitchen, gymnasium, and cafeteria• CMU installation at gymnasium is ongoing• Duct work installation to start beginning of August
Contractual Substantial Completion – May 2016Forecasted Substantial Completion – May 2016
Funding Source – FEMA Architect – Mahlum Scairono Martinez JVContractor - TBDDesign Phase - CD
• Plan modifications will extend the completion of 100% Construction Documents until late September
Procurement Phase• Anticipated 1st Advertisement – October 2015• Anticipated Bid Opening – November 2015
Small New Orleans East High School at Abramson (RSD)
5552 Read Boulevard, New Orleans, LA 70127 District E Ward 9
Scope of work: Renovation of existing elementary school and new addition to meet code requirements
Scope of work: New School, Design Build
2013 General Meyer Avenue, New Orleans, LA 70114 District C Ward 15
Harriet R. Tubman Elementary School Renovation (RSD)
Sherwood Forest School (RSD)
Scope of work: New High School
4801 Maid Marion Drive, New Orleans, LA 70128 District E Ward 9
18 Status Date: 31 July 2015
Booker T. Washington School Environmental Remediation (RSD)
Funding Source – FEMAArchitect – Hewitt-Washington & AssociatesContractor – SEMS, IncProcurement Phase
• Area 1 is being backfilled after being excavated• Survey of existing piles continues• Area 4 concrete slab being removed
Contractual Substantial Completion – December 2015Forecasted Substantial Completion – December 2015
Funding Source – FEMAArchitect – Hewitt-Washington & AssociatesContractor – TBDDesign Phase - SD
• Successful Proposal will be announced August 2015
Funding Source – FEMA Architect – Waggonner & Ball Architects, APCContractor – Core ConstructionConstruction Phase
• MEP rough-in ongoing• Steel for auditorium to be complete by August• Window refurbishment continues• Floor repairs are ongoing
Contractual Substantial Completion – March 2016Forecasted Substantial Completion – March 2016
Scope of work: Renovation of existing school and gymnasium addition1426 Napoleon Avenue, New Orleans, LA 70115 District B Ward 13
Scope of work: The auditorium and entry will be renovated and the remainder of the facility will be demolished and constructed anew
1201 South Roman Street, New Orleans, LA 70125 District B Ward 2
Sophie B. Wright High School Renovation (RSD)
Scope of work: The remediation of the site
Booker T. Washington School (RSD)
1201 South Roman Street, New Orleans, LA 70125 District B Ward 2
19 Status Date: 31 July 2015
Funding Source – FEMA Architect – N-Y Associates, Inc.Contractor - Tuna ConstructionConstruction Phase
• Window refurbishment is 75% complete• Mechanical work is 50% complete• Tuck pointing is 25% complete• Installation of back flow preventer is ongoing
Contractual Substantial Completion – February 2016Forecasted Substantial Completion – February 2016
Funding Source – FEMA Architect – N-Y Associates, Inc.Contractor - CDW ServicesConstruction Phase
• Project will be delayed due to permitting issuesContractual Substantial Completion – November 2016Forecasted Substantial Completion – November 2016
Benjamin Banneker Elementary School Kitchen Refurbishment (RSD)
Funding Source – FEMA Architect – SCNZ ArchitectsContractor - TBDDesign Phase - CD
• Procurement schedule has been adjusted pending FEMA funding approvalProcurement Phase
• Anticipated 1st Advertisement – January 2016• Anticipated Bid Opening – March 2016
Scope of work: Refurbishment of existing elementary school, including but not limited to structure, windows, doors, masonry walls and roof
5626 Loyola Avenue, New Orleans, LA 70115 District A Ward 14
Henry Allen Elementary School Refurbishment (RSD)
REFURBISHMENTS
Henry Allen Elementary School Kitchen Refurbishment (RSD)
5626 Loyola Avenue, New Orleans, LA 70115 District A Ward 14
Scope of work: Refurbishment of existing elementary school kitchen
421 Burdette Street, New Orleans, LA 70118 District A Ward 16
Scope of work: Refurbishment of existing elementary school kitchen
20 Status Date: 31 July 2015
Funding Source – FEMA, CDBGArchitect – Duplantis Design Group, PCContractor - TBDDesign Phase - CD
• Procurement schedule has been adjusted pending FEMA funding approvalProcurement Phase
• Anticipated 1st Advertisement – August 2015• Anticipated Bid Opening – September 2015
Bethune and Tureaud Elementary School Refurbishment (OPSB)
4040 Eagle Street & 2021 Pauger Street, New Orleans, LA District A Ward 3 & District D Ward 7
Funding Source – FEMA Architect – Chenevert Architects LLCContractor - TBDDesign Phase - CD
• 100% Construction Documents are completeProcurement Phase
• Anticipated 1st Advertisement – August 2015• Anticipated Bid Opening – September 2015
Funding Source – FEMA Architect – N-Y Associates, Inc.Contractor - TBDDesign Phase - CD
• Procurement schedule has been adjusted pending FEMA funding approvalProcurement Phase
• Anticipated 1st Advertisement – January 2016• Anticipated Bid Opening – March 2016
Walter L. Cohen High School Kitchen Refurbishment (RSD)
3520 Dryades, New Orleans Street, LA 70115 District B Ward 12
Scope of work: Refurbishment of existing elementary school kitchen
Scope of work: Refurbishment of existing elementary school, including but not limited to structure, windows, doors, masonry walls and roof
Scope of work: Refurbishment of existing elementary school, including but not limited to structure, windows, doors, masonry walls and roof
Agnes L. Bauduit Elementary School Refurbishment (RSD)
3649 Laurel Street, New Orleans, LA 70115 District B Ward 12
21 Status Date: 31 July 2015
Funding Source – FEMA Architect – SCNZ ArchitectsContractor - TBDProcurement Phase
• 1st Advertisement - July 29th• 2nd Advertisement - August 5th• 3rd Advertisement - August 12th• Pre-Bid Conference - August 13th• Bid Opening - September 3rd
Funding Source – FEMAArchitect – VergesRome Architects, APACContractor – One ConstructionConstruction Phase
• Wood floor repairs are ongoing in classrooms• Plaster repairs continues• Exterior painting 75% complete
Contractual Substantial Completion – November 2015Forecasted Substantial Completion – November 2015
Funding Source – FEMAArchitect – Chenevert Architects LLCContractor - Tuna ConstructionConstruction Phase
• Repairs to doors and hardware is 50% complete• Restroom renovations continues• Exterior tuck pointing 30% complete• Sprinkler work at the Gymnasium will continue during summer break
Contractual Substantial Completion – September 2015Forecasted Substantial Completion – September 2015
Frederick A. Douglass High School Science Lab (RSD)
3820 St. Claude Avenue, New Orleans, LA 70117 District C Ward 9
Scope of work: Renovations to science lab
Scope of work: Refurbishment of existing elementary school kitchen
A. D. Crossman School Kitchen Refurbishment (RSD)
4407 South Carrollton Avenue, New Orleans, LA 70119 District A Ward 3
Warren Easton School (OPSB)
Scope of work: Refurbishment of existing high school, including but not limited to structure, doors, masonry walls and roof
3019 Canal Street, New Orleans, LA 70119 District B Ward 4
22 Status Date: 31 July 2015
Dwight D. Eisenhower Elementary School Refurbishment (RSD)
Funding Source – FEMA Architect – Harry Baker Smith Architects II, PLLCContractor - CDW ConstructionConstruction Phase
• HVAC start up in underway• Roof repairs are 95% complete• Interior finishes continues• Installation of interior lighting is complete
Contractual Substantial Completion – January 2016Forecasted Substantial Completion – January 2016
Dwight D. Eisenhower Elementary School Kitchen Refurbishment (RSD)
Funding Source – FEMA Architect – N-Y Associates, Inc.Contractor - CDW ServicesConstruction Phase
• Project will be delayed due to permitting issuesContractual Substantial Completion – March 2016Forecasted Substantial Completion – March 2016
Funding Source – FEMA, CDBGArchitect – SCNZ ArchitectsContractor - TBDDesign Phase - CD
• 100% Construction Documents are complete• Procurement schedule has been adjusted pending FEMA funding approval
Procurement Phase• Anticipated 1st Advertisement – September 2015• Anticipated Bid Opening – October 2015
William J. Fischer Elementary School Refurbishment (RSD)
1801 L.B. Landry Avenue, New Orleans, LA 70114 District C Ward 15
Scope of work: Refurbishment of existing elementary school, including but not limited to structure, windows, doors, masonry walls and roof
Scope of work: Refurbishment of existing elementary school, including but not limited to structure, windows, doors, masonry walls and roof
Scope of work: Refurbishment of existing elementary school kitchen3700 Tall Pines Drive, New Orleans, LA 70131 District C Ward 15
3700 Tall Pines Drive, New Orleans, LA 70131 District C Ward 15
23 Status Date: 31 July 2015
Funding Source – FEMA Architect – SCNZ ArchitectsContractor - Core ConstructionConstruction Phase
• Contractor is working on punch list from phase one and three• MEP work for phase two his ongoing• Phase two is 50% complete• Installation of new door and hardware continues• Repairs to exterior brick work is ongoing
Contractual Substantial Completion – March 2016Forecasted Substantial Completion – March 2016
Funding Source – FEMAArchitect – SCNZ ArchitectsContractor - TBDDesign Phase - CD
• Procurement schedule has been adjusted pending FEMA funding approvalProcurement Phase
• Anticipated 1st Advertisement – September 2015• Anticipated Bid Opening – October 2015
Funding Source – FEMA Architect – Byron J. Stewart & Associates, APC Architects & PlannersContractor - One ConstructionConstruction Phase
• Flooring in kitchen area 75% complete• Dumpster pad and grease trap installation 85% complete• Fencing for dumpster has started
Contractual Substantial Completion – August 2015Forecasted Substantial Completion – August 2015
Gentilly Terrace School Refurbishment (RSD)
Scope of work: Refurbishment of existing elementary school, including but not limited to structure, windows, doors, masonry walls, roof and kitchen
12000 Hayne Boulevard, New Orleans, LA 70128 District E Ward 9
Scope of work: Refurbishment of existing elementary school, including but not limited to structure, windows, doors, masonry walls and roof
4720 Painters Street, New Orleans, LA 70122 District D Ward 8
Gaudet Elementary School Refurbishment (RSD)
Fortier (Lusher) High School Refurbishment (OPSB)
5624 Freret Street, New Orleans, LA 70115 District A Ward 14
Scope of work: Renovation and repairs to the roof, masonry, plaster, windows, exterior doors, canopies, mechanical systems, and electrical systems.
24 Status Date: 31 July 2015
Funding Source – FEMA Architect – VergesRome Architects, APACContractor - Hernandez Consulting, LLCConstruction Phase
• Fire Alarm work is ongoing• Window replacement is 65% complete• Electrical and plumbing renovations continues• Exterior brick repairs is 70% complete• Restroom repairs 50% complete
Contractual Substantial Completion – August 2015Forecasted Substantial Completion – August 2015
Funding Source – FEMA Architect – VergesRome Architects, APACContractor - Hamp's Construction, LLCConstruction Phase
• Fence gates have been installed• Installation of pipe insulation is 40% complete• Electrical work 25% complete
Contractual Substantial Completion – September 2015Forecasted Substantial Completion – September 2015
Funding Source – FEMA Architect – N-Y Associates, Inc.Contractor - TBDProcurement Phase
• 1st Advertisement - August 19th• 2nd Advertisement - August 26th• 3rd Advertisement - September 2nd• Pre-Bid Conference - September 3rd• Bid Opening - September 23rd
2319 Valence Street, New Orleans, LA 70115 District B Ward 13
Scope of work: Refurbishment of existing elementary school, including but not limited to structure, windows, doors, masonry walls and roof
Edgar P. Harney Elementary School Refurbishment (RSD)
2503 Willow Street, New Orleans, LA 70113 District B Ward 11
Scope of work: Refurbishment of existing elementary school, including but not limited to structure, windows, doors, masonry walls and roof
Andrew Jackson School Refurbishment (RSD)
1400 Camp Street, New Orleans, LA 70130 District B Ward 1
Scope of work: Refurbishment of existing elementary school, including but not limited to structure, windows, doors, masonry walls, roof and kitchen
Samuel J. Green Elementary School Refurbishment (RSD)
25 Status Date: 31 July 2015
Funding Source – FEMA, CDBGArchitect – SCNZ ArchitectsContractor - TBDDesign Phase - CD
• Procurement schedule has been adjusted pending FEMA funding approvalProcurement Phase
• Anticipated 1st Advertisement – September 2015• Anticipated Bid Opening – October 2015
Dr. Martin L. King Elementary School Kitchen Refurbishment (RSD)
Funding Source – FEMA Architect – N-Y Associates, Inc.Contractor - CDW ServicesConstruction Phase
• Project will be delayed due to permitting issuesContractual Substantial Completion – March 2016Forecasted Substantial Completion – March 2016
Funding Source – FEMA Architect – N-Y Associates, Inc.Contractor - TBDDesign Phase - CD
• Procurement schedule has been adjusted pending FEMA funding approvalProcurement Phase
• Anticipated 1st Advertisement – August 2015• Anticipated Bid Opening – September 2015
J. W. Johnson Elementary School Refurbishment (RSD)
1800 Monroe Street, New Orleans, LA 70118 District A Ward 17
Scope of work: Refurbishment of existing elementary school, including but not limited to structure, windows, doors, masonry walls and roof
2727 South Carrollton Avenue, New Orleans, LA 70118 District A Ward 16
Scope of work: Refurbishment of existing elementary school kitchen 1617 Caffin Avenue, New Orleans, LA 70117 District E Ward 9
Lafayette Elementary School Refurbishment (RSD)
Scope of work: Refurbishment of existing elementary school, including but not limited to structure, windows, doors, masonry walls and roof
26 Status Date: 31 July 2015
Funding Source – FEMA, CDBG Architect – Mahlum Scairono Martinez JVContractor - TBDProcurement Phase
• Bid Opening - July 29th• Owner is reviewing bids
Funding Source – FEMAArchitect – VergesRome Architects, APACContractor - TBDDesign Phase - CD
• Procurement schedule has been adjusted pending FEMA funding approvalProcurement Phase
• Anticipated 1st Advertisement – August 2015• Anticipated Bid Opening – September 2015
Funding Source – FEMA Architect – Meyer Engineers, LTD.Contractor - DynamicConstruction Phase
• Window installation has started• Interior painting is ongoing
Contractual Substantial Completion – November 2016Forecasted Substantial Completion – November 2016
Scope of work: Refurbishment of existing elementary school, including but not limited to structure, windows, doors, masonry walls and roof
3128 Constance Street, New Orleans, LA 70115 District B Ward 11
820 Jackson Avenue, New Orleans, LA 70130 District B Ward 10
Laurel Elementary School Refurbishment (RSD)
7315 Willow Street, New Orleans, LA 70118 District A Ward 14
Lusher Elementary School Refurbishment (OPSB)
Live Oak Elementary School Refurbishment (RSD)
Scope of work: Renovation and repairs to the existing bridge, roof, windows, exterior doors, and restroom accessibility
Scope of work: Refurbishment of existing elementary school, including but not limited to structure, windows, doors, masonry walls and roof
27 Status Date: 31 July 2015
Funding Source – FEMA Architect – Mahlum Scairono Martinez JVContractor - TBDDesign Phase - CD
• 100% Construction Documents were received July 29thProcurement Phase
• Anticipated 1st Advertisement – September 2015• Anticipated Bid Opening – October 2015
Funding Source – FEMA Architect – SCNZ Architects, LLCContractor - Tuna ConstructionConstruction Phase
• Kitchen scope change order is being reviewed work to be preformed during Christmas
• Window replacement is 405 complete• Roof work is 85% complete• Sprinkler installation is 75% complete
Contractual Substantial Completion – March 2016Forecasted Substantial Completion – March 2016
Funding Source – FEMA, CDBG Architect – Byron J. Stewart & Associates, APC Architects & PlannersContractor - TBDDesign Phase – CD
• Bid Documents are due August 18th• Procurement schedule has been adjusted pending FEMA funding approval
Procurement Phase• Anticipated 1st Advertisement – September 2015• Anticipated Bid Opening – October 2015
Scope of work: Refurbishment of existing elementary school, including but not limited to structure, windows, doors, masonry walls and roof
McDonogh #32 School Refurbishment (RSD)
Scope of work: Refurbishment of existing elementary school, including but not limited to structure, windows, doors, masonry walls, roof and kitchen
800 DeArmas Street, New Orleans, LA 70114 District C Ward 15
McDonogh #28 School Refurbishment (RSD)
Scope of work: Refurbishment of existing elementary school, including but not limited to structure, windows, doors, masonry walls and roof
4621 Canal Street, New Orleans, LA 70119 District A Ward 4
2733 Esplanade Avenue, New Orleans, LA 70119 District A Ward 7
Thurgood Marshall Elementary School Refurbishment (RSD)
28 Status Date: 31 July 2015
Funding Source – FEMA Architect – Harry Baker Smith ArchitectsContractor - Blanchard Mechanical ContractorConstruction Phase
• Site work to start August• Contractor is submitting a reduced HVAC scope change
Funding Source – FEMA Architect – Byron J. Stewart & Associates, APC Architects & PlannersContractor - Tuna ConstructionConstruction Phase
• Sidewalk repairs are complete• Skylight repairs are 505 complete• Electrical work is complete• Mechanical work is complete
Contractual Substantial Completion – December 2015Forecasted Substantial Completion – December 2015
Funding Source – FEMA Architect – N-Y Associates, Inc.Contractor - CDW ServicesConstruction Phase
• Project will be delayed due to permitting issuesContractual Substantial Completion – March 2016Forecasted Substantial Completion – March 2016
3121 St. Bernard Avenue, New Orleans, LA 70119 District D Ward 7
Nelson Elementary School Refurbishment (OPSB)
Sarah T. Reed School Kitchen Refurbishment (RSD)
Scope of work: Refurbishment of existing high school kitchen
Scope of work: Renovation and repairs to the roof, masonry, windows, exterior doors, mechanical systems, and electrical systems.
5316 Michoud Boulevard, New Orleans, LA 70129 District E Ward 9
Scope of work: Refurbishment of existing high school, including but not limited to structure, windows, doors, masonry walls and roof
Sarah T. Reed School Refurbishment (RSD)
5316 Michoud Boulevard, New Orleans, LA 70129 District E Ward 9
29 Status Date: 31 July 2015
Funding Source – FEMA Architect – Byron J. Stewart & Associates, APC Architects & PlannersContractor - One ConstructionConstruction Phase
• HVAC repairs are 35% complete• Work on dumpster pad and grease trap continues• Electrical work is 50% complete• Roof repairs have started
Contractual Substantial Completion – January 2016Forecasted Substantial Completion – January 2016
Funding Source – FEMA, CBDGArchitect – Duplantis Design Group, PCContractor - Dynamic Constructors LLCConstruction Phase
• Work continues on dumpster pad and grease trap• Replacement of Ceiling tile and grid in hallways is 85% complete• Painting of classrooms is 85 % complete• Mechanical and plumbing work has started
Contractual Substantial Completion – April 2016Forecasted Substantial Completion – April 2016
Funding Source – FEMA Architect – SCNZ ArchitectsContractor - TBDDesign Phase - CD
• Procurement schedule has been adjusted pending FEMA funding approvalProcurement Phase
• Anticipated 1st Advertisement – January 2016• Anticipated Bid Opening – March 2016
2011 Bienville Street, New Orleans, LA 70112 District D Ward 4
5100 Cannes Street, New Orleans, LA 70129 District E Ward 9
Scope of work: Refurbishment of existing elementary school, including but not limited to structure, windows, doors, masonry walls and roof
6501 Berkley Drive, New Orleans, LA 70131 District C Ward 15Scope of work: Refurbishment of existing high school, including but not limited to structure, windows, doors, masonry walls and roof
Village de l'Est Elementary School Refurbishment (RSD)
Albert Wicker School Kitchen Refurbishment (RSD)
Scope of work: Refurbishment of existing elementary school kitchen
Rosenwald Elementary School Refurbishment (RSD)
30 Status Date: 31 July 2015
Funding Source – FEMA Architect – N-Y Associates, Inc.Contractor - HampsConstruction Phase
• Door and window repairs is ongoing• Work on parking resurfacing is 50% complete• Brick repairs continues• Dumpster and grease trap work is complete
Contractual Substantial Completion – August 2015Forecasted Substantial Completion – August 2015
Sylvanie F. Williams School Refurbishment (RSD)
3127 Martin Luther King Jr. Boulevard, New Orleans, LA 70125 District B Ward 2
Scope of work: Refurbishment of existing elementary school, including but not limited to structure, windows, doors, masonry walls and roof
31 Status Date: 31 July 2015
Funding Source – General Fund & Harrah'sArchitect – Duplantis Design GroupContractor – TBDProcurement Phase
• Owner is review bids
Funding Source – General Fund & Harrah'sArchitect – Duplantis Design GroupContractor – Tuna ConstructionProcurement Phase
• Owner has reviewed bids• Contractor is reviewing the contract
Funding Source – OPSB General FundArchitect – N-Y Associates, Inc.Contractor - TBDDesign Phase - PC
• Owner has placed project on holdProcurement Phase
• Anticipated 1st Advertisement – TBD• Anticipated Bid Opening – TBD
5721 S. Claiborne Avenue, New Orleans, LA 70125 District A Ward 14
Scope of work: Various maintenance work.
Timbers III - Building Controls (OPSB)
3520 General DeGaulle Drive, New Orleans, LA 70114 District C Ward 15
Scope of work: Design and installation of new building controls
OTHER PROJECTS
Eleanor L. McMain School Roof Replacement (OPSB)
5721 S. Claiborne Avenue, New Orleans, LA 70125 District A Ward 14
Scope of work: Roof replacement
Eleanor L. McMain School Maintenance Upgrades (OPSB)
32 Status Date: 31 July 2015
Funding Source – FEMAArchitect – Moses EngineersContractor – Synergy Building Solutions, Inc.Construction Phase
• The five Quick Start Schools are complete, the Energy Dash Board is being implemented
• Sylvanie Williams Elementary School, Sarah T. Reed Elementary School, Fannie C. Williams Elementary School, Bienville Elementary School, Charles L. Colton Elementary School, William Frantz Elementary School, Parkview Elementary School, Osborne Elementary School, Carter G. Woodson Elementary School, Walter Cohen High School, Dolores T Aaron Elementary School, A. D. Crossman Elementary School, and Albert Wicker Elementary School are complete
• Punch list work is complete at Benjamin Banneker Elementary School• Integrations 97% complete at Lawrence D. Crocker Elementary School
Contractual Substantial Completion – May 2015Forecasted Substantial Completion – May 2015
Various Addresses
Building Automation System Integration At Recovery School
Scope of work: Implementation of a Central Remote Building Automation System that integrates the existing Building Automation Systems of the 4 Quick Start Schools (Andrew H. Wilson ES, Langston Hughes ES, L.B. Landry HS, and Lake Area HS) and Joseph A. Craig ES into a central remote monitoring workstation that will include Fannie C. Williams ES, Lawrence D. Crocker ES, Mildred Osborne ES, William Frantz ES, Bienville ES, Charles J. Colton ES, Carter G. Woodson ES and Parkview ES
33 Status Date: 31 July 2015
Demolition of Modular Buildings at Abramson and Carver (RSD)
5552 Read Boulevard and 3059 Higgins Boulevard, New Orleans, LA
Funding Source – FEMAArchitect – Mahlum Scairono Martinez JVContractor - TBDDesign Phase - CD
• 50% construction Documents are due August 30thProcurement Phase
• Anticipated 1st Advertisement – October 2015• Anticipated Bid Opening – November 2015
Demolition of Modular Buildings at Livingston (RSD)
7301 Dwyer Road, New Orleans, LA District C Ward 15
Funding Source – FEMAArchitect – GAEA Consultants, LLCContractor – TBDProcurement Phase
• Anticipated 1st Advertisement – November 2015• Anticipated Bid Opening – December 2015
Scope of work: Demolition of existing modular buildings
Scope of work: Demolition of existing modular buildings
MOTHBALL OR SAFEAND SECURE OF SELECTED SCHOOLS
34 Status Date: 31 July 2015
1 Abrams | Morial | Abramson | Coghill Demolition (RSD)
2 A. D. Cross Elementary School Energy Conservation (RSD)
3
4
5
6 Agnes Bauduit Elementary School Boiler (RSD)
7 Albert Wicker Elementary School Refurbishment (RSD)
8 Albert Wicker Elementary School Roof Repairs (RSD)
9 Alfred Lawless Senior High Security Fencing (RSD)
10 Alice M. Harte Elementary School (OPSB)
11 Alice M. Harte Elementary School Demolition (OPSB)
12 Andrew J. Bell Junior High School Roof Replacement (RSD)
13 Andrew J. Bell Junior High School Mothball (RSD)
14 Andrew Jackson Elementary School Roof Repairs (RSD)
15 Andrew Jackson Elementary School Solar Panels (RSD)
16 Andrew H. Wilson Elementary School Cottage (RSD)
17 Arthur Ashe Elementary School Kitchen Renovation (OPSB)
18 Augustine Elementary School Roof (RSD)
19 Avery-Alexander Elementary School Demolition (RSD)
20 Barbara C. Jordan Elementary School Demolition (RSD)
21 Bell JH Shoring (RSD)
22
23
24 Bienville Elementary School Demolition (RSD)
25 Booker T. Washington High School Partial Demolition (RSD)
26 Carter G. Woodson Middle School Demolition (RSD)
27 Central Services Warehouse Demolition (OPSB)
28 Charles J. Colton Elementary Selective Demolition (RSD)
29 Charles J. Colton Elementary School (RSD)
30
31
32 Cohen High School Health Clinic (RSD)
33
34 Demolition of Modular Buildings at Gregory and Abramson (RSD)
35 Douglass High School Under Floor Utilities (RSD)
36 Dr. Martin Luther King School Roof Repairs (RSD)
37 Dr. Martin Luther King Jr. School Renovation (RSD)
38 Dwight D. Eisenhower Elementary School Roof Repairs (RSD)
39 East Bank Swing Space for Audubon Charter School (OPSB)
40 Edgar P. Harney Elementary School Roof Repairs (RSD)
41 Edna Karr High School - Gymnasium Repair (OPSB)
42 Edna Karr High School - Assessment (OPSB)
43 Edward Livingston Middle School Demolition (RSD)
A. P. Tureaud Elementary School Roof Repairs (RSD)
Benjamin Franklin Senior High School (OPSB)
A. D. Crossman Elementary School Refurbishment (RSD) A. D. Crossman Elementary School and Benjamin Banneker Elementary School (RSD)
Comprehensive List - Completed Projects
Demolition of Caretakers Cottage at George Mondy Scholl and Andrew Bell School (RSD)
Charles R. Drew Elementary School (RSD)
Benjamin Banneker Elementary School Energy Conservation (RSD)
Charles R. Drew Elementary Roof & Installation of Kitchen Hood (RSD)
35 Status Date: 31 July 2015
44
45 New Edward Hynes School (OPSB)
46 Edwards | Hardin | Lockett | Lawless Demolition (RSD)
47 Edward Livingston High School (RSD)
48
49 Eleanor L. McMain School Clinic (OPSB)
50 Ernest N. Morial Elementary Security Fencing (RSD)
51 Fannie C. Williams Elementary School Demolition (RSD)
52 Fisk-Howard Elementary School Demolition (RSD)
53 Florence J. Chester Elementary School Demolition (RSD)
54 Francis W. Gregory Demolition (RSD)
55 Frederick A. Douglass High Refurbishment (RSD)
56 Frederick A. Douglass High Switchgear (RSD)
57
58 George Mondy Elementary School Mothball (RSD)
59 George Washington Carver High School Demolition (RSD)
60 Greater St. Stephens School (OPSB)
61
62 Henry Allen Elementary School Roof (RSD)
63
64
65 Holy Cross Modular Relocation (RSD)
66 Israel M. Augustine Middle School Roof Replacement (RSD)
67 Israel M. Augustine Middle School Mothball (RSD)
68 James Derham Demolition (RSD)
69 James W. Johnson Elementary School Roof (RSD)
70 New Jean Batiste de Bienville School (RSD)
71 Jean Gordon Elementary School Demolition (RSD)
72 John Dibert Elementary School Roof (RSD)
73 John W. Hoffman Elementary School Demolition (RSD)
74 John F. Kennedy Modular Relocation (Schwarz Campus) (RSD)
75
76
77 John F. Kennedy High School Demolition (RSD)
78
79 John McDonogh Senior High School Roof (RSD)
80 John A. Shaw Elementary School Mothball (RSD)
81 Joseph S. Clark Senior High School Roof Repairs (RSD)
82 Joseph A. Craig Elementary Canopies (RSD)
83 Joseph A. Craig Elementary Elevator Installation (RSD)
84 Joseph A. Hardin Elementary Security Fencing (RSD)
85 Lafayette Elementary School Roof and Masonry (RSD)
86 Lake Area | Landry Demolition (RSD)
87 Langston Hughes Elementary School (Phase I) (RSD)
88
Henry C. Schaumburg School Refurbishment (RSD)
John McDonogh Senior High School Bleachers and Sprinklers (RSD)
Edward Henry Phillips Junior High School Demolition (OPSB)
Henry C. Schaumburg - Window/Door, Air Condition, Water Fountain/Sink Installation (RSD)
Eleanor L. McMain School Replacement of Existing Chillers (OPSB)
John F. Kennedy Modular Demolition (RSD)
Frederick A. Douglass High Emergency Boiler Roof Repairs (RSD)
Harriet R. Tubman Elementary School Selective Demolition (RSD)
John F. Kennedy Modular Relocation (Coghill Modular Campus) (RSD)
Langston Hughes Elementary School - New Gymnasium (Phase II) (RSD)
36 Status Date: 31 July 2015
89 Langston Hughes Elementary School - Dumpster Pad (RSD)
90 Lawrence D. Crocker Elementary School Demolition (RSD)
91 L.B. Landry Annex Demolition (RSD)
92 Little Woods Elementary School Demolition (RSD)
93
94 Live Oak Elementary School Roof (RSD)
95 Live Oak Elementary School Exterior Door Replacement (RSD)
96 Lorraine Hansberry Elementary School Mothball (RSD)
97 Louis D. Armstrong Elementary School (RSD)
98 Mahalia Jackson Elementary School (OPSB)
99
100 Mahalia Jackson Elementary School Office Renovation (OPSB)
101 Martin Behrman Elementary School Roof (RSD)
102 Martin Luther King Jr. Elementary Canopy System (RSD)
103
104 Mary Church Terrell Elementary School Demolition (RSD)
105 Mary M. Bethune Elementary 1st Floor Replacement (OPSB)
106
107
108
109 McDonogh #28 Elementary School Roof (RSD)
110 McDonogh #32 Roof Replacement (RSD)
111McDonogh #35 ADA Upgrades to Public Restrooms, Exterior Ramp & Handicap Seating in the Auditorium (OPSB)
112 McDonogh #42 Elementary School Renovation (RSD)
113 McDonogh #42 Elementary School Roof (RSD)
114 McDonogh #42 Elementary School HVAC Replacement (RSD)
115 Mildred C. Osborne Elementary School Demolition (RSD)
116 Mildred C. Osborne Elementary School (RSD)
117 Modular Campuses Close Outs (RSD)
118
119
120 Morris F.X. Jeff Elementary School Demolition (RSD)
121 Morris F.X. Jeff Elementary School Mothball (RSD)
122 Murray G. Henderson Elementary School Roof (RSD)
123 New Andrew H. Wilson Elementary School (RSD)
124 New Carter G. Woodson School (RSD)
125 New Fannie C. Williams School (RSD)
126 New Joseph A. Craig Elementary School (RSD)
127 New L.B. Landry High School (RSD)
128 New Lake Area High School (RSD)
129 New Lawrence D. Crocker School (RSD)
130 New Parkview School (RSD)
131
132 New William Frantz Elementary School (RSD)
McDonogh #15 Elementary Exterior Masonry to SOI Standards (RSD)
Mahalia Jackson Elementary School Dumpster / Other Improvements (OPSB)
Modular Structures at Langston Hughes Elementary School (RSD)
Mary M. Bethune Elementary Rear Yard Repair/Resurfacing (OPSB)
Little Woods School (Dolores T. Aaron Elementary School) (RSD)
McDonogh #7 High School Repairs (OPSB)
Modular Classroom Demolition at Fannie C. Williams Elementary School (RSD)
New Equipment & Upgrades at 8 Central & 25 Satellite Kitchens (RSD)
Martin Luther King Jr. School Modular Building, Deck, Canopy (RSD)
37 Status Date: 31 July 2015
133 New Orleans High School Signature Center Study (RSD)
134 Oretha C. Haley Demo (RSD)
135 Oretha C. Haley Elementary School Mothball (RSD)
136 Parkview Elementary School Demolition (RSD)
137 Paul L. Dunbar Elementary School Demolition (RSD)
138 Paul L. Dunbar Elementary School (RSD)
139 Paul B. Habans Elementary School Roof Repairs (RSD)
140 Phillis Wheatley Elementary School Demolition (RSD)
141 Phillis Wheatley Elementary School (RSD)
142
143 Sarah T. Reed High School Bleachers (RSD)
144 Sarah T. Reed High School Auditorium Wall (RSD)
145 Seabrook Computer Training Center Demolition (OPSB)
146 Schaumburg Chillers (RSD)
147 Schwarz Alternative Repairs (RSD)
148 Schwarz Alternative Modulars Demolition (RSD)
149 Schwarz Modular Building Demolition (RSD)
150 Sherwood Forest Elementary School Demolition (RSD)
151 Sophie B. Wright School Selective Demolition (RSD)
152 Sophie B. Wright Various Repairs/Restroom Renovations (OPSB)
153 Stuart R. Bradley Elementary School Demolition (RSD)
154 Stuart R. Bradley Elementary School (RSD)
155 Sylvanie Williams Elementary School AHU Replacement (RSD)
156 Sylvanie Williams Elementary School Play Yard (RSD)
157 Sylvanie Williams Elementary School Roof Repairs (RSD)
158
159 Temporary Campus for McDonogh #11 Expropriation (OPSB)
160 Thomas A. Edison Elementary School Demolition (RSD)
161 Thomy Lafon Elementary School Demolition (RSD)
162 Thomy Lafon School Interpretative Display (RSD)
163 Timbers Park Office Building #1 & #2 Demolition (OPSB)
164 Timbers HVAC (OPSB)
165 Timbers III - IT Room Relocation (OPSB)
166 Village de L'est Elementary School Subsidence (RSD)
167
168 Vorice J. Waters Elementary School Demolition (RSD)
169 Valena C. Jones Elementary School (RSD)
170
171
172
173 New William J. Guste Elementary School (RSD)
174 William J. Guste Elementary School Science Lab (RSD)
175
176 William Frantz Elementary School (RSD)
177 William Frantz Elementary School Roof (RSD)
William Frantz Elementary School Environmental Remediation & Selective Demolition (RSD)
West Bank Swing Space for Alice Harte Elementary School (OPSB) Warren Easton High School Window Replacement (OPSB)Walter L. Cohen High School HVAC (RSD)
Village de L'est Elementary School Roof and Modular Demolition (RSD)
Robert M. Lusher Elementary Roof Removal & Replacement (OPSB)
Sylvanie Williams Elementary School HVAC/Chiller Replacement (RSD)
38 Status Date: 31 July 2015
BESE MONTHLY REPORTOPEN CONTRACTS as of 08/07/15
Page 1
PROJECT CONTRACTOR/ARCHITECT FUNDING SOURCE ORIGINAL CONTRACT
AMOUNTS CHANGE ORDERS/
AMENDMENTS CONTRACT AMOUNTS
DEMOLITIONSAndrew Bell - Caretakers Cottage Demo VergesRome Architects, APAC FEMA -$ 5,268.00$ 5,268.00$
Concrete Busters of Louisiana, Inc. FEMA 42,560.00$ -$ 42,560.00$ Andrew Bell - Caretakers Cottage Demo Total 47,828.00$
Gregory Modular Demolition Holly & Smith Architects, APAC FEMA 8,636.37$ 4,656.82$ 13,293.19$ Ashley Savarino Unlimited Construction, LLC FEMA 120,250.00$ -$ 120,250.00$
Gregory Modular Demolition Total 133,543.19$ Abramson Modular Demolition Holly & Smith Architects, APAC FEMA 14,515.63$ 7,929.18$ 22,444.81$
Ashley Savarino Unlimited Construction, LLC FEMA 202,111.00$ -$ 202,111.00$ Abramson Modular Demolition Total 224,555.81$
Livingston Modular Demolition GAEA Consultants, LLC FEMA 28,452.80$ 9,110.08$ 37,562.88$ Livingston Modular Demolition Total 37,562.88$
Schwarz Modular Demolition GAEA Consultants, LLC FEMA 7,113.20$ 1,647.52$ 8,760.72$ Concrete Busters of Louisiana, Inc. FEMA 72,373.00$ -$ 72,373.00$
Schwarz Modular Demolition Total 81,133.72$ Carver Modular Demolition Mahlum Scairono Martinez Architects, LLC FEMA 55,712.00$ -$ 55,712.00$
Carver Modular Demolition Total 55,712.00$ Abramson (Phase II) Modular Demolition Mahlum Scairono Martinez Architects, LLC FEMA 27,856.00$ -$ 27,856.00$
Abramson (Phase II) Modular Demolition Total 27,856.00$ 608,191.60$
PHASE 1 SCHOOLSFC Williams ES Playground Equipment Relocation Mahlum Scairono Martinez Architects, LLC FEMA 14,250.00$ -$ 14,250.00$
Hamp's Construction, LLC FEMA 93,300.00$ -$ 93,300.00$ FC Williams ES Playground Equipment Relocation Total 107,550.00$
Crocker ES Construction Chenevert Architects, LLC FEMA -$ 1,684,163.17$ 1,684,163.17$ Mathes Brierre Architects FEMA 50,000.00$ -$ 50,000.00$ Farnsworth Group, Inc - Building Commissioning 7 New & Reno FEMA 157,600.00$ 67,731.38$ 225,331.38$ Harry Baker Smith Architects II, PLLC FEMA 9,385.00$ 2,912.00$ 12,297.00$ Hamp's Construction, LLC FEMA 55,076.84$ -$ 55,076.84$
Crocker ES Construction Total 2,026,868.39$ Crocker ES Playground Equipment Relocation Mahlum Scairono Martinez Architects, LLC FEMA 10,695.00$ -$ 10,695.00$
Hamp's Construction, LLC FEMA 70,400.00$ -$ 70,400.00$ Crocker ES Playground Equipment Relocation Total 81,095.00$
Crocker ES Demolition Chenevert Architects, LLC FEMA -$ 56,170.50$ 56,170.50$ Crocker ES Demolition Total 56,170.50$
Frantz ES Renovation/Addition Harry Baker Smith Architects II, PLLC FEMA 24,522.00$ 5,677.00$ 30,199.00$ Hamp's Construction, LLC FEMA 177,164.02$ -$ 177,164.02$
Frantz ES Renovation/Addition Total 207,363.02$ Colton ES Renovation Harry Baker Smith Architects II, PLLC FEMA 5,506.00$ 5,120.00$ 10,626.00$
Hamp's Construction, LLC FEMA 76,565.18$ -$ 76,565.18$ Colton ES Renovation Total 87,191.18$
Osborne ES Construction Fauntleroy & Latham Architects, APC FEMA 1,336,822.00$ 818,317.17$ 2,155,139.17$ Osborne ES Construction Total 2,155,139.17$
Woodson ES Construction Harry Baker Smith Architects II, PLLC FEMA 1,904.00$ 373.00$ 2,277.00$ Hamp's Construction, LLC FEMA 37,985.77$ -$ 37,985.77$
Woodson ES Construction Total 40,262.77$ Parkview ES Construction Harry Baker Smith Architects II, PLLC FEMA 2,449.00$ 1,746.00$ 4,195.00$
Hamp's Construction, LLC FEMA 82,708.19$ -$ 82,708.19$ Parkview ES Construction Total 86,903.19$
Parkview ES Playground Equipment Relocation Mahlum Scairono Martinez Architects, LLC FEMA 10,695.00$ -$ 10,695.00$ Hamp's Construction, LLC FEMA 73,800.00$ -$ 73,800.00$
Parkview ES Playground Equipment Relocation Total 84,495.00$ Little Woods ES Construction Group Novak, LLC FEMA 1,498,299.00$ 447,628.41$ 1,945,927.41$
Little Woods ES Construction Total 1,945,927.41$
BESE MONTHLY REPORTOPEN CONTRACTS as of 08/07/15
Page 2
PROJECT CONTRACTOR/ARCHITECT FUNDING SOURCE ORIGINAL CONTRACT
AMOUNTS CHANGE ORDERS/
AMENDMENTS CONTRACT AMOUNTS
Wheatley ES New Construction Farnsworth Group, Inc - Building Commissioning 5 plus 2 FEMA 222,742.00$ -$ 222,742.00$ Gibbs Construction, L.L.C. Insurance Proceeds (blank) 369,587.49$ 369,587.49$
QSCB (blank) 1,409,370.12$ 1,409,370.12$ Tax Credit 7,962,938.35$ (blank) 7,962,938.35$ Tax Credit 17,050,726.50$ (65,534.83)$ 16,985,191.67$
Personal Touch Services, Inc. 1,700.00$ Wheatley ES New Construction Total 26,951,529.63$
Wheatley ES Interpretive Display Bright Moments, LLC FEMA 4,125.00$ -$ 4,125.00$ Wheatley ES Interpretive Display Total 4,125.00$
33,834,620.26$
PHASE 2 SCHOOLSFisk-Howard ES Construction VergesRome Architects + Fanning Howey, A Joint Venture FEMA 1,582,878.00$ 340,771.44$ 1,923,649.44$
Farnsworth Group, Inc - Building Commissioning 5 plus 2 FEMA 222,742.00$ 30,848.56$ 253,590.56$ FHP Tectonics Corp. FEMA 25,580,947.45$ 406,230.81$ 25,987,178.26$
Insurance Proceeds 19,052.55$ 34,203.71$ 53,256.26$ Fisk-Howard ES Construction Total 28,217,674.52$
New High School @ Alfred Lawless Sizeler Thompson Brown Architects Project Design Group, LLC FEMA 1,981,345.00$ 39,809.00$ 2,021,154.00$ Farnsworth Group, Inc - Building Commissioning 5 plus 2 FEMA 321,880.00$ (94,990.49)$ 226,889.51$ CORE Construction Services, L.L.C. FEMA 35,728,664.00$ 261,327.66$ 35,989,991.66$
Insurance Proceeds 45,336.00$ (blank) 45,336.00$ New High School @ Alfred Lawless Total 38,283,371.17$
Dunbar ES Construction Chenevert Architects, LLC FEMA 1,437,088.00$ 481,005.88$ 1,918,093.88$ Farnsworth Group, Inc - Building Commissioning 5 plus 2 FEMA 222,742.00$ (45,060.09)$ 177,681.91$ The McDonnel Group, LLC FEMA 24,457,000.00$ (101,259.93)$ 24,355,740.07$
Insurance Proceeds 35,000.00$ 5,897.01$ 40,897.01$ Dunbar ES Construction Total 26,492,412.87$
Bradley ES Renovation/Construction Sizeler Thompson Brown Architects Project Design Group, LLC FEMA 1,582,878.00$ 42,076.05$ 1,624,954.05$ Farnsworth Group, Inc - Building Commissioning 1N + 4R FEMA 223,767.17$ -$ 223,767.17$ Landis Construction Co., LLC FEMA 25,424,627.00$ (328,415.51)$ 25,096,211.49$
Insurance Proceeds 21,373.00$ (blank) 21,373.00$ Bradley ES Renovation/Construction Total 26,966,305.71$
Drew ES Renovation Blitch Knevel Architects, Inc. FEMA 1,326,913.41$ 32,208.60$ 1,359,122.01$ Tax Credit 129,632.59$ -$ 129,632.59$
Farnsworth Group, Inc - Building Commissioning 1N + 4R FEMA 105,906.49$ (blank) 105,906.49$ Tax Credit 97,816.34$ -$ 97,816.34$
CORE Construction Services, L.L.C. FEMA 12,608,699.56$ 558,474.62$ 13,167,174.18$ Tax Credit 2,687,300.41$ 428,607.44$ 3,115,907.85$
Drew ES Renovation Total 17,975,559.46$ McDonogh 42 ES Renovation Eskew+Dumez+Ripple, APC FEMA 1,371,659.00$ 235,106.05$ 1,606,765.05$
Farnsworth Group, Inc - Building Commissioning 1N + 4R FEMA 204,763.03$ -$ 204,763.03$ CORE Construction Services, L.L.C. QSCB 8,748,579.53$ 449,764.93$ 9,198,344.46$
Tax Credit 6,750,420.47$ 268,458.05$ 7,018,878.52$ McDonogh 42 ES Renovation Total 18,028,751.06$
Ernest 'Dutch' Morial School (New - PK-8) Waggonner & Ball Architects, APC FEMA 1,151,421.08$ 1,218,164.92$ 2,369,586.00$ SSRCx, LLC - Building Commissioning 1R + 4N FEMA 111,595.00$ -$ 111,595.00$ The McDonnel Group, LLC FEMA 31,888,519.00$ -$ 31,888,519.00$
Insurance Proceeds 40,000.00$ (blank) 40,000.00$ Ernest 'Dutch' Morial School (New - PK-8) Total 34,409,700.00$
Ernest 'Dutch' Morial School - Test Pile Waggonner & Ball Architects, APC FEMA (blank) 6,999.85$ 6,999.85$ Ernest 'Dutch' Morial School - Test Pile Total 6,999.85$
Edward Livingston HS Construction Rozas-Ward/a.i.a. architects, inc. FEMA 1,058,410.78$ 676,647.28$ 1,735,058.06$ Farnsworth Group, Inc - Building Commissioning 5 plus 2 FEMA -$ 213,049.90$ 213,049.90$ Gibbs Construction, L.L.C. FEMA 31,372,558.27$ (1,413,939.66)$ 29,958,618.61$
Insurance Proceeds 157,441.73$ (70,690.40)$ 86,751.33$ Edward Livingston HS Construction Total 31,993,477.90$
BESE MONTHLY REPORTOPEN CONTRACTS as of 08/07/15
Page 3
PROJECT CONTRACTOR/ARCHITECT FUNDING SOURCE ORIGINAL CONTRACT
AMOUNTS CHANGE ORDERS/
AMENDMENTS CONTRACT AMOUNTS
Abrams ES Construction Waggonner & Ball Architects, APC FEMA 1,580,386.52$ 35,616.75$ 1,616,003.27$ SSRCx, LLC - Building Commissioning 1R + 4N FEMA 111,595.00$ -$ 111,595.00$ The McDonnel Group, LLC FEMA 31,129,481.00$ -$ 31,129,481.00$
Insurance Proceeds 20,000.00$ (blank) 20,000.00$ Abrams ES Construction Total 32,877,079.27$
Avery Alexander School (New - PK-8) Sizeler Thompson Brown Architects Project Design Group, LLC FEMA 1,297,048.60$ 241,665.57$ 1,538,714.17$ SSRCx, LLC - Building Commissioning 1R + 4N FEMA 106,680.00$ -$ 106,680.00$ CORE Construction Services, L.L.C. FEMA 21,430,000.00$ (blank) 21,430,000.00$
Insurance Proceeds 30,000.00$ (blank) 30,000.00$ Tax Credit 6,000,000.00$ (blank) 6,000,000.00$
Avery Alexander School (New - PK-8) Total 29,105,394.17$ Avery Alexander School (New - PK-8) - Environmental Professional Services Industries, Inc FEMA 65,530.00$ -$ 65,530.00$
CORE Construction Services, L.L.C. FEMA 500,000.00$ (blank) 500,000.00$ Avery Alexander School (New - PK-8) - Environmental Total 565,530.00$
Sophie B Wright HS Renovation Waggonner & Ball Architects, APC FEMA 1,637,482.20$ 514,052.06$ 2,151,534.26$ Tax Credit 210,193.80$ -$ 210,193.80$
Farnsworth Group, Inc - Building Commissioning 1N + 4R FEMA 206,111.51$ (77,988.12)$ 128,123.39$ Tax Credit 6,460.00$ -$ 6,460.00$
CORE Construction Services, L.L.C. FEMA 19,300,552.00$ -$ 19,300,552.00$ Insurance Proceeds (blank) -$ -$
Tax Credit 5,007,448.00$ (blank) 5,007,448.00$ Sophie B Wright HS Renovation Total 26,804,311.45$
John McDonogh HS Renovation VergesRome Architects, APAC FEMA 2,450,151.00$ 53,468.40$ 2,503,619.40$ Tax Credit 246,255.00$ (blank) 246,255.00$
SSRCx, LLC FEMA 153,051.00$ -$ 153,051.00$ Tax Credit 7,886.00$ (blank) 7,886.00$
John McDonogh HS Renovation Total 2,910,811.40$ John McDonogh HS Renovation - Selective Demolition VergesRome Architects, APAC FEMA (blank) 90,958.00$ 90,958.00$
Zimmer-Eschette Service II, LLC FEMA 778,400.00$ -$ 778,400.00$ John McDonogh HS Renovation - Selective Demolition Total 869,358.00$
Tubman ES Renovation Mahlum Scairono Martinez Architects, LLC FEMA 1,253,475.00$ 93.00$ 1,253,568.00$ Tax Credit 122,467.00$ (blank) 122,467.00$
SSRCx, LLC - Building Commissioning 1R + 4N FEMA 58,527.00$ -$ 58,527.00$ Tax Credit 2,951.00$ (blank) 2,951.00$
Tubman ES Renovation Total 1,437,513.00$ Tubman ES Renovation - Selective Demo Mahlum Scairono Martinez Architects, LLC FEMA (blank) 34,442.00$ 34,442.00$
Insulation Technologies, Inc FEMA 268,000.00$ -$ 268,000.00$ Tubman ES Renovation - Selective Demo Total 302,442.00$
New Orleans East HS (Abramson Site) Rozas-Ward/a.i.a. architects, inc. FEMA 1,056,051.52$ 738,853.86$ 1,794,905.38$ Farnsworth Group, Inc FEMA 236,206.39$ -$ 236,206.39$ Gibbs Construction, L.L.C. FEMA 27,768,550.95$ 266,577.74$ 28,035,128.69$
Insurance Proceeds 31,449.05$ (blank) 31,449.05$ New Orleans East HS (Abramson Site) Total 30,097,689.51$
New Booker T Washington HS - Test Pile Hewitt-Washington & Associates Architects and Planners FEMA -$ 9,050.00$ 9,050.00$ New Booker T Washington HS - Test Pile Total 9,050.00$
New Booker T Washington HS Interpretive Display Bright Moments, LLC FEMA 4,125.00$ -$ 4,125.00$ New Booker T Washington HS Interpretive Display Total 4,125.00$
New Booker T Washington HS - Environmental CB&I Government Solutions, Inc (Shaw) FEMA 91,927.00$ 28,156.00$ 120,083.00$ HRSA (blank) 9,500.00$ 9,500.00$
SEMS, Inc. FEMA 2,984,110.00$ -$ 2,984,110.00$ New Booker T Washington HS - Environmental Total 3,113,693.00$
New Booker T Washington Medium High School Farnsworth Group, Inc - Building Commissioning 7 New & Reno FEMA 239,900.00$ 1,802.94$ 241,702.94$ Hewitt-Washington & Associates Architects and Planners FEMA -$ 3,180,911.02$ 3,180,911.02$
New Booker T Washington Medium High School Total 3,422,613.96$
BESE MONTHLY REPORTOPEN CONTRACTS as of 08/07/15
Page 4
PROJECT CONTRACTOR/ARCHITECT FUNDING SOURCE ORIGINAL CONTRACT
AMOUNTS CHANGE ORDERS/
AMENDMENTS CONTRACT AMOUNTS
George W. Carver HS Construction Farnsworth Group, Inc - Building Commissioning 5 plus 2 FEMA 321,880.00$ (71,907.18)$ 249,972.82$ Broadmoor, LLC FEMA 48,883,387.00$ -$ 48,883,387.00$
HRSA 496,170.00$ (blank) 496,170.00$ George W. Carver HS Construction Total 49,629,529.82$
George W. Carver HS Interpretive Display Bright Moments, LLC FEMA 4,125.00$ -$ 4,125.00$ George W. Carver HS Interpretive Display Total 4,125.00$
CORE Construction Services, L.L.C. FEMA 30,373,000.00$ -$ 30,373,000.00$ Insurance Proceeds 30,000.00$ (blank) 30,000.00$
CSS Grant (blank) (blank)Habans ES Construction Total 30,515,014.00$
Sherwood Forest School (New - PK-8) SSRCx, LLC - Building Commissioning 1R + 4N FEMA 106,680.00$ -$ 106,680.00$ CORE Construction Services, L.L.C. FEMA 29,325,000.00$ -$ 29,325,000.00$
Insurance Proceeds 30,000.00$ (blank) 30,000.00$ Sherwood Forest School (New - PK-8) Total 29,461,680.00$
463,504,212.12$
REFURBISHMENTSFrederick A Douglass HS Refurbishment VergesRome Architects, APAC FEMA -$ 741,988.15$ 741,988.15$
FHP Tectonics Corp. FEMA 8,588,000.00$ 1,025,298.46$ 9,613,298.46$ Frederick A Douglass HS Refurbishment Total 10,355,286.61$
Village de L'est ES Refurb Duplantis Design Group, PC FEMA 48,733.00$ 184,952.00$ 233,685.00$ Dynamic Constructors, LLC CDBG 2,138,000.00$ -$ 2,138,000.00$
Village de L'est ES Refurb Total 2,371,685.00$ Albert Wicker ES Refurb SCNZ Architects, LLC FEMA 72,114.00$ (4,106.60)$ 68,007.40$
Insurance Proceeds (blank) 14,300.00$ 14,300.00$ Albert Wicker ES Refurb Total 82,307.40$
Thurgood Marshall ES Refurb Hamilton Anderson Associates FEMA 70,601.00$ 16,420.80$ 87,021.80$ Mahlum Scairono Martinez Architects, LLC FEMA 166,314.00$ -$ 166,314.00$
Thurgood Marshall ES Refurb Total 253,335.80$ Henry C. Schaumburg ES Refurb N-Y Associates, Inc. FEMA 15,193.00$ 26,603.19$ 41,796.19$
Hernandez Consulting, LLC FEMA 273,000.00$ 36,404.41$ 309,404.41$ Henry C. Schaumburg ES Refurb Total 351,200.60$
Edgar P. Harney ES Refurb Hamilton Anderson Associates FEMA 27,131.00$ 16,578.90$ 43,709.90$ VergesRome Architects, APAC FEMA -$ 38,000.00$ 38,000.00$ Hamp's Construction, LLC FEMA 649,600.00$ -$ 649,600.00$
Edgar P. Harney ES Refurb Total 731,309.90$ Julius Rosenwald ES Refurb Byron J. Stewart & Associates, APC FEMA 105,034.00$ 78,597.00$ 183,631.00$
One Construction, LLC FEMA 1,779,000.00$ -$ 1,779,000.00$ Julius Rosenwald ES Refurb Total 1,962,631.00$
Sylvanie Williams ES Refurb N-Y Associates, Inc. FEMA 48,754.00$ 79,997.43$ 128,751.43$ Hamp's Construction, LLC FEMA 1,145,000.00$ -$ 1,145,000.00$
Sylvanie Williams ES Refurb Total 1,273,751.43$ Agnes L. Bauduit ES Refurb Duplantis Design Group, PC FEMA 301,824.00$ (5,211.40)$ 296,612.60$
Agnes L. Bauduit ES Refurb Total 296,612.60$ Laurel ES Refurb Mahlum Scairono Martinez Architects, LLC FEMA 458,942.00$ 71,083.00$ 530,025.00$
Laurel ES Refurb Total 530,025.00$ McDonogh 28 ES Refurb SCNZ Architects, LLC FEMA 199,248.00$ 94,149.20$ 293,397.20$
Tuna Construction, LLC FEMA 1,975,000.00$ -$ 1,975,000.00$ McDonogh 28 ES Refurb Total 2,268,397.20$
Henry Allen ES Refurb N-Y Associates, Inc. FEMA 92,546.00$ 124,056.81$ 216,602.81$ Tuna Construction, LLC FEMA 1,625,000.00$ -$ 1,625,000.00$
Henry Allen ES Refurb Total 1,841,602.81$ Andrew Jackson ES Refurb N-Y Associates, Inc. FEMA 118,872.00$ 190,255.51$ 309,127.51$
Andrew Jackson ES Refurb Total 309,127.51$ A.D. Crossman ES Refurb One Construction, LLC FEMA 239,000.00$ (1,925.00)$ 237,075.00$
A.D. Crossman ES Refurb Total 237,075.00$
BESE MONTHLY REPORTOPEN CONTRACTS as of 08/07/15
Page 5
PROJECT CONTRACTOR/ARCHITECT FUNDING SOURCE ORIGINAL CONTRACT
AMOUNTS CHANGE ORDERS/
AMENDMENTS CONTRACT AMOUNTS
Dwight D Eisenhower ES Refurb Harry Baker Smith Architects II, PLLC FEMA 154,483.00$ 1,542.90$ 156,025.90$ Blanchard Mechanical Contractors, Inc. FEMA 1,518,000.00$ -$ 1,518,000.00$
Dwight D Eisenhower ES Refurb Total 1,674,025.90$ Gentilly Terrace ES Refurb Byron J. Stewart & Associates, APC FEMA 137,099.00$ (34,853.00)$ 102,246.00$
One Construction, LLC FEMA 993,000.00$ -$ 993,000.00$ Gentilly Terrace ES Refurb Total 1,095,246.00$
Sarah T. Reed HS Refurb Byron J. Stewart & Associates, APC FEMA 105,514.00$ 25,687.55$ 131,201.55$ Tuna Construction, LLC FEMA 405,000.00$ -$ 405,000.00$
Sarah T. Reed HS Refurb Total 536,201.55$ Green ES Refurb VergesRome Architects, APAC FEMA 420,497.00$ 162,929.50$ 583,426.50$
Hernandez Consulting, LLC FEMA 6,170,000.00$ -$ 6,170,000.00$ Green ES Refurb Total 6,753,426.50$
Walter L Cohen Food Service N-Y Associates, Inc. FEMA 27,456.00$ 25,171.66$ 52,627.66$ Walter L Cohen Food Service Total 52,627.66$
Banneker ES Food Service SCNZ Architects, LLC FEMA 29,528.00$ 7,872.00$ 37,400.00$ Banneker ES Food Service Total 37,400.00$
McDonogh 32 ES Refurb Byron J. Stewart & Associates, APC FEMA 296,940.00$ 5,280.00$ 302,220.00$ McDonogh 32 ES Refurb Total 302,220.00$
Live Oak ES Refurbishment VergesRome Architects, APAC FEMA 265,287.00$ 590,109.00$ 855,396.00$ Live Oak ES Refurbishment Total 855,396.00$
Lafayette ES Refurb N-Y Associates, Inc. FEMA 324,260.00$ 69,709.60$ 393,969.60$ Lafayette ES Refurb Total 393,969.60$
Gaudet ES Refurb SCNZ Architects, LLC FEMA 232,753.00$ 11,660.00$ 244,413.00$ Gaudet ES Refurb Total 244,413.00$
Fischer ES Refurb SCNZ Architects, LLC FEMA 204,015.00$ 11,396.00$ 215,411.00$ Fischer ES Refurb Total 215,411.00$
Johnson ES Refurb SCNZ Architects, LLC FEMA 155,901.00$ 12,056.00$ 167,957.00$ Johnson ES Refurb Total 167,957.00$
A.D. Crossman Food Services SCNZ Architects, LLC FEMA 17,519.00$ 4,326.50$ 21,845.50$ A.D. Crossman Food Services Total 21,845.50$
Dwight D Eisenhower ES Food Services N-Y Associates, Inc. FEMA 32,445.00$ (5,387.53)$ 27,057.47$ C.D.W. Services, LLC FEMA 174,092.00$ -$ 174,092.00$
Dwight D Eisenhower ES Food Services Total 201,149.47$ Andrew Jackson ES Food Services N-Y Associates, Inc. FEMA 19,979.00$ 2,691.67$ 22,670.67$
Andrew Jackson ES Food Services Total 22,670.67$ Martin Luther King Jr. ES Food Services N-Y Associates, Inc. FEMA 11,987.00$ 5,170.48$ 17,157.48$
C.D.W. Services, LLC FEMA 48,271.00$ -$ 48,271.00$ Martin Luther King Jr. ES Food Services Total 65,428.48$
Gentilly Terrace ES Food Services SCNZ Architects, LLC FEMA 19,519.00$ (5,906.40)$ 13,612.60$ Gentilly Terrace ES Food Services Total 13,612.60$
McDonogh 28 ES Food Services SCNZ Architects, LLC FEMA 20,519.00$ 4,300.00$ 24,819.00$ McDonogh 28 ES Food Services Total 24,819.00$
Henry Allen ES Food Services N-Y Associates, Inc. FEMA 10,983.00$ 11,332.49$ 22,315.49$ C.D.W. Services, LLC FEMA 176,144.00$ -$ 176,144.00$
Henry Allen ES Food Services Total 198,459.49$ Sarah T. Reed HS Food Services N-Y Associates, Inc. FEMA 13,985.00$ 3,959.48$ 17,944.48$
C.D.W. Services, LLC FEMA 160,493.00$ -$ 160,493.00$ Sarah T. Reed HS Food Services Total 178,437.48$
Albert Wicker ES Food Services SCNZ Architects, LLC FEMA 26,529.00$ (1,200.00)$ 25,329.00$ Albert Wicker ES Food Services Total 25,329.00$
Frederick A Douglass HS New Science Lab VergesRome Architects, APAC FEMA -$ 156,326.00$ 156,326.00$ One Construction, LLC FEMA 1,394,000.00$ -$ 1,394,000.00$
Frederick A Douglass HS New Science Lab Total 1,550,326.00$ 37,494,719.76$
BESE MONTHLY REPORTOPEN CONTRACTS as of 08/07/15
Page 6
PROJECT CONTRACTOR/ARCHITECT FUNDING SOURCE ORIGINAL CONTRACT
AMOUNTS CHANGE ORDERS/
AMENDMENTS CONTRACT AMOUNTS
MOTHBALLINGAndrew J Bell Shoring Main Classroom Building VergesRome Architects, APAC FEMA -$ 106,095.00$ 106,095.00$
Abry Brothers, Inc. FEMA 910,000.00$ 1,043,425.00$ 1,953,425.00$ Andrew J Bell Shoring Main Classroom Building Total 2,059,520.00$
Andrew J Bell Safe & Secure - Mothballing VergesRome Architects, APAC FEMA 92,568.00$ 157,224.00$ 249,792.00$ C.D.W. Services, LLC FEMA 2,058,000.00$ 696,850.81$ 2,754,850.81$
Andrew J Bell Safe & Secure - Mothballing Total 3,004,642.81$ 5,064,162.81$
BUILDING AUTOMATION SYSTEMBuilding Automation System - Banneker Synergy Building Solutions FEMA (blank) 19,502.05$ 19,502.05$
Building Automation System - Banneker Total 19,502.05$ Building Automation System - Bienville Synergy Building Solutions FEMA 18,238.90$ 522.32$ 18,761.22$
Building Automation System - Bienville Total 18,761.22$ Building Automation System - Colton Synergy Building Solutions FEMA 29,127.41$ -$ 29,127.41$
Building Automation System - Colton Total 29,127.41$ Building Automation System - Craig ES Synergy Building Solutions FEMA 56,716.33$ 7,418.90$ 64,135.23$
Building Automation System - Craig ES Total 64,135.23$ Building Automation System - Crocker Synergy Building Solutions FEMA 16,515.03$ -$ 16,515.03$
Building Automation System - Crocker Total 16,515.03$ Building Automation System - FC Williams Synergy Building Solutions FEMA 17,516.91$ 522.32$ 18,039.23$
Building Automation System - FC Williams Total 18,039.23$ Building Automation System - Frantz Synergy Building Solutions FEMA 17,487.49$ 522.32$ 18,009.81$
Building Automation System - Frantz Total 18,009.81$ Building Automation System - L.B. Landry HS Synergy Building Solutions FEMA 50,189.62$ 522.32$ 50,711.94$
Building Automation System - L.B. Landry HS Total 50,711.94$ Building Automation System - Lake Area HS Synergy Building Solutions FEMA 48,450.83$ 2,343.20$ 50,794.03$
Building Automation System - Lake Area HS Total 50,794.03$ Building Automation System - Langston Hughes ES Synergy Building Solutions FEMA 44,855.18$ 522.32$ 45,377.50$
Building Automation System - Langston Hughes ES Total 45,377.50$ Building Automation System - Osborne Synergy Building Solutions FEMA 17,900.05$ -$ 17,900.05$
Building Automation System - Osborne Total 17,900.05$ Building Automation System - Parkview Synergy Building Solutions FEMA 19,063.99$ -$ 19,063.99$
Building Automation System - Parkview Total 19,063.99$ Building Automation System - Sarah T Reed Synergy Building Solutions FEMA -$ 12,550.12$ 12,550.12$
Building Automation System - Sarah T Reed Total 12,550.12$ Building Automation System - Sylvanie Williams Synergy Building Solutions FEMA -$ 11,597.53$ 11,597.53$
Building Automation System - Sylvanie Williams Total 11,597.53$ Building Automation System - Wilson ES Synergy Building Solutions FEMA 44,958.72$ 7,941.22$ 52,899.94$
Building Automation System - Wilson ES Total 52,899.94$ Building Automation System - Woodson Synergy Building Solutions FEMA 17,355.04$ -$ 17,355.04$
Building Automation System - Woodson Total 17,355.04$ Building Automation System - AD Crossman Synergy Building Solutions FEMA (blank) 18,624.52$ 18,624.52$
Building Automation System - AD Crossman Total 18,624.52$ Building Automation System - Cohen Synergy Building Solutions FEMA (blank) 13,252.58$ 13,252.58$
Building Automation System - Cohen Total 13,252.58$ Building Automation System - Little Woods Synergy Building Solutions FEMA (blank) 24,064.90$ 24,064.90$
Building Automation System - Little Woods Total 24,064.90$ Building Automation System - Wicker Synergy Building Solutions FEMA (blank) 13,273.32$ 13,273.32$
Building Automation System - Wicker Total 13,273.32$ 531,555.44$
BESE MONTHLY REPORTOPEN CONTRACTS as of 08/07/15
Page 7
PROJECT CONTRACTOR/ARCHITECT FUNDING SOURCE ORIGINAL CONTRACT
AMOUNTS CHANGE ORDERS/
AMENDMENTS CONTRACT AMOUNTS
OTHER PROFESSIONAL SERVICESPM/CM Jacobs Project Management Company/CSRS Consortium FEMA 23,590,758.00$ 1,517,497.81$ 25,108,255.81$
Insurance Proceeds (blank) 267,759.19$ 267,759.19$ PM/CM Total 25,376,015.00$
Consulting Services - Building Commissioning GCE Services Insurance Proceeds 50,000.00$ -$ 50,000.00$ Consulting Services - Building Commissioning Total 50,000.00$
Wilson ES Warranty Oversight HMS Architects, apc Insurance Proceeds 50,000.00$ -$ 50,000.00$ Wilson ES Warranty Oversight Total 50,000.00$
25,476,015.00$ GRAND TOTAL 566,513,476.99$
OPSB OPEN CONTRACTSas of
08/07/2015
Page 1
PROJECT CONTRACTOR/ARCHITECT ORIGINAL CONTRACT
AMOUNTS CHANGE ORDERS/
AMENDMENTS CONTRACT
AMOUNTS
DEMOLITIONAbatement & Demo of JoEllen Smith Medical Center VergesRome Architects, APAC 253,481.00$ 57,414.00$ 310,895.00$
Abatement & Demo of JoEllen Smith Medical Center Total $ 310,895.00 310,895.00$
CONSTRUCTION/RENOVATIONAbatement & Demo of JoEllen Smith Medical Center VergesRome Architects, APAC 253,481.00$ 57,414.00$ 310,895.00$
Abatement & Demo of JoEllen Smith Medical Center Total 310,895.00$ New McDonogh 35 High School (Phillips Waters Site) Sizeler Thompson Brown Architects Project Design Group, LLC 3,279,219.00$ 1,105,992.96$ 4,385,211.96$
Farnsworth Group, Inc 321,880.00$ 13,448.00$ 335,328.00$ Citadel Builders, LLC 54,984,000.00$ 911,086.68$ 55,895,086.68$
New McDonogh 35 High School (Phillips Waters Site) Total 60,615,626.64$ New McDonogh 35 High School (Phillips Waters Site) Site Remediation Sizeler Thompson Brown Architects Project Design Group, LLC -$ 1,691,177.70$ 1,691,177.70$
New McDonogh 35 High School (Phillips Waters Site) Site Remediation Total 1,691,177.70$ Audubon School Reno/Addition Blitch Knevel Architects 995,406.90$ 1,001,800.14$ 1,997,207.04$
Farnsworth Group, Inc 162,212.00$ 15,118.60$ 177,330.60$ FHP Techtonics Corporation 12,415,000.00$ 480,031.51$ 12,895,031.51$
Audubon School Reno/Addition Total 15,069,569.15$ Audubon School Reno/Addition Interpretive Display Bright Moments, LLC 4,125.00$ -$ 4,125.00$
Audubon School Reno/Addition Interpretive Display Total 4,125.00$ Alice Harte Elementary WDG Architects Engineers 1,513,534.00$ 770,434.55$ 2,283,968.55$
Farnsworth Group, Inc 222,742.00$ 14,019.44$ 236,761.44$ Woodrow Wilson Construction 18,229,554.00$ -$ 18,229,554.00$
8,490,446.00$ 86,995.50$ 8,577,441.50$ Alice Harte Elementary Total 29,327,725.49$
McMain New Gym & Covered Walkway Jahncke & Burns Architects, LLC 972,951.50$ 14,225.48$ 987,176.98$ Farnsworth Group, Inc -$ 132,434.00$ 132,434.00$ Ellis Construction, Inc. 9,497,800.00$ 997,024.48$ 10,494,824.48$
McMain New Gym & Covered Walkway Total 11,614,435.46$ McMain Exterior Stabilization Jahncke & Burns Architects, LLC -$ 669,013.28$ 669,013.28$
McMain Exterior Stabilization Total 669,013.28$ New PK-8 at Kenilworth Park (Curran Site) Mathes Brierre Architects 1,587,671.03$ 419,724.12$ 2,007,395.15$
Farnsworth Group, Inc -$ 15,511.00$ 15,511.00$ Woodrow Wilson Construction 22,476,000.00$ 226,332.01$ 22,702,332.01$
New PK-8 at Kenilworth Park (Curran Site) Total 24,725,238.16$ New Lake Forest School @ Greater St Stephens Site Imre Hegedus & Associated Architects 1,382,303.00$ 875,288.50$ 2,257,591.50$
Farnsworth Group, Inc 264,670.51$ -$ 264,670.51$ The McDonnel Group, LLC 34,075,000.00$ 510,495.24$ 34,585,495.24$
New Lake Forest School @ Greater St Stephens Site Total 37,107,757.25$ Nelson Elementary School Refurbishment Harry Baker Smith II, PLLC 173,888.00$ 2,420.00$ 176,308.00$
Blanchard Mechanical Contractors, Inc. 1,480,000.00$ -$ 1,480,000.00$ Nelson Elementary School Refurbishment Total 1,656,308.00$
182,791,871.13$
OPSB OPEN CONTRACTSas of
08/07/2015
Page 2
PROJECT CONTRACTOR/ARCHITECT ORIGINAL CONTRACT
AMOUNTS CHANGE ORDERS/
AMENDMENTS CONTRACT
AMOUNTS
REFURBS & STABILIZATIONS - VARIOUSLusher Elementary School Meyer Engineers, LTD 139,948.00$ 404,453.00$ 544,401.00$
Dynamic Constructors 4,342,000.00$ -$ 4,342,000.00$ Lusher Elementary School Total 4,886,401.00$
McDonogh 35 HS Stabilization Chenevert Architects, LLC 32,372.00$ 24,299.20$ 56,671.20$ McDonogh 35 HS Stabilization Total 56,671.20$
Warren Easton HS Stabilization Chenevert Architects, LLC 32,372.00$ 254,548.81$ 286,920.81$ Tuna Construction, LLC 2,407,000.00$ 69,453.66$ 2,476,453.66$
Warren Easton HS Stabilization Total 2,763,374.47$ Audubon Charter School (Extension ES & MS) Stabilization Chenevert Architects, LLC 32,372.00$ 510.53$ 32,882.53$
Audubon Charter School (Extension ES & MS) Stabilization Total 32,882.53$ Lusher (Fortier) High School Refurbishment SCNZ Architects, LLC 1,057,864.00$ 282,432.80$ 1,340,296.80$
CORE Construction Services, LLC 14,552,000.00$ 952,627.46$ 15,504,627.46$ Lusher (Fortier) High School Refurbishment Total 16,844,924.26$
McDonogh 7 ES Stabilization Perez, APC 106,429.00$ -$ 106,429.00$ McDonogh 7 ES Stabilization Total 106,429.00$
Timbers III - IT Room Relocation N-Y Associates, Inc 4,519.00$ 9,252.87$ 13,771.87$ HUDA, LLC 93,000.00$ -$ 93,000.00$
Timbers III - IT Room Relocation Total 106,771.87$ Timbers III - Building Controls N-Y Associates, Inc 3,832.00$ -$ 3,832.00$
Timbers III - Building Controls Total 3,832.00$ Ben Franklin ES Renovation N-Y Associates, Inc 186,264.00$ 32,689.20$ 218,953.20$
Ben Franklin ES Renovation Total 218,953.20$ McMain SS Roof Replacement Duplantis Design Group 366,425.00$ -$ 366,425.00$
McMain SS Roof Replacement Total 366,425.00$ McMain School Maintenace Upgrades Duplantis Design Group 259,165.00$ -$ 259,165.00$
McMain School Maintenace Upgrades Total 259,165.00$ Bethune & Tureaud Refurb Chenevert Architects, LLC 284,172.00$ 3,821.84$ 287,993.84$
19,270.00$ 259.16$ 19,529.16$ 59,899.00$ 4,081.00$ 63,980.00$
Bethune & Tureaud Refurb Total 371,503.00$ 26,017,332.53$
OTHER PROFESSIONAL SERVICESProgram Management/Construction Management Jacobs Project Management Company/CSRS Consortium 8,050,817.00$ 1,217,982.00$ 9,268,799.00$
9,268,799.00$
GRAND TOTAL 218,388,897.66$