Electromagnetic and Magnetic Surveyfor

DOME EXPLORATION (CANADA) LIMITED

onPROJECT 242

Corless Township, Ontario

(To Accompany Maps 85-20, A to D85-21, A to E)

March 20, 1985

010

JUi j { ]

LAHUS

Page 2: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

l l l l l l l l l l l l l l l l l l l

- l -

INTRODUCTION

An electromagnetic and magnetic survey was carried out

for Dome Exploration (Canada) Limited on Project 242, Corless

Township, Ontario during January and February, 1985*

The property consists of 71 unpatented raining claims

numbered as follows:

KRL 775404 to KRL 775412 inclusive*

w 775434 to " 775442 " *

" 775485 to " 775496 " *

11 788763 to " 788788 "

" 793694 to " 793708 "

The claims are located in the northeast corner of

Corless Township(N.T.S. 52-N-2), approximately 70 km E/NE of

Red Lake, Ontario. Access was made by fixed wing aircraft from

Red Lake, Ontario.

This report covers the magnetic survey which was carried

out on the new claims to the north and south of the previous

work and the electromagnetic survey which was carried out over

the eastern portion of the entire claim block.

The purpose of the survey was to locate sub-surface geo-

electrical conductors and outline areas favourable for gold

mineralization.

Numerous conductors were located. The accompanying maps

show the area surveyed and the results obtained.

A technical data sheet is appended to this report.

* indicates the claims which have had a magnetic survey performed in January, 1984 (Geosearch report on Project 242, Corless Twp.,Maps 84-111 E b W - May 18, 1984)

Page 3: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

l l l l l l l l l l l l l l l l l l l

2,.-

IDD AND INTERPRETATION OP RESULTS - ELECTROMAGNETIC SURVEY

Op era t in/j^ Principle ; When an electrical conductor is subjected to a

primary alternating field, a secondary current is induced in the

conductor. This current produces a secondary alternating field

which together with the primary field produces a resultant field of

different amplitude and phase from the applied primary field* These

differences may indicate the presence of a conductor,

Op erat ion t The battery-powered transmitter sets up a primary field

while the in-phase and out-of-phase (quadrature) components of the

complex secondary vertical field are detected by a receiving coil

and measured by means of a compensator-amplifier unit located a fixed

distance from the transmitter unit. These parameters are expressed

in percentage of the primary field*

Conduc to r Recognition t The typical curve over a steeply-dipping conductor

shows a low (negative - greater than 5?0 over the centre of the

conductor, flanked by positive readings on both sides of the conductor.

Both the in-phase and the out-of-phase components usually produce

the same general shape of curve. An asymmetrical curve may indicate

one or more of the following conditions: (l) more than one conductor

(2) variable conductive overburden (3) a shallow dipping conductor.

Conductivi, ty Determination; The ratio of the amplitudes of the two

measured components, in-phase to out-of-phase, is directly proportional

to the conductivity of the conductor, in areas of non-conductive

overburden.

Conduc tor Location; For a single conductor, both component readings are

normally zero when either the transmitting or receiving coil is

directly above the conductor. The location of the conductor is cal

culated by adding one-half the distance between the transmitting coil

and the receiving coil (coil interval) to the co-ordinate at which

the readings are zero. A unique solution is generally not possible

in the case of multiple conductors spaced less than one coil interval

apart. This results in the possibility that an apparently wide

conductor may actually consist of two or more narrow conductors.

Pejrth of Penetration; The maximum depth of penetration for detection of

a steeply-dipping conductor in a geo-electrically neutral background

is about 0.7 times the coil interval. Over horizontal or flatly-

dipping conductors, penetration of up to 1.5 times the coil interval

is possible.

Page 4: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

ll l

RESULTS

Magnetic Survey

The magnetic survey \\ras "tied" to the previous magnetic

l survey to maintain continuity. The magnetic background is quite

flat averaging a value of 60,300 gammas. There are a number of

" discontinuous features striking roughly N/NW with magnetic relief

B ranging from 600 gammas below to 7500 gammas above background.

From Line 18N, 12EOO to Line ION, 14E50 (Map 85-21A) there

l is a broad (250 metres) feature with magnetic readings up to 2500

m gammas above background. This N/NW striking zone appears to out

line a separate lithologic unit, possibly a mafic intrusive.

l There is a narrower magnetic band from Line 23N, 7^00 to

g Line 13N, 6E75 (Map 85-21A) striking roughly N/NW with a magnetic

high of 7500 gammas above background. There is an offset between

l Lines 17N and l6N indicating a dextral fault structure. This

faulting is also observed in the electromagnetic, conductors (Map

l 85-20A) associated with this magnetic feature (conductors #h t 5 1 6

of this report). The conductors indicate a second offset between

Lines 17N and 18N. This evidence of multiple faulting agrees with

j the published geology of the area (ODM Preliminary Map P63^).

On Line 21N, 5EOO (Map 85-21A) there is a feature of short

l strike length with readings up to 4000 gammas above background in

m close proximity to an area with readings of 600 gammas below back

ground. This feature, indicative of areas with very shallow over-

I burden, is possibly caused by an inversion of the remanent magneti

zation of the magnetite which is thought to be present. There is

Page 5: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

ll

a weak and indefinite conductor (Map 85-20A) associated with this

l magnetic feature (conductors #2 and #3)* The preliminary map

m referenced above indicates diamond drilling for base metals was

performed on this and the previous feature.

l Prom Line 4S, 13W25 to Line 13S, 9W50 there is a N/NW

striking narrow (up to 100 metres) magnetic feature with a high

value of 1000 gammas above background. The magnetic contours show

M a slight curvature at Line 7S. There are two associated conductors

with the feature (conductors #12, 13* Map 85-20C) which show an

l offset between Lines "JS and 8S. With the degree of faulting observ

ed in the area, it is likely that a fault exists at Line 7S of this

B feature. The depth to the centre of the magnetic source is calcu-

M lated to be 17 metres on Line 8S and 11 metres on Line 7S.

From Line 18S, 21VOO to Line 21S, 16WOO (Map 85-21E) there

l exists a very narrow (50 to 75 metres) magnetic feature striking

j roughly E-W with a high value of 2000 gammas above background.

It is suggested that this is a different rock type, possibly mafic

l volcanics. Depth to the centre of this magnetic body is calculated

to be 15 metres.

ltt E l e c t r omagne t i c Survey

The 1^ conductors which were located are listed in the

l following table. The anomalous quadrature response of the high

frequency over the lake areas is attributed to conductive lake

l

l

bottom sediments and not to bedrock conductors.

Page 6: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

TABLE OF* CONDUCTORS

#

1

2

3

k

5

6

7

8

9

10

11

12

13

111

Map

85-20A

85-20A

85-20A

85-20A

85--20A

85-20A and C

85-20A

85-20C

85-20C

85-20C

85--20C

85-20C

85-20C

85-20D

Location

L23N, L18N,

L21N,

L2JN,

L19N, L18N,

L17N,

L16N, LI IN,

L14N, L13N,

L6N,

L5N, L2N,

L3N,

L3S,

L5S, L?S,

L8S, L9S,

L16S, L1?S,

7E02 to 7E80

^E60

5E10

6E80 to 7E10

6E88

6E25 to 7E15

16E75 to 6E95

5E92

7E20 to 7E38

5E28

5EO/J

^E15 to 4E15

3E75 to 'JE70

2E20 to 1E75

Maximum Highest Apparent I. P. /O .P Width Low Freq

min.

25 m

min.

min.

min.

18 m

min e

min.

min.

min e

min*

min.

min 0

min.

L23N 3

1.5

2

L19N k

3

L15N 7

L13N 1*5

2

L5N 2

0.5

1

L6s1.5

L8S 1

LI 6S0.5

Mag. High . Correl- Mag. . a t ion (gammas)

yes

yes

yes

yes

yes

yes

yes

yes

yes

no

yes

yes

yes

yes

5000

1600

*tooo

7000

500

5000

500

500

500

3000

t

2500

1000

800

Remarks ^B

Strong conductor coincident with the magnetic high

Short strike length - weak conductor on a magnetic high

Indefinite conductor - possibly part of zone of #2

Strong conductor coincident with high mag.

Strong conductor - flanking mag. high

Strong conductor follows magnetic structure

Follows magnetic structure, parallels #6

Coincident with weakly magnetic feature

It 11 tt M

Weak indefinite conductor

Weak conductor - r. trike direc tion may be subparallel to line direction

Conductor follows mag, trend

Conductor follows magnetics - possible fault between conduc tors #12 and 13

Very indefinite conductor, crosses mag. structure - possibly causedby conductive overburden

Page 7: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

l l l l l l l l l l l l l l l l l l l

. 5 -

RIDCOMMENDATIONS

The geophysical work should be used in conjunction with

the known geology to determine the location of drill holes.

Recommended drill locations based on magnetic setting,

conductivity and apparent width are as follows:

Map #

85-20C

-20C

-20A

-20A

-20A

-20A

-20A

LJR/mm

Location

L6S, 4E07

L9S, 4E15

L14N, 6E?4

L15N, 6E25

L17N, 6E87,

L18N, 7E12 and

L21N,and 5E10

I.P./O.P. Ratio (Low Freq.)

Apparent Width

1.511"7

35

lj1l1l

min.

min.

min.

20 m

min.

min.

1.5 J l min.

Geosearch Consultants Limited

Louis J* Racic, B.Se.

Geophysicist

Page 8: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

ly,iwi ii

Ministry of Natural Resources FUc.

OntarioGEOPHYSICAL - GEOLOGICAL - GEOCHEMICAL

TECHNICAL DATA STATEMENT .^^/ ;v;,P*oJe.cr 242

TO BE ATTACHED AS AN APPENDIX TO TECHNICAL REPORT sFACTS SHOWN HERE NEED NOT BE REPEATED IN REPORT .

TECHNICAL REPORT MUST CONTAIN INTERPRETATION, CONCLUSIONS ETC.

Type of Survey (s) Magnetic and Electromagnetic ----i-—-.Township or Area Cmrl psa Twp. ______ , ——.————-.— UllClaim Hnldcr(s) Dome Exploration (Canada) Limited

Consultants Ltd oSurvey f-nmpany

Author of Report I.mH K

Address of Author 360 - 111 Queen St.. E. 6 , TorontoCovering Dates of Snrwy .T an. 11/^5 - Ma-r. 20/85

((incoming to office)

Total Miles of Line C.iit ^5 km

1

SPECIAL PROVISIONSCREDITS REQUESTED

ENTER 40 days (includes line cutting) for first survey. ;ENTER 20 days for each additional survey using same grid.

Geophysical -Electromagnetic.—Magnetometer

; — ftadiomrtric-.,ll--rtth^r

ficnlngiral., ,,.. .....^

O'-rtrh^rriica'

DAYS per claim

20

40; ,, ' ' \ '. ' -

AIRBORNE CREDITS (Special proviiion credit! do not apply to airborne iurvey*)

Magnetometer. .Electromagnetic. . Radiometric(enter day* per claim)

DATE: March 20 f.Autho?^nKeport or Agent

Res. Geol.. . Qualifications.Previous Surveys

File No. Type Date Claim Holder

.o;.MINING CLAIMS TRAVERSED

List numerically

Claims covered by Le Survey t..... , -, j****************iW*********k*****t****

(prefix) . (number)

KRL 788763 to 788788• ••••••••••••••^•••/•*4r^***c*r*i*******t*4**T*********4

KHL 793694 tp 793708• •••••••••**f*r* W* **^t**fj**r*7******^* P*'* ** *T* ••••••••t

•*v*iv*WiTfiii w**t?^***** SrfT*K*T***iv*j******* ************Electromagnetic Survey:

"'ic'RL""775464 to 775410.........,..7.^^.viAvli...Lp^t^.v4t^-tUvl; ^v,: 775412 ( ")............77^.34...(........Ji.).-"*" -775491 to 775493

•••••••••4

788766 to 7.88768 ''"'""'''"'""*'""

788775"

793697 ..7.9.369..a...(.........'L......).793699 to 793708

TOTAL rr.ATMsMag 41/EM

Page 9: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

GEOPHYSICAL TECHNICAL DATAProject ZkZ

GROUND SURVEYS — If more than one survey, specify data for each type of survey

of Stations.

Station interval——

Profile scale .————

Contour interval.

252? EM

25 m

1 Cm tO 20^

.Number of Readings Mago 3008 EM 185*1

Xine spacing_____3-OQ M.-—..———.————

100 gammas

1

1

1

1

1

1

1

1

1

1

Instrument Geometrics G-826- .- J- gamma(^ Accuracy — Scale constant ——

*3 Diurnal correction method Base station recorder with readings at 30 second intervals9S Base Station check-in interval (hours)_______________________;---————--——...—-——--—————-..——

"XO

SO

H

O;

2

1^ < t^i ^! H)

lil^B'

I l

Rase Station location and value , OEOO at ONOO 6 0, 321 gammas

Instrument Apex Maxmin II

Coil configuration co-planar

Coil separation ___100 m.-—-——

CD Fixed transmitter Hz and 1777 Hz

D Shoot back,.E In line Parallel line

Accuracy ——.-——.Method:

Frequen cy .————(specify V.L.F. station)

Parameters measured In-phase and quadrature components of the vertical secondaryfield

Instrument _________________________________________________________________

Scale constant

Corrections made.

Base station value and location .

Elevation accuracy.

Instrument __________

Method |~~l Time Domain

Parameters — On time ..-——

- Off time ——

— Delay time ———.

— Integration time.

O Frequency Domain

_ Frequency _____

_ Range ————.-——

u3i Power.

Electrode

Electrode spacing .

Type of electrode

Page 10: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

Onlano

Ministry otNatural Pfltces

Report ot Work (Geophysical, Geological, Geochemical and Expenditures) S2N02NW0037 2 .8270 CORLESS

PROJECT .,~. ~^Mining Act

900in the "Expend. Days Cr." columns.

— Do not use shaded areas below.Type of Survey(s)

ElectromagneticClaim Holder(s)

Dome Exploration (Canada)Address

Box 270, 1 First CanadianSurvey Company

Geosearch Consultants LtdName and Address of Author (of Geo-Technical report)

Louis Racic, Suite 360 ~

Limited

Place, TorontoDate of Sur

Township or Area

Corless Twp.

: Prospector's Licence No.

A 21304

, Ont. M5X 1H1vey (from A to) Total Miles of

111 Queen St. E., Toronto, Ont. M5C

. . .

line Cut

1S2Credits Requested per Each Claim in Columns at rightSpecial Provisions

For first survey:Enter 40 days. (This includes line cutting)

For each additional survey: using the same grid:

Enter 20 days (for each)

Man Days

Complete reverse side and enter total (s) here

Oeophysleal

- Electromagnetic

- Magnetometer

- Radiometric

-Other

Geological

Geochemical

Geophysical

- Electromagnetic

- Magnetometer

Note: Special htejjsiont credits di to Airborne

Expenditures (excludes power stripping)

Day* per Claim

20

Days per Claim

Mining Claims Traversed (List in numerical sequence)

Type of Work Performed

Performed on Claim(t)

Calculation of Expenditure Days Credits

Total Expenditures

S -3- |15

Total Days Credits

E

Inttructions Total Days Credits may be apportioned at the claim holder's choice. Enter number of days credits per claim selected in columns at right.

Mining ClaimPrefix l Number

KRL 793699

p?~*

793705793706793707793708

RECE

MINING LAW

Expend. Days Cr.

VE

Total number of mining claims covered by this report of work.

33

D

ION

DeteJuly 9, 1985

Recorded Holder or Agent (Signature)

Certification Verifying Report of WoriK

For Office Use OnlyTotal DaysCr. Recorded

D aja Recorded

pate Approved as RecordedW^^U^f

Branch Director

1 hereby certify that t have a personal and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report is true.

Name and Postal Addreu of Person Certifying

Louis Racic, Suite 360 -- 111 Queen St.

136? 'S 1,91

E., Toronto, Ont. y^C 1S2Date CertifiedMarch 20, 1985 jttyfSf/-' fifjft-- r

Page 11: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

Ministry of ir a l iurces

Report of Work f * V(Geophysical, Geological.

•J s- Instructions: Please type o r print.- If number of mining claims traversed

exceeds space on this form, attach a list.Ontario ^ ^eocnemicai ana expenditures; PROJECT NO. 242

Vv (PlCMETTtType of Survey!*^ ^~*

MagneticClaim Holder(s)

Dome Exploration (Canada)Address

Box 270, 1 First CanadianSurvey Company

Geosearch Consultants Ltd.Name and Address of Author (of Geo-Technical report)

Louis Racic. Suite 360 - 1

Mining Act

Limited

Place, Toronto,

mote: — uniy aays creans caicuiatea m tne "Expenditures" section may be entered n the "Expend. Days Cr." columns.

— Do not use shaded afeas below.Township or Area

Corless Twp.Prospector's Licence No.

A 21304

Ont. M5X 1H1Date of Survey (from Si toi [Total Miles of line Cut

D^J So1 L 8̂ Uv0,^, 8̂ 65 km

11 Queen Stt E* . Toronto. Ont. M^C 1 S2Credits Requested per Each Claim in Columns at rightSpecial Provisions

For first survey:Enter 40 days. (This includes line cutting)

For each additional survey: using the same grid:

Enter 20 days (for each)

Man Days

Complete reverse side and enter total(s) here

Airborne Credits -^ jijL\

Note: Special provisiorftO'^ credits do noraoply to Airborne Stw/eys.

R ^

Geophysical

- Electromagnetic

- Magnetometer

- Radiometric

- Other

Geological

Geochemical

Geophysical

- Electromagnetic

* Magnetometer

- Radiometric

- Other

Geological

Geochemical

fcectrqwgnetic^i/'

*?^tN' , Xsjfcr* \JSSS^V&A. t

Days per Claim

40

Days per Claim

Days per Claim

Mining Claims Traversed (List in numerical sequence)

ExpendituresType of Work Performed

Performed on C laim(s)

Calculation of Expenditure Days Credits

Total ExpendituresTotal

Days Credits

-h 15

instructionsTotal Days Credits may be a pportioned at the c laim holder's choice. Enter n umber o f days c redits per claim selected in columns at r ight.

Mining ClaimPrefix

KRL*'"f'lV ' V-'*1- *2t.

oMt:itftK6f,4*6^.4;Vi* ;- ' \ - r- 1 -H

WS&!:^y,s-*f,^- .VVtf0? ..: -. -^

' •'-•.'. '.1: T ''•' ' -. . : - v .; . -

..;-^r'-"^-^;

. :t.--':^v*/^*'-•, f'\- •'"•••' '-'".' . ' ,-..- -. y.-st*,\:i^ •H*^**^

' ...^j'-i^ vi".-^'-

v^t^.t;-rt.-.-y.t^^^Uv

-,:r*, jC.y^;;

-^'' ,.".''\'"-'V.

K- ;;I?K 1^^??i'i'ai,W*•j?i,j'-e;i3^•JfeiMFm^-Ipi w^.SF^

•'' - . ' .' ,

Number

78876?788764.7857657887667887^7788768

. 7S87-69 .788770

788771788772

hj^8877JL.78877*1

788775

788776

788777

7887787.8S779

J7BS7-BQ- -7887817887^2 ..

788783-.J?B87BA- -

rrftRrrfte;

Expend. Days Cr.

'

f r t ^

Mining ClaimPrefix ! Number

y RT.- Vi :',' P f ~-'M*^.sr;;;•t-^ 1 X'SW

'.; ^i-"^. , , is ". ' •- -^!:

t i 'f

. ff ,.-'. .-, i r*'.,'.;

'•-•-i^iif.^

.6i^' ' i \ 1-'

RE

/' At

IININ'G

7.8B78.6—. .788787788788793694r*f o O ^ A ̂793695 ——

795^6793697-'7QO/CQQy-y-^oyo —— —

793699

79J7-QQ.. —79375^7.55702.793703B ^ ̂ t mS

793704* ir w^ r *

793705

793706

70^707

7-93708

efiv-ftfi i -i IQR^'-' J. ':* f^.'Ov)

LANDS S L'CTl

Expend. Days Cr.

1

)NTotal number of mining 2l "l claims covered by this report of work.

Recorded Holder or Agent (Signature)Date

July 9, 1985Certification Verifying Report of Woi

l hereby certify that l have a personal and intimate knowledge of the facts set forth in the Report of Work annexeH±ia*CTO, having performed the work or witnessed same during and/or after its completion and the annexed report is true.

Name and Postal Address of Person Certifying

Louis Racic, Suite 360 - 111 Queen St. E., Toronto, Ont., M5QolS2Date CertifiedMarch 20, 1985

Page 12: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

Ontario

Ministry of Natural Resources

GEOPHYSICAL - GEOLOGICAL - GEOCHEMICAL TECHNICAL DATA STATEMENT

File.

Project1 2k2

TO BE ATTACHED AS AN APPENDIX TO TECHNICAL REPORTFACTS SHOWN HERE NEED NOT BE REPEATED IN REPORT

TECHNICAL REPORT MUST CONTAIN INTERPRETATION, CONCLUSIONS ETC.

Win

Wu

Type of Survey(s) Magnetic and Electromagnetic——^—Township or Area Corlass IXP*^^^——-——————————^—Claim Holder(s) Dome Exploration (Canada) Limited

Survey Company Gfiosearr.h Consultants Ltd*——————

Author of Report I-.m H g Ra c. le^^————————————————Address of Author 3^0 - 3.11 Queen St* E.. Toronto

Covering Dates of Survey.jLan., . Mar. 208^is;

(linecutting to office)

Total Miles of Line Cut. km

SPECIAL PROVISIONSCREDITS REQUESTED

ENTER 40 days (includes line cutting) for first survey.ENTER 20 days for each additional survey using same grid.

Geophysical —Electromagnetic-

R.Hinn^trir

-rtthrr

r^h,m^,

DAYSper claim

204o

AIRBORNE CREDITS (Special provision credits do not apply to airborne surveys)

Magnetometer. .Electromagnetic. . Radiometric(enter days per claim)

DATE- March Ute /\LIC'-ithor 67 Reportl/ Author 4( Report or Agent

Res. Geo!.. .Qualifications. C/- ®^' f-

Previous Surveys File No. Type Date Claim Holder

MINING CLAIMS TRAVERSED List numerically

Claims covered by Macne tic Survey :•••••i tKt • ••••••••••••••••••••••••* *v* ••••••••^••••••••••

(prefix) (number) KRL 788763 t? 788788••••••••••••••••••*/*** **v ••••••••••/^•••••^•••••••••••••

KRL

Electromagnetic Survey: I

KRL 775404 to 775410 """"""775412 ( '" )

775491 to 775493

.7M7. 66..to...7.88768l

"7'8'8'7"69""(p"ar'fiaT

"788775

793697793.698 l " l• •f *j4 ̂ **Vt*-**Vfc* **\** ** *** * **** ••••**f**

793699 to 793708

JUi- 1 0

TOTAL

837 (6179)

Page 13: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

GEOPHYSICAL TECHNICAL DATAProject

GROUND SURVEYS - If more than one survey, specify data for each type of survey

Number of Stations

Station interval -—— Profile scaleContour interval.

MaG EM 185**

"i

l cm to 20^

.Number of Readings Mag. 3008 EM 185**

.Line spacing_____3-00 m^———.——^.^..^

100 gammas

o

Instrument Geometrics G-826

- l gammaAccuracy — Scale constant ———— Diurnal correction method Base station recorder with readings at 30 second intervals

Base Station check-in interval (hours)______________________________________________- Base Station location and value OEOO at ONOO 60 f 321 gammas

u

O < 53

S H Uw -l w

InstrumentCoil configuration

Coil separation

Accuracy Method:Frequency

AT j ex Maxmin IIco-lanar

1OO m

Q Fixed transmitter IIz and 1777 Hz

d Shoot back l In line C! Parallel line

(specify V.L.F. station)

Parameters mpasnrpH In-phase and quadrature components of the verticalfield

tt O

Instrument __ Scale constant.Corrections made.

Base station value and location .

Elevation accuracy.

o*~HH

itO a, tot .~i

co t'l ftf

Instrument -—-.—-^-—.— Method D Time Domain

Parameters On time . Off time

— Delay time -——-— Integration time.

I l Frequency Domain

_ Frequency _____ _ Range --^-—^.—--

Power.Electrode array — Electrode spacing .

Type of electrode

Page 14: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

SELF POTENTIAL Instrument^-———————^—-^-——————-—^^^———.—-——..—..—.———— Range.Survey Method -——————^—^^^——————^-——^^---—^—^——.——-———..——

Corrections made.

RAD1OMKTRICInstrument -—^—Values measured .

Energy windows (levels) .^-^————^——-..^—————^^——--————^-^————^—.

Height of instrument____________________________Background Count.

Size of detector—^—-———-————————.—-^—————————^-—..—.^^———.—.

Overburden .—.——^.^^—....^-^^^^—.———.——.—^.^^———.^^^^——-—.^—————.(type, depth — include outcrop map)

PIHERS (SEISMIC, DRILL WELL LOGGING ETC.) Type of survey-—-————————^^^^———————Instrument ̂ —————^———-—————————^^—^^Accuracy———..-——^^^——————————————Parameters measured.

Additional information (for understanding results).

Type of survey(s)

Instrument(s)(specify for each type of survey)

Accuracy^——..^^—..———.——.———{specify for each type of survey)

Aircraft used—.————-—————-————————.^^-—-—..^——————

Sensor altitude-Navigation and flight path recovery method.

Aircraft altitude_________________________________Line Sparing Miles flown over total area___________________________Over claims only.

Page 15: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

GEOCHEMICAL SURVEY - PROCEDURE RECORD

Numbers of claims from which samples taken.

Total Number of Samples. Type of Sample.

(Nature of Material)

Average Sample Weight——————— Method of Collection————————

Soil Horizon Sampled. Horizon Development. Sample Depth^——— Terrain—————————

Drainage Development———————————— Estimated Range of Overburden Thickness.

ANALYTICAL METHODS

Values expressed in: per centp. p. m. p. p. b.

n n n

Cu, Pb, Zn, Ni, Co, Ag, Mo, As.-(circle)

Others ____________________________Field Analysis (.

Extraction Method. Analytical Method- Reagents Used——

Field Laboratory AnalysisNo. -—————————

SAMPLE PREPARATION (Includes drying, screening, crushing, ashing)

Mesh size of fraction used for analysis____

Extraction Method. Analytical Method . Reagents Used__

Commercial Laboratory (- Name of Laboratory—. Extraction MpthnH

Analytical Method —— Reagents Used————

.tests)

.tests)

-tests)

General. General.

Page 16: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

Mining Lands Section

Control Sheet

File No

TYPE OF SURVEY

MINING LANDS COMMENTS

GEOPHYSICAL

GEOLOGICAL

GEOCHEMICAL

EXPENDITURE

kf-l

v Signature of Assessor

wesDate

Page 17: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

1985 09 27 Your File: 81-85 Our File: 2.8270

Mining RecorderMinistry of Natural ResourcesOntario Government BuildingBox 5003Red Lake, OntarioPOV 2MO

Dear Sir:

RE: Notice of Intent dated September 4, 1985 Geophysical (Electromagnetic) Survey on KRL 775404, et al, 1n Corless Township

The assessment work credits, as listed with the above-mentioned Notice of Intent, have been approved as of the above date.

Please Inform the recorded holder of these mining claims and so Indicate on your records.

Yours sincerely,

S.E. YundtDirectorLand Management Branch

Whitney Block, Room 6643 Queen's Park Toronto, Ontario M7A 1H3 Phone:(416)965-4888

DI/me

cc

cc;

End.

Dome Exploration (Canada) Limited cc:Box 270l First Canadian PlaceToronto, Ontario M5X 1H1

Mr. G.H. Ferguson cc: Mining S Lands Commissioner Toronto, Ontario

Louis RaclcSuite 360111 Queen Street EastToronto, OntarioM5C 1S2Resident GeologistRed Lake, Ontario

Page 18: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

© Ministry of Technical Assess) Natural - , ., , ^ .., Resources Work Credits

Ontario ^^

inent File 2.8270

Date Mining Recorder's Report of Work No. -,, n r

1985 09 04 81-85

Recorded HolderDOME EXPLORATION (CANADA) LIMITED

Township or AreaCORLESS TOWNSHIP

Type of survey and number of Assessment days credit per claim

Geophysical 20

InHncerl pnlariratinn days

Other days

Section 77 (19) See "Mining Claims Assessed" column

Rpnlngiral days

Man days C] Airborne fi

Special provision H Ground Q

CH Credits have been reduced because of partial coverage of claims.

CD Credits have been reduced because of corrections to work dates and figures of applicant.

Mining Claims Assessed

KRL 775404 to 411 inclusive 775491 to 493 inclusive 788766 to 768 inclusive 788775 793697 793699 to 708 inclusive

Special credits under section 77 (16) for the following mining claims

10 DAYS 5 DAYS

KRL 775494 KRL 775412 788769 775434

788774 793695 793698

No credits have been allowed for the following mining claims

1 l not sufficiently covered by the survey 1 _ 1 Insufficient technical data filed

The Mining Recorder may reduce the above credits if necessary in order that the total number of approved assessment days recorded on each claim does not exceed the maximum allowed as follows: Geophysical — 80; Geological — 40; Geochemical — 40; Section 77(19)—60:

828 (83/6)

Page 19: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

no

Ministry ofNaturalResources

1985 09 04 Your File: 81-85 Our File: 2.8270

Mining RecorderMinistry of Natural ResourcesOntario Government BuildingBox 5003Red Lake, OntarioPOV 2MODear Sir:

Enclosed are two copies of a Notice of Intent with statements listing a reduced rate of assessment work credits to be allowed for a technical survey. Please forward one copy to the recorded holder of the claims and retain the other. In approximately fifteen days from the above date, a final letter of approval of these credits will be sent to you. On receipt of the approval letter, you may then change the work entries on the claim record sheets.For further information, if required, please contact Mr. R.J. Pichette at 416/965-4888.

Yours sincerely,

S.E. YundtDirectorLand Management Branch

Whitney Block, Room 6643 Queen's Park Toronto, Ontario M7A 1W3

i/ D. I sherwood: me

Ends.cc: Dome Exploration (Canada) Limited

Box 270l First Canadian PlaceToronto, OntarioM5X 1H1

cc: Mr. G.H. FergusonMining 4 Lands CommissionerToronto, Ontario

cc: Louis Racic Suite 360111 Queen Street East Toronto, Ontario M5C 1S2

845

Page 20: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

MinistryofNaturalResources

Ontario

Notice of Intent

for Technical Reports

1985 09 04 2.8270/81-85

An examination of your survey report indicates that the requirements of The Ontario Mining Act have not been fully met to warrant maximum assessment work credits. This notice is merely a warning that you will not be allowed the number of assessment work days credits that you expected and also that in approximately 15 days from the above date, the mining recorder will be authorized to change the entries on his record sheets to agree with the enclosed statement. Please note that until such time as the recorder actually changes the entry on the record sheet, the status of the claim remains unchanged.

If you are of the opinion that these changes by the mining recorder will jeopardize your claims, you may during the next fifteen days apply to the Mining and Lands Commissioner for an extension of time. Abstracts should be sent with your application.

If the reduced rate of credits does not jeopardize the status of the claims then you need not seek relief from the Mining and Lands Commissioner and this Notice of Intent may be disregarded.

If your survey was submitted and assessed under the "Special Provision-Performance and Coverage" method and you are of the opinion that a re-appraisal under the "Man-days" method would result in the approval of a greater number of days credit per claim, you may, within the said fifteen day period, submit assessment work breakdowns listing the employees names, addresses and the dates and hours they worked. The new work breakdowns should be submitted direct to the Land Management Branch, Toronto. The report will be re-assessed and a new statement of credits based on actual days worked will be issued.

846 (82/5)

Page 21: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

Ministry of ral urces

Ontario

J-Report of Work(Geophysical, Geological, Geochemical and Expenditures)

KMPROJECT NO. 242

Mining Act

Instructions: — Please lype or print.— If number of mining claims traversed

exceed? space on this form, attach a list,Note: - Only days credits calculated m the

"Expenditures" section may be enteredin the "Expend. Days Cr." columns.

— Do not use shaded areas below.Type of Surveyi

Claim Holder UlMagnetic ^ __JTownship or Area

Dome Exploration (Canada) Limited

Corless Twp.Prospector's Licence No.

A 21304Address

____Box 270, l First Canadian Place, Torgntp t-Pnt.— MjJX 1H1__ _____Survey Company " [C)ate of Survey (from 4 to) TTotal Miles of line Cut

Name and Address of Author (of Geo-Technical t*ponl

Louis Racica Suite ~ 111 Queen St. E. f Toronto, Ont. MSC 1S2Credits Requested per Each Claim in Columns at rightSpecial Provisions

For first survey:Enter 40 days. (This includes line cutting)

For each additional survey: using the same grid:

Enter 20 days (for each)

Man Days

Complete reverse side and enter total (s) here

Airborne Credits ^ sfa\

Note: Special provisio/njy' credits do noKuSply to Airborne Ztwpeys.H "

Geophysical

- Electromagnetic

- Magnetometer

- Radiometric

- Other

Geological

Geochemical

Geophysical

- Electromagnetic

- Magnetometer

- Radiometric

- Other

Geological

Geochemical

^ectrqinignetlcNy,''

f?V^' , X'^^' y. fc^v^. t

Days perClaim

ka

Days per Claim

Days perClaim

Mining Claims Traversed (List in numerical sequence)

Calculation of Expenditure Days Credits

Total ExpendituresTotal

Days Credits

Isnstructiont

Total Days Credits may be apportioned at the claim holder's choice. Enter number of days credits per claim selected in columns at right.

Mining ClaimPrefix

JiEL-*tjtt*'-i"~**e*f-~-'-.

:^fe^*^:^?.'^%'^.r.'i-V'f?';*'

'..- .- -^jyyl.l.^v.^

•:"-7-r'~) v '•ssT*".*': .^..,,j,,i^--i

''t'*-- -'',:- -Hr--- "t- '

#mVi****^.0*4 •"*^"

-**-r '!*-,*.-^^

*-t^*T^J-'!-**'^

/i''f'"V'.~V

•^•V^-.VV:'..A :V"-

Mffi^.i:^*!."|^i^r̂ ; ;-i^/.:-^-^/•' j'-'. ^^*:?.'."-S,'v^'-A ;'

•', f, . . -.

. -.

Number

78876378876478876578876678876778876878876978877078877178877278877378877478877578877678877778877878877078878078878]788782788783788784TAft'IfttC

Expend. Days Cr.

'

f

Mining ClaimPrefix

KRL

v^C* -*— *-, .H,,-.-•*,* *.'C'vr -,..—- ,, ^.K. jj' : - !;.i-

' - - . R" -

":' i *

"';

' ' V

-- - - '.' - ~ ,

*.'4,'K*'V.#:,u

,'- , i ;- ' . .'~--'*:

. . . - i.. ' '

RE- to

IINIlifG

Nunber

7.8B7861J78B7B7 ——7RR7RR

79369^7936957956^ —— r

795697ToaAofif y juyu

79^699

793700

793701

7^37^2 ——793703 ——7-9-370U ——

7937051 7 J 1 v*r

7937067-^370779370S

ettvttH "i A IQflc:

•-1 — - '\..wvl

Ui,; DS SECT!

Expend. Days Cr.

}

)NTotal number of miofng ^* l claims covered by this report of work.

Date

July 9, 1985Recorded Holder or Agent (Signature)

Certification Verifying Report of \\l hereby certify that l have a personal and intimate knowledge of the facts set forth in the Report of Work annexe or witnessed same during and/or after its completion and the annexed report is true.

, having performed thevvork

Name and Postal Address of Person Certifying

Louis Racic, Suite 360 - 111 Queen St. E., Toronto, Ont. 7 M5C-,1S2Date Certifiedtearch 20, 1985

Page 22: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

1985 07 16 File: 2,8270

Mining RecorderMinistry of Natural ResourcesOntario Government BuildingBox 5003Red Lake, OntarioPOV 2MO

Dear Sir:

We received reports and maps on July 10, 1985 for a Geophysical (Magnetometer and Electromagnetic) Survey submitted under Special Provisions (credit for Performance and Coverage) on Mining Claims KRL 775404, et al, 1n the Township of Corless.

This material Mill be examined and assessed and a statement of assessment work credits will be Issued.

We do not have a copy of the report of work which 1s normally filed with your office prior to the submission of this technical data. Please forward a copy as soon as possible.

Yours sincerely,

S.E. YundtDirectorLand Management Branch

Whitney Block, Room 6643 Queen's Park Toronto, Ontario M7A 1W3 Phone:(416)965-4888

A. Barr:mccc: Dome Exploration (Canada) Limited

P.O. Box 270 l First Canadian Place Toronto, Ontario M5X 1H1 Attention: Ed PlgulsM

Page 23: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

Dome Exploration (Canada) P-O/BOX270. . -4. j 1 F irst Canadian Place Limited Toronto, Ontario

M5X1H1 (416)364-3453 Telex 065-24590

Executive Of (ice July 10 ' 1985 Telecopier 366-1775

DELIVER

Lands Administration BranchMinistry of Natural ResourcesRoom 6610, Whitney Block Our Project No. 242Queen's ParkToronto, OntarioM7A 1X1

Attention: Mr. Ray Pichette

Re: Corless Township - (M. 2154)

Dear Mr. Pichette:

We enclose herewith, in duplicate, a report and plans by Geosearch Consultants Ltd. (Louis Racic), covering an electromagnetic and magnetic survey performed on claims held by this Company in Corless Township.

This submission is made under the Special Provisions Regulations as to 40 days per claim for the claims covered by the magnetic survey, namely KRL. 788763 et al (41 claims) and 20 days per claim for the claims covered by the electromagnetic survey, namely KRL. 775404 et al (33 claims).

Enclosed are copies o f the Reports of Work which we forwarded to the Mining Recorder in Red Lake, Ontario.

Please date-stamp the enclosed copy of this letter and return it to me.

RECEIVEDYours very truly,

J UL ] fl 1985DOME EXPLORATION (.CANADA) LIMITED

's LMDS SECT/ON*-**1- v~-t— --Edward A. Pigulski Assistant Secretary

EAPltc Enclosures

Page 24: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

Copy For: Mr. Ray Pichette

Dome Exploration (Canada). . •*.~fi Limited

Executive Office1 JUiy

p o BQ* 2701 First Canadian Place Toronto, Ontario M5X 1H1 (416)364-3453 Telex 065-24590 Telecopier 366-1775

Mr. Scott RivettMining RecorderMinistry of Natural ResourcesP.O. Box 5003Ontario Government BuildingHowey StreetRed Lake, OntarioPOV 2MO

Our Project No. 242

Re; Corless Township (M. 2154)

Dear Mr. Rivett:

Enclosed are two Reports of Work, as listed below, covering geophysical surveys performed by Geosearch Consultants Ltd. (Louis Racic) on the mining claims shown on each Report.

1. Report of Work covering a Magnetic Survey performed on claims KRL. 788763 et al (41 claims) applying 40 days work on each claim.

2. Report of Work covering an Electromagnetic Survey performed on claims KRL. 775404 et al (33 claims) applying 20 days work on each claim.

We will be delivering the survey report and plans in duplicate to the Land Management Branch of the Ministry for evaluation within the next few days.

The assessment work is being filed under The Special Provisions Regulations.

EAP:tc Enclosures

Yours very truly,

DOME EXPLORATION (CANADA) LIMITED

*9

Edward A. Pigulski Assistant Secretary

f ^fDttft

c. c. Mr. Ray Pichette (w, /ends.)

Page 25: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

Ministry ofNaturalResources

Report of Work(Geophysical, Geological, Geochemical and Expenditures)

PROJECT NO. 242

Mining Act

Instructions: — Please type or print.— If number of mining claims traversed

exceeds space on this form, attach a list. Only days credits calculated in the "Expenditures" section may be entered in the "Expend. Days O," columns. Do not use shaded areas below.

Note: —

Type of Survey(s)

MagneticClaim Holder(s)

Dome Exploration (Canada) Limited

Township or Area

Corless Twp.i Prospector's Licence No.

[ A 2 1304Address

^ Box 270, l First Canadian Place, Toronto, Ont. M^X 1H1Survey Company Date o f Survey (from Si lot [ Total Miles of line Cut

__ Geosearch Consultants Ltd*Name and Address of Author (of Geo-Technical report)

11,01,85 i 20 03 85 i , ei Day j Mo. j VT ; Day VicT l Y r ; 65

Louis Racic. Suite l60 - 111 Queen St. E.. Toronto. Ont. M5C 1S2Credits Requested per Each Claim in Columns at rightSpecial Provisions . . Geophysical

For first survey: -, ' - ElectromagneticEnter 40 days. (Thisincludes line cutting) Magnetometer

f , t -i- - i ' -Radiometric For each additional survey:using the same grid:

- OthdrEnter 20 days (for each)

Man Days

Days perClaim

- —— -™ ——

2iQ

Geological ;

Geochemical

Geophysical

Complete reverse side i . ,, t , - Electromagnetic and enter total(s) here

- Magnetometer

- Radiometric

- Other

Geological

Geochemical

Airborne Credits

Note: Special provisions , E lee t r o magneticcredits do not applyto Airborne Surveys. Magnetometer

Radiometricj

Days perClaim

---— -- —

Days porClaim

—. ————

Expenditures (excludes power stripping)

Calculation of ExpenditurS^ays Credits

Total ExpendituresTotal

Days Credits

InstructionsTotal Days Credits may be apportioned at the claim holder's choice. Enter number of days credits per claim selected in columns at right.

Date

July 9, 1985Recorded Holder or Agent (Signature)

Certification Verifying Report of WOCK

Mining Claims Traversed (List in numerical sequence)w

Prefix

JHIL.

ining ClaimNumher

-7-BJ37-d3-..- ^788764788765

..7887.6 6 . 7.8876.7

-..7^87 68.— ~788769.--.-788770

^7-88771788772

. 7^87.73.78877^

. 788775788776 788777-

. 788778- 78-8779.7287 so-788781....788782.788783788784 7^878*1

E xpeno. Days Cr.

- - — --

^ ...— ̂ —

.. ———— ..

_ -.. —.-

. _ .. ^ _

^ , . .—- -

........

. -,.

Mi n i ng Clai m Prefix | Number

-KIIL 788786

i 7887S71

788788

793694"*t c\ o f*r\ t?793o95793696793697793698793699 ....-[793700793701793702793703793704 793705.793706[793707L793708

i

Expend. Days Cr.

-.- ——

. . .. ,. .

— —. _ --

... . ...^

, . ... —. - —

Total number of mining claims covered by this report of work.

For Office Use OnlyTotal Days Cr. Date Become.. Recorded

Mining Recorder

Date A pproves; as Recorded Branch Director

l hereby certify that l have a personal and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report is true.

Name and Postal Address of Person Certifying

Louis Racic, Suite 360 - 111 Queen St. E,, Toronto, Ont. ;Date Certified

March 20, 1985(SignajfTre)

13G2 (81/9)

Page 26: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

Assessment Work Breakdown

Man Days are based on eight (8) hour Technical or Line-cutting days. Technical days include work performed by consultants, draftsmen, etc..

Type of Survey

Technical Days Credits

Line-cutting Day* Total Credits

Page 27: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

Den

t T

wp.

-

M.2

I55

o l C* t? l X

*tt

-M

l ut

O o

ii o

~

3" •B

O

O o^

o

Z o m O)

r m o m z o

•f

U

I zm

0) o > r m z o I O *5

i

Z

C/)

m

oO o

-D "H

o H

O

r~

m CO

CO

H

I m Hoo -n

^ z 0) I TJ

Page 28: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

Ministry ofNaturalResources

OnlaJ

Report of Work(Geophysical, Geological, Geochemical and Expenditures)

PROJECT NO. 242 Mining Act

Instructions: — Please type or print.— If number of mining claims traversed

exceeds space on this form, attach a list.Note: — Only days credits calculated in the

"Expenditures" section may be enteredin the "Expend. Days Cr." columns,

— Do not use shaded areas below.Type of Survey(s)

Elec tromagneticClaim Holder(s)

l Township o r Area

Corless Twp.•Prospector's Licence No.

Dome Exploration ^CanadaJ Limited A 21304

_ ,.J3qx 270, l First Canadian Place, Toronto, Ont. . M5X 1111Survey Company !Date of Survey (froir. Si to) -Total Miles of line Cut

__ Geosearch Consultants Ltd. .j Day [ MS. ; r?, j feV wtf. | ^?. .Marne and Address of Author (of Geo-Technical report)

_______Louis Racic, Suite 360 - 111 Queen St. E., Toronto, Ont. M5C 1S2Credits Requested per Each Claim in Columns at rightSpecial Provisions

For first survey:

Enter 40 days. (This includes line cutting)

For each additional survey: using the same grid:

Enter 20 days (for eachl

! Geophysical

- Electromagnetic

- Magnetometer

- Radiometric

- Other

Geological

Geochertiical

Days perClaim

L-AP.

I—

Man Days

Complete reverse side and enter total(s) here

Geophysical

Electromagnetic

- Magnetometer

- Radiometric

- Other

Geological

Geochemical

Days per Claim

Airborne Credits

Note: Special provisions j Electromagneticcredits do not apply |to Airborne Surveys. Magnetometer

Radiometric

Days perClaim

Mining Claims Traversed (List in numerical sequence)

Expenditures (excludes power stripping)Type of Work Performed

Calculation of E^nyjQstifure Days Credits

Total ExpendituresTotal

Days Credits

InstructionsTotal Days Credits may be apportioned at the claim holder's choice. Enter number of days credits per claim selected in columns at right.

NPrefix

KRL

ining CiaimNumber

775404775405775406

-775.407,.,..775408

.775AQ2—— 775410,-...7 73411 (Pa

.77543.4 (775491 .7-25492---775493—775494 (Pa

.788767--788768 -7-83-7^9 (Pa .7 8877-4 1788775 793695 (Pa793697

Expend,Days Cr.

—— - ———

ctial ii--

rtiaJL

i

?tieil

-tial

)

)

|)

)

Mining Claimf1 r o' i x Nu mber

KRL 793699' 793700

793701793702793703

l 79370.4,..,.. 793705

793706.793707

793708

h i

Expend.Days Cr.

-----...--

; ;

Total number of mining claims covered hy this report of work.

DateJuly 9, 1985

Recorded Holder or Agent (Signature)

Certification Verifying Report of Work?'

For Office Use OnlyTotal Days Cr.fDate Recorue i Recorded i

.Mining Recorder

Date Approvocs as Recorded Branch Director

I hereby certify that l have a persona! and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report is true.

Name and Postal Address of Person Certifying

Louis Racic, Suite 360 - 111 Queen St. E., Toronto, Ont. 1S2Date Certified

March 20, 1985Ce r t i f i e t S i g naj*(re )

1362 (81/9)

L

Page 29: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

Assessment Work Breakdown

Man Days are based on eight (8) hour Technical or Line-cutting days. Technical days include work performed by consultants, draftsmen, etc..

Type of Survey

Technical Dayi Credits

Line-cutting Da y t Total Credits

Days per Claim

Line-cutting Days

Total CreditsNo. of Claims

Page 30: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

205

? \7754eV'|77S486

/7S494 l//54B3 77549^ 7V7549I

788777 j 788778 | 78/8771 |7\88770

IKRL l K W I7a)a77j

786785 l 788786FKRL ~ KRL

17887881788787 'S8\3Z47

KRL i/KRL i J

7688491 *

— -- JT*J9USt- b i j . ' i, m ~t T -~~

y" i l ''-x/-! l76Bjrs!!768 -" '?66*e*rtesz*.7S89ZT5 ,768924 S l- - - - - -K-SP

V RI l If RI . "VWi.

'7681311 7 68932 [ 768933 A

THE TOWNSHIP OF

CORLESSDISTRICT OF

KENORA-PATRICIA PORTION

RED LAKE MINING DIVISION

SCALE: 1-INCH — 4O CHAINS

LEGEND

PATENTED LANDCROWN LAND SALELEASESLOCATED LANDLICENSE OF OCCUPATIONMINING RIGHTS ONLYSURFACE RIGHTS ONLYROADSIMPROVED ROADSKING'S HIGHWAYSRAILWAYSPOWER LINESMARSH OR MUSKEGMINESCANCELLEDPATENTED S.R.O.

C.e

NOTES400' Surface Rights Reservation along the shores of all lakes and rivers.

Page 31: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

KRL

788776

L.rValues above base level of 60,000 gammas

Base station...................0 + 00E, 0+00 N

Contour interval ....................100 gammas

lOOgamma contour

500 gamma contour

Depression

52NC2NWe037 2.8270 CORLESS200

TOTAL FIELD MAGNETOMETER.bx iCOMSUOAWTS LIP.

I9S4 Surv&y

111E

MAP KEXMap

•oAOcc^

DOME EXPLORATION (CANADA) LIMITED

PROJECT 242.CORLESS TOWWSHIP

OWTA^IO

1064-

•wss) (Map No.85-21

Page 32: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

r f-z. Lake-

1965

Values above base level of 60,000 gammas

Base station....................0+OOE , 0+00 N

Contour interval .................. .100 gammas

(OOgamma contour.

500 gamma contour..

Depression ...........,.2

52N02NW0a37 2 .827® CORLESS

TOTAL FIELD SURVEXby

1964

w

GEOSEARCH CONSULTANTS LTP--TO r

DOME EXPLORATION (CAKJAPA) LIMITED

PROJECT 24ZTOWNSHIP

MAP

L.J.R.. I985J Mo.

85-21 C34- 1 H

Page 33: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

KR

L

793698

L

52N

02N

WW

37

2.8

27

0

CO

RLE

SS

CO

IL—

177

7 H

i*

SCAL

E"—

—\e

.*n

-h

*

TT^|.

Line

- —

LEG

END

44

4 H

z,LO

Wx

——

— x

x

——

-y

6ut-

df "

Phas

e.

mar

ts

WE

AK

MA

P K

E/

by CO

NS

ULT

AN

TS L

TD

DO/VI

E EX

PLOR

ATIO

N (C

ANAD

A)

LIM

ITED

PR

OJE

CT

24 Z

CORL

ESS

TOW

NSHI

PO

NT

AR

IO

- LR

,e.

-

Page 34: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

\

\

D

\

d

COIL- INTERVAL- FREQUENCIES - PROFILE SCALE

LEGEND- IOO m

— 1?7? Hz * 444-l om t

x— — — tt

u Leff

52N02NW0037 2.627C CORLESS 230

V'

SURVE/

(3EOSETARCH CONSULTANTS, LTD

MAP

{C!(*i

DOME (CAN)ADA)

PROJECT 242.CORLESS TOWNSHIP

OMTARIO

- 2.5OO 85-20 B

Page 35: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

52N02NW0037 2 .8270 CORLESS

- LI?, MM.

ELECTROMAGNETIC by

OeoSEARCH CONSULTANTS LTD.•for

DOME EXPLORATION (CANADA) LIMITED

PROJECT 24ZCORLESS TOWNSHIP

ONTARIO

-1 - Z5OO 65-ZO C

Page 36: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

\

KRL.

783774-

KRL

738775

LEGENDINTERVAL- — IOO m

——— 1777 Hz. * 4-4-4 H z-

x ——— x

In-Phose\

f Li

. Lint

byLTD.

Key

52N02NWW37 2.827* CORLESS 250

DOME EXPLORATION) CCANJADA) LIMITED

PROJECT 24iCORLESS TOVMMSHIP

ONTARIO

- ^5OO 85-20 D

Page 37: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

-JL lr

LEG

EN

D

Vol

ues

obov

e ba

se l

evel

of

60

,000

gam

mas

Base

sta

tion

....

....

....

......

.0+

OO

E,

0 +

OO

N

Con

tour

in

terv

al..

..................100

gam

mas

lOO

gam

ma

cont

our.

500

gam

ma

cont

our.

5000 g

amm

a co

ntou

r.

Dep

ress

ion.

......

......

..

"

60,0

00^*

0

TO

TA

L P

ieU

D M

AG

WE

TT1C

SU

RV

E/

by

GE

OS

EA

RC

H

CO

M5U

LTA

NT&

LTD

.

MAP

2.8270 CORLESS

DOME

: EX

PLOR

ATIO

N (C

ANAD

A)

LIM

ITED

PR

OJE

CT

242.

CO

RLE

SS

TO

WN

SH

IPO

NT

AR

IO

85-2

1A

Page 38: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

\!fr

788775

\

LEGEND

Values above base level of SO.OOOgammos

Base station...................0 + 00E , 0-1-00 N

Contour interval.. ..... ............100 gammas

IQOgomma contour.

500 gamma contour.

Depression ............

n

52N02NW0937 2.827e CORLESS S 70

TOTAL- FlEUO AAAfiMETriC

by CONSULTANTS LTD.

DOMEl EXPLORATIONCCAMADA) LIMITED

PROJECT 24-2.CORLESS TOWNSHIP

- Feb.,

; SI i-.' f tfu-c

- V.25OO 85-21 P

Page 39: RPT ON EM AND MAG SUR - PROJ 242 - CORLESS TWP

M 5

LEGEND

Volues above base level of 60,000gammas

Base station................ ,0+OOE , 0 + OON

Contour interval.................. 100 gammas

100 gamma contour

500 gamma contour.

Depression.,

60,000•fe?

52N02NWe037 2 .8270 CORLESS 280

MA&NETOMETEI? suievey

GEOSEARCH COMSULTANTS LTD.

DOME EXPLORATION)&ANADA) LIMITED PROJECT 24Z-

CORLESS

- LJR 85-21 E