*** 2.4 Hazard & P & ID hazop review in the stage of basic, Operability Study detailed design and plant operation (HAZOP)

*** 3.10 Operating Manual

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 2/35

TPI

P.1 OF 29

SCOP

E OF

WOR

K

FOR

BASI

C /

DETAI

LED

DESI

GN, PROCUREMENT, CONSTRUCTION OF

PTA RPF PROJECT

PROJECT PROCEDURE NO.

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 3/35

TPI

P.2 OF 29

CONTENT

PAGE

1.0Project

 Administr ation andCoordination ............................................................................................................................................................................ 3

2.0ProjectEngineering ...........................................................................................................

................

................

................

................

................

................

. 4

3.0Process ..................

............................................................................................................................................................................................................

. 6

4.0Environmental..................................................................................................................................................................................................................... 8

5.0Vessels ............................................................................................................................................................................................................................... 8

6.0 Heat

Exchangers ................................................................................................................................................................................................................ 10

7.0 FiredHeater...................................................................................................................................................................................................................... 11

8.0 RotaryEquipment ............................................................................................................................................................................................................... 12

9.0 EquipmentPackage ........................................................................................................................................................................................................... 13

10.0 Other  

Equipment ................................................................................................................................................................................................................ 13

11.0 Heating,Ventilating and Air Conditioning(HVAC) .............................................................................................................................................................. 13

12.0Civil ..................................................................................................................................................................................................................................... 14

13.0Structure ............................................................................................................................................................................................................................. 17

14.0 Architecture .......................................................................................................................................................................................

................................. 1815.0Piping .................................................................................................................................................................................................................................. 19

16.0Instrumentation ................................................................................................................................................................................................................... 21

17.0Electrical ............................................................................................................................................................................................................................. 23

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 4/35

18.0PaintingandWrapping................................................................................................

................

................

................

................

................

................

....... 28

19.0Insulation......................................................................................................................................................................................................................... 29

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 5/35

DESCRIPTION

2.0

PROJECTENGINEERING

2.1

E

n

g

i

n

e

e

in

g

 

D

e

i

n

e

 

e

ng

i

n

e

e

i

n

g

scope of work Scope of Work

2.2 Mechanical Flow Take lead among process, instrument, Diagrams & piping, equipment, and electrical engineers

to Utility/Offsite Flow complete these diagrams Diagrams

2.3 Plot Plan Prepare overall plot plan & elevation with space dimensions

showing location of equipment and the extent and type of structure required.

2.5 Specification Prepare Construction Specification (requirements)

2.7 Equipment List a) Based on prelimenary equipment list from process

licensor, complete equipment list

2.8 System Specification (a) Specifications Including Package Prepare system specification Units, Waste

Treatment, etc. (b) Data Sheets

Based on process engineering specification sheets, complete equipment and

instrument data sheets

P . 4 OF 29

TECH.

DEPT

TAINANPLANT

DOCUMENT TO BESUBMITTED

X xEngineeringScope of Work

X (i) MechanicalFlow Diagram (ii)Utility FlowDiagram (iii)Offsite SystemFlow DiagramInclude existedMFDmodifications for 

tie-in.X (i) Site Plan (ii)

Plot Plan (iii) PlotElevation .

X (i) Hazop Report(If required.)

XConstructionSpecification

X Equipment List

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 6/35

X XX X

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 7/35

TPI

P

. 5 OF 29

NO ITEM

DESCRIPTI

ON TECH.

DEPT

TAINAN

PLANT

DOCUMEN

T TO BE

SUBMITTE

D

2.9 

SystemRequisitions

2.10 

SystemTechnical BidEvaluation

2

.11 

System

Vendor Data &DrawingReview

***2.1

BidDocument

etc.

***2.13 

MaterialControl

 Audit & control materialquantity during thesteps of MTO,requisition, purchasingand field inventory

X X

Tech: bulk materialduring MTO &requisition. Tainan:filed inventorycontrol.

2.14 

FireFightingSystem

Prepare fire fightingsystem flow diagram

X Fire FightingSystem FlowDiagram Tie-in toexisting header.

2.15 

BasicEngineer ingDesignData( BEDD)

Prepare BasicEngineering DesignData Including site data,weather condition, code& regulation, etc..

X X BEDD

2.

16 

ModelReview Model review X

Not required. (or 

3D AutoCADmodel)

***2.17 

Permit Application

 Apply to localgovernment for building,fire prevention ,andpower permits

X

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 8/35

NO ITEM

3.0

PROCESS

3.1 ProcessScheme

*** 3.2ProcessDesign

3.3

Equi

pme

nt

Sizin

g

and/

or 

Spec

ificati

ons

3.4 Preliminary Equipment List

3.5 Process Flow Diagrams

TPI

DESCRIPTION

Establish and/or optimize process scheme

(a) Clarify criteria for process design(b) Provide physical and thermodynamic properties(c) Make energy and mass balance including conditions & compositions of streams(d) Establish product yield and flow rates(a) Sizing and/or specification of columns, (towers), drums, tanks, exchangers, fired heaters, etc. including equipmentdimensions, nozzle elevation and size, operating and design conditions, material of construction, internal sketch, etc.(b) Tray calculations(c) Process specifications for commodity equipment

Prepare preliminary equipment list

Prepare process flow diagrams with stream conditions and tabulate mass balancesTECH. DEPT

X

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 9/35

X

XTAINANPLANT

X X X

X

X X

X

X

P . 6 OF 29 DOCUMENT TO BE SUBMITTED

Process Scheme

Tainan provide ; Tech. review

Process Design Data

Process Data/Specification Sheets

Tainan: provide process data. Tech: sizing, prepare vessel sketch..

Tray Data Sheets (not applicable for this project)

Process Engineering Specification Sheets

Preliminary Equipment List (Process information Only)

Process Flow Diagrams

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 10/35

NO ITEM

3.6

P

e

li

m

i

n

ar 

y

M

e

c

h

a

n

i

c

a

lF

l

o

w

 

D

i

a

g

a

ms

(

P

 

&

 

I

D

)

3.7 Preliminary Utility/Offsite System Flow Diagrams

3.8 Line and Flow Summary

3.9 Instrument Process Data

*** 3.11 Analytical Procedure Manual

3.12 Technical Bid Evaluation

TPI

DESCRIPTIONTECH.DEPT

TAINANPLANT

Develop initial layoutshowing processschemes & processrequirements for equipment, pipingandinstrumentation(a)Develop initial layoutshowing utilitysystems schemes &requirements for equipment, pipingandinstrumentation(b)Develop initial layout

showing offsiteprocess schemes &requirements for equipment, pipingandinstrumentationProvide line sizes, flowrates, physicalproperties, operatingconditions, short-

X X XX X XX X X

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 11/35

term variations,insulationrequirements,material of construction, etc.(a)Provide process datafor instrumentation(b) Provide inter-lock/shut downsystem

descriptionPreparegeneral processoperatinginstructionsAnalyticalprocedures for feeds,chemicals andproducts Reviewbidders' data andproposal for conformance withprocessrequirements (Thenumber of bids is

limited to 3.)

P . 7 OF

29

DOCUMEN

T TO BE

SUBMITTE

D

Prelimi

nary

Mecha

nical

Flow

Diagra

ms

TECH:

Review.

Preliminary Utility System Flow Diagrams

TECH: Review.

Preliminary Offsite System Flow Diagrams

Line List & Schedule

TECH: provide blank form or electronic file.

Instrument Process Data Sheets

Operating Manual

 Analytical Procedure Manual

Technical Bid Evaluation Sheets

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 12/35

TASCO

P .

PLANT DOCUMENTTO BE

SUBMITTED

1. ENVI

RONMENTAL(mer geintoPROCESSDiscipline,notapplicablefor thisproject.)

2. VESSEL(INCLUDINGTOWER,DRUM,TANK)

5.1

Specifications & (a) Prepare engineering technical X Engineering Specification Standard specifications

(b) Prepare standard drawing X Standard Drawings

5.2 Strength Calculation (a) Based on process sketch(data sheet), X Calculation

Sheets calculate strength of vessel to meet code requirment .

(b) Prepare calculation sheets per code X Calculation sheets

requirement

5.3 Engineering (a) Prepare drawings showing design data, X Engineering Drawing

Drawings material specification, wall thickness, nozzles schedule, orientation &

elevation, supports and anchor,internals.

(b) Prepare drawings showing platform, X Platform & Ladder Engineering ladder,

their supports Drawings

5.4 Shop Drawing (a) Prepare vessel shop drawings X Shop Drawings

(b) Prepare platform & ladder drawings X Platform & Ladder Shop Drawings(c) Prepare lining detail drawing(refractory, X Lining Drawings acid resistance)

*** (d) Prepare welding procedure specification X WPS, Test & Inspection Procedure (WPS), test & inspection procedureTASCO

TPI

P . 9 OF 29

ITEM DESCRIPTIONTECH.DEPT

TAINANPLANT

DOCUMENT TO BESUBMITTED

5.5

M.T.O. Prepare bill of materialand/or materialrequisition

X Bill of Materialand/or Requisitions

5.6

Requisition

(a) Prepare vesselrequisition

X Requisitions

(b) Prepare vesselinternals & liningcomponents requisition

X Requisitions

5.7

Technical BidEvaluation

Compare and assessbidder‘s technical data& drawing to meet therequirements of requisition (Thenumber of bids islimited to 3.)

X X Technical BidEvaluation SheetsSQUAD CHECK

5. Vendor Review vendor‘s data, X X Comment

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 13/35

8 Data &DrawingReview

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 14/35

6.0HEATEXC

HANGERS

6.1

S

p

e

ci

i

c

a

t

i

o

n

s

 

(

a

)

 

P

e

pare engineering technical Standard specifications

(b) Prepare standard drawing

6.2 Strength Calculation (a) Based on process sketch(data sheet),calculate strenght of heat exchanger to meet code

requirement.

(b) Prepare calculation sheets per code requirement

6.3 Engineering (a) Prepare drawings showing design data,

Drawings material specification, wall thickness, nozzles schedule, orientation &

elevation, supports and anchor, internals.

(b) Prepare drawings showing platform ,ladder, their supports

6.4 Shop Drawings (a) Prepare heat exchanger shop drawing

(b) Prepare Platform & Ladder drawing(c) Prepare lining detail drawing(refractory, acid resistance)(d) Prepare welding procedure specification(WPS), test & inspection procedure

P . 10 OF 29

TECH.

DEPT

TAINANPLANT

DOCUMENT TO BESUBMITTED

XEngineeringSpecification

XStandardDrawings

X CalculationSheets

XCalculationSheets

X Engineering

Drawings

XPlatform & Ladder EngineeringDrawing

X Shop Drawings

XPlatform & Ladder Shop Drawing

X Lining Drawings

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 15/35

X

TASCO TPI

NO

ITEM DESCRIPTION

6.5 M.T.O. Prepare bill of materialand/or material requisition

6.6 Requisition (a) Prepare heatexchanger requisition (b) Prepare heatexchanger internals & liningcomponents requisition6.7 Technical Bid Evaluation Compareand assess bidder's technical dataand drawings to meet therequirements of requisition (Thenumber of bids is limited to 3.)6.8 Vendor Data & Drawing ReviewReview vendor's data, drawings anddocuments to meet the requirement of requisition

7Fired Heater(Incl.Duct)applicable in RPF project.)

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 16/35

TASCO

P .

PLANT DOCUMENTTO BESUBMITTED

8.0

ROTAR YEQUIPMENT(PUMPS,COMPR

ESSORS,BL

OWERS, FANS, AND THEIR DRIVERS )

8.1 Specifications & (a) Prepare engineering technical X Engineering Specifications Data Sheets specifications

and standard

(b) Complete data sheets X X Data Sheets

(Tech:

prepare,

Tainan:

review)

8.2 Requisition (a) Prepare requisition for purchasing X Requisitions

(b) Prepare equipment & components X Requisitions requisition

8.3 Technical Bid Compare and assess Bidder's technical data X X Technical Bid Evaluation Sheets

Evaluation and drawings to meet the requirements of (SQUAD CHECK)requisition (The

number of bids is limited to 3.)

8.4 Vendor 

Data &

Review

vendor's data,drawings, and

X X Comment

(SQUAD

CHECK)

Drawing Review documents to meet the requirements of requisition

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 17/35

TASCO

P .

PLANT DOCUMENTTO BESUBMITTED

9.0

EquipmentPackage(Incl.Refrigeration,Boiler,Pneu

maticConveying

System, etc.)

9.1 Specifications & (a) Prepare engineering technical X Engineering Specification Data Sheets specification and

standard

(b) Complete data sheets X X Data Sheets

(Proces

s data

by

Tainan)

9.2 Requisition Prepare requisition for purchasing X Requisition

9.3 Technical Bid Compare and assess bidder's technical data X X Technical Bid Evaluation Sheets

Evaluation and drawings to meet the requirements of (SQUAD CHECK)requisition (The

number of bids is limited to 3.)

9.4 Vendor 

Data &

Review

vendor's data,

drawings and

X X Comment(SQUAD

CHECK)

Drawing Review documents to meet the requirements of requisition

1. Other Equipment (Incl. Stack, Filter ,etc.) (See 9.0 Equipment Package)

2. HEATING, VENTILATING AND AIR CONDITIONING (HVAC): (Not applicable for RPF Project.)

TASCO TPI P . 14 OF 29

NO

ITEM DESCRIPTION TECH.DEPT TAINANPLANT DOCUMENT TO BESUBMITTED

1

CIVIL

12.1

Surveying

(a)

Perform sitesurveying

X Surveying Report

(b

Prepare propertymap

Property Map

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 18/35

12.2

GeotechnicalInvesti

gation

12

.3

Specificati

on/DesignCriteria/StandardDrawings(a) *** (b)

(c)

12.4

SitePrepar ation

12

.5

Soil

Improvement/GeotechnicalDesign

TASCO ITEM

12.612.712.8

12.9

(c) Prepare geotechnical designdrawings Piling/Foundation (a)Decide type of pile (b) Preparepiling diagrams. (including piledesign) (c) Prepare foundationlocation plan (d) Preparecalculation sheets for equipment/machinery/structurefoundations (e) Prepare plan &detail drawings for 

equipment/machinery/structurefoundations (f) Prepare piling testprogram (g) Perform pilingtestDike/Retaining Wall/ BlastWall Prepare detail drawing of dike , retaining wall & blast wallPaving/Road/ Drainage System/Pipe Sleeper/Pipe Trench/CableTrench (a) Prepare paving, roadand drainage system drawing (b)Prepare detail drawing of trench,sewer, manhole, catch basin, pit &sump, pipe sleeper, pipe/cable

trench,etc. Fence & GatePrepare detail drawing of fence &gate

X X X XX X X XX X

X

GeotechnicalDesign DrawingsDiscuss withTASCO. PilingLocation Plan/PileDetail FoundationLocation PlanCalculationSheets DetailDrawing for 

Foundations Testprogram (If required) Testreport (If required)DetailDrawing of Dike,Retaining Walland Blast wallPaving, Road andDrainage SystemPlan & DetailDetail DrawingsDetail Drawing

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 19/35

TPI

P

. 16 OF

29 NO

ITEM

DESCRIPTI

ON TECH.

DEPT

TAINAN

PLANT

DOCUMEN

T TO BE

SUBMITTE

D

12.10

ConcreteTank/CoolingTower Basin/Separator 

1

2.11

Culvert

12.1

M.T.O.

2

***12.13

BidDocument

Prepare bid documentBid Document (not required)

1

2.14

Permit Application(a) *** (b)

Prepare document for permit applicationfrom governmentauthority Applicationfor permit

X X

TECH: prepare

design drawings& calculationsheets whenrequired. AuthorizedPermit

12.15

 AsBuiltDrawings

(a)

Prepare marked-updrawing in field by

constructioncontractor 

X Marked-upDrawings

***(b)

Prepare as builtdrawings after completion of 

erection

 As BuiltDrawings (notrequired.)

***12.16

Technical BidEvaluation

Review bidder‘s dataand drawings for conformance withspecifications (Thenumber of bids is limitedto 3.)

X Technical BidEvaluationSheets

12.17

ConstructionContractor‘sData &DrawingsReview

Review constructioncontractor's data anddrawings

X Comment

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 20/35

NO ITEM DESCRIPTION

13.0 STRUCTURE

13.1 Specification/Design (a) Prepare steel and concrete

engineering Criteria/Standard specification/design

criteria Drawings

*** (b) Prepare construction

specification

(c) Prepare standard drawings

13.2 Pipe Rack/Pipe (a) Prepare calculation sheets for 

steel pipe Bridge/Conveyor rack/steel pipe

bridge/concrete pipe Support rack/conveyor support

(b) Prepare detail

drawing for steel pipe

rack/steel pipe

bridge/concrete pipe

rack/ conveyor support

13.3 Operating (a) Prepare calculationsheets for Structure/Building

operating/building structures Structure

(b) Prepare detail drawing for 

structures

13.4 Access Platform & Prepare detail drawing of 

access platform & Walkway walkway

13.9 M.T.O. Prepare bill of 

material for purchasing and/or 

construction

13.10 Shop Drawings

Prepare shop fabrication

drawings and erection

drawings

*** 13.12 Bid document Prepare bid documentTECH. DEPT TAINAN PLANT

X

X X X

X

X

X X

X

X

P . 17 OF 29 DOCUMENT TO BE SUBMITTED

Steel and Concrete Structural Specification Construction

Specification Standard DrawingsCalculation Sheets

Detail Drawing

Calculation Sheets

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 21/35

Detail Drawing for Structures

Detail Drawing of Access Platform & Walkway Bill of Materials

Shop fabrication Drawings and erection drawings for Steel Structure

(Not required.)

Bid Document

TASCO TPI P . 18N

OITEM DESCRIPTION

TECH.DEPT

TAINANPLANT

DOCUMENT TO BESUBMITTED

13.13

Permit Application

(a)

Prepare documentfor permitapplication fromgovernmentauthority

X XTECH: designdrawings &calculation sheetswhen required.

***(b

)

 Application for permit

X  Authorized Permit

13.14

 AsBuiltDrawings

(a)

Prepare mark-updrawing in field byconstructioncontractor 

Marked-upDrawingsrequired.)

***(b)

Prepare as builtdrawings after completion of erection

 As Built Drawings(Not required.)

***13.

15

Technical Bid

Evaluation

Review bidder‘s data &drawings for 

conformance withspecifications (Thenumber of bids islimited to 3.)

X Technical BidEvaluation Sheets

13.16

ConstructionContractor‘sData &Drawing

Review constructioncontractor's data anddrawings

X Comment

Review

1

ARCHITECTURE (Notapplicable for RPF Project.)

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 22/35

TASCO

NO

ITEM

1

PIPING15.1

PipingSpecific

ation

15.2 Piping Standard

15.3 Line List

15.4 Underground & Fire Fighting Piping

15.5 Piping Plan

15.6 Steam Tracing/Jacketing

15.7 Isometric Drawings

TPI

DESCRIPTION

Establish piping design and material specification

Prepare piping standard

Based on line and flow summary, operating conditions, prepare line

list including design condition, test pressure and insulation

thickness for each line

(a) Piping conceptual design(b) Prepare all necessary arrangement and detail drawings(a) Piping general layout(b) Data of nozzle, platform & ladder orientation of vessel andsupport clip on equipment(c) Utility service station and safety shower location plan

(d) Drawing of piping plans and details

Steam tracing and/or jacketing drawings and details

Prepare isometric drawings for A/G piping two (2) inch and above in

sufficient detail showing dimensions to permit prefabrication

P . 19 OF 29TECH.

DEPT

TAINANPLANT

DOCUMENT TO BESUBMITTED

X XX

(i) Piping DesignSpecification (ii)Piping MaterialSpecification (iii)Instrument PipingMaterialSpecification

X Piping Standard

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 23/35

X X (i) Pipe ScheduleCalculation for Critical Line (ii)Line List

X Conceptual

X (i) UndergroundPiping Drawings(ii) Fire FightingDrawings

X

X

X

Utility ServiceStation and SafetyShower LocationPlan

XPiping Plan &Details

X Steam Tracingand/ or JacketingDrawing

XIsometricDrawings

TASCO

ITEM

TPI

DESCRIPTIONTECH.DEPT

TAINANPLANT

P . 20 OF 29DOCUMENT TO BESUBMITTED

15.815.915.10***15

.11***15.12***15.13

Stress Analysis PipeSuppor tM.T.O.Technical BidEvaluat

ion AsBuiltDrawingPipingModelShopDrawingsVendor 

(a) Stress analysis for critical lines (b)Simplified pipingflexibility check (a)Prepare pipe supportstandard (b) Preparepipe support details (c)Prepare pipe supportloading data on pipe

rack, structure andequipment (a) Materialtake-off and prepare billof material sheets for summary (b) Preparepiping summary sheetstabulating all pipingmaterials required for purchase Reviewbidder's data and

X X X XX X X XX X X

X Stress AnalysisSummary PipeSupport Standard(i) Pipe SupportLocation Plans (ii)Special PipeSupport DrawingsBill of MaterialsPiping Summary

Sheets TechnicalBid EvaluationSheetsREQUIRED NOTREQUIREDDrawingsrequired.)Commentcheck) BidDocument

***15.14***15.15***15

.16

Data &DrawingReviewBidDocument

drawings for conformance withspecifications (Thenumber of bids islimited to 3.) Prepareshop drawings of formpiece (a) Review & Approvevendor's data& drawings,interfaceonly for ensuing

detailed design ,

Prepare bid document(incl. constructionspecification)

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 24/35

NO ITEM

16.0 INSTRUMENTATION

16.1 Design Criteria, Specification, and Standard

16.2 Instrument Specification Sheets

16.3 Instrument Pressure Tubing/Piping Hook-up

16.4 Layout of Field Instrument Locations

16.5 Layout of Instrument Main Cable Way

16.6 Layout of Instrument Main Cable

16.7 Electric Power Supply for Instrument

16.8 Control Panel

TPI

DESCRIPTION

Define the design criteria, and prepare instrument, material, and

installation specifications or standards

Prepare instrument specification sheets

Prepare installation drawings showing hookups of tubing/piping

materials

Plot plan showing locations of field instruments, junction boxes, local

panels, etc.

Prepare layout of cable duct, tray, or conduit bank from field to

control room

Prepare layout of instrument main cable from junction boxes and

local panels to control room

Estimate instrument power consumptions and prepare loadschedule for power distribution panels

Prepare control panel layout drawings showing instrument

arrangement, panel configuration and dimensions.TECH. DEPT

X

XTAINAN PLANT

X

X

X X (By Contractor)

X X (By Contractor)

X X (By Contractor)

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 25/35

X X (By Contractor)

X X (By Contractor)

X (By Contractor)

P . 21 OF 29 DOCUMENT TO BE SUBMITTED

Specifications and Standards for Instrumentation

Instrument Specification Sheets

TAINAN:Provide process data.

InstrumentHook-upDrawingsInstrumentSteam

Tracing Hookup Drawings

InstrumentLocation PlanInstrumentWiringConnectionList

Cable Duct or Tray LayoutConduit BankLayoutInstrumentMain CableLayoutInstrumentWiringConnection

List

Load Schedule of Instrument Power Distribution Panel

(i) Outline of Control Panel

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 26/35

TPI

P

. 22 OF 29 NO ITEM DESCRIPTION TECH. DEPT TAINAN PLANT

DOCUMENT TO BE SUBMITTED

1

6.9 

Layout

of Control

Prepare drawings

showing locations of 

X (

i) 

Control

Room Arrangement

Room control roomequipment, cable way,and

X (ii) 

ControlRoomCable List

cable routing X (iii

CableConnectionList

(ByContractor 

)16.10 M.T.O.

Prepare bill of construction materials X

Bill of ConstructionMaterials

(ByContractor 

)

16.11

DistributedControl

Define the scope of DCS/ESD, and prepare

XSystemSpecificationand

System(DCS)and

detailed systemspecification and

input/outputSummaryTable

Emergency

input/output summarytable

ShutdownSystem

(ESD)Specificatio

n16.12

Requisition

Prepare requisition for purchasing

X Requisitions

16.13

Technical Bid

Review bidder‘s data,drawing & document

X XTechnical BidEvaluationSheet

Evaluation

to meet therequirements of requisition (The

(SQUADREVIEW)

number of bids islimited to 3.)

16.

14

Vendor‘s Data

&

Review vendor‘s data,drawing, &

x

Comment

DrawingReview

documents (SQUADREVIEW)

***16.15

 As BuiltDrawing

(NotRequired.)

16.16 Bid

Document Prepare bid document X Bid Document

TASCO

ITEM

TPI

DESCRIPTIONTECH.DEPT

TAINANPLANT

P . 23 OF 29DOCUMENT TO BESUBMITTED

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 27/35

1 ELECTRICAL 17.1EngineeringSpecification17.2EquipmentSpecification& DataSheets 17.3Installation

Details

Prepare electricalengineeringspecification Prepareelectrical equipmentspecifications anddata sheets Preparetypical electrical

installation drawings

X

X X X

ElectricalEngineeringSpecificationElectr ical EquipmentSpecifications andData SheetsTypical ElectricalInstallation Detail

Drawings

 1

PrepareDocuments for Government Approval

(a

Prepare documents anddrawings for approval per local regulation

(not required.),,,,,

17

OneLineDiagram

(a

Establish electrical power distribution system

X

(b

Establish design basis for emergency power system.

Design and preparedetailed drawings for thefollowings:

X (If Required.)

(1) Uninterruptible power system with batterycharger, rectifier, battery,inverter, etc. tp provideemergency power for instruments includingdistributed control system.

X (If Required.)

(2) Supply of emergencypower to critical equipment

X (If Required.)

(3) Supply of emergencypower to emergencylighting

X (If Required. Also,power tocertain pumps.)

(c

Prepare system one linediagram X

One LineDiagrams (If Required.)

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 28/35

NO

TASCO 

1

7.6 

ITEM

 AreaClassifi

cation

17.7 

SchematicDiagrams

17.8

 

Motor 

List

17.9 

EngineeringStudyandCalculations

17.10 17.11 

ProtectiveRelayCoordinationRequisition

17.

Substation andSwitch

12 

RoomLayout

DESCRIPTION

(a) Establish classification of hazardous areas for electrical apparatusinstallation(b) Prepare hazardous area classification drawings(a) Develop typical motor control scheme(b) Prepare typical automatic re-acceleration scheme(c) Prepare schematic diagram showing connections and functions for control circuit of motor‘s, etc.

Prepare electrical load list for motors and other electrical

equipment

Prepare engineering study and calculations for electrical design

comprising the followings:

Establish protective relay coordination

(a) Prepare requisition for purchasing of electrical equipment(b) Prepare reqisitions for purchasing of electrical materials(a) Decide location of substation and electrical rooms(b) Prepare equipment layout drawings for substation and electricalrooms

TECH.DEPT

X X

TAINANPLAN

T X XX

X (notrequir ed.)

(notrequir ed.) X X

X

P . 24 OF 29 DOCUMENT TO BE SUBMITTED

Hazardous Area Classification Drawings

(If Required.) (If Required.)

Schematic Diagrams

(If Required.)

Motor List (For Design Use Only) Calculation Sheets (not

required.)

Relay Setting Record and Coordination Drawing

Equipment Requisitions

Material Requisitions

(Not Required.)

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 29/35

Subs

tatio

n

and

Elect

rical

Roo

ms

Layo

ut

Drawings

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 30/35

NOITEM

17.1317.14

ElectricalComputer Monitor ing andControlSystemPower Layout

1

7.15***17.161

7.17

ConnectionDiagramsPower PanelboardScheduleConduitandCable

Schedule

17.18

Electrical HeatTracingSystem

DESCRIPTION TECH. DEPT TAINAN PLANT

(c) Prepare power and control wiring layout X drawings for substationand electrical (By Contractor) rooms

(d) Prepare substation equipment (MCC/SWGR) outline (by vendors)

Prepare power layoutdrawings showing

X

location of electricalequipment,

(ByContractor)

conduits or cables

Prepare cable tray or other type cable X

support layout andinstallation details, if 

(ByContractor)

any

Prepare connectiondiagrams for control

X

circuits of motors, etc. (ByContractor)

Prepare power panelboardschedule showingcircuit and load data.

Prepare conduit and/or cable schedule listing Xthe identification number,type, size, length,

(ByContractor)

route and purpose for allconduits and/or cables serving the motorsand other electricalequipment shown onpower layout drawings

Prepare specification for electrical heat

X

tracing system(construction drawings by

(ByContractor)

construction contractor)

P . 25 OF 29 DOCUMENT TO BE SUBMITTED

Substation and Electrical Rooms Wiring Layout Drawings

(Not Required.)(Not Required.)

Power Layout Drawings

Connection Diagrams Power Panelboard Schedule

(Not Required.)

Conduit and/or Cable Schedule

Specification for Electrical Heat Tracing

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 31/35

NOITEM

17.19

17.20

17.21

17.22

17.23

17.24

17.25

17.2

6

Grounding/Lightning Protection Layout

Cathodic Protection Layout

Lighting Layout

lighting Panel Board Schedule

Lighting Fixture Schedule

Communication/Fire Alarm System

Safety/Security system

M.T.O.

TPI

DESCRIPTIONTECH.DEPT

TAINANPLANT

Developgrounding/lightningprotection layoutdrawings showinggrounding looparrangement,location of groundrods andconnections to allequipment to be

grounded includinglightning protectionsystem if requiredDevelop cathodicprotection systemand prepare drawingshowing equipmentand devicearrangement andwiring layout(induding relatedengineeringcalculation of 

required) Developlighting system andprepare drawingshowingarrangement of lighting fixtures,lighting panels,conveniencereceptacles andwiring in outdoor areas or in buildingsincluding emergencylighting system

Prepare lightingpanel boardschedule showingload and circuitrequirements of panel Board for lighting systemPrepare lightingfixture schedulesshowing fixtures,

X (ByContract

or) X(By

Contractor) X(By

Contractor) X(By

Contractor) X(By

Contractor) X(By

Contractor) X(By

Contractor) X(By

Contract

or)

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 32/35

type, and wattagePreparecommunication/firealarm layout drawingshowing equipmentand devicearrangement andwiring layout (incl.system diagram)Preparesafety/security layoutdrawings showingequipment anddevice arrangementand wiring layoutPrepare compositebill of electricalmaterials showingtheir requirements

P .

26OF

29

DOC

UME

NT

TO

BE

SUB

MITT

ED

G

o

unding/Lightning protection Layout Drawings

Cathodic Protection Layout Drawings

(If Required.)

Lighting Layout Drawings

Lighting Panel Board Schedule

Lighting Fixture Schedule

Communication/Fire Alarm Layout Drawings

Safety/Security layout drawings

(If Required.)

Bill of Materials

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 33/35

TPI

P

. 27 OF 29 NO ITEM DESCRIPTION TECH. DEPT TAINAN

PLANT DOCUMENT TO BE SUBMITTED

17.27

Technical Bid

Review bidder‘s data, drawing& document

X Technical BidEvaluationSheets

Evaluation

to meet the requirements of requisition (Thenumber of bids is limited to 3.)

17.28

Vendor‘s Data&

Review vendor's data, drawing& documents

X Comment

Drawing

Review***17.29

 As BuiltDrawings

(Marked-upDrawings

(NOT Required.)

17.30 BidDocument Prepare bid document X Bid Document

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 34/35

7/27/2019 RPF Project-Engineering Scope of Work

http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 35/35

TASCO

P .

NO

ITEM DESCRIPTION TECH.DEPT

TAINANPLANT

1 PAINTING AND WRAPPING

18.1

Specifications

(a

)

Prepare paintingspecifications

X

(b)

Prepare wrappingand coatingspecification

X

(c)

Prepare paintingschedule

X

18.2

M.T.O.Prepare bill of materialsfor purchasing

X

***18.3

Technical BidEvaluation

Review bidder's datafor conformance withspecification (Thenumber of bids is

limited to 3.)

X

***18.4

BidDocument

Prepare bid document(incl. constructionspecification)

X