1
ROWAN UNIVERSITY STORMWATER MANAGEMENT & LANDSCAPE MASTER PLAN Harnessing a hidden resource in plain sight. 5 MOST IMPORTANT ISSUES Functional landscapes like this proposed wetland amenity weave ecology with stormwater management. Laurel Hall Enhanced native herbaceous and shrub plantings along edges of campus green Bioretention and bioswales along the pathways where needed Gathering Spaces Designed Within the Wetland Buffer Plantings Wetland Oak Grove Native Herbaceous Plantings Boardwalk Oak Hall N New Location For Linden Hall N Not To Scale THE CAMPUS GREEN INFRASTRUCTURE OVERLAY Rendering by Biohabitats Student participation included interactive work sessions. An enhanced Meditation Walk along Chestnut Branch brings greater cohesion across the campus. A phased prioritization of the planning projects ensures implementation can occur immediately. INFRASTRUCTURE REQUIREMENTS Rather than address ooding using traditional, site-specic, “hard engineering” solutions, the University and its planning team developed a holistic solution that harnesses the power of nature and charts the course for a more cohesive and connected campus. Viewed as living infrastructure, each stormwater practice on campus becomes a functional landscape, a component of a natural system that not only slows down and lters stormwater, but links open space, and connects the campus to its ecological context. SUSTAINABILITY By seamlessly linking functional landscapes within the campus’ ecological context the plan moves beyond sustainability to regeneration. With every application of the plan, new connections are forged. Ecological processes and human connections to the landscape are strengthened. New spaces for campus life and learning are created. Native plants, natural features, and green infrastructure become increasingly integral to the campus aesthetic, ecology, natural resource management, and academic mission. Each campus development project builds upon a growing, meaningful, cohesive, campus-wide statement about the power and beauty of natural systems. OPEN SPACE AND PEDESTRIAN CIRCULATION By viewing water as a resource rather than a problem, and by embracing the natural stream corridor unique to its campus Rowan is now transforming its landscape and the entire campus experience into one that is pedestrian-dominant and enriched and enlivened by the regional ecology. PLANNING PROCESS No one knows a campus better than its daily users. Stakeholders were engaged in hands- on planning exercises that yielded honest, meaningful input from Rowan’s students, faculty, staff, and community members. Their feedback, including the identi cation of spaces where students love to enjoy nature or spaces that feel unsafe, was directly addressed in the plan. MASTER PLAN IMPLEMENTATION With capital improvement projects already underway, there was a need to implement stormwater management projects while developing a comprehensive and long term stormwater and landscape master plan. The planning team recognized the opportunity to solve immediate problems in a way that would lead to greater landscape cohesion and the gradual realization of a new, vibrant campus landscape that is connected and dened by nature. INTEGRATED PLANNING MAKING CONNECTIONS IMPLEMENTATION IN THE GROUND & LAYING GROUNDWORK Analysis began with data assessment to understand the regional setting and characteristics, planning and hydrologic history, ecology, stormwater, and regulatory and landscape contexts. Stakeholder interviews and activities uncovered user needs and challenges. Site walks and assessments yielded a more complete understanding of the campus experience and conditions. Designs were developed collaboratively, with Rowan staff and stakeholders providing input at every stage. Concepts and landscape typologies were crafted for three ‘focus areas’ deemed representative of campuswide stormwater problems. With an emphasis on buildings currently under development, the concepts strengthened core open space and connectivity between north and south and restored the Chestnut Branch corridor as an east-west connection and ecological asset. An interconnected pattern of historic streams and wetlands provided the model for a renewed campus hydrology. An historic aerial of the property shows extensive wetlands and streams. Rendering by Ayers Saint Gross Rendering by Biohabitats A network of high-performing open spaces fosters learning and strengthens a sense of place. Students highlighted unsafe areas of campus, as well as the most popular open space areas. Image by Ayers Saint Gross Recently completed stormwater garden and landscape upgrade at Memorial Hall. Memorial Hall Vending (Icebox) Bioretention Areas Outdoor Classroom N Flexible Outdoor Classroom Space Flexible Outdoor Classroom Space Detailed site plan for Memorial Hall landscape improvements and stormwater management (December 2014). Rendering by Ayers Saint Gross Students took an active role in the planning process. Rendering by Rowan University Rendering by Biohabitats & Ayers Saint Gross Rendering by Ayers Saint Gross College of Engineering Rowan Hall North Engineering Green creates long views to Chestnut Branch. South Engineering Green Parking lot with integrated bioretention features and tree canopy A new gateway for campus is formed with the placement of Rowan Hall and the new College of Engineering Building. Rowan Pond Integrated stormwater management features along the streetscape as well as the buildings Open Space/ Bioretention Feature Wilson Hall Future daylighting opportunity 0 25 50 100 FEET N Woodland An immediately implementable plan that addresses ooding while knitting together a cohesive, functional, and engaging campus. Specic goals: • Stormwater management connects and enhances a fragmented campus landscape– mitigating ongoing ooding issues. • Restoration of Chestnut Branch to improve ecological function. • Creation of a cohesive, connected campus landscape that enhances the university experience. • Promote mission of University with exible open space and research opportunities SCOPE OF PROJECT 207 acres on campus 229 acres 118 acres 35 acres 88 acres By using Chestnut Branch and historic hydrology as guides, the plan seamlessly integrates green infrastructure and natural systems into the campus open space network. PROPOSED PLAN ows Storm drains Existing wetlands and streams Existing green infrastructure Proposed wetlands and streams Proposed BMPs Underground storage LEGEND NTS N Campus stormwater management is integrated throughout the campus landscape. Although the master plan is a long-term planning document, it needed to address an immediate stormwater problem and be applicable to campus development projects underway. Design and construction of Memorial Hall’s landscape and stormwater BMPs began simultaneously with the development of this plan. This was viewed as an opportunity to seamlessly integrate the plan’s vision for improved landscape function, aesthetics, and connectivity with existing development while creating a visible path for future implementation. An interconnected pattern of historic streams and wetlands provided the model for a renewed campus hydrology. N FEET N FEET Integrating natural systems, infrastructure, and open space creates functional landscapes. Rendering by Biohabitats The Rowan campus drains over 470 acres from adjacent properties. Rendering and mapping by Biohabitats Meditation Walk

ROWAN UNIVERSITY 5 MOST IMPORTANT ISSUES STORMWATER ... · Viewed as living infrastructure, each stormwater practice on campus becomes a functional landscape, a component of a natural

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ROWAN UNIVERSITY 5 MOST IMPORTANT ISSUES STORMWATER ... · Viewed as living infrastructure, each stormwater practice on campus becomes a functional landscape, a component of a natural

ROWAN UNIVERSITYSTORMWATER MANAGEMENT & LANDSCAPE MASTER PLANHarnessing a hidden resource in plain sight.

5 MOST IMPORTANT ISSUES

Functional landscapes like this proposed wetland amenity weave ecology with stormwater management.

LaurelHall

Enhanced native herbaceous and shrub plantings along edges of campus green

Bioretention and bioswales along

the pathways where needed

Gathering Spaces

Designed Within the Wetland Buffer

Plantings

Wetland

Oak Grove

Native Herbaceous

Plantings

Boardwalk

OakHall

N

New Location For

Linden Hall

NNot To Scale

THE CAMPUS GREEN INFRASTRUCTURE

OVERLAY

Ren

deri

ng b

y B

ioha

bita

ts

Student participation included interactive work sessions.

An enhanced Meditation Walk along Chestnut Branch brings greater cohesion across the campus.

A phased prioritization of the planning projects ensures implementation can occur immediately.

INFRASTRUCTURE REQUIREMENTSRather than address � ooding using traditional, site-speci� c, “hard engineering” solutions, the University and its planning team developed a holistic solution that harnesses the power of nature and charts the course for a more cohesive and connected campus. Viewed as living infrastructure, each stormwater practice on campus becomes a functional landscape, a component of a natural system that not only slows down and � lters stormwater, but links open space, and connects the campus to its ecological context.

SUSTAINABILITYBy seamlessly linking functional landscapes within the campus’ ecological context the plan moves beyond sustainability to regeneration. With every application of the plan, new connections are forged. Ecological processes and human connections to the landscape are strengthened. New spaces for campus life and learning are created. Native plants, natural features, and green infrastructure become increasingly integral to the campus aesthetic, ecology, natural resource management, and academic mission. Each campus development project builds upon a growing, meaningful, cohesive, campus-wide statement about the power and beauty of natural systems.

OPEN SPACE AND PEDESTRIAN CIRCULATIONBy viewing water as a resource rather than a problem, and by embracing the natural stream corridor unique to its campus Rowan is now transforming its landscape and the entire campus experience into one that is pedestrian-dominant and enriched and enlivened by the regional ecology.

PLANNING PROCESSNo one knows a campus better than its daily users. Stakeholders were engaged in hands-on planning exercises that yielded honest, meaningful input from Rowan’s students, faculty, staff, and community members. Their feedback, including the identi� cation of spaces where students love to enjoy nature or spaces that feel unsafe, was directly addressed in the plan.

MASTER PLAN IMPLEMENTATIONWith capital improvement projects already underway, there was a need to implement stormwater management projects while developing a comprehensive and long term stormwater and landscape master plan. The planning team recognized the opportunity to solve immediate problems in a way that would lead to greater landscape cohesion and the gradual realization of a new, vibrant campus landscape that is connected and de� ned by nature.

INTEGRATED PLANNINGMAKING CONNECTIONS

IMPLEMENTATIONIN THE GROUND & LAYING GROUNDWORK

Analysis began with data assessment to understand the regional setting and characteristics, planning and hydrologic history, ecology, stormwater, and regulatory and landscape contexts. Stakeholder interviews and activities uncovered user needs and challenges. Site walks and assessments yielded a more complete understanding of the campus experience and conditions.

Designs were developed collaboratively, with Rowan staff and stakeholders providing input at every stage. Concepts and landscape typologies were crafted for three ‘focus areas’ deemed representative of campuswide stormwater problems. With an emphasis on buildings currently under development, the concepts strengthened core open space and connectivity between north and south and restored the Chestnut Branch corridor as an east-west connection and ecological asset.

An interconnected pattern of historic streams and wetlands provided the model for a renewed campus hydrology.

An historic aerial of the property shows extensive wetlands and streams.

Ren

deri

ng b

y Ay

ers

Sain

t G

ross

Ren

deri

ng b

y B

ioha

bita

ts

A network of high-performing open spaces fosters learning and strengthens a sense of place.

Students highlighted unsafe areas of campus, as well as the most popular open space areas.

Imag

e by

Aye

rs S

aint

Gro

ss

Recently completed stormwater garden and landscape upgrade at Memorial Hall.

Memorial Hall

Vending(Icebox)

Bioretention Areas

Outdoor Classroom

N

Flexible Outdoor Classroom

Space

Flexible Outdoor Classroom

Space

Detailed site plan for Memorial Hall landscape improvements and stormwater management (December 2014).

Ren

deri

ng b

y Ay

ers

Sain

t G

ross

Students took an active role in the planning process.

Ren

deri

ng b

y R

owan

Uni

vers

ity

Ren

deri

ng b

y B

ioha

bita

ts

& A

yers

Sai

nt G

ross

Ren

deri

ng b

y Ay

ers

Sain

t G

ross

College of Engineering

Rowan Hall

North

EngineeringGreen

creates long views to Chestnut Branch.

South

EngineeringGreen

Parking lot with

integrated bioretention features and tree

canopy

A new gateway for campus is formed

with the placement of Rowan Hall and the new College of

Engineering Building.

Rowan Pond

Integrated stormwater management features

along the streetscape as well as the buildings

Open Space/Bioretention

Feature

Wilson Hall

Future daylighting

opportunity

0 25 50 100

FEETN

Woodland

An immediately implementable plan that addresses � ooding while knitting together a cohesive, functional, and engaging campus.

Speci� c goals: • Stormwater management connects and

enhances a fragmented campus landscape– mitigating ongoing � ooding issues.

• Restoration of Chestnut Branch to improve ecological function.

• Creation of a cohesive, connected campus landscape that enhances the university experience.

• Promote mission of University with � exible open space and research opportunities

SCOPE OF PROJECT

207 acres on campus

229 acres

118 acres

35 acres

88 acres

By using Chestnut Branch and historic hydrology as guides, the plan seamlessly integrates green infrastructure and natural systems into the campus open space network.

PROPOSED PLAN

ows

Storm drains

Existing wetlands and streams

Existing green infrastructure

Proposed wetlands and streams

Proposed BMPs

Underground storage

LEGEND

NTSN

Campus stormwater management is integrated throughout the campus landscape.

Although the master plan is a long-term planning document, it needed to address an immediate stormwater problem and be applicable to campus development projects underway. Design and construction of Memorial Hall’s landscape and stormwater BMPs began simultaneously with the development of this plan. This was viewed as an opportunity to seamlessly integrate the plan’s vision for improved landscape function, aesthetics, and connectivity with existing development while creating a visible path for future implementation.

An interconnected pattern of historic streams and wetlands provided the model for a renewed campus hydrology.

NFEET

NFEET

Integrating natural systems, infrastructure, and open space creates

functional landscapes.

Ren

deri

ng b

y B

ioha

bita

ts

The Rowan campus drains over 470 acres from adjacent

properties.

Ren

deri

ng a

nd m

appi

ng

by B

ioha

bita

ts

Meditation Walk