17
County of Fairfax, Virginia Department of Transportation Route 7 Bus Rapid Transit Study NVTC and FCDOT Fairfax County Department of Transportation

Route 7 BRT Study - Fairfax County, Virginia...FCDOT Route 7 BRT Study Progress •9 route alternatives are currently being analyzed •3 of the 9 will be chosen to undergo a more

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Route 7 BRT Study - Fairfax County, Virginia...FCDOT Route 7 BRT Study Progress •9 route alternatives are currently being analyzed •3 of the 9 will be chosen to undergo a more

County of Fairfax, Virginia

Department of Transportation

Route 7 Bus Rapid Transit StudyNVTC and FCDOT

Fairfax County Department of Transportation

Page 2: Route 7 BRT Study - Fairfax County, Virginia...FCDOT Route 7 BRT Study Progress •9 route alternatives are currently being analyzed •3 of the 9 will be chosen to undergo a more

County of Fairfax, Virginia

NVTC Overview

• Process Overview

• Progress Update

• Station Layout

• Process Closeout

Department of Transportation

2

Page 3: Route 7 BRT Study - Fairfax County, Virginia...FCDOT Route 7 BRT Study Progress •9 route alternatives are currently being analyzed •3 of the 9 will be chosen to undergo a more

County of Fairfax, Virginia

NVTC Process Overview• Phase III of Envision Route 7

kickoff Spring 2018

• Regular TAC meetings with

jurisdictions and other

stakeholders (VDOT, WMATA,

DRPT)

• Advancing layouts consistent with

feedback and regional plans

Department of Transportation

3

Page 4: Route 7 BRT Study - Fairfax County, Virginia...FCDOT Route 7 BRT Study Progress •9 route alternatives are currently being analyzed •3 of the 9 will be chosen to undergo a more

County of Fairfax, Virginia

NVTC Process Update• Created station and

runningway templates

• Selected runningway type

to enhance operations

• Refined conceptual

station locations

• Begun initial design

effortsDepartment of Transportation

4

Page 5: Route 7 BRT Study - Fairfax County, Virginia...FCDOT Route 7 BRT Study Progress •9 route alternatives are currently being analyzed •3 of the 9 will be chosen to undergo a more

County of Fairfax, Virginia

Demographics and Land Use

Department of Transportation

5

Existing

Land Use

Population

Density

% Below

Poverty Level% Zero and One

Car Households

Page 6: Route 7 BRT Study - Fairfax County, Virginia...FCDOT Route 7 BRT Study Progress •9 route alternatives are currently being analyzed •3 of the 9 will be chosen to undergo a more

County of Fairfax, Virginia

Station and Runningway Templates

Department of Transportation

6

Page 7: Route 7 BRT Study - Fairfax County, Virginia...FCDOT Route 7 BRT Study Progress •9 route alternatives are currently being analyzed •3 of the 9 will be chosen to undergo a more

County of Fairfax, Virginia

Station and Runningway Templates

Department of Transportation

7

Page 8: Route 7 BRT Study - Fairfax County, Virginia...FCDOT Route 7 BRT Study Progress •9 route alternatives are currently being analyzed •3 of the 9 will be chosen to undergo a more

County of Fairfax, Virginia

NVTC Planning Level Layouts

Department of Transportation

8

• Selected

runningway type

(curb, BAT,

median, mixed)

• Identified specific

station locations

Page 9: Route 7 BRT Study - Fairfax County, Virginia...FCDOT Route 7 BRT Study Progress •9 route alternatives are currently being analyzed •3 of the 9 will be chosen to undergo a more

County of Fairfax, Virginia

Conceptual Design (Right-of-Way)

Department of Transportation

9

Page 10: Route 7 BRT Study - Fairfax County, Virginia...FCDOT Route 7 BRT Study Progress •9 route alternatives are currently being analyzed •3 of the 9 will be chosen to undergo a more

County of Fairfax, Virginia

Conceptual Design (Cross Section)

Department of Transportation

10

Page 11: Route 7 BRT Study - Fairfax County, Virginia...FCDOT Route 7 BRT Study Progress •9 route alternatives are currently being analyzed •3 of the 9 will be chosen to undergo a more

County of Fairfax, Virginia

NVTC Process Closeout

• Complete conceptual design

• Assess ROW needs

• Formulate Cost Estimate

• NVTC Phase III finish late Summer / early Fall of

2019

Department of Transportation

11

Page 12: Route 7 BRT Study - Fairfax County, Virginia...FCDOT Route 7 BRT Study Progress •9 route alternatives are currently being analyzed •3 of the 9 will be chosen to undergo a more

County of Fairfax, Virginia

FCDOT Route 7 BRT Overview

• Scope of Study

• Progress of Study

• Study Closeout

Department of Transportation

12

Page 13: Route 7 BRT Study - Fairfax County, Virginia...FCDOT Route 7 BRT Study Progress •9 route alternatives are currently being analyzed •3 of the 9 will be chosen to undergo a more

County of Fairfax, Virginia

FCDOT Route 7 BRT Scope of Study

• Study Kickoff October

2018

• Study focus on Route 7

(from Spring Hill Metro to I-

66 Interchange)

• Alternative routings within

Tysons

Department of Transportation

13

Page 14: Route 7 BRT Study - Fairfax County, Virginia...FCDOT Route 7 BRT Study Progress •9 route alternatives are currently being analyzed •3 of the 9 will be chosen to undergo a more

County of Fairfax, Virginia

FCDOT Route 7 BRT Scope of Study

• Study will answer the following:

– What is the multimodal cross section?

– What alignment will BRT take within Tysons?

– What type of transit runningway does BRT

operate in?

– Where are the BRT stations to be located?

Department of Transportation

14

Page 15: Route 7 BRT Study - Fairfax County, Virginia...FCDOT Route 7 BRT Study Progress •9 route alternatives are currently being analyzed •3 of the 9 will be chosen to undergo a more

County of Fairfax, Virginia

FCDOT Route 7 BRT Study Progress

• Transportation Model

Calibration completed

May 2019

• Existing Conditions

Analysis to be completed

Summer 2019

Department of Transportation

15

Page 16: Route 7 BRT Study - Fairfax County, Virginia...FCDOT Route 7 BRT Study Progress •9 route alternatives are currently being analyzed •3 of the 9 will be chosen to undergo a more

County of Fairfax, Virginia

FCDOT Route 7 BRT Study Progress

• 9 route alternatives are

currently being

analyzed

• 3 of the 9 will be

chosen to undergo a

more in-depth analysis

and evaluation

Department of Transportation

16

Page 17: Route 7 BRT Study - Fairfax County, Virginia...FCDOT Route 7 BRT Study Progress •9 route alternatives are currently being analyzed •3 of the 9 will be chosen to undergo a more

County of Fairfax, Virginia

FCDOT Route 7 BRT Study Closeout

• Study expected to be completed by Spring 2020

• Findings from FCDOT Route 7 BRT Study will be

incorporated into Envision Route 7 Phase IV which

will include more detailed traffic analysis for whole

corridor

Department of Transportation

17