County of Fairfax, Virginia
Department of Transportation
Route 7 Bus Rapid Transit StudyNVTC and FCDOT
Fairfax County Department of Transportation
County of Fairfax, Virginia
NVTC Overview
• Process Overview
• Progress Update
• Station Layout
• Process Closeout
Department of Transportation
2
County of Fairfax, Virginia
NVTC Process Overview• Phase III of Envision Route 7
kickoff Spring 2018
• Regular TAC meetings with
jurisdictions and other
stakeholders (VDOT, WMATA,
DRPT)
• Advancing layouts consistent with
feedback and regional plans
Department of Transportation
3
County of Fairfax, Virginia
NVTC Process Update• Created station and
runningway templates
• Selected runningway type
to enhance operations
• Refined conceptual
station locations
• Begun initial design
effortsDepartment of Transportation
4
County of Fairfax, Virginia
Demographics and Land Use
Department of Transportation
5
Existing
Land Use
Population
Density
% Below
Poverty Level% Zero and One
Car Households
County of Fairfax, Virginia
Station and Runningway Templates
Department of Transportation
6
County of Fairfax, Virginia
Station and Runningway Templates
Department of Transportation
7
County of Fairfax, Virginia
NVTC Planning Level Layouts
Department of Transportation
8
• Selected
runningway type
(curb, BAT,
median, mixed)
• Identified specific
station locations
County of Fairfax, Virginia
Conceptual Design (Right-of-Way)
Department of Transportation
9
County of Fairfax, Virginia
Conceptual Design (Cross Section)
Department of Transportation
10
County of Fairfax, Virginia
NVTC Process Closeout
• Complete conceptual design
• Assess ROW needs
• Formulate Cost Estimate
• NVTC Phase III finish late Summer / early Fall of
2019
Department of Transportation
11
County of Fairfax, Virginia
FCDOT Route 7 BRT Overview
• Scope of Study
• Progress of Study
• Study Closeout
Department of Transportation
12
County of Fairfax, Virginia
FCDOT Route 7 BRT Scope of Study
• Study Kickoff October
2018
• Study focus on Route 7
(from Spring Hill Metro to I-
66 Interchange)
• Alternative routings within
Tysons
Department of Transportation
13
County of Fairfax, Virginia
FCDOT Route 7 BRT Scope of Study
• Study will answer the following:
– What is the multimodal cross section?
– What alignment will BRT take within Tysons?
– What type of transit runningway does BRT
operate in?
– Where are the BRT stations to be located?
Department of Transportation
14
County of Fairfax, Virginia
FCDOT Route 7 BRT Study Progress
• Transportation Model
Calibration completed
May 2019
• Existing Conditions
Analysis to be completed
Summer 2019
Department of Transportation
15
County of Fairfax, Virginia
FCDOT Route 7 BRT Study Progress
• 9 route alternatives are
currently being
analyzed
• 3 of the 9 will be
chosen to undergo a
more in-depth analysis
and evaluation
Department of Transportation
16
County of Fairfax, Virginia
FCDOT Route 7 BRT Study Closeout
• Study expected to be completed by Spring 2020
• Findings from FCDOT Route 7 BRT Study will be
incorporated into Envision Route 7 Phase IV which
will include more detailed traffic analysis for whole
corridor
Department of Transportation
17