2
F:\AESBusinessSystems\AES Technical\Piece part instructions\CF25 Furnacne assembly.doc Room Fan Blower Assembly Complete #CF25 For 6500 & 7500 furnance CF31 Blower Housing w/ mounting feet CF32 Blower Capacitor CF33 Blower motor Wire connections: Red wire for low output (not used) Yellow wire high output Black common Remove all parts from boxes. Mount the mounting bracket to the blower motor see instruction. Make sure that all 3 legs of bracket are equal and the there is amount 2 holes shown. Add a male connector to the black and yellow lead from the blower motor. Connect the capacitor to the blow leads in position shown. CF32 Blower capacitor CF31 blower housing w/ hardware 2 holes shown

Room Fan Blower Assembly Complete #CF25F:\AESBusinessSystems\AES Technical\Piece part instructions\CF25 Furnacne assembly.doc. Room Fan Blower Assembly Complete #CF25. For 6500 & 7500

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Room Fan Blower Assembly Complete #CF25F:\AESBusinessSystems\AES Technical\Piece part instructions\CF25 Furnacne assembly.doc. Room Fan Blower Assembly Complete #CF25. For 6500 & 7500

F:\AESBusinessSystems\AES Technical\Piece part instructions\CF25 Furnacne assembly.doc

Room Fan Blower Assembly Complete #CF25

For 6500 & 7500 furnance

• CF31 Blower Housing w/ mounting feet • CF32 Blower Capacitor • CF33 Blower motor

Wire connections:

• Red wire for low output (not used) • Yellow wire high output • Black common

• Remove all parts from boxes. • Mount the mounting bracket to the blower motor see instruction. Make sure that all 3 legs of bracket are

equal and the there is amount 2 holes shown.

• Add a male connector to the black and

yellow lead from the blower motor. Connect the capacitor to the blow leads in position shown.

CF32 Blower capacitor

CF31 blower housing w/ hardware

2 holes shown

Page 2: Room Fan Blower Assembly Complete #CF25F:\AESBusinessSystems\AES Technical\Piece part instructions\CF25 Furnacne assembly.doc. Room Fan Blower Assembly Complete #CF25. For 6500 & 7500

F:\AESBusinessSystems\AES Technical\Piece part instructions\CF25 Furnacne assembly.doc

• Using a tie wrap neatly wrap the red lead and the

capacitor leads together. Fasten the capacitor to the blower housing using tie wrap.

• Mount the blower assembly to the blower housing using the #14 bolts supplied. The housing must be straight or motor with be off set.

• Ground the green lead to housing. • Evenly space the fan housing inside the blower housing. • Tighten the set screw making sure it is on the flat side of the blower motor shaft. • Box if necessary.

#14 screw (3x)