Project Notes: Project Number: Date: Sheet Number: Drawing Title: Roof Replacement Project: Huntley CSD#158 Roof Plan with Projections Conley Elementary 750 Academic Drive Algonquin, Il. 60120 Roof I Roof B Roof D Roof C Roof H Roof G Roof O Roof N Roof M Roof L Roof E Roof F Roof J Roof P Roof K N Shingle Roof Areas Roof E, F, G & H Roof L Roof M Roof N Roof O Total 517 Squares 9 Squares 5 Squares 7 Squares 4 1/2 Squares 542 1/2 Squares ASPHALT & GRAVEL SURFACED BUR N.I.C. STANDING SEAM METAL ROOF N.I.C. COURT YARD STANDING SEAM METAL ROOF N.I.C. N.I.C. N.I.C. N.I.C. 264' 121' 66' 77' 74' 55' 69' 125' 7'-6" 7'-6" 7'-6" 60' 7'-6" 95' A D1 D1 D1 D1 D1 D1 A D1 A D1 D1 7'-6" 58' 256' 11' D1 D1 74' 75' 90' 09-24-17 A D1 D1 General Notes: A C D F C E Self-adhering Underlayment 6' Width at Rake Edge Self-adhering Underlayment 3' Width, ech side of Ridge Self-adhering Underlayment 6' Width at Drip Edge/Gutter Edge Self-adhering Underlayment 6' Width at Side Walls. Run up Vertical 4" min. Self-adhering Underlayment 3' Width each side of Dormer Valley Self-adhering Underlayment 6' Width outside of Eyebrow Dormer Valley Self-adhering Underlayment Completely cover Eybrow Dormer Self-adhering Underlayment 3' Width below Dormer. Run up Vertical 4" min. Self-adhering Underlayment 3' Width, ech side of Ridge Self-adhering Underlayment 6' Width at Side Walls Run up Vertical 4" min. Self-adhering Underlayment 6' Width at Drip Edge/Gutter Edge Self-adhering Underlayment 6' Width at Rake Edge Self-adhering Underlayment 12' Width in Open Valleys Self-adhering Underlayment 12' Width in Open Valleys Self-adhering Underlayment Completely cover all Lower Shed Roofs Note 2 Remove all pre-existing ridge vents prior to installation of new specified vents see Note #3 file: SD158181 roof areas approximate Bidders shall field verify Install new roof anchors at ridge 25' O.C. see Note #4 F D D1 G Note 1: All dimensions are for reference. Bidding contractors shall have sole responsibility for verifing and submitting bids based on the accuracy of their measurements. Note 2: Enclose designated duct with exterior grade 3/4" plywood. Enclosure shall extend down to structural metal deck. Cover plywood enclosure with self-adhering granule surfaced modified bitumen membrane and base sheet. Flash at roof level and strip-in with 5 course mastic and mesh seal. Scarify flood coat down to top ply. 6" beyond toe of cant. Note 3: Remove all pre-existing ridge vents prior to installation of new specified vents. Replace entire sheet with treated 1"X dimensional lumber (no plywood) affected by vent opening (do not 'patch' individual vent openings). For specifications on shoebox vent replacements see BTC drawings and specifications. Note 4: Install new permanant roof anchors 25' O.C. on all ridge lines. See detail Detail 'L', Sheet D-1. Note 5: Refer to typical details where not called out. rev3 on 10-24-17 rev1 on 10-10-17, rev2 on 10-18-17, L

Roof Replacement Project: Huntley CSD#158 Advertisements/2017/Bid #2017-6… · Project Notes: Project Number: Date: Sheet Number: Drawing Title: Huntley CSD#158 Roof Plan with Projections

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Roof Replacement Project: Huntley CSD#158 Advertisements/2017/Bid #2017-6… · Project Notes: Project Number: Date: Sheet Number: Drawing Title: Huntley CSD#158 Roof Plan with Projections

Project Notes:

Project Number:

Date:

Sheet Number:

Drawing Title:

Roof Replacement Project:

Huntley CSD#158

Roof Plan withProjections

Conley Elementary750 Academic DriveAlgonquin, Il. 60120

Roof I

Roof B

Roof D

Roof C

RoofH

RoofG

Roof O

Roof NRoof M

Roof L

Roof E

Roof F

Roof J

Roof P

RoofK

N

Shingle Roof AreasRoof E, F, G & H

Roof LRoof MRoof NRoof O

Total

517 Squares9 Squares5 Squares7 Squares

4 1/2 Squares

542 1/2 Squares

ASPHALT & GRAVEL SURFACED BURN.I.C.

STANDING SEAM METAL ROOFN.I.C.

COURT YARD

STANDING SEAM METAL ROOFN.I.C.

N.I.C.

N.I.C.

N.I.C.

264'

121' 66'77'

74'

55'

69'

125'

7'-6"

7'-6"

7'-6"

60'

7'-6"

95'

AD1

D1

D1

D1

D1

D1

AD1

AD1

D1

7'-6"

58'

256'

11'

D1

D1

74'

75' 90'

09-24-17

AD1

D1

General Notes:

A

C

D

F

C

E

Self-adhering Underlayment6' Width at Rake Edge

Self-adhering Underlayment3' Width, ech side of Ridge

Self-adhering Underlayment6' Width at Drip Edge/Gutter Edge

Self-adhering Underlayment6' Width at Side Walls.Run up Vertical 4" min.

Self-adhering Underlayment3' Width each side of Dormer Valley

Self-adhering Underlayment6' Width outside of Eyebrow Dormer Valley

Self-adhering UnderlaymentCompletely cover Eybrow Dormer

Self-adhering Underlayment3' Width below Dormer.Run up Vertical 4" min.

Self-adhering Underlayment3' Width, ech side of Ridge Self-adhering Underlayment

6' Width at Side WallsRun up Vertical 4" min.Self-adhering Underlayment

6' Width at Drip Edge/Gutter Edge

Self-adhering Underlayment6' Width at Rake Edge

Self-adhering Underlayment12' Width in Open Valleys

Self-adhering Underlayment12' Width in Open Valleys

Self-adhering UnderlaymentCompletely cover all Lower Shed Roofs

Note 2

Remove all pre-existing ridge ventsprior to installation of new specified vents

see Note #3

file: SD158181

roof areas approximateBidders shall field verify

Install new roof anchors at ridge 25' O.C.see Note #4

F

D

D1G

Note 1: All dimensions are for reference. Bidding contractors shall have sole responsibility for verifingand submitting bids based on the accuracy of their measurements.

Note 2: Enclose designated duct with exterior grade 3/4" plywood. Enclosure shall extend down to structural metal deck.Cover plywood enclosure with self-adhering granule surfaced modified bitumen membrane and base sheet. Flashat roof level and strip-in with 5 course mastic and mesh seal. Scarify flood coat down to top ply. 6" beyond toe of cant.

Note 3: Remove all pre-existing ridge vents prior to installation of new specified vents. Replace entire sheetwith treated 1"X dimensional lumber (no plywood) affected by vent opening (do not 'patch' individual vent openings).For specifications on shoebox vent replacements see BTC drawings and specifications.

Note 4: Install new permanant roof anchors 25' O.C. on all ridge lines. See detail Detail 'L', Sheet D-1.

Note 5: Refer to typical details where not called out.

rev3 on 10-24-17

rev1 on 10-10-17, rev2 on 10-18-17,

L

Page 2: Roof Replacement Project: Huntley CSD#158 Advertisements/2017/Bid #2017-6… · Project Notes: Project Number: Date: Sheet Number: Drawing Title: Huntley CSD#158 Roof Plan with Projections

Project Notes:

Project Number:

Date:

Sheet Number:

Drawing Title:

Huntley CSD#158

Roof Plan withProjections

09-14-17

Heineman Middle School725 Academic DriveAlgonquin, Il. 60120

Roof A

Roof B

Roof C

Roof DRoof ERoofI

Roof H

Roof G

Roof F

Roof N

Roof M

Roof JRoofKRoof

L

Roof ORoof P

N

D2

D2

MATCH LINE

28'

53'

15'

94'-6"

94'-6"

28'

121'

150'

MATCH LINE

D2

81'-6"

78'

15'

53'

191'

D2

MATCH LINE

MATCH LINE

67'-6"

Roof Restoration Project:

A

D2C

D2E

D

D2A

D

D2

D2A

FA

D2C

D2A

D2A

POLYMER MODIFIED PRIMER @ 225 SQFT/GAL +/- 10%

POLYESTER REINFORCING SET INTO WET BASE COAT, DRYROLL LIGHLY TO EMBED

APPLY TOP COAT @ 2 GAL./SQUARE, BACKROLL TO ACHEIVE APPROX. 32 WET MILS

EXISTING STRUCTURAL METAL DECK

EXISTING MECHANICALLY ATTACHED POLYISOCYANURATE INSULATION LAYERS

EXISTING FULLY ADHERED 60 MIL. EPDM MEMBRANE TO REMAIN,POWERWASH & PREP. WITH POLYMER MODIFIED PRIMER AS SPECIFIED

BASE COAT OF POLYURETHANE @ 3 GAL./SQUARE, BACKROLL TO ACHEIVE APPROX. 48 MILS

Roof Construction Profile:Fully Adhered EPDM Single Ply Membrane on Structural Metal Deck

Polyurethane Rehabilitation

0 5 10 25 50 75 100 file: SD158187

Roof Areas:A, B & C

S C A L E I N F E E T

General Notes:

D2A

D2A

D2A

INCLUDE ALL LOWER ROOF AREAS

D2F

Fall Protection Warning Line

Fall ProtectionWarning Line

D2

327 Squares51 1/2 Squares

53 Squares

431 1/2 Squares

Roof ARoof BRoof C

Total

roof areas approximateBidders shall field verify

A

D2AD2

B

D2B

Contractors shall include all smalllower roof areas and verify sqftg.

Note 1: All dimensions are for reference. Bidding contractors shall have sole responsibility for verifyingand submitting bids based on the accuracy of their measurements.

Note 2: Remove all existing walkpads. Peel existing pad from EPDM membrane, or cut out walkwayand membrane and patch with new EPDM membrane. Either options cost shall be included in base bid.Replace existing walkways with textured surface in fluid-applied restoration system.

Note 3: Fluid applied membrane shall extend under all splash blocks, wood sleepers, lightning protectioncables, antenna 'sleds', etc.

Note 4: Refer to typical details where not called out.

rev1 10-10-17, rev2 on 10-18-17,

rev3 10-24-17

Page 3: Roof Replacement Project: Huntley CSD#158 Advertisements/2017/Bid #2017-6… · Project Notes: Project Number: Date: Sheet Number: Drawing Title: Huntley CSD#158 Roof Plan with Projections

Project Notes:

Project Number:

Date:

Sheet Number:

Drawing Title:

Huntley CSD#158

Roof Plan withProjections

09-14-17

Roof Restoration Project:

Heineman Middle School725 Academic DriveAlgonquin, Il. 60120

Roof A

Roof B

Roof C

Roof DRoof ERoofI

Roof H

Roof G

Roof F

Roof N

Roof M

Roof JRoofKRoof

L

Roof O

N

file: SD158186

D2

D2

D2

D2

D2

D2

16'

67'-6"

134'-6" 105'-6"

17'-6"19'

18'

93'

74'

32'

D2

126'

D2

D2

D

F

B

D2C

A

B

POLYMER MODIFIED PRIMER @ 225 SQFT/GAL +/- 10%

POLYESTER REINFORCING SET INTO WET BASE COAT, DRYROLL LIGHLY TO EMBED

APPLY TOP COAT @ 2 GAL./SQUARE, BACKROLL TO ACHEIVE APPROX. 32 WET MILS

EXISTING STRUCTURAL METAL DECK

EXISTING MECHANICALLY ATTACHED POLYISOCYANURATE INSULATION LAYERS

EXISTING FULLY ADHERED 60 MIL. EPDM MEMBRANE TO REMAIN,POWERWASH & PREP. WITH POLYMER MODIFIED PRIMER AS SPECIFIED

BASE COAT OF POLYURETHANE @ 3 GAL./SQUARE, BACKROLL TO ACHEIVE APPROX. 48 MILS

0 5 10 25 50 75 100

S C A L E I N F E E T

A

A

A

B

General Notes:

Roof P

105'-6"

10'

Roof Construction Profile:Fully Adhered EPDM Single Ply Membrane on Structural Metal Deck

Polyurethane Rehabilitation

114'

Roof Areas:D, E, F, G, H and P

Roof DRoof ERoof FRoof GRoof HRoof P

Total

114 1/2 Squares136 1/2 Squares

11 squares5 1/2 squares4 1/2 squares

1 Square

273 Squares

Fall Protection Warning Line

Contractors shall include all smalllower roof areas and verify sqftg.

roof areas approximateBidders shall field verify

Note 1: All dimensions are for reference. Bidding contractors shall have sole responsibility for verifyingand submitting bids based on the accuracy of their measurements.

Note 2: Remove all existing walkpads. Peel existing pad from EPDM membrane, or cut out walkwayand membrane and patch with new EPDM membrane. Either options cost shall be included in base bid.Replace existing walkways with textured surface in fluid-applied restoration system.

Note 3: Fluid applied membrane shall extend under all splash blocks, wood sleepers, lightning protectioncables, antenna 'sleds', etc.

Note 4: Refer to typical details where not called out.

rev1 10-10-17, rev2 10-18-17,

rev3 10-24-17

Page 4: Roof Replacement Project: Huntley CSD#158 Advertisements/2017/Bid #2017-6… · Project Notes: Project Number: Date: Sheet Number: Drawing Title: Huntley CSD#158 Roof Plan with Projections

Project Notes:

Project Number:

Date:

Sheet Number:

Drawing Title:

Huntley CSD#158

Roof Plan withProjections

09-14-17

Roof Restoration Project:

Heineman Middle School725 Academic DriveAlgonquin, Il. 60120

Roof A

Roof B

Roof C

Roof DRoof ERoofI

Roof H

Roof G

Roof F

Roof N

Roof M

Roof JRoofKRoof

L

Roof O

N

file: SD158185

0 5 10 25 50 75 100

S C A L E I N F E E T

POLYMER MODIFIED PRIMER @ 225 SQFT/GAL +/- 10%

POLYESTER REINFORCING SET INTO WET BASE COAT, DRYROLL LIGHLY TO EMBED

APPLY TOP COAT @ 2 GAL./SQUARE, BACKROLL TO ACHEIVE APPROX. 32 WET MILS

EXISTING STRUCTURAL METAL DECK

EXISTING MECHANICALLY ATTACHED POLYISOCYANURATE INSULATION LAYERS

EXISTING FULLY ADHERED 60 MIL. EPDM MEMBRANE TO REMAIN,POWERWASH & PREP. WITH POLYMER MODIFIED PRIMER AS SPECIFIED

BASE COAT OF POLYURETHANE @ 3 GAL./SQUARE, BACKROLL TO ACHEIVE APPROX. 48 MILS

Roof Construction Profile:Fully Adhered EPDM Single Ply Membrane on Structural Metal Deck

Polyurethane Rehabilitation

110'-6" 66'

114'-6"

54'59'-6"

45'

20'

24'39'

89'

53'

37'

D2

D2

D2

D2

18'

11' 47'

12'

D2F

Roof Areas:I, J, K, L, M, N and O

D2

D2

D2

D2B

A

B

D2A

D

B

A

C

C

D2A

RaisedPlatforms

D2E

D2C

D2B

General Notes:

Fall Protection Warning Line

Roof P

56 Squares76 1/2 Squares23 1/2 Squares36 1/2 Squares

5 Squares2 1/5 Squares

1/2 Square

200 1/2 Squares

Roof IRoof JRoof KRoof L

Roof MRoof NRoof 0

Total

roof areas approximateBidders shall field verify

Contractors shall include all smalllower roof areas and verify sqftg.

Note 1: All dimensions are for reference. Bidding contractors shall have sole responsibility for verifyingand submitting bids based on the accuracy of their measurements.

Note 2: Remove all existing walkpads. Peel existing pad from EPDM membrane, or cut out walkwayand membrane and patch with new EPDM membrane. Either options cost shall be included in base bid.Replace existing walkways with textured surface in fluid-applied restoration system.

Note 3: Fluid applied membrane shall extend under all splash blocks, wood sleepers, lightning protectioncables, antenna 'sleds', etc.

Note 4: Refer to typical details where not called out.

rev1 on 10-24-17

Page 5: Roof Replacement Project: Huntley CSD#158 Advertisements/2017/Bid #2017-6… · Project Notes: Project Number: Date: Sheet Number: Drawing Title: Huntley CSD#158 Roof Plan with Projections

Project Notes:

Project Number:

Date:

Sheet Number:

Drawing Title:

Huntley CSD#158Roof Restoration Project:

Heineman Middle School725 Academic DriveAlgonquin, Il. 60120

Roof A

Roof B

Roof C

Roof DRoof ERoofI

Roof H

Roof G

Roof F

Roof N

Roof M

Roof JRoofKRoof

L

Roof O

N

Roof P

56 Squares76 1/2 Squares23 1/2 Squares36 1/2 Squares

5 Squares2 1/5 Squares

1/2 Square

200 1/2 Squares

Roof IRoof JRoof KRoof L

Roof MRoof NRoof 0

Total

roof areas approximateBidders shall field verify

Contractors shall include all smalllower roof areas and verify sqftg.

10-24-17

file: SD15818X

Roof Plan withWalkways

DRenkosik
Text Box
and partial plan for Marlowe Middle School 9625 Haligus Rd. Lake In The Hills, IL
Page 6: Roof Replacement Project: Huntley CSD#158 Advertisements/2017/Bid #2017-6… · Project Notes: Project Number: Date: Sheet Number: Drawing Title: Huntley CSD#158 Roof Plan with Projections

Project Notes:

Project Number:

Date:

Sheet Number:

Drawing Title:

Roof Replacement Project:

Huntley CSD#158

Roof Plan withProjections

Roof O

Roof MRoof N

Roof L

RoofG

RoofH

Roof CRoof E

Roof I

Roof D

Roof F

RoofK

Roof P

Roof J

Roof B

NN.I.C.

D1A

General Notes:

Shingle Roof AreasRoof E, F, G & H

Roof LRoof MRoof NRoof O

Total

517 Squares9 Squares5 Squares7 Squares

4 1/2 Squares

542 1/2 Squares

7'-6"

7'-6"

7'-6"

7'-6"

7'-6"

11' AD1

D1C

D1C

D1F

AD1

AD1

D1 D1

Self-adhering Underlayment6' Width at Side Walls.Run up Vertical 4" min.

Self-adhering Underlayment6' Width outside of Eyebrow Dormer Valley

Self-adhering UnderlaymentCompletely cover Eybrow Dormer

Self-adhering Underlayment6' Width at Rake Edge

Self-adhering Underlayment3' Width, ech side of Ridge

Self-adhering Underlayment6' Width at Drip Edge/Gutter Edge

Self-adhering Underlayment3' Width, ech side of Ridge

Self-adhering Underlayment6' Width at Rake Edge

Self-adhering UnderlaymentCompletely cover all Lower Shed Roofs

Self-adhering Underlayment3' Width below Dormer.Run up Vertical 4" min.

Self-adhering Underlayment12' Width in Open Valleys

Self-adhering Underlayment6' Width at Side WallsRun up Vertical 4" min.

Self-adhering Underlayment6' Width at Drip Edge/Gutter Edge

D1D

Remove all pre-existing ridge ventsprior to installation of new specified vents

see Note #1

D1E

COURT YARD

256'

125' 58'

74'

75'

74'

60'

77' 121' 66'

264'

AD1

90'

Self-adhering Underlayment12' Width in Open Valleys

09-28-17

85'

85'

66'

ASPHALT & GRAVEL SURFACED BURN.I.C.

N.I.C.

STANDING SEAM METAL ROOFN.I.C.

ASPHALT & GRAVEL SURFACED BURN.I.C.

STANDING SEAM METAL ROOFN.I.C.

N.I.C.

Mackeben Elementary800 Academic DriveAlgonquin, Il. 60120

SHINGLE ROOF AREA ONLY

file: SD158183

Install new roof anchors at ridge 25' O.C.see Note #3

D1I

D1D

G F

95'

69'

55'

roof areas approximateBidders shall field verify

Note 1: All dimensions are for reference. Bidding contractors shall have sole responsibility for verifingand submitting bids based on the accuracy of their measurements.

Note 2: Remove all pre-existing ridge vents prior to installation of new specified vents. Replace entire sheetwith treated 1"X dimensional lumber (no plywood) affected by vent opening (do not 'patch' individual vent openings).For specifications on shoebox vent replacements see BTC drawings and specifications.

Note 3: Install new permanant roof anchors 25' O.C. on all ridge lines. See detail Detail 'L', Sheet D-1.

Note 4: Refer to typical details where not called out.

rev1 on 10-10-17, rev2 on 10-18-17,

rev3 on 10-24-17

Page 7: Roof Replacement Project: Huntley CSD#158 Advertisements/2017/Bid #2017-6… · Project Notes: Project Number: Date: Sheet Number: Drawing Title: Huntley CSD#158 Roof Plan with Projections

Project Notes:

Project Number:

Date:

Sheet Number:

Drawing Title:

N

Roof Replacement Project:

Huntley CSD#158

Marlowe Middle School9625 Haligus RoadLake in the Hills 60156

Roof Plan withProjections

09-14-17

Roof Q

Roof H

Roof I

Roof K RoofL

Roof JRoof T

Roof MRoof

NRoof

O

Roof D

Roof S

Roof A

Roof B

Roof CRoof E

Roof F

Roof G

Roof P

Roof R

191'

121'

150'

25'

28'

53'

15'

94'-6"

94'-6"

28'

53'

15'

25'

44'-6"

78'

81'-6"

Roof ARoof BRoof D

Total

327 Squares74 1/2 Squares

53 Squares

454 1/2 Squares

D2

D2

D2

D2

D2

MATCH LINE

MATCH LINE

MATCH LINE

MATCH LINE

Roof Areas:A, B & D

0 5 10 25 50 75 100

S C A L E I N F E E T

POLYMER MODIFIED PRIMER @ 225 SQFT/GAL +/- 10%

POLYESTER REINFORCING SET INTO WET BASE COAT, DRYROLL LIGHLY TO EMBED

APPLY TOP COAT @ 2 GAL./SQUARE, BACKROLL TO ACHEIVE APPROX. 32 WET MILS

EXISTING STRUCTURAL METAL DECK

EXISTING MECHANICALLY ATTACHED POLYISOCYANURATE INSULATION LAYERS

EXISTING FULLY ADHERED 60 MIL. EPDM MEMBRANE TO REMAIN,POWERWASH & PREP. WITH POLYMER MODIFIED PRIMER AS SPECIFIED

BASE COAT OF POLYURETHANE @ 3 GAL./SQUARE, BACKROLL TO ACHEIVE APPROX. 48 MILS

Roof Construction Profile:Fully Adhered EPDM Single Ply Membrane on Structural Metal Deck

Polyurethane Rehabilitation

A

A

F

D2F

D2

D

D

A

D2E

D2C

D2C

file: SD15818T

General Notes:

D2A

D2A INCLUDE ALL LOWER ROOFS

D2A

Fall Protection Warning Line

Contractors shall include all smalllower roof areas and verify sqftg.

roof areas approximateBidders shall field verify

rev1 on 10-18-17, rev2 on 10-24-17

Note 1: All dimensions are for reference. Bidding contractors shall have sole responsibilityfor verifying and submitting bids based on the accuracy of their measurements.

Note 2: Remove all existing walkpads. Peel existing pad from EPDM membrane, or cut outwalkway and membrane and patch with new EPDM membrane. Either options costshall be included in base bid. Replace existing walkways with textured surface influid-applied restoration system.

Note 3: Fluid applied membrane shall extend under all splash blocks, wood sleepers,lightning protection cables, antenna 'sleds', etc.

Note 4: Refer to typical details where not called out.

Page 8: Roof Replacement Project: Huntley CSD#158 Advertisements/2017/Bid #2017-6… · Project Notes: Project Number: Date: Sheet Number: Drawing Title: Huntley CSD#158 Roof Plan with Projections

Project Notes:

Project Number:

Date:

Sheet Number:

Drawing Title:

N

Huntley CSD#158

Marlowe Middle School9625 Haligus RoadLake in the Hills 60156

Roof Plan withProjections

09-14-17

Roof Q

Roof H

Roof I

Roof K RoofL

Roof JRoof T

Roof MRoof

NRoof

O

Roof D

Roof S

Roof A

Roof B

Roof CRoof E

Roof F

Roof G

Roof P

Roof R

122'147'

133'

125'-6"

68'

262 SquaresRoof C

D2

D2

D2

D2

D2

Roof Restoration Project:

Roof Area: C

POLYMER MODIFIED PRIMER @ 225 SQFT/GAL +/- 10%

POLYESTER REINFORCING SET INTO WET BASE COAT, DRYROLL LIGHLY TO EMBED

APPLY TOP COAT @ 2 GAL./SQUARE, BACKROLL TO ACHEIVE APPROX. 32 WET MILS

EXISTING STRUCTURAL METAL DECK

EXISTING MECHANICALLY ATTACHED POLYISOCYANURATE INSULATION LAYERS

EXISTING FULLY ADHERED 60 MIL. EPDM MEMBRANE TO REMAIN,POWERWASH & PREP. WITH POLYMER MODIFIED PRIMER AS SPECIFIED

BASE COAT OF POLYURETHANE @ 3 GAL./SQUARE, BACKROLL TO ACHEIVE APPROX. 48 MILS

Roof Construction Profile:Fully Adhered EPDM Single Ply Membrane on Structural Metal Deck

Polyurethane Rehabilitation

file: SD15818E

0 5 10 25 50 75 100

S C A L E I N F E E T

A

D2C

A

AD

A

D2C

D2E

D2D

General Notes:

D2A

D2A

INCLUDE ALL LOWER ROOF AREAS

Fall Protection Warning Line

roof areas approximateBidders shall field verify

Contractors shall include all smalllower roof areas and verify sqftg.

Note 1: All dimensions are for reference. Bidding contractors shall have sole responsibility for verifyingand submitting bids based on the accuracy of their measurements.

Note 2: Remove all existing walkpads. Peel existing pad from EPDM membrane, or cut out walkwayand membrane and patch with new EPDM membrane. Either options cost shall be included in base bid.Replace existing walkways with textured surface in fluid-applied restoration system.

Note 3: Fluid applied membrane shall extend under all splash blocks, wood sleepers, lightning protectioncables, antenna 'sleds', etc.

Note 4: Refer to typical details where not called out.

rev1 on 10-18-17, rev2 on 10-24-17

Page 9: Roof Replacement Project: Huntley CSD#158 Advertisements/2017/Bid #2017-6… · Project Notes: Project Number: Date: Sheet Number: Drawing Title: Huntley CSD#158 Roof Plan with Projections

Project Notes:

Project Number:

Date:

Sheet Number:

Drawing Title:

N

Huntley CSD#158

Marlowe Middle School9625 Haligus RoadLake in the Hills 60156

Roof Plan withProjections

09-14-17

Roof Q

Roof H

Roof I

Roof K RoofL

Roof JRoof T

Roof MRoof

NRoof

O

Roof D

Roof S

Roof A

Roof B

Roof CRoof E

Roof F

Roof G

Roof P

Roof R

134'-6"105'-6"

93'

74'

105'-6" 36'

54'

126'

32'

67'-6"19'17'-6"

32'16'

18'

10'

Roof ERoof FRoof GRoof HRoof I

Roof JRoof KRoof QRoof T

Total

11 Squares5 1/2 squares4 1/2 squares

114 1/2 squares79 Squares*23 Squares

133 Squares6 Squares1/2 Square

376 Squares

Roof Restoration Project:

D2

D2

D2

D2

D2

D2

D2

D2

D2

D2

Roof Areas:E, F, G, H, I, J, K, Q and T

POLYMER MODIFIED PRIMER @ 225 SQFT/GAL +/- 10%

APPLY TOP COAT @ 2 GAL./SQUARE, BACKROLL TO ACHEIVE APPROX. 32 WET MILS

EXISTING STRUCTURAL METAL DECK

EXISTING MECHANICALLY ATTACHED POLYISOCYANURATE INSULATION LAYERS

Roof Construction Profile:Fully Adhered EPDM Single Ply Membrane on Structural Metal Deck

Polyurethane Rehabilitation

POLYESTER REINFORCING SET INTO WET BASE COAT, DRYROLL LIGHLY TO EMBED

BASE COAT OF POLYURETHANE @ 3 GAL./SQUARE, BACKROLL TO ACHEIVE APPROX. 48 MILS

EXISTING FULLY ADHERED 60 MIL. EPDM MEMBRANE TO REMAIN,POWERWASH & PREP. WITH POLYMER MODIFIED PRIMER AS SPECIFIED

B

D2C

B

D2

D2

D

F

B

A

A

A

B

A

A

B

file: SD158188

D2B

D2A

D2A

D2A

General Notes:

0 5 10 25 50 75 100

S C A L E I N F E E T

Fall Protection Warning Line

rev1 on 10-18-17, rev2 on 10-24-17

Note 1: All dimensions are for reference. Bidding contractors shall have sole responsibility for verifyingand submitting bids based on the accuracy of their measurements.

Note 2: Remove all existing walkpads. Peel existing pad from EPDM membrane, or cut out walkwayand membrane and patch with new EPDM membrane. Either options cost shall be included in base bid.Replace existing walkways with textured surface in fluid-applied restoration system.

Note 3: Fluid applied membrane shall extend under all splash blocks, wood sleepers, lightning protectioncables, antenna 'sleds', etc.

Note 4: Refer to typical details where not called out.

Page 10: Roof Replacement Project: Huntley CSD#158 Advertisements/2017/Bid #2017-6… · Project Notes: Project Number: Date: Sheet Number: Drawing Title: Huntley CSD#158 Roof Plan with Projections

Project Notes:

Project Number:

Date:

Sheet Number:

Drawing Title:

N

Huntley CSD#158

Marlowe Middle School9625 Haligus RoadLake in the Hills 60156

Roof Plan withProjections

09-14-17

Roof Q

Roof H

Roof I

Roof K RoofL

Roof JRoof T

Roof MRoof

NRoof

O

Roof D

Roof S

Roof A

Roof B

Roof CRoof E

Roof F

Roof G

Roof P

Roof R

56 Squares76 1/2 Squares23 1/2 Squares36 1/2 Squares

5 Squares2 1/5 Squares

1/2 Square

200 1/2 Squares

Roof Restoration Project:

POLYMER MODIFIED PRIMER @ 225 SQFT/GAL +/- 10%

POLYESTER REINFORCING SET INTO WET BASE COAT, DRYROLL LIGHLY TO EMBED

APPLY TOP COAT @ 2 GAL./SQUARE, BACKROLL TO ACHEIVE APPROX. 32 WET MILS

EXISTING STRUCTURAL METAL DECK

EXISTING MECHANICALLY ATTACHED POLYISOCYANURATE INSULATION LAYERS

EXISTING FULLY ADHERED 60 MIL. EPDM MEMBRANE TO REMAIN,POWERWASH & PREP. WITH POLYMER MODIFIED PRIMER AS SPECIFIED

BASE COAT OF POLYURETHANE @ 3 GAL./SQUARE, BACKROLL TO ACHEIVE APPROX. 48 MILS

Roof Construction Profile:Fully Adhered EPDM Single Ply Membrane on Structural Metal Deck

Polyurethane Rehabilitation

47' 54' 59'-6" 20' 11'

39'24'

53'

89'

37'

110'-6"66'

114'-6"

D2

D2

D2

D2

12'

18'

D245'

D2

D2

D2

D2

D2

D2

D2

D

F

A

C

A

A

A

C

E

B

B

A

Roof Areas:L, M, N, O, P, R and S

Roof LRoof MRoof NRoof ORoof PRoof RRoof S

Total

D2F

General Notes:

0 5 10 25 50 75 100

S C A L E I N F E E T

Fall Protection Warning Line

Note 1: All dimensions are for reference. Bidding contractors shall have sole responsibility for verifyingand submitting bids based on the accuracy of their measurements.

Note 2: Remove all existing walkpads. Peel existing pad from EPDM membrane, or cut out walkwayand membrane and patch with new EPDM membrane. Either options cost shall be included in base bid.Replace existing walkways with textured surface in fluid-applied restoration system.

Note 3: Fluid applied membrane shall extend under all splash blocks, wood sleepers, lightning protectioncables, antenna 'sleds', etc.

Note 4: Refer to typical details where not called out.

file: SD158189

rev1 on 10-24-17

Page 11: Roof Replacement Project: Huntley CSD#158 Advertisements/2017/Bid #2017-6… · Project Notes: Project Number: Date: Sheet Number: Drawing Title: Huntley CSD#158 Roof Plan with Projections

Project Notes:

Project Number:

Date:

Sheet Number:

Drawing Title:

N

Huntley CSD#158

Marlowe Middle School9625 Haligus RoadLake in the Hills 60156

Roof Q

Roof H

Roof I

Roof K RoofL

Roof JRoof T

Roof MRoof

NRoof

O

Roof D

Roof S

Roof A

Roof B

Roof CRoof E

Roof F

Roof G

Roof P

Roof R

56 Squares76 1/2 Squares23 1/2 Squares36 1/2 Squares

5 Squares2 1/5 Squares

1/2 Square

200 1/2 Squares

Roof Restoration Project:

Roof LRoof MRoof NRoof ORoof PRoof RRoof S

Total

Roof Plan withWalkways

file: SD15818W

10-24-17

DRenkosik
Text Box
Partial plan for
Page 12: Roof Replacement Project: Huntley CSD#158 Advertisements/2017/Bid #2017-6… · Project Notes: Project Number: Date: Sheet Number: Drawing Title: Huntley CSD#158 Roof Plan with Projections

Project Notes:

Project Number:

Date:

Sheet Number:

Drawing Title:

Roof Replacement Project:

Flashing Details

SHEET METAL VALLEY FALSHING6" MIN. END LAPS, BLIND-NAIL

TOP EDGE AS SPECIFIED

HIGH STRENGTH TRILAMINATE BASE SHEET

LAMINATED SHINGLES AS SPECIFIED

SET SHEET METAL VALLEYFLASHING WITH METALCLIPS AS SPECIFIED

INSPECT OSB/NAILBASE SUBSTRATE REPLACINGDAMAGED AS NECESSARY BASED ON UNIT PRICE

NEW LAMINATED SHINGLE AS SPECIFIED

HIGH STREGTH TRILAMINATE BASE SHEET

SELF-ADHERED ICE AND WATER UNDERLAYMENT

Open Metal ValleyDrip EdgeGutter EdgeA B D

HIGH STRENGTH TRILAMINATE BASE SHEET

LAMINATED SHINGLES AS SPECIFIED

EXTRA FASTENERAT SHINGLE END

CUT SHINGLES OFUPPER COURSE ANDTRIM CORNERS. NOFASTENERS WITHIN6" OF VALLEYCENTERLINE

EXTEND EACH END SHINGLE 12"MIN. BEYOND VALLEY CENTERLINE

CONTINUOUS SEALANT

9' WIDTH SELF-ADHERING UNDERLAYMENT

Closed-Cut Valley DetailE

SELF-ADHERING UNDERLAYMENT(SEE UNDERLAYMEN LAYOUT DRAWING

FOR SPECIFIC WIDTH REQUIREMENTS)

24' WIDE SHEET METAL VALLY FLASHING

09-25-17

NEW LAMINATED SHINGLE AS SPECIFIED

HIGH STREGTH TRILAMINATE BASE SHEET

SELF-ADHERED ICE AND WATER UNDERLAYMENT

INSPECT OSB/NAILBASE SUBSTRATE REPLACINGDAMAGED AS NECESSARY BASED ON UNIT PRICE

REUSE DRIP EDGE SHEET METALINSPECT AND REFASTEN AS NECESSARY REUSE DRIP EDGE SHEET METAL

INSPECT AND REFASTEN AS NECESSARY

REUSE EXISTING GUTTERINSPECT STRAPS REPLACE

AND FASTEN AS NECESSARY

NEW LAMINATED SHINGLE AS SPECIFIED

EXISTING THRU-WALL FLASHING 'STEPPED' INTO MASONRY

NEW SURFACE MOUNT COUNTERFLASHINGFASTENED AND SEALED AS SPECIFIED

INSPECT OSB/NAILBASE SUBSTRATE REPLACINGDAMAGED AS NECESSARY BASED ON UNIT PRICE

REPLACE SHEET METAL APRON FLASHINGOVER NEW SELF ADHERED UNDERLAYMENT

Surface-mount Counterflashing under 'Steeped' Thru-wall

HIGH STREGTH TRILAMINATE BASE SHEET

SELF-ADHERED ICE AND WATER UNDERLAYMENT

NEW LAMINATED SHINGLE AS SPECIFIED

INSPECT OSB/NAILBASE SUBSTRATE REPLACINGDAMAGED AS NECESSARY BASED ON UNIT PRICE

Wall Flashing Detail

SHEET METAL STUCCO-STOP/APRON FLASHING WITH HEMMED DRIP EDGE

NEW LAMINATED SHINGLE AS SPECIFIED

FASCIA TO REMAIN

HIGH STREGTH TRILAMINATE BASE SHEET(extend 3" over edge of self-adhering membrane)

SELF-ADHERED ICE & WATER UNDERLAYMENT(extend 36" beyond inside face of exterior wall)

Rake Edage Detail

RIDGE CAP SHINGLE

REUSE EXISTING DRIP EDGE SHEET METAL

NEW LAMINATED SHINGLE AS SPECIFIED

HIGH STREGTH TRILAMINATE BASE SHEET

SELF-ADHERED ICE AND WATER UNDERLAYMENT

INSPECT OSB/NAILBASE SUBSTRATE REPLACINGDAMAGED AS NECESSARY BASED ON UNIT PRICE

Conley Elementary750 Academic DriveAlgonquin, Il. 60120

Mackeben Elementary800 Academic DriveAlgonquin, Il. 60120

Consolidated SchoolDistrict #158

and

C

F G H

NEW LAMINATED SHINGLE AS SPECIFIED

SHEET METAL STACK APRON

INSPECT OSB/NAILBASE SUBSTRATE REPLACINGDAMAGED AS NECESSARY BASED ON UNIT PRICE

SHEET METAL STACK FLASHINGSEAL AND FASTEN AS SPECIFIED

SHEET METAL STACK FLASHINGSEAL AND FASTEN AS SPECIFIED

NEW LAMINATED SHINGLE AS SPECIFIED

INSPECT OSB/NAILBASE SUBSTRATE REPLACINGDAMAGED AS NECESSARY BASED ON UNIT PRICE

REUSE EXISTING SHEET METALCRICKET OVER PLYWOODINSTALL 3' WIDE SELF-ADHERINGUNDERLAYMENT

EXISTING SHEET METAL CURB APRON

NEW LAMINATED SHINGLE AS SPECIFIED

INSPECT OSB/NAILBASE SUBSTRATE REPLACINGDAMAGED AS NECESSARY BASED ON UNIT PRICE

LEAD FLASHING SHEET AS SPECIFIED

ROLL LEAD FLASHING INTO PLUMBING VENT 1" MIN.

6" MIN. FLANGE

'Hot' Stack Steep-slope Detail Curb Flashing Steep-slope DetailI

Soil Stack/Plumbing Vent Steep-slope Detail

Shed Wall Detail

EFIS/MASONRY/SIDING WALL

file: SD15818A

General Note:Reuse of sheet metal flashingcomponents reference only appliesto components that are notdamaged during construction process.

J K

NON-VENTED RIDGE CAP SHINGLE

PERMANENT ROOF ANCHOR AS SPECIFIED

Ridge and Permanent Roof AnchorL

rev1 10-10-17, rev2 10-13-17,

rev3 10-18-17

ENCLOSE EXISTING VENT OPENING, with 1"X DIMENSIONAL LUMBER (NO PLYWOOD)

Page 13: Roof Replacement Project: Huntley CSD#158 Advertisements/2017/Bid #2017-6… · Project Notes: Project Number: Date: Sheet Number: Drawing Title: Huntley CSD#158 Roof Plan with Projections

Project Notes:

Project Number:

Date:

Sheet Number:

Drawing Title:

ROOFFLASHING DETAILS

Consolidated School District #158

Roof Restoration Project:

Heinemaan Middle School725 Academic DriveAlgonquin, Il. 60120

Marlowe Middle School9625 Haligus RoadLake in the Hills, Il. 60156

10-03-17

STRUCTURAL METAL DECK

Reglet Mounted Counter Flashing Detail

STRUCTURAL METAL DECK

Membrane Covered Wall Flashing DetailA B C

STRUCTURAL METAL DECKSTRUCTURAL METAL DECK

D

EXISTING SHEET METAL COUNTERFLASHING AND RECEIVER TO REMAIN.

EXISTING MECHANICALLY ATTACHED INSULATION LAYERS

INSPECT AND REPAIR EXISTING EPDM FLASHING MEMBRANE PRIOR TOAPPLICATION OF FLUID APPIED COATING AND REINFORCING FABRIC.

CONTINUOUS APPLICATION OF POLYURETHANE AND POLYESTER FLUID APPLIEDMEMBRANE OVER EXISTING EPDM FLASHING MEMBRANE. CLEAN AND PRIME EPDMSURFACE AS SPECIFIED.

CONTINUOUS APPLICATION OF POLYURETHANE AND POLYESTERFLUID APPLIED MEMBRANE OVER EXISTING EPDM FIELD MEMBRANE.CLEAN AND PRIME EPDM SURFACE AS SPECIFIED.

INSPECT OLD SEALANT IN EXISTING REGLET. REPAIR ANY REVEALED DETERIORATION.DO NOT IMPEDE WEEPS. PROTECT EXISTING METAL SKIRT FROM FLUID APPLIEDAPPLICATION 'OVERAGE'. RECOMMEND APPLYING PAINTERS MASKING TAPE.CONTRACTOR WILL BE RESPONSIBLE FOR CLEANING EXCESS OFF METAL AND WALLS.

EXISTING MECHANICALLY ATTACHED INSULATION LAYERS

EXISTING EPDM MEMBRANE TO REMAIN. CLEAN AND PRIME EPDM SURFACEAS SPECIFIED. CONTINUOUS APPLICATION OF POLYURETHANE AND POLYESTERFLUID APPLIED MEMBRANE OVER EXISTING EPDM WALL MEMBRANE.

CONTINUOUS APPLICATION OF POLYURETHANE AND POLYESTERFLUID APPLIED MEMBRANE OVER EXISTING EPDM FIELD MEMBRANE.CLEAN AND PRIME EPDM SURFACE AS SPECIFIED.

CONTINUOUS APPLICATION OF POLYURETHANE AND POLYESTER FLUID APPLIEDMEMBRANE OVER EXISTING EPDM FLASHING MEMBRANE. CLEAN AND PRIME EPDMSURFACE AS SPECIFIED.

EXISTING MECHANICALLY ATTACHED INSULATION LAYERS

INSPECT AND REPAIR EXISTING EPDM FLASHING MEMBRANE PRIOR TOAPPLICATION OF FLUID APPIED COATING AND REINFORCING FABRIC.

EXISTING SHEET METAL REGLET MOUNT COUNTERFLASHING TO REMAIN

INSPECT AND REPAIR EXISTING EPDM FLASHING MEMBRANE PRIOR TOAPPLICATION OF FLUID APPIED COATING AND REINFORCING FABRIC.

INSPECT AND REPAIR EXISTING EPDM WALL MEMBRANE PRIOR TOAPPLICATION OF FLUID APPIED COATING AND REINFORCING FABRIC.

EXISTING 'SLIP' SHEET METAL SURFACE MOUNT COUNTERFLASHING TO REMAIN.PROTECT EXISTING METAL SKIRT FROM FLUID APPLIED APPLICATION 'OVERAGE'.RECOMMEND APPLYING PAINTERS MASKING TAPE. CONTRACTOR WILL BE RESPONSIBLEFOR CLEANING EXCESS OFF METAL AND WALLS.

INSPECT EXISTING SHEET METAL COPING CAP. ALERT OWNER TO ANYSUSPECT SEALANT OR FASTENING ISSUES THAT MAY NEED TO BE ADDRESSED.

INSPECT OLD SEALANT IN EXISTING REGLET. REPAIR ANY REVEALED DETERIORATION.DO NOT IMPEDE WEEPS. PROTECT EXISTING METAL SKIRT FROM FLUID APPLIEDAPPLICATION 'OVERAGE'. RECOMMEND APPLYING PAINTERS MASKING TAPE.CONTRACTOR WILL BE RESPONSIBLE FOR CLEANING EXCESS OFF METAL AND WALLS.

CONTINUOUS APPLICATION OF POLYURETHANE AND POLYESTER FLUID APPLIEDMEMBRANE OVER EXISTING EPDM FLASHING MEMBRANE. CLEAN AND PRIME EPDMSURFACE AS SPECIFIED.

CONTINUOUS APPLICATION OF POLYURETHANE AND POLYESTER FLUID APPLIEDMEMBRANE OVER EXISTING EPDM FLASHING MEMBRANE. CLEAN AND PRIME EPDMSURFACE AS SPECIFIED.

INSPECT AND REPAIR EXISTING EPDM FLASHING MEMBRANE PRIOR TOAPPLICATION OF FLUID APPIED COATING AND REINFORCING FABRIC.

CONTINUOUS APPLICATION OF POLYURETHANE AND POLYESTERFLUID APPLIED MEMBRANE OVER EXISTING EPDM FIELD MEMBRANE.CLEAN AND PRIME EPDM SURFACE AS SPECIFIED.

CONTINUOUS APPLICATION OF POLYURETHANE AND POLYESTERFLUID APPLIED MEMBRANE OVER EXISTING EPDM FIELD MEMBRANE.CLEAN AND PRIME EPDM SURFACE AS SPECIFIED.

EXISTING MECHANICALLY ATTACHED INSULATION LAYERS

Eifs Wall Reglet Mounted Counter Flashing Detail

EIFS COVERED WALL

Parapet with Metal Coping Cap Detail

STRUCTURAL METAL DECK

REPLACE ALL PLASTIC AND ANY BROKEN METALDOMES WITH METAL DRAIN STRAINER BASKETS

STRUCTURAL METAL DECK

FIN. ROOF

INSPEC EXISTING CLAMPING RING. TIGHTEN ALL LOOSE BOLTS.APPLY FLUID APPIED MEMBRANE SYSTEM UP TO CLAMPING RING.

INSPECT AND REPAIR EXISTING EPDM MEMBRANE PRIOR TOAPPLICATION OF FLUID APPIED COATING AND REINFORCING FABRIC.

CONTINUOUS APPLICATION OF POLYURETHANE AND POLYESTERFLUID APPLIED MEMBRANE OVER EXISTING EPDM FIELD MEMBRANE.

CLEAN AND PRIME EPDM SURFACE AS SPECIFIED.

EXISTING TAPERED INSULATION SUMP

EXISTING MECHANICALLY ATTACHED INSULATION LAYERS

CONTINUOUS APPLICATION OF POLYURETHANE AND POLYESTERFLUID APPLIED MEMBRANE OVER EXISTING EPDM FIELD MEMBRANE.

CLEAN AND PRIME EPDM SURFACE AS SPECIFIED.

EXISTING MECHANICALLY ATTACHED INSULATION LAYERS

CONTINUOUS APPLICATION OF POLYURETHANE AND POLYESTER FLUID APPLIEDMEMBRANE OVER EXISTING EPDM FLASHING MEMBRANE.

CLEAN AND PRIME EPDM SURFACE AS SPECIFIED.

EXISTING PRE-FAB SHEET METAL or WOOD CURB

EXISTING EXHAUST VENT/EQUIPMENT SHEET METAL TO REMAIN.PROTECT EXISTING METAL SKIRT FROM FLUID APPLIED APPLICATION 'OVERAGE'.

RECOMMEND APPLYING PAINTERS MASKING TAPE. CONTRACTOR WILL BE RESPONSIBLEFOR CLEANING EXCESS OFF METAL.

Equipment Curb DetailRoof Drain DetailE F

STRUCTURAL METAL DECK

EXISTING MECHANICALLY ATTACHEDINSULATION LAYERS

Non-Penetrating Equipment Support/Pad Detail

EXISTING PIPE SUPPORT TO REMAIN. PROVIDE TEMPORARYSUPPORT, LIFT EXISTING PADS. CONTINUOUS APPLICATION OFFLUID APPLIED SYSTEM SHALL BE INSTALLED UNDER ALL PADSAND WOOD BLOCKING WHERE LIGHTER WEIGHT EQUIPMENTHAS BEEN INSTALLED NOT PENETRATING THE EPDM MEMBRANE.PROTECT EXISTING METAL CAP FROM FLUID APPLIED APPLICATION'OVERAGE'. RECOMMEND WRAPPING PIPING. CONTRACTOR WILLBE RESPONSIBLE FOR CLEANING EXCESS OFF METAL.

FIN. ROOF

'Hot' Stack Low-slope Detail

CONTINUOUS APPLICATION OF POLYURETHANE AND POLYESTERFLUID APPLIED MEMBRANE OVER EXISTING EPDM FIELD MEMBRANE.CLEAN AND PRIME EPDM SURFACE AS SPECIFIED.

CONTINUOUS APPLICATION OF POLYURETHANE AND POLYESTERFLUID APPLIED MEMBRANE OVER EXISTING EPDM FIELDMEMBRANE. CLEAN AND PRIME EPDM SURFACE AS SPECIFIED.EXTEND FLUID APPLIED SYSTEM UP SHEET METAL PITCH POCKETPRIME METAL WITH 'M' PRIME

STRUCTURAL METAL DECK

EXISTING MECHANICALLY ATTACHED INSULATION LAYERS

INSPECT DRAWBAND CLAMP. TIGHTEN AND RESEAL AS NECESSARY

CONTINUOUS APPLICATION OF POLYURETHANEAND POLYESTER FLUID APPLIED MEMBRANE

OVER EXISTING EPDM FIELD MEMBRANE.CLEAN AND PRIME EPDM SURFACE AS SPECIFIED.

CONTINUOUS APPLICATION OF POLYURETHANE AND POLYESTERFLUID APPLIED MEMBRANE OVER EXISTING EPDM FIELDMEMBRANE. CLEAN AND PRIME EPDM SURFACE AS SPECIFIED.EXTEND FLUID APPLIED SYSTEM UP SHEET METAL VENT 4" MIN.PRIME METAL WITH 'M' PRIME

4" MIN.

WHERE EPDM WRAP TERMINATES ON VENT, EXTENDFLUID APPLIED FLASHING UP ONTO SHEET METAL4" MIN. PRIME METAL WITH 'M' PRIME

CONTINUOUS APPLICATION OF POLYURETHANE AND POLYESTERFLUID APPLIED MEMBRANE OVER EXISTING EPDM MEMBRANE,

INCLUDING UNDER PADS AND WOOD BLOCKING.CLEAN AND PRIME EPDM SURFACE AS SPECIFIED.

STRUCTURAL METAL DECK

Vent Stack Detail

EXISTING MECHANICALLY ATTACHED INSULATION LAYERS

STRUCTURAL METAL DECK

FLUID APPLIED POYURETHANE AND POLYESTERREIFORING MEMBRANE. RUN UP SOIL STACK 4' ABOVEEXISTING EPDM TERMINATION.

CLEAN PVC SOIL STACKS AND PRIMEWITH 'WB' PRIMER PRIOR TOAPPLICATION OF FLUID APPLIEDMEMBRANE AND REINFORCING.

CLEAN CAST IRON SOIL STACKS TO BARE METAL.PRIME WITH 'M' PRIME PRIOR TO APPLICATION OFFLUID APPLIED MEMBRANE AND REINFORCING.

'WRAPPED' FLASHING STACKPREFAB 'BOOT' FLASHING STACK

EXISTING MECHANICALLY ATTACHEDINSULATION LAYERS

CONTINUOUS APPLICATION OF POLYURETHANE AND POLYESTERFLUID APPLIED MEMBRANE OVER EXISTING EPDM FLASHING.

CLEAN AND PRIME EPDM SURFACE AS SPECIFIED.

CONTINUOUS APPLICATION OF POLYURETHANE AND POLYESTERFLUID APPLIED MEMBRANE OVER EXISTING EPDM FIELD MEMBRANE.

CLEAN AND PRIME EPDM SURFACE AS SPECIFIED.

EXISTING EQUIPMENT RAIL SHEET METAL CAP TO REMAIN.PROTECT EXISTING METAL CAP FROM FLUID APPLIED APPLICATION'OVERAGE'. RECOMMEND APPLYING PAINTERS MASKING TAPE.CONTRACTOR WILL BE RESPONSIBLE FOR CLEANING EXCESS OFF METAL.

Equipment Support/Rail Detail

CLEAN AND PRIME EXISTING EPDM PORTAL BOOTS WITH 'WB'APPLY BASE AND TOP COAT APPLICATIONS.

TERMINATE REINFORCING FABRIC AT BASE OF BOOT.

INSPECT BOOT CLAMP. TIGHTEN AND RESEAL AS NECESSARY

STRUCTURAL METAL DECK

EXISTING MECHANICALLY ATTACHED INSULATION LAYERS

CONTINUOUS APPLICATION OF POLYURETHANE AND POLYESTERFLUID APPLIED MEMBRANE OVER EXISTING EPDM FIELD AND FLASHINGMEMBRANE. CLEAN AND PRIME EPDM SURFACE AS SPECIFIED.

Hatch/Skylight/VentFlashing Detail Pitch Pocket Detail

SPECIFIED SEALANT AND BUTYL TAPE

STAINLESS STEEL DRAWBAND

EXISTING MECHANICALLYATTACHED INSULATION LAYERS

STRUCTURAL METAL DECK

SHEET METAL HOOD REQUIRED

STRUCTURAL METAL DECK

EXISTING MECHANICALLY ATTACHEDINSULATION LAYERS

EXISTING PIPE SUPPORT TO REMAIN. PROVIDE TEMPORARYSUPPORT, LIFT EXISTING PADS. CONTINUOUS APPLICATION OFFLUID APPLIED SYSTEM SHALL BE INSTALLED UNDER ALL PADSAND WOOD BLOCKING WHERE LIGHTER WEIGHT EQUIPMENTHAS BEEN INSTALLED NOT PENETRATING THE EPDM MEMBRANE.PROTECT EXISTING METAL CAP FROM FLUID APPLIED APPLICATION'OVERAGE'. RECOMMEND WRAPPING PIPING. CONTRACTOR WILLBE RESPONSIBLE FOR CLEANING EXCESS OFF METAL.

FIN. ROOF

G H

I J K L

M N O Conduits/Lightening Protection Boot Detail

CONTINUOUS APPLICATION OF POLYURETHANEAND POLYESTER FLUID APPLIED MEMBRANE OVER

EXISTING EPDM MEMBRANE. EXTENDFLUID APPLIED SYSTEM UP ONTO PROJECTION BOOT.

CLEAN AND PRIME EPDM SURFACE AS SPECIFIED.

Metal Edge Detail Raised Edge Detail

CONTINUOUSCLEAT

EXISTING MECHANICALLY ATTACHED INSULATION LAYERS

STRUCTURAL METAL DECK

PROTECT FASCIA SURFACE FROM FLUID-APPLIED APPLICATION 'OVERAGE'.CONTRACTOR WILL BE RESPONSIBLE FOR CLEANING EXCESS OFF METAL AND WALLS.

CONTINUOUS APPLICATION OF POLYURETHANE AND POLYESTERFLUID APPLIED MEMBRANE OVER EXISTING EPDM FIELD MEMBRANE.PRIME ANY EXISTING METAL LIGHTNING ROD BASES WITH 'M' PRIME.CLEAN AND PRIME EPDM SURFACE AS SPECIFIED.

APPLYING PAINTERS MASKING TAPE TO PREVENT FLUID APPLIED SYSTEM FROM ADHERING TO EDGE METAL

CONTINUOUSCLEAT

PROTECT FASCIA SURFACE FROM FLUID-APPLIED APPLICATION 'OVERAGE'.CONTRACTOR WILL BE RESPONSIBLE FOR CLEANING EXCESS OFF METAL AND WALLS.

CONTINUOUS APPLICATION OF POLYURETHANE AND POLYESTERFLUID APPLIED MEMBRANE OVER EXISTING EPDM FIELD MEMBRANE.PRIME ANY EXISTING METAL LIGHTNING ROD BASES WITH 'M' PRIME.CLEAN AND PRIME EPDM SURFACE AS SPECIFIED.

STRUCTURAL METAL DECK

EXISTING MECHANICALLY ATTACHED INSULATION LAYERS

USE MASKING TAPE TO PREVENT FLUID APPLIED SYSTEM FROM ADHERING TO EDGE METAL

KMulti-pipe Portal DetailP

EXISTING MECHANICALLY ATTACHEDINSULATION LAYERS

STRUCTURAL METAL DECK

CONTINUOUS APPLICATION OF POLYURETHANEAND POLYESTER FLUID APPLIED MEMBRANE OVER

EXISTING PORTAL CURB AND BOOTS EXTENDINGFLUID APPLIED SYSTEM UP TO DRAW CLAMP.

CLEAN AND PRIME EPDM SURFACE AS SPECIFIED.

INSPECT AND REPAIR ALL DEFICIENCIES TOPORTAL CAP AND BOOTS WITH 60 MIL.UNCURED NEOPRENE ELASTOMERIC SHEETING

CONTINUOUS APPLICATION OF POLYURETHANEAND POLYESTER FLUID APPLIED MEMBRANEOVER EXISTING EPDM FIELD MEMBRANE.CLEAN AND PRIME EPDM SURFACE AS SPECIFIED.EXTEND FLUID APPLIED SYSTEM UP PORTALBASE TO CAP DRIP EDGE.

INSPECT EXISTING FASTENERS. PROTECT EXISTING METAL COPINGCAP FROM FLUID APPLIED APPLICATION 'OVERAGE'. RECOMMENDAPPLYING PAINTERS MASKING TAPE. CONTRACTOR WILL BERESPONSIBLE FOR CLEANING EXCESS OFF METAL AND WALLS.

file: SD15818c

rev1 10-10-17

General Note:Reuse of sheet metal flashingcomponents reference only appliesto components that are notdamaged during construction process.Damaged components shall be replacedat Contractors expense.

APPLIES TO ALL EXISTING PORTALSAT BOTH HEINEMAN & MARLOWE

Page 14: Roof Replacement Project: Huntley CSD#158 Advertisements/2017/Bid #2017-6… · Project Notes: Project Number: Date: Sheet Number: Drawing Title: Huntley CSD#158 Roof Plan with Projections

1 CONLEY ELEMENTARY SCHOOL - ROOF VENT LOCATIONSNTS

N

1SK3

SK1

Building Technology Consultants, Inc.

1845

Eas

t Ran

d R

oad

, Sui

te L

-100

Arli

ngto

n He

ight

s, Illi

nois

600

04w

ww

.btc

.exp

ert

Con

ley

and

Mac

kebe

n El

emen

tary

Sch

ools

Stee

p Sl

ope

Roof

Rep

lace

men

t and

Ven

tilat

ion

Repa

irs75

0 an

d 8

00 A

cad

emic

Driv

eA

lgon

quin

, Illin

ois,

6010

2

Page 15: Roof Replacement Project: Huntley CSD#158 Advertisements/2017/Bid #2017-6… · Project Notes: Project Number: Date: Sheet Number: Drawing Title: Huntley CSD#158 Roof Plan with Projections

1 MACKEBEN ELEMENTARY SCHOOL - ROOF VENT LOCATIONSNTS

N

1SK3

SK2

Building Technology Consultants, Inc.

1845

Eas

t Ran

d R

oad

, Sui

te L

-100

Arli

ngto

n He

ight

s, Illi

nois

600

04w

ww

.btc

.exp

ert

Con

ley

and

Mac

kebe

n El

emen

tary

Sch

ools

Stee

p Sl

ope

Roof

Rep

lace

men

t and

Ven

tilat

ion

Repa

irs75

0 an

d 8

00 A

cad

emic

Driv

eA

lgon

quin

, Illin

ois,

6010

2

Page 16: Roof Replacement Project: Huntley CSD#158 Advertisements/2017/Bid #2017-6… · Project Notes: Project Number: Date: Sheet Number: Drawing Title: Huntley CSD#158 Roof Plan with Projections

1 TYP. BUILDING SECTIONNTS

3SK6

1SK4

2SK5

4SK7

SK3

Building Technology Consultants, Inc.

1845

Eas

t Ran

d R

oad

, Sui

te L

-100

Arli

ngto

n He

ight

s, Illi

nois

600

04w

ww

.btc

.exp

ert

Con

ley

and

Mac

kebe

n El

emen

tary

Sch

ools

Stee

p Sl

ope

Roof

Rep

lace

men

t and

Ven

tilat

ion

Repa

irs75

0 an

d 8

00 A

cad

emic

Driv

eA

lgon

quin

, Illin

ois,

6010

2

Page 17: Roof Replacement Project: Huntley CSD#158 Advertisements/2017/Bid #2017-6… · Project Notes: Project Number: Date: Sheet Number: Drawing Title: Huntley CSD#158 Roof Plan with Projections

1 SECTION1 1/2" = 1'-0"

SK4

Building Technology Consultants, Inc.

1845

Eas

t Ran

d R

oad

, Sui

te L

-100

Arli

ngto

n He

ight

s, Illi

nois

600

04w

ww

.btc

.exp

ert

Con

ley

and

Mac

kebe

n El

emen

tary

Sch

ools

Stee

p Sl

ope

Roof

Rep

lace

men

t and

Ven

tilat

ion

Repa

irs75

0 an

d 8

00 A

cad

emic

Driv

eA

lgon

quin

, Illin

ois,

6010

2

Page 18: Roof Replacement Project: Huntley CSD#158 Advertisements/2017/Bid #2017-6… · Project Notes: Project Number: Date: Sheet Number: Drawing Title: Huntley CSD#158 Roof Plan with Projections

2 SECTION1 1/2" = 1'-0"

SK5

Building Technology Consultants, Inc.

1845

Eas

t Ran

d R

oad

, Sui

te L

-100

Arli

ngto

n He

ight

s, Illi

nois

600

04w

ww

.btc

.exp

ert

Con

ley

and

Mac

kebe

n El

emen

tary

Sch

ools

Stee

p Sl

ope

Roof

Rep

lace

men

t and

Ven

tilat

ion

Repa

irs75

0 an

d 8

00 A

cad

emic

Driv

eA

lgon

quin

, Illin

ois,

6010

2

Page 19: Roof Replacement Project: Huntley CSD#158 Advertisements/2017/Bid #2017-6… · Project Notes: Project Number: Date: Sheet Number: Drawing Title: Huntley CSD#158 Roof Plan with Projections

3 SECTION1 1/2" = 1'-0"

SK6

Building Technology Consultants, Inc.

1845

Eas

t Ran

d R

oad

, Sui

te L

-100

Arli

ngto

n He

ight

s, Illi

nois

600

04w

ww

.btc

.exp

ert

Con

ley

and

Mac

kebe

n El

emen

tary

Sch

ools

Stee

p Sl

ope

Roof

Rep

lace

men

t and

Ven

tilat

ion

Repa

irs75

0 an

d 8

00 A

cad

emic

Driv

eA

lgon

quin

, Illin

ois,

6010

2

Page 20: Roof Replacement Project: Huntley CSD#158 Advertisements/2017/Bid #2017-6… · Project Notes: Project Number: Date: Sheet Number: Drawing Title: Huntley CSD#158 Roof Plan with Projections

4 SECTION @ TYP. RIDGENTS

SK7

Building Technology Consultants, Inc.

1845

Eas

t Ran

d R

oad

, Sui

te L

-100

Arli

ngto

n He

ight

s, Illi

nois

600

04w

ww

.btc

.exp

ert

Con

ley

and

Mac

kebe

n El

emen

tary

Sch

ools

Stee

p Sl

ope

Roof

Rep

lace

men

t and

Ven

tilat

ion

Repa

irs75

0 an

d 8

00 A

cad

emic

Driv

eA

lgon

quin

, Illin

ois,

6010

2