Missouri School for the Blind
OWNER: STATE OF MISSOURIMICHAEL L. PARSON,GOVERNOR
PROJECTMANAGEMENT:
OFFICE OF ADMINISTRATIONDIVISION OF FACILITIESMANAGEMENT, DESIGN ANDCONSTRUCTION
DESIGNER: PATTERHN IVES, LLC
PROJECT NUMBER: E1908-01
ASSET NUMBERS: 50120110075012011009
Saint Louis, Missouri
Roof Replacement
SHEET NUMBER:
G-0011 OF 10 SHEETS01/24/2020
DEPARTMENT OFELEMENTARY AND SECONDARYEDUCATION
patterhn ives llc7 7 5 1 c a r o n d e l e t a v e n u ec l a y t o n t o w e r s u i t e 5 0 0s t l o u i s m i s s o u r i 6 3 1 0 5
01
AERIAL LOCATION MAP
MISSOURI SCHOOL FOR THE BLIND - 3815 MAGNOLIA AVENUE, SAINT LOUIS MISSOURI
NORTH
SITE
LIST OF DRAWINGS:G-001 COVERA-100 OVERALL ROOF PLANA-101 ENLARGED ROOF PLANA-102 ENLARGED ROOF PLANA-103 ENLARGED ROOF PLANSA-500 EXISTING ROOF ASSEMBLIESA-501 ROOF ASSEMBLIESA-502 ROOF DETAILSA-503 ROOF DETAILSA-504 ROOF DETAILS
MHD ANNEX
28,369sf
LIBRARY
BOOK STACKS
4673sf
K
DORMITORY
6217sf
LITTLE
THEATRE
2668sf
DINING HALL
CAFETERIA
1875sf
DINING HALL
CANTEEN
1372sf
C & D
DORMITORY
4775sf
ADMINISTRATION
4518sf
01
CAMPUS ORIENTATION ROOF PLAN
A-100 1"=30'-0" 0 7'-6" 15' 30' 60'
T
R
U
E
N
O
R
T
H
NORTH
PROJECT
GENERAL NOTES
01
A-101
02
A-103
01
A-103
01
A-102
03
A-103
A
AB
ADJ
AFF
AGGR
ALT
ALUM
AP
APPROX
ARCH
B
BD
BKHD
BLDG
BLK
BLKG
BM
BO
BOS
BOD
BOT
BRG
BRD
BTWN
BUR
BW
BYD
C
CAM
CIP
CJ
CFMF
CL
CLG
CLJ
CLR
CMU
CNSK
COL
CON / CONC
CONN
CONSTR
CONT
CONTR
COORD
CW
ANCHOR BOLT
ADJACENT
ABOVE FINISHED FLOOR
AGGREGATE
ALTERNATE
ALUMINUM
ACCESS PANEL
APPROXIMATE
ARCHITECTURAL (ARCHITECT)
BOARD
BULKHEAD
BUILDING
BLOCK
BLOCKING
BEAM
BOTTOM OF
BOTTOM OF STEEL
BASIS OF DESIGN
BOTTOM
BEARING
BOARD
BETWEEN
BUILT UP ROOFING
BOTH WAYS
BEYOND
CAMERA (SECURITY)
CAST IN PLACE
CONTROL JOINT
COLD FORMED METAL FRAMING
CENTERLINE
CEILING
CENTERLINE OF JOIST
CLEAR
CONCRETE MASONRY UNIT
COUNTERSINK (COUNTERSUNK)
COLUMN
CONCRETE
CONNECTION
CONSTRUCTION
CONTINUOUS
CONTRACTOR
COORDINATE
CURTAIN WALL
Q
QTY
R
R
RA
RD
RDO
REC
REF
REINF
REQ
REQD
RH
RO
RTU
S
S
SA
SALV
SC
SCHED
SECT
SF
SHEATH
SHT
SIM
SLNT
SPEC
SQ
SST
STAG
STD
STIF STL
STN
STRUCT
SUSP
SV
SYS
QUANTITY
RISER
RETURN AIR
ROOF DRAIN
ROOF DRAIN OUTLET
RECOMMENDATION
REFER TO / REFERENCE
REINFORCED
REQUIREMENT(S)
REQUIRED
ROOF HATCH
ROUGH OPENING
ROOF TOP UNIT
SOUTH
SUPPLY AIR
SALVAGE
SOLID CORE
SCHEDULE
SECTION
SQUARE FOOT
SHEATHING
SHEET
SIMILAR
SEALANT
SPECIFICATION
SQUARE
STAINLESS STEEL
STAGGERED
STANDARD
STIFFENER STEEL
STONE
STRUCTURAL
SUSPENDED
SMOKE VENT
SYSTEM
T
T & B
TEMP
TG
THK
TN
TO
TOC
TOP
TOS
TOW
TPO
TR
TYP
U
UON
USL
V
VER
VERT
VIF
VTR
W
W
W/
WD
WDW
W/O
WP
WPM
WRB
TOP AND BOTTOM
TEMPORARY
TONGUE & GROOVE
THICK
TRANSITION
TOP OF
TOP OF CONCRETE
TOP OF PARAPET
TOP OF STEEL
TOP OF WALL
ROOFING (REF SPEC)
TREAD
TYPICAL
UNLESS OTHERWISE NOTED
UNIT SKYLIGHT
VERIFY
VERTICAL
VERIFY IN FIELD
VENT THROUGH ROOF
WEST
WITH
WOOD
WINDOW
WITHOUT
WORKPOINT
WATERPROOFING MEMBRANE SYS
WEATHER (AIR) BARRIER
D
DAF
DEG
DEMO (D)
DIAG
DIA
DIM
DN
DR
DSP
DTL
DWG
E
E
EA
EJ
EL
ELEC
ELEV
EMER
ENCL
EQ
EQUIP
EW
EO
EXH
EXP
EXPS
EXIST (E)
EXT
F
FIN
FL
FLR
FND
FO
FOB
FOC
FOF
FOG
FOS
FR
FRT
FS
FSTNR
FT
FURR
FV
DIRECT APPLIED FINISH
DEGREE
DEMOLISH / DEMOLITION / REMOVE
DIAGONAL
DIAMETER
DIMENSION
DOWN
DOOR
DOWNSPOUT
DETAIL
DRAWING
EAST
EACH
EXPANSION JOINT
ELEVATION
ELECTRICAL
ELEVATOR
EMERGENCY
ENCLOSURE
EQUAL
EQUIPMENT
EACH WAY
EDGE OF
EXHAUST
EXPANSION
EXPOSED STRUCTURE
EXISTING
EXTERIOR
FINISH
FLOW LINE
FLOOR
FOUNDATION
FACE OF
FACE OF BRICK
FACE OF CONCRETE
FACE OF FINISH
FACE OF GLAZING
FACE OF SLAB
FRAME
FIRE RETARDANT TREATED
FULL SIZE
FASTENER
FOOT OR FEET
FURRING
FIELD VERIFY
M
MAX
MECH
MEMB
MFR
MIN
MINL
MISC
MO
MTD
MTL
MUL
N
N
NA
NIC
NO
NOM
NTS
O
OC
OD
OF
OFCI
OFOI
OH
OVHD
OPG
OPT
OPP
ORD
ORN
P
PB
PCT
PERF
PERP
PLT
PLYWD
POL
PR
PRFM
PS
PT
PWR
MAXIMUM
MECHANICAL
MEMBRANE
MANUFACTURER
MINIMUM
MINERAL
MISCELLANEOUS
MASONRY OPENING
MOUNTED
METAL
MULLION
NORTH
NOT APPLICABLE
NOT IN CONTRACT
NUMBER
NOMINAL
NOT TO SCALE
ON CENTER
OUTSIDE DIAMETER
OVERFLOW DRAIN OUTLET
OWNER FURNISHED,
CONTRACTOR INSTALLED
OWNER FURNISHED,
OWNER INSTALLED
OPPOSITE HAND
OVERHEAD
OPENING
OPTION
OPPOSITE
OVERFLOW ROOF DRAIN
ORNAMENTAL
PULL BOX
PRE-CAST CONCRETE
PERFORATED
PERPENDICULAR
PLATE
PLYWOOD
POLISHED
PAIR
PERFORMANCE
PHOTOCELL SENSOR
PAINT
POWER
ABBREVIATIONS
G
GA
GALV
GC
GL / GLAZ
GR
GYP / GYPBD
H
HB
HC
HCP
HD
HDWD
HDW
HM
HORZ
HR
HT
HVAC
I
ID
INFO
INSUL
INT
J
JB
JT
JST
L
LA
LAM
LF
LMST
LOC
LT
LT WT
LV
LVL
LVR
GAUGE
GALVANIZED
GENERAL CONTRACTOR
GLASS / GLAZING
GRADE
GYPSUM / GYPSUM BOARD
HOSE BIBB
HOLLOW CORE
HANDICAPPED
HEAVY DUTY
HARDWOOD
HARDWARE
HOLLOW METAL
HORIZONTAL
HOUR
HEIGHT
HEATING VENTILATION &
AIR CONDITIONING
INSIDE DIAMETER
INFORMATION
INSULATION
INTERIOR
JUNCTION BOX
JOINT
JOIST
LAYER
LAMINATE
LINEAL FEET
LIMESTONE
LOCATION
LIGHT
LIGHT WEIGHT
LOW VOLTAGE
LEVEL
LOUVER
STANDARDS AND REGULATIONS
ADMINISTRATION OF THE WORK
1. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE MEANS, METHODS, AND SEQUENCE OF
CONSTRUCTION.
2. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE SAFETY OF ALL CONSTRUCTION
PERSONNEL AND AUTHORIZED VISITORS.
3. CONTRACTOR SHALL BE FULLY ACQUAINTED WITH ALL DOCUMENTS AND CONDITIONS RELATED
TO THE WORK. ANY KNOWN DISCREPANCIES BETWEEN THE DOCUMENTS AND ACTUAL
CONDITIONS SHALL BE REPORTED TO THE ARCHITECT FOR RESOLUTION PRIOR TO PROCEEDING
WITH WORK RELATED TO THE DISCREPANCY.
4. CONTRACTOR SHALL TAKE PRECAUTIONS TO MAINTAIN AND PROTECT EXISTING SYSTEMS AND
FINISHES WHICH ARE TO REMAIN. ANY DAMAGES TO SUCH CONDITIONS, SYSTEMS, AND FINISHES
SHALL BE IMMEDIATELY REPAIRED IN A MANNER ACCEPTABLE TO THE ARCHITECT. IF
SATISFACTORY REPAIRS CANNOT BE MADE, CONTRACTOR SHALL REPLACE CONDITIONS,
SYSTEMS, AND FINISHES WITH LIKE NEW QUALITY CONSTRUCTION ACCEPTABLE TO THE
ARCHITECT. ALL REPAIRS AND REPLACEMENT COSTS SHALL BE THE FINANCIAL RESPONSIBILITY
OF THE CONTRACTOR.
5. CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF ALL CONSTRUCTION AND DEMOLITION
DEBRIS. CONTRACTOR SHALL OBTAIN APPROVAL OF OWNER (AND BUILDING OWNER, IF
APPLICABLE) FOR DETAILS RELATED TO REMOVAL OF TRASH, INCLUDING SUCH ISSUES AS PATH
OF TRAVEL, USE OF STAIRS AND ELEVATORS, REMOVAL OF WINDOWS, LOCATION OF CHUTES AND
DUMPSTERS, ETC., PRIOR TO REMOVAL OF DEBRIS. CONTRACTOR SHALL CLEAN AND REPAIR ANY
DAMAGES TO EXISTING SYSTEMS SOILED OR DAMAGED BY DEBRIS REMOVAL PROCESS. IF
CLEANING AND REPAIR DOES NOT RETURN SYSTEM(S) TO ORIGINAL CONDITION, CONTRACTOR
SHALL INSTALL NEW SYSTEM(S) AT NO COST TO OWNER.
6. CONTRACTOR SHALL BECOME FAMILIAR WITH AND COMPLY WITH OWNER'S (OR BUILDING
OWNER'S) PROCEDURES FOR MAINTAINING A SECURE SITE AND BUILDING.
7. WITH AN EXISTING BUILDING, CONTRACTOR SHALL BECOME FAMILIAR WITH AND COMPLY WITH
OWNER'S (OR BUILDING OWNER'S) PROCEDURES FOR DISABLING AND REACTIVATING EXISTING
BUILDING SYSTEMS.
8. EACH INSTALLER SHALL EXAMINE SUBSTRATE CONDITIONS AND/OR SITE CONDITIONS WHICH
AFFECT THE QUALITY OF EACH PRODUCT TO BE INSTALLED. IF ANY CONDITIONS EXIST WHICH
WILL HAVE A DETRIMENTAL EFFECT ON THE QUALITY OF THE INSTALLATION, THE INSTALLER
SHALL IMMEDIATELY NOTIFY THE CONTRACTOR. INSTALLATION SHALL NOT PROCEED UNTIL THE
UNSATISFACTORY CONDITIONS ARE CORRECTED. INSTALLATION SHALL SIGNIFY ACCEPTANCE OF
THE CONDITIONS.
9. CONTRACTOR SHALL MAINTAIN RECORD DRAWINGS ON SITE AT ALL TIMES.
10. CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING COORDINATION EFFORTS OF ALL
SUBCONTRACTORS.
11. ALL FIRE SAFETY SYSTEMS (i.e., AUTOMATIC SPRINKLERS, FIRE ALARM, EMERGENCY POWER &
LIGHTING, SMOKE CONTROL, FIRE DAMPERS, LABEL DOORS, ETC.) SHALL REMAIN IN OPERATION
TO THE MAXIMUM EXTENT POSSIBLE. IF SYSTEMS ARE TAKEN OUT OF OPERATION DURING
CONSTRUCTION WORKING HOURS, THE SYSTEMS SHALL BE PLACED BACK INTO SERVICE DURING
NON-CONSTRUCTION HOURS. REFERENCE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
12. CONTRACTOR SHALL LAY OUT WORK AS SOON AS POSSIBLE. ANY DISCREPANCIES SHALL BE
REPORTED TO THE ARCHITECT FOR RESOLUTION PRIOR TO PROCEEDING WITH THE WORK IN
QUESTION.
USE OF CONSTRUCTION DOCUMENTS
1. CONTRACTOR SHALL NOT SCALE DRAWINGS; ONLY WRITTEN DIMENSIONS OR KEYED NOTES
SHALL BE USED. CONTACT ARCHITECT IF CLARIFICATION OR ADDITIONAL INFORMATION IS
REQUIRED.
2. INFORMATION REGARDING EXISTING SITE CONDITIONS INDICATED IN THESE DOCUMENTS IS
BASED UPON INFORMATION FURNISHED TO THE ARCHITECT BY THE OWNER AND/OR PERCEIVED
CONDITIONS IN THE FIELD. THE INFORMATION IS NOT INTENDED TO GUARANTEE EXACT
CONDITIONS BEFORE WORK IS STARTED. NOTIFY THE ARCHITECT IF ANY DISCREPANCIES ARE
FOUND.
3. DRAWINGS ARE SCHEMATIC IN NATURE. MODIFICATIONS IN DUCTS, PIPING, CONDUIT AND WIRING
MAY BE REQUIRED TO ACCOMMODATE ACTUAL FIELD CONDITIONS.
4. DRAWINGS SHALL NOT BE REPRODUCED FOR SUBMITTALS. DRAWINGS OR PORTIONS OF
DRAWINGS USED FOR SUBMITTALS WILL BE REJECTED AND RETURNED TO THE CONTRACTOR.
5. ROOF NAMES AND NUMBERS ARE FOR CONSTRUCTION PURPOSES ONLY.
DEFINITIONS
DIMENSIONS
1. DIMENSIONS ARE AS FOLLOWS UNLESS OTHERWISE NOTED. A) TO FINISHED FACE OF PARTITION
OR EXTERIOR WALL. B) TO CENTERLINE OF COLUMNS AND STRUCTURAL GRID. C) TO TOP OF
STRUCTURAL FLOOR. D) TO BOTTOM (INTERIOR FACE) OF FINISHED CEILING.
2. DIMENSIONS INDICATED AS 'FO CMU' ARE FROM FACE OF CMU TO WORKPOINT (WP); 'FO WD' ARE
FROM FACE OF WOOD FINISH TO WORKPOINT (WP).
3. ALIGNMENT OF PARTITIONS AND FINISHES AS SCHEDULED SHALL BE STRAIGHT, TRUE & PLUMB.
THE PRIORITY FOR PROJECT DIMENSIONS SHALL BE IN THE FOLLOWING ORDER:
A. MINIMUM DIMENSION FOR ACCESSIBILITY CLEARANCE & BUILDING CODE REQUIREMENT
B. LARGE SCALE DETAILS
C. SMALL SCALE DETAILS
D. ENLARGED VIEWS
E. FLOOR PLANS & ELEVATIONS
3. DIMENSIONS SHOWN ON THE DRAWINGS INDICATE THE REQUIRED SIZE, CLEARANCE, AND
DIMENSIONAL RELATIONSHIP BETWEEN PROJECT SYSTEMS AND COMPONENTS. DIMENSIONS
SHALL NOT BE DETERMINED BY SCALING THE DRAWINGS.
1. CONTRACTOR SHALL PERFORM ALL WORK IN CONFORMANCE WITH APPLICABLE BUILDING CODES,
REGULATIONS, ORDINANCES, UTILITY PROVIDER REQUIREMENTS, AND SIMILAR STANDARDS.
2. CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS AND SIMILAR RELEASES REQUIRED FOR
CONSTRUCTION AND OCCUPANCY. CONTRACTOR SHALL FURNISH COPIES OF ALL SUCH ITEMS TO
OWNER AND ARCHITECT WITHIN 10 DAYS OF RECEIPT. IF PERMITS ARE ISSUED SUBJECT TO
CERTAIN CONDITIONS OR REVISIONS TO THE WORK OR IF PERMITS ARE DELAYED FOR ANY
REASON, CONTRACTOR SHALL NOTIFY ARCHITECT IMMEDIATELY.
3. CONTRACTOR SHALL OBTAIN ALL REQUIRED INSPECTIONS OF THE WORK. CONTRACTOR SHALL
REGULARLY UPDATE OWNER AND ARCHITECT REGARDING THE STATUS OF INSPECTIONS.
4. IF APPLICABLE, CONTRACTOR SHALL FILE NOTICE OF INTENT WITH THE ENVIRONMENTAL
PROTECTION AGENCY (EPA).
5. CONTRACTOR SHALL COORDINATE WORK WITH ALL APPLICABLE UTILITY PROVIDERS.
6. CONTRACTOR SHALL BE FAMILIAR WITH ALL DOCUMENTS AND WORK SHALL BE IN COMPLIANCE
WITH REFERENCED FIRE-RATED ASSEMBLY TESTS & STANDARDS.
7. IF UNANTICIPATED HAZARDOUS MATERIALS ARE ENCOUNTERED, CONTRACTOR SHALL CEASE
WORK IN THE AREA AND CONTACT ARCHITECT IMMEDIATELY.
1. "TYPICAL" OR "TYP" INDICATES IDENTICAL COMPLETE SYSTEM SHALL BE PROVIDED FOR EACH
OCCURRENCE OF THE CONDITION NOTED.
2. "SIMILAR" INDICATES COMPLETE SYSTEM AND COMPONENTS SHALL BE PROVIDED COMPARABLE
TO THE CHARACTERISTICS FOR THE CONDITION NOTED.
3. "AS REQUIRED" INDICATES COMPONENTS REQUIRED TO COMPLETE THE NOTED SYSTEM AS
INDICATED IN THE PROJECT DOCUMENTS SHALL BE PROVIDED.
4. "ALIGN" AS USED IN THESE DOCUMENTS SHALL MEAN TO ACCURATELY LOCATE AND FINISH FACES
OF MATERIALS IN STRAIGHT, TRUE, AND PLUMB RELATION TO ADJACENT MATERIALS; AND/OR TO
INSTALL NEW CONSTRUCTION ADJACENT TO EXISTING CONSTRUCTION WITHOUT ANY VISIBLE
JOINTS OR SURFACE IRREGULARITIES.
5. "CLEAR" AS USED IN THESE DOCUMENTS SHALL MEAN THAT THE CONDITION IS NOT ADJUSTABLE
WITHOUT THE APPROVAL OF THE ARCHITECT. CLEAR DIMENSIONS ARE TYPICALLY TO FINISH
FACE.
6. "MAXIMUM" OR "MAX." AS USED IN THESE DOCUMENTS SHALL MEAN THAT THE CONDITION IS
SLIGHTLY ADJUSTABLE BUT MAY NOT VARY TO A DIMENSION OR QUANTITY GREATER THAN THAT
SHOWN WITHOUT APPROVAL OF THE ARCHITECT.
7. "MINIMUM" OR "MIN." AS USED IN THESE DOCUMENTS SHALL MEAN THAT THE CONDITION IS
SLIGHTLY ADJUSTABLE BUT MAY NOT VARY TO A DIMENSION OR QUANTITY LESS THAN THAT
SHOWN WITHOUT APPROVAL OF THE ARCHITECT.
8. "HOLD" AS USED IN THESE DOCUMENTS SHALL MEAN THAT THE CONDITION IS NOT ADJUSTABLE
WITHOUT THE APPROVAL OF THE ARCHITECT, AND IN SOME CASES IT MAY REQUIRE EXCEEDING
TOLERANCES DEFINED IN SPECIFICATIONS.
ROOF AREA IN
PROJECT SCOPE
ROOF PLAN LEGEND
ROOF AREA OUTSIDE
PROJECT SCOPE
GLAZING
ISSUE DATE:
SHEET NUMBER:
ASSET #
CHECKED BY:DRAWN BY:
DESIGNED BY:
DATE:REVISION:
PROJECT #
SHEET TITLE:
REVISION:DATE:
REVISION:DATE:
CAD DWG FILE:
STATE OF MISSOURIMICHAEL L. PARSON,
GOVERNOR
OFFICE OF ADMINISTRATIONDIVISION OF FACILITIESMANAGEMENT,DESIGN AND CONSTRUCTION
DEPARTMENT OF
SECONDARY EDUCATIONELEMENTARY AND
ROOF REPLACEMENT
3815 MAGNOLIA AVENUESCHOOL FOR THE BLINDMISSOURI
SAINT LOUIS, MO 63110
E1908-0150120110075012011009
01/24/2020
E1908-01 2011 A-100MER / MGCP / AICP / MG
OVERALLROOF PLAN
A-1002 OF 10 SHEETS01/24/2020
ROOF CONSULTANT:
7 7 5 1 c a r o n d e l e t a v e n u ec l a y t o n t o w e r s u i t e 5 0 0s t l o u i s m i s s o u r i 6 3 1 0 53 1 4 8 3 3 0 3 0 1w w w . p a t t e r h n - i v e s . c o mMO State Cer t i f icate of Author i ty #A2014032538
patterhn ives llcARCHITECT:
7 7 3 3 f o r s y t h b o u l e v a r ds u i t e 1 1 0 0s t l o u i s m i s s o u r i 6 3 1 0 53 1 4 8 9 6 2 5 1 1w w w . k i r k e g a a r d . c o m
ROOFTECH CONSULTING, INC
(E) LT
(E) PS
(E) LT
(E) LT
(E) LT
(E) LT
(E) LT
(E) LT
(E) LT
(E) PS
(E) LT
(E) LT
(E) LT (E) PS
RD
05
RD
05
RD
05
RD
05
RD
05
RD
05
RD
05
RD
05
RD
05
RD
05
RD
05
(E) VTR
01
(E) VTR
01
(E) VTR
01
(E) VTR
(E) VTR
01
(E) VTR
01
(E) VTR
01
(E) VTR
01
(E) VTR
01
(E) VTR
01
(E) VTR
01
(E) VTR
01
(E) VTR
01
(E) VTR
01
(E) VTR
01
RD
05
(E) VTR
01
(E) VTR
01
(E) VTR
01
DS DS
DS
DS
DS
DS
DS
DS
(E) LADDER
(
E
)
L
A
D
D
E
R
(
E
)
C
O
N
D
U
I
T
(E) WDW ROOF
ACCESS
09
06
0
9
0
9
0
9
2
7
0
9
1
3
1
9
1
9
1
3
1
3
SLO
PE
06 06
16
18
21
09 09
MHD ANNEX
SECTION 4
325 SF
0
9
0
9
0
9
0
9
09
09
09
09
09
09
09
09
09
09
1
3
1
3
1
3
13
13
1
3
1
3
1
3
1
3
1
3
1
3
02
0
6
0
6
MHD ANNEX
SECTION 8
370 SF
09
20
20
20 20
1
4
MHD ANNEX
SECTION 7
2368 SF
MHD ANNEX
SECTION 1
18,230SF
1
5
1
4
1
5
1
4
1
5
1
4
1
5
17
17
17 17
16
18
21
MHD ANNEX
SECTION 6
325 SF
06 06
09 09
SLO
PE
1
9
1
9
1
3
01
21
1816
1
9
1
9
06
06
09
09
22
2
3
0
9
0
9
0
9
0
9
0
9
SLOPE
S
L
O
P
E
18
2
1
0
6
0
6
MHD ANNEX
SECTION 3
325 SF
MHD ANNEX
SECTION 5
138 SF
MHD ANNEX
SECTION 2
712 SF
S
L
O
P
E
4-WAY SLOPE
MHD ANNEX
SECTION 9
3136 SF
(D
) C
ON
DU
IT
(
D
)
C
O
N
D
U
I
T
(
D
)
C
O
N
D
U
I
T
(D) CONDUIT
(
E
)
C
O
N
D
U
I
T
ALTERNATE 2
ALTERNATE 2
ALTERNATE 2
ALTERNATE 3
ALTERNATE 4
ALTERNATE 4
ALTERNATE 4
ALTERNATE 4
ALTERNATE 4
A. REFERENCE SHEET A-100 FOR PROJECT GENERAL NOTES AND CONDITIONS.
B. REFERENCE SHEET A-500 FOR EXISTING ROOF ASSEMBLY TYPES. CONTRACTOR TO FIELD VERIFY EXISTING
CONSTRUCTION AND CONDITIONS. PROVIDED INFORMATION REPRESENTS ONLY CORED AREAS.
C. REFERENCE SHEET A-501 FOR NEW ROOF ASSEMBLY TYPES.
D. ALL ROOF AREAS WITHIN PROJECT SCOPE ARE TO MEET FM GLOBAL REQUIREMENTS FOR FM 1A-90. INCREASE
FASTENER RATES AND ADHESIVE BEAD PATTERN DENSITIES AT PERIMETERS PER TESTED FM GLOBAL
ASSEMBLY. SUBMIT ADHESIVE SHOP DRAWINGS ILLUSTRATING PATTERNS AND PERIMETER WIDTHS FOR
APPROVAL PRIOR TO COMMENCING WORK.
E. PROVIDE AND INSTALL WALK PADS AT EACH OF THE FOLLOWING ON ALL ROOF AREAS UNLESS OTHERWISE
NOTED: LADDERS, ACCESS POINTS, DOWNSPOUT DISCHARGE POINTS, ACCESS DOORS, AND ROOFTOP
EQUIPMENT REQUIRING MAINTENANCE.
F. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS, CALCULATE ALL QUANTITIES, AND DETERMINE SUITABILITY.
G. CONTRACTOR TO INSTALL NEW WOOD BLOCKING AND/OR ADJUST/REMOVE EXISTING BLOCKING TO HEIGHTS
NECESSARY TO ACCOMMODATE THE HEIGHT OF NEW ROOF ASSEMBLIES AND EDGE PROFILES. PERIMETER
DETAILING AND SECUREMENT TO COMPLY WITH FM GLOBAL 1-49.
H. METAL TRIM FINISH TO BE SELECTED BY ARCHITECT FROM MANUFACTURER'S STANDARD COLORS UNLESS
OTHERWISE NOTED.
I. ALL REQUIRED DISCONNECTIONS AND RECONNECTIONS OF EQUIPMENT, PLUMBING, MECHANICAL, AND
ELECTRICAL AS REQUIRED AS PART OF PROPER INSTALLATION OF ROOF ASSEMBLIES AND DETAILS SHALL BE
PROVIDED BY CONTRACTOR.
J. INSTALL PRE-MANUFACTURED SUPPORTS UNDER ALL ELEC CONDUIT AND CONDENSATE LINES SERVING
EQUIPMENT TO REMAIN AND SPACE 6'-0" OC. PROVIDE NEW CONDENSATE LINES FOR EQUIPMENT TO REMAIN
AND RUN LINES TO NEAREST GUTTER / DRAIN.
K. ALL LADDERS, UNIT SKYLIGHTS, EXHAUST FANS AND ROOF HATCHES TO REMAIN. REMOVE AND REINSTALL FOR
ROOF REPLACEMENT. ADJUST CURBS TO MEET ROOF ASSEMBLY REQUIREMENTS.
ROOF PLAN GENERAL NOTES
01 FLASH EXIST ROOF PENETRATION - PIPE. REF 01/A-502 FOR DETAIL. REMOVE EXIST FLASHING, SEALANT AND
ASSOCIATED COMPONENTS. CLEAN, PREPARE AND APPLY FIELD WRAP FLASHING OR BOOT FLASHING PER
MEMBRANE MANUFACTURER'S RECOMMENDATIONS. EXTEND ALL PIPES TO 12" MIN ABOVE NEW ROOF
ASSEMBLY HEIGHT.
02 FLASH EXIST BASE CURB. REF 04/A-502 FOR DETAIL. REMOVE EXIST FLASHING AND ASSOCIATED
COMPONENTS. CLEAN AND PREPARE CURB AS REQUIRED TO ACCEPT NEW FLASHING. RAISE EQUIPMENT AS
REQUIRED FOR 12" MIN FLASHING HEIGHT. FULLY ADHERE AND TERMINATE NEW FLASHING TO THE CURB AS
REQUIRED. INSTALL FLASHING UP AND OVER TOP OF CURB.
03 FLASH EXIST ROOF PENETRATION - HOT FLUE. REF 02/A-502 FOR DETAIL. REMOVE EXIST FLASHING. GAP
INSULATION AT HOT STACK TO DISSIPATE HEAT AND INSTALL OVERSIZED FLANGE AS REQUIRED TO GAP AND
DISSIPATE HEAT.
04 SEALANT POCKET, REF DETAIL 03/A-502. REMOVE EXIST FLASHING AND ASSOCIATED COMPONENTS FROM
PENETRATIONS. CLEAN, PREPARE AND PRIME ALL SURFACES AS REQUIRED. TOP OFF SEALANT AT PROJECT
COMPLETION.
05 EXISTING ROOF DRAIN, REF DETAIL 05/A-502. REMOVE ALL EXIST FLASHING AND ASSOCIATED COMPONENTS;
SALVAGE EXIST CLAMPING COLLAR AND STRAINER FOR REUSE. REPLACE DRAIN BOWL UNDER UNIT COST AS
APPROVED. EXIST DRAINS SIT ABOVE DECK; INSTALL SUMPS ACCORDINGLY TO PROVIDE POSITIVE SLOPE TO
DRAIN.
06 BASE BID & ALTERNATE 2: SURFACE-MOUNT COUNTERFLASHING, REF 01/A-503. REMOVE EXIST FLASHING,
TERMINATION BAR AND COUNTERFLASHING. DO NOT COVER OR RESTRICT WEEPS. REFERENCE A-101 FOR
ALTERNATE 2 LOCATIONS.
07 SLIP FLASHING AT EXIST GUTTER, REF DETAIL 04/A-503. REMOVE EXIST FLASHING AND TERMINATION BAR.
PROTECT IN PLACE EXIST GUTTER AND FLASHING BEHIND. DO NOT COVER OR RESTRICT WEEPS.
08 FLASHING AT EXIST PLYWOOD WALL ENCLOSURE, REF 05/A-503. REMOVE EXIST FLASHING AND ASSOCIATED
COMPONENTS DOWN TO PLYWOOD SHEATHING. PREP FOR NEW WORK. DO NOT COVER OR RESTRICT WEEPS.
09 BASE BID & ALTERNATES: METAL EDGE AT PARAPET, REF 02/A-503. REMOVE EXIST MEMBRANE, FLASHING AND
METAL COPING. INSTALL ALL COMPONENTS ACCORDING TO ANSI/SPRI ES-1 GUIDELINES AND MFR'S REC FOR
WARRANTY INCLUSION. CONTINUE METAL EDGE AND COUNTERFLASHING DOWN VERTICAL SIDES OF PARAPET
AT CRENNELS TO COVER TERMINATION BAR. REMOVE AND REINSTALL CONDUIT AND FIXTURES AS REQUIRED
TO INSTALL COPING. REPLACE CONDUIT UNDER UNIT COST AS APPROVED. REFERENCE A-101 FOR LOCATIONS
OF ASSOCIATED ALTERNATE.
10 METAL EDGE AT STEP TRANSITION, REF 03/A-503. REMOVE EXIST MEMBRANE, FLASHING AND METAL COPING.
INSTALL ALL COMPONENTS ACCORDING TO ANSI/SPRI ES-1 GUIDELINES AND MFR'S REC FOR WARRANTY
INCLUSION.
11 METAL EDGE EXTENSION AT COPING, REF 06/A-503. REMOVE EXIST MEMBRANE, FLASHING AND METAL COPING.
INSTALL ALL COMPONENTS ACCORDING TO ANSI/SPRI ES-1 GUIDELINES AND MFR'S REC FOR WARRANTY
INCLUSION.
12 TPO-COATED METAL EDGE, REF 07/A-503. REMOVE EXIST MEMBRANE, FLASHING AND METAL COPING.
13 ALTERNATE 2: CRENNEL GLAZING DETAIL, REF 08/A-503. REMOVE EXIST MEMBRANE, FLASHING AND METAL
COPING. INSTALL ALL COMPONENTS ACCORDING TO ANSI/SPRI ES-1 GUIDELINES AND MFR'S REC FOR
WARRANTY INCLUSION. REMOVE AND REINSTALL CONDUIT AS REQUIRED TO INSTALL ROOF ASSEMBLY.
REPLACE CONDUIT UNDER UNIT COST AS APPROVED.
14 BASE BID & ALTERNATE 2: SKYLIGHT CURB FLASHING, REF 09/A-503. REMOVE MODIFIED BITUMEN FLASHING.
CLEAN AND PREPARE METAL FLASHING FOR REUSE.
15 BASE BID & ALTERNATE 3: METAL EDGE AT SKYLIGHT, REF 10/A-503. REMOVE EXIST MEMBRANE, FLASHING AND
METAL COPING. SECURE WOOD BLOCKING AS REQUIRED PER FM 1-49. INSTALL ALL COMPONENTS
ACCORDING TO MFR'S REC FOR WARRANTY INCLUSION.
16 ALTERNATE 4: GRAVEL STOP AT SKYLIGHT, REF 11/A-503. REMOVE EXIST MEMBRANE, FLASHING AND METAL
COPING. SECURE WOOD BLOCKING AS REQUIRED PER FM 1-49. INSTALL ALL COMPONENTS ACCORDING TO
MFR'S REC FOR WARRANTY INCLUSION.
17 REMOVE AND REPLACE COLLECTOR HEAD AND DOWNSPOUTS WITH NEW METAL COLLECTOR HEAD AND
DOWNSPOUTS. MATCH SIZE AND PROFILE OF EXIST, REF SPEC FOR METAL FINISH.
18 ALTERNATE 4: SCUPPER AND COLLECTOR HEAD, REF 01/A-504. REMOVE EXISTING SCUPPER, COLLECTOR
HEAD AND DOWNSPOUT.
19 ALTERNATE 4: REMOVE EXIST COPING CAP ALONG SKYLIGHTS. SECURE EXIST BLOCKING PER FM 1-49 PRIOR
TO INSTALLATION OF NEW METAL COPING SYSTEM TO MATCH EXIST IN SIZE AND EXTENT, FINISH TO MATCH
NEW METAL EDGE AT SKYLIGHT GRAVEL STOP.
20 ALTERNATE 4: METAL EDGE DETAIL, REF 02/A-504. REMOVE EXIST MEMBRANE AND EDGE METAL. INSTALL
WOOD BLOCKING TO MATCH HEIGHT OF NEW ROOF ASSEMBLY. INSTALL ALL COMPONENTS ACCORDING TO
ANSI/SPRI ES-1 GUIDELINES AND MFR'S REC FOR WARRANTY INCLUSION.
21 ALTERNATE 2: THRESHOLD DETAIL, REF 03/A-504. REMOVE THRESHOLD HARDWARE AT EXIST OPENING.
22 ALTERNATE 2: ROOF TO WALL EXPANSION JOINT, REF 08/A-504. REMOVE ALL EXIST COMPONENTS TO DECK.
23 ALTERNATE 2: ROOF TO ROOF EXPANSION JOINT, REF 07/A-504. REMOVE ALL EXIST COMPONENTS TO DECK.
24 BASE BID & ALTERNATE 1: TYPICAL GUTTER DETAIL, REF 04/A-504. BLOCKING AND GUTTER ATTACHMENT TO
COMPLY WITH SMACNA, FM 1-49, AND ANSI/SPRI ES-1 AS APPLICABLE.
25 BASE BID & ALTERNATE 1: GUTTER DETAIL AT K DORMITORY, REF 05/A-504. BLOCKING AND GUTTER
ATTACHMENT TO COMPLY WITH SMACNA, FM 1-49, AND ANSI/SPRI ES-1 AS APPLICABLE.
26 STEP TRANSITION DETAIL, REF 06/A-504. REMOVE EXIST FLASHING AND GUTTER SYSTEM.
27 ALTERNATE 2: WINDOW SILL FLASHING, REF 09/A-504. REMOVE EXIST MEMBRANE, FLASHING, METAL
TRANSITIONS AND SEALANT.
28 REMOVE CONDUIT / EXT DUCTWORK AND ASSOCIATED SUPPORTS / CURBS PRIOR TO NEW ROOF
INSTALLATION. INFILL OPENINGS TO MATCH ADJACENT CONDITIONS AND MATERIALS. REF NOTE 29 FOR INFILL
REQS IN DECK OPENINGS.
29 REMOVE EXIST NON-FUNCTIONING EQUIPMENT, ASSOCIATED SUPPORTS / CURBS, AND CONDUIT. INSTALL 3/16"
STEEL PLATE OVER DECK OPENING. EXTEND PLATE 6" MIN BEYOND OPENING DIMENSIONS AND FASTEN AT
CORNERS & 12" OC AT SIDES.
ROOF PLAN KEY NOTES
ISSUE DATE:
SHEET NUMBER:
ASSET #
CHECKED BY:DRAWN BY:
DESIGNED BY:
DATE:REVISION:
PROJECT #
SHEET TITLE:
REVISION:DATE:
REVISION:DATE:
CAD DWG FILE:
STATE OF MISSOURIMICHAEL L. PARSON,
GOVERNOR
OFFICE OF ADMINISTRATIONDIVISION OF FACILITIESMANAGEMENT,DESIGN AND CONSTRUCTION
DEPARTMENT OF
SECONDARY EDUCATIONELEMENTARY AND
ROOF REPLACEMENT
3815 MAGNOLIA AVENUESCHOOL FOR THE BLINDMISSOURI
SAINT LOUIS, MO 63110
E1908-0150120110075012011009
01/24/2020
E1908-01 2011 A-101MER / MGCP / AICP / MG
ENLARGEDROOF PLAN
A-1013 OF 10 SHEETS01/24/2020
ROOF CONSULTANT:
7 7 5 1 c a r o n d e l e t a v e n u ec l a y t o n t o w e r s u i t e 5 0 0s t l o u i s m i s s o u r i 6 3 1 0 53 1 4 8 3 3 0 3 0 1w w w . p a t t e r h n - i v e s . c o mMO State Cer t i f icate of Author i ty #A2014032538
patterhn ives llcARCHITECT:
7 7 3 3 f o r s y t h b o u l e v a r ds u i t e 1 1 0 0s t l o u i s m i s s o u r i 6 3 1 0 53 1 4 8 9 6 2 5 1 1w w w . k i r k e g a a r d . c o m
ROOFTECH CONSULTING, INC
01
ENLARGED ROOF PLAN: MHD ANNEX
A-101 3/32"=1'-0" 0 3' 6' 12' 24'
T
R
U
E
N
O
R
T
H
NORTH
PROJECT
ALT-1:REPLACE GUTTERS AND DOWNSPOUTS
ALT-2: TPO ASSEMBLY ON MHD SECTIONS 1, 2 AND 7
ALT-3: TPO ASSEMBLY ON MHD SECTION 9
ALT-4: TPO ASSEMBLY ON MHD SECTIONS 3, 4, 5, 6 AND 8
ALTERNATES KEY
(D) CONDUIT
(E) ELEC
SWITCH GEAR
02 09
09
09
09
09
09
09
0909
06
08
(E) VTR
(E) VTR
02
02
06
(E) VTR
(E) VTR
(E) VTR
(E) VTR
01
01
01
01
06
(E) FLUE
03
(E) FLUE
03
(E) VTR
01
(E) VTR
01
(E) VTR
01
(E) VTR
01(D) VTR
(E) VTR
01
(E) EXH
02
(E) EXH
02
CRICKET CRICKET
CRICKET
(D) CONDUIT(D) CONDUIT(D) CONDUIT
(D) CONDUIT
29
29
SLO
PE
SLO
PE
SLO
PE
SLO
PE
(E) LADDER
09
24
29
06
2828
28
(E
) LA
DD
ER
04 TYP OF 4
02
(E) VTR
01
25
25
(E) RTU
SLOPE
06
CRICKET
24
24
24
24
24
26
SLO
PE
SLO
PE
LITTLE THEATRE
2668 SF
K DORMITORY
6217 SF
DINING HALL
CANTEEN
1372 SF
DINING HALL
CAFETERIA
1875 SF
AREA AAREA BAREA C
AREA D
06
06
06
06
(E) EXH
02
(E) RTU
(D) RTU
29
(D) CONDUIT
(D) ELEC
FEEDER
REWORK 400A
FEED BELOW
ROOF, ROUTE
INTO PANEL
(E) 400A
PANEL
CRICKET
(E) CONDUIT
(E) PWR
(E
) C
ON
DU
IT
04
STAIR ABOVE, MODIFY
AS REQD FOR NEW
ROOF INSTALLATION
ALT
-1
ALT
-1
ALT
-1
ALT
-1
ALT-1
ALT-1
ALT-1
ALT-1
A. REFERENCE SHEET A-100 FOR PROJECT GENERAL NOTES AND CONDITIONS.
B. REFERENCE SHEET A-500 FOR EXISTING ROOF ASSEMBLY TYPES. CONTRACTOR TO FIELD VERIFY EXISTING
CONSTRUCTION AND CONDITIONS. PROVIDED INFORMATION REPRESENTS ONLY CORED AREAS.
C. REFERENCE SHEET A-501 FOR NEW ROOF ASSEMBLY TYPES.
D. ALL ROOF AREAS WITHIN PROJECT SCOPE ARE TO MEET FM GLOBAL REQUIREMENTS FOR FM 1A-90. INCREASE
FASTENER RATES AND ADHESIVE BEAD PATTERN DENSITIES AT PERIMETERS PER TESTED FM GLOBAL
ASSEMBLY. SUBMIT ADHESIVE SHOP DRAWINGS ILLUSTRATING PATTERNS AND PERIMETER WIDTHS FOR
APPROVAL PRIOR TO COMMENCING WORK.
E. PROVIDE AND INSTALL WALK PADS AT EACH OF THE FOLLOWING ON ALL ROOF AREAS UNLESS OTHERWISE
NOTED: LADDERS, ACCESS POINTS, DOWNSPOUT DISCHARGE POINTS, ACCESS DOORS, AND ROOFTOP
EQUIPMENT REQUIRING MAINTENANCE.
F. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS, CALCULATE ALL QUANTITIES, AND DETERMINE SUITABILITY.
G. CONTRACTOR TO INSTALL NEW WOOD BLOCKING AND/OR ADJUST/REMOVE EXISTING BLOCKING TO HEIGHTS
NECESSARY TO ACCOMMODATE THE HEIGHT OF NEW ROOF ASSEMBLIES AND EDGE PROFILES. PERIMETER
DETAILING AND SECUREMENT TO COMPLY WITH FM GLOBAL 1-49.
H. METAL TRIM FINISH TO BE SELECTED BY ARCHITECT FROM MANUFACTURER'S STANDARD COLORS UNLESS
OTHERWISE NOTED.
I. ALL REQUIRED DISCONNECTIONS AND RECONNECTIONS OF EQUIPMENT, PLUMBING, MECHANICAL, AND
ELECTRICAL AS REQUIRED AS PART OF PROPER INSTALLATION OF ROOF ASSEMBLIES AND DETAILS SHALL BE
PROVIDED BY CONTRACTOR.
J. INSTALL PRE-MANUFACTURED SUPPORTS UNDER ALL ELEC CONDUIT AND CONDENSATE LINES SERVING
EQUIPMENT TO REMAIN AND SPACE 6'-0" OC. PROVIDE NEW CONDENSATE LINES FOR EQUIPMENT TO REMAIN
AND RUN LINES TO NEAREST GUTTER / DRAIN.
K. ALL LADDERS, UNIT SKYLIGHTS, EXHAUST FANS AND ROOF HATCHES TO REMAIN. REMOVE AND REINSTALL FOR
ROOF REPLACEMENT. ADJUST CURBS TO MEET ROOF ASSEMBLY REQUIREMENTS.
ROOF PLAN GENERAL NOTES
01 FLASH EXIST ROOF PENETRATION - PIPE. REF 01/A-502 FOR DETAIL. REMOVE EXIST FLASHING, SEALANT AND
ASSOCIATED COMPONENTS. CLEAN, PREPARE AND APPLY FIELD WRAP FLASHING OR BOOT FLASHING PER
MEMBRANE MANUFACTURER'S RECOMMENDATIONS. EXTEND ALL PIPES TO 12" MIN ABOVE NEW ROOF
ASSEMBLY HEIGHT.
02 FLASH EXIST BASE CURB. REF 04/A-502 FOR DETAIL. REMOVE EXIST FLASHING AND ASSOCIATED
COMPONENTS. CLEAN AND PREPARE CURB AS REQUIRED TO ACCEPT NEW FLASHING. RAISE EQUIPMENT AS
REQUIRED FOR 12" MIN FLASHING HEIGHT. FULLY ADHERE AND TERMINATE NEW FLASHING TO THE CURB AS
REQUIRED. INSTALL FLASHING UP AND OVER TOP OF CURB.
03 FLASH EXIST ROOF PENETRATION - HOT FLUE. REF 02/A-502 FOR DETAIL. REMOVE EXIST FLASHING. GAP
INSULATION AT HOT STACK TO DISSIPATE HEAT AND INSTALL OVERSIZED FLANGE AS REQUIRED TO GAP AND
DISSIPATE HEAT.
04 SEALANT POCKET, REF DETAIL 03/A-502. REMOVE EXIST FLASHING AND ASSOCIATED COMPONENTS FROM
PENETRATIONS. CLEAN, PREPARE AND PRIME ALL SURFACES AS REQUIRED. TOP OFF SEALANT AT PROJECT
COMPLETION.
05 EXISTING ROOF DRAIN, REF DETAIL 05/A-502. REMOVE ALL EXIST FLASHING AND ASSOCIATED COMPONENTS;
SALVAGE EXIST CLAMPING COLLAR AND STRAINER FOR REUSE. REPLACE DRAIN BOWL UNDER UNIT COST AS
APPROVED. EXIST DRAINS SIT ABOVE DECK; INSTALL SUMPS ACCORDINGLY TO PROVIDE POSITIVE SLOPE TO
DRAIN.
06 BASE BID & ALTERNATE 2: SURFACE-MOUNT COUNTERFLASHING, REF 01/A-503. REMOVE EXIST FLASHING,
TERMINATION BAR AND COUNTERFLASHING. DO NOT COVER OR RESTRICT WEEPS. REFERENCE A-101 FOR
ALTERNATE 2 LOCATIONS.
07 SLIP FLASHING AT EXIST GUTTER, REF DETAIL 04/A-503. REMOVE EXIST FLASHING AND TERMINATION BAR.
PROTECT IN PLACE EXIST GUTTER AND FLASHING BEHIND. DO NOT COVER OR RESTRICT WEEPS.
08 FLASHING AT EXIST PLYWOOD WALL ENCLOSURE, REF 05/A-503. REMOVE EXIST FLASHING AND ASSOCIATED
COMPONENTS DOWN TO PLYWOOD SHEATHING. PREP FOR NEW WORK. DO NOT COVER OR RESTRICT WEEPS.
09 BASE BID & ALTERNATES: METAL EDGE AT PARAPET, REF 02/A-503. REMOVE EXIST MEMBRANE, FLASHING AND
METAL COPING. INSTALL ALL COMPONENTS ACCORDING TO ANSI/SPRI ES-1 GUIDELINES AND MFR'S REC FOR
WARRANTY INCLUSION. CONTINUE METAL EDGE AND COUNTERFLASHING DOWN VERTICAL SIDES OF PARAPET
AT CRENNELS TO COVER TERMINATION BAR. REMOVE AND REINSTALL CONDUIT AND FIXTURES AS REQUIRED
TO INSTALL COPING. REPLACE CONDUIT UNDER UNIT COST AS APPROVED. REFERENCE A-101 FOR LOCATIONS
OF ASSOCIATED ALTERNATE.
10 METAL EDGE AT STEP TRANSITION, REF 03/A-503. REMOVE EXIST MEMBRANE, FLASHING AND METAL COPING.
INSTALL ALL COMPONENTS ACCORDING TO ANSI/SPRI ES-1 GUIDELINES AND MFR'S REC FOR WARRANTY
INCLUSION.
11 METAL EDGE EXTENSION AT COPING, REF 06/A-503. REMOVE EXIST MEMBRANE, FLASHING AND METAL COPING.
INSTALL ALL COMPONENTS ACCORDING TO ANSI/SPRI ES-1 GUIDELINES AND MFR'S REC FOR WARRANTY
INCLUSION.
12 TPO-COATED METAL EDGE, REF 07/A-503. REMOVE EXIST MEMBRANE, FLASHING AND METAL COPING.
13 ALTERNATE 2: CRENNEL GLAZING DETAIL, REF 08/A-503. REMOVE EXIST MEMBRANE, FLASHING AND METAL
COPING. INSTALL ALL COMPONENTS ACCORDING TO ANSI/SPRI ES-1 GUIDELINES AND MFR'S REC FOR
WARRANTY INCLUSION. REMOVE AND REINSTALL CONDUIT AS REQUIRED TO INSTALL ROOF ASSEMBLY.
REPLACE CONDUIT UNDER UNIT COST AS APPROVED.
14 BASE BID & ALTERNATE 2: SKYLIGHT CURB FLASHING, REF 09/A-503. REMOVE MODIFIED BITUMEN FLASHING.
CLEAN AND PREPARE METAL FLASHING FOR REUSE.
15 BASE BID & ALTERNATE 3: METAL EDGE AT SKYLIGHT, REF 10/A-503. REMOVE EXIST MEMBRANE, FLASHING AND
METAL COPING. SECURE WOOD BLOCKING AS REQUIRED PER FM 1-49. INSTALL ALL COMPONENTS
ACCORDING TO MFR'S REC FOR WARRANTY INCLUSION.
16 ALTERNATE 4: GRAVEL STOP AT SKYLIGHT, REF 11/A-503. REMOVE EXIST MEMBRANE, FLASHING AND METAL
COPING. SECURE WOOD BLOCKING AS REQUIRED PER FM 1-49. INSTALL ALL COMPONENTS ACCORDING TO
MFR'S REC FOR WARRANTY INCLUSION.
17 REMOVE AND REPLACE COLLECTOR HEAD AND DOWNSPOUTS WITH NEW METAL COLLECTOR HEAD AND
DOWNSPOUTS. MATCH SIZE AND PROFILE OF EXIST, REF SPEC FOR METAL FINISH.
18 ALTERNATE 4: SCUPPER AND COLLECTOR HEAD, REF 01/A-504. REMOVE EXISTING SCUPPER, COLLECTOR
HEAD AND DOWNSPOUT.
19 ALTERNATE 4: REMOVE EXIST COPING CAP ALONG SKYLIGHTS. SECURE EXIST BLOCKING PER FM 1-49 PRIOR
TO INSTALLATION OF NEW METAL COPING SYSTEM TO MATCH EXIST IN SIZE AND EXTENT, FINISH TO MATCH
NEW METAL EDGE AT SKYLIGHT GRAVEL STOP.
20 ALTERNATE 4: METAL EDGE DETAIL, REF 02/A-504. REMOVE EXIST MEMBRANE AND EDGE METAL. INSTALL
WOOD BLOCKING TO MATCH HEIGHT OF NEW ROOF ASSEMBLY. INSTALL ALL COMPONENTS ACCORDING TO
ANSI/SPRI ES-1 GUIDELINES AND MFR'S REC FOR WARRANTY INCLUSION.
21 ALTERNATE 2: THRESHOLD DETAIL, REF 03/A-504. REMOVE THRESHOLD HARDWARE AT EXIST OPENING.
22 ALTERNATE 2: ROOF TO WALL EXPANSION JOINT, REF 08/A-504. REMOVE ALL EXIST COMPONENTS TO DECK.
23 ALTERNATE 2: ROOF TO ROOF EXPANSION JOINT, REF 07/A-504. REMOVE ALL EXIST COMPONENTS TO DECK.
24 BASE BID & ALTERNATE 1: TYPICAL GUTTER DETAIL, REF 04/A-504. BLOCKING AND GUTTER ATTACHMENT TO
COMPLY WITH SMACNA, FM 1-49, AND ANSI/SPRI ES-1 AS APPLICABLE.
25 BASE BID & ALTERNATE 1: GUTTER DETAIL AT K DORMITORY, REF 05/A-504. BLOCKING AND GUTTER
ATTACHMENT TO COMPLY WITH SMACNA, FM 1-49, AND ANSI/SPRI ES-1 AS APPLICABLE.
26 STEP TRANSITION DETAIL, REF 06/A-504. REMOVE EXIST FLASHING AND GUTTER SYSTEM.
27 ALTERNATE 2: WINDOW SILL FLASHING, REF 09/A-504. REMOVE EXIST MEMBRANE, FLASHING, METAL
TRANSITIONS AND SEALANT.
28 REMOVE CONDUIT / EXT DUCTWORK AND ASSOCIATED SUPPORTS / CURBS PRIOR TO NEW ROOF
INSTALLATION. INFILL OPENINGS TO MATCH ADJACENT CONDITIONS AND MATERIALS. REF NOTE 29 FOR INFILL
REQS IN DECK OPENINGS.
29 REMOVE EXIST NON-FUNCTIONING EQUIPMENT, ASSOCIATED SUPPORTS / CURBS, AND CONDUIT. INSTALL 3/16"
STEEL PLATE OVER DECK OPENING. EXTEND PLATE 6" MIN BEYOND OPENING DIMENSIONS AND FASTEN AT
CORNERS & 12" OC AT SIDES.
ROOF PLAN KEY NOTES
ISSUE DATE:
SHEET NUMBER:
ASSET #
CHECKED BY:DRAWN BY:
DESIGNED BY:
DATE:REVISION:
PROJECT #
SHEET TITLE:
REVISION:DATE:
REVISION:DATE:
CAD DWG FILE:
STATE OF MISSOURIMICHAEL L. PARSON,
GOVERNOR
OFFICE OF ADMINISTRATIONDIVISION OF FACILITIESMANAGEMENT,DESIGN AND CONSTRUCTION
DEPARTMENT OF
SECONDARY EDUCATIONELEMENTARY AND
ROOF REPLACEMENT
3815 MAGNOLIA AVENUESCHOOL FOR THE BLINDMISSOURI
SAINT LOUIS, MO 63110
E1908-0150120110075012011009
01/24/2020
E1908-01 2011 A-102MER / MGCP / AICP / MG
ENLARGEDROOF PLAN
A-1024 OF 10 SHEETS01/24/2020
ROOF CONSULTANT:
7 7 5 1 c a r o n d e l e t a v e n u ec l a y t o n t o w e r s u i t e 5 0 0s t l o u i s m i s s o u r i 6 3 1 0 53 1 4 8 3 3 0 3 0 1w w w . p a t t e r h n - i v e s . c o mMO State Cer t i f icate of Author i ty #A2014032538
patterhn ives llcARCHITECT:
7 7 3 3 f o r s y t h b o u l e v a r ds u i t e 1 1 0 0s t l o u i s m i s s o u r i 6 3 1 0 53 1 4 8 9 6 2 5 1 1w w w . k i r k e g a a r d . c o m
ROOFTECH CONSULTING, INC
01
ENLARGED ROOF PLAN: LITTLE THEATRE / K DORMITORY / DINING HALL CANTEEN / DINING HALL CAFETERIA
A-102
T
R
U
E
N
O
R
T
H
NORTH
PROJECT
24'12'6'3'03/32"=1'-0"
ALT-1:REPLACE GUTTERS AND DOWNSPOUTS
ALT-2: TPO ASSEMBLY ON MHD SECTIONS 1, 2 AND 7
ALT-3: TPO ASSEMBLY ON MHD SECTION 9
ALT-4: TPO ASSEMBLY ON MHD SECTIONS 3, 4, 5, 6 AND 8
ALTERNATES KEY
(E) VTR
(E) VTR
DS
(E) USL
(E) RH
(E) VTR (BELOW DUCT)
(E) RD
2020
20
01
01
01
01
01
01
01
01
01
02
02
02
06
06
29
24
05
05
28
SLO
PE
ADMIN
SECTION 2
90 SF
ADMIN
SECTION 1
4428 SF
(D
) C
ON
DU
IT
28
28
29
29 28
29
28
02
28
28
28
(E) USL
(E) VTR
(E) RD
(E) EXH
(E) VTR
(E) VTR
(E) VTR
(E) VTR
(E) VTR
USL
USLUSL
RH
VTR
EXH
RD
VTR
VTR
02
02 02
02
01
01
01
02
05
06
11 11
11
C & D
DORMITORY
4775 SF
VTR
01
RD
05
LIBRARY
BOOK STACKS
4673 SF
SLO
PE
SLO
PE
(E) VTR
01
(E) RELIEF VTR
02
(E) RELIEF VTR
02
(E) RTU
(E) ELEC
SWITCH GEAR
CONDUIT
07
20
20
10
24
12
09
09
04
06
04
CRICKET
STAIR ABOVE, MODIFY
AS REQD FOR NEW
ROOF INSTALLATION
INFILL EXIST
OPENING,
REF 04/A503
INFILL EXIST
OPENING,
REF 04/A503
A. REFERENCE SHEET A-100 FOR PROJECT GENERAL NOTES AND CONDITIONS.
B. REFERENCE SHEET A-500 FOR EXISTING ROOF ASSEMBLY TYPES. CONTRACTOR TO FIELD VERIFY EXISTING
CONSTRUCTION AND CONDITIONS. PROVIDED INFORMATION REPRESENTS ONLY CORED AREAS.
C. REFERENCE SHEET A-501 FOR NEW ROOF ASSEMBLY TYPES.
D. ALL ROOF AREAS WITHIN PROJECT SCOPE ARE TO MEET FM GLOBAL REQUIREMENTS FOR FM 1A-90. INCREASE
FASTENER RATES AND ADHESIVE BEAD PATTERN DENSITIES AT PERIMETERS PER TESTED FM GLOBAL
ASSEMBLY. SUBMIT ADHESIVE SHOP DRAWINGS ILLUSTRATING PATTERNS AND PERIMETER WIDTHS FOR
APPROVAL PRIOR TO COMMENCING WORK.
E. PROVIDE AND INSTALL WALK PADS AT EACH OF THE FOLLOWING ON ALL ROOF AREAS UNLESS OTHERWISE
NOTED: LADDERS, ACCESS POINTS, DOWNSPOUT DISCHARGE POINTS, ACCESS DOORS, AND ROOFTOP
EQUIPMENT REQUIRING MAINTENANCE.
F. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS, CALCULATE ALL QUANTITIES, AND DETERMINE SUITABILITY.
G. CONTRACTOR TO INSTALL NEW WOOD BLOCKING AND/OR ADJUST/REMOVE EXISTING BLOCKING TO HEIGHTS
NECESSARY TO ACCOMMODATE THE HEIGHT OF NEW ROOF ASSEMBLIES AND EDGE PROFILES. PERIMETER
DETAILING AND SECUREMENT TO COMPLY WITH FM GLOBAL 1-49.
H. METAL TRIM FINISH TO BE SELECTED BY ARCHITECT FROM MANUFACTURER'S STANDARD COLORS UNLESS
OTHERWISE NOTED.
I. ALL REQUIRED DISCONNECTIONS AND RECONNECTIONS OF EQUIPMENT, PLUMBING, MECHANICAL, AND
ELECTRICAL AS REQUIRED AS PART OF PROPER INSTALLATION OF ROOF ASSEMBLIES AND DETAILS SHALL BE
PROVIDED BY CONTRACTOR.
J. INSTALL PRE-MANUFACTURED SUPPORTS UNDER ALL ELEC CONDUIT AND CONDENSATE LINES SERVING
EQUIPMENT TO REMAIN AND SPACE 6'-0" OC. PROVIDE NEW CONDENSATE LINES FOR EQUIPMENT TO REMAIN
AND RUN LINES TO NEAREST GUTTER / DRAIN.
K. ALL LADDERS, UNIT SKYLIGHTS, EXHAUST FANS AND ROOF HATCHES TO REMAIN. REMOVE AND REINSTALL FOR
ROOF REPLACEMENT. ADJUST CURBS TO MEET ROOF ASSEMBLY REQUIREMENTS.
ROOF PLAN GENERAL NOTES
01 FLASH EXIST ROOF PENETRATION - PIPE. REF 01/A-502 FOR DETAIL. REMOVE EXIST FLASHING, SEALANT AND
ASSOCIATED COMPONENTS. CLEAN, PREPARE AND APPLY FIELD WRAP FLASHING OR BOOT FLASHING PER
MEMBRANE MANUFACTURER'S RECOMMENDATIONS. EXTEND ALL PIPES TO 12" MIN ABOVE NEW ROOF
ASSEMBLY HEIGHT.
02 FLASH EXIST BASE CURB. REF 04/A-502 FOR DETAIL. REMOVE EXIST FLASHING AND ASSOCIATED
COMPONENTS. CLEAN AND PREPARE CURB AS REQUIRED TO ACCEPT NEW FLASHING. RAISE EQUIPMENT AS
REQUIRED FOR 12" MIN FLASHING HEIGHT. FULLY ADHERE AND TERMINATE NEW FLASHING TO THE CURB AS
REQUIRED. INSTALL FLASHING UP AND OVER TOP OF CURB.
03 FLASH EXIST ROOF PENETRATION - HOT FLUE. REF 02/A-502 FOR DETAIL. REMOVE EXIST FLASHING. GAP
INSULATION AT HOT STACK TO DISSIPATE HEAT AND INSTALL OVERSIZED FLANGE AS REQUIRED TO GAP AND
DISSIPATE HEAT.
04 SEALANT POCKET, REF DETAIL 03/A-502. REMOVE EXIST FLASHING AND ASSOCIATED COMPONENTS FROM
PENETRATIONS. CLEAN, PREPARE AND PRIME ALL SURFACES AS REQUIRED. TOP OFF SEALANT AT PROJECT
COMPLETION.
05 EXISTING ROOF DRAIN, REF DETAIL 05/A-502. REMOVE ALL EXIST FLASHING AND ASSOCIATED COMPONENTS;
SALVAGE EXIST CLAMPING COLLAR AND STRAINER FOR REUSE. REPLACE DRAIN BOWL UNDER UNIT COST AS
APPROVED. EXIST DRAINS SIT ABOVE DECK; INSTALL SUMPS ACCORDINGLY TO PROVIDE POSITIVE SLOPE TO
DRAIN.
06 BASE BID & ALTERNATE 2: SURFACE-MOUNT COUNTERFLASHING, REF 01/A-503. REMOVE EXIST FLASHING,
TERMINATION BAR AND COUNTERFLASHING. DO NOT COVER OR RESTRICT WEEPS. REFERENCE A-101 FOR
ALTERNATE 2 LOCATIONS.
07 SLIP FLASHING AT EXIST GUTTER, REF DETAIL 04/A-503. REMOVE EXIST FLASHING AND TERMINATION BAR.
PROTECT IN PLACE EXIST GUTTER AND FLASHING BEHIND. DO NOT COVER OR RESTRICT WEEPS.
08 FLASHING AT EXIST PLYWOOD WALL ENCLOSURE, REF 05/A-503. REMOVE EXIST FLASHING AND ASSOCIATED
COMPONENTS DOWN TO PLYWOOD SHEATHING. PREP FOR NEW WORK. DO NOT COVER OR RESTRICT WEEPS.
09 BASE BID & ALTERNATES: METAL EDGE AT PARAPET, REF 02/A-503. REMOVE EXIST MEMBRANE, FLASHING AND
METAL COPING. INSTALL ALL COMPONENTS ACCORDING TO ANSI/SPRI ES-1 GUIDELINES AND MFR'S REC FOR
WARRANTY INCLUSION. CONTINUE METAL EDGE AND COUNTERFLASHING DOWN VERTICAL SIDES OF PARAPET
AT CRENNELS TO COVER TERMINATION BAR. REMOVE AND REINSTALL CONDUIT AND FIXTURES AS REQUIRED
TO INSTALL COPING. REPLACE CONDUIT UNDER UNIT COST AS APPROVED. REFERENCE A-101 FOR LOCATIONS
OF ASSOCIATED ALTERNATE.
10 METAL EDGE AT STEP TRANSITION, REF 03/A-503. REMOVE EXIST MEMBRANE, FLASHING AND METAL COPING.
INSTALL ALL COMPONENTS ACCORDING TO ANSI/SPRI ES-1 GUIDELINES AND MFR'S REC FOR WARRANTY
INCLUSION.
11 METAL EDGE EXTENSION AT COPING, REF 06/A-503. REMOVE EXIST MEMBRANE, FLASHING AND METAL COPING.
INSTALL ALL COMPONENTS ACCORDING TO ANSI/SPRI ES-1 GUIDELINES AND MFR'S REC FOR WARRANTY
INCLUSION.
12 TPO-COATED METAL EDGE, REF 07/A-503. REMOVE EXIST MEMBRANE, FLASHING AND METAL COPING.
13 ALTERNATE 2: CRENNEL GLAZING DETAIL, REF 08/A-503. REMOVE EXIST MEMBRANE, FLASHING AND METAL
COPING. INSTALL ALL COMPONENTS ACCORDING TO ANSI/SPRI ES-1 GUIDELINES AND MFR'S REC FOR
WARRANTY INCLUSION. REMOVE AND REINSTALL CONDUIT AS REQUIRED TO INSTALL ROOF ASSEMBLY.
REPLACE CONDUIT UNDER UNIT COST AS APPROVED.
14 BASE BID & ALTERNATE 2: SKYLIGHT CURB FLASHING, REF 09/A-503. REMOVE MODIFIED BITUMEN FLASHING.
CLEAN AND PREPARE METAL FLASHING FOR REUSE.
15 BASE BID & ALTERNATE 3: METAL EDGE AT SKYLIGHT, REF 10/A-503. REMOVE EXIST MEMBRANE, FLASHING AND
METAL COPING. SECURE WOOD BLOCKING AS REQUIRED PER FM 1-49. INSTALL ALL COMPONENTS
ACCORDING TO MFR'S REC FOR WARRANTY INCLUSION.
16 ALTERNATE 4: GRAVEL STOP AT SKYLIGHT, REF 11/A-503. REMOVE EXIST MEMBRANE, FLASHING AND METAL
COPING. SECURE WOOD BLOCKING AS REQUIRED PER FM 1-49. INSTALL ALL COMPONENTS ACCORDING TO
MFR'S REC FOR WARRANTY INCLUSION.
17 REMOVE AND REPLACE COLLECTOR HEAD AND DOWNSPOUTS WITH NEW METAL COLLECTOR HEAD AND
DOWNSPOUTS. MATCH SIZE AND PROFILE OF EXIST, REF SPEC FOR METAL FINISH.
18 ALTERNATE 4: SCUPPER AND COLLECTOR HEAD, REF 01/A-504. REMOVE EXISTING SCUPPER, COLLECTOR
HEAD AND DOWNSPOUT.
19 ALTERNATE 4: REMOVE EXIST COPING CAP ALONG SKYLIGHTS. SECURE EXIST BLOCKING PER FM 1-49 PRIOR
TO INSTALLATION OF NEW METAL COPING SYSTEM TO MATCH EXIST IN SIZE AND EXTENT, FINISH TO MATCH
NEW METAL EDGE AT SKYLIGHT GRAVEL STOP.
20 ALTERNATE 4: METAL EDGE DETAIL, REF 02/A-504. REMOVE EXIST MEMBRANE AND EDGE METAL. INSTALL
WOOD BLOCKING TO MATCH HEIGHT OF NEW ROOF ASSEMBLY. INSTALL ALL COMPONENTS ACCORDING TO
ANSI/SPRI ES-1 GUIDELINES AND MFR'S REC FOR WARRANTY INCLUSION.
21 ALTERNATE 2: THRESHOLD DETAIL, REF 03/A-504. REMOVE THRESHOLD HARDWARE AT EXIST OPENING.
22 ALTERNATE 2: ROOF TO WALL EXPANSION JOINT, REF 08/A-504. REMOVE ALL EXIST COMPONENTS TO DECK.
23 ALTERNATE 2: ROOF TO ROOF EXPANSION JOINT, REF 07/A-504. REMOVE ALL EXIST COMPONENTS TO DECK.
24 BASE BID & ALTERNATE 1: TYPICAL GUTTER DETAIL, REF 04/A-504. BLOCKING AND GUTTER ATTACHMENT TO
COMPLY WITH SMACNA, FM 1-49, AND ANSI/SPRI ES-1 AS APPLICABLE.
25 BASE BID & ALTERNATE 1: GUTTER DETAIL AT K DORMITORY, REF 05/A-504. BLOCKING AND GUTTER
ATTACHMENT TO COMPLY WITH SMACNA, FM 1-49, AND ANSI/SPRI ES-1 AS APPLICABLE.
26 STEP TRANSITION DETAIL, REF 06/A-504. REMOVE EXIST FLASHING AND GUTTER SYSTEM.
27 ALTERNATE 2: WINDOW SILL FLASHING, REF 09/A-504. REMOVE EXIST MEMBRANE, FLASHING, METAL
TRANSITIONS AND SEALANT.
28 REMOVE CONDUIT / EXT DUCTWORK AND ASSOCIATED SUPPORTS / CURBS PRIOR TO NEW ROOF
INSTALLATION. INFILL OPENINGS TO MATCH ADJACENT CONDITIONS AND MATERIALS. REF NOTE 29 FOR INFILL
REQS IN DECK OPENINGS.
29 REMOVE EXIST NON-FUNCTIONING EQUIPMENT, ASSOCIATED SUPPORTS / CURBS, AND CONDUIT. INSTALL 3/16"
STEEL PLATE OVER DECK OPENING. EXTEND PLATE 6" MIN BEYOND OPENING DIMENSIONS AND FASTEN AT
CORNERS & 12" OC AT SIDES.
ROOF PLAN KEY NOTES
ISSUE DATE:
SHEET NUMBER:
ASSET #
CHECKED BY:DRAWN BY:
DESIGNED BY:
DATE:REVISION:
PROJECT #
SHEET TITLE:
REVISION:DATE:
REVISION:DATE:
CAD DWG FILE:
STATE OF MISSOURIMICHAEL L. PARSON,
GOVERNOR
OFFICE OF ADMINISTRATIONDIVISION OF FACILITIESMANAGEMENT,DESIGN AND CONSTRUCTION
DEPARTMENT OF
SECONDARY EDUCATIONELEMENTARY AND
ROOF REPLACEMENT
3815 MAGNOLIA AVENUESCHOOL FOR THE BLINDMISSOURI
SAINT LOUIS, MO 63110
E1908-0150120110075012011009
01/24/2020
E1908-01 2011 A-103MER / MGCP / AICP / MG
ENLARGEDROOF PLANS
A-1035 OF 10 SHEETS01/24/2020
ROOF CONSULTANT:
7 7 5 1 c a r o n d e l e t a v e n u ec l a y t o n t o w e r s u i t e 5 0 0s t l o u i s m i s s o u r i 6 3 1 0 53 1 4 8 3 3 0 3 0 1w w w . p a t t e r h n - i v e s . c o mMO State Cer t i f icate of Author i ty #A2014032538
patterhn ives llcARCHITECT:
7 7 3 3 f o r s y t h b o u l e v a r ds u i t e 1 1 0 0s t l o u i s m i s s o u r i 6 3 1 0 53 1 4 8 9 6 2 5 1 1w w w . k i r k e g a a r d . c o m
ROOFTECH CONSULTING, INC
02
ENLARGED ROOF PLAN: ADMINISTRATION
A-103
T
R
U
E
N
O
R
T
H
NORTH
PROJECT
24'12'6'3'03/32"=1'-0"
01
ENLARGED ROOF PLAN: C & D DORMITORY
A-103
T
R
U
E
N
O
R
T
H
NORTH
PROJECT
24'12'6'3'03/32"=1'-0"
T
R
U
E
N
O
R
T
H
NORTH
PROJECT
24'12'6'3'03/32"=1'-0"
03
ENLARGED ROOF PLAN: LIBRARY BOOK STACKS
A-103
ALT-1:REPLACE GUTTERS AND DOWNSPOUTS
ALT-2: TPO ASSEMBLY ON MHD SECTIONS 1, 2 AND 7
ALT-3: TPO ASSEMBLY ON MHD SECTION 9
ALT-4: TPO ASSEMBLY ON MHD SECTIONS 3, 4, 5, 6 AND 8
ALTERNATES KEY
01
EXIST ROOF ASSEMBLY - K DORMITORY / DINING CANTEEN (AREAS A & D)
A-500
02
EXIST ROOF ASSEMBLY - LITTLE THEATRE
A-500
03
EXIST ROOF ASSEMBLY - DINING CANTEEN (AREA B)
A-500
04
EXIST ROOF ASSEMBLY - DINING CANTEEN (AREA C)
A-500
05
EXIST ROOF ASSEMBLY - DINING CAFETERIA / ADMINISTRATION (AREA 1) / LIBRARY
A-500
06
EXIST ROOF ASSEMBLY - C & D DORMITORY
A-500
07
EXIST ROOF ASSEMBLY - ADMINISTRATION (AREA 2)
A-500
08
EXIST ROOF ASSEMBLY - MHD ANNEX (AREAS 1 - 8)
A-500
09
EXIST ROOF ASSEMBLY - MHD ANNEX (AREA 9)
A-500
3"=1'-0" 0 1 2 4 8 IN3"=1'-0" 0 1 2 4 8 IN3"=1'-0" 0 1 2 4 8 IN
3"=1'-0" 0 1 2 4 8 IN 3"=1'-0" 0 1 2 4 8 IN 3"=1'-0" 0 1 2 4 8 IN
3"=1'-0" 0 1 2 4 8 IN3"=1'-0" 0 1 2 4 8 IN3"=1'-0" 0 1 2 4 8 IN
EXIST CONCRETE DECK
EXIST HOT-APPLIED BASE SHEET
EXIST 1" PERLITE BOARD
EXIST MODIFIED ROOF SYSTEM
EXIST 1/4" TAPERED
POLYISO INSULATION
EXIST SLOPED WOOD PLANK DECKING
EXIST 1-1/2" PERLITE BOARD
EXIST MODIFIED ROOF SYSTEM
EXIST 4-1/2" POLYISO INSULATION
EXIST SLOPED WOOD PLANK DECKING
EXIST 1/2" PERLITE BOARD
EXIST MODIFIED ROOF SYSTEM
EXIST 4-1/2" POLYISO INSULATION
EXIST SLOPED CONCRETE DECK
EXIST HOT-APPLIED BASE SHEET
EXIST 1/2" PERLITE BOARD
EXIST MODIFIED ROOF SYSTEM
EXIST 4-1/2" POLYISO INSULATION
EXIST LIGHTWEIGHT CONCRETE DECK
EXIST HOT-APPLIED BASE SHEET
EXIST 1/2" PERLITE BOARD
EXIST MODIFIED ROOF SYSTEM
EXIST TAPERED POLYISO INSULATION
EXIST SLOPED CONCRETE DECK
EXIST 1/2" PERLITE BOARD
EXIST MODIFIED ROOF SYSTEM
EXIST 3" POLYISO INSULATION
EXIST METAL DECK, NO SLOPE
EXIST HOT-APPLIED BASE SHEET
EXIST 1/2" PERLITE BOARD
EXIST MODIFIED ROOF SYSTEM
EXIST TAPERED POLYISO INSULATION
EXIST SLOPED GYPSUM DECK
EXIST MODIFIED ROOF SYSTEM
EXIST TECTUM DECK - NO SLOPE
EXIST BASE SHEET
EXIST MODIFIED ROOF SYSTEM
EXIST FOUR-WAY TAPERED POLYISO
INSULATION
BASE BID: COATING OVER EXIST
ASSEMBLY - REF 075600
ALT-2 / ALT-4: REF 10 & 11/A-501
FOR TPO ASSEMBLY
BASE BID: COATING OVER EXIST
ASSEMBLY - REF 075600
ALT-3: REF 12/A-501 FOR TPO
ASSEMBLY
ISSUE DATE:
SHEET NUMBER:
ASSET #
CHECKED BY:DRAWN BY:
DESIGNED BY:
DATE:REVISION:
PROJECT #
SHEET TITLE:
REVISION:DATE:
REVISION:DATE:
CAD DWG FILE:
STATE OF MISSOURIMICHAEL L. PARSON,
GOVERNOR
OFFICE OF ADMINISTRATIONDIVISION OF FACILITIESMANAGEMENT,DESIGN AND CONSTRUCTION
DEPARTMENT OF
SECONDARY EDUCATIONELEMENTARY AND
ROOF REPLACEMENT
3815 MAGNOLIA AVENUESCHOOL FOR THE BLINDMISSOURI
SAINT LOUIS, MO 63110
E1908-0150120110075012011009
01/24/2020
E1908-01 2011 A-500MER / MGCP / AICP
EXISTINGROOF ASSEMBLIES
A-5006 OF 10 SHEETS01/24/2020
ROOF CONSULTANT:
7 7 5 1 c a r o n d e l e t a v e n u ec l a y t o n t o w e r s u i t e 5 0 0s t l o u i s m i s s o u r i 6 3 1 0 53 1 4 8 3 3 0 3 0 1w w w . p a t t e r h n - i v e s . c o mMO State Cer t i f icate of Author i ty #A2014032538
patterhn ives llcARCHITECT:
7 7 3 3 f o r s y t h b o u l e v a r ds u i t e 1 1 0 0s t l o u i s m i s s o u r i 6 3 1 0 53 1 4 8 9 6 2 5 1 1w w w . k i r k e g a a r d . c o m
ROOFTECH CONSULTING, INC
01
ROOF ASSEMBLY - K DORMITORY
A-501
02
ROOF ASSEMBLY - LITTLE THEATRE
A-501
NOTES:
1. ADHERE TO MANUFACTURER-APPROVED SURFACE.
2. MINIMUM TWO (2) LAYERS INSULATION, STAGGER JOINTS.
03
ROOF ASSEMBLY - DINING CANTEEN (AREAS A & D)
A-501
04
ROOF ASSEMBLY - DINING CANTEEN (AREA B)
A-501
NOTES:
1. MINIMUM TWO (2) LAYERS INSULATION, STAGGER JOINTS.
2. INSTALL CRICKETS AS SHOWN IN PLAN FOR POSITIVE SLOPE, TRANSITION INTO ADJOINING ROOF AREAS.
05
ROOF ASSEMBLY - DINING CANTEEN (AREA C)
A-501
06
ROOF ASSEMBLY - DINING CAFETERIA / LIBRARY
A-501
07
ROOF ASSEMBLY - C & D DORMITORY
A-501
08
ROOF ASSEMBLY - ADMINISTRATION (AREA 1)
A-501
09
ROOF ASSEMBLY - ADMINISTRATION (AREA 2)
A-501
10
ROOF ASSEMBLY - MHD ANNEX (AREAS 3 - 6 & 8) - ALTERNATE 4
A-501
NOTES:
1. INSTALL CRICKETS AS REQUIRED FOR POSITIVE SLOPE TO DRAIN, REF PLAN.
11
ROOF ASSEMBLY - MHD ANNEX (AREAS 1, 2 & 7) - ALTERNATE 2
A-501
12
ROOF ASSEMBLY - MHD ANNEX (AREA 9) - ALTERNATE 3
A-501
3"=1'-0" 0 1 2 4 8 IN
3"=1'-0" 0 1 2 4 8 IN
3"=1'-0" 0 1 2 4 8 IN
EXIST CONCRETE DECK
NOTES:
1. ADHERE TO MANUFACTURER-APPROVED SURFACE.
2. MINIMUM TWO (2) LAYERS INSULATION, STAGGER JOINTS.
NOTES:
1. INSTALL CRICKETS AS REQUIRED FOR POSITIVE SLOPE TO DRAIN, REF PLAN.
NOTES:
1. ADHERE TO MANUFACTURER-APPROVED SURFACE.
2. MINIMUM TWO (2) LAYERS INSULATION, STAGGER JOINTS.
3. INSTALL CRICKETS AS SHOWN IN PLAN FOR POSITIVE SLOPE, TRANSITION INTO ADJOINING ROOF AREAS.
NOTES:
1. ADHERE TO MANUFACTURER-APPROVED SURFACE.
2. MINIMUM TWO (2) LAYERS INSULATION, STAGGER JOINTS.
NOTES:
1. MINIMUM TWO (2) LAYERS INSULATION, STAGGER JOINTS.
2. INSTALL CRICKETS AS SHOWN IN PLAN FOR POSITIVE SLOPE, TRANSITION INTO ADJOINING ROOF AREAS.
NOTES:
1. ADHERE TO MANUFACTURER-APPROVED SURFACE.
2. MINIMUM TWO (2) LAYERS INSULATION, STAGGER JOINTS.
3. INSTALL CRICKETS AS SHOWN IN PLAN FOR POSITIVE SLOPE, TRANSITION INTO ADJOINING ROOF AREAS.
FULLY-ADHERED 1/2" HD POLYISO INSULATION
W/ COATED GLASS FACER
FULLY-ADHERED 60 MIL TPO MEMBRANE
1/4" TAPERED POLYISO INSULATION,
ADHERE IN LOW-RISE FOAM,
1" MIN HEIGHT AT GUTTER
EXIST SLOPED WOOD PLANK DECKING
FULLY-ADHERED 1/2" HD POLYISO INSULATION
W/ COATED GLASS FACER
FULLY-ADHERED 60 MIL TPO MEMBRANE
TWO (2) LAYERS 2.6" FLAT STOCK POLYISO
INSULATION, ADHERE IN LOW-RISE FOAM,
STAGGER JOINTS
1/2" GYPSUM COVERBOARD W/ COATED GLASS
FACER, MECHANICALLY FASTEN TO DECK
EXIST CONCRETE DECK
FULLY-ADHERED 1/2" HD POLYISO INSULATION
W/ COATED GLASS FACER
FULLY-ADHERED 60 MIL TPO MEMBRANE
1/4" TAPERED POLYISO INSULATION,
ADHERE IN LOW-RISE FOAM,
1-1/2" MIN HEIGHT AT GUTTER
EXIST SLOPED WOOD PLANK DECKING
FULLY-ADHERED 1/2" HD POLYISO INSULATION
W/ COATED GLASS FACER
FULLY-ADHERED 60 MIL TPO MEMBRANE
TWO (2) LAYERS 2.6" FLAT STOCK POLYISO
INSULATION, ADHERE IN LOW-RISE FOAM,
STAGGER JOINTS
1/2" GYPSUM COVERBOARD W/ COATED GLASS
FACER, MECHANICALLY FASTEN TO DECK
EXIST SLOPED CONCRETE DECK
FULLY-ADHERED 1/2" HD POLYISO INSULATION
W/ COATED GLASS FACER
FULLY-ADHERED 60 MIL TPO MEMBRANE
TWO (2) LAYERS 2.6" FLAT STOCK POLYISO
INSULATION, ADHERE IN LOW-RISE FOAM,
STAGGER JOINTS
EXIST LIGHTWEIGHT CONCRETE DECK
MECHANICALLY-FASTENED BASE SHEET
FULLY-ADHERED 1/2" HD POLYISO INSULATION
W/ COATED GLASS FACER
FULLY-ADHERED 60 MIL TPO MEMBRANE
1/4" TAPERED POLYISO INSULATION,
ADHERE IN LOW-RISE FOAM,
1" MIN HEIGHT AT PERIMETER EDGE / GUTTER
EXIST SLOPED CONCRETE DECK
FULLY-ADHERED 1/2" HD POLYISO INSULATION
W/ COATED GLASS FACER
FULLY-ADHERED 60 MIL TPO MEMBRANE
TWO (2) LAYERS 1.5" FLAT STOCK POLYISO
INSULATION, ADHERE IN LOW-RISE FOAM,
STAGGER JOINTS
EXIST CONCRETE DECK
FULLY-ADHERED 1/2" HD POLYISO INSULATION
W/ COATED GLASS FACER
FULLY-ADHERED 60 MIL TPO MEMBRANE
1/4" TAPERED POLYISO INSULATION,
ADHERE IN LOW-RISE FOAM,
2" MIN HEIGHT AT DRAIN
EXIST METAL DECK, NO SLOPE
FULLY-ADHERED 1/2" HD POLYISO INSULATION
W/ COATED GLASS FACER
FULLY-ADHERED 60 MIL TPO MEMBRANE
1/4" TAPERED POLYISO INSULATION,
MECHANICALLY FASTEN TO DECK,
2" MIN HEIGHT AT GUTTER
EXIST SLOPED GYPSUM DECK
MECHANICALLY-FASTENED BASE SHEET
FULLY-ADHERED 1/2" HD POLYISO INSULATION W/
COATED GLASS FACER, ADHERE IN LOW-RISE FOAM
FULLY-ADHERED 60 MIL TPO MEMBRANE
EXIST SLOPED GYPSUM DECK
MECHANICALLY-FASTENED BASE SHEET
FULLY-ADHERED 1/2" HD POLYISO INSULATION
W/ COATED GLASS FACER
FULLY-ADHERED 60 MIL TPO MEMBRANE
TWO (2) LAYERS 2" FLAT STOCK POLYISO INSULATION,
ADHERE IN LOW-RISE FOAM, STAGGER JOINTS
EXIST TECTUM DECK - NO SLOPE
MECHANICALLY-FASTENED BASE SHEET
FULLY-ADHERED 1/2" HD POLYISO INSULATION
W/ COATED GLASS FACER
FULLY-ADHERED 60 MIL TPO MEMBRANE
FOUR-WAY TAPERED POLYISO INSULATION,
ADHERE IN LOW-RISE FOAM, TWO (2) LAYERS W/
STAGGERED JOINTS, 1" MIN HEIGHT AT SCUPPERS
ISSUE DATE:
SHEET NUMBER:
ASSET #
CHECKED BY:DRAWN BY:
DESIGNED BY:
DATE:REVISION:
PROJECT #
SHEET TITLE:
REVISION:DATE:
REVISION:DATE:
CAD DWG FILE:
STATE OF MISSOURIMICHAEL L. PARSON,
GOVERNOR
OFFICE OF ADMINISTRATIONDIVISION OF FACILITIESMANAGEMENT,DESIGN AND CONSTRUCTION
DEPARTMENT OF
SECONDARY EDUCATIONELEMENTARY AND
ROOF REPLACEMENT
3815 MAGNOLIA AVENUESCHOOL FOR THE BLINDMISSOURI
SAINT LOUIS, MO 63110
E1908-0150120110075012011009
01/24/2020
E1908-01 2011 A-501MER / MGCP / AICP / MG
ROOF ASSEMBLIES
A-5017 OF 10 SHEETS01/24/2020
ROOF CONSULTANT:
7 7 5 1 c a r o n d e l e t a v e n u ec l a y t o n t o w e r s u i t e 5 0 0s t l o u i s m i s s o u r i 6 3 1 0 53 1 4 8 3 3 0 3 0 1w w w . p a t t e r h n - i v e s . c o mMO State Cer t i f icate of Author i ty #A2014032538
patterhn ives llcARCHITECT:
7 7 3 3 f o r s y t h b o u l e v a r ds u i t e 1 1 0 0s t l o u i s m i s s o u r i 6 3 1 0 53 1 4 8 9 6 2 5 1 1w w w . k i r k e g a a r d . c o m
ROOFTECH CONSULTING, INC
01
TYPICAL PIPE FLASHING
A-502
04
TYPICAL BASE CURB FLASHING DETAILS
A-502
02
TYPICAL HOT FLUE FLASHING
A-502
03
TYPICAL SEALANT POCKET
A-502
NOTES:
1. IF MULTIPLE PENETRATIONS EXIST, THERE MUST BE 1" BETWEEN PENETRATIONS.
2. USE HOT DIPPED GALVANIZED NAILS 1-1/4" LONG WITH 3/8"-1/2" DIA. HEAD.
3. IF REINFORCEMENT IS EXPOSED, APPLICATION OF CUT EDGE SEALANT IS REQUIRED.
4. PREP AND CLEAN ALL PENETRATIONS TO INSTALL NEW DETAIL.
05
TYPICAL INTERNAL DRAIN DETAIL
A-502
NOTES:
1. IF ROOF MEMBRANE SEAMS RUN WITHIN 18" OF DRAIN, INSTALL 4'x4' PATCH ON TOP OF MEMBRANE ASSURING SEAM IS COVERED OR STRIP-IN SEAM WITH 6" WIDE MEMBRANE.
2. REMOVE EXISTING FLASHINGS DOWN TO METAL SUMP. REPAIR OR REPLACE BROKEN CLAMPING RING. DRILL AND TAP BROKEN DRAIN BOLTS AND REPLACE AS NEEDED.
3. INSTALL 4'-0" TAPERED EDGE SUMPS. MODIFICATIONS TO SUMP TO BE APPROVED BY ARCHITECT PRIOR TO INSTALL.
4. DRAIN INSERTS ARE NOT ACCEPTABLE. COMPROMISED DRAINS TO BE REPLACED AT PROVIDED UNIT COST.
NOTES:
1. REMOVE ALL EXIST FLASHING, LEAD, AND SURFACE TO BE FREE OF ALL RUST, GREASE, ETC
PRIOR TO NEW WORK.
2. ANCHOR PIPE TO BOTTOM SIDE OF DECK FOR STABILITY.
3. APPLY POLYURETHANE SEALANT TO ALL EXPOSED REINFORCEMENTS.
4. EXTEND PIPE AS REQUIRED TO MAINTAIN 12" MIN ABOVE NEW ROOF ASSEMBLY.
1/2
" - 3
/4
"
2" MIN
12
" M
IN
STAINLESS STEEL CLAMPING RING, REMOVE
EXCESS TAGS FROM RING, NO WRINKLES /
FOLDS IN MEMBRANE UNDER RING
POLYURETHANE SEALANT
60 MIL TPO MEMBRANE AS FLASHING /
BOOT FLASHING
BONDING ADHESIVE
FULLY-ADHERED TPO MEMBRANE
REF A-501 FOR ROOF ASSEMBLY TYPE
PERSPECTIVE - NTS
3"=1'-0" 0 1 2 4 8 IN
3"=1'-0" 0 1 2 4 8 IN
NTS
3"=1'-0" 0 1 2 4 8 IN
3"=1'-0" 0 1 2 4 8 IN
NOTES:
1. REMOVE ALL EXIST FLASHING, LEAD, AND SURFACE TO BE FREE OF ALL RUST, GREASE, ETC
PRIOR TO NEW WORK.
2. ANCHOR PIPE TO BOTTOM SIDE OF DECK FOR STABILITY.
3. INSTALL NEW HOOD AS REQUIRED.
4. PROVIDE COATED METAL AS REQUIRED.
2" MIN
12
" M
IN
1/2
" - 3
/4
"
1/2"-
3/4"
STAINLESS STEEL CLAMPING RING, REMOVE
EXCESS TAGS FROM RING, NO WRINKLES /
FOLDS IN MEMBRANE UNDER RING
POLYURETHANE SEALANT
60 MIL TPO MEMBRANE AS FLASHING
BONDING ADHESIVE
FULLY-ADHERED TPO MEMBRANE
REF A-501 FOR ROOF ASSEMBLY TYPE
GAP FOR HEAT DISSIPATION
METAL SLEEVE - FASTEN TO DECK. SPACE AS
REQD TO KEEP MEMBRANE BELOW 140°F (60°C)
SHEET METAL HOOD - REPLACE AS REQD
STAINLESS STEEL CLAMPING RING, REMOVE
EXCESS TAGS FROM RING
HIGH-TEMPERATURE SEALANT
UNSUPPORTED FLASHING AT ALL CORNERS
UNSUPPORTED FLASHING OVER SEAM
1" MIN
2" METAL FLANGE W/ ROUNDED CORNERS
TPO COATED METAL
60 MIL TPO MEMBRANE
POURABLE SEALER, COLOR TO MATCH
TPO MEMBRANE
SHEET METAL HOOD, REPLACE AS REQD
OPTION 1
12
" M
IN
3" M
IN
60 MIL TPO MEMBRANE
BONDING ADHESIVE
BARBED SEAM PLATES ANCHORED BY
FASTENERS 12" OC AS REQD
REF A-501 FOR ROOF ASSEMBLY TYPE
METAL FLASHING, REF SPEC FOR FINISH
INSTALL TERMINATION BAR W/ MFR REC
SEALANT
12
" M
IN
60 MIL TPO MEMBRANE
BONDING ADHESIVE
BARBED SEAM PLATES ANCHORED BY
FASTENERS 12" OC AS REQD
REF A-501 FOR ROOF ASSEMBLY TYPE
METAL FLASHING, REF SPEC FOR FINISH
INSTALL TERMINATION BAR W/ MFR REC
SEALANT
OPTION 2 OPTION 3
24 GA MIN METAL SLIP COUNTERFLASHING,
REF SPEC FOR FINISH
12
" M
IN
60 MIL TPO MEMBRANE
BONDING ADHESIVE
BARBED SEAM PLATES ANCHORED BY
FASTENERS 12" OC AS REQD
REF A-501 FOR ROOF ASSEMBLY TYPE
METAL FLASHING, REF SPEC FOR FINISH
INSTALL TERMINATION BAR W/ MFR REC
SEALANT
2" M
IN
TAPERED EDGE SUMP - NTS
4'-0
"
4'-0"
CL
DRAIN / SUMP
2'-0"
INSTALL TARGET PATCH AS REQD PER
MFR REC AND WARRANTY REQS
REF A-501 FOR ROOF ASSEMBLY TYPE
60 MIL TPO MEMBRANE
BONDING ADHESIVE
INSTALL TAPERED EDGE SUMP, MAX SLOPE
TO DRAIN 1:12
BUTYL RUBBER SEALANT
12
1
1/2" - 3/4"
EXTEND MEMBRANE PAST BOLTS
DRAIN BOWL
SECURE ALL BOLTS, SUPPLY NEW
IF EXIST NOT FUNCTIONAL
DECK CLAMP
ISSUE DATE:
SHEET NUMBER:
ASSET #
CHECKED BY:DRAWN BY:
DESIGNED BY:
DATE:REVISION:
PROJECT #
SHEET TITLE:
REVISION:DATE:
REVISION:DATE:
CAD DWG FILE:
STATE OF MISSOURIMICHAEL L. PARSON,
GOVERNOR
OFFICE OF ADMINISTRATIONDIVISION OF FACILITIESMANAGEMENT,DESIGN AND CONSTRUCTION
DEPARTMENT OF
SECONDARY EDUCATIONELEMENTARY AND
ROOF REPLACEMENT
3815 MAGNOLIA AVENUESCHOOL FOR THE BLINDMISSOURI
SAINT LOUIS, MO 63110
E1908-0150120110075012011009
01/24/2020
E1908-01 2011 A-502MER / MGCP / AICP
ROOF DETAILS
A-5028 OF 10 SHEETS01/24/2020
ROOF CONSULTANT:
7 7 5 1 c a r o n d e l e t a v e n u ec l a y t o n t o w e r s u i t e 5 0 0s t l o u i s m i s s o u r i 6 3 1 0 53 1 4 8 3 3 0 3 0 1w w w . p a t t e r h n - i v e s . c o mMO State Cer t i f icate of Author i ty #A2014032538
patterhn ives llcARCHITECT:
7 7 3 3 f o r s y t h b o u l e v a r ds u i t e 1 1 0 0s t l o u i s m i s s o u r i 6 3 1 0 53 1 4 8 9 6 2 5 1 1w w w . k i r k e g a a r d . c o m
ROOFTECH CONSULTING, INC
01
SURFACE-MOUNT COUNTERFLASHING - BASE BID / ALTERNATE 2
A-503
NOTES:
1. COMPLY WITH FM GLOBAL 1-49 AND ANSI SPRI ES-1 REQUIREMENTS WHERE APPLICABLE.
2. USE FASTENERS APPROPRIATE FOR WALL MATERIAL / CONDITIONS.
04
SLIP FLASHING AT EXIST GUTTER DETAIL
A-503
NOTES:
1. INFILL EXIST TWO (2) VENT OPENINGS WITH WOOD BLOCKING AND GYPSUM COVERBOARD
PRIOR TO NEW MEMBRANE INSTALLATION.
02
METAL EDGE DETAIL - BASE BID / ALTERNATES 2 - 4
A-503
03
STEP TRANSITION DETAIL
A-503
NOTES:
1. REMOVE ELECTRICAL CONDUIT / DEVICES / FIXTURES AS REQD TO INSTALL METAL EDGE SYSTEM.
REINSTALL DEVICES / FIXTURES W/ NEW SPLICED CONDUIT (WHERE REMOVED). REF GENERAL NOTES.
2. COUNTERFLASHING TO COVER ALL TERMINATION BARS.
06
METAL EDGE EXTENSION COPING DETAIL
A-503
07
TPO-COATED METAL EDGE DETAIL
A-503
08
CRENNEL GLAZING DETAIL - ALTERNATE 2
A-503
NOTES:
1. REMOVE ELECTRICAL CONDUIT / DEVICES / FIXTURES AS REQD TO INSTALL METAL EDGE SYSTEM.
REINSTALL DEVICES / FIXTURES W/ NEW SPLICED CONDUIT (WHERE REMOVED). REF GENERAL NOTES.
2. METAL FLASHING TO COVER ALL VERTICAL TERMINATION BARS.
09
SKYLIGHT CURB FLASHING DETAIL - BASE BID / ALTERNATE 2
A-503
10
METAL EDGE AT SKYLIGHT DETAIL - BASE BID / ALTERNATE 3
A-503
11
GRAVEL STOP DETAIL AT SKYLIGHTS - ALTERNATE 4
A-503
24 GA COUNTERFLASHING, ANCHORED
12" OC, REF SPEC FOR FINISH,
TOOLED SEALANT TO MATCH
3"=1'-0" 0 1 2 4 8 IN
12
" M
IN
60 MIL TPO BASE FLASHING MEMBRANE
PERIMETER ATTACHMENT PER MFR REC
BASE BID: A-500 FOR EXIST ROOF ASSEMBLY
ALT-2: REF A-501 FOR ROOF ASSEMBLY TYPE
EXIST PARAPET / WALL
TERMINATION BAR, ANCHORED 12" OC
W/ BUTYL & TOOLED URETHANE SEALANT
COORD W/ EXIST CONDUIT, DEVICES, ETC
NON-CURING SEALANT
VA
RIE
S
60 MIL TPO BASE FLASHING MEMBRANE
PERIMETER ATTACHMENT PER MFR REC
BASE BID: A-500 FOR EXIST ROOF ASSEMBLY
ALT-2 - 4: REF A-501 FOR ROOF ASSEMBLY TYPE
AND ALTERNATES LOCATIONS
EXIST MASONRY WALL
CONT WOOD BLOCKING, ATTACH PER FM 1-49
#9x2" STAINLESS STEEL FASTENERS,
ATTACH 12" OC
COVER EXIST REVEAL LINE BY 1/2" MIN
PREFABRICATED CLIP-ON EDGE W/ COVER,
REF SPEC FOR FINISH
60 MIL TPO BASE FLASHING MEMBRANE
PERIMETER ATTACHMENT PER MFR REC
REF A-501 FOR ROOF ASSEMBLY TYPE
EXIST PARAPET WALL
EXIST ROOF SYSTEM
NON-CURING SEALANT
CONT WOOD BLOCKING, ATTACH PER FM 1-49
#9x2" STAINLESS STEEL FASTENERS,
ATTACH 12" OC
STRIP-IN PER MFR REQ, AS REQD
PREFABRICATED CLIP-ON EDGE W/ COVER,
REF SPEC FOR FINISH
OVERLAP NEW TPO MEMBRANE W/ EXIST
MEMBRANE, INSTALL ADDL MEMBRANE TO
EXIST ROOF AS REQD TO MAINTAIN WARRANTY
3"=1'-0" 0 1 2 4 8 IN
3"=1'-0" 0 1 2 4 8 IN
3"=1'-0" 0 1 2 4 8 IN3"=1'-0" 0 1 2 4 8 IN3"=1'-0" 0 1 2 4 8 IN
3"=1'-0" 0 1 2 4 8 IN 3"=1'-0" 0 1 2 4 8 IN
3"=1'-0" 0 1 2 4 8 IN 3"=1'-0" 0 1 2 4 8 IN
24 GA METAL SLIP FLASHING, REF SPEC
FOR FINISH
60 MIL TPO BASE FLASHING MEMBRANE
PERIMETER ATTACHMENT PER MFR REC
REF A-501 FOR ROOF ASSEMBLY TYPE
EXIST MASONRY WALL
TERMINATION BAR, ANCHORED 12" OC
W/ BUTYL & TOOLED URETHANE SEALANT
VA
RIE
S
EXIST ROOF SYSTEM
EXIST GUTTER & METAL FLASHING TO
REMAIN
3"=1'-0" 0 1 2 4 8 IN
05
WALL SECTION
A-503
NOTES:
1. FLASH PENETRATIONS WITHIN THIS DETAIL PER MANUFACTURER STANDARD DETAILS.
2. WALL SURFACE VARIES IN AND OUT.
3. ALL TERMINATION BAR TO BE COVERED WITH COUNTERFLASHING IN VERTICAL APPLICATIONS.
4. RELOCATE ELECTRICAL BOX AND CONDUIT TO ALLOW FOR PROPER FLASHING HEIGHTS.
60 MIL TPO BASE FLASHING
MEMBRANE, EXTEND UP
EXIST ENCLOSURE
PERIMETER ATTACHMENT
PER MFR REC
REF A-501 FOR ROOF
ASSEMBLY TYPE
EXIST MASONRY WALL
EXIST PLYWOOD & FRAMING
TO REMAIN
1/2" GYPSUM COVERBOARD
W/ COATED GLASS FACER,
MECHANICALLY-FASTENED
MA
TC
H E
XIS
T H
EIG
HT
PERIMETER ATTACHMENT PER MFR REC
60 MIL TPO BASE FLASHING MEMBRANE
24 GA COUNTERFLASHING, ANCHORED
12" OC, REF SPEC FOR FINISH,
TOOLED SEALANT TO MATCH
TERMINATION BAR, ANCHORED 12" OC
W/ BUTYL & TOOLED URETHANE SEALANT
EXIST CAP FLASHING & SEALANT TO
REMAIN, PROTECT DURING ROOF INSTALL
EXIST MASONRY WALL
EXIST PAINTED CONCRETE
FACE OF EXIST METAL PANEL BEYOND
24 GA CLEATED EDGE METAL EXTENDER
22 GA CLEAT, FASTEN TO EXIST CONCRETE
CONT WOOD BLOCKING, ATTACH PER FM 1-49
#9x2" STAINLESS STEEL FASTENERS,
ATTACH 12" OC
COVER EXIST REVEAL LINE BY 1/2" MIN
PREFABRICATED CLIP-ON EDGE W/ COVER,
REF SPEC FOR FINISH
LAP METAL EDGE EXTENDER OVER
MEMBRANE, FASTEN TO BLOCKING
REF A-501 FOR ROOF ASSEMBLY TYPE
NON-CURING SEALANT
24 GA CLEATED EDGE METAL
CONT 22 GA CLEAT, LAP OVER MEMBRANE,
ATTACH TO BLOCKING
COVER EXIST REVEAL LINE BY 1/2" MIN
EXIST MASONRY WALL
CONT WOOD BLOCKING, ATTACH PER FM 1-49
REF A-501 FOR ROOF ASSEMBLY TYPE
STRIPPING PLY, COVER ALL EDGE METAL
ATTACHMENTS
TERMINATION BAR ON PARAPET BEYOND,
CONCEAL W/ COUNTERFLASHING, REF 01/A-503
ALT-2: REF A-501 FOR ROOF ASSEMBLY TYPE
PREFABRICATED CLIP-ON EDGE W/ COVER,
REF SPEC FOR FINISH, SIZE TO EXTEND 1" MIN
OVER MULLION
NON-CURING SEALANT
LAP MEMBRANE OVER BLOCKING, EXTEND
1/2" MIN OVER MULLION
#9x2" STAINLESS STEEL FASTENERS,
ATTACH 12" OC
CONT WOOD BLOCKING, ATTACH PER FM 1-49
EXIST MULLION, PROTECT IN PLACE, PROVIDE
NEW SILICONE SEALANT BTWN MULLION AND
BLOCKING (MIN 1/2" GAP FOR DEFLECTION)
EXIST SPANDREL GLASS, PROTECT IN PLACE
EXIST RIGID INSULATION, PROTECT IN PLACE
EXIST WOOD BLOCKING TO REMAIN
EXIST FLASHING TO REMAIN
REMOVE CANT BLOCKING
EXIST DECK & STRUCTURE TO REMAIN
PERIMETER ATTACHMENT PER MFR REC
REUSE EXIST FLASHING, LAP OVER MEMBRANE
BASE FLASHING AND ANCHOR 12" OC W/ NEW
FASTENER, EPDM SEALING WASHER & SET IN
SEALANT BED
PERIMETER ATTACHMENT PER MFR REC
BASE BID: REF A-500 FOR COATING
ALT-2: REF A-501 FOR ROOF ASSEMBLY TYPE
EXIST WOOD BLOCKING TO REMAIN
REMOVE CANT BLOCKING
EXIST DECK & STRUCTURE TO REMAIN
TERMINATION BAR, ANCHORED 12" OC
W/ BUTYL & TOOLED URETHANE SEALANT
60 MIL TPO BASE FLASHING MEMBRANE
EXIST SKYLIGHT SYSTEM, PROTECT IN PLACE
BASE BID: REF A-500 FOR COATING
ALT-3: REF A-501 FOR ROOF ASSEMBLY TYPE
PREFABRICATED CLIP-ON EDGE W/ COVER,
REF SPEC FOR FINISH
NON-CURING SEALANT
LAP BASE FLASHING MEMBRANE OVER EXIST
BLOCKING
#9x2" STAINLESS STEEL FASTENERS,
ATTACH 12" OC
EXIST RIGID INSULATION, PROTECT IN PLACE
EXIST WOOD BLOCKING TO REMAIN
EXIST DECK & STRUCTURE TO REMAIN
PERIMETER ATTACHMENT PER MFR REC
VA
RIE
S
22 GA METAL FLASHING, REF SPEC FOR FINISH,
MATCH EXIST SIZE/PROFILE, ATTACH TO EXIST
BLOCKING
MARRY BASE FLASHING MEMBRANE TO
SKYLIGHT W/ SILICONE SHEET STRIP
ALT-4: REF A-501 FOR ROOF ASSEMBLY TYPE
24 GA TPO COATED METAL EDGE, MATCH
EXIST PROFILE
WOOD BLOCKING
FULLY WELDED COVER STRIP
SECURE METAL EDGE TO SKYLIGHT BY
OVERSIZED FASTENER W/ EPDM SEALING
WASHER
EXIST SKYLIGHT SYSTEM, PROTECT IN PLACE
SLO
PE
SLO
PE
SLO
PE
SLO
PE
SLO
PE
SLO
PE
SLO
PE
SLO
PE
SLO
PE
SLO
PE
SLO
PE
SLO
PE
SLO
PE
SLO
PE
SECURE FLASHING TO SKYLIGHT BY
OVERSIZED FASTENER W/ EPDM SEALING
WASHER
EXIST SKYLIGHT SYSTEM, PROTECT IN PLACE
ISSUE DATE:
SHEET NUMBER:
ASSET #
CHECKED BY:DRAWN BY:
DESIGNED BY:
DATE:REVISION:
PROJECT #
SHEET TITLE:
REVISION:DATE:
REVISION:DATE:
CAD DWG FILE:
STATE OF MISSOURIMICHAEL L. PARSON,
GOVERNOR
OFFICE OF ADMINISTRATIONDIVISION OF FACILITIESMANAGEMENT,DESIGN AND CONSTRUCTION
DEPARTMENT OF
SECONDARY EDUCATIONELEMENTARY AND
ROOF REPLACEMENT
3815 MAGNOLIA AVENUESCHOOL FOR THE BLINDMISSOURI
SAINT LOUIS, MO 63110
E1908-0150120110075012011009
01/24/2020
E1908-01 2011 A-503MER / MGCP / AICP / MG
ROOF DETAILS
A-5039 OF 10 SHEETS01/24/2020
ROOF CONSULTANT:
7 7 5 1 c a r o n d e l e t a v e n u ec l a y t o n t o w e r s u i t e 5 0 0s t l o u i s m i s s o u r i 6 3 1 0 53 1 4 8 3 3 0 3 0 1w w w . p a t t e r h n - i v e s . c o mMO State Cer t i f icate of Author i ty #A2014032538
patterhn ives llcARCHITECT:
7 7 3 3 f o r s y t h b o u l e v a r ds u i t e 1 1 0 0s t l o u i s m i s s o u r i 6 3 1 0 53 1 4 8 9 6 2 5 1 1w w w . k i r k e g a a r d . c o m
ROOFTECH CONSULTING, INC
01
SCUPPER DETAIL - ALTERNATE 4
A-504
02
METAL EDGE DETAIL - ALTERNATE 4
A-504
03
THRESHOLD DETAIL - ALTERNATE 2
A-504
08
ROOF TO WALL EXPANSION JOINT DETAIL - ALTERNATE 2
A-504
07
ROOF TO ROOF EXPANSION JOINT DETAIL - ALTERNATE 2
A-504
04
TYPICAL GUTTER DETAIL - BASE BID / ALTERNATE 1
A-504
NOTES:
1. INSTALL SUMP WHENEVER POSSIBLE TO PREVENT PONDING.
NOTES:
1. PEEL AND STICK STRIPPING PLY WILL NOT BE APPROVED.
2. SECURE ALL WOOD BLOCKING PER FM 1-49.
3. INSTALL EXTENDER IF REQUIRED TO MATCH THE EXISTING REVEAL LINE.
NOTES:
1. SIZE AND STYLE OF GUTTERS VARIES FROM BUILDING TO BUILDING. IF ALT 1 ACCEPTED,
DIMENSIONS OF REPLACEMENT GUTTERS AND DOWNSPOUTS TO MATCH EXISTING SIZES ON EACH
ROOF AREA IN PROJECT SCOPE.
2. ALT 1: GUTTER AND DOWNSPOUT COLOR TO BE SELECTED BY ARCHITECT FROM MFR'S STANDARD
RANGE, PROFILE PER SMACNA REQS, AND CONSTRUCTED OF SAME GAUGE METAL.
06
STEP TRANSITION DETAIL
A-504
09
WINDOW SILL FLASHING - ALTERNATE 2
A-504
NOTES:
1. ALL WEEPS TO REMAIN OPEN AND FREE.
3"=1'-0" 0 1 2 4 8 IN
1"
#9x2" STAINLESS STEEL FASTENERS,
ATTACH 12" OC
PREFABRICATED CLIP-ON EDGE W/ COVER,
REF SPEC FOR FINISH
REF A-501 FOR ROOF ASSEMBLY TYPE
NON-CURING SEALANT
COVER EXIST REVEAL LINE BY 1/2" MIN
EXIST WOOD BLOCKING
FULLY ADHERED FLASHING UP AND OVER
TOP OF EXIST PARAPET
TPO-CLAD METAL SCUPPER LINER, MATCH
EXIST PROFILE, COLOR TO MATCH MEMBRANE
HEAT WELD ALL SEAMS
HEAT WELDED STRIP-IN PLY
PERIMETER ATTACHMENT PER MFR REC,
TO NEW WOOD BLOCKING
METAL COLLECTOR HEAD &
DOWNSPOUT TO MATCH EXIST
SIZE AND PROFILE, REF SPEC
FOR FINISH
TWO (2) STRAPS PER DOWNSPOUT,
FINISH TO MATCH DOWNSPOUT
3"=1'-0" 0 1 2 4 8 IN
MATCH EXIST REVEAL LINE
EXIST MASONRY WALL
CONT WOOD BLOCKING, ATTACH PER FM 1-49
REF A-501 FOR ROOF ASSEMBLY TYPE
NON-CURING SEALANT
#9x2" STAINLESS STEEL FASTENERS,
ATTACH 12" OC
PREFABRICATED CLIP-ON EDGE W/ COVER,
REF SPEC FOR FINISH
60 MIL TPO BASE FLASHING MEMBRANE,
WRAP UP CURB AND UNDER THRESHOLD,
FULLY ADHERE
PERIMETER ATTACHMENT PER MFR REC
REF A-501 FOR ROOF ASSEMBLY TYPE
NEW ALUMINUM THRESHOLD, SET IN
CONT BED OF SEALANT
3"=1'-0" 0 1 2 4 8 IN
4"4"
CONT WOOD BLOCKING, REPLACE AS REQD,
ATTACH PER FM 1-49, TOP OF BLOCKING TO
BE 1/8" TO 1/4" LOWER THAN TOP OF ROOF
ASSEMBLY
FULLY WELDED STRIPPING PLY
REF A-501 FOR ROOF ASSEMBLY TYPE
24 GA TPO COATED STEEL DRIP EDGE,
ATTACH 6" OC
22 GA CONT CLEAT
ALT 1: 11 GA MIN STAVES 30" OC, SECTURED
AT LEADING EDGE W/ 3/16" STAINLESS RIVETS
BASE BID: EXIST GUTTER TO REMAIN,
REMOVE AND REINSTALL ALL SEALANT
ALT 1: 24 GA GUTTER TO MATCH EXIST SIZE &
PROFILE, REF NOTES FOR FINISH
BASE BID: EXIST DOWNSPOUT TO REMAIN
ALT 1: 24 GA DOWNSPOUT, MATCH EXIST
PROFILE AND NUMBER, REF NOTES FOR
FINISH; INSTALL STRAPS 5'-0" OC
3"=1'-0" 0 1 2 4 8 IN
05
GUTTER DETAIL AT K DORMATORY - BASE BID / ALTERNATE 1
A-504
NOTES:
1. IF ALT 1 ACCEPTED, DIMENSIONS OF REPLACEMENT GUTTERS AND DOWNSPOUTS TO MATCH
EXISTING SIZES.
2. ALT 1: GUTTER AND DOWNSPOUT COLOR TO BE SELECTED BY ARCHITECT FROM MFR'S STANDARD
RANGE, PROFILE PER SMACNA REQS, AND CONSTRUCTED OF SAME GAUGE METAL.
4"4"
FULLY WELDED STRIPPING PLY
REF A-501 FOR ROOF ASSEMBLY TYPE
24 GA TPO COATED STEEL DRIP EDGE,
ATTACH 6" OC
22 GA CONT CLEAT
ALT 1: 11 GA MIN STAVES 30" OC, SECURED AT
LEADING EDGE W/ 3/16" STAINLESS RIVETS
BASE BID: REINSTALL EXIST GUTTER
ALT 1: 24 GA GUTTER TO MATCH EXIST SIZE &
PROFILE, REF NOTES FOR FINISH
BASE BID: REINSTALL EXIST DOWNSPOUT
ALT 1: 24 GA DOWNSPOUT, MATCH EXIST
PROFILE AND NUMBER, REF NOTES FOR
FINISH; INSTALL STRAPS 5'-0" OC
3"=1'-0" 0 1 2 4 8 IN
CONT WOOD BLOCKING, REPLACE AS REQD,
ATTACH PER FM 1-49, TOP OF BLOCKING TO
BE 1/8" TO 1/4" LOWER THAN TOP OF ROOF
ASSEMBLY
INSTALL ADDL WOOD BLOCKING AS REQD TO
INSTALL BACK OF GUTTER FLUSH W/ FACE
OF TOP MASONRY COURSE
3"=1'-0" 0 1 2 4 8 IN
PERIMETER ATTACHMENT PER MFR REC
REF A-501 FOR ROOF ASSEMBLY TYPE
NEW 1/2" GYPSUM COVERBOARD W/ COATED
GLASS FACER, MECHANICALLY FASTENED
EXIST WALL
60 MIL TPO BASE FLASHING MEMBRANE,
FULLY ADHERE
CONT WOOD BLOCKING, ATTACH PER FM 1-49
REF A-501 FOR ROOF ASSEMBLY TYPE
EXTEND MEMBRANE DOWN OVER EDGE
AND HEAT WELD TO BASE FLASHING
MEMBRANE
3" M
IN
3"=1'-0" 0 1 2 4 8 IN
NOTES:
1. REMOVE ALL EXISTING EXPANSION JOINT DETAIL COMPONENTS AND REPLACE WITH NEW
COMPONENTS.
2. SECURE ALL BLOCKING PER FM 1-49.
MHD - ROOF 2MHD - ROOF 1
COMPRESSIBLE BATT INSULATION &
VAPOR SOCK
COMPRESSIBLE TUBE, DIAMETER TO BE
EQUAL TO OR EXCEED DECK OPENING;
PROVIDE 3" MIN ADDL MEMBRANE TO
ALLOW FOR EXPANSION
ANCHOR FASTENERS W/ BARBED SEAM
PLATES, FASTEN 12" OC
REF A-501 FOR ROOF ASSEMBLY TYPE
WOOD BLOCKING, INSTALL FLUSH W/
HEIGHT OF NEW ROOF ASSEMBLY
60 MIL TPO FLASHING, FULLY ADHERED
CONTINUOUS WELD & LAP SEALANT AT
CUT EDGES
1
1
2
" MIN
3"=1'-0" 0 1 2 4 8 IN
12
" M
IN
REF A-501 FOR ROOF ASSEMBLY TYPE
3" MIN FOAM ROPE
HEAT WELD SEAM
ANCHOR FASTENERS W/ BARBED SEAM
PLATES, FASTEN 12" OC
60 MIL TPO FLASHING, FULLY ADHERED
EXIST MASONRY WALL
CONT BEAD OF SEALANT IN COMPRESSION
24 GA COUNTERFLASHING, ANCHORED
12" OC, REF SPEC FOR FINISH
TERMINATION BAR, ANCHORED 12" OC
W/ BUTYL SEALANT
3"=1'-0" 0 1 2 4 8 IN
09A
A-504
09A: FLASHING SIDE SECTION - NTS
CONT BEAD
TOOLED SEALANT
24 GA COUNTERFLASHING,
ANCHORED 12" OC, REF
SPEC FOR FINISH
SILL FLASHING,
ANCHORED 12" OC
PERIMETER ATTACHMENT
PER MFR REC
REF A-501 FOR ROOF
ASSEMBLY TYPE
60 MIL TPO BASE FLASHING
MEMBRANE, EXTEND UP &
OVER EXIST SILL
24 GA METAL EDGE, REF SPEC FOR FINISH
22 GA CONT CLEAT
EXIST SLOPED BRICK SILL, CLEAN AND
REMOVE EXIST FLASHING & SEALANTS
FLASHING ON SIDE WALL BEYOND
TOOLED SEALANT, COLOR TO MATCH FLASHING
EXIST WINDOW TO REMAIN, PROTECT IN PLACE
SLO
PE
SLO
PE
SLO
PE
SLO
PE
EXIST MASONRY WALL
SLO
PE
EXIST MASONRY WALL
SLO
PE
SLO
PE
SLO
PE
SPLICE JOINTS IN SILL FLASHING TO BE
TREATED W/ SILICONE SHEET STRIP,
COLOR TO MATCH FLASHING
ISSUE DATE:
SHEET NUMBER:
ASSET #
CHECKED BY:DRAWN BY:
DESIGNED BY:
DATE:REVISION:
PROJECT #
SHEET TITLE:
REVISION:DATE:
REVISION:DATE:
CAD DWG FILE:
STATE OF MISSOURIMICHAEL L. PARSON,
GOVERNOR
OFFICE OF ADMINISTRATIONDIVISION OF FACILITIESMANAGEMENT,DESIGN AND CONSTRUCTION
DEPARTMENT OF
SECONDARY EDUCATIONELEMENTARY AND
ROOF REPLACEMENT
3815 MAGNOLIA AVENUESCHOOL FOR THE BLINDMISSOURI
SAINT LOUIS, MO 63110
E1908-0150120110075012011009
01/24/2020
E1908-01 2011 A-504MER / MGCP / AICP / MG
ROOF DETAILS
A-50410 OF 10 SHEETS01/24/2020
ROOF CONSULTANT:
7 7 5 1 c a r o n d e l e t a v e n u ec l a y t o n t o w e r s u i t e 5 0 0s t l o u i s m i s s o u r i 6 3 1 0 53 1 4 8 3 3 0 3 0 1w w w . p a t t e r h n - i v e s . c o mMO State Cer t i f icate of Author i ty #A2014032538
patterhn ives llcARCHITECT:
7 7 3 3 f o r s y t h b o u l e v a r ds u i t e 1 1 0 0s t l o u i s m i s s o u r i 6 3 1 0 53 1 4 8 9 6 2 5 1 1w w w . k i r k e g a a r d . c o m
ROOFTECH CONSULTING, INC