2
MATERIALS &. RESEARCH DIVISION W. Law so n, P . E . M at e rials & Research Engineer RESEARCH UPDATE January 29 , t 990 Page 1 of 2 NUMBER U90-4 NEED FOR PAVEMENT SCARIFICATION References - W ork P la n 86 -R- 3 , U87 - 6 Purpos e - To deter mi ne if it is n ecessary to scar if y a n existi ng bituminous pavement prior to overlaying it wit h additio nal s ubb ase m ater i al and a n ew p ave m ent syste m to in s ur e th ere is no slippage or ot her distortion of t he overlay m ate r ia ls. History - Tw o 1, 000 foot test sect io ns were l eft unscarifi ed on Ver m ont Route 100 ( Project Stowe-Morri st o wn· F029-1(9)(S) · in 1 986 . The test sections are l ocated in Morristown at MM 0. 426 - 0.615 a nd Mt-1 1 . 56 1- 1 . 7 5 . Reconstruct io n in the n on- sca rified place m ent of 6" of s ubb ase of gravel, co u rse , 1 l /4" of T ype III bi nd er and cou rs e. test sect ion s inc lud ed 3" of pl a nt mixed base 3/4" of Type IV sur fa ce The scarifi c at i on treat m ent on 1. 73 mi les of th e in an average si ze of 1 square foot or less bitumin o us pave m ent with the re m ai nd er ra ng i ng up feet in dime n sio n. project resu lt ed on 50% of t he to 1 by 3 lineal Cost Information- The pavement scari fi catio n was bid at $1.50 per square ya rd for a total of 23,750 s qu are yards. Initial P er formanc e Th e fo ll owing inf or m at i on s ummarizes the c ondition of the pavement at s carified and no n- sca r ified test l oc ation s through three ye ars of service . Pav e me nt Cra cki ng (in lineal feet per 1 00 fe e t) No n -sca rif ie d Sc arifi ed Pre c onstruc tion (5/86) 774 776 Pav e me nt Rutting {i n 1 6ths of an in c h) No n -sc nr ifi ed 7.6 Scar ifie d 7.5 3 Year Evaluati on (6/89) 85 94 2.6 3.2

Ron~rascoia - Vermont - 04 (OCR) Need...pavement-distortion in the 1,000 foot non-scarified section~. Preliminary Conclusion - Field measurements recorded ~o date suggest there has

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Ron~rascoia - Vermont - 04 (OCR) Need...pavement-distortion in the 1,000 foot non-scarified section~. Preliminary Conclusion - Field measurements recorded ~o date suggest there has

MATERIALS &. RESEARCH DIVISION

~1. W. Lawson, P . E. Mate rials & Research

Engineer

RESEARCH UPDATE

l-1 r ·r~ p il n~ d n ~· :

Ron~rascoia January 29 , t 990 Page 1 of 2

NUMBER U90-4

NEED FOR PAVEMENT SCARIFICATION

References - Work P lan 86-R- 3 , U87 - 6

Purpose - To determi ne if it is necessary to scarify a n existi ng bituminous pavement prior to overlaying it with additiona l s ubbase mater i al and a n ew pavement system to ins ure there is no slippage or other distortion of t h e overlay mater ials.

History - Two 1, 000 foot test sect i ons were l eft unscarified o n Vermont Route 100 ( Project Stowe-Morristown· F029-1(9)(S) · in 1986 . The test sections are l ocated in Morristown at MM 0 . 426 - 0.615 a nd Mt-1 1 . 56 1- 1 . 7 5 .

Reconstruct ion in t h e non- scarified placement of 6" of s ubbase of gravel, course , 1 l /4" of Type III binder a nd c o u rse .

test sect ions inc luded 3" of pl a nt mixed base 3/4" of Type IV s u r face

The scarific at i on treatment on 1 . 73 mi les of the in an average s i ze of 1 square foot or less bituminous pavement with the remai nder rang i ng up feet in dimension.

project resulted on 50% o f t h e

to 1 by 3 lineal

Cost Information- The pavement scari fi cation was bid at $1.50 per square yard for a total o f 23,750 s quare yards.

Initial Performance Th e fo llowing informati on s ummarizes the c ondition of t h e pavement at s carified and no n- sca r ified test l ocations through t h r e e y e ars of service .

Pave me nt Crac k i ng (in lineal feet per 100 fe e t)

Non-scarif ied Scarifi ed

Prec onstruc tion (5/86) 774 776

Pave me nt Rutting {i n 16ths of an inc h) No n -scn r ifi e d 7 . 6 Scar ified 7 . 5

3 Year Evaluati on (6/89) 85 94

2.6 3 . 2

Page 2: Ron~rascoia - Vermont - 04 (OCR) Need...pavement-distortion in the 1,000 foot non-scarified section~. Preliminary Conclusion - Field measurements recorded ~o date suggest there has

l '9 0- ~

MAYS Roug hness (in inches per mile> The trailer mounted MAYS meter was not available for testing prior to the reconstruction of the project.

Non-scarified Scarified

Miscellaneous

2 Year Evaluation (6/88) 68 62

3 Year Evaluation ( 7/89) 80 84

There was no visible sign of any shoving, rippling or other pavement -distortion in the 1,000 foot non - scarified section~ .

Preliminary Conclusion - Field measurements recorded ~o date suggest there has been no reduction in performance on the roadway sections where the underlying pavement was not scarified .

The elimination of the scarification requirement should b e considered on future projects whic h are reconstructed to a similar standard. The resulting cost savings could be used to increase the paveme nt design thickness.

rollow- Up - Annual inspec tions will continue for t h e life of t h e prcJject and reports will be prepared on a biennial schedul e .

Dist: A,B,C, D,E,F, G, H