SAFFO CONTRACTORS Rome Bridge Rome, Georgia DATE

Rome Bridge Rome, Georgia DATE. This project called for hydro-blasting maintenance to be performed on the steel infrastructure and support frame of

Embed Size (px)

Citation preview

Page 1: Rome Bridge Rome, Georgia DATE.  This project called for hydro-blasting maintenance to be performed on the steel infrastructure and support frame of

SAFFO CONTRACTORS

Rome BridgeRome, Georgia

DATE

Page 2: Rome Bridge Rome, Georgia DATE.  This project called for hydro-blasting maintenance to be performed on the steel infrastructure and support frame of
Page 3: Rome Bridge Rome, Georgia DATE.  This project called for hydro-blasting maintenance to be performed on the steel infrastructure and support frame of

Project Overview

This project called for hydro-blasting maintenance to be performed on the steel infrastructure and support frame of the bridge.

Page 4: Rome Bridge Rome, Georgia DATE.  This project called for hydro-blasting maintenance to be performed on the steel infrastructure and support frame of

Utilizing scaffolding, suspended cables, and manlifts, crews hydroblasted and prepped the support column and the truss structures to receive a protective coating comprised of <insert paint>.

Services Performed

Page 5: Rome Bridge Rome, Georgia DATE.  This project called for hydro-blasting maintenance to be performed on the steel infrastructure and support frame of

Workers used manlifts to reach the upper deck area of the steel trusses.

Manlift Operation

Page 6: Rome Bridge Rome, Georgia DATE.  This project called for hydro-blasting maintenance to be performed on the steel infrastructure and support frame of

Deep rust and degradation of the steel is present pre-blast.

Degradation of Steel - Preblast

Page 7: Rome Bridge Rome, Georgia DATE.  This project called for hydro-blasting maintenance to be performed on the steel infrastructure and support frame of

The steel columns supporting the bridge are also rusted and corroded.

Degradation of Support Columns - Preblast

Page 8: Rome Bridge Rome, Georgia DATE.  This project called for hydro-blasting maintenance to be performed on the steel infrastructure and support frame of

Workers utilized high-tension steel cable with suspended walkboards to reach the areas underneath the bridge.

Suspended Walkboards

Page 9: Rome Bridge Rome, Georgia DATE.  This project called for hydro-blasting maintenance to be performed on the steel infrastructure and support frame of

Workers also used suspended baskets to reach areas around the columns and farther down below the bridge.

Suspended Baskets

Page 10: Rome Bridge Rome, Georgia DATE.  This project called for hydro-blasting maintenance to be performed on the steel infrastructure and support frame of

Workers remove rust and flaking paint from the steel faces of the bridge.

Hydroblasting In Progress

Page 11: Rome Bridge Rome, Georgia DATE.  This project called for hydro-blasting maintenance to be performed on the steel infrastructure and support frame of

Suspended in baskets, employees work on the central support column.

Central Column Work

Page 12: Rome Bridge Rome, Georgia DATE.  This project called for hydro-blasting maintenance to be performed on the steel infrastructure and support frame of

Employees applied a rust inhibiting coating to all bolts and intersecting joists.

Application of Rust Inhibitor

Page 13: Rome Bridge Rome, Georgia DATE.  This project called for hydro-blasting maintenance to be performed on the steel infrastructure and support frame of

More examples of the rust inhibitor application.

Application of Rust Inhibitor

Page 14: Rome Bridge Rome, Georgia DATE.  This project called for hydro-blasting maintenance to be performed on the steel infrastructure and support frame of

Painting In Progress

Page 15: Rome Bridge Rome, Georgia DATE.  This project called for hydro-blasting maintenance to be performed on the steel infrastructure and support frame of

Completed bridge.

Finished Product

Page 16: Rome Bridge Rome, Georgia DATE.  This project called for hydro-blasting maintenance to be performed on the steel infrastructure and support frame of

Opposite Angle

Page 17: Rome Bridge Rome, Georgia DATE.  This project called for hydro-blasting maintenance to be performed on the steel infrastructure and support frame of

SAFFO CONTRACTORS