    BACKGROUND

    EC Act came into force on 2001 : Anact to provide for efficient use of energy and itsconservation.

    Institutional Mechanism: Nodal Agency : BEE

    State Level Agency : SDA

  • 8/8/2019 Role of Empanelled Consultants

    3/19

    ROLE OF SDAs

    A DEVELOPMENT AGENCY:Database, Policy formulation, Annual reports& review, Awareness creation, knowledgecentre, capacity building

    A FACILITATOR : Demo project, PPP

    A REGULATORY AGENCY : Notifyvarious mandatory requirements for DCs,S&L and other schemes of MoP/BEE and its

    implementation

  • 8/8/2019 Role of Empanelled Consultants

    4/19

    ROLE OF SDAS

    SDAs are the statutory bodies set up under section

    15(d) of the EC Act,2001 to play an effective roleto:

    Collection, Collation and analysis of data regardingenergy use

    Dissemination of information to the massesregarding use of efficient energy.

    Create public awareness and understanding aboutthe values of energy conservation

    Implementation of the EC Act,2001

    Stimulating market transformation at the local

    level

  • 8/8/2019 Role of Empanelled Consultants

    5/19

    INITIATIVES OF BEE FOR

    SUPPORTING SDAs

    NPC as a consultant to help SDAs to prepare

    Action Plan

    Organize meetings and workshops

    Help SDAs technically and financially to takeup different activities as per the action plan

    Support during implementation

  • 8/8/2019 Role of Empanelled Consultants

    6/19

    SCHEME FOR

    STRENGTHENING SDAs

    The total expenditure under this scheme is estimatedto be Rs. 49.47 crores over a 5 year periodcommencing from year 2007-08.

    The year wise expenditure for the respective yearsfor the XI plan period is tabulated below:

    Year Amount (Rs. In Lakhs)

    2007-08 755

    2008-09 2371

    2009-10 1047

    2010-11 387

    2011-12 387

    Total 4947

  • 8/8/2019 Role of Empanelled Consultants

    7/19

    ACTION PLAN

    19 points Deliverables have been formulated by BEE whichare as per the EC Act.

    The 19 deliverables include activities on Policy Preparation of database Dissemination of information

    Publications, publicity, awareness Training Designated Consumers Demo projects Appliances/ Equipments

    Energy Conservation Building Codes

    Details are uploaded in the w ebsite: www.bee.gov.in

    For any further clarification please post your queries at

    [email protected], [email protected] [email protected]

    mailto:[email protected]:[email protected]:[email protected]:[email protected]
  • 8/8/2019 Role of Empanelled Consultants

    8/19

    5/29/2009 8

    STATUSSTATUS AN OVERVIEWAN OVERVIEW

    Rs. 755 lacs disbursed to 24 SDAs for the FY 2007-08

    towards the Annual Action Plan

    Rs. 2762 lacs disbursed to 27 SDAs for the FY 2008-09 tilldate

    Rs. 836 lacs for Annual Action P lan to 22 SDAs

    Rs. 404 lacs for IGEA of 409 Govt. buildings to 24

    SDAs 40 demonstration project identified on energy efficient

    street lighting, revamping of drinking water pumping

    system and energy efficiency in SMEs cluster

    Rs. 1188 lacs for implementation of 24 demo projects

    All the SDAs except Lakshadweep have prepared their

    Energy Conservation Action P lan

  • 8/8/2019 Role of Empanelled Consultants

    9/19

    ROLE OF THE

    EMPANELLLED

    CONSULTANTS

    ASSISTANCE TO SDAs

  • 8/8/2019 Role of Empanelled Consultants

    10/19

    5/29/2009 10

    ASSISTANCE TO SDAsASSISTANCE TO SDAs

    Assist SDAs towards

    industry interaction

    interaction w ith other State Govt. dept. / agencies

    awareness campaign, conduct State Level Awards

    preparation & budget estimation of Yearly Action

    Planimplementation of Energy Conservation Activities in

    the states

    IGEA of Govt. buildings and its implementationimplementation of demonstration projects

    organizing seminars / workshops

    preparation of Annual Reportothers, as per SDA requirement

  • 8/8/2019 Role of Empanelled Consultants

    11/19

    5/29/2009 11

    ASSISTANCE TO SDAsASSISTANCE TO SDAs

    No. State / UT Name of SDA Location

    1. Rajasthan Rajasthan Renewable Energy Corporation Ltd. Jaipur

    2. Assam O/o Chief Electrical Inspector-cum-Adviser Guwahati

    3. Madhya

    Pradesh

    M.P. Urja Vikas Nigam Limited Bhopal

    4. HimachalPradesh

    H.P. State Electricity Board Shimla

    5. Bihar Bihar Renewable Energy Development Agency Patna

    6. Meghalaya O/o Senior Electrical Inspector Shillong

    7. Pondicherry Renewable Energy Agency of Pondicherry Pondicherry

    8. Uttar Pradesh U.P. Power Corporation Ltd. Lucknow

    9. Chandigarh O/o Chief Engineer Chandigarh

    10. Jharkhand O/o Chief Engineer-cum-Chief Electrical Inspector Ranchi

    11. Orissa O/o Chief Electrical Inspector Bhubaneswar

    12. Andaman & Nicobar

    Electricity Department, A&N Administration Port Blair

    13. Manipur O/o Chief Engineer Imphal

    14. Tripura Tripura State Electricity Corporation Ltd. Agartala15. Lakshwadeep Electricity Department, Lakshwadeep Administration Kavaratti

  • 8/8/2019 Role of Empanelled Consultants

    12/19

    5/29/2009 12

    PAYMENT TO CONSULTANTSPAYMENT TO CONSULTANTS

    Rs. 4000/ - per man day for deputing a technical

    person for assisting the SDAs

    The technical person is to be deputed in the city where

    the SDA is headquartered

    The technical person should be a BEE certified Energy

    Manager / Energy Auditor w ith a minimum of two

    years work experience in the field of energy efficiency

    Payment will be made through SDAs or by BEE onreceipt of letter from SDA

  • 8/8/2019 Role of Empanelled Consultants

    13/19

    5/29/2009 13

    EXPECTATIONSEXPECTATIONS

    Should send a detailed CV to BEE of the technical

    person prior to deputing them to SDAs for approval

    Should be stationed at SDA headquarter and use their

    office space

    Should carry their own laptop and data card for

    internet access

    No change of personnel at frequent intervals

    Any change of the deputed personnel to be done w ith

    the consent of SDA or BEE

    Should work towards fulfillment of the roles assigned

    to SDAs under the EC Act 2001 and by the BEE

  • 8/8/2019 Role of Empanelled Consultants

    14/19

    ROLE OF THE EMPANELLLED

    CONSULTANTS

    PREPARATION OF DPR FOR

    DEMONSTRATIONPROJECTS

  • 8/8/2019 Role of Empanelled Consultants

    15/19

    5/29/2009 15

    DEMO PROJECTSDEMO PROJECTS

    SDAs will identify demonstration projects with high

    impact value in big cities

    The demonstration projects may be

    energy efficiency lighting project for upcoming

    flyovers or centrally located park, or a place ofcultural or tourism importance within the city

    drinking water supply in a government owned

    residential or office complex small / medium enterprises industry cluster, having

    high replicability

  • 8/8/2019 Role of Empanelled Consultants

    16/19

    5/29/2009 16

    DEMO PROJECTSDEMO PROJECTS

    Based on proposal of demo projects obtained

    from SDAs, BEE w ill prepare a scope of work

    Consultants w ill submit their financial bid based

    on the scope of work

    A consultant will be awarded a demo projectbased on the lowest financial bid

    Demo project is to be conducted in consultation

    with SDA, State Government Agency /Department which has to implement the project

  • 8/8/2019 Role of Empanelled Consultants

    17/19

    5/29/2009 17

    DEMO PROJECTSDEMO PROJECTS

    Conduct f ield visits

    Technical parameters to be measured

    Choose the best energy efficient device for this

    particular project

    A study is to be carried out by placing the mostefficient option to obtain a real data

    Analysis of the reduction in Electrical Energy

    Consumption (KWH & KVAH)

    Meters to be installed on site to verify the reduction in

    energy savings achieved

  • 8/8/2019 Role of Empanelled Consultants

    18/19

    5/29/2009 18

    DEMO PROJECTSDEMO PROJECTS

    Cost-benefit analysis showing the simple pay-back

    period, Return on Investment (RoI), Net Present

    Value (NPV) and Internal Rate of Return (IRR)

    Providing a list of manufacturers / suppliers

    Providing bid document

    Development of monitoring protocol