    ROCKS - Road Costs Knowledge System

    Set of Sample Statistical ReportsVersion 2.01, 09/09/02

    The World Bank

    Roads and Highways Thematic Group

  • 7/29/2019 ROCKS - Documentation - Annex 1 - Set of Statistics Reports (Version 2.01)

    2/17

    ROCKS - Road Costs Knowledge S

    Scenario: All World Regions - Two Lane Roads

    Costs per Km Statistics (2000 US$/km)

    Work Category Work Class Work Type Average Minimum Maximum St Dev. Count Predominant Work Activ

    Preservation Routine Routine Maintenance 2019 277 5580 1147 47 Routine Maintenance 1L

    Routine Maintenance Un

    Routine Maintenance Blo

    Routine Maintenance Bit

    Routine Maintenance Co

    Routine Maintenance Bit

    Routine Maintenance Co

    Routine Maintenance Bit

    Routine Maintenance Co

    Periodic Grading 247 51 876 229 18 Light Grading

    Heavy Grading

    Gravel Resurfacing 15326 1997 65038 14154 127 Regravelling

    Concrete Pavement #N/A #N/A #N/A #N/A #N/A Concrete Pavement Prev

    Preventive Treatment

    Bituminous Pavement 7802 1196 31962 5972 52 Fog Seal

    Preventive Treatment Rejuvenation

    Unsealed 4266 2009 6965 1141 98 Unsealed Preventive Tre

    Preventive Treatment

    Surface Treatment 20309 4452 45277 10412 115 Slurry Seal or Cape Sea

    Resurfacing Single Surface Treatmen

    Double Surface Treatme

    Triple Surface Treatmen

    Asphalt Mix 64728 12878 126131 27614 169 Asphalt Overlay < 40 mm

    Resurfacing Asphalt Overlay 40 to 59

    Rehabilitation Strengthening 116939 27473 252349 44017 140 Asphalt Overlay 60 to 79

    Asphalt Overlay 80 to 99

    Asphalt Overlay > 99 mm

    Mill and Replace

    Bonded Concrete Overla

    Unbounded Concrete Ov

    Concrete Pavement #N/A #N/A #N/A #N/A #N/A Concrete Slab Replacem

    Restoration Concrete Slab Repair

    Concrete Diamond Grind

    Reconstruction 215587 10046 666219 132543 384 Reconstruction Unsealed

    Reconstruction Block

    Reconstruction Bitumino

    Reconstruction Concrete

    Development Improvement Partial Widening 150925 135964 161677 9606 6 Partial Widening to Unse

    Partial Widening to Bloc

    Partial Widening to Bitum

    Partial Widening to Conc

    Partial Widening and 378160 307222 424928 38871 13 Partial Widening to Unse

    Reconstruction Partial Widening to Bloc

    Partial Widening to Bitum

    Partial Widening to Conc

    Widening 486930 290776 670195 85186 22 Widening Adding Bitumi

    Widening Adding Bitumi

    Widening Adding Bitumi

    Widening Adding Concre

    Widening Adding Concre

  • 7/29/2019 ROCKS - Documentation - Annex 1 - Set of Statistics Reports (Version 2.01)

    3/17

    ROCKS - Road Costs Knowledge Sys

    Scenario: All World Regions - Two Lane Roads

    Costs per M2 Statistics (2000 US$/m2)

    Work Category Work Class Work Type Average Minimum Maximum St Dev. Count Predominant Work Activity

    Preservation Periodic Gravel Resurfacing 2.41 0.29 10.84 2.39 127 Regravelling

    Concrete Pavement #N/A #N/A #N/A #N/A #N/A Concrete Pavement Preventiv

    Preventive Treatment

    Bituminous Pavement 1.06 0.17 4.57 0.84 52 Fog Seal

    Preventive Treatment Rejuvenation

    Unsealed 0.71 0.33 1.16 0.19 98 Unsealed Preventive Treatmen

    Preventive Treatment

    Surface Treatment 2.86 0.74 6.14 1.41 115 Slurry Seal or Cape Seal

    Resurfacing Single Surface Treatment

    Double Surface Treatment

    Triple Surface Treatment

    Asphalt Mix 9.37 1.84 19.16 4.11 167 Asphalt Overlay < 40 mm

    Resurfacing Asphalt Overlay 40 to 59 mm

    Rehabilitation Strengthening 16.69 3.92 36.05 6.22 140 Asphalt Overlay 60 to 79 mm

    Asphalt Overlay 80 to 99 mm

    Asphalt Overlay > 99 mm

    Mill and Replace

    Bonded Concrete Overlay

    Unbounded Concrete Overlay

    Concrete Pavement #N/A #N/A #N/A #N/A #N/A Concrete Slab Replacement

    Restoration Concrete Slab Repair

    Concrete Diamond Grinding

    Reconstruction 30.96 1.44 95.17 19.25 384 Reconstruction Unsealed

    Reconstruction Block

    Reconstruction Bituminous

    Reconstruction Concrete

  • 7/29/2019 ROCKS - Documentation - Annex 1 - Set of Statistics Reports (Version 2.01)

    4/17

    ROCKS - Road Costs Knowledge S

    Scenario: Asia - Two Lane Roads

    Costs per Km Statistics (2000 US$/km)

    Work Category Work Class Work Type Average Minimum Maximum St Dev. Count Predominant Work Activ

    Preservation Routine Routine Maintenance 791 656 927 192 2 Routine Maintenance 1L

    Routine Maintenance Un

    Routine Maintenance Blo

    Routine Maintenance Bit

    Routine Maintenance Co

    Routine Maintenance Bit

    Routine Maintenance Co

    Routine Maintenance Bit

    Routine Maintenance Co

    Periodic Grading #N/A #N/A #N/A #N/A #N/A Light Grading

    Heavy Grading

    Gravel Resurfacing 21141 11278 31005 13949 2 Regravelling

    Concrete Pavement #N/A #N/A #N/A #N/A #N/A Concrete Pavement Pre

    Preventive Treatment

    Bituminous Pavement 4042 4042 4042 #DIV/0! 1 Fog Seal

    Preventive Treatment Rejuvenation

    Unsealed #N/A #N/A #N/A #N/A #N/A Unsealed Preventive Tre

    Preventive Treatment

    Surface Treatment 11010 4452 31762 7480 26 Slurry Seal or Cape Sea

    Resurfacing Single Surface Treatmen

    Double Surface Treatme

    Triple Surface Treatmen

    Asphalt Mix 66329 15421 126131 29246 88 Asphalt Overlay < 40 mm

    Resurfacing Asphalt Overlay 40 to 59

    Rehabilitation Strengthening 99453 27473 210219 31493 34 Asphalt Overlay 60 to 79

    Asphalt Overlay 80 to 99

    Asphalt Overlay > 99 mm

    Mill and Replace

    Bonded Concrete Overla

    Unbounded Concrete Ov

    Concrete Pavement #N/A #N/A #N/A #N/A #N/A Concrete Slab Replacem

    Restoration Concrete Slab Repair

    Concrete Diamond Grind

    Reconstruction 242977 20165 626659 133899 65 Reconstruction Unseale

    Reconstruction Block

    Reconstruction Bitumino

    Reconstruction Concrete

    Development Improvement Partial Widening 156339 149719 161677 5016 4 Partial Widening to Unse

    Partial Widening to Bloc

    Partial Widening to Bitum

    Partial Widening to Conc

    Partial Widening and 378160 307222 424928 38871 13 Partial Widening to Unse

    Reconstruction Partial Widening to Bloc

    Partial Widening to Bitum

    Partial Widening to Conc

    Widening 486930 290776 670195 85186 22 Widening Adding Bitumi

    Widening Adding Bitumi

    Widening Adding BitumiWidening Adding Concre

    Widening Adding Concre

  • 7/29/2019 ROCKS - Documentation - Annex 1 - Set of Statistics Reports (Version 2.01)

    5/17

    ROCKS - Road Costs Knowledge Sys

    Scenario: Asia - Two Lane Roads

    Costs per M2 Statistics (2000 US$/m2)

    Work Category Work Class Work Type Average Minimum Maximum St Dev. Count Predominant Work Activity

    Preservation Periodic Gravel Resurfacing 3.39 1.61 5.17 2.51 2 Regravelling

    Concrete Pavement #N/A #N/A #N/A #N/A #N/A Concrete Pavement Preventiv

    Preventive Treatment

    Bituminous Pavement 0.58 0.58 0.58 #DIV/0! 1 Fog Seal

    Preventive Treatment Rejuvenation

    Unsealed #N/A #N/A #N/A #N/A #N/A Unsealed Preventive Treatme

    Preventive Treatment

    Surface Treatment 1.70 0.74 4.59 1.08 26 Slurry Seal or Cape Seal

    Resurfacing Single Surface Treatment

    Double Surface Treatment

    Triple Surface Treatment

    Asphalt Mix 9.88 2.20 19.16 4.49 88 Asphalt Overlay < 40 mm

    Resurfacing Asphalt Overlay 40 to 59 mm

    Rehabilitation Strengthening 15.13 3.92 28.80 4.71 34 Asphalt Overlay 60 to 79 mm

    Asphalt Overlay 80 to 99 mm

    Asphalt Overlay > 99 mm

    Mill and Replace

    Bonded Concrete Overlay

    Unbounded Concrete Overlay

    Concrete Pavement #N/A #N/A #N/A #N/A #N/A Concrete Slab Replacement

    Restoration Concrete Slab Repair

    Concrete Diamond Grinding

    Reconstruction 35.18 2.88 85.84 19.55 65 Reconstruction Unsealed

    Reconstruction Block

    Reconstruction Bituminous

    Reconstruction Concrete

  • 7/29/2019 ROCKS - Documentation - Annex 1 - Set of Statistics Reports (Version 2.01)

    6/17

    ROCKS - Road Costs Knowledge S

    Scenario: Africa - Two Lane Roads

    Costs per Km Statistics (2000 US$/km)

    Work Category Work Class Work Type Average Minimum Maximum St Dev. Count Predominant Work Activ

    Preservation Routine Routine Maintenance 2280 277 5580 1265 22 Routine Maintenance 1L

    Routine Maintenance Un

    Routine Maintenance Blo

    Routine Maintenance Bit

    Routine Maintenance Co

    Routine Maintenance Bit

    Routine Maintenance Co

    Routine Maintenance Bit

    Routine Maintenance Co

    Periodic Grading 524 205 876 337 3 Light Grading

    Heavy Grading

    Gravel Resurfacing 15759 1997 65038 14803 112 Regravelling

    Concrete Pavement #N/A #N/A #N/A #N/A #N/A Concrete Pavement Pre

    Preventive Treatment

    Bituminous Pavement 7433 1196 31962 6599 39 Fog Seal

    Preventive Treatment Rejuvenation

    Unsealed 4266 2009 6965 1141 98 Unsealed Preventive Tre

    Preventive Treatment

    Surface Treatment 22798 10684 40669 9036 25 Slurry Seal or Cape Sea

    Resurfacing Single Surface Treatmen

    Double Surface Treatme

    Triple Surface Treatmen

    Asphalt Mix 55851 12878 112438 25856 27 Asphalt Overlay < 40 mm

    Resurfacing Asphalt Overlay 40 to 59

    Rehabilitation Strengthening 135182 49003 241847 50231 14 Asphalt Overlay 60 to 79

    Asphalt Overlay 80 to 99

    Asphalt Overlay > 99 mm

    Mill and Replace

    Bonded Concrete Overla

    Unbounded Concrete Ov

    Concrete Pavement #N/A #N/A #N/A #N/A #N/A Concrete Slab Replacem

    Restoration Concrete Slab Repair

    Concrete Diamond Grind

    Reconstruction 158393 10046 510994 121602 88 Reconstruction Unseale

    Reconstruction Block

    Reconstruction Bitumino

    Reconstruction Concrete

    Development Improvement Partial Widening 135964 135964 135964 #DIV/0! 1 Partial Widening to Unse

    Partial Widening to Bloc

    Partial Widening to Bitum

    Partial Widening to Conc

    Partial Widening and #N/A #N/A #N/A #N/A #N/A Partial Widening to Unse

    Reconstruction Partial Widening to Bloc

    Partial Widening to Bitum

    Partial Widening to Conc

    Widening #N/A #N/A #N/A #N/A #N/A Widening Adding Bitumi

    Widening Adding Bitumi

    Widening Adding BitumiWidening Adding Concre

    Widening Adding Concre

  • 7/29/2019 ROCKS - Documentation - Annex 1 - Set of Statistics Reports (Version 2.01)

    7/17

    ROCKS - Road Costs Knowledge Sys

    Scenario: Africa - Two Lane Roads

    Costs per M2 Statistics (2000 US$/m2)

    Work Category Work Class Work Type Average Minimum Maximum St Dev. Count Predominant Work Activity

    Preservation Periodic Gravel Resurfacing 2.47 0.29 10.84 2.50 112 Regravelling

    Concrete Pavement #N/A #N/A #N/A #N/A #N/A Concrete Pavement Preventiv

    Preventive Treatment

    Bituminous Pavement 0.99 0.17 4.57 0.93 39 Fog Seal

    Preventive Treatment Rejuvenation

    Unsealed 0.71 0.33 1.16 0.19 98 Unsealed Preventive Treatmen

    Preventive Treatment

    Surface Treatment 3.25 1.53 5.74 1.26 25 Slurry Seal or Cape Seal

    Resurfacing Single Surface Treatment

    Double Surface Treatment

    Triple Surface Treatment

    Asphalt Mix 7.88 1.84 15.40 3.50 27 Asphalt Overlay < 40 mm

    Resurfacing Asphalt Overlay 40 to 59 mm

    Rehabilitation Strengthening 19.19 7.00 34.55 7.15 14 Asphalt Overlay 60 to 79 mm

    Asphalt Overlay 80 to 99 mm

    Asphalt Overlay > 99 mm

    Mill and Replace

    Bonded Concrete Overlay

    Unbounded Concrete Overlay

    Concrete Pavement #N/A #N/A #N/A #N/A #N/A Concrete Slab Replacement

    Restoration Concrete Slab Repair

    Concrete Diamond Grinding

    Reconstruction 23.30 1.44 85.17 19.29 88 Reconstruction Unsealed

    Reconstruction Block

    Reconstruction Bituminous

    Reconstruction Concrete

  • 7/29/2019 ROCKS - Documentation - Annex 1 - Set of Statistics Reports (Version 2.01)

    8/17

    ROCKS - Road Costs Knowledge S

    Scenario: Latin America and Caribbean - Two Lane Roads

    Costs per Km Statistics (2000 US$/km)

    Work Category Work Class Work Type Average Minimum Maximum St Dev. Count Predominant Work Activ

    Preservation Routine Routine Maintenance 1879 695 5193 1047 21 Routine Maintenance 1L

    Routine Maintenance Un

    Routine Maintenance Blo

    Routine Maintenance Bit

    Routine Maintenance Co

    Routine Maintenance Bit

    Routine Maintenance Co

    Routine Maintenance Bit

    Routine Maintenance Co

    Periodic Grading 192 51 591 167 15 Light Grading

    Heavy Grading

    Gravel Resurfacing 10702 4268 22253 5470 13 Regravelling

    Concrete Pavement #N/A #N/A #N/A #N/A #N/A Concrete Pavement Prev

    Preventive Treatment

    Bituminous Pavement 9850 4353 15346 7773 2 Fog Seal

    Preventive Treatment Rejuvenation

    Unsealed #N/A #N/A #N/A #N/A #N/A Unsealed Preventive Tre

    Preventive Treatment

    Surface Treatment 22762 5917 44794 9928 45 Slurry Seal or Cape Sea

    Resurfacing Single Surface Treatmen

    Double Surface Treatme

    Triple Surface Treatmen

    Asphalt Mix 71033 29289 121070 25565 34 Asphalt Overlay < 40 mm

    Resurfacing Asphalt Overlay 40 to 59

    Rehabilitation Strengthening 128282 67592 223749 35148 29 Asphalt Overlay 60 to 79

    Asphalt Overlay 80 to 99

    Asphalt Overlay > 99 mm

    Mill and Replace

    Bonded Concrete Overla

    Unbounded Concrete Ov

    Concrete Pavement #N/A #N/A #N/A #N/A #N/A Concrete Slab Replacem

    Restoration Concrete Slab Repair

    Concrete Diamond Grind

    Reconstruction 177205 36974 574952 95090 45 Reconstruction Unsealed

    Reconstruction Block

    Reconstruction BituminoReconstruction Concrete

    Development Improvement Partial Widening #N/A #N/A #N/A #N/A #N/A Partial Widening to Unse

    Partial Widening to Bloc

    Partial Widening to Bitum

    Partial Widening to Conc

    Partial Widening and #N/A #N/A #N/A #N/A #N/A Partial Widening to Unse

    Reconstruction Partial Widening to Bloc

    Partial Widening to Bitum

    Partial Widening to Conc

    Widening #N/A #N/A #N/A #N/A #N/A Widening Adding Bitumin

    Widening Adding Bitumin

    Widening Adding BituminWidening Adding Concre

    Widening Adding Concre

  • 7/29/2019 ROCKS - Documentation - Annex 1 - Set of Statistics Reports (Version 2.01)

    9/17

    ROCKS - Road Costs Knowledge Sys

    Scenario: Latin America and Caribbean - Two Lane Roads

    Costs per M2 Statistics (2000 US$/m2)

    Work Category Work Class Work Type Average Minimum Maximum St Dev. Count Predominant Work Activity

    Preservation Periodic Gravel Resurfacing 1.76 0.71 3.71 0.91 13 Regravelling

    Concrete Pavement #N/A #N/A #N/A #N/A #N/A Concrete Pavement Preventive

    Preventive Treatment

    Bituminous Pavement 1.39 0.67 2.10 1.01 2 Fog Seal

    Preventive Treatment Rejuvenation

    Unsealed #N/A #N/A #N/A #N/A #N/A Unsealed Preventive Treatmen

    Preventive Treatment

    Surface Treatment 3.11 0.81 6.14 1.36 45 Slurry Seal or Cape Seal

    Resurfacing Single Surface Treatment

    Double Surface Treatment

    Triple Surface Treatment

    Asphalt Mix 9.87 4.01 16.58 3.58 33 Asphalt Overlay < 40 mm

    Resurfacing Asphalt Overlay 40 to 59 mm

    Rehabilitation Strengthening 17.62 9.26 31.96 4.95 29 Asphalt Overlay 60 to 79 mm

    Asphalt Overlay 80 to 99 mm

    Asphalt Overlay > 99 mm

    Mill and Replace

    Bonded Concrete Overlay

    Unbounded Concrete Overlay

    Concrete Pavement #N/A #N/A #N/A #N/A #N/A Concrete Slab Replacement

    Restoration Concrete Slab Repair

    Concrete Diamond Grinding

    Reconstruction 25.14 8.79 78.76 12.39 45 Reconstruction Unsealed

    Reconstruction BlockReconstruction Bituminous

    Reconstruction Concrete

  • 7/29/2019 ROCKS - Documentation - Annex 1 - Set of Statistics Reports (Version 2.01)

    10/17

    ROCKS - Road Costs Knowledge S

    Scenario: Eastern Europe and Middle East - Two Lane Roads

    Costs per Km Statistics (2000 US$/km)

    Work Category Work Class Work Type Average Minimum Maximum St Dev. Count Predominant Work Activ

    Preservation Routine Routine Maintenance 1808 1808 1808 #DIV/0! 1 Routine Maintenance 1L

    Routine Maintenance Un

    Routine Maintenance Blo

    Routine Maintenance Bit

    Routine Maintenance Co

    Routine Maintenance Bit

    Routine Maintenance Co

    Routine Maintenance Bit

    Routine Maintenance Co

    Periodic Grading #N/A #N/A #N/A #N/A #N/A Light Grading

    Heavy Grading

    Gravel Resurfacing #N/A #N/A #N/A #N/A #N/A Regravelling

    Concrete Pavement #N/A #N/A #N/A #N/A #N/A Concrete Pavement Prev

    Preventive Treatment

    Bituminous Pavement 9206 5158 13350 2497 10 Fog Seal

    Preventive Treatment Rejuvenation

    Unsealed #N/A #N/A #N/A #N/A #N/A Unsealed Preventive Tre

    Preventive Treatment

    Surface Treatment 24019 8481 45277 10151 15 Slurry Seal or Cape Sea

    Resurfacing Single Surface Treatmen

    Double Surface Treatme

    Triple Surface Treatmen

    Asphalt Mix 57698 25877 108476 25180 17 Asphalt Overlay < 40 mm

    Resurfacing Asphalt Overlay 40 to 59

    Rehabilitation Strengthening 115679 35775 252349 48793 61 Asphalt Overlay 60 to 79

    Asphalt Overlay 80 to 99

    Asphalt Overlay > 99 mm

    Mill and Replace

    Bonded Concrete Overla

    Unbounded Concrete Ov

    Concrete Pavement #N/A #N/A #N/A #N/A #N/A Concrete Slab Replacem

    Restoration Concrete Slab Repair

    Concrete Diamond Grind

    Reconstruction 244525 62807 666219 134288 180 Reconstruction Unsealed

    Reconstruction Block

    Reconstruction BituminoReconstruction Concrete

    Development Improvement Partial Widening 144230 144230 144230 #DIV/0! 1 Partial Widening to Unse

    Partial Widening to Bloc

    Partial Widening to Bitum

    Partial Widening to Conc

    Partial Widening and #N/A #N/A #N/A #N/A #N/A Partial Widening to Unse

    Reconstruction Partial Widening to Bloc

    Partial Widening to Bitum

    Partial Widening to Conc

    Widening #N/A #N/A #N/A #N/A #N/A Widening Adding Bitumi

    Widening Adding Bitumi

    Widening Adding BitumiWidening Adding Concre

    Widening Adding Concre

  • 7/29/2019 ROCKS - Documentation - Annex 1 - Set of Statistics Reports (Version 2.01)

    11/17

    ROCKS - Road Costs Knowledge Sys

    Scenario: Eastern Europe and Middle East - Two Lane Roads

    Costs per M2 Statistics (2000 US$/m2)

    Work Category Work Class Work Type Average Minimum Maximum St Dev. Count Predominant Work Activity

    Preservation Periodic Gravel Resurfacing #N/A #N/A #N/A #N/A #N/A Regravelling

    Concrete Pavement #N/A #N/A #N/A #N/A #N/A Concrete Pavement Preventive

    Preventive Treatment

    Bituminous Pavement 1.32 0.74 1.91 0.36 10 Fog Seal

    Preventive Treatment Rejuvenation

    Unsealed #N/A #N/A #N/A #N/A #N/A Unsealed Preventive Treatmen

    Preventive Treatment

    Surface Treatment 3.37 1.16 6.04 1.39 15 Slurry Seal or Cape Seal

    Resurfacing Single Surface Treatment

    Double Surface Treatment

    Triple Surface Treatment

    Asphalt Mix 8.12 3.45 15.50 3.71 16 Asphalt Overlay < 40 mm

    Resurfacing Asphalt Overlay 40 to 59 mm

    Rehabilitation Strengthening 16.36 5.11 36.05 6.99 61 Asphalt Overlay 60 to 79 mm

    Asphalt Overlay 80 to 99 mm

    Asphalt Overlay > 99 mm

    Mill and Replace

    Bonded Concrete Overlay

    Unbounded Concrete Overlay

    Concrete Pavement #N/A #N/A #N/A #N/A #N/A Concrete Slab Replacement

    Restoration Concrete Slab Repair

    Concrete Diamond Grinding

    Reconstruction 34.82 11.11 95.17 19.12 180 Reconstruction Unsealed

    Reconstruction BlockReconstruction Bituminous

    Reconstruction Concrete

  • 7/29/2019 ROCKS - Documentation - Annex 1 - Set of Statistics Reports (Version 2.01)

    12/17

    ROCKS - Road Costs Knowledge Sy

    Scenario: All World Regions - Two Lane Roads

    Average Costs per Km per Cost Type (2000 US$/k

    Estimate Contract Actual

    Work Type Routine Maintenance 1497 2768 2338

    Grading 265 0 108Gravel Resurfacing 28096 13404 9389

    Concrete Pavement Preventive Treatment #N/A #N/A #N/A

    Bituminous Pavement Preventive Treatment 8578 8745 5752

    Unsealed Preventive Treatment 4607 4224 4116

    Surface Treatment Resurfacing 20799 15963 27444

    Asphalt Mix Resurfacing 75102 50903 70640

    Strengthening 120078 112433 115698

    Concrete Pavement Restoration #N/A #N/A #N/A

    Reconstruction 211635 190247 248111

    Partial Widening 153422 135964 155897

    Partial Widening and Reconstruction 378160 0 0

    Widening 0 486930 0

    Widening and Reconstruction 1081793 1040138 640142

    Upgrading 283932 220325 262284

    New 1L Road #N/A #N/A #N/ANew 2L Highway 1117428 1262273 1157435

    New 4L Highway #N/A #N/A #N/A

    New 6L Highway #N/A #N/A #N/A

    New 4L Expressway #N/A #N/A #N/A

    New 6L Expressway #N/A #N/A #N/A

    Predominant Work Activity Routine Maintenance 1L Road #N/A #N/A #N/A

    Routine Maintenance Unsealed 2L Highway 525 1740 1541

    Routine Maintenance Block 2L Highway #N/A #N/A #N/A

    Routine Maintenance Bituminous 2L Highway 1674 2837 2869

    Routine Maintenance Concrete 2L Highway #N/A #N/A #N/A

    Routine Maintenance Bituminous > 2L Highway #N/A #N/A #N/A

    Routine Maintenance Concrete > 2L Highway #N/A #N/A #N/A

    Routine Maintenance Bituminous Expressway #N/A #N/A #N/A

    Routine Maintenance Concrete Expressway #N/A #N/A #N/ALight Grading 110 0 108

    Heavy Grading 522 0 0

    Regravelling 28096 13404 9389

    Concrete Pavement Preventive Treatment #N/A #N/A #N/A

    Fog Seal 9334 9385 7487

    Rejuvenation #N/A #N/A #N/A

    Unsealed Preventive Treatment 4607 4224 4116

    Slurry Seal or Cape Seal 12195 8359 0

    Single Surface Treatment 17906 15487 23064

    Double Surface Treatment 26772 24675 32371

    Triple Surface Treatment #N/A #N/A #N/A

    Asphalt Overlay < 40 mm 42016 34828 0

    Asphalt Overlay 40 to 59 mm 80806 54476 70640

    Asphalt Overlay 60 to 79 mm 87633 80947 73519

    Asphalt Overlay 80 to 99 mm 111881 114695 134885Asphalt Overlay > 99 mm 141700 134005 135892

    Mill and Replace #N/A #N/A #N/A

    Bonded Concrete Overlay #N/A #N/A #N/A

    Unbounded Concrete Overlay #N/A #N/A #N/A

    Concrete Slab Replacement #N/A #N/A #N/A

    Concrete Slab Repair #N/A #N/A #N/A

    Concrete Diamond Grinding #N/A #N/A #N/A

    Reconstruction Unsealed 93207 34142 32536

    Reconstruction Block #N/A #N/A #N/A

    Reconstruction Bituminous 210382 208715 264642

    Reconstruction Concrete 281349 244879 227845

    Partial Widening to Unsealed 2L #N/A #N/A #N/A

    Partial Widening to Block 2L #N/A #N/A #N/A

    Partial Widening to Bituminous 2L 153422 135964 155897

    Partial Widening to Concrete 2L #N/A #N/A #N/A

    Partial Widening to Unsealed 2L and Reconstruction #N/A #N/A #N/A

    Partial Widening to Block 2L and Reconstruction #N/A #N/A #N/A

    Partial Widening to Bituminous 2L and Reconstruction 378160 0 0

  • 7/29/2019 ROCKS - Documentation - Annex 1 - Set of Statistics Reports (Version 2.01)

    13/17

    ROCKS - Road Costs Knowledge Sy

    Scenario: All World Regions - Two Lane Roads

    Average Costs per Km per Cost Source (2000 US$/

    Section Program

    Work Type Routine Maintenance 2229 1983

    Grading 496 216Gravel Resurfacing 16021 11610

    Concrete Pavement Preventive Treatment #N/A #N/A

    Bituminous Pavement Preventive Treatment 7943 6896

    Unsealed Preventive Treatment 4266 0

    Surface Treatment Resurfacing 18098 21680

    Asphalt Mix Resurfacing 63147 66807

    Strengthening 115531 118761

    Concrete Pavement Restoration #N/A #N/A

    Reconstruction 224975 188559

    Partial Widening 149930 155897

    Partial Widening and Reconstruction 384072 307222

    Widening 486930 0

    Widening and Reconstruction 1090091 467412

    Upgrading 261362 239669

    New 1L Road #N/A #N/ANew 2L Highway 1194210 1108391

    New 4L Highway #N/A #N/A

    New 6L Highway #N/A #N/A

    New 4L Expressway #N/A #N/A

    New 6L Expressway #N/A #N/A

    Predominant Work Activity Routine Maintenance 1L Road #N/A #N/A

    Routine Maintenance Unsealed 2L Highway 1727 694

    Routine Maintenance Block 2L Highway #N/A #N/A

    Routine Maintenance Bituminous 2L Highway 2429 2167

    Routine Maintenance Concrete 2L Highway #N/A #N/A

    Routine Maintenance Bituminous > 2L Highway #N/A #N/A

    Routine Maintenance Concrete > 2L Highway #N/A #N/A

    Routine Maintenance Bituminous Expressway #N/A #N/A

    Routine Maintenance Concrete Expressway #N/A #N/ALight Grading 116 110

    Heavy Grading 876 451

    Regravelling 16021 11610

    Concrete Pavement Preventive Treatment #N/A #N/A

    Fog Seal 9734 7372

    Rejuvenation #N/A #N/A

    Unsealed Preventive Treatment 4266 0

    Slurry Seal or Cape Seal 8071 12266

    Single Surface Treatment 15859 19514

    Double Surface Treatment 26000 27855

    Triple Surface Treatment #N/A #N/A

    Asphalt Overlay < 40 mm 34828 42016

    Asphalt Overlay 40 to 59 mm 67192 70742

    Asphalt Overlay 60 to 79 mm 78182 85183

    Asphalt Overlay 80 to 99 mm 119628 118364

    Asphalt Overlay > 99 mm 141340 134456

    Mill and Replace #N/A #N/A

    Bonded Concrete Overlay #N/A #N/A

    Unbounded Concrete Overlay #N/A #N/A

    Concrete Slab Replacement #N/A #N/A

    Concrete Slab Repair #N/A #N/A

    Concrete Diamond Grinding #N/A #N/A

    Reconstruction Unsealed 34315 44830

    Reconstruction Block #N/A #N/A

    Reconstruction Bituminous 238729 194610

    Reconstruction Concrete 252777 0

    Partial Widening to Unsealed 2L #N/A #N/A

    Partial Widening to Block 2L #N/A #N/A

    Partial Widening to Bituminous 2L 149930 155897

    Partial Widening to Concrete 2L #N/A #N/A

    Partial Widening to Unsealed 2L and Reconstruction #N/A #N/A

    Partial Widening to Block 2L and Reconstruction #N/A #N/A

    Partial Widening to Bituminous 2L and Reconstruction 384072 307222

  • 7/29/2019 ROCKS - Documentation - Annex 1 - Set of Statistics Reports (Version 2.01)

    14/17

    ROCKS - Road Costs Knowledge Sy

    Scenario: All World Regions - Two Lane Roads

    Average Costs per Km per Year (2000 US$/km)

    1994 1995 1996 1997

    Work Type Routine Maintenance 1472 1062 1810 1408

    Grading 430 0 332 353

    Gravel Resurfacing 6901 37278 12303 9739

    Concrete Pavement Preventive Treatment #N/A #N/A #N/A #N/A

    Bituminous Pavement Preventive Treatment 0 0 6238 11167

    Unsealed Preventive Treatment 0 0 0 4342

    Surface Treatment Resurfacing 23152 33352 19212 22652

    Asphalt Mix Resurfacing 76042 93804 79479 57400

    Strengthening 124669 136023 121299 115572

    Concrete Pavement Restoration #N/A #N/A #N/A #N/A

    Reconstruction 177750 210218 219928 219258

    Partial Widening 0 0 145930 0

    Partial Widening and Reconstruction 0 0 0 0

    Widening 0 0 0 0

    Widening and Reconstruction 0 509864 0 578622

    Upgrading 169615 137855 208020 398477

    New 1L Road #N/A #N/A #N/A #N/ANew 2L Highway 1386459 932408 1003039 0 1

    New 4L Highway #N/A #N/A #N/A #N/A

    New 6L Highway #N/A #N/A #N/A #N/A

    New 4L Expressway #N/A #N/A #N/A #N/A

    New 6L Expressway #N/A #N/A #N/A #N/A

    Predominant Work Activity Routine Maintenance 1L Road #N/A #N/A #N/A #N/A

    Routine Maintenance Unsealed 2L Highway 0 316 754 0

    Routine Maintenance Block 2L Highway #N/A #N/A #N/A #N/A

    Routine Maintenance Bituminous 2L Highway 1472 1808 2514 1408

    Routine Maintenance Concrete 2L Highway #N/A #N/A #N/A #N/A

    Routine Maintenance Bituminous > 2L Highway #N/A #N/A #N/A #N/A

    Routine Maintenance Concrete > 2L Highway #N/A #N/A #N/A #N/A

    Routine Maintenance Bituminous Expressway #N/A #N/A #N/A #N/A

    Routine Maintenance Concrete Expressway #N/A #N/A #N/A #N/ALight Grading 0 0 80 91

    Heavy Grading 430 0 501 876

    Regravelling 6901 37278 12303 9739

    Concrete Pavement Preventive Treatment #N/A #N/A #N/A #N/A

    Fog Seal 0 0 4105 11167

    Rejuvenation #N/A #N/A #N/A #N/A

    Unsealed Preventive Treatment 0 0 0 4342

    Slurry Seal or Cape Seal 0 0 14159 9841

    Single Surface Treatment 16813 29693 20131 18180

    Double Surface Treatment 31605 40669 30695 31337

    Triple Surface Treatment #N/A #N/A #N/A #N/A

    Asphalt Overlay < 40 mm 0 0 55158 37982

    Asphalt Overlay 40 to 59 mm 76042 93804 81156 64681

    Asphalt Overlay 60 to 79 mm 0 80790 129433 79444

    Asphalt Overlay 80 to 99 mm 119592 133744 124369 105651Asphalt Overlay > 99 mm 144979 173896 109557 159416

    Mill and Replace #N/A #N/A #N/A #N/A

    Bonded Concrete Overlay #N/A #N/A #N/A #N/A

    Unbounded Concrete Overlay #N/A #N/A #N/A #N/A

    Concrete Slab Replacement #N/A #N/A #N/A #N/A

    Concrete Slab Repair #N/A #N/A #N/A #N/A

    Concrete Diamond Grinding #N/A #N/A #N/A #N/A

    Reconstruction Unsealed 55075 0 43557 0

    Reconstruction Block #N/A #N/A #N/A #N/A

    Reconstruction Bituminous 194600 211846 236833 220707

    Reconstruction Concrete 199322 182550 205553 170729

    Partial Widening to Unsealed 2L #N/A #N/A #N/A #N/A

    Partial Widening to Block 2L #N/A #N/A #N/A #N/A

    Partial Widening to Bituminous 2L 0 0 145930 0

    Partial Widening to Concrete 2L #N/A #N/A #N/A #N/APartial Widening to Unsealed 2L and Reconstruction #N/A #N/A #N/A #N/A

    Partial Widening to Block 2L and Reconstruction #N/A #N/A #N/A #N/A

    Partial Widening to Bituminous 2L and Reconstruction 0 0 0 0

  • 7/29/2019 ROCKS - Documentation - Annex 1 - Set of Statistics Reports (Version 2.01)

    15/17

    ROCKS - Road Costs Knowledge Sy

    Scenario: All World Regions - Two Lane Roads

    Average Costs per Km per Terrain (2000 US$/km

    Flat Rolling Hilly Mountainous

    Work Type Routine Maintenance 2194 2876 1916 #N/A

    Grading 0 0 0 #N/AGravel Resurfacing 30716 31340 21773 #N/A

    Concrete Pavement Preventive Treatment #N/A #N/A #N/A #N/A

    Bituminous Pavement Preventive Treatment 9656 10639 0 #N/A

    Unsealed Preventive Treatment 3722 4511 4077 #N/A

    Surface Treatment Resurfacing 24569 12970 0 #N/A

    Asphalt Mix Resurfacing 0 0 0 #N/A

    Strengthening 106428 141886 0 #N/A

    Concrete Pavement Restoration #N/A #N/A #N/A #N/A

    Reconstruction 235495 371777 0 #N/A

    Partial Widening 0 156486 144230 #N/A

    Partial Widening and Reconstruction 0 0 0 #N/A

    Widening 0 0 0 #N/A

    Widening and Reconstruction 0 1160071 0 #N/A

    Upgrading 239906 396942 332971 #N/A

    New 1L Road #N/A #N/A #N/A #N/ANew 2L Highway 1367863 0 0 #N/A

    New 4L Highway #N/A #N/A #N/A #N/A

    New 6L Highway #N/A #N/A #N/A #N/A

    New 4L Expressway #N/A #N/A #N/A #N/A

    New 6L Expressway #N/A #N/A #N/A #N/A

    Predominant Work Activity Routine Maintenance 1L Road #N/A #N/A #N/A #N/A

    Routine Maintenance Unsealed 2L Highway 0 1727 0 #N/A

    Routine Maintenance Block 2L Highway #N/A #N/A #N/A #N/A

    Routine Maintenance Bituminous 2L Highway 2194 3163 1916 #N/A

    Routine Maintenance Concrete 2L Highway #N/A #N/A #N/A #N/A

    Routine Maintenance Bituminous > 2L Highway #N/A #N/A #N/A #N/A

    Routine Maintenance Concrete > 2L Highway #N/A #N/A #N/A #N/A

    Routine Maintenance Bituminous Expressway #N/A #N/A #N/A #N/A

    Routine Maintenance Concrete Expressway #N/A #N/A #N/A #N/ALight Grading 0 0 0 #N/A

    Heavy Grading 0 0 0 #N/A

    Regravelling 30716 31340 21773 #N/A

    Concrete Pavement Preventive Treatment #N/A #N/A #N/A #N/A

    Fog Seal 9656 10639 0 #N/A

    Rejuvenation #N/A #N/A #N/A #N/A

    Unsealed Preventive Treatment 3722 4511 4077 #N/A

    Slurry Seal or Cape Seal 0 12970 0 #N/A

    Single Surface Treatment 14861 0 0 #N/A

    Double Surface Treatment 29423 0 0 #N/A

    Triple Surface Treatment #N/A #N/A #N/A #N/A

    Asphalt Overlay < 40 mm 0 0 0 #N/A

    Asphalt Overlay 40 to 59 mm 0 0 0 #N/A

    Asphalt Overlay 60 to 79 mm 72611 91905 0 #N/A

    Asphalt Overlay 80 to 99 mm 108857 241847 0 #N/AAsphalt Overlay > 99 mm 133573 0 0 #N/A

    Mill and Replace #N/A #N/A #N/A #N/A

    Bonded Concrete Overlay #N/A #N/A #N/A #N/A

    Unbounded Concrete Overlay #N/A #N/A #N/A #N/A

    Concrete Slab Replacement #N/A #N/A #N/A #N/A

    Concrete Slab Repair #N/A #N/A #N/A #N/A

    Concrete Diamond Grinding #N/A #N/A #N/A #N/A

    Reconstruction Unsealed 0 93207 0 #N/A

    Reconstruction Block #N/A #N/A #N/A #N/A

    Reconstruction Bituminous 232857 402730 0 #N/A

    Reconstruction Concrete 370876 0 0 #N/A

    Partial Widening to Unsealed 2L #N/A #N/A #N/A #N/A

    Partial Widening to Block 2L #N/A #N/A #N/A #N/A

    Partial Widening to Bituminous 2L 0 156486 144230 #N/A

    Partial Widening to Concrete 2L #N/A #N/A #N/A #N/APartial Widening to Unsealed 2L and Reconstruction #N/A #N/A #N/A #N/A

    Partial Widening to Block 2L and Reconstruction #N/A #N/A #N/A #N/A

    Partial Widening to Bituminous 2L and Reconstruction 0 0 0 #N/A

  • 7/29/2019 ROCKS - Documentation - Annex 1 - Set of Statistics Reports (Version 2.01)

    16/17

    ROCKS - Road Costs Knowledg

    Scenario: All World Regions - Two Lane Roads

    Average Costs per Km per World Region (2

    South

    America

    Central

    America

    North

    America Caribbean South

    Work Type Routine Maintenance 1837 2127 #N/A 0

    Grading 152 354 #N/A 0

    Gravel Resurfacing 10268 13088 #N/A 0 3

    Concrete Pavement Preventive Treatment #N/A #N/A #N/A #N/A

    Bituminous Pavement Preventive Treatment 15346 4353 #N/A 0

    Unsealed Preventive Treatment 0 0 #N/A 0

    Surface Treatment Resurfacing 22317 24663 #N/A 21229 2

    Asphalt Mix Resurfacing 73810 67796 #N/A 33505 8

    Strengthening 122822 145170 #N/A 179644 10

    Concrete Pavement Restoration #N/A #N/A #N/A #N/A

    Reconstruction 181263 132944 #N/A 329773 28

    Partial Widening 0 0 #N/A 0 15

    Partial Widening and Reconstruction 0 0 #N/A 0 37

    Widening 0 0 #N/A 0

    Widening and Reconstruction 656830 1056388 #N/A 0 103Upgrading 264449 439628 #N/A 307822 6

    New 1L Road #N/A #N/A #N/A #N/A

    New 2L Highway 0 0 #N/A 0 85

    New 4L Highway #N/A #N/A #N/A #N/A

    New 6L Highway #N/A #N/A #N/A #N/A

    New 4L Expressway #N/A #N/A #N/A #N/A

    New 6L Expressway #N/A #N/A #N/A #N/A

    Predominant Work Activity Routine Maintenance 1L Road #N/A #N/A #N/A #N/A

    Routine Maintenance Unsealed 2L Highway 1368 0 #N/A 0

    Routine Maintenance Block 2L Highway #N/A #N/A #N/A #N/A

    Routine Maintenance Bituminous 2L Highway 1865 2127 #N/A 0

    Routine Maintenance Concrete 2L Highway #N/A #N/A #N/A #N/A

    Routine Maintenance Bituminous > 2L Highway #N/A #N/A #N/A #N/A

    Routine Maintenance Concrete > 2L Highway #N/A #N/A #N/A #N/ARoutine Maintenance Bituminous Expressway #N/A #N/A #N/A #N/A

    Routine Maintenance Concrete Expressway #N/A #N/A #N/A #N/A

    Light Grading 97 147 #N/A 0

    Heavy Grading 426 457 #N/A 0

    Regravelling 10268 13088 #N/A 0 3

    Concrete Pavement Preventive Treatment #N/A #N/A #N/A #N/A

    Fog Seal 15346 4353 #N/A 0

    Rejuvenation #N/A #N/A #N/A #N/A

    Unsealed Preventive Treatment 0 0 #N/A 0

    Slurry Seal or Cape Seal 11787 0 #N/A 0

    Single Surface Treatment 19095 21499 #N/A 0 2

    Double Surface Treatment 29049 30991 #N/A 21229 1

    Triple Surface Treatment #N/A #N/A #N/A #N/A

    Asphalt Overlay < 40 mm 44583 49822 #N/A 0 3

    Asphalt Overlay 40 to 59 mm 83552 72931 #N/A 33505 8

    Asphalt Overlay 60 to 79 mm 0 0 #N/A 0 9Asphalt Overlay 80 to 99 mm 115528 145170 #N/A 179644 10

    Asphalt Overlay > 99 mm 135790 0 #N/A 0 17

    Mill and Replace #N/A #N/A #N/A #N/A

    Bonded Concrete Overlay #N/A #N/A #N/A #N/A

    Unbounded Concrete Overlay #N/A #N/A #N/A #N/A

    Concrete Slab Replacement #N/A #N/A #N/A #N/A

    Concrete Slab Repair #N/A #N/A #N/A #N/A

    Concrete Diamond Grinding #N/A #N/A #N/A #N/A

    Reconstruction Unsealed 0 0 #N/A 0

    Reconstruction Block #N/A #N/A #N/A #N/A

    Reconstruction Bituminous 181263 132944 #N/A 329773 28

    Reconstruction Concrete 0 0 #N/A 0

    Partial Widening to Unsealed 2L #N/A #N/A #N/A #N/A

    Partial Widening to Block 2L #N/A #N/A #N/A #N/A

    Partial Widening to Bituminous 2L 0 0 #N/A 0 15Partial Widening to Concrete 2L #N/A #N/A #N/A #N/A

    Partial Widening to Unsealed 2L and Reconstruction #N/A #N/A #N/A #N/A

    Partial Widening to Block 2L and Reconstruction #N/A #N/A #N/A #N/A

  • 7/29/2019 ROCKS - Documentation - Annex 1 - Set of Statistics Reports (Version 2.01)

    17/17

    ROCKS - Road Costs Knowledge System

    Scenario: All World Regions

    Road Work Cost Details (% of Road Work Cost)Mobilization (%): 2.8%

    Demolition and Site Clearance (%): 1.7%

    Earthworks (%): 5.2%

    Drainage,P Works,Culv.&Min. Bridges (%): 5.2% Drainage and Protective Works(%): 3.4%

    Major Bridges and Structures (%): 2.5% Culverts and Minor Bridges (%): 2.5%

    Accesses and Junctions (%): 0.1%

    Pavement Courses (%): 54.7% Surface (%): 38.9%

    Shoulder Works (%): 8.1% Subbase and Base (%): 15.9%

    Line Markings and Signs (%): 6.5% Subbase (%): 3.1%

    Environment (%): 0.1% Base (%): 9.3%

    Dayworks (%): 0.9%

    Other (%): 1.0%

    Contingencies (%): 4.6%

    Taxes (%): 6.6%

    Total (%): 100.0%

    Labor (%): 14.3%Materials (%): 37.8%

    Equipment (%): 47.8%

    Total (%): 100.0%

    Foreign Currency (%): 4.9%

    Other Additional Road Agency Costs (% of Road Work Cost)Land Acquisition (%): 4.6% Design (%): 5.7%

    Resettlement (%): 3.0% Supervision (%): 7.4%

    Land Acquisition & Resettlement (%): 12.3%