ROCKAWAY BOARDWALK Construction Meeting March 19, 2014

ROCKAWAY BOARDWALK...CB14 Meeting: Design Presentation and Construction Management Overview February 6, 2014 Conceptual Plan Public Meeting February 13, 2014 Employment Opportunities

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ROCKAWAY BOARDWALK...CB14 Meeting: Design Presentation and Construction Management Overview February 6, 2014 Conceptual Plan Public Meeting February 13, 2014 Employment Opportunities

ROCKAWAY BOARDWALK Construction Meeting March 19, 2014

Page 2: ROCKAWAY BOARDWALK...CB14 Meeting: Design Presentation and Construction Management Overview February 6, 2014 Conceptual Plan Public Meeting February 13, 2014 Employment Opportunities

Introduction

Page 3: ROCKAWAY BOARDWALK...CB14 Meeting: Design Presentation and Construction Management Overview February 6, 2014 Conceptual Plan Public Meeting February 13, 2014 Employment Opportunities

Meeting Date

September 17, 2013 CB14 Parks Committee Presentation: Background and Constraints

September 23/24/25, 2013 Neighborhood Listening Sessions: Access, Surface, Recreation and Boardwalk Design

October 8, 2013 Full CB14 Meeting: Update and General Design Principles

October 23, 2013 Community Listening Session: Access, Surface and Amenities

November 6, 2013 Conceptual Plan Workshop: Recreation, Access, Natural Resources and Resiliency

November 18, 2013 CB14 Parks Committee Presentation: Preliminary Architectural Concepts

November 25, 2013 Conceptual Plan Workshop: Recreation, Access, Natural Resources and Resiliency

December 5, 2013 Conceptual Plan Workshop: Opportunity Sites

December 17, 2013 Full CB14 Meeting: Engineering and Pile Update and Phasing Overview

January 14, 2014 CB14 Meeting: Design Presentation and Construction Management Overview

February 6, 2014 Conceptual Plan Public Meeting

February 13, 2014 Employment Opportunities Outreach Meeting #1

February 27, 2014 Phase 3 Design Meeting with Local Stakeholders

March 5, 2014 Employment Opportunities Outreach Meeting #2

March 19, 2014 Construction Logistics Meeting #1

March 24, 2014 CB14 Parks Committee Presentation: Conceptual Plan

March 26, 2014 Employment Opportunities Outreach Meeting #3

Community Input

Page 4: ROCKAWAY BOARDWALK...CB14 Meeting: Design Presentation and Construction Management Overview February 6, 2014 Conceptual Plan Public Meeting February 13, 2014 Employment Opportunities

• Construction Logistics • Construction Logistics Q+A • Phase 1 and 2 Access Review

Agenda

Page 5: ROCKAWAY BOARDWALK...CB14 Meeting: Design Presentation and Construction Management Overview February 6, 2014 Conceptual Plan Public Meeting February 13, 2014 Employment Opportunities

ROCKAWAY BOARDWALK

PROJECT INFORMATIONAL SESSION Phases 1 and 2 Construction Logistics March 19, 2014

Page 6: ROCKAWAY BOARDWALK...CB14 Meeting: Design Presentation and Construction Management Overview February 6, 2014 Conceptual Plan Public Meeting February 13, 2014 Employment Opportunities

Construction Phases

Phase 1 B86 – B97

Phase 2 B97-B107

Phase 3A B106-B115 Phase 3B B117-B126

Phase 4A B73-B86 Phase 4B B60-B73

Phase 5A B39-B60 Phase 5B B19-B39

Phase: Phase 1 (B86-B97): Phase 2 (B97-B107):

Start: April 2014 June 2014

Completion: Memorial Day 2015 July 4, 2015

Page 7: ROCKAWAY BOARDWALK...CB14 Meeting: Design Presentation and Construction Management Overview February 6, 2014 Conceptual Plan Public Meeting February 13, 2014 Employment Opportunities

Phase 1 and Phase 2 Coordination Items

− All work contained within fully enclosed work areas.

− All work areas surrounded by an 8’-0” high chain link fence.

− Existing beach access locations at B86, B90, B92, B94, B96, B101, B103, and B106 will be maintained.

− When required to safeguard the public, a single beach access point will be closed to allow the work to progress.

Page 8: ROCKAWAY BOARDWALK...CB14 Meeting: Design Presentation and Construction Management Overview February 6, 2014 Conceptual Plan Public Meeting February 13, 2014 Employment Opportunities

Phase 1 and Phase 2 Coordination Items

− All construction materials, equipment, worker parking, and delivery trucks will be contained within the fenced work areas.

− Flagmen to be utilized when construction equipment and deliveries are crossing the pedestrian path adjacent to Shore Front Parkway.

− Work Hours will be Monday – Friday, 7:00a.m.-4:00p.m.; Saturday makeup days in case of inclement weather.

Page 9: ROCKAWAY BOARDWALK...CB14 Meeting: Design Presentation and Construction Management Overview February 6, 2014 Conceptual Plan Public Meeting February 13, 2014 Employment Opportunities

Phase 1 and Phase 2 Coordination Items

− Sound and Vibration Monitoring.

− Watchmen Service for work areas.

− Skanska Offices: − Storefront − Site Trailers

− NYCEDC Primary Contact: Keith Dumanski Email: [email protected] Phone: 212-312-3819

Page 10: ROCKAWAY BOARDWALK...CB14 Meeting: Design Presentation and Construction Management Overview February 6, 2014 Conceptual Plan Public Meeting February 13, 2014 Employment Opportunities

Phase 1: B86-B97

Beach Access Locations

Chain Link Construction Fence Construction Gates Beach Access Locations at B90, B92 and B94

B94 B92 B90 B86

Page 11: ROCKAWAY BOARDWALK...CB14 Meeting: Design Presentation and Construction Management Overview February 6, 2014 Conceptual Plan Public Meeting February 13, 2014 Employment Opportunities

Phase 2: B97-B107

Beach Access Locations

Chain Link Construction Fence Construction Gates Beach Access Locations at B101 and B103

B101 B97

Page 12: ROCKAWAY BOARDWALK...CB14 Meeting: Design Presentation and Construction Management Overview February 6, 2014 Conceptual Plan Public Meeting February 13, 2014 Employment Opportunities

Phase 2: B97-B107

Beach Access Locations

B103

Chain Link Construction Fence Construction Gates Beach Access Locations at B101 and B103

B106

Page 13: ROCKAWAY BOARDWALK...CB14 Meeting: Design Presentation and Construction Management Overview February 6, 2014 Conceptual Plan Public Meeting February 13, 2014 Employment Opportunities

Existing Conditions

Existing Boardwalk Pile Caps and Pile Field

REMOVALS: 1. Remove Concrete Pile Caps 2. Remove Concrete Piles

Page 14: ROCKAWAY BOARDWALK...CB14 Meeting: Design Presentation and Construction Management Overview February 6, 2014 Conceptual Plan Public Meeting February 13, 2014 Employment Opportunities

Removals Work

Excavator Excavator with Hammer

Excavator with Shear Waterjetting

Page 15: ROCKAWAY BOARDWALK...CB14 Meeting: Design Presentation and Construction Management Overview February 6, 2014 Conceptual Plan Public Meeting February 13, 2014 Employment Opportunities

Pile Driving

1. Steel Pipe Piles for Boardwalk 2. Steel H Piles for Sand Retaining Wall

1. Precast Concrete Sand Retaining Wall

Sand Retaining Wall

Page 16: ROCKAWAY BOARDWALK...CB14 Meeting: Design Presentation and Construction Management Overview February 6, 2014 Conceptual Plan Public Meeting February 13, 2014 Employment Opportunities

Pile Driving Work

Vibratory Hammer Impact Hammer Impact Hammer

Page 17: ROCKAWAY BOARDWALK...CB14 Meeting: Design Presentation and Construction Management Overview February 6, 2014 Conceptual Plan Public Meeting February 13, 2014 Employment Opportunities

Precast Concrete Pile Caps

1. Sand Fill 2. Plumbing Pipe and Electrical Conduits

Utilities

1. Precast Concrete Pile Caps

Page 18: ROCKAWAY BOARDWALK...CB14 Meeting: Design Presentation and Construction Management Overview February 6, 2014 Conceptual Plan Public Meeting February 13, 2014 Employment Opportunities

Precast Concrete Planks

1. Precast Concrete Planks 2. Light Poles 3. Railings 4. Site Furnishings

Page 19: ROCKAWAY BOARDWALK...CB14 Meeting: Design Presentation and Construction Management Overview February 6, 2014 Conceptual Plan Public Meeting February 13, 2014 Employment Opportunities

Boardwalk Access

1. Access Stairs and Ramps 2. Site Work

Page 20: ROCKAWAY BOARDWALK...CB14 Meeting: Design Presentation and Construction Management Overview February 6, 2014 Conceptual Plan Public Meeting February 13, 2014 Employment Opportunities

Question and Answer Session

Page 21: ROCKAWAY BOARDWALK...CB14 Meeting: Design Presentation and Construction Management Overview February 6, 2014 Conceptual Plan Public Meeting February 13, 2014 Employment Opportunities

• Pre/Post Sandy Access Locations

Phase 1 and 2 Access Review

Page 22: ROCKAWAY BOARDWALK...CB14 Meeting: Design Presentation and Construction Management Overview February 6, 2014 Conceptual Plan Public Meeting February 13, 2014 Employment Opportunities

Pre-Sandy Configuration New Access Points

Access (Pre/Post Sandy) Phase 1

Page 23: ROCKAWAY BOARDWALK...CB14 Meeting: Design Presentation and Construction Management Overview February 6, 2014 Conceptual Plan Public Meeting February 13, 2014 Employment Opportunities

Access (Pre/Post Sandy) Phase 2

23

Page 24: ROCKAWAY BOARDWALK...CB14 Meeting: Design Presentation and Construction Management Overview February 6, 2014 Conceptual Plan Public Meeting February 13, 2014 Employment Opportunities

Wrap Up

24

Questions?