14
Timber Harvest Road Planning/Cost Estimation Form Landowner________________________________________ General Location__________________________________ County/State______________________________________ Date____________________________ Forester__________________________________________ 1. What is the current road situation? An adequate road exists----------------------------------Stop No road exists------------------------------------------------Proceed to part 2 Road exists, but needs upgrade/repair--------------Proceed to part 5 2. Plan for a new road (or section of road). Locate the desired road on topomap and attach map. Estimated length of road Traffic (comment on weight, quantity, and configuration) Width of Road Maximum desired grade of road Permanent or temporary Rock type & hardness expected (soil survey) 3. Are perennial stream crossings needed?___________ Stream width?______________ Traffic wt?___________ How many of the following are needed? Type Length/Quantity Expected cost range/crossing Est. Cost Total Ford 0 $500-1500/ford 750 0 Reinforced ford 0 $500-2500/ford 1500 0 Culvert (steel or plastic) 0 $400-2000/culvert 1200 0 Portable skidder bridges 0 $2000-10000/bridge 6000 0 Stringer bridges 0 $8000-50000/bridge 29000 0 Other options 0 0 0 4. New Construction Costs Easement costs 0 $? 0 0 Location & gradeline installation 0 $500-1500/mile 1000 0 Clearing & grubbing 0 $4000-7000/mile 5500 0 Cut & Fill slopes 0 $1500-2500/mile 2000 0 Ditch construction 0 $1200-2000/mile 1600 0 Shape final surface grade 0 $1000-2500/mile 1750 0 Water control broad based dips 0 $25-50/dip 35 0 water turnouts 0 $10-50/turnout 30 0 culvert install & cost 0 $280 install + pipe 0 0 Seeding banks 0 $300-500/mile 400 0 Tons of Gravel 0 $5-30/ton 10 0 5. Upgrade-repair-maintenance-existing road Ditch improvement/repair 0 $300-2000/mile 1150 0 Grade road 0 $300-2500/mile 1400 0 Improve water control broad based dips 0 $25-50/dip 35 0 water turnouts 0 $10-50/turnout 30 0 culvert install & costs 0 $280 install + pipe 0 0 Seeding 0 $300-500/mile 400 0 Tons of Gravel 0 $5-30/ton 10 0 6. Closure costs water bars 0 $15-30/bar 23 0 disc & seed 0 $400-800/mile 600 0 gates 0 $500-2000/each 1250 0 other 0 0 0 7. Other? 0 0 0 TOTAL ESTIMATED COSTS 0

Road Costing Spreadsheet.xls

  • Upload
    jaffna

  • View
    220

  • Download
    4

Embed Size (px)

Citation preview

Page 1: Road Costing Spreadsheet.xls

Timber Harvest Road Planning/Cost Estimation Form

Landowner________________________________________ General Location________________________________________

County/State______________________________________ Date____________________________

Forester__________________________________________

1. What is the current road situation?

An adequate road exists----------------------------------Stop

No road exists------------------------------------------------Proceed to part 2

Road exists, but needs upgrade/repair--------------Proceed to part 5

2. Plan for a new road (or section of road). Locate the desired road on topomap and attach map.

Estimated length of road

Traffic (comment on weight, quantity, and configuration)

Width of Road

Maximum desired grade of road

Permanent or temporary

Rock type & hardness expected (soil survey)

3. Are perennial stream crossings needed?___________ Stream width?______________ Traffic wt?___________

How many of the following are needed?

Type Length/Quantity Expected cost range/crossing Est. Cost Total

Ford 0 $500-1500/ford 750 0

Reinforced ford 0 $500-2500/ford 1500 0

Culvert (steel or plastic) 0 $400-2000/culvert 1200 0

Portable skidder bridges 0 $2000-10000/bridge 6000 0

Stringer bridges 0 $8000-50000/bridge 29000 0

Other options 0 0 0

4. New Construction Costs

Easement costs 0 $? 0 0

Location & gradeline installation 0 $500-1500/mile 1000 0

Clearing & grubbing 0 $4000-7000/mile 5500 0

Cut & Fill slopes 0 $1500-2500/mile 2000 0

Ditch construction 0 $1200-2000/mile 1600 0

Shape final surface grade 0 $1000-2500/mile 1750 0

Water control

broad based dips 0 $25-50/dip 35 0

water turnouts 0 $10-50/turnout 30 0

culvert install & cost 0 $280 install + pipe 0 0

Seeding banks 0 $300-500/mile 400 0

Tons of Gravel 0 $5-30/ton 10 0

5. Upgrade-repair-maintenance-existing road

Ditch improvement/repair 0 $300-2000/mile 1150 0

Grade road 0 $300-2500/mile 1400 0

Improve water control

broad based dips 0 $25-50/dip 35 0

water turnouts 0 $10-50/turnout 30 0

culvert install & costs 0 $280 install + pipe 0 0

Seeding 0 $300-500/mile 400 0

Tons of Gravel 0 $5-30/ton 10 0

6. Closure costs

water bars 0 $15-30/bar 23 0

disc & seed 0 $400-800/mile 600 0

gates 0 $500-2000/each 1250 0

other 0 0 0

7. Other? 0 0 0

TOTAL ESTIMATED COSTS 0

Page 2: Road Costing Spreadsheet.xls

Landowner________________________________________ General Location________________________________________

Page 3: Road Costing Spreadsheet.xls

Length Calculations

ENTER ENTER ENTER

FEET METERS MILES

0 0 0

MILES MILES FEET

0 0 0

Gravel Calculations (Gravel weights commonly range from 75-125lbs/ft3)

ENTER ENTER ENTER ENTER

LENGTH WIDTH DEPTH GRAVEL WEIGHT

(FEET) (FEET) (INCHES) (LBS/FT3)

0 0 0 100

TONS

GRAVEL

0

Page 4: Road Costing Spreadsheet.xls

0 0 0 0 0 0 0 0 0

500 500 400 2000 8000 4000 1500 1200 1000

525 525 425 2025 8100 4025 1525 1225 1025

550 550 450 2050 8200 4050 1550 1250 1050

575 575 475 2075 8300 4075 1575 1275 1075

600 600 500 2100 8400 4100 1600 1300 1100

625 625 525 2125 8500 4125 1625 1325 1125

650 650 550 2150 8600 4150 1650 1350 1150

675 675 575 2175 8700 4175 1675 1375 1175

700 700 600 2200 8800 4200 1700 1400 1200

725 725 625 2225 8900 4225 1725 1425 1225

750 750 650 2250 9000 4250 1750 1450 1250

775 775 675 2275 9100 4275 1775 1475 1275

800 800 700 2300 9200 4300 1800 1500 1300

825 825 725 2325 9300 4325 1825 1525 1325

850 850 750 2350 9400 4350 1850 1550 1350

875 875 775 2375 9500 4375 1875 1575 1375

900 900 800 2400 9600 4400 1900 1600 1400

925 925 825 2425 9700 4425 1925 1625 1425

950 950 850 2450 9800 4450 1950 1650 1450

975 975 875 2475 9900 4475 1975 1675 1475

1000 1000 900 2500 10000 4500 2000 1700 1500

1025 1025 925 2525 10100 4525 2025 1725 1525

1050 1050 950 2550 10200 4550 2050 1750 1550

1075 1075 975 2575 10300 4575 2075 1775 1575

1100 1100 1000 2600 10400 4600 2100 1800 1600

1125 1125 1025 2625 10500 4625 2125 1825 1625

1150 1150 1050 2650 10600 4650 2150 1850 1650

1175 1175 1075 2675 10700 4675 2175 1875 1675

1200 1200 1100 2700 10800 4700 2200 1900 1700

1225 1225 1125 2725 10900 4725 2225 1925 1725

1250 1250 1150 2750 11000 4750 2250 1950 1750

1275 1275 1175 2775 11100 4775 2275 1975 1775

1300 1300 1200 2800 11200 4800 2300 2000 1800

1325 1325 1225 2825 11300 4825 2325 1825

1350 1350 1250 2850 11400 4850 2350 1850

1375 1375 1275 2875 11500 4875 2375 1875

1400 1400 1300 2900 11600 4900 2400 1900

1425 1425 1325 2925 11700 4925 2425 1925

1450 1450 1350 2950 11800 4950 2450 1950

1475 1475 1375 2975 11900 4975 2475 1975

1500 1500 1400 3000 12000 5000 2500 2000

1525 1425 3025 12100 5025 2025

1550 1450 3050 12200 5050 2050

1575 1475 3075 12300 5075 2075

1600 1500 3100 12400 5100 2100

1625 1525 3125 12500 5125 2125

1650 1550 3150 12600 5150 2150

1675 1575 3175 12700 5175 2175

1700 1600 3200 12800 5200 2200

1725 1625 3225 12900 5225 2225

1750 1650 3250 13000 5250 2250

Page 5: Road Costing Spreadsheet.xls

1775 1675 3275 13100 5275 2275

1800 1700 3300 13200 5300 2300

1825 1725 3325 13300 5325 2325

1850 1750 3350 13400 5350 2350

1875 1775 3375 13500 5375 2375

1900 1800 3400 13600 5400 2400

1925 1825 3425 13700 5425 2425

1950 1850 3450 13800 5450 2450

1975 1875 3475 13900 5475 2475

2000 1900 3500 14000 5500 2500

2025 1925 3525 14100 5525

2050 1950 3550 14200 5550

2075 1975 3575 14300 5575

2100 2000 3600 14400 5600

2125 3625 14500 5625

2150 3650 14600 5650

2175 3675 14700 5675

2200 3700 14800 5700

2225 3725 14900 5725

2250 3750 15000 5750

2275 3775 15100 5775

2300 3800 15200 5800

2325 3825 15300 5825

2350 3850 15400 5850

2375 3875 15500 5875

2400 3900 15600 5900

2425 3925 15700 5925

2450 3950 15800 5950

2475 3975 15900 5975

2500 4000 16000 6000

4025 16100 6025

4050 16200 6050

4075 16300 6075

4100 16400 6100

4125 16500 6125

4150 16600 6150

4175 16700 6175

4200 16800 6200

4225 16900 6225

4250 17000 6250

4275 17100 6275

4300 17200 6300

4325 17300 6325

4350 17400 6350

4375 17500 6375

4400 17600 6400

4425 17700 6425

4450 17800 6450

4475 17900 6475

4500 18000 6500

4525 18100 6525

4550 18200 6550

Page 6: Road Costing Spreadsheet.xls

4575 18300 6575

4600 18400 6600

4625 18500 6625

4650 18600 6650

4675 18700 6675

4700 18800 6700

4725 18900 6725

4750 19000 6750

4775 19100 6775

4800 19200 6800

4825 19300 6825

4850 19400 6850

4875 19500 6875

4900 19600 6900

4925 19700 6925

4950 19800 6950

4975 19900 6975

5000 20000 7000

5025 20100

5050 20200

5075 20300

5100 20400

5125 20500

5150 20600

5175 20700

5200 20800

5225 20900

5250 21000

5275 21100

5300 21200

5325 21300

5350 21400

5375 21500

5400 21600

5425 21700

5450 21800

5475 21900

5500 22000

5525 22100

5550 22200

5575 22300

5600 22400

5625 22500

5650 22600

5675 22700

5700 22800

5725 22900

5750 23000

5775 23100

5800 23200

5825 23300

5850 23400

Page 7: Road Costing Spreadsheet.xls

5875 23500

5900 23600

5925 23700

5950 23800

5975 23900

6000 24000

6025 24100

6050 24200

6075 24300

6100 24400

6125 24500

6150 24600

6175 24700

6200 24800

6225 24900

6250 25000

6275 25100

6300 25200

6325 25300

6350 25400

6375 25500

6400 25600

6425 25700

6450 25800

6475 25900

6500 26000

6525 26100

6550 26200

6575 26300

6600 26400

6625 26500

6650 26600

6675 26700

6700 26800

6725 26900

6750 27000

6775 27100

6800 27200

6825 27300

6850 27400

6875 27500

6900 27600

6925 27700

6950 27800

6975 27900

7000 28000

7025 28100

7050 28200

7075 28300

7100 28400

7125 28500

7150 28600

Page 8: Road Costing Spreadsheet.xls

7175 28700

7200 28800

7225 28900

7250 29000

7275 29100

7300 29200

7325 29300

7350 29400

7375 29500

7400 29600

7425 29700

7450 29800

7475 29900

7500 30000

7525 30100

7550 30200

7575 30300

7600 30400

7625 30500

7650 30600

7675 30700

7700 30800

7725 30900

7750 31000

7775 31100

7800 31200

7825 31300

7850 31400

7875 31500

7900 31600

7925 31700

7950 31800

7975 31900

8000 32000

8025 32100

8050 32200

8075 32300

8100 32400

8125 32500

8150 32600

8175 32700

8200 32800

8225 32900

8250 33000

8275 33100

8300 33200

8325 33300

8350 33400

8375 33500

8400 33600

8425 33700

8450 33800

Page 9: Road Costing Spreadsheet.xls

8475 33900

8500 34000

8525 34100

8550 34200

8575 34300

8600 34400

8625 34500

8650 34600

8675 34700

8700 34800

8725 34900

8750 35000

8775 35100

8800 35200

8825 35300

8850 35400

8875 35500

8900 35600

8925 35700

8950 35800

8975 35900

9000 36000

9025 36100

9050 36200

9075 36300

9100 36400

9125 36500

9150 36600

9175 36700

9200 36800

9225 36900

9250 37000

9275 37100

9300 37200

9325 37300

9350 37400

9375 37500

9400 37600

9425 37700

9450 37800

9475 37900

9500 38000

9525 38100

9550 38200

9575 38300

9600 38400

9625 38500

9650 38600

9675 38700

9700 38800

9725 38900

9750 39000

Page 10: Road Costing Spreadsheet.xls

9775 39100

9800 39200

9825 39300

9850 39400

9875 39500

9900 39600

9925 39700

9950 39800

9975 39900

10000 40000

40100

40200

40300

40400

40500

40600

40700

40800

40900

41000

41100

41200

41300

41400

41500

41600

41700

41800

41900

42000

42100

42200

42300

42400

42500

42600

42700

42800

42900

43000

43100

43200

43300

43400

43500

43600

43700

43800

43900

44000

44100

44200

Page 11: Road Costing Spreadsheet.xls

44300

44400

44500

44600

44700

44800

44900

45000

45100

45200

45300

45400

45500

45600

45700

45800

45900

46000

46100

46200

46300

46400

46500

46600

46700

46800

46900

47000

47100

47200

47300

47400

47500

47600

47700

47800

47900

48000

48100

48200

48300

48400

48500

48600

48700

48800

48900

49000

49100

49200

49300

49400

Page 12: Road Costing Spreadsheet.xls

49500

49600

49700

49800

49900

50000

Page 13: Road Costing Spreadsheet.xls

0 0 0 0 0 0 0 0

25 10 300 15 400 300 300 5

26 11 310 16 425 325 325 6

27 12 320 17 450 350 350 7

28 13 330 18 475 375 375 8

29 14 340 19 500 400 400 9

30 15 350 20 525 425 425 10

31 16 360 21 550 450 450 11

32 17 370 22 575 475 475 12

33 18 380 23 600 500 500 13

34 19 390 24 625 525 525 14

35 20 400 25 650 550 550 15

36 21 410 26 675 575 575 16

37 22 420 27 700 600 600 17

38 23 430 28 725 625 625 18

39 24 440 29 750 650 650 19

40 25 450 30 775 675 675 20

41 26 460 800 700 700 21

42 27 470 725 725 22

43 28 480 750 750 23

44 29 490 775 775 24

45 30 500 800 800 25

46 31 825 825 26

47 32 850 850 27

48 33 875 875 28

49 34 900 900 29

50 35 925 925 30

36 950 950

37 975 975

38 1000 1000

39 1025 1025

40 1050 1050

41 1075 1075

42 1100 1100

43 1125 1125

44 1150 1150

45 1175 1175

46 1200 1200

47 1225 1225

48 1250 1250

49 1275 1275

50 1300 1300

1325 1325

1350 1350

1375 1375

1400 1400

1425 1425

1450 1450

1475 1475

1500 1500

1525 1525

1550 1550

Page 14: Road Costing Spreadsheet.xls

1575 1575

1600 1600

1625 1625

1650 1650

1675 1675

1700 1700

1725 1725

1750 1750

1775 1775

1800 1800

1825 1825

1850 1850

1875 1875

1900 1900

1925 1925

1950 1950

1975 1975

2000 2000

2025

2050

2075

2100

2125

2150

2175

2200

2225

2250

2275

2300

2325

2350

2375

2400

2425

2450

2475

2500