64

RMS Pre-Bid Presentation

Embed Size (px)

DESCRIPTION

RMS Pre-Bid Presentation

Citation preview

  • Pre-Bid Conference regarding International Bidding Document Mkt-03 for Remote Meter Reading System (RMS)LAHORE ELECTRIC SUPPLY COMPANY

  • LESCO is leap froging towards a Radical Change with Breakthrough technology of introducing Remote Meter Reading System (RMS)

  • Tender Document Mkt-03 Salient Features of Tender Document

    SCOPE:Design, Supply, Installation and Commissioning of Remote Meter Reading System (RMS) inclusive of static energy meter as per Wapda Specifications by utilizing RF with GSM/GPRS based hybrid system or totally GSM/GPRS based fixed network.

  • Salient Features of Tender DocumentProposed area Canal Road Sub-DivisionApproximate consumers 18,000 (single phase, three phase, CT , CT & PT operated)Funds for procurement will be made from LESCO own resources.Single stage two envelop procedure will be followed.

  • Para wise reply of Quarries raised by M/s Sitronics telecom solution

  • (Continue ..)

  • Para wise reply of Quarries raised by SoftVerx

  • Para wise reply of Quarries raised by SIEMENS

  • Issues with Stand-alone meter readingHighly Person dependant.Human errors cannot be avoided.Accessibility of meters in rural/ Agricultural zones.Energy Audits performed based on bill collection which is highly inaccurate.Billing done mainly on estimated/ monthly average basisInability to monitor and control discrete loadsBilling cycle requires excessive time.Meter data used only for billing, cannot help in analysis like demand analysis, energy audit, pinpointing losses, etc.

  • Smart Metering and IT: An opportunity to Leapfrog

  • Why RMS ?

  • Critical Benefits from RMS

    Ability to detect tamper events and outage occurrences.Remotely Connect/ disconnect power supply through meter.Calculate transformer loading and sizing from interval data15 minute interval data gives accurate load information for supply scheduling, switching operations, planning etcMonitor voltage at each premise to know conditions when to operate capacitor switches or regulatorsConsistent and granular data for improved accuracy

  • Connectivity in AMR Architecture1. GSM Based Communication Single stage communication between Meter and central station through GSM Modem

    2. Hybrid Communication Two stages of communication in AMR System

  • GSM Based Communication

  • Hybrid Communication

    Two stages of communication in AMR System

    Stage-1 Meters and Data Concentrator Unit (DCU):Communication channel used between meters and DCU is power Line. Stage-2 DCU and Host Central Station (HCS): Communication channel used between DCU and HCS is the standard GSM, CDMS, RF Network.