Page 1: RltResults of Pil tPilot TtiT esting of CO Process · 2015-09-11 · Amine‐Based CO 2 Capture is Inefficient • High costs • Steam for solvent regeneration = high operating costs

R lt f Pil t T ti fResults of Pilot Testing of Enzyme Accelerated CO2Capture Process

3rd Post Combustion Capture ConferenceRegina, SaskatchewanS b 8 2015September 8, 2015

© 2015 CO2 Solutions Inc. All Rights Reserved. 

Page 2: RltResults of Pil tPilot TtiT esting of CO Process · 2015-09-11 · Amine‐Based CO 2 Capture is Inefficient • High costs • Steam for solvent regeneration = high operating costs

About CO2 Solutions Inc.2

• Leader in the field of enzyme‐based CO2 capture

B d i Q b C d• Based in Quebec, Canada

• $45 million invested to date

• 22 employees• 17 R&D, including 7 PhDs

• 47 issued and 39 pending patents

• Entering commercial phasete g co e c a p ase

• Publicly traded on TSX Venture Exchange (Symbol:  CST)

2

g ( y )

Page 3: RltResults of Pil tPilot TtiT esting of CO Process · 2015-09-11 · Amine‐Based CO 2 Capture is Inefficient • High costs • Steam for solvent regeneration = high operating costs

Amine‐Based CO2 Capture is InefficientAmine Based CO2 Capture is Inefficient

• High costsHigh costs• Steam for solvent regeneration = high operating 

costs• $60‐90/tonne of CO2 for flue gas application(1,2)

l b l d f d• Cost is critical issue to be resolved for EOR and other CO2 reuse and sequestration to be expanded(3,4)

• Operational and environmental problems(5)

D d ti d t bilit i t i fl• Degradation and stability issues; extensive flue gas pre‐treatment required

• Toxic aerosol emissions• Solvent losses• Waste products to handle

Sources:1) http://ccemc.ca/wp‐content/uploads/2012/12/C101033‐HTC‐DEV‐JA‐03‐001‐1‐R1‐+‐FEED‐REPORT‐CCEMC.pdf, Page 19 (~$70/tonne cost)

3

) p // / p / p / / / p , g ( / )2) https://www.netl.doe.gov/File%20Library/Events/2014/2014%20NETL%20CO2%20Capture/A‐Bhown‐EPRI‐CO2‐Capture‐RD‐EPRI.pdf, Page 63) http://www.ai‐ees.ca/media/10958/2010_barriers_to_co2_eor_report_final_june4‐13.pdf, Page 444) http://www.energy.gov.ab.ca/Org/pdfs/CCS_Implementation.pdf, Page 105) http://www.sciencedirect.com/science/article/pii/S1750583614001777

Page 4: RltResults of Pil tPilot TtiT esting of CO Process · 2015-09-11 · Amine‐Based CO 2 Capture is Inefficient • High costs • Steam for solvent regeneration = high operating costs

Our Process – An ‘Industrial Lung’g

b l l• Aqueous carbonate salt solvent• Low temperature stripping using low‐grade (~80ᵒC) heat• Absent

• Solvent reclamation• Water wash• Intercooling

Carbonic Anhydrase EnzymeEnzyme

4

Page 5: RltResults of Pil tPilot TtiT esting of CO Process · 2015-09-11 · Amine‐Based CO 2 Capture is Inefficient • High costs • Steam for solvent regeneration = high operating costs

1 tonne/day Pilot Testing/ y g

• Conducted at Energy & Environmental ResearchConducted at Energy & Environmental Research Center (EERC), Jan. 2015

• Coal and natural gas flue gases

• Stripping heat was provided by hot water; steam never used

• Cost of capture incl. compression to 2250psi p p pestimated at $39/tonne by EERC• Use of low‐grade, nil value heat from outside power plant 

steam cycle is the key

• Constant capture performance• Constant capture performance• No enzyme activity loss during the test

• No solvent make‐up

• Zero waste produced

• Detailed results presented April 29, 2015 at Pittsburgh CCUS conference 

5

g(http://tinyurl.com/nkuabns)

Page 6: RltResults of Pil tPilot TtiT esting of CO Process · 2015-09-11 · Amine‐Based CO 2 Capture is Inefficient • High costs • Steam for solvent regeneration = high operating costs

10 tonne/day Pilot Testing/ y g

• Located in Salaberry de Valleyfield near• Located in Salaberry‐de‐Valleyfield, near Montreal

• CO2 capture from flue gases of natural gas firedCO2 capture from flue gases of natural gas fired boiler (~8.5% CO2 content)

• Uses enzyme accelerated aqueous carbonate;Uses enzyme accelerated aqueous carbonate; neat enzyme in solvent flowing freely throughout process, including in reboiler

• Capture operations began June, 2015

• 1,200 operation hours to date

• Stripping uses hot water (80‐85ᵒC)

6

• Open for visitation

Page 7: RltResults of Pil tPilot TtiT esting of CO Process · 2015-09-11 · Amine‐Based CO 2 Capture is Inefficient • High costs • Steam for solvent regeneration = high operating costs

Some Facts

• From sketches to operation in less than 14 monthsFrom sketches to operation in less than 14 months

• On schedule, on budget. • Built for 2.1 M$. (excluding engineering)Built for 2.1 M$. (excluding engineering)

• 1 week of extensive training for third‐party operators

• 3 weeks from power up to normal operation at design capacity

• Objective is to test drive the process• Execute start‐ups and shut‐downs, simulate power 

failure and restart; determine time to resume normal ;operation

• Extended time with enzyme at high temperature; challenge enzyme stability in process conditions

7

• Determine impact of operating conditions on energy consumption and capture performance

Page 8: RltResults of Pil tPilot TtiT esting of CO Process · 2015-09-11 · Amine‐Based CO 2 Capture is Inefficient • High costs • Steam for solvent regeneration = high operating costs

Performance Observed ‐ Enzymey6

5

n (‐)

Performance observed

3

4

Acceleratio

n

Design curve from EERC testing

2

CO2Ca

pture A

1

C

pH = 9.5;  L/G < 10; Heat source: hot water at 82.5oC

00.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0

Enzyme concentration (Relative to design basis)

8

• Reached unit capture capacity with enzyme dosing ~¼ of design value• Direct benefit to operating costs

Page 9: RltResults of Pil tPilot TtiT esting of CO Process · 2015-09-11 · Amine‐Based CO 2 Capture is Inefficient • High costs • Steam for solvent regeneration = high operating costs

Performance Observed – Enzyme Stabilityy y

1.4

1.6

y

0 8

1.0

1.2

e Ac

tivity

0 4

0.6

0.8

ve Enzym

e

0.0

0.2

0.4

Relativ

0.00 200 400 600 800 1000

Operation Time (h)

9

Enzyme activity measured from solvent samples in standardized kinetic measurement cell

Page 10: RltResults of Pil tPilot TtiT esting of CO Process · 2015-09-11 · Amine‐Based CO 2 Capture is Inefficient • High costs • Steam for solvent regeneration = high operating costs

Performance Observed ‐ Capturep100

90

95

80

85

pture (%

)

75

80

CO2Ca

p

65

70

pH = 9.5;  L/G < 10; Heat source: hot water at 82.5 oC

600.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00

Lean Solvent pH (Relative to Design )

10• Lower pH required than expected for longer enzyme stability

Page 11: RltResults of Pil tPilot TtiT esting of CO Process · 2015-09-11 · Amine‐Based CO 2 Capture is Inefficient • High costs • Steam for solvent regeneration = high operating costs

Environmental and Other Performance

• No solvent degradation observed

• No solvent makeup required

• No aste prod cts generated• No waste products generated

• Current operation with day shift onlyCurrent operation with day shift only• To support R&D activities• Normal operation does not require full‐ti t ti ti i 0 25 FTtime operators; estimation is 0.25 FT operator, even at large capacity

11

Page 12: RltResults of Pil tPilot TtiT esting of CO Process · 2015-09-11 · Amine‐Based CO 2 Capture is Inefficient • High costs • Steam for solvent regeneration = high operating costs

CO2 Produced2

• 99.5% CO2 purity achieved (dry basis) by independent lab verification with only O2and N2 remaining to be removed2

• Meets requirements for food and beverage use (ISBT)1 without expensive g ( ) pdownstream purification

• Exceeds Enhanced Oil Recovery (EOR) andExceeds Enhanced Oil Recovery (EOR) and other reuse application purity requirements

• Eliminates typical additional cost of post‐capture purification

12 1http://www.bevtech.org/

Page 13: RltResults of Pil tPilot TtiT esting of CO Process · 2015-09-11 · Amine‐Based CO 2 Capture is Inefficient • High costs • Steam for solvent regeneration = high operating costs

Sept/Oct. 2015 – Remaining Testingp / g g

O i i fi i lid• Optimize configuration to validate engineering improvements

• Testing of solvent additive for improved g pperformance in both absorption and stripping

• Additional stress testing• Additional stress testing

• Measurement of contaminants absorption kinetics

• Total work will bring operations to ~2,500 hours

• Detailed energy balance and techno‐economics being developed from operational data expected to confirm the lowest capture cost for solvent‐based

13

lowest capture cost for solvent based capture technology

Page 14: RltResults of Pil tPilot TtiT esting of CO Process · 2015-09-11 · Amine‐Based CO 2 Capture is Inefficient • High costs • Steam for solvent regeneration = high operating costs

Next: Rotating Packed Bed (RPB)

l i ll b i i h

Next:  Rotating Packed Bed (RPB)

• Exclusive collaboration with GasTran Systems (GTS) of Cleveland (OH) ‐ leader in RPB technology

• Process intensification in action• Process intensification in action

• Enables maximum performance from enzyme

• RPB never used for CO2 capture previously because of slower kinetics of conventional amine solvents

G t t l f t G L i t f l• Generates extremely fast G‐L interface renewal

• Mass transfer is orders of magnitude than packed columncolumn

• RPB is proven commercially in other gas‐liquid applications at scale• Beverage deaeration RPBs in Use at Dow 

14

• Beverage deaeration• Chemical production Chemical

Page 15: RltResults of Pil tPilot TtiT esting of CO Process · 2015-09-11 · Amine‐Based CO 2 Capture is Inefficient • High costs • Steam for solvent regeneration = high operating costs

RPB vs. Packed ColumnRPB vs. Packed Column90% CO2 Capture from Natural Gas-Fired Boiler Flue Gases; 300

t /d CO t dtonnes/day CO2 captured

Packed ColumnPacked Column 

• Greatly reduced size of capture equipment better it d t t i d

Rotating Packed Bed

suited to space constrained industrial locations

• Reduced CAPEX 

15Target CO2 capture cost <$30/tonne incl. compression

Page 16: RltResults of Pil tPilot TtiT esting of CO Process · 2015-09-11 · Amine‐Based CO 2 Capture is Inefficient • High costs • Steam for solvent regeneration = high operating costs

Intellectual Propertyp y

47BROAD PATENT PORTFOLIO FOR USE OF  3947 ISSUEDCARBONIC ANHYDRASE IN CANADA, U.S., EU, CHINA, AUSTRALIA  AND OTHER MARKETS

39 PENDING*vs. 13 and 19 respectively in 2008

SOLVENTSCarbonates

PROCESSESPacked Tower

Areas of Carboni

Amino AcidsAminesCombinations

High‐Intensity ContactorSpray Scrubber

UniversalCarbonic AnhydraseCO2 Capture ApplicationINDUSTRIAL SECTORS ENZYMES AND INDUSTRIAL SECTORS

PowerSteam‘Drop‐in’ Applications

THEIR UTILIZATIONEnzyme Strains

SolubleParticle‐Based

16 *at March 31, 2015

Particle BasedAnalogs

Page 17: RltResults of Pil tPilot TtiT esting of CO Process · 2015-09-11 · Amine‐Based CO 2 Capture is Inefficient • High costs • Steam for solvent regeneration = high operating costs

Steps to Large Scale Applicationp g pp

1. Completion of Valleyfield testing and development of detailed mass and energy balances and techno‐economics (Q3‐Q4 2015)

2. Relocation of 10 tonne/day unit to commercial customer (in negotiations) for longer term operation (2016)operation (2016)

3. Pilot testing of RPB (Q1 2016)

4. 30 tonne/day commercial CO2 reuse project incorporating RPB (2016‐2017)

/d l d h5. 300 tonne/day commercial EOR and other CO2reuse project incorporating RPB (2016‐2017)

6 Large scale broader commercial rollout (2017+)

17

6. Large‐scale broader commercial rollout (2017+)

Page 18: RltResults of Pil tPilot TtiT esting of CO Process · 2015-09-11 · Amine‐Based CO 2 Capture is Inefficient • High costs • Steam for solvent regeneration = high operating costs

Overall Benefits of CSI Technology

• Solvent regeneration using heat outside of 

gy

So e t ege e at o us g eat outs de osteam cycle• Low parasitic load; minimal boiler upgrade

• Smaller footprint of capture unitSmaller footprint of capture unit• Better suited to retrofit and space‐constrained 

operations

• Environmentally benign solvent• Environmentally benign solvent• No degradation products or aerosols• Ease of environmental and waste management 

operations

• Larger net GHG reductions than amines• Benefit of using low‐grade heat

• Low total cost of capture• Low total cost of capture• Economics more favourable relative to Enhanced 

Oil Recovery opportunities• In line with carbon pricing

18

Page 19: RltResults of Pil tPilot TtiT esting of CO Process · 2015-09-11 · Amine‐Based CO 2 Capture is Inefficient • High costs • Steam for solvent regeneration = high operating costs

THANK YOUCO2 Solutions Inc.Jonathan A. CarleyVice‐President, Business Developmentj th l @ 2 l [email protected]: 905‐320‐6260www.co2solutions.com