    Red Lake River WatershedRestoration and Protection Project

    April 2013

    Stakeholders U date Meetin

  • 7/28/2019 RLR Hanson 041013

    2/35

    Red Lake River

    -

  • 7/28/2019 RLR Hanson 041013

    3/35

  • 7/28/2019 RLR Hanson 041013

    4/35

    Im ortance of the Red Lake River

  • 7/28/2019 RLR Hanson 041013

    5/35

    History of Red Lake River Waterua ty Montor ng

    RLWD Soil andWater Conservation

    Districts, International Water Institute, RiverWatch USGS Red Lake DNR MPCA

  • 7/28/2019 RLR Hanson 041013

    6/35

    Red Lake River WRAP Project

    $150,000+ for Phase I$100,000 for Phase II$100,000 for the developmentof a HSPF Model of theWatershed$86,514 Surface Water

    Assessment Grant

  • 7/28/2019 RLR Hanson 041013

    7/35

  • 7/28/2019 RLR Hanson 041013

    8/35

    Assessment of Water Qualit Data

  • 7/28/2019 RLR Hanson 041013

    9/35

    Water Qualit Monitorin SurfaceWater

  • 7/28/2019 RLR Hanson 041013

    10/35

    Continuous Water QualityMonitoring

  • 7/28/2019 RLR Hanson 041013

    11/35

    Continuous Water QualityMonitoring

    KrippleCreek

  • 7/28/2019 RLR Hanson 041013

    12/35

    Continuous Water Quality Monitoring

    Burnham Creek

  • 7/28/2019 RLR Hanson 041013

    13/35

    Continuous Water Quality Monitoring

    Black River

  • 7/28/2019 RLR Hanson 041013

    14/35

    Continuous Water Quality Monitoring

    GentillyCreek

  • 7/28/2019 RLR Hanson 041013

    15/35

    Stage and Flow Monitoring

  • 7/28/2019 RLR Hanson 041013

    16/35

    Biological Monitoring

  • 7/28/2019 RLR Hanson 041013

    17/35

  • 7/28/2019 RLR Hanson 041013

    18/35

  • 7/28/2019 RLR Hanson 041013

    19/35

    Species Presence

    29 8

    197

    16

    10

    101

  • 7/28/2019 RLR Hanson 041013

    20/35

    Stream Channel Stability

    Assessment (Geomorphology)

  • 7/28/2019 RLR Hanson 041013

    21/35

  • 7/28/2019 RLR Hanson 041013

    22/35

  • 7/28/2019 RLR Hanson 041013

    23/35

    Lori Clark of RMB Environmental

    Laboratories, has been hired as asubcontractor

    Expansion of public outreach and

  • 7/28/2019 RLR Hanson 041013

    24/35

    LIDAR Terrain Analysis

    ream ower n ex eveopmen

  • 7/28/2019 RLR Hanson 041013

    25/35

    LIDAR Terrain Analysis

    ream ower n ex eveopmen

  • 7/28/2019 RLR Hanson 041013

    26/35

    LIDAR Terrain Analysis

    ream ower n ex eveopmen

  • 7/28/2019 RLR Hanson 041013

    27/35

    LIDAR Terrain AnalysisStream Power Index Development

  • 7/28/2019 RLR Hanson 041013

    28/35

    Water Qualit Modelin - SWAT SWAT Com leted

  • 7/28/2019 RLR Hanson 041013

    29/35

    HSPF Modeling

  • 7/28/2019 RLR Hanson 041013

    30/35

    Restoration Plans

    ro ec on ans TMDL restoration re ort for each

    impairment that isverifieddiscovered from availablemonitoring data

    reaches that arent impaired.

    sources that we find whether there is anofficial TMDL or no

  • 7/28/2019 RLR Hanson 041013

    31/35

    Addresses Point and Nonpoint

    Equation Expressed in pounds, tons , or number

    of organisms

    Regulatory teeth of the programlimited to MPCA ermittin rocesses

  • 7/28/2019 RLR Hanson 041013

    32/35

    Wastewater treatment facilities

    Stormwater permits Special conditions in stormwaterpermits (BMPs)

    Desi nated MS4 Cit StormwaterPermitting

  • 7/28/2019 RLR Hanson 041013

    33/35

    Re uiredb theUnitedStates

    Environmental Protection Agency

    established in Minnesota State statutes.

    reams assesse w oca co ec edata

    Lots of money involved in theestablishment of TMDLs and carrying-out mpementaton pans

  • 7/28/2019 RLR Hanson 041013

    34/35

    Restoration Funding for Projects

    Example: Lower Otter Tail Turbidity TMDL

    ,

    >$1,000,000 in total funding

  • 7/28/2019 RLR Hanson 041013

    35/35

    2013 Plans

    FinishPhaseI startPhaseII

    Finish SWAG Sampling ssove ox en o ers n e

    Upper Red Lake River, JD60, CD96,an rowns ree or r ppe ree

    Flow Measurements

    Follow-up geomorphology work