Drainage Regions of Canada
• There are 5 main drainage regions of Canada:– Pacific Ocean– Atlantic Ocean– Hudson Bay– Arctic Ocean– Gulf of Mexico
• Regions are based on physical features which dictate the flow of water (ex. mountain)
Drainage Patterns
• Dendritic iii) eg. Lethbrige, Alta.i) Uniform flow Rivers join together at acute anglesii) Occurs on bedrock
Radial iii) ex. Martinique, Quei) Water flows down from a high pointii) Common around mountain ranges
River Development
• Youth Stage– Straight, flowing water– Often in steep regions– V-shaped valley (shape of river)– Often lined with rocks, boulders– High amount of potential energy– Transports large amounts of material
• Maturity Stage– Meandering pattern– Water starts to erode weak regions along the streambed – River widens as a result of erosion– Deposits material in slower regions– Creates floodplains where water overflows
• Old Age Stage– Deposits more sediment than it transports- U-shaped river bed– Slow moving– Often muddy looking– Often occurs wen river rises above the flood plain– Rich soil along river edge– Ex. Nile
Factors Affecting River Development
• 1. Gradient– The steeper the slope, the faster the water flows – This increases the speed of erosion
• 2. Depth – Deeper rivers carry more water and this increases
erosion• 3. Width– Wider rivers allow more water to pass through the
river
River Development Animation
• http://River Animation
• Define the following:– Delta– Rejuvenation– Flood plain– Tributary
• Answer the following question:– Pg. 203 Q. 16– What are the benefits of a riparian watershed?
Red River Floodway
• Constructed in 1968• 47 km long• 2nd largest earth moving project (Panama Canal #1)
• Flood of the Century – April/ May 1997• Most severe since 1826.• Water levels reached 21.6 ft (7.5 m)• Result of abundant snowfall and extreme temperatures• Grand Forks was hit the hardest. • • 2009 Flood – March 28th
• Resulted from frozen ground• Water reached up to 23ft (6.9m)• Floodway was closed due to ice jams. • They didn’t open the floodway till April 8thhttp://www.winnipegsun.com/2011/05/17/flood-costs-could-reach-1997-levels