Phases of works and risk analysis **
ACTIVITY HAZARDS MEASURES AND MEANS OF PREVENTION
*Steel erection work byCrane.
*Slip, Trip, Fall and crushing.*Working area should be clear from any abstruckle.
*Accident due to equipment.*Personal Injury. *Equipment should be check before each use.*Accident due to un-skill operator,rigger
*Lifting work by Crane. And working crew. *Use Proper PPE.*Collapse of equipment.
*Working area should be barricaded.
*Lack of communication andimproper signal lead to fallingof steel members leading topersonal injury.
*Only one rigger gives signal.
*Material should be secure.
*Failure to lifting tools Crane &lifting gears.
*Proper sling should be used and secure thematerial. Lifting gear and check for safe workingload.
*Struck by equipment.*Use proper lifting tool’s and tackle with colorcode.
*Crushing. *Skill crew perform job.
*Falling objects during liftingCause personal injury.
*Two tagline should be use.
*Personal injury due to slipping of hand tools.
*Flagman must be present all time withequipment.
*Failure of wire rope. *Only authorize rigger give signal.
INTERNATIONAL BUILDING SYSTEM FACTORY CO.LTD.
IBSF-HSE-RA-05
Rev: 01. 13/11/2010
RISK ANALYSISPage
1/1
9
8/3/2019 Risk Analysis for CRANE
http://slidepdf.com/reader/full/risk-analysis-for-crane 2/3
*Falling person from heights.*Do not stand and walk under suspended loadand boom.
*Slipping of hand Tools. *Competent person should be present all time.
*Only qualified person operate equipment.
*Provide signage.*Fallow safety rule and regulation.
Additional Information about
single top.
*Lack of communication andimproper signal lead to fallingof steel members leading topersonal injury.
***The lifting capacity for single top is same asthat of 8.5M jip (0* Offset).
*Crushing/Overload *The total rated lifting capacity includes the wetof hook block And slings, unit: t.
*Slip, Trip, Fall and crushing.*The working radius in the table is the actualvalue including boom deflection under load.
*Failure of wire rope.*Before lifting operation, set up all theoutriggers, including the 5th outrigger, if necessary.
*Failure to lifting tools Crane &lifting gears.
*Single line pull should not exceed Total ratedlifting load of single Top.
*Rotates material in air. * Follow Crane manufacture load Chart.*Only one rigger gives signal.*Material should be secure.*Two tag line should be use.*Skill crew perform job.*Proper sling should be used and secure thematerial.
Additional Excavation Awareness **Personal Injury **Do not stack any material near excavation**Falling of person and equipment into the
excavation.** Do not park any equipment near excavation.
INTERNATIONAL BUILDING SYSTEM FACTORY CO.LTD.
IBSF-HSE-RA-05
Rev: 01. 13/11/2010
RISK ANALYSISPage
2/1
8/3/2019 Risk Analysis for CRANE
http://slidepdf.com/reader/full/risk-analysis-for-crane 3/3
**Collapse of excavation edge. *Proper supervision should be done.*Trained signalman should be assigned.
* The areas must be barricaded with signage toprevent unauthorized entry and traffic/workermovements.**Observe work area hazard and take precautionwith proper
Supervision/monitor.**operator operates the equipment in a safemanner that will not endanger any personinvolved in the excavation work.
** In case that a work phase, a mean or a hazard does not appear in this document, an attachment will be supplied before the beginning of the works for preliminary validation by the Safety Department AMTPJ
INTERNATIONAL BUILDING SYSTEM FACTORY CO.LTD.
IBSF-HSE-RA-05
Rev: 01. 13/11/2010
RISK ANALYSISPage
3/1