Upload
rion
View
223
Download
1
Tags:
Embed Size (px)
DESCRIPTION
A small scale project located in Victor, NY. Here is the design drawing set for what is to become the new working wood shop of Zac Holtz, of Holtz Furniture Studio. We are projected to begin construction in September, 2011.
Citation preview
RION by design1867 7th avenue, 4bnew york, ny 10026
518.269.1181
DATE: August 18, 2011
PROJECT:
DRAWING BY: rp
SHEET NUMBER:
VICTOR, NEW YORKHOLTZ BARN
RION by Design
freelance design consulting
COVERCONTENTS: A1. BELOW GRADE A2. FIRST FLOOR PLAN A3. LOFT FLOOR PLAN A4. ROOF PLAN D1. WALL ASSEMBLY
RION by design1867 7th avenue, 4bnew york, ny 10026
518.269.1181
DATE: August 18, 2011
PROJECT:
DRAWING BY: rp
SHEET NUMBER:
VICTOR, NEW YORKHOLTZ BARN
RION by Design
freelance design consulting
A1
1’-6” CONCRETE FOOTING
5’-6
”5’
-6”
11’-8
”
NOTE: 1. CONCRETE FOOTINGS TO BE POURED BELOW FROST LINE (APPROX. 3’-1”) 2. FOOTINGS, AND FIRST FLOOR SLAB TO BE POURED SIMULTANEOUSLY
0’-1/2”STEEL REBARO.C.
0’-41/2”CONCRETE FLOOR SLABON GRADE
11’-5” 11’-5”11’-10”
SCALE: 1/2" = 1'-0"BELOW GRADE
0 1' 2' 4'
RION by design1687 7th avenue, 4bnew york, ny 10026
518.269.1181
DATE: August 18, 2011
PROJECT:
DRAWING BY: rp
SHEET NUMBER:
VICTOR, NEW YORKHOLTZ BARN
RION by Design
freelance design consulting
A2SCALE: 1/2" = 1'-0"FIRST FLOOR
0 1' 2' 4'
2”X4” STUDS16” O.C.
6’-8
”11
’-0”
6’-8
”3’
-2”
24’-4
”
NOTE: 1. STEEL REBAR PUNCTURES FLOOR SLAB BY 0’-6” 2. STEEL REBAR: COLUMN PIN
8” WOOD COLUMN(ASH)
0’-41/2” CONCRETE FLOOR SLABON GRADE
24’-5”3’-2” 10’-10” 1’-3”
36’-6”
OPEN ABOVE
RION by design1867 7th avenue, 4bnew york, ny 10026
518.269.1181
DATE: August 18, 2011
PROJECT:
DRAWING BY: rp
SHEET NUMBER:
VICTOR, NEW YORKHOLTZ BARN
RION by Design
freelance design consulting
A3
OPEN TO BELOW
SCALE: 1/2" = 1'-0"LOFT
0 1' 2' 4'
1”X1 1/2” BATTEN8’
-3”
7’-1
0”8’
-3”
24’-4
”
1”X7 1/2” BOARD
1/2” EXPANSION JOINT
6’-4”2’-6” 17’-4” 12’-10” 2’-6”
36’-6”
NOTE: 1. SEE D1 FOR WALL ASSEMBLY
RION by design1867 7th avenue, 4bnew york, ny 10026
518.269.1181
DATE: August 18, 2011
PROJECT:
DRAWING BY: rp
SHEET NUMBER:
VICTOR, NEW YORKHOLTZ BARN
RION by Design
freelance design consulting
A4SCALE: 1/2" = 1'-0"ROOF PLAN
0 1' 2' 4'NOTE: 1. 32 - 36”X192” CORRUGATED METAL ROOF PANELS (36” ROOF OVERHANG INCLUDED) 2. ROOF SLOPE = 1:6
21’-5
1/2
”7’
-9”
1’-4
”
30’-7
1/2
”
ROOF BELOW
OVERHANG
42’-0”
RION by design1867 7th avenue, 4bnew york, ny 10026
518.269.1181
DATE: August 18, 2011
PROJECT:
DRAWING BY: rp
SHEET NUMBER:
VICTOR, NEW YORKHOLTZ BARN
RION by Design
freelance design consulting
D1NOT TO A MEASURABLE SCALEWALL ASSEMBLY
4 1/2” POURED IN PLACE CONCRETE SLAB
1”X7 1/2” BOARD
1/2” EXPANSION JOINT
1”X1 1/2” BATTEN
2”X4” SILL PLATE
5 5/8”X24” CMU BLOCK WALL
1”X4” LINTEL
3/4”X9”X16” GLASS PANE
3”X4” LINTEL
1”X2” SPACER
6”X12” ASH BEAM
3/4” PLYWOOD SHEATHING