Upload
nilesh-gadge
View
5
Download
0
Embed Size (px)
DESCRIPTION
Weekly Review Format for Construction Project
Citation preview
PX4- J3 PROJECT - JAMNAGAR .
L&T - WEEKLY REVIEW MEETING
Date : 04th May’15L&T Hydrocarbon EngineeringHydrocarbon Construction & Pipelines (D)
Overall Progress- Balance RCC Works
2
Sr. No Area/ Structure Bal Concrete As on 29-Apr
Total Qty. (Cum)
Plan for May 2015
Plan Till Date
Achieved Till Date
Backlog Till Date
1 Refrigeration Area 941 890 32 23 92 Crystallisation Train 1 506 367 58 56 23 Common Area 1129 433 70 31 394 ISOM Area 1100 410 39 37 25 SS70 388 268 4 4 6 TA Area 2746 807 262 125 1377 AEU Area 1303 539 18 90 -728 TA+AEU PR Rigid Bays 399 365 55 24 319 Crystallisation Train 2 1631 317 47 7 40
10 Crystallisation Train 3 4257 1383 224 96 128 Total = 14401 5780 809 493 316
Readiness as on 08-05-2015
3
Sr. No Area/ Structure Qty. (Cum)
1 PX-4 ISBL COMM. FACILITY SUPPORTING PLATFORM FOR MV-AYZ202-V000005 14
2 PX-4 ISBL SS-70 (SCREED CONCRETE) BACKLOG QTY. 8
3 PX-4 ISBL SS-70 TRANSFERMER BAY PCC (8-9/D-E) 15
4 PX-4 ISBL UG WORKS (MH/CB) PCC 8
5 PX-4 ISBL REST SHED AT REFRIGERATION AREA 6
6 RLS PRECAST YARD (MH/CB) BACKLOG QTY. 6
TOTAL = 57