Projects: Elizabeth Quay Pedestrian Bridge Role: Projects Engineer Employer: DASSH JV Main Contractors: Leighton Broad Links: Elizabeth Quay Pedestrian Bridge is a landmark project on the foreshore of Perth city. An architecturally driven project encompasses extensive temporary works and bespoke finishes resulted for a very challenging and rewarding build. Tendering, engineering, planning, programming, technical analysis and subcontractor vetting prior to contract award. Upon contract award my works involved and provided me experience with; Extensive temporary works design, deep excavation planning, dewatering management, concrete mix designing and thermal analysis, extensive reinforcement feasibility redesign, detailed design of architectural finishes, design of electrical systems, formworks design, lift studies, non-destructive material testing, developing weld procedures, subcontract management, developing safe work procedures, temporary access design, air handing system design, managing detailing and fabrication of over 500t of high grade fabricated structural steel, technical query management and quality assurance management. Elizabeth Quay Project tested me on every level, enabling me to learn an incredible amount.

Richard Blair Projects Portfolio

Embed Size (px)

Citation preview

Page 1: Richard Blair Projects Portfolio

Projects:

Elizabeth Quay Pedestrian Bridge

Role:

Projects Engineer

Employer:

DASSH JV

Main Contractors:

Leighton Broad

Links:

Elizabeth Quay Pedestrian Bridge is a landmark project on the foreshore of Perth city. An architecturally driven project encompasses extensive temporary works and bespoke finishes resulted for a very challenging and rewarding build.

Tendering, engineering, planning, programming, technical analysis and subcontractor vetting prior to contract award.

Upon contract award my works involved and provided me experience with; Extensive temporary works design, deep excavation planning, dewatering management, concrete mix designing and thermal analysis, extensive reinforcement feasibility redesign, detailed design of architectural finishes, design of electrical systems, formworks design, lift studies, non-destructive material testing, developing weld procedures, subcontract management, developing safe work procedures, temporary access design, air handing system design, managing detailing and fabrication of over 500t of high grade fabricated structural steel, technical query management and quality assurance management. Elizabeth Quay Project tested me on every level, enabling me to learn an incredible amount.

Page 2: Richard Blair Projects Portfolio

Projects:

Post Tensioned Structures

Perth, WA

Role:

Projects Engineer

Employer:

SRG Limited

Main Contractors:

Broad Constructions

Brookfield Multiples

BGC

John Holland

Lend Lease

Probuild

Built

Various Post tenioned structures throughout Meropolitan Perth and regional WA

Tendering, project management, procurement, labour management, value

engineering, contracts negotiation and contract administration for a variety of post tensioning projects in Perth, WA.

PT installed to slab on grade, suspended slabs, transfer structures, pre cast beams, tilt panels and slip forms

BBR Multistring, SSL flat slab PT, Macalloy stress bar, Bridon, Ancon, Radaelli and BBR cable stays systems

Experience with tendering, contracts, logistics, pre pour inspections, pressure grouting works, enterprise bargaining agreements and human resources.

Page 3: Richard Blair Projects Portfolio

Projects:

Bridge Maintenance Projects

Various Locations, WA

Role:

Project Engineer

Employer:

SRG Limited

Main Contractor:

Downer Mouchel JV

Main Roads WA

The ministry of

Defence

Multiple bridge maintenance / remedial projects through regional WA

Procurement, site management, labour management and contracts administration for a variety of bridge maintenance projects in Perth and rural WA.

Typically rural project carried out on a rostered basis requiring manpower management working 7 days a week to maintain tight programme requirements to keep main traffic routes open.

Experience with tendering, contract administration, rural site logistics, Mainroads WA concrete mix designs, external post tensioning works, intricate formwork / false works, concrete repair works, traffic management, timber bridge construction, hydro demolition, concrete cutting, cathodic protection and guard rail

Page 4: Richard Blair Projects Portfolio

Project:

Queen Elizabeth School

Wimborne, England

Role:

Senior Site Engineer /

Site Manager

Employer:

Woodmace Civil

Engineering LTD

Main Contractor:

Carillion Mouchel JV

£56m New build secondary school in Wimborne, Dorset.

Procurement, site engineering, site management and surveying management for

an ecological secondary school development involving many bespoke and maiden construction methodologies

European first fully insitu suspended Cobiax flooring system.

UK first Rehau Air attneutaion installation and comissioning

Multi sub level Biomass incinerator construction

Mains utlity installation for Gas, Water, HV, Pressurised Sewearge, and air handling

Extensive RC installation, hardstanding, archtectural finishes, landscaping and resing bound surfacing, and attenuation ponds

Experience with Design and Construct, temporary works, cofferdam construction, new and innovative technologies, below ground waterproofing and man management for 100+ operatives

Page 5: Richard Blair Projects Portfolio

Project:

Waitrose Distribution

Facility / Cold Store

Bracknell, England

Role:

Site Engineer

Employer:

Woodmace Civil

Engineering LTD

Main Contractor:

Carters Group

Procurement, site engin

eering, and surveying for deep drainage, piling, ground stabilisation, hardstand and landscaping.

30,000m³ lime stabilised fill material

20,000m² Fibre reinforced concrete hardstand

Mono post tensioned slab on grade Experience with ground stabilisation, pre cast tilt up construction, bulk earthworks, insitu concrete works, deep drainage, attenuation tanks and heavy plant.

Project:

Mixed use development

1 Lambs Passage

London, UK

Role:

Junior Designer /

Draftsman

Employer:

Godsell Arnold

Partnership LTD

Main Contractor:

Bovis Lend Lease

Extensive substructure works on a heritage listed basements, pile and capping beam arrangement to accommodate brick cellars dating back to 1900s.

Extremely tight site footprint requiring detailed forethought to aid constructability

Design works carried out on CADS3DMax, drafting on AutoCAD

Experience with metro multi-storey construction, heritage remedial works, concrete frame construction, detailed design software, RC concrete mix designing and reo detailing / scheduling