RICH 17 m Beam Pipe Mirrors parate pions from muons <1% level between 15 and 35 GeV/c ack time at 100 ps level rtecipate in the L0 trigger • Neon as Cherenkov radiator • mosaic of mirrors (17 m focal length) • two spots with PM (1000 PM per spot) • beam pipe passing through PM lodging disk INFN Perugia INFN Firenze CERN M.Lenti

RICH 17 m Beam Pipe Mirrors Separate pions from muons

Embed Size (px)

Citation preview

Page 1: RICH 17 m Beam Pipe Mirrors Separate pions from muons

RICH

17 m

Beam Pipe

Mirrors•Separate pions from muons <1% level between 15 and 35 GeV/c•Track time at 100 ps level•Partecipate in the L0 trigger

• Neon as Cherenkov radiator• mosaic of mirrors (17 m focal length)• two spots with PM (1000 PM per spot)• beam pipe passing through

PM lodging disk

INFN PerugiaINFN FirenzeCERN

M.Lenti

Page 2: RICH 17 m Beam Pipe Mirrors Separate pions from muons

M.Lenti 2

RICH prototype resultsNIM A593 (2008) 314-318 NIM A621 (2010) 205-211

15 GeV/c

35 GeV/c

m suppression: 0.7%( 15<p<35 GeV/c)

12.9.2011

Page 3: RICH 17 m Beam Pipe Mirrors Separate pions from muons

Milestones:• Design for mirror support: 30.06.2011• Vessel installation ready: 30.04.2012• Mirror and PM installation complete: 2.12.2012

Page 4: RICH 17 m Beam Pipe Mirrors Separate pions from muons

M.Lenti 4

Vessel (CERN): vacuum proof !

Gas system simplified: make vacuum, then inject pure Neon12.9.2011

Page 5: RICH 17 m Beam Pipe Mirrors Separate pions from muons

512.9.2011 M.Lenti

Vessel tender not submitted yet(CERN responsibility)

Page 6: RICH 17 m Beam Pipe Mirrors Separate pions from muons

M.Lenti 6

Photomultipliers• 1944 PM available (quality test ongoing)• 2000 HV divider in preparation (custom made)

PM mechanics in fabrication

FE electronics in preparation

12.9.2011

Page 7: RICH 17 m Beam Pipe Mirrors Separate pions from muons

M.Lenti 7

RICH PMs

PM Time resolution measurements made in Perugia

12.9.2011

Page 8: RICH 17 m Beam Pipe Mirrors Separate pions from muons

M.Lenti 8

PM HV dividers

SOLDERED HV- CONNECTION

TOP AND BOTTOM SMD COMPONENTS

SIG OUT COAX

SOLDERED HV+ (GND)

COAX SHIELD AND HV+ SOLDERED TOGETHER

12.9.2011

Page 9: RICH 17 m Beam Pipe Mirrors Separate pions from muons

M.Lenti 9

HV Filter boardSHV CONNECTOR FROM CAEN HV-PS

BRACKET TO FIX BOARD TO THE 9U EMPTY CHASSIS

32 CH HV TO PMT

SPACERS SUPPORT FOR SECURITY COVER

12.9.2011

Page 10: RICH 17 m Beam Pipe Mirrors Separate pions from muons

M.Lenti 10

Electronics chain

PMT

PRE_NINO NINO_CHIP TELL 62

RG174

PCB MICROSTRIP50-52 OHM DIFFERENTIALFOR NINO CHIP MATCHING

MADISONUNIVERSAL TM CABLE FOR 130 OHMDIFFERENTIALFOR LVDS SIGNAL

VME RICH FE 32 CH BOARD

GAIN DIFF

PCB MICROSTRIP130 OHM DIFFERENTIALFOR CABLE MATCHING

BIPOLAR HV CABLE

50 OHMTERMINATOR

VHDCI CONN

12.9.2011

Page 11: RICH 17 m Beam Pipe Mirrors Separate pions from muons

M.Lenti 11

FE board340 mm

360

mm

CUSTOMIZABLEFRONT END (“FE”)AREA

“DAQ”AREA

8CHNINOCHIP

DC/DCCONVERTER3.3 TO 2.5V

I2C

CAN

8CHNINOCHIP

8CHNINOCHIP

8CHNINOCHIP

MIN. 120 mm MAX. 220 mm 32

LEM

O C

OAX

SIG

NAL

FRO

M P

MT

32 C

HAN

NEL

FRO

NT-

END

ARE

A

J1 VMECONNECTOR

32 CH VHDCICONNECTOR

TO TELL62

4CH MULTIPLICITYTO TELL62

CAN BUSCONNECTORS

G

12.9.2011

Page 12: RICH 17 m Beam Pipe Mirrors Separate pions from muons

M.Lenti 12

DAQ

• TEL62 board equipped with 4 HPTDC: 512 ch• 4 TEL62 for all PM (2000 ch)• 1 TEL62 for “multiplicity” trigger (250 ch)• Perugia group works on the TEL62 fimware

and trigger• See M.Sozzi report for details

12.9.2011

Page 13: RICH 17 m Beam Pipe Mirrors Separate pions from muons

M.Lenti 13

Mirrors• All mirrors ready (18 hex + 2 semi-hex),

now at CERN• Quality test made in Italy in may 2011• Coating to be done at CERN

Mirror support system with a “dummy” mirror:• hung at the center• aligned with micrometric piezo.motors

V.Carassiti will engeneerize the mirror support system In the fall 2011

12.9.2011

Page 14: RICH 17 m Beam Pipe Mirrors Separate pions from muons

M.Lenti 14

Lab’sOptical Measurements Lab 12.4.2011

Dummy Mirror in Clean Room 12.4.2011

12.9.2011

Page 15: RICH 17 m Beam Pipe Mirrors Separate pions from muons

M.Lenti 15

Hex10Hex10 in Box3 (28.04.2011) Hex10 in box (29.04.2011)

Hex10 in Optics Lab (29.04.2011)

12.9.2011

Page 16: RICH 17 m Beam Pipe Mirrors Separate pions from muons

M.Lenti 16

Hex10

Dist Laser-Mirror: 33.875 mDist Mirror-Diode: 33.985 mMinimum: +0.6 cmR = (33.875+33.985+0.006)/2 = 33.933 mF = R/2 = 16.967 mσX(min) = 0.20 mmσy(min) = 0.13 mm√(σX*σY)(min) = 0.12 mmFx-Fy: +4.2 cm

Hor

iz. S

igm

a

Vert

. Si

gma

Hor

iz.*

Vert

. Sig

ma(

2)

12.9.2011

Page 17: RICH 17 m Beam Pipe Mirrors Separate pions from muons

M.Lenti 17

A. Cassese

12.9.2011

Page 18: RICH 17 m Beam Pipe Mirrors Separate pions from muons

M.Lenti 18

Mirror Support

The Mirror is supported through one hole in the back where a dowel is inserted.The Mirror is falling: the dowel is touching the mirror not in the barycenterActuating ribbon works against g and givesvertical axis alignmentA second actuating ribbon at 90 deg givesthe horizontal axis alignmentPiezo motors are used to pull the ribbons

System heavily tested in Lab in Firenze

12.9.2011

Page 19: RICH 17 m Beam Pipe Mirrors Separate pions from muons

M.Lenti 19

Mirror Support Panel

Goal: engeneer projectby the end of 2011, then go for tender (INFN responsibility)

12.9.2011

Page 20: RICH 17 m Beam Pipe Mirrors Separate pions from muons

M.Lenti 20

Milestones RICH 2012

• Installazione dei PM e dell'elettronica di FE 31.08.2012• Installazione degli specchi 31.08.2012

12.9.2011

Page 21: RICH 17 m Beam Pipe Mirrors Separate pions from muons

M.Lenti 21

Mirror Support Design

Mirror Wall Design

Mirror Wall Tender + Contract Preparation

Design for Mirror Supports and Wall Completed

Mirror Support Wall Order

Mirror Support Wall Fabrication

Vessel Tender and Contract preparation

Vessel order

Vessel Fabrication

RICH Vessel Installation

Vessel Installation Completed

Temp. setup for TR

Filling Gas

Mirror Support Installation

Mirror Installation

Mirror Laser Alignment

Temp. Beam Pipe Installation

Beam Pipe Installation

Photodetector Installation

Cooling + cabling of PM's

Mirror and PM Installation complete

Commissioning without Beam

07/2010 12/2010 07/2011 01/2012 07/2012 01/2013RICH TR

RICH Schedule V8.4 (baseline)Assumes Rich vessel in time for TR

Very short time windowTo get ready for the TR

Temp. installation…

today

12.9.2011

Page 22: RICH 17 m Beam Pipe Mirrors Separate pions from muons

M.Lenti 22

RICH Schedule V8.42 (back-up)

Mirror Support Design

Mirror Wall Design

Mirror Wall Tender + Contract Preparation

Design for Mirror Supports and Wall Completed

Mirror Support Wall Order

Mirror Support Wall Fabrication

Vessel Tender and Contract preparation

Vessel order

Vessel Fabrication

RICH Vessel Installation

Vessel Installation Completed

Temp. setup for TR

Filling Gas

Temp. Beam Pipe Installation

07/2010 12/2010 07/2011 01/2012 07/2012 01/2013RICHTR

Prolongation ???

Non-conform with baseline planning

TR

Outside beam periods

In this scenario the RICH could only be used if there is a window to prolong the TR in 2013 !

today

12.9.2011

Page 23: RICH 17 m Beam Pipe Mirrors Separate pions from muons

M.Lenti 23

Conclusions

• Lot of progress on many items of RICH• Vessel production (CERN responsibility)

delayed• Mirror support system to be finalized• The RICH is on the critical path for september

2012 technical run

12.9.2011

Page 24: RICH 17 m Beam Pipe Mirrors Separate pions from muons

M.Lenti 24

Richieste Firenze 2012INTERNO Totale: 10.00 1. Riunioni con gli altri gruppi italiani di NA62 e riunioni del gruppo RICH 10.00ESTERO Totale: 64.00 1. meeting di analisi e collaborazione al CERN: 8 MU 32.00 2. Installazione al CERN del rivelatore RICH: 4 MU 16.00 3. Technical run di NA62: 4 MU 16.00 CONSUMO Totale: 153.00 1. Electronic Pool del CERN: noleggio moduli di elettronica 20.00 2. Common Fund della collaborazione NA62 100.00 3. Metabolismo 10.00 4. Installazione al CERN del rivelatore RICH 20.00 5. Noleggio auto al CERN per l'installazione ed il technical run 3.00 APPARATI Totale: 25.00 1. Installazione e test dell'elettronica di front-end del rivelatore RICH (CORE 2012) 25.00

Totale NA62 Firenze 252.00

12.9.2011

Page 25: RICH 17 m Beam Pipe Mirrors Separate pions from muons

M.Lenti 25

Richieste Perugia 2012INTERNO Totale: 18.00 1. Riunioni e attività in Italia per RICH e TDAQ (Firenze, Pisa, Frascati) 12.00 2. Riunioni in Italia 6.00 ESTERO Totale: 76.00 1. Installazione rivelatori (RICH, TDAQ): 4 m.u. 16.00 2. Commissioning run: : 6 m.u. (previsione durata run: 6 settimane) 24.00 3. Riunioni di analisi e di collaborazione (7 riunioni) al CERN o presso altre istituzioni estere,

riunioni e "working group" sul rivelatore e per la preparazione del commissioning run (9 m.u.) 36.00 CONSUMO Totale: 32.50 1. Installazione rivelatori al CERN 10.00 2. Metabolismo ricerca 10.00 3. Attività TDAQ (1 PC x sviluppo firmware L0: 2k€; 2 schede di rete 10Gbit: 1k€; TDAQ spare: 1 Tel62: 3.5k€; 2 TDCB nuova produzione con cavi: 3k€; consumo di laboratorio per riutilizzo

elettronica esistente di NA62 per lettura CHOD di NA48 nel commissioning run 2012: 3k€) 12.50 TRASPORTI Totale: 1.00 1. Trasporto materiale ordinato 1.00LICENZE-SW Totale: 2.00 1. Licenze Software Altera (convenzione Università) 2.00APPARATI Totale: 25.00 1. Completamento HV RICH (residuo CORE) 25.00SPSERVIZI Totale: 6.00 1. Spese consumo per servizi 6.00

Totale NA62 Perugia 160.50 12.9.2011