FEED BACK NO. 46
SUBJECT
Delayed opening of LPBP stop & control valves leading to Boiler trip outs.
Details
In one of the 500 MW sets proble of Boiler tripping on either of the follo!ing
protections !as reported !henever turbine tripped"
#. $eheater protection
%. Boiler load inde ' (0)
*nalysis
#. Whenever turbine trips and boiler troubles are not present+ latter should continue
to operate through ,P-LP bypass syste. nder such conditions $eheater is to be
protected against starvation. /o above t!o protections are provided. $,
protection has a tie delay of seconds !here as BLI has ( seconds only.
%. /12 & trends analysis confired that !ith turbine trip outs instant coands
!ere issued by ,P BP as !ell as LP BP controllers !ere issued by ,P BP as !ell as
LP BP controllers to go to full open states. ,P BP valves follo!ed the coands
siultaneously and !ere opening as per coand !ithin # sec. of issue of
coands. ,o!ever+ LP BP valves !ere ta3ing ore than %0 seconds to open.
(. 4he syste !as thoroughly chec3ed and dapers provided in spray !ater
pressure ipulse line to liiter of LP BP rac3 !ere found to be !elded in !rong
direction.
2planation
* 4o protect condenser against daages caused by hot stea entering
through LP BP syste condensate spray syste is provided. 4o ensure
that sufficient spray !ater is available before stea is duped in
condenser+ the spray !ater pressure at the do!n strea of !ater in6ection
valves is sensed and counicated to liiter !hich acts as the perissive
providing tool for LP BP stop and control valves. 4his signal is also used as
LP BP tripping signal and acts on in6ection !ater pressure slide valve in the
rac3. 7Pl. refer the enclosed diagra.
7/18/2019 Rh Protection
http://slidepdf.com/reader/full/rh-protection 2/2
B 4he echanis has sensing of spray !ater pressure at do!n strea of
WI valves via daper 7(. When LPBP syste is not in use+ no !ater !ill
be available in do!n strea. 4o avoid undesirable thrust on the bello! of
liiter+ it is necessary to ensure positive filling of ipulse line upto the
bello!. 4his is achieved by optii8ing orifices 7# & 7%. Daper 7( also
acts as 9$: and stops bac3 flo! of fill-!ater !hen LPBP is not in use.
; 4he dapers 7( !ere installed in the reversed direction. 4his not only
!as resulting into draining of spray !ater pressure ipulse line but also
the liiter !as providing perissive to LPBP control and stop valves
opening due to in6ection !ater pressure ahead of the !ater in6ection
valves 7due to stoppage of !ater flo! at daper on pressuri8ation of
ipulse line !ith spray !ater at do!n strea of WI valves.
4his !hole process of counication of spray !ater pressure 7that+ too of upstrea
header to liiter !as ta3ing considerable tie 7< %# seconds.
Action Taken
4he dapers 7( !ere cut and re-!elded in the right direction. :arious trials !ere ta3en.
4he tie gap bet!een issue of coand by controller 7*s3ania and eecution of valve
stri3ers could be reduced of # second.
4hus+ the proble of Boiler trip+ on turbine tripping due to above protections could be
resolved.