Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
SAC/MRSA/RFP/Aug’18/SSPA V1
1
RFP for
Characterization, Test & Evaluation
Of
Solid State Power Amplifiers (SSPA)
Space Applications Centre
Indian Space Research Organization
Ahmedabad, Gujarat, India
SAC/MRSA/RFP/Aug’18/SSPA V1
2
Contents
1. Introduction ................................................................................................................................... 3
2. Scope of Work ............................................................................................................................... 3
3. Deliverables ................................................................................................................................... 4
4. Delivery Schedule and Payment Terms ...................................................................................... 4
5. Milestones / Status Reviews .......................................................................................................... 5
6. Proprietary Rights ........................................................................................................................ 5
7. Guidelines to Vendor .................................................................................................................... 5
8. Vendor Evaluation Criteria ......................................................................................................... 6
Annexure A: General Description .......................................................................................................... 7
Annexure C: List of FIM ...................................................................................................................... 13
Annexure D: R&QA Requirement........................................................................................................ 14
SAC/MRSA/RFP/Aug’18/SSPA V1
3
1. Introduction
Under Indian remote sensing program by ISRO, SAC is developing various microwave
payloads. Under this development activity, we are in process of developing X-Band Solid State
Power Amplifiers (SSPA).
SAC has plan for indigenous development of X-band SSPAs, wherein SAC would provide
the hardware and Test & Evaluation (T & E) would be done through Indian industry.
2. Scope of Work
The overall scope of this contract involves characterization and Testing & Evaluation (T & E)
of FM & QM X-Band Solid State Power Amplifiers (SSPA) as per the details given in this
RFP and complying to the R&QA requirements given in Annexure D.
SSPA is comprised of two separate mechanical packages (namely, RF-Tray 1 & RF-Tray 2).
All components required for assembly of RF-Tray 1 & RF-Tray 2 will be delivered to the
vendor along with Electronic Power Conditioner (EPC) as Free Issue Material. RF Harness
(i.e. semi-rigid RF cables) to be used between RF-Tray 1, RF-Tray will also be provided as
FIM. The SSPA hardware & EPC together (RF-Tray 1+RF-Tray 2+EPC) will be treated as
“Device under Test” (DUT) for this RFP. Vendor has to characterize the DUT as per this RFP
along with Testing & Evaluation (T & E) as per R & QA requirement given in Annexure D.
The scope of work is broadly listed below:
Sr. No Activity Responsibility
1 Delivery of FIM in batches SAC
2 Incoming Inspection of FIM on receipt & report to SAC Vendor
3 Compatibility of Carrier Plates (bare, without gold
plating) with MIC substrates & bare Aluminum package
Vendor
4 Surface treatment (gold/silver plating and black thermal
paint)
Vendor
5 MIC attachment to carrier plates & component mounting
& assembly
Vendor
6 Mechanical assembly in package, interconnection &
DC/RF Harnessing
Vendor
7 Electrical Tests & Performance Optimization using RF
absorber and gold ribbon tuning
Vendor
8 Temporary Cover Closing & Temperature Cycling Test Vendor
9 Temperature Operating Test Vendor
10 LP application wherever required Vendor
11 Phase shift characterization Vendor
12 Cover closing after results review Vendor with SAC’s
approval
13 Test & Evaluation Vendor
14 Delivery of DUT with Test Report Vendor
2.1 Procurement of materials and inspection
Procurement of consumable materials such as RTV, Conductive/Non-conductive Epoxies
(Cho-bond), gold ribbons, mounting screws, washers and other tools for mechanical assembly
related activities etc.as per requirements given in Annexure D.
SAC/MRSA/RFP/Aug’18/SSPA V1
4
2.2 Processes
Following processes are involved:
a. Attachment of Alumina MICs to carrier plates
b. Attachment/mounting of SMD components like SLCs, Chip Resistors, Chip
Terminations, Cu-magnet wires etc on MIC/PCB.
c. RF & DC interconnection
d. Surface Treatment – gold plating on Al6061 package, Kovar & Cu-Molly carrier plates
e. 5/10/20 mil gold ribbon bonding from MIC substrates to components.
f. RF absorber & EMI Gasket Mounting on Al alloy cover
g. RTV application wherever required in integrated package
The processes to be used in this activity is listed in the R & QA Annexure (Annexure-D).
3. Deliverables
Sr. No Items
1 Flight Model (FM) SSPAs
2 Qualification Model (QM) SSPA
3 Data Package
4. Delivery Schedule and Payment Terms
Table 1: Delivery Schedule
Sr. No. Delivery Schedule Activities to be completed / Units to be
delivered
01 T0 PO Placement
02 T1=T0 + 2 weeks Submission of BG by Vendor
03 TFM_OUT1: TFM_IN1 + 7 weeks Delivery of 4 FM units
04 TFM_OUT2 = TFM_IN2 + 5 weeks Delivery of 4 FM Units every 5 weeks
05 TQM_OUT: TQM_IN + 20 weeks Delivery of 1 QM Units
Where, TFM_IN1: Delivery of 1st batch of FIM for FM Units
TFM_IN2: Delivery of 2nd batch of FIM for FM Units
TQM_IN: Delivery of FIM for QM Unit
Note:
I. Sr. No. 04 of Table 1 could be a repeat activity depending on the total no. of units to be
delivered as per PO.
II. Typically, a single batch for FIM will cater to 4 FM units. However, if the batch size <
4 FM units, vendor has to deliver the available units within the schedule given in Table
1 and if the batch size > 4 FM units, vendor has to maintain the above delivery schedule.
III. Delivery schedule is utmost critical and compliance to the schedule is essential.
SAC/MRSA/RFP/Aug’18/SSPA V1
5
5. Milestones / Status Reviews
The pre-requisite for this activity is qualification and line certification of the assembly
line & the operators and implementation of QA approved PID.
Test Setup review and approval by SAC.
A Test Result Review shall be conducted after the first batch of SSPAs are ready for
dispatch.
6. Proprietary Rights
Vendor is required to have a non-disclosure agreement with SAC. The developed designs and
product will be the property of SAC and shall not be provided to third party without prior
written permission from competent authority of SAC.
7. Guidelines to Vendor
The Vendor should be an Indian company with their fabrication and test facilities in
India.
The vendor shall examine the whole RFP thoroughly and offer point-by-point
compliance matrix indicating clearly the parameter/specification in tabular format for
their offer. In case of non-compliance, the deviation from the specified parameter shall
be furnished.
Vendor must quote for all the requirements specified in the RFP for offer consideration.
It is necessary for the vendor to furnish complete information as required in the scope of
RFP for proper evaluation and assessment of the proposal.
The vendor may seek clarifications, if any, in advance before submitting the quotations.
Vendor shall quote in two parts:
PART-1: “Detailed Technical Proposal” giving all details as per the specifications.
Vendor should also provide the commercial itemized quote masking the pricing
information along with Part-1.
PART-2: “Commercial Proposal” giving cost, payment terms and other financial
details. Part-2 must be submitted in a separate sealed envelope. This requirement shall
be strictly adhered to.
Bidders should upload detailed/itemized break-up of price quoted as an attachment under
the link “Documents submitted by vendor (Price Related)” in the following format. No
Price details should be submitted under technical envelope. However, unpriced copy of
the itemized list also shall be uploaded with the technical documents. This requirement
shall be strictly adhered to.
Table 2: Quotation Format
Sr. No. Description Qty Unit Cost
01 FM units of X Band SSPA as per RFP 5-8
9-24
25-40
02 QM unit of X Band SSPA as per RFP 1
2-3
SAC/MRSA/RFP/Aug’18/SSPA V1
6
For price comparison, the total cost of “24 FM Units and 1 QM Unit” ONLY will
be considered and L1 price will be obtained.
The purchase order will be split between two vendors, in the ratio of 60:40, with
vendor with L1 quote getting 60% of total quantity and vendor with L2 quote
getting 40% of total quantity, provided vendor with L2 quote accepting the L1 offer,
when asked for. If vendor with L2 quote does not accept the offer, then purchase
order for full quantity will be placed on vendor with L1 quote.
As the purchase order will be split to two vendors, order for 1 QM unit will be
placed to each vendor.
Vendors may be asked to take part in Technical Discussion during technical bid
evaluation, whenever deemed necessary, by SAC.
The vendor must ensure that the quotation along with all the required details reaches
SAC/ISRO before the due date.
Vendor should clearly indicate ordering information (order to be placed in favour of,
component’s part no. & other relevant information.
8. Vendor Evaluation Criteria
It is mandatory that the vendor’s MIC and PCB assembly lines as well as manpower
should have valid certification from ISRO, at the time of bidding.
Vendor must have prior experience of Fabrication, Assembly, Test & Evaluation of
flight-worthy (FM/QM) RF Subsystems.
Vendor must have sufficient technical expertise of optimization and testing of high
power RF subsystems specifically and pulsed in general. In this context, vendor has
to provide details of similar contracts executed in the last 5 years.
Vendor should preferably have vacuum compatible high power test accessories like high
power Couplers, Attenuators, Loads, RF Cables etc and RF instruments with Pulsed
measurement capability.
Vendor is required to provide the details of the available test equipment like, make, brief
specifications, year of procurement, number of equipment, etc.
Based on the details provided by the vendor, SAC will assess the capability of the vendor
to take up this work. Decision of SAC will be final in this regard.
SAC/ISRO reserves the right to visit & audit the facility at vendor site for vendor
capability evaluation before PO placement.
Vendor must provide the project execution with reference to proposed schedule in terms
of available resources like certified manpower, testing infrastructure, usage of external
agencies for testing etc.
All the required test facilities should preferably be available with the vendor. However,
if vendor proposes to use external test facilities, a letter of consent from the external
vendor must be produced at the time of bidding. Vendor shall also bring out its impact
on schedule.
SAC/MRSA/RFP/Aug’18/SSPA V1
7
Annexure A: General Description
A1. Feeder SSPA Block Schematic & Specifications
The major specifications of the SSPA are given in Table A1:
Table A1: SSPA Specifications
PARAMETER SPECIFICATION
Frequency 9600 ± 300MHz
Phase control 6 bit, 360° in steps of 5.625°
RMS Phase Setability Error <5.625°
Input Power 0 dBm (nom.)
Peak Transmit Power 54 dBm (250 Watts)
Transmit Pulse Duration 40µs (max)
Transmit Duty Cycle 22% (max)
O/P Power Flatness ± 0.5 dB for 300 MHz Bandwidth
± 1 dB for 600 MHz Bandwidth
O/P Power Variation over Temp. (-15oC to
55 oC) ± 0.75 dB w.r.t. ambient
Input Return Loss -10 dB
Total DC Power with EPC 350W
Harmonic Rejection -20 dBc
Out-of-Band Spurious -50 dBc
Figure A1: Tentative Mechanical Hardware of SSPA Tentative Dimension: 250 X 200 X 65 (in mm)
Approximate Weight: 2 Kg
SAC/MRSA/RFP/Aug’18/SSPA V1
8
A2. EPC Specifications
Table A2: EPC Input Specification
PARAMETER SPECIFICATION
Input Raw Bus Voltage
Vmin: 34.45 V
Vnominal: 40 V
Vmax: 41.55 V
Input Average Current 12 A (max.) at Vmin
10 A (max.) at Vmax
SAC/MRSA/RFP/Aug’18/SSPA V1
9
Annexure B: Functional Testing
The scope of work is listed as follows:
EPC will be provided at the time of IBT of T & E; entire T & E has to be carried out for
the (SSPA+EPC) combination.
Typical test plan is provided in following sub-sections. However, the exact test parameters
as well as the test conditions will be specified at the time of execution of this contract.
Vendor must provide detailed Test set-up along with instrument details for testing of
SSPA; the set-up has to be approved by SAC. These details must be provided by the vendor
along with the technical bid.
B1. General Guidelines
1. Vendor has to test the SSPA as per specifications given in Table A1 and test plan given
in para B3. Unless specified, all the tests as per para B3 are to be carried out at nominal
input power level (refer Table A1 of Annexure A).
2. The Test Setup shall be able to run through the test plan under pulsed condition with
selectable PRF.
3. Test data provided should comprise of plots, Microsoft Excel spreadsheets or any
spreadsheet software, e.g. open-office with all the necessary annotations. Test Results
to be compiled by vendor in formats of SnP / CSV, plots and images in jpeg.
4. Vendor shall compile the summary of the test results in a format approved by SAC for
each unit.
5. Modifications in the specifications, assembly and test plan, if any, along with the
required data format will be given by SAC at the time of PO placement.
B2. Test Setup Interface
One SSPA with its power supply is defined as one DUT as shown in Figure B1. The test setup
shall be controlling the DUT.
SSPA
EPC
Test S
et-u
p (TS
)
Figure B1: Integrated SSPA Test Setup
SAC/MRSA/RFP/Aug’18/SSPA V1
10
B3. Test Plan I/O test
S Parameter Measurement
Input Level Tx input: 0 dBm
Phase control 0 deg
On a pulsed VNA, Pulsed Sij parameters with above conditions are to be recorded over 600
MHz bandwidth around 9600 MHz for at least 61 points. Data is analyzed to calculate Power
Gain and Input Return Loss.
Flatness, Peak Output Power & Droop Measurement
RF Input Level 0 dBm
Phase control 0 deg setting
Output is to be observed on a Peak Power Meter and the following are to be recorded
Peak Power
Power Droop
Pulse profile plot
The above measurements are required over 600 MHz bandwidth centered around 9600 MHz
in 100 MHz steps.
Input Power Sweep Measurement
RF Input Power -20 dBm to +2 dBm
Phase control 0 deg setting
Peak output Power is to be recorded. The above measurements are required over swept input
power levels of -20dBm to +2 dBm in 1 dB steps and at 7 points around 9600 MHz over 600
MHz bandwidth.
Harmonic Level & Out of Band Spurious Measurement
Out of band Spurious search up to 18 GHz.
Input Level Tx input: 0 dBm at 9300, 9600 & 9900 MHz
Phase control 0 deg setting
Phase Control Characterization
Phase shifter is to be varied through all the 64 states and both "Phase & Magnitude" for all the
pulsed S-parameters need to be recorded. S21 data is to be analyzed to estimate RMS Phase
setability Error & RMS ∆A with 64 phase states over the frequency band. The above
measurement is required over at least 7 frequency points over the bandwidth of 600 MHz
around 9600 MHz.
From the above measured S parameter data following are to be calculated:
RMS Phase Setability Error (Tx Path)
RMS Gain variation with Phase control (Tx Path)
SAC/MRSA/RFP/Aug’18/SSPA V1
11
B4. Non-Operating Temperature Cycling Test
After performance optimization and temporary cover closing, the DUT shall undergo
temperature-cycling test under non-operating condition as per the profile given in Figure B2.
B5. Temperature Operating Test
Before final cover closing & stacking, the DUT is to be tested in a thermal chamber as per
following profile (Figure B3):
Temp. transition rate of 10C/min is
to be followed for this test.
Following parameters are to be
recorded during the measurement
slot:
Output Power (dBm) from 9.3
to 9.9 GHz at 7 equidistant
frequency points.
Out of band spurious at 9.3, 9.6
& 9.9 GHz
Harmonic Level at 9.3, 9.6 &
9.9 GHz.
Note:
1) This test may be continued with the above thermal cycling test.
2) Vendor has to test the DUT with values of DC Bias Voltages as defined by SAC.
B6. Phase Shifter Control Characterization Data for LUT generation
After successful TOT, final cover closing of RF-Tray 1 & RF-Tray 2 will be carried out and
both the trays will be stacked as per SAC approved drawing. Subsequently, the SSPA
Characterization data (S-parameters for each of the 64 phase states) shall be acquired and
Figure B2: Non-operating Temp. Cycling Profile
Figure B3: Operating Temp. Cycling Profile
SAC/MRSA/RFP/Aug’18/SSPA V1
12
recorded, in 5°C steps over -15 to +55°C, for generating the Look Up Table. Characterization
data shall be collected twice and verified for repeatability, before proceeding for next
temperature. The Test Setup shall generate Look Up Table from the above collected data of
each of the SSPAs as per format provided by SAC. This data has to be captured in 5 set of
input power levels, details of which will be communicated at the time of execution of this
contract.
Note: 1. The Test Setup shall be able to de-embed test accessories connecting the DUT over the
complete DUT operating temperature range. The final Look Up Table should be with
deembedded values.
2. Figure B4 represents the temperature profile for the Temperature operational test.
Fast Ramp Rate (for transitions from 250C to -150C & 550C to 250C): 10C/min Slow Ramp Rate (for transitions in 50C steps): 0.10C/min
Figure B4: Temp. Profile for TOT
SAC/MRSA/RFP/Aug’18/SSPA V1
13
Annexure C: Component & Material List
Table C1: List of Components & Material per SSPA
List of FIM
Sr. No Component Qty/unit FIM (Y/N)
1 Carrier Plates 30 Y
2 Patterned MICs (Alumina) 40 Y
3 FR4 PCB 3 Y
4 SLC Capacitor 70 Y
5 EMI Line Filters 20 Y
6 Chip Resistors 15 Y
7 Chip Terminations 6 Y
8 Cu-magnet Wire (24, 28, 32 Gauge) - N
9 Thermopad 2 Y
10 Drop-in Isolators 3 Y
11 SMD Resistors 80 Y
12 SMD Capacitors 80 Y
13 CKR type Capacitors 20 Y
14 SMA Connectors 3 Y
15 Sub D Connectors 3 Y
16 Multi-pin Header 1 Y
17 EMI Gasket - Y
18 Ground Lug 20 Y
19 PGS Sheet - Y
20 RF Active Devices 9 Y
21 Digital ICs 2 Y
22 Power MOSFETs/BJTs 10 Y
23 Diodes 20 Y
24 Thermisters 2 Y
25 RF Absorber - Y
26 Semi-rigid RF Cable 1 Y
27 Polyamide Wires - N
Note: FIMs will be given in batches. The maximum value of FIM given at any point of time
will be 50 lakhs.
SAC/MRSA/RFP/Aug’18/SSPA V1
14
Annexure D: R & QA Requirement
Para No. Requirements Vendor’s
Compliance
1.0 INTRODUCTION: This section describes the Reliability and Quality Assurance requirements
to be followed by Vendor during optimization & testing of ordered
subsystems.
Mandatory requirements: It is mandatory that ISRO qualified PCB, MIC
(25 mil Alumina) fabrication and assembly process line of the vendor
including fabricators & inspectors shall have valid qualification status at
the time of bid. Necessary certificate shall be attached along with the quote.
SAC may visit the vendor facility to access their capability after receiving
the quote.
Vendor shall have capability in terms of SAC/ISRO qualified fabrication,
test and storage facilities as well as necessary technical expertise to build,
optimize, test and deliver the high reliability product including test
engineers.
2.0 APPLICABLE DOCUMENTS:
Following reference documents are applicable during realization of the
hardware.
ISRO-PAS-100
Issue-3, Nov
2012
Non-conformance control requirements for ISRO
projects
ISRO-PAS-201
Issue-3, Nov
2012
Failure Reporting, Analysis and corrective Action
procedures
ISRO-PAS-202,
Issue 2, Aug
2014
Environmental Test Specification Requirements for
ISRO Space craft
ISRO-PAS-207 Storage, Handling and Transportation requirements for
Electronic Hardware
ISRO-PAX-300
Issue-5, Nov
2012
Workmanship Standards for the Fabrication of
Electronic Packages
ISRO-PAX-305 Qualification requirements and Workmanship Standard
for Microwave Integrated Circuits (MIC)
MIL-STD-461E Requirements for the control of Electromagnet
Interference Characteristics of Subsystems and
Equipment
3.0 OPERATING CONDITION FOR ACTIVE COMPONENTS:
The electrical designs are made compliant to the SAC derating
requirements. During optimization the electrical operating conditions of
active devices shall be selected such that junction/ channel temperatures of
all solid-state devices shall not exceed +110ºC for GaAs and 150 0C for
GaN (or Tj max-75 °C, whichever is lower) under nominal operating (RF
SAC/MRSA/RFP/Aug’18/SSPA V1
15
Para No. Requirements Vendor’s
Compliance
ON in case of RF active components) and worst case environmental
conditions.
4.0 ENVIRONMENTAL SPECIFICATIONS
4.1 Non-Operating Environment:
The units are designed to withstand following environmental conditions: a) Temp. Range : - 40oC to +70oC
b) Pressure : Ambient and hard vacuum better than 10-6 torr.
c) Relative Humidity : Up to 95% without condensation of water at +40oC
(Applicable for storage on ground only)
4.2 Operating Environment:
The unit is designed to meet all the performance requirements as given in
electrical specifications under the following environmental conditions:
a) Temp. Range:
i) Flight Acceptance : -10C to +50oC
ii) Proto Flight / Qualification : -15oC to +55oC#
# Tentative; to be finalized during PO placement
b) Pressure: The unit shall be capable of operating and compliant to the
specifications at ambient pressure as well as vacuum level of 10-5 torr
and hard vacuum of the order of 10 -13 torr.
4.3 EMI / EMC :
EMI / EMC requirements of MIL-STD-461E (Test applicability is shown
in Table – D1)
Unit shall meet be tested for Conducted susceptibility and Radiated
Susceptibility requirements of MIL-STD-461E. Further test conditions
TBD.
4.4 Space Radiation:
Radiation shielding shall be carried out by the vendor as per SAC approved
drawing.
5.0 Incoming inspection of FIM form SAC:
All the active & passive electronic parts, Materials and hardware shall be
subjected to incoming visual inspection, in as received condition.
Traceability shall be maintained from incoming inspection to the final units.
Regarding the active components in bare die version, visual inspection shall
be carried out just prior to the assembly in the module.
Any defect / damage observed during visual inspection shall be informed
to SAC.
6.0 MATERIALS:
Vendor shall ensure to use ISRO approved / qualified materials for
fabrication & rework. Procurement of fabrication materials shall be done as
per SAC Approved Materials List (DML). Vendor shall review & clear
Material Test Report (MTR) & CoC of the manufacturer. Non-metallic
materials shall have a Total Mass Loss (TML) of less than 1% and
Collectable Volatile Condensable Materials (CVCM) of less than 0.1%
when subjected to a test condition of +125ºC and 1x10-06 torr pressure for
SAC/MRSA/RFP/Aug’18/SSPA V1
16
Para No. Requirements Vendor’s
Compliance
24 hours. If CoC contains outgassing parameters, then separate test not
required. All inspection and clearance records for the materials shall be
maintained by the vendor.
Materials list consisting of the name of vendor, shelf life, qualifying agency,
location of application in the sub-systems shall be submitted to SAC for
approval.
All the materials shall be used within their shelf life.
7.0 PROCESSES:
ISRO-PAX-300 / 305 workmanship standards shall be followed for the
fabrication work/rework. All electronic fabrication processes shall be ISRO
qualified. Similarly, whenever required the processes used for surface
treatment shall also be ISRO qualified. All the processes shall be carried
out in accordance with PIDs reviewed by QA-SAC.
The following processes are likely to be used for fabrication/rework of unit.
1. Attachment of Alumina MICs to Kovar carrier plates
2. Attachment of Alumina MIC on Cu-Molly CP
3. Attachment/mounting of SMD components like SLCs, Chip
Resistors, Chip Terminations, Cu-magnet wires etc on MIC / PCB
& CP.
4. RF & DC interconnection
5. Surface Treatment – Gold plating on Al 6061, Kovar & Cu-Molly
6. 5 / 10 / 20 mil gold ribbon bonding
7. Fabricated CPs / PCBs assembly in RF tray
8. Cu enamel wire soldering on Substrates & PCB
9. Local potting & araldite application wherever ever required as per
SAC approved location diagram
10. Test harnessing external D connector
11. CHO bond – 1075 application on RF connector, if required
12. Gasket & microwave absorber attachment as per SAC approved
drawing
13. SR cable assembly
In case of processes qualified by other agencies, process qualification
reports shall be submitted to QA SAC for review. After review of previous
qualification plan, SAC will decide for requirement of full qualification /
delta qualification of such processes.
Assembly / Rework work shall be carried out on ISRO qualified fabrication
line by ISRO certified operators. In case, where consistently poor
workmanship is observed, Verification of the Process Qualification (VOQ)
/ operator re-certification shall be carried out at the discretion of SAC.
SAC/MRSA/RFP/Aug’18/SSPA V1
17
Para No. Requirements Vendor’s
Compliance
It is mandatory that all processes listed above shall ISRO qualified at the
time of submission of BID, except following two process - which shall have
to be qualified prior to starting of work as per this RFP.
1. Alumina attachment to Cu-Molly CP
2. Gold plating on Cu-Moly CP
Vendor to provide qualification status of all above 13 processes.
8.0 FABRICATION DOCUMENTATION:
All the activities involved during optimisation and Rework of FM units
shall be addressed in this sheet. Vendor shall prepare sheet / document,
identifying all the activities, methods / procedures & inspection check
points that will be followed during the fabrication activities.
For traceability of fabrication/assembly/testing activities, Vendor shall
maintain, a history sheet for each unit, where-in all the activities and QC
inspection comments are logged. This shall include any non-conformance
reported by QC and its close out, if any.
Work flow: A work sequence detailing each step of handling, optimisation, rework and
testing shall be jointly worked out before start of work.
(a) Name of processes and PID numbers.
(b) Permanent/Temporary torque values.
(c) Specific instructions, caution notes etc.
9.0 QUALITY CONTROL (QC): Vendor’s in-house Quality Control (QC) shall carry out 100% inspection of
all the units in as received conditions. Non Conformance, if any, shall be
reported to SAC immediately. In case of ribbon bonding required during
optimization / rework, such bonds shall be tested for NDT on 100% bonds.
QA Audit:
The QA audit shall be carried by QA SAC on vendor QC accepted hardware
from both electronic & mechanical point of view at various stages of
hardware realization. Following may be noted.
The frequency for QA audit shall be decided by SAC and intimated to
the Vendor.
Audit shall cover Electronic & Mechanical aspects for the following,
a) Surface finishing (plating / painting)
b) Wired Substrate / PCB
c) Packaging & fixing of cards/ substrates/ connectors & internal
harness
d) Integrated package level.
SAC/MRSA/RFP/Aug’18/SSPA V1
18
Para No. Requirements Vendor’s
Compliance
SAC shall audit all related facilities, Fabrication processes, cleanliness
records, overall documentation, parts & materials evaluation/test
reports, etc.
The Vendor shall generate close outs of discrepancies observed during
audit and submit the same to QA-SAC for review and acceptance, stage
wise clearance shall be given by QA SAC.
Virtual Audit (Online / Photographic & Documentation): Based on
confidence level build-up on fabricated hardware, SAC may opt for
virtual audit of hardware, provided vendor facility, process line, their
quality system, etc. found satisfactory.
10.0 STORAGE and TRANSPORTATION
Storage of hardware, parts & materials: Storage of fabricated hardware, parts & materials shall be done as per
ISRO-PAS-207. Active & Passive Component shall be stored in controlled
area environment under Class 100,000 clean room with round the clock
controlled temperature (22±3ºC) & humidity (45 to 55% RH). Parts shall
be stored in such manner as to prevent damage due to undue stresses. ESD
protection care shall be taken while receiving & issue of components. A
manufacturer instruction for storage & handling of parts shall strictly be
followed during the storage. Dry N2 (Nitrogen) purged packaging and
storage cabinets shall be used for storage of critical components like MMIC
bare dice and oxygen sensitive items like PCBs / mechanical hardware.
Transportation:
Suitable packing (as specified in ISRO-PAS-207) shall be provided for the
transportation of the unit by air or road without any degradation / damage.
Each unit shall be packaged in individual ESD protective packaging and
protect the unit from environmental conditions encountered during
transportation, like heat, humidity & dust. This individual container shall
then be placed in a transportation container. More than one individual unit
may be placed in the transportation container. The transportation container
shall protect the units from heat, humidity, dust, mechanical shock &
vibrations during transportation.
The individual unit packages and transportation containers shall be clearly
marked with following instructions along with other mandatory markings.
“ESD sensitive units”
“To be opened only under clean environment with ESD
precautions”
“High reliability space usage systems”
11.0 Test Applicability: All FM units shall undergo Acceptance level T&E and ONE unit identified by
SAC shall be subjected to QM level tests. Applicable tests for QM and FM are
given in Table-D1 below.
SAC/MRSA/RFP/Aug’18/SSPA V1
19
Para No. Requirements Vendor’s
Compliance Table – D1 : Tests applicability
Sr.
No.
Test QM (if
applicable)
FM
1 Visual Inspection X X
2 Initial Bench Test (IBT) X X
3 Burn-in-Test X
(168Hrs)
X
(168 Hrs)
4 Post Burn-in electrical tests X X
5. Temperature tests
a) Storage temperature (hot & cold) X -
b) Humidity Storage X -
c) Temp. operational test X -
6. EMI / EMC
CE102, RE102, RS-103 (@5V/m) X X
CS-101 (up to 1 Vrms)
CS-114 (curve3)
CS-115, 116 (Imax=5A)
X -
7. Sine Vibration X -
8. Random Vibration X X
9 Thermo-Vacuum test X X
10 Mechanical Shock X -
11 ESD test
Radiated Field (7 KV, 1pps, 30
pulses) X -
Single Point Discharge (5 KV, 30
pulses, 1 pps) X -
Structural Current ( 5KV, 1pps,
30 pulses) X -
12 Life Test X
(2000Hrs) -
13 Final Bench Tests (FBT) X X
14 Final Visual inspection X X
Requirement of QM will be decided at the time of placing order
Note:
1. ‘X’ denotes applicability of test.
2. At the end of each environmental /mechanical test, visual
inspection and electrical performance check shall be carried out.
3. Vendor shall send the Test data to SAC for review & clearance
for next test.
4. Buffer connectors suitable for mating with FM hardware, shall be
provided to protect input / output connectors of the device from
wear and tear due to mating / de-mating with other connectors
SAC/MRSA/RFP/Aug’18/SSPA V1
20
Para No. Requirements Vendor’s
Compliance
during testing. Record of number of time mating / de-mating of
connectors shall be maintained.
12.0 Failure:
Deviation from the agreed electrical specifications shall be treated as non-
compliance, and as cause to reject the units.
Any failure observed at any stage during testing shall be reported to SAC
immediately. This shall be followed by detailed failure analysis, clearly
identifying the cause of failure; random or design related, handling or test
induced etc. Based on analysis, further action shall be decided. In case of
mechanical or electrical failures; a retest plan or modification in the test
plan shall be decided and implemented after approval by SAC. This may
include re-qualification of process or the unit / Proto flight level testing.
13.0 TESTS:
All the specification requirements of this RFP shall be verified by testing.
Vendor is required to generate test procedure, clearly showing test set-up
and connection details including grounding as well as details of ATE. This
test procedure shall be sent to SAC for review & clearance. Testing shall be
done as per SAC approved test procedure using calibrated test & measuring
instruments. It is preferred that cable types used by the vendor for
harnessing during testing shall be similar or very close to cable type to be
used in harnessing of FM unit in the Space craft.
Acceptance of the test set-up shall be done jointly by SAC and vendor
before the testing of the QM & FM units. This will include verification of
control software of ATE. This shall also be audited, during the testing
activity. Vendor shall inform the readiness of the test set-up as well as the
schedule well in advance. Grounding scheme will be provided by SAC.
Representatives from SAC may participate in the testing.
Input level required for testing need to be as per specified by the SAC.
(a) Measurement Accuracy:
The measurement accuracy, calibration, etc. of the test instruments shall be
verified and the factors shall be stated in the test plan and procedures
document submitted by the vendor. All test & measuring instruments / unit
shall have valid calibration status at the time of testing.
(b) Temperature Stabilization:
Temperature stabilization shall be considered achieved when all the
temperature readings are within 3 C of the specified temperature for at
least three consecutive readings taken at ten minutes intervals.
SAC/MRSA/RFP/Aug’18/SSPA V1
21
Para No. Requirements Vendor’s
Compliance
(c) Maximum Allowable Tolerance in Test Conditions:
Parameter Tolerance
Temperature
1C Amb. Pressure
3C under vacuum
Atmospheric Pressure
Greater than 0.1 Torr
Below 0.1 Torr
5%
50%
Relative Humidity 5 %
Acceleration 10%
Sine Vibration
Frequency
Amplitude
Sweep rate
Time
2% above 25 Hz & 0.5 Hz below 25 Hz
10%
5%
1%
Random Vibration
Power Spectral Density
Overall grms
Duration
1.5 dB for 20-300 Hz & 3.0 dB for 300-
2000 Hz
10%
+10% / - 0%
Mechanical SRS
Amplitude
-3dB / +6dB
NOTE: The instruments shall be capable of measuring at least 10 times
better than tolerance limits.
14.0 TEST CONDITION & DETAILS: Following paragraphs give details of various tests to be performed on QM
/ FM units. Electrical test shall be carried out within 96 hours after
completion of each environmental test. The test parameters to be measured
during / after each of following test are given in Sub-Annexure D1. for
qualification unit and Sub-Annexure D2 for Flight unit. External visual
inspection shall be conducted after each environmental test.
14.1 Visual Inspection & Electrical test:
All the units shall be examined visually at 10 X magnification before and
after each environmental test. The units shall be inspected for surface
finish, plating, mechanical and workmanship related defects.
14.2 Electrical Test (IBT): This test shall be performed to verify compliance to all the electrical
parameters and will be taken as reference for all subsequent tests.
Electrical parameters shall be measured as specified. The electrical
parameter measurements, and DC current shall be measured at Minimum,
Maximum and Nominal input DC voltages as defined in EPC specifications
of this document.
SAC/MRSA/RFP/Aug’18/SSPA V1
22
Para No. Requirements Vendor’s
Compliance
14.3 Burn-In Test
Burn-in shall be carried out at maximum Operating Temperature for
QM/FM unit, as specified in this annexure. Unit shall be in power ‘ON’
condition. The duration of Burn-in shall be 168 hrs for all units. Data log
for Time-Temperature shall be kept for verification.
14.4 Post Burn-in Electrical Test:
This test shall be conducted at ambient temperature. Electrical parameters
shall be measured during Post burn-in functional tests.
14.5 Temperature storage test:
Temperature storage test is applicable to QM only. The unit shall be
subjected to minimum storage temperature for 24 hours. After this storage,
electrical and visual inspection shall be performed.
The test shall be repeated for maximum storage temperature. Units shall be
in non-operating conditions for the storage duration.
Visual inspection shall be performed after the test. Pre and post electrical
measurements shall also be carried out outside the chamber.
14.6 Humidity Test: This test shall be conducted on QM units as per the following conditions
Humidity : 95 % RH
Temperature : 40 0C
Duration : 24 Hrs.
After the humidity test, unit shall be visually inspected. There shall be no
visual defect like, degradation of plating/coating, discoloration, patches,
etc. Electrical parameters shall be measured after the test.
14.7 Operational temperature test: This test shall be performed to check the performance specifications of the
units at the specified Lowest and Highest operating temperatures. The units
shall be placed in a suitable thermal chamber, and connected with the
external test set-up. Dwell time at temperature extreme shall be at least 6
hours. Electrical parameters shall to be measured as specified.
14.8 EMI /EMC Test: The units shall be subjected to EMI / EMC tests as per MIL-STD-461E.
Test applicability is shown in Table - D1. Any additional tests, if required
by SAC, shall also be carried out by the vendor. Plots taken during all the
tests shall be kept for verification.
14.9 Vibration Test: Sine / Random vibration tests shall be carried out on applicable QM / FM
units. Visual & electrical measurement shall also be performed after each
Sine & Random vibration test. Vibration levels given below are tentative.
Final levels will be decided at the time of execution.
SAC/MRSA/RFP/Aug’18/SSPA V1
23
Para No. Requirements Vendor’s
Compliance
Vendor shall generate a vibration test report in a standard format, as shown
in Sub-Annexure D4, which will be sent to SAC for review and acceptance.
14.9.1 Resonance Search Pre & Post Vibration, resonance search shall be carried out in all the three
axes as per following levels. Natural resonance frequency (Fn) shall be
greater than 100 Hz and drift in pre & post vibration ‘Fn’ shall be within
10%.
Frequency (Hz) Amplitude
10 - 2000 0.5 g
Sweep rate 2 Oct / Minute
Resonance search success criteria are as under,
(i) < 10% in frequency shifts for modes with effective mass >10%
(ii) < 20% in amplitude shifts for modes with effective mass >10%
Vibration test sequence:
For QM Unit (all axis): LLS, Sine Vib, LLS, Functional test, LLS
Random Vibration, LLS
For FM Unit (all axis) LLS pre, Random vibration, LLS post.
Vendor shall use valid calibrated torque wrenches for fixture & package
mounting.
14.9.2 Sine Vibration: Sine vibration test shall be conducted only on QM unit. The unit shall be in
non-operating condition for the duration of vibration test.
Normal to mounting plane
(Z-axis)
Parallel to mounting plane
(X & Y axes)
Frequency
(Hz) Amplitude
Frequency
(Hz) Amplitude
5-20 12.4 mm (0–p) 5-18 11.5 mm ( 0 – p)
20-70 20g 18-70 15g
70-100 10g 70-100 8g
sweep rate
QM
2 Oct./minute
sweep rate
QM
2 Oct./minute
1 sweep in each axis shall be performed.
14.9.3 Random Vibration:
Units shall be subjected to random vibration tests with levels as given below
in passive mode. Frequency verses PSD plots shall be obtained and shall be
kept along with the test results for verification.
For QM units: Power spectral density
SAC/MRSA/RFP/Aug’18/SSPA V1
24
Para No. Requirements Vendor’s
Compliance
Frequency
(Hz)
Normal to mounting plane
(z-axis)
Parallel to mounting plane
(X & Y axes)
20-100 + 3 dB/octave + 3 dB/octave
100-700 0.28 g2/Hz 0.1 g2/Hz
700-2000 -6 dB/octave -3 dB/octave
Overall RMS 17.5 g 11.8g
Duration 120 sec. 120 sec.
For FM units:
Frequency
(Hz)
Power spectral density
Normal to mounting
plane (z-axis)
Parallel to mounting plane
(X & Y axes)
20-100 + 3 dB/octave + 3 dB/octave
100-700 0.12 g2/Hz 0.044 g2/Hz
700-2000 -6 dB/octave -3 dB/octave
Overall RMS 11.7 g 7.9 g
Duration 60 sec. 60 sec.
Note: Levels are tentative and shall be finalised before actual testing
based on weight & mounting configuration
14.10 Thermo vacuum Test: QM / FM units shall be subjected to thermal vacuum test as per the test
profiles shown in Figure-D1.
Following points shall be considered before starting thermo-vacuum test:
a) It shall be ensured that the parameters of the thermos-vacuum
chamber i.e. temperature, air pressure measuring device, etc. are
properly calibrated prior to the start of the test.
b) The input and output cables shall be properly identified and calibrated
at lab temperature.
c) The cables to be used in test setup shall be properly calibrated for the
extreme cold and hot temperatures in vacuum and the correction factor
shall be applied accordingly to the test data.
d) It should be ensured that the temperature sensors are mounted at pre-
determined locations for monitoring base plate and package
temperatures.
Electrical measurements shall be carried out at the points mentioned in test
profiles. The electrical parameter measurements, and DC current shall be
measured at Minimum, Maximum and Nominal input DC voltages as
defined in EPC specifications (Table A2 of Annexure A). During Turn-On,
DC inrush current shall be recorded and no RF measurement shall be
performed. Time-Temperature and Pressure data shall be logged along with
electrical results for verification.
14.11 Mechanical Shock Test: QM unit shall be subjected to mechanical shock test as per the following
test levels in all the 3 axes. Number of shocks in each axis shall be 2 and
Shock levels specified with Q = 10.
Frequency (Hz) SRS
100 – 600 +15 dB / octave
SAC/MRSA/RFP/Aug’18/SSPA V1
25
Para No. Requirements Vendor’s
Compliance
600-5000 1000 g
Note: Levels are tentative and shall be finalised before actual testing
14.12 ESD Test ESD tests shall be conducted on QM units only. Electrical measurements
shall be carried out after ESD tests.
14.12.1 Radiated field Test The unit (EUT) shall not exhibit any degradation of performance when
subjected to the radiated fields of less than or equal to 7 kV ESD, simulated
at 30 cm from all critical points identified by SAC. Discharge rate shall be
1 discharge per second for a period of 30 seconds at each point. The test set
up is as shown in figure below.
14.12.2 Single point Discharge Test The Unit (EUT) shall not exhibit any degradation of performance when
subjected to discharges equal to or less than 5 kV with discharge current
return wire in close proximity, applied to subsystem surface directly at
critical points to simulate the discharge and local flowing of arc currents.
Discharge rate shall be 1 discharge per second for a period of 30 seconds at
each point. The test set up is as shown in Figure below.
14.12.3 Structural current test The Unit (EUT) shall not exhibit any malfunction, degradation of
performance or deviation from the specifications when subjected to contact
discharges of less than or equal 5 kV, simulating structural current
SAC/MRSA/RFP/Aug’18/SSPA V1
26
Para No. Requirements Vendor’s
Compliance
transients, with discharge current return wire at diagonally opposite corners,
to simulate blow-off discharge currents. Discharge rate shall be 1 discharge
per second for a period of 30 seconds at each point.
14.13 Life test:
Life test shall be carried out during qualification testing. The unit shall be
subjected at maximum operating temperature for 2000 hours, with DC
biasing and normal RF input applied. During this test, electrical
measurement of critical parameters shall be carried out at suitable intervals
(e.g. 240 hours, 500 hours, 1000 hours, 1500 hours and 2000 hours). The
critical parameters of the unit under test shall be monitored continuously
during testing. However, the parameters to be monitored, duration and
interval for monitoring of parameters (typically 24 hours) shall be mutually
agreed between SAC and vendor. Acceptance criteria and parametric drift
shall be decided later.
14.14 Final Bench Test (FBT) :
The final bench test shall be conducted for measurement of electrical
parameters as given in test matrix. The electrical parameter measurements
and DC current shall be measured at Minimum, Maximum and Nominal
input DC voltages as defined in EPC specifications. The test shall be
conducted at ambient temperature. All the test results shall be recorded and
any performance deviation with respect to Initial Bench Test shall be
evaluated.
14.15 Final Visual Inspection: The unit shall be inspected for plating, surface, finish, mechanical
deviations, corrosion and workmanship related defects. No visual
degradation shall be allowed after completion of QM or FM test.
15.0 NON-CONFORMANCE MANAGEMENT:
Effective non-conformance management mechanism shall be established
by the vendor. Major non-conformance at any stage, which affects the
quality & reliability of any unit , shall be reported to SAC immediately with
photographs, nature of non-conformance observed, etc. Disposition shall be
taken in consultation with QA, SAC. However, for all the minor non-
conformances, approval from SAC is not mandatory, and shall be reviewed
and discussed by the vendor’s NCR board. This NCR board shall be
SAC/MRSA/RFP/Aug’18/SSPA V1
27
Para No. Requirements Vendor’s
Compliance
constituted by vendor in consultation with SAC. Non-conformance report
shall be generated by the concerned agency and shall be reviewed and
disposed-off by the NCR board.
Any non-conformance affecting the fabrication and / or inspection
procedure shall be reported to SAC. Changes in related documents shall be
implemented and revision number of the document shall be updated. This
shall be followed by updating all the documentation (fabrication,
inspection, test etc).
All the non-conformances with the disposition given by the NCR board
shall be reported to SAC within 2 working days. This shall be followed by
report of close out action completion, if any. For all the non-conformance
report, SAC representative shall be the focal the person.
16.0 DOCUMENT TO BE SUPPLIED :
16.1 The following documents shall be supplied along with the quote:
a) Pont by point compliance to all the requirements of this document.
b) Details to be provided as per QA check list given in Sub-Annexure D3.
16.2 The following documents shall be supplied during the contract:
a) Materials & Process List to be used for the fabrication / rework of units,
detailing process qualification status, procurement specifications,
traceability information, out gassing specifications etc.
b) Record of Bias conditions of identifying the channel / junction
temperatures of all the active devices
c) Process Identification Document.
d) Test procedure documents for Qualification and Acceptance (FM) tests
with test conditions, procedures, list of equipment and their calibration
status, for review & approval by SAC
e) Non-conformance management plan
16.3 Following documents shall be supplied during the program with respect to
relevant activity.
a) Schedule for final Cover closing of the QM and FM units
b) Details of test set-up and readiness
c) Non-conformance report
d) Failure Report; as and when failure occurs
16.4 Following detailed documents shall be supplied for each unit along with
deliverables, in soft copy on CD/ DVD.
a) T & E report of each unit containing detailed test results, test history,
conformance matrix, TBD value of components etc.
b) CoC of the deliverable units
c) CoC of materials Including screening report
d) Non Conformance reports with close-outs
SAC/MRSA/RFP/Aug’18/SSPA V1
28
Para No. Requirements Vendor’s
Compliance
Figure -
D1
Test Profile for Thermo-Vacuum
Sub-
Annexure
D1
TEST PARAMETER MATRIX for QM
Sr.
No.
Parameter
Fu
nct
ion
al T
est
on
Rec
eip
t
IB
T
B
urn
-in
Po
st B
urn
-in
ele
ctri
cal
Po
st
cold
sto
rag
e
Po
st h
ot
sto
rag
e
Po
st
Hu
mid
ity
sto
rag
e
Tem
p.
op
erat
ion
al t
est
EM
I/ E
MC
tes
t
Po
st
sin
e v
ibra
tion
P
ost
R
and
om
v
ibra
tion
Th
erm
o v
ac
Po
st m
ech
anic
al s
ho
ck
Po
st E
SD
Lif
e te
st
FB
T
1 Output Power X X X X X X X X X X X X X X X
2 Gain flatness
Over 300 MHz X X X X X X X X X X X X X X X
Over 600 MHz
3 Gain variation over operating
Temp. Range (max.)
X X
4 Phase Shift X X X X X X X
5 (a) Harmonic Level X X X X X X X X
(a) out of band spurious X X X X X X X X X
6 Input RL X X X X X
7 DC voltage X X X X X X X X X X X X X X X X
8 DC current X X X X X X X X X X X X X X X X
9 In-rush Current X X
SAC/MRSA/RFP/Aug’18/SSPA V1
29
Para No. Requirements Vendor’s
Compliance
Sub-
Annexure
D2
TEST MATRIX for FM
Sr.
No. Parameter
Fu
nct
ion
al T
est
on
Rec
eip
t o
f
Har
dw
are
IB
T
Bu
rn-i
n
Po
st B
urn
-in
ele
ctri
cal
EM
I/ E
MC
tes
t
Po
st
Ran
do
m v
ibra
tion
Th
erm
ov
ac
FB
T
1 Output Power X X X X X X X
2 Gain flatness
Over 300 MHz X X X X X X X
Over 600 MHz
3 Gain variation over operating
Temp. Range (max.)
X
4 Phase Shift X X X X
5 (b) Harmonic Level X X X X X
(b) out of band spurious X X X X X X
6 Input RL X X X
7 DC Voltage X X X X X X X X
8 DC Current X X X X X X X X
9 In-rush Current X X
SAC/MRSA/RFP/Aug’18/SSPA V1
30
Sub-Annexure D3: QA Check List
Vendor to provide complete details of following with relevant certificates.
Sr.
No
Details of information required Vendor response
1 Point by Point compliance provided ? Yes / No
2 List each applicable process ISRO qualified at your / sub-vendor’s
facility, their qualification status & attach qualification certificate.
Process Name Facility Certi. No.
a) Fabrication facilities : MIC
PCB
b) Component mounting & Assembly process on,
MIC
PCB
c) Details of ISRO qualified process available at vendor end,
Attachment of Alumina MICs to Kovar carrier plates Yes / No
Attachment of Alumina MIC on Cu-Molly CP Yes / No
Attachment / mounting of SMD components like SLCs,
Chip Resistors, Chip Terminations, Cu-magnet wires etc
on MIC/PCB and CP.
Yes / No
Gold plating on Al6061, Kovar and Cu-Molly Yes / No
5 / 10 / 20 mil gold ribbon bonding Yes / No
Cu enamel wire soldering on Substrates & PCB Yes / No
Local potting & araldite application wherever ever required
as per SAC approved location diagram
Yes / No
Test harnessing external D connector Yes / No
CHO bond – 1075 application on RF connector, if required Yes / No
Gasket & microwave absorber attachment as per SAC
approved drawing
Yes / No
SR cable assembly Yes / No
Note : If YES, pl. attach qualification certificate.
If NO, pl. provide status of process qualification & expected date of
completion.
3 Details of ISRO certified fabricator and Inspector for both MIC
and PCB work with its validity date
4 Details of Manpower for optimization & testing of Hi-Rel
subsystems & their experience
5 Location of test facilities likely to be used for following tests shall
be provided. (whichever applicable)
a) Visual Inspection (internal & external)
b) Electrical measurements
c) Burn-in test
d) Storage temperature test
e) Humidity storage test
f) Temp. operational test
g) EMI / EMC test
h) Sine Vibration test
i) Random Vibration test
SAC/MRSA/RFP/Aug’18/SSPA V1
31
j) Thermo-Vacuum test
k) Mechanical Shock test
l) ESD test
m) Life Test
SAC/MRSA/RFP/Aug’18/SSPA V1
32
Sub-Annexure D4
SAC/MRSA/RFP/Aug’18/SSPA V1
33
SAC/MRSA/RFP/Aug’18/SSPA V1
34