51
 GPMC Profile Rev. 6 (23122013) Global PMC (Private) Limited The Project Management Consultants Company Profile Global PMC (Private) Limited 14/H, Block No. 6, P.E.C.H.S, Karachi-75350, Pakistan.  Telephone No . 922 1-34331351, 3422169 4 Email: [email protected] Web: www.globalpmc.com.pk

Rfinery PMC.pdf

Embed Size (px)

Citation preview

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 1/51

 

GPMC Profile Rev. 6 (23‐12‐2013) 

Global PMC (Private) Limited 

The Project Management Consultants

Company Profile 

Global PMC (Private) Limited 

14/H, Block No. 6, P.E.C.H.S,

Karachi-75350, Pakistan. 

Telephone No. 9221-34331351, 34221694

Email:  [email protected]

Web: www.globalpmc.com.pk 

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 2/51

 

GPMC Profile Rev. 6 (23‐12‐2013)  Page 2

Table of Contents 

S. NO. Contents Page No. 

1 INTRODUCTION 3 

2 CONTACT INFORMATION 3

3 OUR PHILOSOPHY 3

4 OUR VISION 4

5 OUR MISSION 4

6 OUR VALUES 4

7 OUR STRENGTH 4

8 OUR CORPORATE GOVERNANCE 4

9 OUR CORE COMPETENCY 4

10 OUR EXPERIENCE 5

11 MAJOR PROJECTS HANDLED BY OUR TEAM MEMBERS 7

12 OUR TECHNICAL LIBRARY 13

13 OUR ENGINEERING RESOURCES 13

14 OUR TEAM 13

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 3/51

 

GPMC Profile Rev. 6 (23‐12‐2013)  Page 3

1) 

INTRODUCTION

Global Project Management Consultants Private Limited (GPMC) wasincorporated in July 2010, though a young entity its team members (director & key

 persons) have in-depth capabilities of providing services to oil & gas, petroleumrefining, chemicals, petrochemicals, storage terminals, pipeline, power plant, alternateenergy, sugar, textile industry, construction supervision, operation & maintenance,annual turnaround of plants, regulatory compliance audit, pre-shipment inspection,HAZOP’s, safety audits, feasibility studies, engineering audits & conservations,effluent treatment environmental studies and Facility Management Services.

Our key team members have been the main contributor’s with Oil & Gas RegulatoryAuthority of Pakistan (OGRA) in instituting regulatory compliance audit systemin Pakistan for LPG production, storage & bottling plants.

Our team members have also been involved in almost all the main projects ofRefineries, Petrochemical & Pipeline projects of Pakistan and some members have

extensive international experience.

The Global PMC (Private) Limited’s team mission is to become the prime & leadingconsultancy focused on providing Project Management, Design Engineering Services,Regulatory Compliance and Safety Audit and technical evaluation Services to theupstream & downstream oil & gas, petrochemical, energy and other engineeringindustries. From various platforms, our team members have provided services todifferent companies during the planning and development phase of projects. Our teammember’s clientele includes national & international companies for small to largescale projects.

2)  CONTACT INFORMATION

Global PMC (Private) Limited

14/H, Block No. 6, P.E.C.H.S,Karachi-75350, Pakistan.Phone #: 9221-34221694,34331351Email: contact @globalpmc.com.pkWeb: www.globalpmc.com.pk

3) 

OUR PHILOSOPHY

Global PMC has eyed on highly dedicated and professional attitude towards achievingclient’s target and in order to materialize truly the development of a highly productiveengineering industry with following criteria:

  Timely completion with quality meeting international industry standards, bestengineering practices and safety standards.

  Economic efficiency  Preservation of the environment.

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 4/51

 

GPMC Profile Rev. 6 (23‐12‐2013)  Page 4

4) OUR VISION

Contribution in the development of industries with excellence.

5) OUR MISSION 

Becoming an active participant and imperative organization as a global player in theindustry.

6) OUR VALUES 

  Act with integrity, loyalty and honesty.  Focus on customer success.  Create safe and health-conscious work environment.

7) OUR STRENGTH 

  Our management and technical team is group of highly skilled professionals who arededicated and committed for achieving the best results.

  Technical Team with proven track record.

8) OUR CORPORATE GOVERNANCE 

At Global PMC, we dedicate ourselves to earning the trust of our clients,employees, suppliers and customers by fostering a culture that emphasizescompliance with the law and ethical business behavior and byadopting strong principles of corporate governance, our constituents can feelconfident about their association with Global PMC.

 

The cornerstone of our compliance program is our Business Responsibilities of allGlobal PMC Employee.

  We apply strict ethical standards to our financial audit practices.  Our system of corporate governance based on board of directors

9) OUR CORE COMPETENCY 

  Project Management Services (PMC)  Complex process simulation model development  FEED Development  Detail Engineering  Procurement Services  Site Supervision 

Feasibility Studies, Safety & Engineering Audits and Conservations  Regulatory Compliance Audits, industry codes and review of complete design package

for Third Party appraisal.  Inspections & Witness Testing  Asset evaluations 

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 5/51

 

GPMC Profile Rev. 6 (23‐12‐2013)  Page 5

10) OUR EXPERIENCE 

The Global PMC (Private) Limited’s team mission is to become the prime & leadingconsultancy focused on providing Project Management, Regulatory Compliance andSafety Audit and technical evaluation Services to the upstream & downstream oil & gas, petrochemical and other engineering industries. From various platforms, our team

members have provided services to different companies during the planning anddevelopment phase of projects. Our team member’s clientele includes national &international companies for small to large scale projects. Our team members have provided services to following clients from various platforms:

Major Clients inside Pakistan

 

Techno-consults International Limited (TCIL) 

  Pakistan State Oil Co., Ltd. (PSO) 

  Peoples Steel Mills (PSM) 

 

Oil Industries Pakistan (OIP) 

  Unilever Pakistan Limited 

  Dalda Pakistan Limited 

 

Beltexco Limited

 

Unicol Pakistan

 

Manshanat Brothers

  Heavy Mechanical Complex (HMC) 

  Hub Power co. (HUBCO) 

  Cactus Fertilizer  

  HTG Chemicals 

 

BP Pakistan Exploration & Production Inc. (BPP)

  Karachi School Business & Leadership (KSBL)

 

Byco (Bosicor) Pakistan Ltd. 

  ENAR Petroleum Refining Facility I, II & III (EPRF) 

 

Oil & Gas Regulatory Authority (OGRA).

  Oil & Gas development corporation Limited (OGDCL).

  Pakistan Petroleum Limited (PPL)

   National Refinery Ltd. NRL 

  Nimar Chemicals (formerly Ravi chemicals) 

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 6/51

 

GPMC Profile Rev. 6 (23‐12‐2013)  Page 6

Major Clients outside Pakistan

 

Fluor Iraq

  ATG Hamriyah UAE

Typically, GLOBAL PMC team members have provided the following services to clients:

a) Project Management Consultancy Services 

i)  Feasibility Studies, Review of FEED and Design documents.ii)

 

Detail Engineering Design.iii)

 

Development/review of contract document for design engineering consultant andconstruction contractor.

iv)  Development/review of procurement documents and bid evaluation reports.v)

 

Procurement assistance & sourcingvi)

 

Development/review of Construction documents and bid evaluation reports.vii)

 

Project planning, scheduling and updating progress reports.viii)  Coordination with the consultants & construction contractors in all phases of work,

review of submittals and all documents pertaining to the project.ix)

 

Monitoring the project cost, cost variations due to changes in work quantum (ifrequired) and other such matters.

x) 

Verifying work progress of Consultants/Contractors’ invoices.xi)

 

HAZOP & other related studies.xii)  Supervision of site works to ensure compliance.xiii)  Provide technical liaison between various vendors and Contractor.

b) Regulatory Compliance Audits

xiv) 

Preparation of required documents for the verification of regulatory compliance ofhydrocarbon production, storage & filling facilities

xv) 

Verification/inspection of production, storage & filling facilities for their regulatorycompliance as per OGRA’s requirements.

xvi) 

Development of comprehensive audit reports and recommendations.

c) Inspections & Asset Valuation

i)  Pre-shipment inspectionsii)

 

Mill/factory, on-site, off-site & stage inspectionsiii)

 

Witness/performance testingiv)  Assets evaluations for owners and as third party.

v)  Integrity Management & RBI 

d) Technical Trainings

Onsite/Offsite training and certifications for:

i) 

Materials & Metallurgyii)  Welding & Welding Processesiii)  Corrosion Inspection Techniquesiv)

 

ASME Sec. IX & VIIIv)  API-510vi)  Cathodic Protection

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 7/51

 

GPMC Profile Rev. 6 (23‐12‐2013)  Page 7

e) Engineering Services for Upstream & Downstream Projects:

i) 

Pre feasibility, feasibility reports, Conceptual design, Process selection, FEEDii)

 

Process schemes, operations and maintenance philosophyiii)  Offsites, utility, relief, blow down, venting/ flaring/ incineration systemsiv)  Facility upgrades and debottlenecking.

v) 

Plant, equipment layout & Detailed engineering (piping, civil & E&I)vi)  Equipment design (vessels, columns, exchangers, heaters, storage tanks)vii)  Piping stress / Pipeline surge analysis.viii)

 

System optimization and conceptual design of Flow & gathering lines.ix)

 

Route reconnaissance, Pipeline alignment drawings & crossings design.x)

 

Storage tanks, terminal & pumping stations design.xi)

 

Procurement support ( procurement documents & bid evaluations)xii)  Vendor documentation review, Factory acceptance testing & inspectionsxiii)  Inspection and refurbishment of equipment.xiv)

 

Preparation of commissioning manuals for process units, off sites and utilities.xv)

 

Punch list during pre-commissioning & commissioning.xvi)  Ensure compliance with commissioning procedures during pre-commissioning and

commissioning phase.

11) MAJOR PROJECTS HANDLED BY OUR TEAM MEMBERS. 

 From Global PMC platform: 

i)  Designing of more than 30 vessels, columns & reactors for EPC bid for M/s Sefec

Engineering Limited. (In-Progress) ii)  Designing of breather valve system for PMG Tanks at Mehmoodkot Depot (PSO). 

(In-Progress) iii)

 

Designing of breather valve system for PMG Tanks at Shershah Depot. (PSO). (In-

Progress) 

iv) 

Process, Mechanical, Electrical & Instrumentation design of Several 3-PhaseSeparator Skids, Mercury Removal Vessels, Degassers etc. for ATG Hamriyah

UAE. (In-Progress)

v)  Design and drawings (services) for RO Plant structure, pipe supports, sleeperfoundations etc. Unicol Pakistan.

vi) 

Design and drawings (services) for CO2 Plant structure, skid foundations, pipe racks& supports, sleeper foundations, loading gantry etc. Unicol Pakistan

vii) 

Detailed Technical & Commercial bid evaluation for the Supply of 212 KVARPower Factor for Dawood Public School 

viii)  Improvement in Unloading/Decanting Facilities at existing HSD gantry at KTC(PSO). 

ix) 

Consultancy services for the designing, construction supervision & commissioningof LPG-Air Mix Plant. Beltexco Limited.

x) 

Study for the removal of moisture contents from transformer oil. OIPxi)  Detailed feasibility study of polymer pipe manufacturing plant. TCIL

xii) 

Complete Designing (Mechanical, Electrical & Civil) of 50’ Dia self supportedStorage Tank for Fluor Iraq 

xiii)  Enhancement of PMG loading capacity at Chackpirana Depot (PSO)

xiv) 

Enhancement of PMG loading capacity at Machike Depot (PSO) xv)  Enhancement of PMG loading capacity at Shikarpur Depot (PSO)

xvi)  Project Management Services for Gas Sweetening Unit Project (for EPC Bid) forPeoples Steel Mills Pakistan

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 8/51

 

GPMC Profile Rev. 6 (23‐12‐2013)  Page 8

xvii) 

Developed detailed engineering of electrical lighting system of Karachi School ofBusiness & Leadership. KSBL

xviii) 

Developed detailed engineering package of 700 KW diesel generating sets forxix)

 

Karachi School of Business & Leadership. KSBL xx)  Developed Process Simulation Model & detailed cost estimate of Gas Dehydration

Unit (for EPC Bid) for Peoples Steel Mills Pakistan

xxi) 

Developed Process Simulation Model & detailed cost estimate of Gas Sweeteningunit (for EPC Bid) for Peoples Steel Mills Pakistan 

xxii)  Detailed study of hexamine plant for HTG Chemicals

xxiii) 

Design verification of civil foundations for HUBCO

xxiv) 

Design of fire fighting system for Formaldehyde plant for HTG Chemicals xxv)  Development of BOQ & Fabrication drawings of Super Structure of Silver Rado-III

 project of Futehally Chemicals Limited Uniliver Pakistan.xxvi)

 

Stress Analysis of Utility Pipe Rack lines of Byco Refinery Pakistan.xxvii)  Developed Process Simulation Model of Gas Sweetening Unit (for EPC Bid) for

Heavy Mechanical Complex (HMC) Pakistanxxviii) Development of Civil & Piping packages for relocation of Dalda  Edible Oil

Refineryxxix)

 

HAZOP study of LPG Unit of Pakistan Refinery Limited.

xxx) 

Developed Process & Mechanical Engineering design package of Sulfuric AcidPlant for Cactus Fertilizer Plant 

xxxi)  Construction site management services for ENAR Petroleum Refining Facility-II.xxxii)  Development of Process Simulation model for the Kausar field of MKK concession

with excel interface for engineers not familiar with Aspen-Hysis software. British

Petroleum Pakistan

xxxiii) 

Facility Management Services for Horizon School (School for Children withspecial needs) Horizon School

xxxiv) 

Facility Management Services for Aligarh Muslim University Academy

xxxv)  Development of Detailed Engineering Design package of First Floor of Aligarh

Muslim University Academy. 

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 9/51

 

GPMC Profile Rev. 6 (23‐12‐2013)  Page 9

 From other Platforms: 

b) Regulatory Compliance Audits for OGRA of following plants: 

i) 

BYCO Oil refining & LPG Production Plan

ii)  OGDCL Dhakni Gas processing & LPG production Plant.

iii) 

OPI Naimat Gas processing & LPG production Plant

iv) 

PPL Adhi Gas processing & LPG production plant

v)  JJVL Jamshoro LPG production Plantvi)  SSGC Air Mix Plant Gawader

vii)  Progas Port Qasim Terminal & Sarai Gadai Terminal

viii)  Shell Faisalabad Terminalix)  Akbar Associate Attock Facility

 In Addition to above, Regulatory Compliance Audits for various LPG filling & bottling plants all over Pakistan were carried out.

c) As Project Sponsor/Manager, Plant/Site Managers / Project Leads &Engineers 

Our team members worked on the following projects from various platforms:

 

Project Sponsor for the inspections of different plants for (OGRA). Our team was themain contributor with OGRA for the development of regulatory compliance auditsystem in Pakistan. This Project involved collection of technical data / documentation,visual inspection of plant and facilities, assessment of plants for compliance of Codes/standards and compilation of inspection report. – (OGRA). 

  Project Manager for the development of detailed feasibility report (EPRF III), for therelocation of 25,000 bbls deep conversion refinery from USA. Visited USA for the

detailed inspection, developed dismantling philosophy, packing, loading, transportationto USA port, sea transportation, re- simulation, re-engineering, refurbishing ofequipments, installation, erection, commissioning strategies were developed. The totalrelocated cost of the plant is $ 85 million. – (EPRF-III).

  Project Manager for the grass root pilot refinery project, this project involves the basic and detailed engineering design of process unit, off sites & utilities, procurement,construction and commissioning. – (EPRF-II).

  Engineering Manager for Design House of British Petroleum Pakistan, This designhouse consists of more than 32 Engineer’s & draftsmen and handled hundreds of projects in 2009 – (BP Pakistan).

  Project Manager for the CDU unit revamp project, this project involves the

development of Engineering Design Specification (EDS) packages for process unit, offsites and utilities. After revamp the processing capacity of the CDU unit increasedfrom 12,000 bbls/day to 30,000 bbls/day. –  (Bosicor Pakistan Limited).

 

Project Manager for the development of FEED for EPC Contractor. This projectinvolves the relocation of unused LPG plant to Dhodak.– (OGDCL). 

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 10/51

 

GPMC Profile Rev. 6 (23‐12‐2013)  Page 10

 

Project Manger for the detailed engineering and inspection of LPG Plant for GarhiHassu (stored unused for last eight years) and assessment of the works required for therehabilitation and relocation to Dhodak field. – (OGDCL).

  Engineering Manager for ADN-B Wellhead Platform Detailed Design Project

 – (Addax Petroleum Development Nigeria Limited).

  Engineering Manager for Concept Verification and Detailed Design ofH2S Scavenger System at BONGA FPSO – (Shell Nigeria).

  Engineering Manager for Structural Design Projects at Mobil’s BRT & QIT Facilitiesunder Call-off Contract – (Mobil Nigeria) 

 

Engineering Manager for ORWS Wellhead Platform Detailed Design Project – (Addax Petroleum Development Nigeria Limited).

  Plant Manager, solely responsible for the operation, maintenance andannual turnaround of the EPRF-I during the first 18 months after the commissioningof grass root pilot refinery capable of processing 3000 bbls/day of local condensate.

This pilot project is the first of its kind in the country & providing strategic support tothe defense forces of the Pakistan. – (EPRF-I).

  Project Manager for the detailed engineering design, coordination between companyand client, monitoring project progress, sourcing of material, coordination ofworkflow, ensuring budget and milestones are maintained. – (Gastec GmbH).

  Site Manager for management of construction site, contractors, coordination ofworkflow, ensuring budget and milestones are maintained. – (BOBI LPG OGDCL). 

  Project Manager for process, mechanical, piping, electrical and instrumentengineers to carry out the front end engineering (FEED) of the project. Developed thetime schedule, performance curve and assisted project team to meet the schedule givein the Gantt’s Chart. Was also involved in the cost estimating (CAPEX & OPEX), planning and scheduling of the Project. – (Manzalai-1 MOL Pakistan). 

  Project Manager for technical assessment of various plants and refineries.Projects involved collection and compilation of technical data / documentation,review of process scheme of plants and refineries, visual inspection of plant andfacilities, assessment of condition of plant and facilities, estimation of remainingoperating life of plant and facilities, assessment of normal replacement / maintenancerequirements and revamps projects and identification of non-essential / non productiveassets.

 

Team Lead for complete cost estimate of gas gathering system from different wells tothe Central Processing Facilities. – (Uch Gas Gathering Project OGDCL). 

 

Team Lead for complete cost estimate of Dakhni Train II and Dakhni BMR Project.The objective is to increase the processing capacity of the existing plant from 30MMSCFD to 50MMSCFD. – (Dakhni Train II Project OGDCL).

  Team Lead for complete cost estimate of the grass roots refining complex capable of processing 120,000 bbls/day of crude oil. – (Coastal Refinery Project). 

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 11/51

 

GPMC Profile Rev. 6 (23‐12‐2013)  Page 11

  Team Lead for detailed design, Procurement, Construction andCommissioning of Light Naphtha Splitter to reduce C5 content from Isomerization unitfeed – ( Ruwais Refinery, TAKREER). 

  Assistant Engineering Manager for Zamzama North and B & D Tie-in Detail

Engineering Works with Zamzama Facility for BHP Pakistan.

  Assistant Engineering Manager for Saqib-1A EWT & Latif-2 EWT Wellhead facilitydevelopment for  Petronas Pakistan.

  Assistant Engineering Manager for Conceptual and Front End Engineering Design(FEED) of Kandkhot Gas Purification Facility) for Pakistan Petroleum Limited.

  Assistant Engineering Manager for Replacement of Condensate Degasser at RehmatGas Plant for  Petronas Pakistan.

  Lead Design Engineer for the grass root (3000 bbls/day) pilot refinery project. This project includes basic engineering, detail design, procurement, fabrication ofequipments and construction supervision. Pre-shipment inspection for columns, drums,

 pipe & fittings, boilers, heaters were also performed. –   (Condensate ProcessingFacility Project).

  Lead Design Engineer, responsibilities includes pipeline route selection, survey,alignment drawings, wellhead piping, design, procurement, quality control/ assurancedocuments etc. – (Bobi Early Production Facilities Project of OGDCL).

  Lead Design Engineer for Qadirpur Capacity enhancement Project for Gas purification Plant. (OGDCL).

  Lead Design Engineer for Feed of Adhi LPG/NGL Plant – II for  PPL

  Lead Design Engineer for Detail Engineering of Kadanwari Well K-1 & K-6 for  LASMO Oil Pakistan Ltd.

 

Lead Design Engineer for Engineering Study for Low Cost Low Pressure WellheadSystems for  LASMO Oil Pakistan Ltd.

  Lead Process Engineer for Basic and Detailed Engineering of Tajjal – 1 WellheadExtended Well Test Facility Development for  OMV.

  Lead Process engineer for Level – 3 ESD and Depressurization system for Satahcrude processing facilities located at Zirku Island for  ZADCO.

  Lead Process Engineer for De – bottlenecking study of Yanbu Refinery Atmosphericcolumn’s pump around circuits. Circuits included; Naphtha, Kero, LDO, HDO and Naphtha stabilizer and splitter section. (Saudi Aramco).

 

Lead Process Engineer for Study of upgrade of North Refinery flare system of RasTanura Refinery for  Saudi Aramco

 

Lead Process Engineer for Conceptual design of Brazed Aluminum plate type heatexchanger for Berri Gas Plant, Ethane and NGL Unit for  Saudi Aramco.

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 12/51

 

GPMC Profile Rev. 6 (23‐12‐2013)  Page 12

  Lead Process Engineer for Zulf Artificial lift Project. Carried out the simulation,rating and evaluation of world’s largest Gas-Oil separation facility. Plant contains largenumber of separators, de-salters, dehydrators, heat exchangers, pumps, compressorstrains, gas dehydration and dew point control system, etc. (Saudi Aramco) 

 

Lead Process Engineer for Study of up gradation of Relief system at Ras Tanura Refinery for Aramco.

  Lead Process Engineer for Detailed design of CO2 pipeline for Kingdom Dry IceFactory (KDI KSA).

 

Lead Process Engineer for Condensate Processing Facility a pilot refinery to process3000 BPSD of condensate. Was involved in Conceptual design, detailed design, pre-commissioning, commissioning and startup phase. ENAR Petrotech Services (Pvt)

Limited.

  Lead Process Engineer for Front End Engineering Design (FEED) of Adhi Gas Fieldto enhance the capacity of existing plant by installing a parallel train for   Pakistan

Petroleum Limited (PPL).

  Lead E & I Design Engineer for Kandhkot Field Gas Compression Project of  PPL

  Lead E & I Design Engineer for Qadirpur Gas Compression Project & Tando AllahYar Development Project of OGDCL

 

Lead E & I Design Engineer for Sinjhoro, Dakhni & Chanda Project of  OGDCL

  Lead E & I Design Engineer for Adhi Lpg / Ngl Plant – II Project of  PPL

  Process Engineer for Capacity enhancement study by relocating Garhi Hassu plant to process the additional fluids from Dhodak field –  (OGDCL)

 

Process Engineer for Preliminary Feasibility Study of Tangri & Mazari Gas Fields toInstall Gas Sweetening & De-hydration plants for UTPI. ♦  Process Engineer forDevel opment of System Curves of Kadanwari Gas Field Gathering lines forLASMO Oil Pakistan Limited (LASMO).

  Process Engineer for Capacity Enhancement Study of Turk Amine Plant for UnionTexas Pakistan Inc. (UTP).

  Process Engineer for De – Bottlenecking study of Propane Recovery Unit for(NRL). 

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 13/51

 

GPMC Profile Rev. 6 (23‐12‐2013)  Page 13

12) OUR TECHNICAL LIBRARY

Our team members have been providing Engineering Consultancy services to oil &gas / petrochemicals. We have a huge technical Library, consist of hard &softcopies of International Codes & Standards, Manuals, Technical Books,Procedures, Practices etc.

13) OUR ENGINEERING RESOURCES

Our team members have expertise in using engineering software for projects.Besides world renowned engineering software, our team members also developedsoftware in- house for engineering applications. We have expertise and access tofollowing software’s:

♦  ASPAN Hysys for Process Simulation

♦  OLGA for Dynamic Simulation Hydraulics Analysis

♦  Korf for Hydraulic Analysis

♦  Caesar-II for Piping Flexibility Analysis

♦ 

Coade Tank & E-Tank for Design / Rating of Storage Tank♦

 

Compress & PV Elite For Design of Pressure Vessel

♦  Natasha for Surge Analysis of Pipeline

♦  Staad Pro for Structural Analysis

♦  Cadworks, Autocad & Microstation for 3-D Plant Modeling

14) OUR TEAM

The present strength of Global PMC (Private) Limited is as under:

1. Process Engineers 032. Mechanical Engineers 033. Electrical / Instrumentation Engineers 024. Civil Engineers 035. Cad Designers / Cad Draftsmen 056. Secretarial / Administration / Accounts 01

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 14/51

 

GPMC Profile Rev. 6 (23‐12‐2013)  Page 14

REGISTRATION CERTIFICATE 

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 15/51

 

GPMC Profile Rev. 6 (23‐12‐2013)  Page 15

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 16/51

 

GPMC Profile Rev. 6 (23‐12‐2013)  Page 16

NATIONAL TAXNUMBER

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 17/51

 

GPMC Profile Rev. 6 (23‐12‐2013)  Page 17

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 18/51

 

GPMC Profile Rev. 6 (23‐12‐2013)  Page 18

PAKISTAN ENGINEERINGCOUNCIL REGISTRATION

CERTIFICATE

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 19/51

 

GPMC Profile Rev. 6 (23‐12‐2013)  Page 19

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 20/51

 

GPMC Profile Rev. 6 (23‐12‐2013)  Page 20

RESUME’S OF KEY

PERSON’S

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 21/51

GLOBAL PMC (PRIVATE)LIMITED

PERSONAL PROFILE

Name: MATEEN HAMEED  Employee No: 0000

Designation: Chairman

Page 1 of 4

EDUCATION

•  Bachelor of Electrical Engineering 1967

NED University of Engineering & Technology, Karachi, Pakistan

TRAINING / COURSES

•  Completed numerous study courses on General and Project Management.

EMPLOYMENT HISTORY

Present

Chairman Feb. 2011 to-dateGlobal PMC (Private) LimitedKarachi, Pakistan

Previous

Project Manager   Nov 2007 – Feb. 2011ETIMAAD Engineering (Private) Ltd 

Karachi, Pakistan

Site Manager / Project Manager Mar 2006 – Oct 2007Descon Engineering Qatar L.L.CQatar

General Manager - Const ruct ion Management Services Jun'1986 – Feb’2006ENAR Petrotech Services (Private) LimitedKarachi, Pakistani

Petrofac International L td., Sharjah, U.A.E. Dec.1985 - Jun.1986Senior Project Engineer (On Assignment)

Maintenance / Engineering Superintendent  Jan.1979 - Dec.1985 Abu Dhabi National Oil Company, Abu Dhabi, U.A.E.

Senior Plant Engineer / Operation Engineer   Mar.' 67 - Dec.' 78National Refinery LimitedKarachi, Pakistan

EXPERIENCE PROFILE

Present

 As Chairman in Global PMC (Private) Limited, leading a team of Engineers & Draftspersons forproviding services to oil & gas, petroleum refining, chemicals, petrochemicals, storage terminals,pipeline, power plant, textile industries and other related projects.

Previous

Have more than Forty-four years experience in the field of Design, Project, EngineeringManagement, plant operation & maintenance which includes Project Estimates, DetailedEngineering, Site/Construction Supervision, Regulatory compliance & safety Audits, Designvetting and Plant Operation & Maintenance of Oil & gas, Power & Petrochemical Plantsensuring timely project completion according to governing codes, standards using latestcomputer technology.

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 22/51

GLOBAL PMC (PRIVATE)LIMITED

PERSONAL PROFILE

Name: MATEEN HAMEED  Employee No: 0000

Designation: Chairman

Page 2 of 4

Provided leadership, direction and timely decisions, Budget, manpower requirements,Institute and conduct all phases of Project Management. Promoted progressive developmentof inter-personal and communication skills and team building. Developed, implementedoverall work plans and control work progress. Evaluated contracts and establishedappropriate project requirements and authorization limits. Established Hazop review andstandard requirements. Recruitment necessary staff for project

Set-up organized and supervised project groups for Review P&ID's and detail constructiondrawings. Developed contracts scope of work, prequalify contractors, review bid proposals,select contractors and award contracts. Prepare detail work plans and monitor work progress.Generate procurement packages, place purchase requisitions, review proposals and selectsuppliers/vendors. Coordinate total project activities, interface with project support groupsand prepare management information reports. Prepare check list for pre-commissioningequipment/plant, issue completion certificates and sign off for acceptance.The work details in projects are as follows:

Project Description Client Responsibility

Electrical light ing system KSBL(Global PMC Pvt. Ltd.)  Karachi School of

Business

Project Manager   for Developed detailedengineering of electrical lighting system ofKarachi School of Business & Leadership.KSBL

Engineering package of 700 KWdiesel generating sets(Global PMC Pvt. Ltd.) 

Karachi School ofBusiness

Project Manager for Developed detailedengineering package of 700 KW dieselgenerating sets Karachi School of Business &Leadership. KSBL

P&G DRY LAUNDRY PLANT(ETIMAAD Engineering Pvt.Limited)

Proctor & Gamble(Nov 07 to Feb 11)

Project Manager   for all the activities  DryLaundry Project

 Aisha Steel Mil l Project(ETIMAAD Engineering Private Ltd   Aisha Steel(Nov 07 to Feb 11)  Project Manager   for all the activities for ColdRoll Steel Complex (CRSM) 

Ethylene Cracker Project(DESCON Engineering).

TECHNIPFRANCE

(Mar' 2006 – Oct2007)

Site/Project Manager  for all the activities onbehalf of subcontractor for the Cold Section ofEthylene Cracker Project (3

rd Largest Project of

its kind) being built by EPC Contractor

Revamp Project o f CrudeDistillation Unit(ENAR Petrotech Service Pvt. Ltd).

National RefineryProject Manager   for all the activities ofincreasing its throughput from 35,000 BPD to50,000 BPD.

INSPECTION OF LPGPRODUCTION & BOTTLINGPLANTS(ENAR Petrotech Service Pvt. Ltd).

Oil & GasRegulatory

 Authori ty (OGRA)Project Manager for the inspections of differentplants.

QADIRPUR 400MMSCFDPROJECT(ENAR Petrotech Service Pvt. Ltd)

Oil & GasDevelopmentCompany Ltd

Project Manager  

increasing gas purificationcapacity from existing 250 to 400 MMSCFD.Include details engineering, procurementassistance, Construction supervision andproject management.

Condensate Processing FacilityProject (EPRF-I)(ENAR Petrotech Service Pvt. Ltd).

Enar Petro leumRefining Facility(Apr. 98 to Dec.02)

Project Manager  for Procurement of Equipment/ Material Detailed Engineering andConstruction Supervision Services forprocessing 3000 barrels / day CondensateProcessing Facilities which includes all utilitiesand development of storage area.

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 23/51

GLOBAL PMC (PRIVATE)LIMITED

PERSONAL PROFILE

Name: MATEEN HAMEED  Employee No: 0000

Designation: Chairman

Page 3 of 4

Bobi Early Production Facilities

(ENAR Petrotech Service Pvt. Ltd).

Oil & GasDevelopmentCompany Ltd

Project Manager   for   establishment ofhydrocarbon gathering pipeline and separatingthe condensate from gas and recovery of LPG.The work includes detailed engineering,procurement and construction supervision.

Chanda Gas Processing Facili ty(ENAR Petrotech Service Pvt. Ltd). 

Oil & GasDevelopmentCompany Ltd

Project Manager   for re-location of LPG PlantDehydration Plant to increase LPG ProductionCapacity to 50 tons per day and produce 3000barrels per day condensate. 

Omar Phase IV (Syria) WaterInjection Project.

(Petrofac International  L t d . )  

PetrofacInternational Ltd.,

Sharjah, U.A.E.

Senior Project Engineer   for Design activitiesof expanding and improving the watertreatment, injection and distribution facilities.

Maintenance and engineering

 Activi ties o f UAN Refinery.(Abu Dhabi National Oil Company) 

 Abu DhabiNational Oil

Company, AbuDhabi, U.A.E

Jan.' 79 - Dec.' 85 

Maintenance / Engineering SuperintendentCompleted pre commissioning/commissioningactivities and signed off acceptance and

maintenance of 400 MMSCF of sour gas plant.

Supervised all the activities of maintenance andengineering departments of UAN Refinery.Responsible for maintenance and engineeringactivities of rotary equipment, stationaryequipment, electrical and power distributionsystems, instrumentation, process computers,selection of equipment, inventory managementand standardization.

Operations & Maintenance(National Refinery Limited)

National RefineryLimited, Karachi Mar.' 67 - Dec.' 78 

Senior Plant Engineer / Operation Engineer Overall training in all the department of therefinery.Operation and maintenance of boilers, water

treatment & distribution facilities, utilities,electrical system, power distribution system andasphalt air blowing unit.Coordinator total shutdown maintenance (turn-around) of the refinery.Control of all the activities of generalengineering department which includemechanical, electrical, civil and instrumentationworks.Supervised contract, maintenance andmodification jobs.

COMPUTER SKILLS

MS Office & Other related engineering software’s

 AFFILIATIONS

•  Life Member – PEC (Pakistan Engineering Council)

•  Member, Institute of Engineers of Pakistan

•  Member, Petroleum Institute of Pakistan

PERSONAL

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 24/51

GLOBAL PMC (PRIVATE)LIMITED

PERSONAL PROFILE

Name: MATEEN HAMEED  Employee No: 0000

Designation: Chairman

Page 4 of 4

Date of Birth : July 01, 1944

Nationality : PakistaniReligion : IslamMarital Status : MarriedLanguages : English and Urdu

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 25/51

GLOBAL PMC (PRIVATE)LIMITED

PERSONAL PROFILE

Name: Muhammad Alim ur Rahman Employee No: 0001

Designation: Chief Executive 

Page 1 of 4

EDUCATION

B.E Mechanical Engineering 1993

NED University of Engineering & Technology Karachi, Pakistan

TRAINING / COURSES

  Microsoft Certified System Engineer + I 2000

  Pumps & Compressors – Short course held incollaboration of NED University & Petromen.

  Project Management by PIM’s

2002

2008

EMPLOYMENT HISTORY

Present

Chief Executive  July 2010 to-dateGlobal PMC (Private) Limited 

Karachi, Pakistan

Previous

Principal Engineer   June 2008 to-July 2010(Engineering Manager, British Petroleum Design House)JGC-DESCON Engineering (Pvt.) LimitedKarachi, Pakistan

Senior Mechanical Engineer June 1993 to May 2008ENAR Petrotech Services Private LimitedKarachi, Pakistan

EXPERIENCE PROFILE

Present

 As Chief Executive Global PMC (Private) Limited, heading a team of Design Engineers &Draftspersons for providing services to oil & gas, petroleum refining, chemicals,petrochemicals, storage terminals, pipeline, power plant, textile industries, operation &maintenance services, regulatory compliance & safety audits, pre-shipment inspections,HAZOP’s and other related projects.

Previous

Have twenty years experience in the field of Project & Engineering Management, whichincludes Project Estimates, Detailed Engineering, Site/Construction Supervision, Regulatory

compliance & safety Audits, Design vetting and Plant Operation & Maintenance, Annualturnaround & Facility Management services of Oil & gas, Power & Petrochemical Plantsensuring timely project completion according to governing codes, standards using latestcomputer technology.Carried out number of activities like development of Engineering Calculations, Piping Plans,Isometrics, Pipe Supports, BM/BQ Preparation, Specifications for Materials, ProjectSchedules, procurement activities, Supervision/Planning for Site activities etc.Have excellent knowledge of engineering design codes such as ASME, NFPA, API, ANSI,MSS, etc. I also have excellent knowledge of P&ID’s, Mechanical, Civil, Structure,Instrumentation and Electrical drawings & Documents.While working in ENAR Petroleum Refining Facility as a Plant Manager, I gained in-depthknowledge of plant operation techniques, maintenance problems & schedules and annualturn around activities.

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 26/51

GLOBAL PMC (PRIVATE)LIMITED

PERSONAL PROFILE

Name: Muhammad Alim ur Rahman Employee No: 0001

Designation: Chief Executive 

Page 2 of 4

The work details in projects are as follows:

Project Description Client Responsibility

Case Study for Optimization ofTransformer Oil Plant(Global PMC Pvt. Ltd) 

Oil industriesPakistan 

Project Manager  for Study of transformer oil process in

order to eliminate operational and process error for

achieving the required specifications

Feasibility Study onPolymer Pipes industry(Global PMC Pvt. Ltd) 

TCILProject Manager   for the development of detailedfeasibility for polymer pipes manufacturing plant. 

Enhancing of PMGDecanting & LoadingCapacity at PSO ShikarpurTerminal(Global PMC Pvt. Ltd)

Pakistan State OilProject Manager   for the enhancement pf PMChandling capacity at PSO Shikarpur project

Enhancing of PMG Loading

Points at PSO MachikeTerminal(Global PMC Pvt. Ltd)

Pakistan State Oil Project Manager   for the enhancement pf PMChandling capacity at PSO Machike project

Enhancing of PMG LoadingPoints at PSO ChakpiranaDepot(Global PMC Pvt. Ltd)

Pakistan State OilProject Manager   for the enhancement pf PMChandling capacity at PSO Chakpirana project

Development of detailedfeasibility study of smallcrude oil topping unit(Global PMC Pvt. Ltd.) 

ManshanatBrothers

Project Manager for Development of detailedfeasibility study on small crude oil topping unit

Developed ProcessSimulation Model of GasDehydration Unit(Global PMC Pvt. Ltd.) 

Peoples SteelMills Pakistan 

Project Manager for Developed Process SimulationModel & detailed cost estimate of Gas DehydrationUnit (for EPC Bid) 

Developed ProcessSimulation Model GasSweetening Unit(Global PMC Pvt. Ltd.)

Peoples SteelMills Pakistan 

Project Manager for Developed Process SimulationModel & detailed cost estimate of Gas SweeteningUnit (for EPC Bid).

 

Development of FabricationDrawings for multi-storiedcomplex steel structure(Global PMC Pvt. Ltd.) 

FutehallyChemicals(Uniliver)

Project Manager for the Development of FabricationDrawings for multi-storied complex steel structure anddetailed BOQ 

Stress Analysis of UtilityPipe Rack(Global PMC Pvt. Ltd.) 

Byco RefineryProject Manager for the stress analysis of utility piperack of under construction utility pipe rack.

Developmnt of HysisSimulation Model & Cost

estimate(Global PMC Pvt. Ltd.) 

Heavy Mechanical

Complex

Project Manager for the Development of Process

Simulation model & Cost Estimate for the SinjhoroField of OGDCL.

Relocation of 300 tons/dayedible oil refinery(Global PMC Pvt. Ltd.) 

Dlada FoodsProject Manager for the relocation engineering of 300tons/day edible oil refinery

Site Management Services(Global PMC Pvt. Ltd.)

Enar Petro leumRefining Facility-II

Site Consultant for the construction site of EnarPetroleum Refining Facility-II

220 tons/day Sulfuric AcidPlant(Global PMC Pvt. Ltd.)

Cactus fertilizerProject Manager for the development of Process &Mechanical Package of 220 tons/day Sulfuric Acidplant

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 27/51

GLOBAL PMC (PRIVATE)LIMITED

PERSONAL PROFILE

Name: Muhammad Alim ur Rahman Employee No: 0001

Designation: Chief Executive 

Page 3 of 4

Design House of Br itishPetroleum PakistanManaged by DIPL, formerlyJGC-Descon Engg. Pvt. Ltd.

British PetroleumPakistan

(Jun. 08 to Jul.2010)

Engineering Manager for the design house consistsof more than 32 Engineer’s & draftsmen and handled

projects of more than 200 millions of US $.

Inspection of LPGProduction & BottlingPlants.(ENAR Petrotech Service Pvt.Ltd). 

Oil & GasRegulatory

 Authority(OGRA) (Sep.05 – May 08) 

Project Sponsor for the inspections of differentplants. I was the main contributor with OGRA for thedevelopment of regulatory compliance audit system inPakistan. This Project involves collection of technicaldata / documentation, visual inspection of plant andfacilities, assessment of plants for compliance ofCodes/ standards & compilation of inspection report.

Enar Petro leum RefiningFacility (EPRFIII) Project(ENAR Petrotech Service Pvt.Ltd).

 

Enar Petro leumRefining Facility 

(Aug. 07 – Nov. 07)

Project Manager   for the development of detailedfeasibility report, for the relocation of 25,000 bbls deepconversion refinery from USA. Visited USA for thedetailed inspection, developed philosophy /procedures for dismantling, packing, loading,transportation to USA port and sea transportation toKarachi. Developed strategies for re- simulation, re-engineering, refurbishment of equipments, installation,erection and commissioning The total relocated costof the plant are $ 85 M.

Enar Petro leum RefiningFacility (EPRFII) Project(ENAR Petrotech Service Pvt.Ltd).

Enar Petro leumRefining Facility

(Dec. 06 – May 08)

Project Manager   for the grass root pilot refineryproject, this project involves the basic and detailedengineering design of process unit, off sites & utilities,procurement, construction and commissioning.

Bosicor Pakistan Limited’sCDU revamp Project(ENAR Petrotech Service Pvt.Ltd).

Bosicor PakistanLimited

(Dec. 05 - toDec.06)

Project Manager for the CDU unit revamp project,this project involves the development of EngineeringDesign Specification (EDS) packages for process unit,off sites and utilities. After revamp the processingcapacity of the CDU unit increased from 12,000bbls/day to 30,000 bbls/day. 

Dhodak Expansion Project(ENAR Petrotech Service Pvt.Ltd). 

OGDCL(Feb. 05 to Nov.05)

Project Manager   for the development of FEED forEPC Contractor. This involves the relocation ofunused LPG plant to Dhodak to cater the increasedwell productions with integration to existing plant.

Garhi Hassu LPG plantrehabilitation Project(ENAR Petrotech Service Pvt.Ltd). 

OGDCL(Jul. 04 to Feb. 05) 

Project Manger   for the detailed engineering andinspection of LPG Plant (stored unused for last eightyears) and assessment of the re-engineering & worksrequired for the rehabilitation and installation. 

Enar Petro leum RefiningFacility (EPRFI) Project(ENAR Petrotech Service Pvt.Ltd). 

Enar Petro leumRefining Facility

(Jan. 03 to Jun. 04) 

Plant Manager, solely responsible for the O & MEPRF-I during the first 18 months after thecommissioning of refinery capable of processing 3000bbls/day of local condensate. This project is the first ofits kind in the country & providing strategic support tothe defense forces of the Pakistan.

Condensate ProcessingFacility Project (EPRF-I)(ENAR Petrotech Service Pvt.Ltd).

Enar Petro leumRefining Facility

(Apr. 98 to Dec.02)

Lead Design Engineer/Site Coordinator   for thegrass root (3000 bbls/day) pilot refinery project. Thisproject includes basic engineering, detail design,procurement, & fabrication supervision of equipments,Pre-shipment inspection, construction supervision andcommissioning of the plant.

Uch Gas Gathering Project 

(ENAR Petrotech Service Pvt.

Ltd).

OGDCL(Jun. 98 to Sep.98)

Team Lead for complete cost estimate of gasgathering system from different wells to the CentralProcessing Facilities. 

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 28/51

  GLOBAL PMC (PRIVATE)LIMITED 

PERSONAL PROFILE 

Name: Zakiuddin Hussain  Employee No: 0002 

Designation: Consultant Mechanical Engineering 

EDUCATION M. Sc. Petroleum Technology 1998

Karachi University, PakistanB.S Mechanical Engineering 1995NED University of Engineering & TechnologyKarachi, Pakistan

TRAINING / COURSES T – Bosiet

EMPLOYMENT HISTORY 

Present Head Mechanical Engineering Jul. 2010 to-dateGlobal PMC (Private) LimitedKarachi, Pakistan

Previous Rotating Equipment Design Specialist Nov. 2009- Jun. 2010NETCO NigeriaEngineering Manager Jun. 2006- Oct. 2009Terra Engineering NigeriaSenior Mechanical Engineer Jun. 1995 to May 2006ENAR Petrotech Services Private LimitedKarachi, Pakistan

EXPERIENCE PROFILE 

Present 

 As Head Mechanical Engineering Global PMC (Private) Limited, heading a team of Design Engineers &

Draftspersons for providing services to oil & gas, petroleum refining, chemicals, petrochemicals,storage terminals, pipeline, power plant, textile industries, operation & maintenance services, regulatorycompliance & safety audits, pre-shipment inspections, HAZOP’s and other related projects.

Previous Worked as Rotating Equipment Design Specialist with NETCO Nigeria. Duties include providingdirection and supervision to mechanical department. Providing the client the best engineering solutionbased on engineering standards and best practices. Oversee and assist the engineers in projectsdesign and develop specification of equipment. Assist and develop documentation to support newequipment implementation (User requirement specification, detailed design specification,Worked as Engineering Manager for Terra Engineering Nigeria. Duties include providing the client thebest engineering solution based on engineering standards and best practices. Oversee and assist theengineers in projects design and develop specification of equipment. Assist and develop documentationto support new equipment implementation (User requirement specification, detailed design

specification, operating and maintenance procedures, FAT, SAT and commissioning documents)engineering studies, technical support, QA, validation and other departments for process improvement,troubleshooting, change control and deviation resolution.Worked as Senior Engineer in ENAR Petrotech. ENAR is an Engineering Consulting Companyproviding project management and detailed engineering services to Refineries & Petrochemical Plants.Major Clients include OGDCL, NRL, PARCO, BP, OMV, Eni, MOL, PPL and PSO, etc.During the eleven (11) years of professional associations with EPSL gained experience in the ProjectManagement and Detailed Engineering Design. In the capacity of project manager carried out humanresource management, provide technical team leadership, involved in project planning, coordinatedwith all engineering discipline for smooth execution of project and liaised with client to embed concernsand updated the schedule in line with the new developments and revised scope of works. Alsoresponsible for detailed design while leading detailed engineering. 

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 29/51

  GLOBAL PMC (PRIVATE)LIMITED 

PERSONAL PROFILE 

Name: Zakiuddin Hussain  Employee No: 0002 

Designation: Consultant Mechanical Engineering 

The work details in ro ects are as follows:

Project Descript ion  Client  Responsibility 

 Associated Gas

Gathering Facility

Project (AG

Solution Project) 

Shell Petroleum

Development

Company Limited

Nigeria 

Oversee and assist the engineers in projects design and

develop specification of equipment. Assist and develop

documentation to support new equipment implementation

(User requirement specification, detailed design

specification. 

Vent Captu re Projects 

Chevron Nigeria 

Limited. 

Supervised mechanical department. Provided best

engineering solution based on engineering standards and

best practices. Oversee and assist the engineers in

projects design and develop specification of equipment. 

 ADN-B Wellhead

Platform Detailed Design

Project 

 Addax Petroleum  

Development Nigeria 

Limited 

Oversee and assist the engineers in projects design and

develop specification of equipment. 

Concept Verificationand

Detailed Design of H2S

Scavenger System at

BONGA FPSO 

Shell Nigeria

Exploration &

Production Company

Provide engineering studies, technical support, QA,

alidation for process improvement, troubleshooting,

change control and deviation resolution. 

StructuralDesign Projects at BRT& QIT Facilities underCall-off Contract.

 

Mobil Nigeria 

Duties include providing the client the best engineering

solution based on engineering standards and best

practices. 

ORWS Wellhead

Platform DetailedDesign Project

 

 Addax Petroleum

Development NigeriaLimited 

ssist and develop documentation to support new

equipment implementation (User requirement

specification, design specification, O & M procedures,FAT, SAT and commissioning documents).

 

Detailed Engineering

Project for  Adhi field

of PPL 

Gastec GmbH 

Project manager on “”. Project involved engineering and

planning. Responsible for the engineering design,

coordination between company and client, monitoring

project progress, sourcing of material, coordination of

orkflow, ensuring budget and milestones. 

Manzalai-1 EWT 

Surface Facility Project 

MOL Pakistan 

Limited 

s Project manager led a team of process, mechanical,

piping, electrical and instrument engineers to carry out

he front end engineering of the project. Developed the

ime schedule, performance curve and assisted project

eam to meet the schedule give in the Gantt’s Chart. Was

also involved in the cost estimating (CAPEX & OPEX),

planning and scheduling of the Project. 

BOBI LPG Project. 

Oil & Gas 

Development 

Corporation Limited 

orked as a site manager for project and was also

involved in detailed engineering, planning and

construction of a LPG plant from design to completion. 

Qadirpur Capacity

Enhancement Project

for Gas purification

Plant. 

Oil & Gas

Development

Corporation Limited 

Responsible for the detailed engineering design,

coordination between company and client, monitoring

project progress, sourcing of material, coordination of

orkflow, ensuring budget and milestones are

maintained. 

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 30/51

  GLOBAL PMC (PRIVATE)LIMITED 

PERSONAL PROFILE 

Name: Zakiuddin Hussain  Employee No: 0002 

Designation: Consultant Mechanical Engineering 

Technical assessment ofvarious plants andrefineries in Pakistan. 

Various Clients 

orked as project manager for Projects involvedcollection and compilation of technical data /

documentation, review of processing scheme of plantsand refineries, visual inspection of plant and facilities,assessment of present condition of plant and facilities,estimation of probable remaining operating life of plantand facilities, assessment of normal replacement /maintenance requirements and revamps projects andidentification of non-essential / non productive assets.

 

Inspection of LPGProduction & BottlingPlants. 

Oil & Gas Regulatory Authority(OGRA) 

Project Manager for the inspections of different plants. Ias the main contributor with OGRA for the development

of regulatory compliance audit system in Pakistan. ThisProject involves collection of technical data /documentation, visual inspection of plant and facilities,assessment of plants for compliance of Codes/ standardsand compilation of inspection report. 

Detail Engineering ofKadanwari Well K-1 & K-6

 

LASMO Oil PakistanLtd

 

Led a team of process, mechanical, piping, electrical andinstrument engineers to carry out the front endengineering of the project. Developed the time schedule,performance curve and assisted project team to meet theschedule give in the Gantt’s Chart. 

Engineering Study forLow Cost Low PressureWellhead Systems. 

LASMO Oil PakistanLtd

 

Oversee and assist the engineers in detailed engineering

design and develop specification of equipment. 

Cost evaluation Studyfor Dhurnal LPG Plant. 

Orient Petroleum Inc. Projects involved collection and compilation of technicaldata / documentation, assessment of present condition of plant, estimation of remaining operating life of plant.

Dhurnal Gas Lift Project  Orient Petroleum Inc. 

as involved in detailed engineering and projectplanning of the project.

 

Kunnar LPG Project 

Oil & Gas DevelopmentCorporation Limited 

orked as a site engineer for project and was alsoinvolved in detailed engineering, planning andconstruction of a LPG plant from design to completion.

Condensate Processing

Facility Project. 

Enar PetroleumRefining Facility

 

Design Engineer for Condensate Processing Facilityproject. Was involved in detail design.

 

Uch Gas DevelopmentProject.

 

Oil & Gas DevelopmentCorporation Limited

orked as a site engineer for project 

Designing Fixed &

Floating Roof Crude

Storage Tanks 

Various Clients 

Detail Design & construction supervision of severalstorage tanks. 

COMPUTER SKILLS 

MS Office, MS Project, Autocad & Other related engineering software’s

 AFFILIATIONS 

Life Member – PEC (Pakistan Engineering Council)

PERSONAL 

Date of Birth : 1970Nationality : PakistaniReligion : IslamMarital Status : MarriedLanguages : English and Urdu 

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 31/51

GLOBAL PMC (PRIVATE)LIMITED

PERSONAL PROFILE

Name: Nasirudd in Shaikh Employee No: 0003

Designation: - Process Consultant 

Page 1 of 4

EDUCATION♦  Chartered Engineer from Institute of Chemical Engineers, United Kingdom.♦  Bachelor of Chemical Technology from University of Karachi. (1999) secured First Class First Position (80.0%).

♦  Master of Computer Science (MCS) from PAF-KIET (2002) with CGPA 3.33.♦  H.S.S.C. from Sind Muslim Science College, Karachi (1994)♦  S.S.C. from Govt. Tech. High School, Karachi (1992.

TRAINING / COURSES

  In house training of Process Simulation using Hysys  Advance Process Simulation  Heat exchanger design using HTFS  Installation and configuration of Fischer Delta V DCS  Quality management system (ISO 9000:14000)

EMPLOYMENT HISTORY

Present

I. Global PMC Private limited (July 2010 to To date)

 As Consultant Process Engineering for Global PMC (Private) Limited, providing process engineering services to oil &gas, petroleum refining, chemicals, petrochemicals, storage terminals, pipeline, power plant, textile industries,operation & maintenance services, regulatory compliance & safety audits, pre-shipment inspections, HAZOP’s andother related projects.

II. II. Litw in PEL, L.L. C. Abu Dhabi (Oct-2009 to To date)

Litwin is a well established engineering company, with more than 1000 references in Oil & Gas,Chemical & Industry, and Energy & Environmental projects. With about 1200 dedicated engineers,

technical specialists and project managers, Litwin provides comprehensive engineering services, fromfeasibility studies through construction of plants on a turnkey basis, for clients worldwide. Litwin works

in close partnership with major technology providers and develop alliances with reputable equipmentmanufacturers, seeking to optimize project management and technology-specific skills.

Worked in the capacity of Senior Process engineer and involves in the following on-going projects:

a.  Keyi Field production facilities, Sudan, a green field project, involved gatheringnetwork, inlet separation, Condensate stabilization, Gas compression and allassociated utilities.

b.  Leading the project for Isomerate Quality Improvement of Ruwais Refinery,TAKREER. Project scope includes, detailed design, Procurement, Construction andCommissioning of Light Naphtha Splitter to reduce C5 content from Isomerization unitfeed.

c.  Involved in the technical proposal preparation for following:•  Early Production facilities for IPRC in Syria•  Early Production Facilities for OMV-IRAQ in Kurdistan Region

•  Bitumen Production Plant for OMV-IRAQ in Kurdistan Region

Carry out Process Simulation using Aspen Hysys, prepare PFDs, preliminary sizing for all majorequipments, preliminary P&IDs for cost estimation purpose.

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 32/51

GLOBAL PMC (PRIVATE)LIMITED

PERSONAL PROFILE

Name: Nasirudd in Shaikh Employee No: 0003

Designation: - Process Consultant 

Page 2 of 4

Previous

III. Clough Engineering and Integrated Soluti ons (CEIS), Pty Ltd (May-07 to Jun-2009)The Clough Group is one of Australia's largest multidisciplinary engineering, construction and asset managementgroup's active in the international oil & gas, minerals, infrastructure and property industries with its Corporate HeadOffice located at Perth in the Western Australia. The Group's turnkey services range from complex front-endengineering design, construction, installation and commissioning to long term operations and asset maintenance.Major Clients of Clough Pakistan includes, Petronas Carigali, OMV, BHP, ENI, BP Pakistan, PPL, etc. Worked as

 Assistant Engineering Manager

IV. Nama Mott MacDonald (Oil and Gas Division – Abu Dhabi) (Nov-2006 to May 2007)

Mott MacDonald one of the world's foremost Multi-disciplinary Independent Engineering Consultancies with itsCorporate Head Office located at Croydon in the UK. With a complement of 8,500 qualified staff worldwide providingan annual turnover in excess of 900 million US $, Mott McDonald have offices in more than 50 countries and a globalexperience spanning more than 130 countries. Major clients includes: ZADCO, ADCO, ADMA-OPCO, GASCO,TAKREER, ADGAS, QP, NPCC, etc. Worked as Senior Process Engineer

V. Dar-al-Riyadh Consul tants, Saudi Arabia (Sep-2005 to Oct-2006)

Dar-Al-Riyadh Consultants is a leading Consultancy firm of Saudi Arabia. Major clients include Saudi Aramco,SABIC, Petro Kemya, etc. Worked as Process Design Engineer and involved in the following Project/studies:

VI. Petrosin Engineering (Private) Limited (March-2004 to August-2005)

Petrosin Engineering Private Limited is a leading Company of Pakistan in engineering design, fabrication, installationand commissioning of oil and gas processing plants. Company is also involved with operations and maintenanceservices. Worked as Senior Process Design Engineer and involved in following projects/bids: 

VII. ENAR Petrotech Services (Private) Limited (May-2000 to Feb-2004)

ENAR is a leading design, engineering and consulting organization providing services of feasibility studies, processdesign, detailed engineering, bid evaluation and recommendation, project monitoring, inspection and construction

supervision to the projects in the petroleum refining, storage and cross country pipelines, gas processing, chemicalfertilizer and other sectors of the process industry. Major clients include OGDCL, NRL, PARCO, PSO, BP Pakistan,OMV, LASMO, PPL, etc. Worked as Process Engineer

VIII. Clariant Pakistan Limited (Sep-1999 to Apr il 2000)

Worked as Trainee Officer in the following Sections

−  Dyes/Chemicals Production &Utilities Generation−  Quality Control−  Environmental Safety & Health (ESHA)

EXPERIENCE PROFILE

Project Description Client Responsibility

ZAM North, ZAM B and ZAM D, tie-in detailengineering with Central Gas Processing Plant

BHP PakistanProcess Engineering and leading the ProcessTeam

Saqib-1A EWT Wellhead Development FacilityPetronasPakistan

Process Engineering and leading the ProcessTeam

Conceptual and Front End Design for Kandhkot GasPurification Plant

PPLProcess Engineering and leading the ProcessTeam

Latif-2 EWT Wellhead Development Facility OMV PakistanProcess Engineering and leading the ProcessTeam

Rehamat Gas Field De-Bottlenecking StudyPetronasPakistan

Process Engineering and leading the ProcessTeam

Tajjal-1 EWT Wellhead Development facility OMV PakistanProcess Engineering and leading the ProcessTeam

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 33/51

GLOBAL PMC (PRIVATE)LIMITED

PERSONAL PROFILE

Name: Nasirudd in Shaikh Employee No: 0003

Designation: - Process Consultant 

Page 3 of 4

Design House activities for BP to provide completerange of services for BP facilities in Pakistan

BP Pakistan All process engineering activities

Level – 3 ESD and Depressurization system for

Satah crude processing facilities ZADCO, UAE All process engineering activitiesNASR offshore field development project, Conceptualand FEED development

 ADMA-OPCO,UAE

Process Simulation, PFDs, P&IDs, equipmentsizing, hydraulics

Zulf Artificial lift Project Saudi AramcoProcess Simulation, Equipment Sizing,Process Datasheets

De-bottlenecking study of Yanbu Refinery Atmospheric Distillation column’s pump aroundcircuits

Saudi AramcoProcess Simulation, Equipment Sizing,Process Datasheets

Conceptual design of Brazed Aluminum plate typeheat exchanger for Berri Gas Plant, Ethane and NGLUnit

Saudi AramcoProcess Simulation, PFDs, P&IDs, EquipmentSizing and Process Datasheets

Study of upgrade of North Refinery flare system ofRas Tanura Refinery

Saudi AramcoProcess Simulation, PFDs, P&IDs, EquipmentSizing and Process Datasheets

Study of up gradation of Relief system at Ras Tanura

RefinerySaudi Aramco

Process Simulation, PFDs, P&IDs, Equipment

Sizing and Process Datasheets

Detailed Engineering design of CO2 pipelineKDI, Saudi

 ArabiaProcess Simulation, PFDs, P&IDs, EquipmentSizing and Process Datasheets

Preparation of Bid document of Pindori Gas plantExpansion Phase II

POL, PakistanProcess Simulation, PFDs, P&IDs, EquipmentSizing and Process Datasheets, Technical bidpreparation

Preparation of FEED study and Bid document forOrient Pakistan Inc. (OPI) Kausar and Umer fields

OPI, PakistanProcess Simulation, PFDs, P&IDs, EquipmentSizing and Process Datasheets, Technical bidpreparation

Condensate Processing FacilityENAR

Petrotech,Karachi

Process Simulation, PFDs, P&IDs, EquipmentSizing and Process Datasheets, Hydraulicscalculations, Design Philosophies

Front End Engineering Design and development ofsurface facilities for Extended Well Testing (EWT) for

Manazali – 1

MOL PakistanProcess Simulation, PFDs, P&IDs, EquipmentSizing and Process Datasheets, Equipment

list, Line list, Design philosophiesFront End Engineering Design for Relocation and up-gradation study of Fimakassar LPG Plant to ChandaGas Field

OGDCL,Pakistan

Process Simulation, PFDs, P&IDs, EquipmentSizing and Process Datasheets

Front End Engineering Design of Adhi Gas Field toenhance the capacity of existing plant

PPLProcess Simulation, PFDs, P&IDs, EquipmentSizing and Process Datasheets, Equipmentlist, Line list, Design philosophies

Front End Engineering Design of Mazarani Gas Fieldto Install Gas Sweetening, De-hydration and dewpoint reduction

PPLProcess Simulation, PFDs, P&IDs, Processdatasheets.

Dakhni Expansion studyOGDCL,Pakistan

Process Simulation, Plant Test Run

Capacity enhancement study of Dhodak field OGDCLProcess Simulation, Equipment sizing andrating.

Preliminary Feasibility Study of Tangri & Mazari GasField

BP PakistanFeasibility study, Process Simulation,Equipments datasheets and Specifications

Development of System Curves of Kadanwari GasField Gathering lines

LASMO OilPakistan

Plant Test run, Process and hydraulicssimulation, Study Report

Qadirpur Capacity enhancement projectOGDCL,Pakistan

Selection of Suitable membranes, hydraulicsanalysis, optimization of heat exchangers

Capacity Enhancement Study of Turk Amine Plant BP PakistanProcess Simulation, comparisons of differentamine solvents, rating of equipments

Relocation study of Dhurnal LPG Plant to HyderabadSSGC,

PakistanProcess Simulation, Rating and sizing ofequipments

De-Bottlenecking study of Propane Recovery Unit NRL, PakistanProcess Simulation, rating and sizing ofequipments, Plant Test run

Process Selection & Screening study of Mari GasField

OGDCLComparison of various processes for gassweetening and dehydration

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 34/51

GLOBAL PMC (PRIVATE)LIMITED

PERSONAL PROFILE

Name: Nasirudd in Shaikh Employee No: 0003

Designation: - Process Consultant 

Page 4 of 4

COMPUTER SKILLS

•  Engineering Software (Aspen HYSYS, Complete HTFS Suit, WinSim (Design-II), SiNET, KORFHydraulics, AMSIM, Line Sizing, Pump Sizing, Control Valve Sizing, Relief Valve Sizing, etc.)

•  Microsoft Windows 2000/XP/NT, LINUX & UNIX

•  C/C++ & Object Oriented Programming, COBOL Programming

•  Visual Tools (Visual C++, Visual Basic, Visual FoxPro, Visual InterDev)

•  Web Development Tools (Flash, Dreamweaver, Java, ASP, FrontPage)

 AFFILIATIONS

 Associate Member, Institute of Chemical Engineers, UK

PERSONAL

Date of Birth : 2nd Nov. 1976Nationality : PakistaniReligion : IslamMarital Status : MarriedLanguages : English and Urdu

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 35/51

GLOBAL PMC (PRIVATE)LIMITED

PERSONAL PROFILE

Name: Umair Baig Employee No: 0006

Designation: Process Consultant

Page 1 of 2

EDUCATION

Bachelor of Chemical Technology, University of Karachi, Karachi, Pakistan 2003

TRAINING / COURSES

  Hysis 2003  Aspen Plus 2007

EMPLOYMENT HISTORY

Present

Process Consultant July 2010 to date Global PMC (Private) Limited

Senior Process Engineer   May 2011 to dateFoster Wheeler Energy Limited, Readings, United Kingdom

Previous

Process Engineer   July 2010 to May 2011Petrofac Sarjah

Process Engineer   Feb. 2009 to July 2010Foster Wheeler Energy Limited, Readings, United Kingdom

Senior Process Engineer June 2003 to Feb. 2009ENAR Petrotech Services Private Limited, Karachi, Pakistan

EXPERIENCE PROFILE

Present

 As Process Consultant for Global PMC (Private) Limited and Foster Wheeler Energy Limited, Readings,

United Kingdom, providing services to oil & gas, petroleum refining, chemicals, petrochemicals, storageterminals, pipeline, power plant, operation & maintenance services, regulatory compliance & safety audits,pre-shipment inspections, HAZOP’s and other related projects.

Previous

Have more than seven years experience in the field of Process Engineering and R&D works, which includesFEED, Process Design & HAZOP’s of Gas plants and refineries including Gas gathering & trunk lines, Gasoil separation plants, Gas treatment units (amine & glycol unit), LPG recovery units, Crude Preheat trains,gas condensate refining units, crude unit, Naptha splitting and stabilization system.Design of utility system such as fuel gas, hot oil system, condensate recovery system, steam distributionsystem, compressed air distribution system, etc.

Hydrocarbon based R&DPreparation & Development of HMB, PFD’s, P&ID’s, process datasheets, simulations reports and FEED’s

The work details in projects are as follows:Project Description Client Responsibility

PSR2 2-Phase Hydrocracker(Unit 30) TA Projects(Foster Wheeler Energy Limited)

Melaka Refinery

Malaysian Refinery

Co (Sep.09 – Apr. 10)

Process Engineer for the development PFD’s andP&ID’s for the implementation of hydrocracker revampproject 

Ras Tanura Integrated Project(RTIP)(Foster Wheeler Energy Limited)

Saudi Aramco(Feb. 09 to Aug. 09) 

Process Engineer for the development & optimization ofProcess design document for pre-feasibility estimate forall the utilities.

120,000 BPDS Milford HavenRefinery Relocation Project(ENAR Petrotech Service Pvt. Ltd). 

Bosicor OilsPakistan Limited

(Jun. 08 – Feb.09)

Lead Process Engineer for the development ofSimulation model based on Qatar Marine Crude.

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 36/51

GLOBAL PMC (PRIVATE)LIMITED

PERSONAL PROFILE

Name: Umair Baig Employee No: 0006

Designation: Process Consultant

Page 2 of 2

40,000 BPBS CDU RevampProject(ENAR Petrotech Service Pvt. Ltd).

Bosicor PakistanLimited

(Apr. 08 – Jun. 08)

Lead Process Engineer   for the development of processsimulation from test run data to final EDS packages.

Mild Vacuum & Visbreaker Unit(ENAR Petrotech Service Pvt. Ltd) 

ENAR PetroleumRefining Facility(Sep. 07 – Apr. 08) 

Lead Process Engineer  for the development of Vacuumunit to recover middle distillate from atmospheric bottomand visbreaker to reduce the pour point of the vacuumbottoms. 

Enar Petroleum Refining Facility(EPRFIII) Project(ENAR Petrotech Service Pvt. Ltd). 

Enar PetroleumRefining Facility (Jan. 07 – Sep. 07) 

Lead Process Engineer   for the development ofsimulation for the relocation and enhancing theprocessing capacity from 15000 BPDS of Libon & ShaleOil to 23000 BPDS of local condensate and light crude oil. 

Visbreaker pilot scale study EnarR&D Project(ENAR Petrotech Service Pvt. Ltd). 

Enar PetroleumRefining Facility (Jan. 07 – Jun. 07) 

Lead Process Engineer  for carrying out several test runson an in-house designed pilot scale visbreaker. 

Enar Petroleum Refining Facility(EPRFII) Project(ENAR Petrotech Service Pvt. Ltd). 

Enar PetroleumRefining Facility (Oct. 06 – Jan. 07 

Lead Process Engineer for conceptual, simulation,preheat train, equipment sizing, line hydraulics, controlscheme, PFD’s, P&ID’s, flare system, offsit and utilities.

Simulation of Hydrotreater

(ENAR Petrotech Service Pvt. Ltd). 

Pak Arab Refinery

(Jan. 06 – Oct. 06 

Lead Process Engineer for the simulation of middle

distillate Hydrotreater and gas concentration units. 

30,000 BPSD CDU revampProject(ENAR Petrotech Service Pvt. Ltd).

Bosicor PakistanLimited(Sep. 05 - to Jan. 06)

Lead Process Engineer for the simulation modelcovering preheat train modifications, addition of newpreflash column and fired heater, modification in existingatmospheric column, naptha splitting and LPG recoveryUnit.

FEED for TAY and SINJHOROdevelopment Project(ENAR Petrotech Service Pvt. Ltd). 

Oil & GasDevelopmentCorporation Limited(Jun. 05 to Sep. 06)

Lead Process Engineer for the a complex surface facilityand its integration with the existing BOBI LPG Plant ofOGDCL. It includes process selection stydy, processsimulation, development of PFD’s & P&ID’s 

HAZOP study of Bhit plant(ENAR Petrotech Service Pvt. Ltd). 

ENI (LASMO)May 2005

Participated in the complete HAZOP study of the Bhitplant.

Enar Petroleum Refining Facility

(EPRFI) Project(ENAR Petrotech Service Pvt. Ltd).

Enar Petroleum

Refining Facility(Jun. 03 to Jan. 05)

Technical Services Engineer responsible for the testruns to identification of bottlenecks, process simulation of

plants, development of HMB across the columns, heatexchangers and furnaces. Carried out preflash overheadcorrosion control study and successfully implemented.

COMPUTER SKILLS

  Hysis Aspen plus, Aspen B-JAC, Aspen HX-net  Winsim Design II  Pipesys, Pipesim  Fisher First Vue  HTFS+  Flarenet  Korf  HTRI  Hands on DCS (DELTA V)

 AFFILIATIONS

 AMIChemE (working towards chartered Status)

PERSONAL

Date of Birth : 27th June 1982

Nationality : PakistaniReligion : IslamMarital Status : MarriedLanguages : English and Urdu

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 37/51

GLOBAL PMC (PRIVATE)LIMITED

PERSONAL PROFILE

Name: M. Aquil ur Rahman Employee No: 0007

Designation: Senior Engineer (Civil)

Page 1 of 3

EDUCATION

Bachelor of Civil Engineering 1990NED University of Engineering & Technology, Karachi, Pakistan

TRAINING / COURSES

  ROADCAL 2003  STAAD PRO 2007

EMPLOYMENT HISTORY

Present

Principal Engineer (Civil)  July 2010 to-dateGlobal PMC (Private) Limited, Karachi, Pakistan

Previous

Cad Engineer (Self Employed)  May 2005 to June 2010 Able Engineering & Construction Services, New Jersey, USA.

Site Engineer   Mar. 2004 to Apr. 2005Tariq & Associates, Karachi, Pakistan

Cad Engineer (Self Employed)  May 2000 to Feb. 2004  Able Engineering & Construction Services, New Jersey, USA.

Highway Design Engineer May 1996 to Apr. 2000Zafar & Associates, Karachi, Pakistan

Highway Design Engineer   Oct. 1994 to Apr. 1996

Self Employed Oct. 1990 to Sep. 1994 

EXPERIENCE PROFILE

Present

 As Principal Engineer (Civil) in Global PMC (Private) Limited, leading a team of Engineers &

Draftspersons for providing services to oil & gas, petroleum refining, chemicals, petrochemicals,storage terminals, pipeline, power plant, textile industries and other related projects.

Previous

Have more than twenty years experience in the field of Civil Engineering and CAD drafting works,which includes Designing of buildings, roads, highways, flyovers etc.

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 38/51

GLOBAL PMC (PRIVATE)LIMITED

PERSONAL PROFILE

Name: M. Aquil ur Rahman Employee No: 0007

Designation: Senior Engineer (Civil)

Page 2 of 3

The work details in projects are as follows:

Project Description Client Responsibility

Enhancing of PMGDecanting & LoadingCapacity at PSOShikarpur Terminal(Global PMC Pvt. Ltd)

Pakistan State OilSr. Civil Design Engineer for the enhancement pf PMChandling capacity at PSO Shikarpur project

Enhancing of PMGLoading Points at PSOMachike Terminal(Global PMC Pvt. Ltd)

Pakistan State OilSr. Civil Design Engineer for the enhancement pf PMChandling capacity at PSO Machike project

Enhancing of PMG

Loading Points at PSOChakpirana Depot(Global PMC Pvt. Ltd)

Pakistan State OilSr. Civil Design Engineer for the enhancement pf PMChandling capacity at PSO Chakpirana project

Development ofFabrication Drawings formulti-storied complexsteel structure(Global PMC Pvt. Ltd.) 

FutehallyChemicals(Uniliver)

Sr. Civil Design Engineer for the Development ofFabrication Drawings for multi-storied complex steelstructure and detailed BOQ 

Relocation of 300tons/day edible oilrefinery(Global PMC Pvt. Ltd.) 

Dlada FoodsSr. Civil Design Engineer for the relocationengineering of 300 tons/day edible oil refinery

Design & Cad drafting

services.(Self Employed)

 Able Engineering& Construction

ServicesNew Jersey, USA. (May 05 to Jun.10)

Cad Engineer  for the services of design engineering &

drafting services to Able engineering for their high risebuildings, store sheds and other civil structures.

Construction of Govt.Degree College(Tariq & Associates)

SIndhGovernment

(Mar. 04 to Apr. 05) 

Site Engineer for the supervision of the constructionactivities of the Degree collage.

Design & Cad draftingservices.(Self Employed)

 Able Engineering& Construction

ServicesNew Jersey, USA. (May 00 to Feb. 04)

Cad Engineer  for the services of design engineering &drafting services to Able engineering for their high risebuildings, store sheds and other civil structures.

Various Highway DesignProjects(Zafar & Associates)

Federal &Provincial

Government s (May 96 to Apr. 00)

Highway  Design Engineer for various highway design

projects, flyover and buildings projects in Pakistan

Various Highway DesignProjects(Umar Munshi & Associates)

Federal &Provincial

Government s 

(Oct 94 to Apr. 96)

Highway  Design Engineer for various highway designprojects, flyover and buildings projects in Pakistan

Supply of constructionChemicals(Self Employed) 

Various Clients (Oct. 90 – Sep. 94) 

Had been engaged in promoting and supply ofconstruction chemicals to different industries andcontractors.

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 39/51

GLOBAL PMC (PRIVATE)LIMITED

PERSONAL PROFILE

Name: M. Aquil ur Rahman Employee No: 0007

Designation: Senior Engineer (Civil)

Page 3 of 3

COMPUTER SKILLS

ROADCALC 13.1 L-AETABS 9.5.0SAFE 12.1.1STAAD PRO 2006

 AUTO CADMS OFFICE

 AFFILIATIONS

Life Member – PEC (Pakistan Engineering Council)

PERSONAL

Date of Birth : 26th November, 1961

Nationality : PakistaniReligion : IslamMarital Status : MarriedLanguages : English and Urdu

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 40/51

GLOBAL PMC (PRIVATE)LIMITED

PERSONAL PROFILE

Name: Faraz Kazmi Employee No: 0008

Designation: Sr. Engineer (Electrical)

Page 1 of2

EDUCATION

•  MBA (Industrial Management) from CBM (In Progress)Passed 1st semester 3.4 GPA

•  Bachelor of Electrical Engineering 2005NED University of Engineering & Technology,Karachi, Pakistan

TRAINING / COURSES

  Matrix (ERP Management) 2008

  AEI software 2010

EMPLOYMENT HISTORY

Present

Sr. Engineer (Electrical)  Jul 2010 to-dateGlobal PMC (Private) LimitedKarachi, PakistanPrevious

In Charge E&P / Electrical South Region   July 2008 to Jul 2010ETIMAAD Engineering (Private) Ltd Karachi, Pakistan

Electrical Engineer Mar 2005 - Jul 2008ENAR Petrotech Services Private LimitedKarachi, Pakistan

EXPERIENCE PROFILE

Present

 As Principal Engineer (Electrical) in Global PMC (Private) Limited, leading a team of Engineers &Draftspersons for providing services to oil & gas, petroleum refining, chemicals, petrochemicals,storage terminals, pipeline, power plant, textile industries and other related projects.

Previous

Have more than Six years experience in the field of Design, Project, Engineering Management,plant operation & maintenance which includes Project Estimates, Detailed Engineering,Site/Construction Supervision, Regulatory compliance & safety Audits, Design vetting and PlantOperation & Maintenance of Oil & gas, Power & Petrochemical Plants ensuring timely project

completion according to governing codes, standards using latest computer technology.Carried out number of activities like development of Engineering Calculations, specifications forgenerators, motors, cables, UPS, motor control center, transformers, development of powergeneration and distribution philosophy, load calculations, equipment and cable sizing,development of single line, wiring connection schematics, area classification and layout drawings,typical installation details, detailed BOQ, Technical bid evaluation for the project, Cost Estimationfor overall / parts of projects, Review / approval of equipment specification and data sheets, Pre-qualification of equipment suppliers / contractors, Technical and commercial evaluation work,Preparation of technical reports as part of feasibility studies, procurement activities,Supervision/Planning for Site activities etc. Have knowledge of engineering design codes such asNFPA, API, IEC.The work details in projects are as follows:

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 41/51

GLOBAL PMC (PRIVATE)LIMITED

PERSONAL PROFILE

Name: Faraz Kazmi Employee No: 0008

Designation: Sr. Engineer (Electrical)

Page 2 of2

Project Description Client Responsibility

P&G DRY LAUNDRY PLANT(ETIMAAD Engineering PrivateLimited)

Proctor & Gamble(Jul 08 to Jul 10)

In Charge Electrical and Instruments at P&Gdry Laundry project Karachi, responsible for theoverall E&I construction and design review

BAHU DEVELOPMENT PROJECT(ENAR Petrotech Service Pvt. Ltd).

Oil & GasDevelopmentCompany L td

2007 

Electrical Engineer   for the development offeed document of Bahu well head facility

QADIRPUR 600MMSCFDPROJECT(ENAR Petrotech Service Pvt. Ltd)

Oil & GasDevelopmentCompany L td

2007-08

Electrical Engineer   for the Detail engineeringdesign and construction supervision of theproject

INSPECTION OF LPG PRODUCTION& BOTTLING PLANTS(ENAR Petrotech Service Pvt. Ltd).

Oil & GasRegulatory

 Aut hori ty (OGRA)

(Sep.05 – May 08) 

Lead E&I Engineer for the inspections of differentplants. This Project involves collection of data /documentation, visual inspection of plant andfacilities, assessment of plants for compliance ofCodes/ standards & compilation of inspection report.

DAKHNI EXPANSION PROJECT(ENAR Petrotech Service Pvt. Ltd) 

OGDCL2005

Electrical Engineer   for the Detail engineeringdesign

Chanda Gas Field DevelopmentProject(ENAR Petrotech Service Pvt. Ltd) 

Oil & GasDevelopmentCompany L td

2005-06

Electrical Engineer for the Detail engineeringdesign and construction supervision of theproject

NRL VALUATION OF ASSETS –TECHNICAL ASSESSMENT(ENAR Petrotech Service Pvt. Ltd) 

Pak Hy Oils L td.2006 

Electrical Engineer   for the collection andcompilation of technical data / documentation,assessment of present condition of plant,estimation of probable remaining operating lifeof plant.

BOSICOR VALUATION OF

 ASSETS – TECHNICAL ASSESSMENT(ENAR Petrotech Service Pvt. Ltd) 

Bosicor Pakistan

Ltd.2006

 

Electrical Engineer   for the collection andcompilation of technical data / documentation,assessment of present condition of plant,estimation of probable remaining operating lifeof plant.

ENAR PETROLEUM

REFINING FACILITY

ENAR Petrotech Services (Pvt.) Ltd.

ENAR PetrotechService Pvt. Ltd

2005-2008 

In charge Electrical for the Operation &maintenance of the refinery

COMPUTER SKILLS

MS OfficeOther related engineering software’s

 AFFILIATIONS

Life Member – PEC (Pakistan Engineering Council)

PERSONAL

Date of Birth : 14th May 1982

Nationality : PakistaniReligion : IslamMarital Status : MarriedLanguages : English and Urdu

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 42/51

 

GLOBAL PMC (PRIVATE)LIMITED

PERSONAL PROFILE

Name: Rizwana Fatima Employee No: 0010

Designation: Principle Engineer Civil / Structural 

Page 1 of 4

EDUCATION

B.E Civil Engineering 1989

NED University of Engineering & Technology Karachi, Pakistan

EMPLOYMENT HISTORY

Present

Principle Engineer Civil / Structural March 2011 to dateGlobal PMC (Private) L imited  Karachi, Pakistan

Previous

Sr. Civil / Structural Engineer   Jan 2009 to July 2011

M/S Petrochem Engineering Services (Pvt.) LimitedKarachi, Pakistan

Senior Structural Engineer 2008 to Jan 2009M/s Engineers Consortium Private LimitedKarachi, Pakistan

Senior Structural Engineer Jan 2008 to Jan 2009M/s Engineering Consultants International (Pvt.) Ltd. Karachi, Pakistan

 Assistant Engineer May 1992 to Sep 1996M/s Engineering Consultants International (Pvt.) Ltd. Karachi, Pakistan

Senior Structural Engineer   March 2005 to-Dec 2006

M/S Akbar and Associates (Pvt.) LimitedKarachi, Pakistan

Senior Structural Engineer   Nov 2003 to Sept 2004M/S Qamar and Associates (Pvt.) LimitedKarachi, Pakistan

Team Leader   Jan 2001 to Oct 2003M/S A.A. (Abdul Aleem) AssociatesKarachi, Pakistan

 Assistant Engineer Apri l 1990 - to -May 1992 M/S Samiur Rahman Associates

Karachi, Pakistan

EXPERIENCE PROFILE

Present

 As Senior Civi l /Structural Engineer Global PMC (Private) Limited, Supervi sing a team of Design Engineers &Draftspersons for providing services to petrochemicals, storage terminals, textile industries & Oil refinery

PreviousHave 21 years of experience in the field of Civil Engineering, which includes Design ing, Detailing, Bill ofQuantities of steel structures and RCC structures for Oil refinery, Petrochemical facilities, Storage facilities,

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 43/51

 

GLOBAL PMC (PRIVATE)LIMITED

PERSONAL PROFILE

Name: Rizwana Fatima Employee No: 0010

Designation: Principle Engineer Civil / Structural 

Page 2 of 4

Structural Designing and detailing of Multistory Buildings, Textile Industries, Hospital Buildings andEducational Institutes, Vetting of Buildings.

Major responsibilities included the detailed Structural Designing and Detailing of Drawings. Coordination for evaluatingand monitoring of Design projects along with uniformity, Consistency under approved Standards and Codes. AchieveTARGETS. Design and Detailing of Steel Structures, Pipe supports and equipment foundations. Dyke walls, Retainingwalls, Tanks foundations. Preparation of Bill of Quantities.

Project Description Client Responsibility

Relocation of 300 tons/dayedible oil refinery(Global PMC Pvt. Ltd.) 

Dalda FoodsSr.Civil/Str. Engr. for Design & detailing of 300 tons/day edible oilrefinery

Oil Storage andInstallations at Machike(Petrochem EngineeringServices Pvt. Ltd.)

Hascol Pvt .LTD

Sr.Civil/Str. Engr  for Designing, detailing and BOQ's facilities for Admin Block, Gate office, Workers/ retiring room, Watch Tower,septic tank , soak pit, Under ground tank , Over Head Tank, MainGate, Boundary wall, Mosque, Nala Crossing Structure, Generatorroom, Electrical Sub station room, Canteen, Workshop, CarParking, Foundation of Oil storage Tanks and Fire Water Tanks,Dyke walls, Retaining Walls, Pump House Meter Rooms/AdditiveInjection Skid, Foam Skid, Plate forms, Pipe supports, Gantry area& Equipment Foundations.

Oil storage and Installationsat Faisalabad.(Petrochem EngineeringServices Pvt. Ltd.)

Pakistan StateOil

Sr.Civil/Str. Engr   for Designing, detailing and BOQ's for facilitiesof Admin Block, Gate office, Workers/ retiring room, Watch Tower,septic tank, soak pit, Under ground tank , Over Head Tank, MainGate, Boundary wall, Mosque, Generator room, LT Panel room,Canteen, Workshop, Car Parking, Gantry area, Foundation of Oilstorage Tanks and Fire Water Tanks, Dyke walls, Retaining Walls,Pump House Meter Rooms/Additive Injection Skid, Foam Skid,

Plate forms, Pipe supports and Equipment Foundations.Oil storage and Installationsat Machike and Rawalpindi.(Petrochem EngineeringServices Pvt. Ltd.)

 APL 

Sr.Civil/Str. Engr  for Designing, detailing and BOQ's of Foundationof Oil storage Tanks and Fire Water Tanks, Dyke walls, RetainingWalls.

Oil storage and Installationsat Kemari.(Petrochem EngineeringServices Pvt. Ltd.)

Shell PakistanSr.Civil/Str. Engr  Designing, detailing and BOQ's of Foundationof Oil storage Tanks and Dyke walls, Retaining Walls. Sheds,water reservoir, Pump House, pump foundations.

Oil & Storage Installation

( Petrochem Engineering

Services Pvt. Ltd.) Shell Hongkong 

Sr. Civil/ Str. Engr   for Designing detailing and BOQ's of PipeSupports and platforms.

Oil & Storage Installation

( Petrochem Engineering

Services Pvt. Ltd.).

Shell Dubai Sr. Civil/ Str. Engr   for Designing detailing and BOQ's of Pipe

Supports, Steel structures & platforms

West Valve station 

( Petrochem Engineering

Services Pvt. Ltd.).

ENI Sr. Civil/ Str. Engr for   Designing detailing and BOQ's of PipeSupports, Steel structures & platforms 

Chemical Sheds

( Petrochem Engineering

Services Pvt. Ltd.) 

EngroChemicals

Sr. Civil/ Str. Engr  for Design of sheds

Richmond San RafealBridge

( A.A.Associates) 

Cultrans.California Team Leader  for Detailing of steel structure.

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 44/51

 

GLOBAL PMC (PRIVATE)LIMITED

PERSONAL PROFILE

Name: Rizwana Fatima Employee No: 0010

Designation: Principle Engineer Civil / Structural 

Page 3 of 4

101. Bay shore BoulevardBridge over river crossingMR-144 city of SanFrancisco (A.A.Associates)

 

CultransCalifornia Team Leader  for Detailing of steel structure.

Steam Power Plant at s iteMadinatul Yanbu Ltd). (A.A.Associates)

 ArabianInternationalCompany 

Team Leader  for Detailing of steel structure

King Fisher Project

(A.A.Associates)

 ArabianInternationalCompany 

Team Leader  for Detailing of steel structure

Oman India Fertili zer  Co.(A.A.Associates)

 ArabianInternationalCompany 

Team Leader  for Detailing of steel structure

Cherat Cement Factory

(A.A.Associates)

Cherat CementFactory 

Team Leader  Detailing of steel structure By using

software X-steel.  

Dubai Police Band

Rehearsal Building. ARENCO

Project Coordinator/Sr.Str. Engineer responsibilities includes

coordination with Architect and Client, Lead the Team for design,detailing and Vetting of Design and Detailing Buildings. 

Dubai Police FootballStadium.

 ARENCOProject Coordinator/Sr.Str. Engineer responsibilities includescoordination with Architect and Client, Lead the Team for design,detailing and Vetting of Design and Detailing Buildings.

Rabia Enclave Gr + 17 Multistorey Building.

ShekhaniBuilders

Project Coordinator/Sr.Str. Engineer responsibilities includescoordination with Architect and Client, Lead the Team for design,detailing and Vetting of Design and Detailing Buildings.

16 Storied Building on plotNo. SB-21, Scheme 33,Gulshan-e-Iqbal, Karachi

ShekhaniBuilders

Project Coordinator/Sr.Str. Engineer responsibilities includescoordination with Architect and Client, Lead the Team for design,detailing and Vetting of Design and Detailing Buildings.

16 Storied Building on plotNo. 18, Firdous CooperativeHousing Society, Karachi.

(Engineers Consor.Pvt. Ltd)

ShekhaniBuilders

Project Coordinator/Sr.Str. Engineer responsibilities includescoordination with Architect and Client, Lead the Team for design,

detailing and Vetting of Design and Detailing Buildings.Federal Urdu Universit yKarachi Administ rationBlock. (ECIL) 

Federal UrduUniversityKarachi

Sr. Structure Engineer, responsibilities includes coordination with Architect and Client, Lead the Team for design and detailing ofBuilding.

Federal Urdu Universit yKarachi Academic Block.(ECIL) 

Federal UrduUniversityKarachi.

Sr. Structure Engineer, responsibilities includes coordination with Architect and Client, Lead the Team for design and detailing ofBuilding. 

Dean Office Building ofKarachi University.(ECIL) 

KarachiUniversity.

Sr. Structure Engineer, responsibilities includes coordination with Architect and Client, Lead the Team for design and detailing ofBuilding.

Camp Office Building ofMalir Development Authority. (ECIL) 

MalirDevelopment Author ity.

Sr. Structure Engineer, responsibilities includes coordination with Architect and Client, Lead the Team for design and detailing ofBuilding. 

Main Gate of Malir

Development Authority(ECIL) 

Malir

Development Author ity.

Sr. Structure Engineer, responsibilities includes coordination with

 Architect and Client, Lead the Team for design and detailing ofBuilding.

Islamabad to PeshawerMotorway.(ECIL) 

NationalHighway Author ity

 Assistant Structure Engineer , responsibilities includesPreparation of Bill of Quantities of all types of Highway structureslike Bridges, culverts, restaurants, check posts. Under passes.Site Progress reports, Planning of Construction schedules ofroads.

Farm to Market Roads.(ECIL) 

NationalHighway Author ity.

 Assistant Structure Engineer , responsibilities includesPreparation of Bill of Quantities of all types of Highway structureslike Bridges, culverts, restaurants, check posts. Under passes.Site Progress reports, Planning of Construction schedules ofroads.

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 45/51

 

GLOBAL PMC (PRIVATE)LIMITED

PERSONAL PROFILE

Name: Rizwana Fatima Employee No: 0010

Designation: Principle Engineer Civil / Structural 

Page 4 of 4

Gawader Ratto Dero Road.(Engineering Consultants

International Pvt Limited) 

NationalHighway Author ity.

 Assistant Structure Engineer, responsibilities includesPreparation of Bill of Quantities of Highway structures like Bridges,culverts, restaurants, check posts. Under passes. Site Progressreports, Planning of Construction schedules of roads. 

Hashim Eye Hospital ofJinnah Post GraduateMedical Centre.

Jinnah MedicalCentre.

Design Engineer, responsibilities includes Designing anddetailing of all Buildings.

Samrina Tower Gr+8 Multi

storey Building. 

LakhaniBuilders. 

Design Engineer, responsibilities includes Designing anddetailing of all Buildings.

Hut of KPT Engineering. Karachi Port Design Engineer, responsibilities includes Designing anddetailing of all Buildings. 

Build ing on p lot No. C-60,

Defence Housing Authority,

Karachi.

(Qamar and Associates) 

Umair AssociatesBuilders &

developers. 

Design Engineer, responsibilities includes Designing anddetailing of all Buildings.

Khadija oil Refinery FillingStation(Akbar and Associates) 

Design Engineer, responsibilities includes Designing anddetailing of all types of civil facilities / services, like Admin Blocks,Labour Accommodations, toilet blocks, Parking sheds, Canteen,Mosque etc. 

CODES UTILIZED

Uniform Building code ACI code API AISC/LRFD AASHTOWEST PAKISTAN HIGHWAY CODE

BS CODE

COMPUTER SKILLS

ETABS 9.5SAFE 9.1.1

SAP 14STAAD PRO 2007

X-STEEL (detailing of steel structure)

PCACOLMICROFEAP

RCC DESIGN SOFTWARES (LOCALLY MADE)

AUTOCAD 2010

MS-OFFICE

 AFFILIATIONS

Life Member – PEC (Pakistan Engineering Council)

PERSONAL

Date of Birth : 26th March 1965

Nationality : PakistaniReligion : IslamMarital Status : MarriedLanguages : English and Urdu

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 46/51

GLOBAL PMC (PRIVATE)LIMITED

PERSONAL PROFILE

Name: Tafseer Uddin Ahmed  Employee No: 019

Designation: Sr. Civil & Structure Engineer  

Page 1 of 3

EDUCATION

Masters of Structural Engineering 2011NED University of Engineering & Technology Karachi, Pakistan 

B.E Civil Engineering 2006NED University of Engineering & Technology Karachi, Pakistan

TRAINING / COURSES

  Training on EAGLE POINT(ROAD CALC.)

  Training on AUTOCAD

EMPLOYMENT HISTORY

Present

Sr. Civil & Structure Engineer

Global PMC (Pvt.) Ltd. April 2011 to-date

Karachi, Pakistan

Previous

Civil & Structure Engineer  

 AL-MUHANDIS July 2010 to Apri l 2011 

ENGINEERS CONSORTIUM July 2009 to June 2010

 ARIF & ASSOCIATES February 2007 to July 2009

Present

I am working with M/s Global PMC (Pvt.) Ltd. under the designation of Sr. Civil & StructureEngineer and leading a team of site engineers and draftsman for Civil Structure, Foundationsand other complex works.

Previous

Have more than 6 years of experience in the field of Civil Engineering, which includesDesigning, Detailing, model of structure, Bill of Quantities of steel structures and RCCstructures for Oil refinery, Petrochemical facilities, Storage facilities, Structural Designingand detailing of Multistor y Buildi ngs, Textile Industries, Hospital Buildings and EducationalInstitutes, Vetting of Building s.

Major responsibilities included the detailed Structural Designing and Detailing of Drawings.Coordination for evaluating and monitoring of Design projects along with uniformity, Consistencyunder approved Standards and Codes.

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 47/51

GLOBAL PMC (PRIVATE)LIMITED

PERSONAL PROFILE

Name: Tafseer Uddin Ahmed  Employee No: 019

Designation: Sr. Civil & Structure Engineer  

Page 2 of 3

The work details in projects are as follows:Project Description Client Responsibility

Enhancing o f PMGDecanting & LoadingCapacity at PSO ShikarpurTerminal(Global PMC Pvt. Ltd) 

Pakistan StateOil 

Lead Civil & Structure Engineer for theenhancement of PMG handling capacity at PSOShikarpur project 

Enhancing of PMG LoadingPoints at PSO MachikeTerminal(Global PMC Pvt. Ltd) 

Pakistan StateOil

Lead Civil & Structure Engineer for theenhancement of PMG handling capacity at PSOMachike project 

Enhancing of PMG LoadingPoints at PSO Chakpirana

Depot(Global PMC Pvt. Ltd) 

Pakistan State

Oil

Lead Civil & Structure Engineer for theenhancement of PMG handling capacity at PSO

Chakpirana project 

Development of detailedfeasibility study of smallcrude oil topping unit(Global PMC Pvt. Ltd.) 

ManshanatBrothers 

Lead Civil & Structure Engineer forDevelopment of detailed feasibility study onsmall crude oil topping unit 

Developed ProcessSimulation Model of GasDehydration Unit(Global PMC Pvt. Ltd.) 

Peoples SteelMills Pakistan 

Lead Civil & Structure Engineer for DevelopedProcess Simulation Model & detailed costestimate of Gas Dehydration Unit (for EPC Bid) 

Developed ProcessSimulation Model GasSweetening Unit(Global PMC Pvt. Ltd.) 

Peoples SteelMills Pakistan 

Lead Civil & Structure Engineer for DevelopedProcess Simulation Model & detailed costestimate of Gas Sweetening Unit (for EPC Bid). 

Development of FabricationDrawings for multi-storiedcomplex steel structure(Global PMC Pvt. Ltd.) 

FutehallyChemicals(Uniliver) 

Lead Civil & Structure Engineer for theDevelopment of Fabrication Drawings for multi-storied complex steel structure and detailedBOQ 

Development of HysisSimulation Model & Costestimate(Global PMC Pvt. Ltd.) 

HeavyMechanical

Complex 

Lead Civil & Structure Engineer for theDevelopment of Process Simulation model &Cost Estimate for the Sinjhoro Field of OGDCL. 

Relocation of 300 tons/dayedible oil refinery(Global PMC Pvt. Ltd.) 

Dlada Foods Lead Civil & Structure Engineer for therelocation engineering of 300 tons/day edible oil

refinery.

SQUARE ONE MALL

(AL-MUHANDIS) Plot # 118 Dis.East Karachi  

Civil & Structure Engineer   for 7 storiedbuilding 

 ALPHA PRIME

(AL-MUHANDIS) 

VIEW plot #43 sector 51-A

scheme 33 

Civil & Structure Engineer   for 12 storiedbuilding. 

KASB BANK COMMERCIAL

(AL-MUHANDIS) 

2/4 block # 1KDA scheme 5

Clifton 

Civil & Structure Engineer   for 32 storiedbuilding. 

JS TOWER

(ENGINEERSCONSORTIUM) 

Plot # 28 SB-5Sadar Bazar  

Civil & Structure Engineer   for 20 storiedbuilding. 

 AL AMIN TOWER 

(ENGINEERSCONSORTIUM) 

Plot # A-909sec. 11-B North

Karachi  

Lead Civil & Structure Engineer   for 5 storiedbuilding. 

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 48/51

GLOBAL PMC (PRIVATE)LIMITED

PERSONAL PROFILE

Name: Tafseer Uddin Ahmed  Employee No: 019

Designation: Sr. Civil & Structure Engineer  

Page 3 of 3

MASJID ALLAHABAD

(ENGINEERSCONSORTIUM) 

KandyaroSINDH

 

Civil & Structure Engineer   for 100 dome andother structures 

HASNI TOWER

(ARIF & ASSOCIATES) 

SB-1 sec. 1Surjani Town

Karachi  

Civil & Structure Engineer   for 5 storiedbuilding. 

SUM SUM TOWER 

(ARIF & ASSOCIATES) 

Plot # 1/Ascheme 33

Karachi  

Civil & Structure Engineer   for 14 storiedbuilding. 

 AQILA ARCADE

(ARIF & ASSOCIATES) 

Plot # 3 block3 KMCHS

Karachi  

Civil & Structure Engineer   for 11 storiedbuilding. 

INDUSTRIAL SHED

(ARIF & ASSOCIATES) METTATEX(PVT) LTD 

Civil & Structure Engineer  for complete designof large Industrial shed and allied facilities 

PORT QASIM 

(ARIF & ASSOCIATES) Plot # 22,23 &

24 

Civil & Structure Engineer  for complete designof large Industrial shed and allied facilities 

GUARDS SHOPPING MALL 

(ARIF & ASSOCIATES) 

BAB-E-BALOCHISTAN

HUB 

Civil & Structure Engineer   for 4 storiedbuilding. 

SUPER COMPOUND (PVT)

LTD (ARIF & ASSOCIATES) 

LX3/1 LANDHIINDUSTRIAL

 AREA  

Civil & Structure Engineer for complete designof large Industrial shed and allied facilities 

COMPUTER SKILLS

  MS Office  AUTOCAD

  ETABS

  SAFE

  SAP

  STAAD

 AFFILIATIONS

Member – PEC (Pakistan Engineering Council)

PERSONAL

Date of Birth : 05th May 1982Nationality : PakistaniReligion : IslamMarital Status : SingleLanguages : English and Urdu

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 49/51

  GLOBAL PMC (PRIVATE)LIMITED 

PERSONAL PROFILE 

Name: Ahsan Abdul Ghani  Employee No: 0023 

Designation: Process Engineer  

EDUCATION M.E Chemical Engineering (In Progress) 2013

NED University of Engr. & Tech.Karachi, PakistanB.E Chemical Engineering 2010University of KarachiKarachi, Pakistan

SKILLS PROFILE ASPEN HYSYS (7.3)HTRI (Exchanger Suit 6.0)KORF (3.0)

EMPLOYMENT HISTORY 

Present 

Process Engineer December. 2010to-dateGlobal PMC (Private) LimitedKarachi, Pakistan

Visiting Faculty Jan. 2011 to-dateDept. of Chemical EngineeringUniversity of KarachiKarachi, Pakistan

EXPERIENCE PROFILE 

Present 

In Process Engineering Division Global PMC (Private) Limited, work with a team of Junior Process Engineers &Draftspersons for providing services to oil & gas, petroleum refining, chemicals, petrochemicals, storageterminals, pipeline, power plant, textile industries, operation & maintenance services and other related projects.

 As Visiting Faculty Member University of Karachi, teach students, the following subjects:

Chemical Process Design & Simulation (Aspen Hysys, Korf, HTRI)Instrumentation and Process ControlGas EngineeringPetroleum Refinery EngineeringFluid MechanicsHeat TransferChemical Process Principles (Energy And Material Balance Calculations)

Page 1 of 3

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 50/51

  GLOBAL PMC (PRIVATE)LIMITED 

PERSONAL PROFILE 

Name: Ahsan Abdul Ghani  Employee No: 0023 

Designation: Process Engineer  

The work details in ro ects are as follows:

Project Descript ion 

Client 

Responsibility LPG-Air Mix Plant  Beltexco

Limited Consultancy services for the designing, construction

supervision & commissioning 

Study for the removal of

moisture contents from

transformer oil 

Oil Industries

Pakistan

Re-engineering of transformer oil process in order to eliminate

operational and process errors for achieving the required

specifications 

Detailed feasibility study of

 polymer pipe manufacturing

 plant 

TCIL 

Complete feasibility study and process specifications 

Improvement in

Unloading/Decanting Facilities

at existing HSD gantry 

KTC (PSO)  All process engineering activities

Design for Skid Mounted

Three Phase Oil & Gas Test

Separator Operated at OGDCL

Field

ATG Hamriya Designing, P&ID development and documentation, preparation of

data sheets for separator vessel (Class 600), filters, instruments etc.

Employ as a mobile test separator at Maru Reti gas field operated by OGDCL to handle condensate, gas and water.

Enhancing of PMG Decanting

& Loading Capacity PSO

Shikarpur Terminal

Pakistan State OilRating & Sizing of Liquid Line hydraulics, Pump calculations,Thermal relief valve, pressure control valve control scheme, PFD’s,

P&ID’s and Equipment data sheets.

Enhancing of PMG Loading

Points PSO Machike Terminal Pakistan State OilRating & Sizing of Liquid Line hydraulics, Pump calculations,

Thermal relief valve, pressure control valve control scheme, PFD’s,P&ID’s and Equipment data sheets.

Enhancing of PMG Loading

Points PSO Chakpirana Depot

Pakistan State OilRating & Sizing of Liquid Line hydraulics, Pump calculations,Thermal relief valve, pressure control valve control scheme, PFD’s,

P&ID’s and Equipment data sheets. 

Detail Feasibility Study of

Small Crude Oil Topping Unit.Manshanat

Brothers

Process Engineering for the development of Simulation model (on

Aspen Hysys), Market Analysis, Crude Oil Selection, Datasheetcompletion 

Developed Process Simulation

Model & detailed cost estimate

Gas Sweetening Unit Project

Peoples Steel

Mills Pakistan

 All process engineering activities

Developed Process Simulation

Model & detailed cost estimate

of Gas Dehydration Unit (for

EPC bid)

Peoples Steel

Mills Pakistan 

 All process engineering activities 

Page 2 of 3

7/21/2019 Rfinery PMC.pdf

http://slidepdf.com/reader/full/rfinery-pmcpdf 51/51

  GLOBAL PMC (PRIVATE)LIMITED 

PERSONAL PROFILE 

Name: Ahsan Abdul Ghani  Employee No: 0023 

Designation: Process Engineer  

Developed Process Simulation

Model & detailed cost estimate

of Gas Sweetening unit (forEPC Bid)

Peoples Steel

Mills Pakistan 

 All process engineering activities

 COMPUTER SKILLS 

MS Office, Autocad & Other related engineering software’s AFFILIATIONS 

Life Member – PEC (Pakistan Engineering Council)

PERSONAL 

Date of Birth : 1988Nationality : Pakistani

Religion : IslamStatus : SingleLanguages : English and Urdu 

Page 3 of 3