106
Site Survey Report for BTS/NodeB Surveyor: KALA/GILBERT Approved: _____ SITE INFORMATION Site Id Site Name 3G co-located Airtel/Warid co-located Site Type Existing Target Configuration Target Target No. of APM30H: Target No. of Coordinates Longitude Latitude: Altitude(m): Location (Flat/Door/block): Building Name: Road or Street Name: Town or City: Nearest Landmark: Responsible Field Engineer: Contact: Security Cabin Available: Security Guard Available: Security Contact: Site Boundary: Site Key Type: Suitable time for equipment delivery: Any Working Time Limitation: Floor in which the shelter is located for RTT/RTP sites: Suitable space available for lifting equipment for RTT/RTP sites: If No, alternative solution for lifting equipment: Remarks: - Tower Details Tower Owner: Tower Type: Make: Tower Type: No. of tower Tower Plinth condition including lock nuts: Tower Leg Earthing available: Lightning Arrestor available: Aviation Lamp available: RTT / RTP GSM 900 Sec 1 Sec 2 Sec 3 Sec 1 Building Height (m): Tower/Pole Height from Tower/Pole Base (m): Tower/Pole Height from AGL (m): GSM 1800 Sec 1 Sec 2 Sec 3 Sec 4 Building Height (m): Tower/Pole Height from Tower/Pole Base (m): Tower/Pole Height from AGL (m): GBT Remarks: Site Address Site access information Access to site in terms of movement of truck and/or crane (eg. Provide Road width from main road to Site): Tower Height (m):

RFI BTS Survey.xlsx

Embed Size (px)

Citation preview

Report

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013

SITE INFORMATIONSite IdSite Name3G co-locatedAirtel/Warid co-locatedSite TypeExistingTargetConfigurationTargetTarget No. of APM30H:Target No. of RFC:CoordinatesLongitudeLatitude:Altitude(m):Site AddressLocation (Flat/Door/block):Building Name:Road or Street Name:Town or City:

Nearest Landmark:Site access informationResponsible Field Engineer:Contact:Security Cabin Available:Security Guard Available:Security Contact:Site Boundary:Site Key Type:Suitable time for equipment delivery:Any Working Time Limitation: Floor in which the shelter is located for RTT/RTP sites:Suitable space available for lifting equipment for RTT/RTP sites:If No, alternative solution for lifting equipment:Access to site in terms of movement of truck and/or crane (eg. Provide Road width from main road to Site):Remarks:-Tower DetailsTower Owner:Tower Type:Make:Tower Type:No. of tower legs:Tower Plinth condition including lock nuts:Tower Leg Earthing available:

Lightning Arrestor available:Aviation Lamp available:RTT / RTPGSM 9003GSec 1Sec 2Sec 3Sec 1Sec 2Sec 3Building Height (m):Tower/Pole Height from Tower/Pole Base (m):Tower/Pole Height from AGL (m):GSM 1800Sec 1Sec 2Sec 3Sec 4Sec 5Sec 6Building Height (m):Tower/Pole Height from Tower/Pole Base (m):Tower/Pole Height from AGL (m):GBTTower Height (m): Remarks:

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013

POWER INFORMATIONSite TypeExisting:Target:Grid Power:Phase: Load out of ATS:DG1 DataMake: Phase: N/AType of lock on DG: Rating (KVA): DG Run Hour Meter Available:DG Run Hour Meter Reading:DG2 DataMake: Phase: N/AType of lock on DG: Rating (KVA): DG Run Hour Meter Available:DG Run Hour Meter Reading:N/AStabilizer DataAVR available: Make:Rating(KVA):Power cable length between Stabilizer & ACDB (m): Cross-Section (sq.mm):N/APMU/PIU/ACPDU DataMake: Unit Rating:Input Phase:LCU Rating:Output Phase:Power cable length between Stabilizer & ACDB (m): Cross-Section (sq.mm):ACDB DataMain MCCB capacity (Input):MCB Capacity: Qty:MCB Capacity: Qty:MCB Capacity: Qty:MCB Capacity: Qty:Existing Huawei BTS MCB rating: 100APower cable length between ACDB & Rectifier(m): Cross-Section (sq.mm):Rectifier DataMake: Capacity = No. of Slots x Rectifier ratingNo. of Empty Slots: 0Rectifier installed (No. of modules x Ampere Load):Existing Current Consumption (Load): 20.7AFree MCB (DCDB)Capacity:125AQty:1Capacity: 16A(Battery MCB)Qty:3Capacity:32AQty:3Capacity: N/AQty:N/ACapacity:20AQty:3Capacity: N/AQty:N/ASpace for installing new MCBs available: NOPower cable length between Rectifier & Battery Bank(m):4Cross-Section (sq.mm): 16Power cables between Rectifier & BTSPositiveNegativeGround (PGND)Existing Cross-Section (sq. mm) 161625Existing ColourBLACKBLUEYELLOW/GREENExisting Length (m)666Required Length (m)N/AN/AN/ABattery BankMake:SHOTOCapacity (V/AH): 300AHType: -48 V DCBattery ChillerMake: N/ACapacity(AH):N/ARemarks:BATTERY CHILLER NOT INSTALLEDAir Con DataMake: N/ARating (Tr. X No.): N/ARemarks:IT HAS HEAT EXCHANGEREarthingEarthing connectivity (Combined for electrical/electronic/lightening etc, Single point): YESIf No, Specify:-Feeder Grounding Bus Bar available: YESSufficient Earthing points available:YESCabinet Grounding Bus Bar available: YESSufficient Earthing points available:YESRemarks:-Shelter DataMake: N/ASize(L x W x H) in metres:N/ANew Entry Plate Required: N/AHoles to be drilled in Existing Entry Plate: N/ARemarks:ITS AN OUTDOOR SITE

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013CABLES INFORMATION2G Feeder & Jumper cable informationSector 1 Sector 2Sector 3900 Band1800 Band900 Band1800 Band900 Band1800 BandExisting Feeder cable length (m)0012121818Existing Feeder cable cross-section 7/87/87/87/87/87/8Existing No. Of Feeders used001111Required Feeder cable length (m)0015152020Required No. Of Feeder cable002222Existing Jumper cable length (m)333333Existing Jumper cable cross-section1/2"1/2"1/2"1/2"1/2"1/2"Existing No. Of Jumpers used (BTS end)444444Required Jumper cable length (m)333333Required No. Of Jumper cable (BTS End)222222TMA details (Make + Model)N/AN/AN/AN/AN/AN/ARET details (Make + Model)N/AN/AN/AN/AN/AN/ACombiner/Diplexer usedYESYESNONONONOCombiner used in Frequency band9001800N/AN/AN/AN/AWhere is the combiner used?JUMPER & ANTENNA ENDN/AN/AN/AN/ASector 4 (1800 Band)Sector 5 (1800 Band)Sector 6 (1800 Band)Existing Feeder cable length (m)N/AN/AN/AN/AN/AN/AExisting Feeder cable cross-section N/AN/AN/AN/AN/AN/AExisting No. Of Feeders usedN/AN/AN/AN/AN/AN/AExisting Jumper cable length (m)N/AN/AN/AN/AN/AN/AExisting Jumper cable cross-sectionN/AN/AN/AN/AN/AN/AExisting No. Of Jumpers usedN/AN/AN/AN/AN/AN/ATMA details (Make + Model)N/AN/AN/AN/AN/AN/ARET details (Make + Model)N/AN/AN/AN/AN/AN/ACombiner/Diplexer usedN/AN/AN/AN/AN/AN/ACombiner used in Frequency bandN/AN/AN/AN/AN/AN/AWhere is the combiner used?N/AN/AN/AN/AN/AN/AFeeder Connector Type: FEMALEJumper Connector Type: MALEFeeder Connector Size: 7/8Jumper Connector Size: 4/5Remarks:-2G E1/Trunk CableType of Trunk120 E1 Existing Length (m):2Existing Quantity (PCS):1Required Length (m):Required Quantity (PCS):Remarks:-CPRI CABLES2G 900 Existing Length (m):22G 900 Required Length (m):2Existing 900 Quantity (PCS):3Required 900Quantity (PCS):32G 1800 Existing Length (m):22G 1800 Required Length (m):2Existing 1800 Quantity (PCS):3Required 1800Quantity (PCS):33G Existing Length (m):N/A3G Required Length (m):20Existing Quantity (PCS):N/ARequiredQuantity (PCS):3Remarks:-3G FE CableRequired Length (m): 2Required Quantity (PCS):1FE Sync cables for NSN 3G out of Kampala (m): N/ARemarks:NO 3G

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013SECTOR INFORMATIONPhoto TakenPanaromic Photos360 Deg PhotosInstallation SpaceSketch MapUnused/Redundant Antenna on Site: 0No. of 2G sectors: 0No. of 3G sectors:0Sector 1 (2G+3G) G900/G1800/3GNo. of Antenna in use: 1Antenna 1Antenna 2Antenna 3MakeAGISSONN/AN/AModelATR451703N/AN/AFrequency Supported824-960/1710-2180/1710-2180N/AN/AFrequency in Use900/1800N/AN/ATotal Number of Ports6N/AN/AAntenna Base Height (m)11.43N/AN/AAzimuth (degrees)20N/AN/AG900G18003GG900G1800G900G1800No. of Feeders installed00N/AN/AN/AN/AN/AMechanical Tilt00N/AN/AN/AN/AN/AElectrical Tilt00N/AN/AN/AN/AN/APole informationLength (m):8Length (m):Length (m):Remarks:-Sector 2 (2G+3G) G900/G1800/3GNo. of Antenna in use: 1Antenna 1Antenna 2Antenna 3MakeAGISSONN/AN/AModelATR451703N/AN/AFrequency Supported824-960/1710-2180/1710-2180N/AN/AFrequency in Use900/1800N/AN/ATotal Number of Ports6N/AN/AAntenna Base Height (m)11.43N/AN/AAzimuth (degrees)130N/AN/AG900G18003GG900G1800G900G1800No. of Feeders installed22N/AN/AN/AN/AN/AMechanical Tilt00N/AN/AN/AN/AN/AElectrical Tilt00N/AN/AN/AN/AN/APole informationLength (m):6Length (m):Length (m):Remarks:-

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013SECTOR INFORMATIONSector 3 (2G+3G) G900/G1800/3GNo. of Antenna in use: 1Antenna 1Antenna 2Antenna 3MakeAGISSONN/AN/AModelATR451703N/AN/AFrequency Supported824-960/1710-2180/1710-2180N/AN/AFrequency in Use900/1800N/AN/ATotal Number of Ports6N/AN/AAntenna Base Height (m)11.43N/AN/AAzimuth (degrees)270N/AN/AG900G18003GG900G1800G900G1800No. of Feeders installed22N/AN/AN/AN/AN/AMechanical Tilt00N/AN/AN/AN/AN/AElectrical Tilt00N/AN/AN/AN/AN/APole informationLength (m):8Length (m):N/ALength (m):Remarks:-Sector 4 (2G - GSM 1800 Only)No. of Antenna in use: Antenna 1Antenna 2Antenna 3MakeN/AN/AN/AModelN/AN/AN/AFrequency SupportedN/AN/AN/AFrequency in UseN/AN/AN/ATotal Number of PortsN/AN/AN/AAntenna Base Height (m)N/AN/AN/AAzimuth (degrees)N/AN/AN/AG900G18003GG900G1800G900G1800No. of Feeders installedN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AMechanical TiltN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AElectrical TiltN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/APole informationLength (m):N/ALength (m):N/ALength (m):N/ARemarks:

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013SECTOR INFORMATIONSector 5 (2G - GSM 1800 Only)Antenna 1Antenna 2Antenna 3No. of Antenna in use: N/AN/AN/AMakeN/AN/AN/AModelN/AN/AN/AFrequency SupportedN/AN/AN/AFrequency in UseN/AN/AN/ATotal Number of PortsN/AN/AN/AAntenna Base Height (m)N/AN/AN/AAzimuth (degrees)N/AN/AN/AG900G18003GG900G1800G900G1800No. of Feeders installedN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AMechanical TiltN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AElectrical TiltN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/APole informationLength (m):N/ALength (m):N/ALength (m):N/ARemarks:-Sector 6 (2G - GSM 1800 Only)No. of Antenna in use: Antenna 1Antenna 2Antenna 3MakeN/AN/AN/AModelN/AN/AN/AFrequency SupportedN/AN/AN/AFrequency in UseN/AN/AN/ATotal Number of PortsN/AN/AN/AAntenna Base Height (m)N/AN/AN/AAzimuth (degrees)N/AN/AN/AG900G18003GG900G1800G900G1800No. of Feeders installedN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AMechanical TiltN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AElectrical TiltN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/APole informationLength (m):N/ALength (m):N/ALength (m):N/ARemarks:

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013

NEW POLE/ANTENNA/RRU/GRRU INFORMATIONSector 1Sector 2Sector 3New pole required for GRRU N/AN/AN/AAvailable Height for new GRRU Pole (m)N/AN/AN/AAvailable Height for new GRRU (m)N/AN/AN/ANew pole required for 3G Single Band AntennaN/AN/AN/ANew Single band antenna for 3G requiredN/AN/AN/AAvailable Height for new 3G Antenna Pole (m)N/AN/AN/AAvailable Height for new 3G Antenna (m)N/AN/AN/AAvailable Azimuth for new 3G Antenna (degree)N/AN/AN/ANew pole required for RRUN/AN/AN/AAvailable Height for new RRU Pole (m)N/AN/AN/AAvailable Height for new RRU (m)N/AN/AN/ARemarks:-EXISTING AIRTEL EQUIPMENT ON SITE:NO AIRTEL EQUIPMENT2G BTS VendorN/ANo. Of BTS cabinetsN/ABTS ModelsN/ABTS Footprint 1.

(L x W) in Mtr 2.N/ABTS input VoltageN/ARectifier (-48V available)N/AN/ABaseband unit detailsN/ARF unit detailsN/A3G BTS VendorN/ABTS ModelN/ANodeB Footprint (L x W) in MtrN/ABTS input (-48V DC, 220V AC)N/ACapacity of MCB usedN/ARectifier (-48V available)N/ABaseband unit detailsN/ARF unit detailsN/AOther available boards and cables with quantity: 1N/A5N/A9N/A2N/A6N/A10N/A3N/A7N/A11N/A4N/A8N/A12N/ARemarks:-

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013

EXISTING WARID EQUIPMENT ON SITE2G BTS VendorHUAWEIBTS Model3900ABTS input power -48 V DCNo. Of APM30 cabinet available1APM30 TYPEDCCAPACITY OF MCB USED100A

No. Of RFC cabinet available1No. Of BBU available1No. Of DDPU available0No. Of GRFU available3No. Of DRFU available0No. Of DTRU available0No. Of GRRU available0No. Of DRRU available0No. Of DCOM available03G BTS VendorN/ABTS TypeN/AWBBP versionN/ANo. Of RRU available0Capacity of MCB usedN/AEMUA availableN/AOther available boards and cables with quantity: 1UPEU5N/A2UPEU6N/A3N/A7N/A4N/A8N/ARemarks:-NEW 2G GRRU INSTALLATION On TowerN/AOn PoleN/AOn WallN/AOn StandN/AOthersN/ABBU and GRRU Connection Fiber (CPRI)Length(m):N/AQuantity(PCS):N/AJumper (1/2 Flexible)ScenariosFeeder:N/AJumper:N/ALength (m):N/ADC Power Cable For RRU:Length(m):N/AQuantity(PCS):N/APGND Cable Length For RRU (m):Length(m):N/AQuantity(PCS):N/ASpace available for CPRI (fiber) and power cables on the Horizontal & Vertical Cable Trays: N/ASpace available for CPRI (fiber) and power cables in the entry plate (window):N/AOther Material Needed (grounding kit, etc):-Available RRU Pole Length (m)Sector 1Sector 2Sector 3900180090018009001800N/AN/AN/AN/AN/AN/ARemarks:-

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013

NEW 3G RRU INSTALLATIONOn TowerN/AOn PoleN/AOn WallN/AOn StandN/AOthersN/ABBU and GRRU Connection Fiber Length(m):N/AQuantity(PCS):N/AJumper (1/2 Flexible)ScenariosFeeder:N/AJumper:N/ALength (m):N/ADC Power Cable For RRU:Length(m):N/AQuantity(PCS):N/APGND Cable Length For RRU (m):Length(m):N/AQuantity(PCS):N/ASpace available for CPRI (fiber) and power cables on the Horizontal & Vertical Cable Trays: N/ASpace available for CPRI (fiber) and power cables in the entry plate (window):N/AOther Material Needed (grounding kit, etc):N/ASector 1Sector 2Sector 3Available RRU Pole InformationLength(m)N/ALength(m)N/ALength(m)N/ARemarks:-EXTERNAL ENVIRONMENT ALARMTelemetry system available: NOAlarm DDF available: YES(Inala type equipment) Alarm Wired: YESIf Alarm Not Wired, check the feasibility and specify: List of Alarms Wired1N/A2N/A3N/A4N/A5N/A6N/A7N/A8N/A9N/A10N/A11N/A12N/A13N/A14N/A15N/A16N/ARequired Alarm Cable Length (m):Required Alarm Cable Quantity (PCS):Remarks:THE ALARMS ARE TERMINATED WELL BUT NOT LABELLEDEVALUATIONHuawei EvaluationPerfectGoodNormalRejectedCustomer EvaluationAcceptedRejectedReason:Approved By:Huawei EngineerDate:Customer EngineerDate:SURVEY PARTICIPANTSNamePositionTelEmailKIZYA GILBERTENGINEER0700850240

LayoutSite Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013

Sketch Maps of Installation Space

---Site layout output (existing BTS, NodeB(BBU,RRU), Power, TX cabinet location, cable tray layout, feeder cable layout, IF cable layout, RF antenna height, MW antenna height, power cable layout, TX cable layout, free spaces on site)

Note:1. The Plot Size must be mentioned in the site layout for all sides. 2. All elements should have dimensions. 3. Distance between all elements should be measured and mentioned accurately.Equipment Type

Installation Space:

YesIndoor Space Enough

NoNeed New Slab

YesSpace Availibility

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____

Proposed new equipment layout: (BTS/NodeB/RRU/BBU/RF & MW Antennae/MW ODU/Pole/Feeder/IF cable/RRU power cable/RRU optical cable)

New Slab Required: New Slab/Slab Extension Size (L x W) in mtr: Horizontal Cable Tray Required:Vertical Cable Tray Required:Length of cable tray required (HCT+VCT) in mtr:Cable Tray length required inside Shelter in mtr:Remarks:

Notes:

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____31-Dec-99New Equipment Slab Layout

Notes:

Pana

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____Panoramic View from top of Tower (every 45 degrees)

Notes:

0 Degrees

45 Degrees

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____0Panoramic View

Notes:

90 Degrees

135 Degrees

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____0Panoramic View

Notes:

180 Degrees

225 Degrees

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____0Panoramic View

Notes:

270 Degrees

315 Degrees

Equipment

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013

1. Equipment room-sketch map or outdoor site equipments layout2. Dimension of indoor room / slab / all units or elements and the space between them3. Proposed cabling routeEquipment room and Site layout-photos (with comments to explain)

Notes:

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013Equipment room and Site layout-photos (with comments to explain)

Notes:

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013Equipment room and Site layout-photos (with comments to explain)

Notes:

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013Equipment room and Site layout-photos (with comments to explain)

Notes:

Cabinet

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013Cabinet internal layout: Sub-rack layout output( Rectifier location, MW IDU location, TRX module location, environment function location, DDF location, Battery location, power convertor location. And all function module connections)

Notes:

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013Cabinet internal layout

Notes:

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013Cabinet internal layout

Notes:

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013Cabinet internal layout

Notes:

Sector Photos

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013Antenna Installation Location View: Sector 1

Notes:

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013Antenna Installation Location View: Sector 2

Notes:

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013Antenna Installation Location View: Sector 3

Notes:

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013

Notes:

Transmission

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013External & Internal View of The Transmission Equipment

Notes:

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013

Notes:

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013

Notes:

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013

Notes:

Power Equipment

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013External & Internal View of The Power Supply Equipment

Notes:

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013External & Internal View of The Power Supply Equipment

Notes:

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013External & Internal View of The Power Supply Equipment

Notes:

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013External & Internal View of The External Alarm Box

Notes:

Alarm Box

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013External & Internal View of The External Alarm Box

Notes:

Tower Photos

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013Tower Photos

Notes:

ROOFTOP POLES

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013Horizontal & Vertical Cable Tray

Notes:

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013EGB & IGB (Grounding Bar)

Notes:

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013

Notes:

Others

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013

Notes:

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013

Notes:

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013

Notes:

Site Survey Report for BTS/NodeBSurveyor: KALA/GILBERTApproved: _____03/11/2013

Notes: