Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
RFworks
CONFIDENTIAL © Air Connect Engineering (Thailand) Co., Ltd.
CONFIDENTIAL© Air Connect Engineering (Thailand) Co., Ltd. Slide No. 2
OurRFServices
CONFIDENTIAL© Air Connect Engineering (Thailand) Co., Ltd. Slide No. 3
Programexperience
CONFIDENTIAL© Air Connect Engineering (Thailand) Co., Ltd. Slide No. 4
WeproposeDrivetesttoolsandPostprocessingtoolsdependoncustomers’sdemand.
SonyXZ2SonyXZs
SonyXZPremiumLGNexus5XSamsungS5SamsungS6
SamsungS6edgeSamsungNote4SamsungNote5SamsungS7SonyLT25SonyW995
RFTools
CONFIDENTIAL© Air Connect Engineering (Thailand) Co., Ltd. Slide No. 5
Scanner Version
TSML GW 900/850/2100
0611 WCDMA900/2100 Ex MINI
6119 WCDMA 850/2100
6001 WCDMA 2100
6001 WCDMA 2100 CX Mini 4110
WCDMA 850 / 2100 CX MINI
RFTools PostProcessing
PCTELibFLEXSpecialScannerwithMIMOMultiband850/900/1800/2100MHzSupportGSM,UMTS,LTETechnology/ Support2100MHz, 1800MHz, 900MHz, 850MHzSupportCrossborderPowerLevelVerificationpereachMCC- atthesametimescan
CONFIDENTIAL© Air Connect Engineering (Thailand) Co., Ltd. Slide No. 6
Project ExperiencesCustomers
Ericsson/ DTACBenchmarkingMultiVendorProject Y2014 - Y2016
Huawei/DTACBenchmarkingMultiVendorProject Y2012-Y2013
DTACIBCBenchmarkingProjectY2008
AISE2EIBCBenchmarkingProjectY2007-Y2012
MfoneNationwideBenchmarkingProjectY2012
BenchmarkingExperiences
CONFIDENTIAL© Air Connect Engineering (Thailand) Co., Ltd. Slide No. 7
ProjectsinThailandYear2011- Currently
� Thailand Project Network Optimization Year 2011 – 2019
� Thailand TI Service Project (North East) Start Year 2019
� 2017 L1800&L2100 Radio Network (2CA Phase 2)
� 2017 LTE Radio Network (LTE Coverage Improvement)
� 2017LTERadioNetwork(4x4MIMO Macro)
� 2017-LTERadioNetwork(Q118CapacityExpansion)
PartnerSinceYear2011
CONFIDENTIAL© Air Connect Engineering (Thailand) Co., Ltd. Slide No. 8
ProjectsinThailand Year2011- Currently
� 2016 Q1 Expansion Test-Q1 2016 Cluster Test + Report for AISSSV Test + SSV Report for AIS
� AIS UTRAN 2016 & 2015 Q1&Q3 Cluster Test + Report for AISSSV Test + SSV Report for AIS
� 2016 3G900-Radio Network (New Community) Drive Test� AIS UTRAN 2016& 2015 Q1&Q3 2015 Phase Strategic Tower -Drive Test
� 2016 3G900 Radio Network (Coverage Improvement Phase2)� 2016-LTE2100 Radio Network (Q4 Capacity Expansion Phase 2)
� 2016-LTE900 Radio Network (Q3 Capacity Expansion)� 2016-LTE2100 Radio Network (Q4 Capacity Expansion Phase 1)
� 2016-LTE2100 Radio Network (Q3 Capacity Expansion)� 2016-LTE1800 Radio Network (Q4 Capacity Expansion Phase 1)
� 2016 LTE1800 RADIO NETWORK (MAIN ROAD COVERAGE)� 2016 LTE1800 RADIO NETWORK (Q.3 ADDITIONAL)
� 2016 LTE1800 Q3 BATCH5� 2015Q1&Q3 capacity expansion-network optimization-optimized site-NER
CONFIDENTIAL© Air Connect Engineering (Thailand) Co., Ltd. Slide No. 9
� TRUETKEASProject� NBTCQoSAuditProject� DTACPostOptimization Project� TRUETK SouthProject� DTACTDDRolloutProject� DTACTDDInstallationserviceBMAProject� DTACTDDEastProject� AISOptimizationServiceLowerNorthEastProject
� AISOptimizationServiceCentralProject
ProjectsinThailandYear2018- Currently
CONFIDENTIAL© Air Connect Engineering (Thailand) Co., Ltd. Slide No. 10
� DTACPostOptimizationProject(6teams)North,CentralandSouthregion
� TrueGSM/UMTS/LTEClusterOptimizationSouthernregion
ProjectsinThailandYear2008- Currently
� LTE2100/1800andUMTS2100/850DTACRolloutProjectClusterDriveTestandOptimization(PAT– FAC)
� DtacDriveTestRentalNorth/NorthEastProject� TRUETurnkey(EAST)
� GSM900/3G2100/LTE1800/LTE2100TMVProjectatNortheastIncludedCVT,ClusterDriveTestandOptimizationuntilPAT
PartnerSince2008
PartnerSince2014
CONFIDENTIAL© Air Connect Engineering (Thailand) Co., Ltd. Slide No. 11
} DTACMVPostOptimizationproject:drivetestmanpowerservice15teams} 3G2100/LTE2100TMVproject:NortheastregionincludedCVT,ClusterdrivetestandOptimizationuntilPAT
} 3G2100RealFutureProject:Provide8DTteamrental includeDTToolatEast.} 3G2100RealFutureProject:Provide6 DTteamrental includeDTToolatEast.} 3G2100RealFutureProject:Provide7 DTteamrental includeDTToolatBMA.} LTE900AISProject:Provide7DTteamincludeCVTandClusterOptimizationBMA
ProjectsinThailandYear2014- 2015
} DTACFEMTOProject:Provide4teamssupportInstallation,CommissioningandWalktestbeforeandafterinstallation
} DTACPostOptimizationProject:Provide6DTteamsatNortheast,CentralandSouth.
CONFIDENTIAL© Air Connect Engineering (Thailand) Co., Ltd. Slide No. 12
} 2GTMV2GAISClusterDriveTestandOptimizationuntilPAT:AISNortheastBTSReplacement(137+sites)
} ExistingNetworkEvaluation:TMVBKK(250+sites)} AIS LTETrialClusterDrivetest(18+sites)} 3G850TMVinBKKincludedCVT,ClusterDrivetestandOptimizationuntilPAT(100+sites)
} 3G850TMVinEastincludedCVT,ClusterDrivetestandOptimizationuntilPAT(100+sites)
} 3G850TMVinNortheastincludedCVT,ClusterDrivetestandOptimizationuntilPAT(100+sites)
ProjectsinThailand Year 2011
} 3GAIS900ClusterDriveTestandOptimizationBKK(80sites)} 2GAIS900ClusterDriveTestandOptimizationBKK(60sites)} 2GAIS900ClusterDriveTestandOptimizationEast(135sites)
CONFIDENTIAL© Air Connect Engineering (Thailand) Co., Ltd. Slide No. 13
ProjectsinThailandYear2008- 2013
} 3G850DTACatNortheastincludedSSV,ClusterDrivetestandOptimizationuntilPAT(900+sites)
} 2G1800DTACSwapoutatNortheastincludedCVT,ClusterDrivesTestandOptimizationuntilPAT(1500+sites)
} 3G850TMVatEastincludedCVTClusterDriveTestandOptimizationuntilPAT(480+sites)
} 3G850TMVatNortheastincludedCVT,ClusterDrivetestandOptimizationuntilPAT(100+sites)
} DTACMVPostOptimizationprojectDriveTestmanpowerservice15teams(1year)
} DTACCWtest50sitesfor3G850ModelTuningtool
} AIS3G2100ClusterDriveTestPh.F2DrivetestandOptimizationNeortheast
} AIS3G2100ParameterTuningClusterDrivetestPh.F2CNortheast
} 3GAIS900ClusterDriveTestandOptimizationNEregion(90sites)
} 3GAIS900SinglesiteVerificationPh.F2CNortheast(30sites)
} 2GAIS1800ClusterDrivetestandOptimizationCentral(27sites)
} 3GAIS900ClusterDrive
} CWTest
CONFIDENTIAL© Air Connect Engineering (Thailand) Co., Ltd. Slide No. 14
ProjectsinThailandYear 2008- 2010
CONFIDENTIAL© Air Connect Engineering (Thailand) Co., Ltd. Slide No. 15
} ProvideNetworkPlanning(Y2007)} Provide“ACE”RepeaterInstallation(Y2007)} Camshin:provideRadioNetworkPlanningTool(Y2007)
} TigerTeam:DriveTestwithRigger(Year2017topresent)} Huawei:SeatelSSVDrivetest(StartFebruary2019)} Huawei:SmartMWExpansionPhase14.1(Start March 2019)} Huawei:WTTxSSVTest&Datacollection(includeSSVreportpreparation)Year2018(300+sites)
} Beelineproject:clusterdtforpre-swap(Year2017)} BenchmarkingPPSEATEL:WirelessLTENetworkOptimizationtest(Year2017)
} CellcardDEMO4Gproject(SSVandCluster)Year2017} ViettelDemo4Gproject(SSVandCluster)Year2017} Seatel:FDD-LTEDTforCluster(Year2016)
ProjectsinCambodia
CONFIDENTIAL© Air Connect Engineering (Thailand) Co., Ltd. Slide No. 16
Project inSingapore Project inLaos
Project inMalaysia Project inPhilippines
LTCWCDMAPh.4ClusterDriveTestandOptimizationYear2010(30sites)
LTC WCDMA Ph. 5Cluster Drive Test and OptimizationYear 2010 (200sites)
CONFIDENTIAL© Air Connect Engineering (Thailand) Co., Ltd. Slide No. 17
ProjectsinAsiaYear 2008- 2010
CONFIDENTIAL© Air Connect Engineering (Thailand) Co., Ltd. Slide No. 18
Workexperiences
CONFIDENTIAL© Air Connect Engineering (Thailand) Co., Ltd. Slide No. 19
DriveTestService